Transnational Skill Standards Foreman Electrical Works (Construction)

Size: px
Start display at page:

Download "Transnational Skill Standards Foreman Electrical Works (Construction)"

Transcription

1 Transnational Skill Standards Foreman Electrical Works (Construction) REFERENCE ID: TOS/CON/Q0102

2 Mapping for Foreman Electrical Works (Construction) (CON/Q0604) with UK Qualification NVQ Level 3Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) Link to Indian Qualification Pack: Link to UK Qualification: NA How to Read this Document This document has two sections - Section I and Section II. Section I: Compares the listing in the Indian QP -Foreman Electrical Works with Installation Electrician /inuk Qualification NVQ Level 3. Section II: Compares the competencies described in each of the Indian with those of UK. The language of the compared competencies of the two countries differs. However, the competency pointers of the described competency can be mapped. Wherever the competency pointer maps it is reported as underthe column Gap in Indian. Wherever the competency pointers do not map with the pointers or scope and range, it is identified as a gap and the corresponding UK competency is noted under the column Gap in Indian. Usage of Benchmarked Transnational Standards There will be two types of users of these benchmarked standards. One type will be of those individuals who are already trained and are certified on the corresponding Indian QP. This set of individuals will have to undergo a bridge course comprising of the identified gaps only. Thereafter, they will be assessed under the aegis of a UK Awarding body through the Indian SSC on the competency portions acquired via the bridge course. All qualifying individuals will be awarded a co-branded certificate comprising of logo of Skill India, Indian SSC and UK Awarding Body. Those individuals who wish to be certified afresh will have to undergo training on both the Indian QP and the gaps in the Indian with regard to UK competencies. Thereafter, they will be assessed under the aegis of a UK Awarding body through the Indian SSC and they will obtain a co-branded certificate comprising of logo of Skill India, Indian SSC and UK Awarding Body. 1

3 Section I: Mapping of Foreman Electrical Works (Construction) QP (CON/Q0604) with the Installation ElectricianLevel 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) in UK Mapping: A Summary Indian Code CON/N0613 CON/N0613 Indian Conduct permanent wiring, maintenance work in buildings Conduct permanent wiring, maintenance work in buildings UK Code SUMET04 SUMET05 UK Install enclosures for electrical cables, conductors and wiring systems Install and connect electrical cables, conductors, wiring Remarks, if any Two of UK are covered in one Indian CON/N0612 Establish electrical connections during erection of plant and heavy construction machineries SUMET06 systems and equipment CON/N0611 CON/N0612" "Monitor regular electrical works (installation, maintenance and repairing) at a construction site Establish electrical connections during erection of plant and heavy construction machineries" SUMET07 Inspect and test electrical systems and equipment Two of Indian are covered in one UK CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a construction site SUMET08 Commission electrical systems and equipment CON/N0613 Conduct permanent wiring, maintenance work in buildings SUMET09 Identify and rectify faults in electrical systems and equipment CON/N9002 Manage workplace for safe and healthy work environment SUMBSE01 Maintain electrical systems and equipment 2

4 Mapping: A Summary Indian Code CON/N8001 CON/N8002 Indian "Work effectively in a team to deliver desired results at the workplace Plan and organize work to meet expected outcomes UK Code SUMBSE02 UK Apply health and safety and environmental legislation in the building services engineering sector Remarks, if any Four of Indian are covered in one UK CON/N8003 Supervise, monitor and evaluate performance of subordinates at workplace CON/N9002 Manage workplace for safe and healthy work environment" CON/N8003 CON/N0611 Supervise, monitor and evaluate performance of subordinates at workplace Monitor regular electrical works (installation, maintenance and repairing) at a construction site SUMBSE03 Establish and maintain relationships in the building services engineering sector Two of Indian are covered in one UK 3

5 Section II:Compares the competencies in Indian Conduct permanent wiring, maintenance work in buildings (CON/Q0613) with those of UK Install enclosures for electrical cables, conductors and wiring systems (SUMET04). Mapping Descriptions Indian QP Title Foreman Electrical Works (Construction) UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) Indian QP Code CON/Q0604 UK Qualification Code NA Indian Code CON/N0613 UK Code SUMET04 Indian Conduct permanent wiring, maintenance work in buildings UK Install enclosures for electrical cables, conductors and wiring systems Scope This scope covers the following: Calculate material requirement from drawing specifications or as per customer requirement following standard practice Conduct installation/ maintenance of wiring, electrical fixtures, and equipment as per requirement /specification ensuring safety of equipment Overview This standard is for people who install enclosures for electrical cables, conductors and wiring systems internally and externally. The person carrying out this work must be able to comply with the procedures and methods for installing enclosures for electrical cables, conductors and wiring systems in accordance with the current versions of the appropriate 4

