DSC Delivery Sub-Group 19/02/2018

Size: px
Start display at page:

Download "DSC Delivery Sub-Group 19/02/2018"

Transcription

1 DSC Delivery Sub-Group 19/02/2018

2 Agenda Defect dashboard UK Link Release Plan (24 Month Change View) Release 2.0 update XRN4449 PSR Requirements Vulnerable Customer Data Requirements Users to confirm the preferred ing approach Release 3.0 update XRN Reads failing market breaker tolerance to be accepted for correct date following AQ Correction solution option XRN4453 File Format Should Have changes - Discussion and Recommendation on inclusion of change items

3 Agenda (2) New Change Proposals presented to DSC Change Management Committee XRN3656 Change to Meter read validation tolerance Views from DSG XRN4576 Class 4 transfer reads being not visible to shippers in DES Views from DSG Update on actions from 22 nd January DSG meeting AOB R&N POAP CNC Volumes (EON)

4 R&N POAP

5 R&N Platform POAP R&N Platform Overview 14/02/ Jan Feb March April May June July August Sept Oct Nov Dec 2019 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec R1.1/R Release 2 XRN4361 Build & Unit Build & Unit System ing Acceptance ing ing Regress I ion m ing p I m p Release 3 XRN4572 Commercial Contracts, BC Submission & DSC Engagement Commercial Contracts, BC Submission & DSC Engagement Detailed Detailed Build & Unit Build & Unit System System SIT UAT Market Trials Imp SIT UAT Market Trials Imp Future Release UIG Release 4 Option 2 Option 2 MOD Option 2 BER Option 2 Delivery Option 2 MT Option 2 IMP Engagement Governance Detailed Build & Unit System SIT UAT MT Imp Release 5 Engagement Governance Detailed Build & Unit System SIT UAT Imp Minor Release Build MR1.3 Build MR2 Build MR3 Build MR4 Build MR5 CSS XRN4584 Sol Man XRN4378 Data Archival XRN1154 UK Link Programme Decomm XRN1154 RFI Approval RFI Approval Document Approval Document Approval T e s t ing ing Imp Detailed Detailed Imp T e s t ILM Imp Physical Decommissioning Physical Decommissioning Imp BUT BUT Bid Prep Pre Qualification Tender Process Bid Prep Pre Qualification Tender Process OTT Acceptance Acceptance Regression Regression OTF Selecti on of Bid Winner Selecti on of Bid Winner HLD HLD

6 R&N Platform POAP Change Allocation R&N Platform Overview 14/02/ Jan Feb March April May June July August Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec R1.1/R1.2 Release 2 XRN4361 Release 3 XRN Build & Unit Build & Unit System ing Commercial Contracts, BC Submission & DSC Engagement Commercial Contracts, BC Submission & DSC Engagement Acceptance ing ing Detailed Detailed Regress I ion m ing p I m p Build & Unit Build & Unit System System 17 SIT UAT Market Trials Imp SIT UAT Market Trials Imp 18 Inc. Cadent Billing 81x R&N Live Changes Future Release UK Link Programme UIG Release 4 Release 5 Minor Release CSS XRN4584 Sol Man XRN4378 Data Archival XRN1154 Decomm XRN1154 Option 2 Option 2 MOD Option 2 BER Option 2 Delivery Option 2 MT Option 2 IMP RFI Approval RFI Approval Document Approval Document Approval T e s t ing 2 Defect R1.15 & R1.16 (feb18) ing Imp Detailed Detailed Imp T e s t ILM Imp Physical Decommissioning Physical Decommissioning Imp 1 MR/IA BUT BUT Engagement 1 New Env OTT Build Governance MR1.3 14x XRNs with ME 1 1 Acceptance Detailed Build & Unit System SIT UAT MT Imp Regression Build OTF MR2 Engagement Build Bid Prep Pre Qualification Tender Process Bid Prep Pre Qualification Tender Process Acceptance 6 Regression 4x XRNs exist to track MODs that required ROMs (not yet valid CPs) MR3 Governance Build Detailed Build & Unit System SIT UAT Imp MR4 Selecti on of Bid Winner Selecti on of Bid Winner 1 Build HLD HLD 3 MR5 Inc. RAASP & Meter Read Sequencing 7x XRNs remain out for industry sponsorship/approval to reject

