1 International Conference on Applications of Radiation Science and Technology (ICARST-2017) IAEA Headquarters, Vienna, Austria April /04/2017 IAEA meeting, Warsaw

2 UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA IRRADIATION FACILITY Period GAMMA IRRADIATOR FACILITY AT THE NATIONAL INSTITUTE OF NUCLEAR RESEARCH (ININ) Presented by MIGUEL IRAN ALCÉRRECA SÁNCHEZ Departamento del Irradiador Gamma, ININ México 15/04/2017 IAEA meeting, Warsaw

3 1. ININ s Gamma Irradiation Facility Centro Nuclear de México, Nabor Carrillo Flores 15/04/2017 IAEA meeting, Warsaw

4 Facility designed and built in the end of 1970s AECL irradiator Model JS-6500, container type (boxes). Shielding for a maximum of a million Curies of activity Operation plant began on March 1980 Main commercial approach to the market of the disposable medical products Currently activity greater than 800 kci. Process capacity 1004 containers (boxes)/ day, at 1MCi considering dose delivery between 7 to 16 kgy). 15/04/2017 IAEA meeting, Warsaw

5 2. Upgrading and improvement aspects. Period Quality System Warehouse and Offices Dosimetry Machinery and Equipment Control Console Safety 15/04/2017 IAEA meeting, Warsaw

6 TIMELINE OF UPGRADES AND IMPROVEMENTS PIG ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO QUALITY DOSIMETRY ISO 9001:2000 certification ISO 9001:2008 certification Health license authorization (SSA) Custumer Care audits Dose interval analysis Improved load patterns Incorporation of dose interval of 5 to 10 kgy Dose definition for the catalog of services Improved dose for high density products Dosimetry system calibration (IDAS, NORDION, NIST) Process control & reliability Process control & reliability Process reliability Customer satisfaction Operating costs, capacity and process control Process control Increased processing capacity Operating costs and improved capacity Customer satisfaction Process control and reliable records IDAS IDAS IDAS IDAS IDAS IDAS NORDIONNORDIONNORDION NIST NIST NIST NIST NIST NIST NIST NIST 15/04/2017 IAEA meeting, Warsaw

7 TIMELINE OF UPGRADES AND IMPROVEMENTS PIG ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO WAREHOUSE AND OFFICES Storage building Installation of epoxy floor Construction of the parking warehouse Relocation of administrative area (new offices) Installation leveling ramps store (2 per year) Enlargement of Visitors lobby Process capacity Health and Safety Safety and customer service Improved safety and better customer service Safety and customer care Customer satisfaction 15/04/2017 IAEA meeting, Warsaw

8 TIMELINE OF UPGRADES AND IMPROVEMENTS PIG ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO MACHINERY AND EQUIPMENT Automation, capacity increase and Operating costs and improved capacity modernization of external conveyors Installation of hydraulic tables in loading Improving occupational safety (Ergonomy) and unloading areas Improved pneumatic source pass conveyor Increased processing capacity (Dose A cylinders, to reduce cycle times incorporation) Reducing cycle time of chain conveyor Increased processing capacity (Dose A (Frequency variator) incorporation) Relocation of compresors and pneumatic Obsolesence, operation cost and electric lines redesing efficiency Incorporation of electric materials handling equipment (electric and manual Improving occupational safety (Ergonomy) fork lift truck ) Process reliablility, electrical efficiency Purchasing Power Plant Emergency and customer satisfaction Purchase and installation of rotary screw Operation costs, process reliability and compressors electrical efficiency Internal Conveyor's Control Electrovalves Obsolesence, operation cost and electric replacement efficiency Purchasing and replacement of Water Obsolesence, operation cost and electric Chiller efficiency 15/04/2017 IAEA meeting, Warsaw

9 TIMELINE OF UPGRADES AND IMPROVEMENTS PIG ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO CONTROL CONSOLE SAFETY Modernization of the irradiator control console JS Fire System Installation Replacement of water filtration plant system Installing video surveillance cameras Confinement of the control room of the irradiator JS Acquisition of radiation detectors (5 Ludlum 44-38, 1 Ludlum 14C, 1 RMS) Improving ozone extraction Replacement of source hoist system Replacement of float level switch Operation costs, process reliability and availability of spare parts Safety Obsolescence and safety improvement Safety improvement Safety improvement Obsolescence and safety improvement Obsolescence and safety improvement Obsolescence and safety improvement Safety improvement 15/04/2017 IAEA meeting, Warsaw