6 Scope Overview industry standards and regulations, the specification, industry recognised working practices, the working environment and the natural environment. They must know and understand the different types of enclosures for electrical cables, conductors and wiring systems, their limitations, applications and the techniques for the positioning, fitting, fixing and connection of the enclosures, their components and accessories. 5

7 Competency Mapping: Thefollowingtable, the Indian maps with the UK SUMET04 Install enclosures for electrical cables, conductors and wiring systems UK. Performance Criteria - Indian To be competent, the user/individual on the job must be able to- PC1. go through electrical drawing, guidelines to ascertain electrical requirement of the work to be undertaken PC2. calculate electrical material requirement considering customer requirement and preferences or standard requirements of home electrical systems as per standard practice if drawing / diagram is not available PC3. derive list of electrical equipment and fixtures to be used in circuits/electrical systems from drawing for considering power rating of the equipment PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice PC5. prepare and document asbuilt drawing of temporary and permanent embedded electrical lines/ connection in order to be available in the final as built drawing PC6. monitor and ensure wall chasing work as per standard procedure prior to laying Performance Criteria - UK You must be able to- P1 confirm the existing electrical supply is suitable for the electrical system P2 confirm before work starts that the work location and work area can be accessed safely and has been checked for the risk to other personnel on the site, and take appropriate action if a risk is present P3 produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment P4 verify that job information and documentation is current and relevant and that the plant, instruments, access equipment and tools are fit for purpose P5 select enclosures and confirm that they are: P5.1 of the right type and size P5.2 fit for purpose in accordance with the electrical system s design P6 determine at the outset, that the plans for positioning and fixing the components and accessories of the selected Gaps w.r.t to Scope and Range in Indian 6

8 Performance Criteria - Indian conduit PC7. conduct conduit laying for RCC structures and ensure specification of conduits are as per requirement PC8. conduct cable laying through conduit and ensure right specification of cables are being used considering electrical voltage/ load requirement PC9. conduct/ carry out concealed, exposed, electrical wiring work as per standard method and customer s requirement PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical wiring or pre-installed units PC11. fix complex electrical fixtures, installs fire alarm systems as per requirement Performance Criteria - UK enclosures are in accordance with: P6.1 the electrical system s design P6.2 manufacturers instructions P7 comply with industry practices and organisational procedures to ensure the coordination of site services and the activities of other trades P8 identify the correct means of electrical isolation prior to commencing installation work P9 complete the correct safeisolation procedures, as and when required, to ensure the safe installation of the enclosures P10 measure and mark out the locations for fitting and fixing the selected enclosures components and accessories in accordance with: P10.1 the electrical system s design P10.2 manufacturers instructions P11 fit, fix and connect the selected enclosures its components and accessories in accordance with: P11.1 the electrical system s design P11.2 industry recognised methods P11.3 manufacturers Gaps w.r.t to Scope and Range in Indian 7

9 Performance Criteria - Indian Performance Criteria - UK instructions Gaps w.r.t to Scope and Range in Indian PC12. conduct/ carry out earthing of installed electrical circuit as per standard method and using standard earthing components PC13. conduct required tests/ inspections as and when necessary to ensure safe working of electrical circuits or to determine any fault in the circuit PC14. suggest suitable methods of maintenance of a part of electrical circuit and conduct/ carry out maintenance work as per requirement adhering specification of parts and general electrical guidelines PC15. change parts, fixture, wirings as per requirement P12 confirm with the relevant people: P12.1 those necessary variations to the planned programme of work that may have the potential to introduce a hazard and/or impact on the installation work to be undertaken P12.2 the correct actions to be undertaken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum impact on the installation work to be undertaken P13 implement organisational procedures for the safe transport and/or disposal of waste materials, substances and liquids in accordance with suppliers and manufacturers instructions 8