7 R&N Platform POAP Release 2 R&N Platform Overview 14/02/18 R1.1/R1.2 Release 2 XRN4361 Release 3 XRN4572 Jan Build & Unit Build & Unit Feb March April May June July August Sept Oct Nov Dec System ing Acceptance ing ing Regress I ion m ing p Commercial Contracts, BC Submission & Detailed Build & Unit DSC Engagement Release 2 Commercial Contracts, BC Submission & Detailed Build & Unit DSC Engagement 2018 I m p System System 17 SIT UAT Market Trials Imp SIT UAT Market Trials Imp 2019 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 81x R&N Live Changes Future Release UK Link Programme UIG Release 4 Release 5 Minor Release CSS XRN4584 Sol Man XRN4378 Data Archival XRN1154 Decomm XRN1154 Option 2 Option 2 MOD Option 2 BER Option 2 Delivery Option 2 MT Option 2 IMP RFI Approval RFI Approval Document Approval Document Approval T e s t ing ing Imp Detailed Detailed Imp T e s t ILM Imp Physical Decommissioning Physical Decommissioning Imp BUT BUT Engagement 4316 Governance Meter Detailed Point Details Report Build & Unit & Sector Breakdown System Report SIT UAT MT Imp XRN Ref Build Build Build 4309 MR1.3 MR2 MR3 Back billing for domestic Build MR4 (SSP) sites needs to be reflect thecorrect adjustment start date Bid Prep Pre Qualification Tender Process Bid Prep Pre Qualification Tender Process OTT 4513 Change to validation of address fields 4514 MIV File Changes for MUR Invoice - CMS 4449 PSR requirements Vulnerable Customer data requirements 3995a Energy Theft Tip-off Service Data Provision 4249 Address Maintenance Solution Engagement Governance Detailed Build & Unit System SIT UAT Imp 4299 Reports required under UNC TPD V16.1 in Nexus (reports required by Mod 520A) Acceptance Acceptance Regression Regression OTF Change Title 4303 Remove n as an allowable value from the.sfn file in Fault corrected field and remove as allowable value from AMT & SAP ISU Amend referral rules for class 2 smaller LSP s b Changes to the upper parameter of the XDO partial refresh file Missing Key Data Item from igt s to Shippers (Plot Number) 4288 DDS/DDU file amendment 3283 Recording of DN Siteworks / New Network Connection Reference in Central systems Selecti of 3386 Create new role for CMS to cover all activities undertaken within a Distribution Bid Network Winner 4248 Quarterly smart metering reporting for HS&E and GDNs 4361 Release 2 Delivery Selecti on of Bid Winner Build HLD HLD MR5

8 R&N Platform POAP Release 3 R&N Platform Overview 14/02/18 R1.1/R1.2 Release 2 XRN4361 Release 3 XRN4572 Jan Build & Unit Build & Unit Feb March April May June July August Sept Oct Nov Dec System ing Commercial Contracts, BC Submission & DSC Engagement Commercial Contracts, BC Submission & DSC Engagement Acceptance ing ing Detailed Detailed Regress I ion m ing p I m p Build & Unit Build & Unit 2018 System System SIT UAT Market Trials Imp SIT UAT Market Trials Imp Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 81x R&N Live Changes Future Release UK Link Programme UIG Release 4 Release 5 Minor Release CSS XRN4584 Sol Man XRN4378 Data Archival XRN1154 Decomm XRN1154 Option 2 Option 2 MOD Option 2 BER Option 2 Delivery Option 2 MT Option 2 IMP RFI Approval RFI Approval Document Approval Document Approval T e s t ing ing Imp Detailed Detailed Imp T e s t ILM Imp Physical Decommissioning Physical Decommissioning Release 3 Imp BUT BUT XRN Ref Engagement Governance Acceptance Detailed Build & Unit System SIT UAT MT Imp Bid Prep Pre Qualification Tender Process Bid Prep Pre Qualification Tender Process Acceptance Regression Regression OTF Change Title 4534 Amendment to RGMA Validation Rules for Meter Asset Installation Date 3667 Provision of Formula Year AQ 4538 Insertion of Maximum Number of Occurrences in Meter Inspection Engagement Date Governance Notice (MID) File New File Level Rejection 4453 File Format Should Have Changes 4454 Cadent Billing - DN Sales (Outbound Services) Build Build Build MR1.3 MR2 MR3 Build MR Introducing IHD (In-Home Display) Installed Status of Failed MOD Amendment to U82 record to include the revised NTS optional tariff rate 4436 Change number of occurances for K13 record for SSMP s Selecti on of Bid 4337 To change the optionality of the Supply Point confirmation reference for the T51 file Winner 4495 Energy Tolerance Rejection code Selecti on of Bid 3656 Read Validation Tolerances Winner 4431 Reads failing market breaker tolerance to be accepted for correct date following AQ Correction 4443 File Format Changes Aug 16 Unique Sites (deferred items from CR252) 4458 Class 4 CSEPS Reconciliation Variance Identification 4486 Meter Type O = Oriffice to be an acceptable value in file formats and reports 4481 Resolution of penny mismatches within invoice supporting information for Core invoices. OTT 4572 Retail & Network Release 3 Detailed Build & Unit System SIT UAT Imp Build HLD HLD MR5

