COST ESTIMATE STREET IMPROVEMENTS (Off Site)

Size: px
Start display at page:

Download "COST ESTIMATE STREET IMPROVEMENTS (Off Site)"

Transcription

1 STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter LF " Curb only LF 11. Gutter (Adj. To existing curb) LF 6. Cross gutter SF 6. Side walk SF 4. Residential DWY Approach SF 4. Commercial DWY APPROACH SF 5. Handicap ramp EA 1,2. 6" AC Dike LF 1. 8" AC Dike LF 11. AC Pavement/Aggregate Base SF 1.5 AC Pavement/Native SF 1.1 Aggregate base Ton 3. Roadway excavation CY 12. Barricades LS 2,. AC overlay SF.35 Fog seal SF.5 Preparation of subgrade SF.25 Street name signs EA 45. Regulatory signs EA 2. Stop sign EA 275. Guide marker EA 7. Saw cut LF 3. Relocate chain link fence LF 5. Chain link LF 24. AC removal SF.5 Street tree EA 1. Street light EA 4,5. Remove street light EA 1,. Grading (import soil) CT 7. Remove curb and gutter LF 3. Street striping LF.3 AC Street cut repair TN 115. AB Street cut repair TN 8. Cold mill (3,5. +.8/sf) SF.8 Street Improvement (Off Site) Subtotal w/o traffic control during CONST Traffic control during construction (5% of estimated construction cost.) Street Improvement (Off Site) Total Page 1 of 6

2 STORM DRAIN IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: 1// UNIT COST ITEM QUANTITY UNIT AMOUNT () 69" RCP and over LF 66" RCP LF 34. 6" RCP LF " RCP LF " RCP LF " RCP LF " RCP LF " RCP LF " RCP LF " RCP LF 86. Catch basin 7' EA 5,. Catch basin 14' EA 7,. Catch basin 21' EA 15,. Catch basin 28' EA 22,. Junction structure EA 2,5. Manhole No. 2 EA 1,8. Local depression EA 56. Concrete collar EA 2,5. Drainage inlet structure EA 6,. Drainage outlet structure EA 2,5. Transition Structure (DW6 #412) EA 1,2. Grate inlet structure EA 2,1. Parkway culvert EA 6. Headwall (LA STD) EA 5. Crushed rock for Rip Rap. CY 32.5 Concrete collar CY 5. Adjustment manhole to FG LS 6. Connect to existing MH LS 1,5. Reinforced concrete CY 8. Storm Drain Improvement (Off Site) Subtotal Page 2 of 6

3 SANITARY SEWER IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: 1// ITEM QUANTITY UNIT UNIT COST () AMOUNT Manhole6" DIA EA 5,. Manhole48" DIA EA 3,5. Drop Manhole EA 4,5. Wyes EA 1. Clean Out EA 675. Sewer Saddle EA 15. Remodeling Existing Manhole EA 8. Sewer 4" VCP LF 23. Sewer 6" VCP LF 25. Sewer 8" VCP LF 4. Sewer 1" VCP LF 45. Sewer 12" VCP LF 55. Sewer 15" VCP LF 6. Encasement LF 3. Pavement Restoration SF 6.5 Offsite Sanitary Sewer Improvement Subtotal Page 3 of 6

4 TRAFFIC SIGNALS / SIGNS /STRIPING (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: 1// ITEM QUANTITY UNIT UNIT COST () AMOUNT Traffic Signals (Complete)* EA Add Phase to Existing Signal LS Traffic Signal Relocation LS Relocate PB or Adj. Grade EA Traffic Signal Loops EA Striping LF Pedestrian Crosswalk Striping LF Pavement Marker LF Traffic Signals / Signs / Striping Subtotal * Estimated cost shall be 5,. per leg in intersection Page 4 of 6

5 TRAFFIC SIGNALS / SIGNS /STRIPING (Off Site) Page 4 of 6

6 ON SITE IMPROVEMENTS (PRIVATE AREA) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: 1// ITEM QUANTITY UNIT UNIT COST () AMOUNT Curb and Gutter LF 13. Planter curb LF 1.5 Ribbon gutter SF 5. Walkways SF 4. Residential DWY SF 4. Commercial DWY SF 5. AC or PCC pavement SF 1.5 Drainage pipes under 24" LF 5. 48" RCP LF " RCP LF " RCP LF " RCP LF " RCP LF " RCP LF 86. Parking lot drain (Std. 42) EA 3. Chain link fence LF 24. Catch basin EA 5,. Concrete collar EA 1,6. 6' garden wall LF 35. 3' Retaining wall LF 45. 4' Retaining wall LF 55. 5' Retaining wall LF 65. 6' Retaining wall LF 75. 8' Retaining wall LF 1. Sewer main LF 4. Manholes EA 3,5. Cleanout EA 675. Headwall structures EA 1,2. Trash enclosure EA 5,. Onsite total Page 5 of 6

7 FEES Developer: Engineer: Phone No: Planning Case # Tract Map No./Parcel Map No.: Date: 1// OFFSITE Street Improvement (Off Site) Subtotal Storm Drain Improvement (Off Site) Subtotal Sanitary Sewer Improvement Subtotal Traffic Signals / Signs / Striping Subtotal Landscaping (LMD, publicly maintained areas) TOTAL TOTALS Plan checking fee 4% (Reso ) 5. Permit / Inspection fee 4% (Reso ) TOTAL OFFSITE FEE 5. MAP CHECK PM/TR Number No. of lots AMOUNT ONSITE IMPROVEMENTS Site Improvement (Private Area) Landscaping (private areas) Total OnSite improvements TOTALS Plan checking fee 2% (Reso ) Permit / Inspection fee 3% (Reso ) TOTAL ONSITE FEE Page 6 of 6