10 Performance Criteria - Indian PC16. carry out basic maintenance of household equipment like water pump, motor etc. Knowledge & Understanding Indian Performance Criteria - UK Knowledge & Understanding UK Gaps w.r.t to Scope and Range in Indian A. Organizational Context KA1. standard practices for conduct permanent wiring and maintenance work KA2. safety rules and regulations for handling and storing required electrical tools, equipment and materials KA3. personal protection including the use of related safety gears & equipment KA4. how to request for tools and materials as per set procedures maintenance of tools and equipment B. Technical Knowledge KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works K1 the operation, applications, advantages and limitations of different electrical systems K2 the appropriate industry standards and regulations relevant to installing enclosures K3 how to produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment, in accordance with: K3.1 the electrical system s design K3.2 organisational procedures K4 how to verify that job information and documentation is current and relevant and that the plant, instruments, access equipment and tools are fit for purpose K5 the applications, advantages and limitations of types of personal protective equipment 9

11 Performance Criteria - Indian KB2. statutory guidelines provided by ISI for LV wiring operations KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement KB4. classification of fire and use of fire protection devices KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice KB7. how to estimate required material quantity from electrical drawings KB8. acceptance criteria of electrical materials, devices, fixtures and protective arrangements Performance Criteria - UK K6 the applications, advantages and limitations of types of enclosures K7 the industry recognised methods for determining the type and size of enclosures K8 how to interpret diagrams and drawings for the electrical system to locate site services K9 how to interpret diagrams and drawings for the electrical system to identify the planned location of the enclosures K10 the methods and techniques for fitting, fixing and connecting the selected enclosures and their components and accessories in accordance with: K10.1 the electrical system s design K10.2 manufacturers instructions K11 the correct procedures for safe isolation K12 the organisational procedures for confirming with the relevant people the appropriate actions to be taken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum negative impact on the installation work to be Gaps w.r.t to Scope and Range in Indian 10

12 Performance Criteria - Indian Performance Criteria - UK undertaken Gaps w.r.t to Scope and Range in Indian KB9. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices KB10. principles of electrical theory as applied to electrical circuits and wiring systems KB11. properties of different components used in electrical earthing work KB12. acceptance criteria of material to be used during performing earthing work KB13. current tentative market rate of common electrical items KB14. common brands and their products KB15. customer preferences regarding brands and trends KB16. right procedure for handling electrical fixtures KB17. standard practice of joining, termination and color coding of cables and wires KB18. concept of electrical isolation procedures and their applications in LV electrical works KB19. use of circuit breakers and its replacement K13 the methods for the safe transport and/or disposal of waste material, substances and liquids in accordance with suppliers and manufacturers instructions 11

13 Performance Criteria - Indian KB20. use of ladders, scaffolds during working/ performing electrical works KB21. basic maintenance of common household equipment KB22. use of electrical power tools and their maintenance KB23. use of measuring and diagnostic tools in electrical circuits KB24. standards procedure of storing, stacking electrical tools and equipment KB25. computer basics MS Office, Internet, KB26. basic arithmetic and use of calculator KB27. methods and techniques of inspection that are approved by the organization KB28. calibration of equipment and authorization procedures as per the organization policy KB29. calibration schedule of equipment and machineries Performance Criteria - UK Gaps w.r.t to Scope and Range in Indian General Note: In the Construction SSC, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs 12

14 Section II continued:compares the competencies in Indian Conduct permanent wiring, maintenance work in buildings (CON/N0613) with the UK Install and connect electrical cables, conductors, wiring systems and equipment(sumet05). Mapping Descriptions Indian QP Title Foreman Electrical Works (Construction) UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) Indian QP Code CON/Q0604 UK Qualification Code NA Indian Code CON/N0613 UK Code SUMET05 Indian Conduct permanent wiring, maintenance work in buildings UK Install and connect electrical cables, conductors, wiring systems and equipment Scope This scope covers the following: Calculate material requirement from drawing specifications or as per customer requirement following standard practice Conduct installation/ maintenance of wiring, electrical fixtures, and equipment as per requirement /specification ensuring safety of equipment Overview This standard is for people who install and connect electrical cables, conductors, wiring systems, equipment, accessories and components. The person carrying out this work must be able to comply with the procedures and methods for installing and connecting electrical cables, conductors, wiring systems, equipment, accessories and components in 13

15 Scope Overview accordance with with the current versions of the appropriate industry standards and regulations, the specification, industry recognised working practices, the working environment and the natural environment. They must know and understand the different types of cables, conductors, wiring systems, equipment, accessories and components, their limitations, applications and the techniques for their positioning, fitting, fixing and connection. 14