10 Quality System At opening in 1980 a quality assurance was implemented for the plant operations First quality assurance (QA) program, under two rules: 10CFR Part 36 and IAEA Code 50-C-Q. "Modernization Program of the Public Administration " of the Gov. of Mexico, demanded to adopt Total Quality schemes October 18, 2000, starts the process to obtain the ISO 9001:2000 QMS certification that ends in February 2002 Maintenance of the quality management system is a must: The QMS, stays with very good performance indicators endorsed through countless quality system audits and likewise inspections of the National Commission of Nuclear Safety and Safeguards (C.N.S.N.S.). We allow also audits of our customers, and have annual maintenance and recertification audits by the certifying agency (CALMECAC), In 2009 the plant`s QMS was certified with ISO 9001: /04/2017 IAEA meeting, Warsaw

11 Warehouse & offices 15/04/2017 IAEA meeting, Warsaw

12 Dosimetry Dose intervals and service dose catalog.- To establish process specifications and work with dose intervals and not with average dose. From October 2004 a database was developed with information of absorbed dose for selected products Statistical analysis conducted in 2006 in order to know the behavior of dose for groups product of densities (from 0.01 to 0.7 g / cc) Specification limits were defined at + 3σ and -3σ from the average, with a confidence level of 95% of the dose values are within this range 15/04/2017 IAEA meeting, Warsaw

13 Currently it is working with a group of "slightly different catalog dose" and includes now "dose C for high density products Year Dose Interval Process Lower spec Upper spec. cycle (s) (kgy) (kgy) Type A A= Type B B= Type C (low density C= 185 <0.3 g/cc) Type C (high density > 0.3 g/cc) C= Type D 2B Type E 1B + 1C Type F 2C Special Dose -- Higher than 38 kgy -- 15/04/2017 IAEA meeting, Warsaw

14 Loading pattern overlapping 15/04/2017 IAEA meeting, Warsaw

15 Auxiliary facilities and process equipment Current return and load conveyor Original conveyor 15/04/2017 IAEA meeting, Warsaw

16 Source pass conveyor 15/04/2017 IAEA meeting, Warsaw

17 Pneumatic system. New air lines and compressors 15/04/2017 IAEA meeting, Warsaw

18 Control Console. The update was done 100% by ININ engineers, the process lasted 2 years since it avoided to have prolonged process stops during the installations. 15/04/2017 IAEA meeting, Warsaw

19 Physical security of the installation.- The video camera surveillance system installation in Control area and access to the irradiation chamber modified. This project was supported by USA s DOE. Irradiation plant control area before 2010 Irradiation plant control area after /04/2017 IAEA meeting, Warsaw

20 CURRENT SITUATION The ININ gamma irradiation plant, during the last 15 years maintained a great dynamic of continuous operation work. For example in the year of 2013, were attended 7,130 service requests to 382 companies in a wide range of products. The annual preventive maintenance programs have been attended timely and solved the problems of failures with efficient improvement actions and programs 15/04/2017 IAEA meeting, Warsaw

21 PERSPECTIVES Persist in the increase of the installed capacity of the plant, this is still possible programming based on studies of dose ranges in more closed intervals of densities and mixture of sequences in the program. the movement of products through various stages: total external conveyor (transportation) system automation is not yet concluded. The information system of product(which is an own development) will have to continue its updating and evolution in order to include the technological changes implemented for the benefit of our QMS and the satisfaction of the requirements of the users. 15/04/2017 IAEA meeting, Warsaw

22 To Finish The support of our institutional authorities to the Quality Management System (QMS) The commitment to the productivity of the staff working in the Department of the Gamma Irradiator The continuous communication with our clients and with national and international organizations who are users and developers of irradiation technology All the above conditions have been the architects and key factors for the mentioned achievements. 15/04/2017 IAEA meeting, Warsaw

23 Thank you for your attention! 15/04/2017 IAEA meeting, Warsaw