1 ADDENDUM #4 WAKULLA COUNTY BOARD OF COUNTY COMMISSIONERS Invitation to Bid DATE: March 31, 2011 PROJECT NAME: New Light Church Road Widening and Resurfacing The purpose of this Addendum is to provide the following clarification: 1) Since there is no Structural component to this project, the Prime Contractor IS NOT required to be a General Contractor. This supersedes the previous clarification provided on March 23, ) Daytime lane closures are not prohibited. Please see the revised Sheet 102. TECHNICAL QUESTIONS CAN BE DIRECTED TO: Alan Wise, Preble-Rish wisea@preble-rish.com (phone) (fax) ADDITIONAL CONTACTS: Deborah DuBose ddubose@mywakulla.com (phone) (fax)

2 NEW LIGHT CHURCH ROAD PRI PROJECT # SECTION BIDDER S QUALIFICATION STATEMENT BIDDER S QUALIFICATION STATEMENT The undersigned guarantees the truth and accuracy of all statements and answers herein contained. Include additional sheets if necessary. Print in ink or type all answers. CONTRACTORS proposing to be qualified to perform the Work are advised that they must address each item of this sheet, giving full descriptions of the material and equipment that they propose to furnish. Any information omitted will be sufficient reason for refusal to qualify. All Contractors or the appropriate subcontractor shall be prequalified with FDOT in the following work groups: Drainage Flexible Paving Grading Grassing, Seeding, & Sodding Hot Plant-mixed Bituminous Courses Pavement Markings A copy of the Contractor s Qualifications Letter must be attached to the bid. Failure to do so may result in the Board deeming the bid non-compliant, subjecting it to disqualification. STATEMENT OF EXPERIENCE OF BIDDER The Bidder is required to state below what work of similar magnitude is a judge of his experience, skill and business standing and of his ability to conduct the work as completely and as rapidly as required under the terms of the contract. Project and Location Reference BIDDERS QUALIFICATION PAGE 1 OF 4

3 4. 5. Dated Bidder By Experience 1. How many years has your organization been in business? 2. Have you ever failed to complete the work awarded to you within the specified contract time in the last five (5) years? If so, where, when, and why? Attach sheet, if necessary. 3. Give names, addresses, and telephone numbers of three (3) individuals or corporations for which you have performed work and that can be contacted as a reference. Attach sheet, if necessary. 4. Complete the table below as fully as possible, describing projects similar in character and scope to the Work specified herein and which have been successfully completed during the past three (3) years. BIDDERS QUALIFICATION PAGE 2 OF 4

4 Location and Type of Work OWNER Name/City Consulting Engineer Year Completed Contract Price General 5. Describe your present workload. Do you have project underway which might interfere with the start of this Work and completion on schedule? 6. List all past litigations or arbitrations for the past five (5) years and final outcome. Fully describe the circumstances (use additional sheets if necessary). BIDDERS QUALIFICATION PAGE 3 OF 4

5 7. Are you presently involved in any litigations or arbitration? If so, describe fully the circumstances and dollar amounts associated with litigation. Attach sheet, if necessary. 8. Use the following space to give a summary of the Financial Statement of your organization. (List assets and liabilities for the past five (5) years, and use additional sheet if necessary): 9. Has your corporation(s) been declared insolvent and/or had the bond pulled on a project? 10. State the true and exact, correct, and complete name under which you do business. BIDDER IS: (Signature) (Name) (Title) (Company) (date) BIDDERS QUALIFICATION PAGE 4 OF 4

6 R/W LINE { CONST. R/W LINE WORKZONE LEVELING COURSE & WIDENING VARIES CHANNELIZING DEVICE PER INDEX VARIES LIMITS OF CONSTRUCTION WIDENING VARIES :4 20 Existing Roadway Pavement 1:4 Natural Ground Natural Ground 1:4 TO EDGE OF CLEAR ZONE & 1:3 FOR FILLS 18 TO TOE TYPICAL SECTION CR 373A STA TO STA GENERAL NOTES 1. POSTED SPEED SHALL BE 45 MPH DURING WORK PERIODS. 2. INDEX 602 MAY BE USED FOR SHOULDER WORK. 3. ALL LANES MUST BE REOPENED TO NORMAL TRAFFIC WITHIN 12 HOURS OF AN EVACUATION NOTICE FOR A HURRICANE OR ANY OTHER EMERGENCY EVENT AND SHALL REMAIN OPEN FOR THE DURATION OF THE EVENT AS DIRECTED BY THE PROJECT ADMINISTRATOR. 4. NO WORK THAT WOULD CAUSE TEMPORARY LANE CLOSURES WILL BE PERFORMED ON HOLIDAYS OR SPECIAL EVENTS. 5. AT THE DISCRETION OF THE ENGINEER, IF A LANE CLOSING CAUSES EXTENDED CONGESTION, THE CONTRACTOR SHALL BE DIRECTED TO REOPEN THE CLOSED LANE UNTIL SUCH TIME AS TRAFFIC FLOW HAS RETURNED TO AN ACCEPTABLE LEVEL. 6. THE TRAFFIC AND TRAVEL WAYS SHALL NOT BE ALTERED TO CREATE A WORK ZONE UNTIL ALL LABOR AND MATERIAL ARE AVAILABLE FOR THE CONSTRUCTION IN THAT AREA. DATE DESCRIPTION REVISIONS DATE DESCRIPTION PREBLE-RISH, INC. CONSULTING ENGINEERS AND SURVEYORS CIVIL SURVEYING SITE PLANNING 36 JASPER THOMAS ROAD (850) CRAWFORDVILLE, FL FDBPR CERT. OF AUTHORIZATION No ENGINEER OF RECORD: ALAN WISE, P.E. No ROAD NO. CR373A WAKULLA COUNTY COUNTY PROJECT ID WAKULLA TRAFFIC CONTROL PLAN SHEET NO. 102 mimsj 3/29/2011 7:23:45 AM S:\ New Light Church Road\203081ms\roadway\TCPLRD01.DGN