16 Competency Mapping: Thefollowingtable, the Indian maps with the UK SUMET05 Install and connect electrical cables, conductors, wiringsystems and equipment UK. Performance Criteria - Indian To be competent, the user/individual on the job must be able to- PC1. go through electrical drawing, guidelines to ascertain electrical requirement of the work to be undertaken PC2. calculate electrical material requirement considering customer requirement and preferences or standard requirements of home electrical systems as per standard practice if drawing / diagram is not available PC3. derive list of electrical equipment and fixtures to be used in circuits/electrical systems from drawing for considering power rating of the equipment PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice PC5. prepare and document asbuilt drawing of temporary and permanent embedded electrical lines/ connection in order to be available in the final as built drawing Performance Criteria - UK You must be able to- P1 confirm the existing electrical supply is suitable for the electrical system P2 produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment P3 verify that job information and documentation is current and relevant and that the plant, instruments, access equipment and tools are fit for purpose P4 select the associated equipment, accessories and components and confirm that they are: P4.1 of the right type and size P4.2 fit for purpose in accordance with the electrical system s design P5 select electrical cables, conductors, wiring systems and confirm that they are: P5.1 of the right size and type P5.2 fit for purpose in accordance with the electrical system s design Gaps w.r.t to Scope and Range in Indian 15

17 Performance Criteria - Indian PC6. monitor and ensure wall chasing work as per standard procedure prior to laying conduit PC7. conduct conduit laying for RCC structures and ensure specification of conduits are as per requirement PC8. conduct cable laying through conduit and ensure right specification of cables are being used considering electrical voltage/ load requirement PC9. conduct/ carry out concealed, exposed, electrical wiring work as per standard method and customer s requirement PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical wiring or pre-installed units Performance Criteria - UK P6 comply with industry practices and organisational procedures to ensure the coordination of site services and the activities of other trades P7 identify the correct means of electrical isolation prior to commencing installation and connection work P8 complete safe-isolation as and when required to ensure the safe installation and connection of electrical cables, conductors and wiring systems and their associated equipment, accessories and components P9 install, fix and connect electrical cables, conductors and wiring systems and their associated equipment, accessories and components in accordance with the requirements of: P9.1 the electrical system s design P9.2 industry recognised methods P9.3 manufacturers instructions P10 check that the connections and joints of the electrical cables, conductors and wiring systems and their associated equipment, accessories and components are of proper construction as regards to conductance, insulation, mechanical strength and protection, and ensure that they are identified correctly and Gaps w.r.t to Scope and Range in Indian 16

18 Performance Criteria - Indian PC11. fix complex electrical fixtures, installs fire alarm systems as per requirement PC12. conduct/ carry out earthing of installed electrical circuit as per standard method and using standard earthing components PC13. conduct required tests/ inspections as and when necessary to ensure safe working of electrical circuits or to determine any fault in the circuit PC14. suggest suitable methods of maintenance of a part of electrical circuit and conduct/ carry out maintenance work as per requirement adhering specification of parts and Performance Criteria - UK clearly in accordance with the requirements of the electrical system P11 confirm with the relevant people: P11.1 those necessary variations to the planned programme of work that may have the potential to introduce a hazard and/or impact on the installation work to be undertaken P11.2 the correct actions to be taken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum impact on the installation to be undertaken P12 implement organisational procedures for the safe transport and/or disposal of waste material, substances and liquids in accordance with suppliers and manufacturers instructions Gaps w.r.t to Scope and Range in Indian 17

19 Performance Criteria - Indian general electrical guidelines Performance Criteria - UK Gaps w.r.t to Scope and Range in Indian PC15. change parts, fixture, wirings as per requirement PC16. carry out basic maintenance of household equipment like water pump, motor etc. Knowledge & Understanding Indian Knowledge & Understanding UK A. Organizational Context KA1. standard practices for conduct permanent wiring and maintenance work KA2. safety rules and regulations for handling and storing required electrical tools, equipment and materials KA3. personal protection including the use of related safety gears & equipment KA4. how to request for tools and materials as per set procedures maintenance of tools and equipment K1 the operation, applications, advantages and limitations of different electrical systems K2 the appropriate industry standards and regulations relevant to installing and connecting electrical cables, conductors, wiring systems, associated equipment, accessories and components K3 how to produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment, in accordance with: K3.1 the electrical system s design K3.2 organisational procedures K4 how to verify that job information and documentation is current and relevant, and that the plant, instruments, access equipment and tools are fit for 18

20 Performance Criteria - Indian Performance Criteria - UK purpose Gaps w.r.t to Scope and Range in Indian B. Technical Knowledge KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works KB2. statutory guidelines provided by ISI for LV wiring operations KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement KB4. classification of fire and use of fire protection devices KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice K5 the applications, advantages and limitations of types of personal protective equipment K6 the applications, advantages and limitations of types of electrical cables, conductors, wiring systems, associated equipment, accessories and components K7 the industry recognised methods for determining the type, size and rating of electrical cables, conductors, wiring systems, associated equipment, accessories and components in relation to the electrical system s design K8 how to interpret diagrams and drawings for the electrical system to locate site services K9 how to interpret diagrams and drawings for the electrical system to identify the planned location of the electrical cables, conductors, wiring systems, associated equipment, accessories and components K10 the methods and techniques for installing, fixing and connecting electrical cables, conductors, wiring systems, associated equipment, accessories and components in 19

21 Performance Criteria - Indian KB7. how to estimate required material quantity from electrical drawings KB8. acceptance criteria of electrical materials, devices, fixtures and protective arrangements KB9. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices KB10. principles of electrical theory as applied to electrical circuits and wiring systems KB11. properties of different components used in electrical earthing work KB12. acceptance criteria of material to be used during performing earthing work Performance Criteria - UK accordance with: K10.1 the electrical system s design K10.2 manufacturers instructions K11 the different types and methods of joining and connecting electrical cables, conductors, wiring systems, their applications, advantages and limitations K12 the correct procedures for safe-isolation K13 the organisational procedures for confirming with the relevant people the appropriate actions to be taken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum negative impact on the installation work to be undertaken K14 the methods for the safe transport and/or disposal of waste material, substances and liquids in accordance with suppliers and manufacturers instructions Gaps w.r.t to Scope and Range in Indian 20

22 Performance Criteria - Indian KB13. current tentative market rate of common electrical items KB14. common brands and their products KB15. customer preferences regarding brands and trends KB16. right procedure for handling electrical fixtures KB17. standard practice of joining, termination and color coding of cables and wires KB18. concept of electrical isolation procedures and their applications in LV electrical works KB19. use of circuit breakers and its replacement KB20. use of ladders, scaffolds during working/ performing electrical works KB21. basic maintenance of common household equipment KB22. use of electrical power tools and their maintenance KB23. use of measuring and diagnostic tools in electrical circuits KB24. standards procedure of storing, stacking electrical tools and equipment KB25. computer basics MS Office, Internet, Performance Criteria - UK Gaps w.r.t to Scope and Range in Indian 21

23 Performance Criteria - Indian KB26. basic arithmetic and use of calculator KB27. methods and techniques of inspection that are approved by the organization KB28. calibration of equipment and authorization procedures as per the organization policy KB29. calibration schedule of equipment and machineries Performance Criteria - UK Gaps w.r.t to Scope and Range in Indian General Note: In the Construction SSC, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs 22

24 Section II continued:compares the competencies in Indian Establish electrical connections during erection of plant and heavy construction machineries(con/n0612) with the UK Inspect and test electrical systems and equipment (SUMET06). Mapping Descriptions Indian QP Title Foreman Electrical Works (Construction) UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) Indian QP Code CON/Q0604 UK Qualification Code NA Indian Code CON/N0612 UK Code SUMET06 Indian Establish electrical connections during erection of plant and heavy construction machineries UK Inspect and test electrical systems and equipment Scope This scope covers the following: Organize resources prior to taking up electrification of heavy machineries Conduct electrification of heavy plant & machineries such as batching, hot mix plant, tower cranes, diesel generators, transformers Overview This standard is for people who inspect and test electrical systems and equipment The person carrying out this work must be able to comply with the processes and procedures for initial and periodic inspection and testing of an electrical system in accordance with the current versions of the appropriate industry standards and regulations, the specification, industry recognised working practices, the working 23

25 Scope Overview environment and the natural environment. They must know, understand and apply the correct methods and procedures for the inspection and testing of electrical systems and equipment, including the: identification and use of the correct instruments completion of the relevant documentation recording of relevant data and information. Competency Mapping: Thefollowingtable, the Indian maps with the UK SUMET06 Inspect and test electrical systems and equipment UK. Performance Criteria - Indian To be competent, the user/individual on the job must be able to- PC1. read manufacturer s guidelines to ascertain electrical requirement of the machinery to be installed PC2. prepare material requirement from electrical drawing/ diagram if available with machinery as per standard practice PC3. derive specification of electrical materials to be used in Performance Criteria - UK You must be able to- P1 confirm a programme of work with the relevant people in accordance with organisational procedures P2 determine and obtain the resources required, as relevant, to undertake: P2.1 initial inspection and testing P2.2 periodic inspection and testing P3 select the instruments to be used for carrying out the Gaps w.r.t to Scope and Range in Indian 24

26 Performance Criteria - Indian circuits/ electrical systems Performance Criteria - UK relevant tests Gaps w.r.t to Scope and Range in Indian PC4. pass material requirement to senior authority after checking with material availability at store PC5. perform visual inspection of available material in terms of their specification and physical condition PC6. coordinate with superiors for allocation of desired manpower PC7. provide inputs in planning and preparing work schedules required to complete the erection PC8. check for completion of required preparatory works and availability of safety devices at workplace, prior to starting installation works P4 confirm that the instruments are fit for purpose and have a current calibration certificate P5 conduct a visual inspection on the enclosures for cables, conductors and wiring systems to confirm they are: P5.1 located and secured correctly P5.2 electronically and mechanically sound P6 conduct a visual inspection on the electrical cable, conductor and wiring systems to confirm they are: P6.1 located and secured correctly P6.2 identified and/or labelled correctly P7 conduct a visual inspection on the equipment, accessories and components to confirm they are: P7.1 located and secured correctly P7.2 identified and/or labelled correctly P8 comply with industry practices and organisational procedures to ensure the coordination of site services and the activities of other trades affected by: P8.1 the inspection process and procedures 25

27 Performance Criteria - Indian Performance Criteria - UK P8.2 the testing process and procedures Gaps w.r.t to Scope and Range in Indian PC9. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical units PC10. inspect electrical panel, transformers to ensure conformance to manufacturer s specification, compatibility of devices, power ratings of devices to be connected adhering electrical safety norms PC11. erect electrical panel as power source if required and get it activated PC12. conduct and carry out electrical connection works between machinery and power source PC13. install earthing arrangement and protective devices at appropriate locations as per manufacturer s guidelines PC14. ensure safe joining (straight through joint as per applicability), and termination P9 identify the correct means of electrical isolation prior to commencing the inspection and/or testing process P10 complete safe-isolation as and when required to ensure the safe inspection and testing of electrical cables, conductors and/or wiring system and the associated equipment, accessories and components P11 perform the tests in the correct sequence that ensure safe and efficient operation of the electrical system P12 comply with organisational procedures for: completion of the relevant documentation P12.2 the recording of relevant data and information P12.3 informing relevant people P12.4 addressing issues and problems 26

28 Performance Criteria - Indian of cables as per standard practice PC15. conduct required electrical tests using appropriate measuring and diagnostic devices to ensure safe and desired working of machineries PC16. conduct trial run and required tests to ensure safe working of plant and machineries PC17. check panels, transformers, machineries for factors responsible for electrical distribution system failure like loose connections/ parts, moisture, line disturbance, defective/ inadequate insulations, short circuiting, collision, overloading, dust/dirt or oil accumulation and other possible unsafe acts PC18. conduct preventive maintenance to electrical panels and electrical machineries parts as and when necessary PC19. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace PC20. prepare field reports, hand sketches etc. as and when necessary for documentation of related works Performance Criteria - UK Gaps w.r.t to Scope and Range in Indian 27

29 Knowledge & Understanding Indian A. Organizational Context KA1. standard practices for establishing electrical connections during erection of plant and heavy construction machinery KA2. safety rules and regulations for handling and storing required electrical tools, equipment and materials KA3. personal protection including the use of related safety gears & equipment KA4. how to request for tools and materials as per set procedures maintenance of tools and equipment B. Technical Knowledge KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works KB2. statutory guidelines provided by ISI for LV wiring operations Knowledge & Understanding UK K1 the operation, applications, advantages and limitations of different electrical systems K2 the organisational procedures to confirm a programme of work with the relevant people K3 how to determine and obtain the resources required, as relevant, to undertake: K3.1 initial inspection and testing K3.2 periodic inspection and testing K4 how to select the instruments to be used for carrying our relevant tests K5 how to confirm that the test instruments are fit for purpose and have a current calibration certificate K6 the methods and procedures for conducting a visual inspection on the enclosures for cables, conductors and wiring systems to confirm they are: K6.1 located and secured correctly K6.2 electrically and mechanically sound 28

30 Performance Criteria - Indian KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as er requirement KB4. classification of fire and use of fire protection devices KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice KB7. how to estimate required material quantity from electrical drawings KB8. sequencing of electrical works to be carried out Performance Criteria - UK K7 the methods and procedures for conducting a visual inspection on the electrical cable, conductor and wiring systems to confirm they are: K7.1 located and secured correctly K7.2 identified and/or labelled correctly K8 the methods and procedures for conducting a visual inspection on the equipment, accessories and components to confirm they are: K8.1 located and secured correctly K8.2 identified and/or labelled correctly K9 the industry practices and organisational procedures to ensure the co-ordination of site services and the activities of other trades affected by: K9.1 the inspection process and procedures K9.2 the testing process and procedures K10 the correct procedures for safe-isolation K11 the methods and processes to carry out correctly the tests that ensure safe and efficient operation of the electrical system K12 the organisational procedures for: Gaps w.r.t to Scope and Range in Indian 29

31 Performance Criteria - Indian depending upon requirement of construction works KB9. acceptance criteria of electrical materials, devices, fixtures and protective arrangements KB10. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices KB11. principles of electrical theory as applied to electrical circuits and wiring systems KB12. complex electrical circuits including schematics, SLDs, etc. KB13. area of application & specification of electrical protective devices KB14. correct alternative use of electrical parts if required one is unavailable KB15. detailed concept of 3 phase connections and its distribution at construction sites KB16. detailed concept of AC and DC circuits, their properties and area of application KB17. concept about safe procedure of troubleshooting in Performance Criteria - UK K12.1 completion of the relevant documentation K12.2 the recording of relevant data and information K12.3 informing relevant people K12.4 addressing issues and problems identified Gaps w.r.t to Scope and Range in Indian 30

32 Performance Criteria - Indian 3 phase connections Performance Criteria - UK Gaps w.r.t to Scope and Range in Indian KB18. concept of working principle and components of electrical panels and transformers and generators KB19. operational characteristics of electrical panels and power distribution through the same KB20. concept of electrical isolation procedures and their applications in LV electrical works KB21. advance troubleshooting in electrical panels, transformers and generators KB22. working principle and connection of AC single phase and AC three phase motors, submersible pumps and their maintenance KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer starter KB24. line and phase voltage, current and power in a 3 phase circuits with balanced and unbalanced load KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc. KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by ELCB and relay, etc. 31

33 Performance Criteria - Indian KB27. use of electrical power tools and their maintenance KB28. use of measuring and diagnostic tools in electrical circuits KB29. standards procedure of storing, stacking electrical tools and equipment KB30. computer basics MS Office, Internet, KB31. basic arithmetic and use of calculator KB32. methods and techniques of inspection that are approved by the organization Performance Criteria - UK Gaps w.r.t to Scope and Range in Indian General Note: In the Construction SSC, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs 32

34 Section II:Compares the competencies in Indian Establish electrical connections during erection of plant and heavy construction machineries (CON/N0612) with the UK Commission electrical systems and equipment (SUMET07). Mapping Descriptions Indian QP Title Foreman Electrical Works (Construction) UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) Indian QP Code CON/Q0604 UK Qualification Code NA Indian Code CON/N0611 UK Code SUMET07 Indian Monitor regular electrical works (installation, maintenance and repairing) at a construction site UK Commission electrical systems and equipment Scope This scope covers the following: Monitor and check wiring / connections for LV works at a construction site. Conduct installation/ maintenance of construction equipment and machineries. Overview This standard is for people who commission electrical systems and equipment The person carrying out this work must be able to comply with the processes and procedures for the commissioning and handing over of an electrical system and equipment in accordance with the current versions of the appropriate industry standards and regulations, the specification; industry 33

35 Scope Overview recognised working practices, the working environment and the natural environment They must know, understand and apply the correct methods and procedures for the commissioning and handing over the electrical system and equipment including the: identification and use of the correct instruments completion of the relevant documentation recording of relevant data and information identification and consideration of the customer s need for electrical systems and equipment configuration planning of the resources required to carry out the commissioning process 34

36 Competency Mapping: Thefollowingtable, the Indian maps with the UK SUMET07 Commission electrical systems and equipment UK. Performance Criteria - Indian To be competent, the user/individual on the job must be able to- PC2. check and ensure materials, fixtures and devices being used in repairing or maintenance works are ISI certified PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools PC16. prepare schedule of maintenance for common equipment and machineries such as motor, bar cutting/ bending machines, vibratos, tower cranes etc.pc16. prepare schedule of maintenance for common equipment and machineries such as motor, bar cutting/ bending machines, vibratos, tower cranes etc. CON/N0612: Establish electrical connections during erection of plant and heavy construction machineries Performance Criteria - UK You must be able to- P1 identify the customer/client s requirements P2 plan the commissioning process P3 determine and obtain the resources required to undertake the process Gaps w.r.t to Scope and Range in Indian 35

37 Performance Criteria - Indian PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements PC11. supervise electrical works by providing instructions, directions ensuring completion of the same within specified time as per applicable schematics, specification, guidelines and safety norms PC8. carry out troubleshooting and take immediate actions in case of emergency repairing requirements related to short circuit or malfunction in wiring systems, temporary electrical panels or lighting arrangements CON/N0612: Establish electrical connections during erection of plant and heavy construction machineries PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements PC4. check & ensure that lighting arrangements and its components are in safe condition working properly PC5. conduct periodical checks/ tests to insulation, joints, physical condition and termination of wires and cables Performance Criteria - UK P4 ensure methods and organisational procedures are implemented correctly P5 verify that the customer/client s requirements are met P6 resolve any problems identified P7 specify methods and organisational procedures which conform with customer/client requirements P8 confirm that conditions are suitable for commissioning to take place Gaps w.r.t to Scope and Range in Indian 36

38 Performance Criteria - Indian to ensure safe working of wiring systems PC18. take necessary steps or report to concerned authorities on observing any hazardous conditions at work place PC19. ensure erection of safety signage and barricading, surrounding the faulty or electrically hazardous equipment/ locations to avoid unsafe conditions PC20. carry out checks for adverse situation like vicinity of water, fire prior, during and after establishing any electrical system at regular intervals CON/N0612: Establish electrical connections during erection of plant and heavy construction machineries PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures Performance Criteria - UK P9 complete the commissioning process P10 record and assess information in accordance with organisational procedures P11 ensure that the results are recorded in the appropriate information systems and passed to the relevant people Gaps w.r.t to Scope and Range in Indian 37

39 Performance Criteria - Indian PC22. ensure occurrence of trial run and obtain clearance from respective authority relevant to electrical works prior to leave any equipment for working PC25. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc. SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor PC22. ensure occurrence of trial run and obtain clearance from respective authority relevant to electrical works prior to leave any equipment for working Performance Criteria - UK P12 ensure that the electrical system and equipment is ready for hand over to the customer/client P13 identify and explain any variations P14 obtain customer/client acceptance of the electrical system and equipment in accordance with organisational procedures Gaps w.r.t to Scope and Range in Indian 38

40 Performance Criteria - Indian SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc. SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor Knowledge & Understanding Indian KB11. principles of electrical theory as applied to electrical circuits and wiring systems KB12. understand working principle of complex electrical circuits and manufacturer's guidelines/ specifications of repairing KB15. correct alternative use of electrical parts if required one is unavailable KB16. detailed concept of 3 phase connections and its distribution at construction sites KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works KB2. statutory guidelines provided by ISI for LV wiring operations Performance Criteria - UK P15 ensure that all relevant documentation is correctly completed and recorded in the appropriate information systems in accordance with organisational procedures Knowledge & Understanding UK K1 the operation, applications, advantages and limitations of different electrical systems K2 the requirements for the commissioning process Gaps w.r.t to Scope and Range in Indian KB3. electrical safety norms 39

41 Performance Criteria - Indian as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system KB7. how to estimate required material quantity from electrical drawings KB10. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices KB7. how to estimate required material quantity from electrical drawings KB35. quality control systems and site documentation procedures for electrical connections KB20. operational characteristics of electrical panels and power distribution through the same KB21. advance troubleshooting in electrical panels, transformers and generators KB22. working principle and connection of AC single phase and AC three phase motors, Performance Criteria - UK K3 the resources required to undertake the commissioning process K4 methods, organisational procedures and systems to: K4.1 record and assess information K4.2 ensure that the results are recorded in the appropriate information systems and passed to the relevant people K5 the correct methods and organisational procedures for implementing the commissioning process Gaps w.r.t to Scope and Range in Indian 40