9 Defect Dashboard

10 Defect Summary Stats Stats as per HPQC extract taken at 8am on Monday 19 th February 2018

11 Defect Summary Stats

12 Defect Race Track Release 1.17

13 Release 2 Update

14 XRN4361 UK Link Release 2 - Delivery 7 th February 2018 Overall Project RAG Status Plan/Time Risks and Issues Cost Resources RAG Status G A G G Objective Plan/Time Status Explanation Full project delivery of UK Link Future Release 2 Scope Primary Scope Update The additional request for XRN4449 (Priority Services Code - PSR) has had impact assessment completed and plan defined to design, build and test the 2 reports. No additional costs to Customers Primary Scope System ing in progress and is tracking to plan XRN4449 (PSR) customer testing approach to be agreed with Customers at the DSG meeting on 19 th February 18 Secondary Scope Update XRN4249 Address Management Change Pack rep comments closed out on 14/02. Responses to comments in progress Change is to develop a UK Link solution to apply monthly GB Mailing address updates Data Migration plan to load files since service was stopped continues to be defined through design; options will be presented to DSG The Detailed for Secondary Scope is in progress, definition of the requirements for XRN4249 Address Management Change and XRN4316 Meter Point Details & Sector Breakdown has meant a replan for these 2 internal CRs for the DD & Build phases The replan of XRN4249 & 4316 has been completed (see page 2), there is no impact to AT, PT & RT phases G Risks and Issues Risk that the scope of R2 may change that could result in impacts to the project plan and costs Risk that the design might change for some of the CRs in scope following Change Pack consultation Cost Project delivery costs are tracking to approved budgets Resources Weekly monitoring of SME resources supporting multiple demands (e.g. Future Releases, UIG etc)

15 UK Link Release 2 - Plan Primary Scope Scoping Initiation Delivery Realisation Stage Scope Prioritisation Scope Defined Funding Initiation Analysis and HLD Detailed Build Acceptance Performance Regression Imp. Baseline Plan 07/06/17 25/07/17 09/08/17 Aug 17 Aug 17 20/11/17 29/01/18 18/05/18 18/05/18 22/06/18 29/06/18 (TBC) 30/07/18 Current Plan 07/06/17 11/10/17 10/01/18 13/12/17 16/01/18 29/01/18 (12/01/18) 16/02/18 18/05/18 18/05/18 22/06/18 29/06/18 (TBC) 08/08/18 Secondary Scope Scoping Initiation Delivery Realisation Stage Scope Prioritisation Scope Defined Funding Initiation Analysis and HLD Detailed Build Acceptance Performance Regression Imp. Baseline Plan 07/06/17 25/07/17 07/02/18 NA NA 09/02/18 09/03/18 18/05/18 18/05/18 22/06/18 29/06/18 (TBC) 30/07/18 Current Plan 07/06/17 27/11/17 07/02/18 NA NA 16/02/18 09/03/18 09/03/18 30/03/18 18/05/18 18/05/18 22/06/18 29/06/18 (TBC) 08/08/18 RAG Key Milestones are end dates: Planning/Milestone date to be confirmed Milestone date forecast to be met Milestone date forecast to be at risk Milestone date forecast to be missed Milestone completed

16 UK Link Release 2 XRN PSR Requirements Customer ing Approach

17 Introduction This following slides set out the approach and testing options for customers to assure the CDSP changes for XRN4449 PSR Requirements - Priority Service Customer Data Requirements The aim is for Xoserve to walkthrough the testing options defined For Customers to agree the preferred option to support the testing of this change to allow the R2 project plan to be defined

18 Aims and Objectives The objective of the testing is to provide confidence to customers that the changes introduced by XRN4449 meet the requirements and function as per the agreed design The testing options will cover the input and output files to Shippers, igts and GTs (see appendix 2) and the below business processes: Update Scenario (CNC/ CNR) Re-confirmation scenario (CNF/CFR) Confirmation scenario (CNF/CFR)

19 ing Options Option 1 Xoserve will share their testing evidence with the industry Option 2 A number of representative Customers (e.g. 2 GT, 2 igt and 4 Shippers) participate in testing. Non participating customers will only see test evidence Option 3 All customers wishing to participate in testing can do so but will require controls around the number transactions and MPRNs to be tested. This will be to ensure all testing is completed within the defined testing window

20 ing Options Option Benefit Risk Option 1- Xoserve complete internal testing and share testing evidence to customers Option 2 - Xoserve work with a number of representative customers to complete testing and share test evidence with all customers when completed Minimal Customer Impact Only nominated customers will be able to test their systems and processes with test files Customers will only receive copies of test evidence Customers will be unable to test their systems and business processes as no test files will be issued Customers not participating will only see test evidence and will be unable to use test files to test their systems and business processes Option 3 - ing is open to all customers to send and receive test files. This allows customers to process files in their own systems and test business All customers will be able to test the functionality of their systems as they will be able to send and receive files (simulated file delivery) Customers will need to plan their testing to align to the test window and sync their test plans to ensure successful completion of testing within the agreed window

21 Appendix 1: ing Options Detail Option 1 - Xoserve complete their internal testing and share the evidence will all customers once completed Xoserve will share copies of their own testing evidence with the industry Benefits ing will be completed with minimal customer impact Risks Customers will only receive test evidence and no test files will be issued for customers to test the functionality of their systems and business processes

22 ing Options continued Option 2 - Xoserve work with a number of representative organisations to complete testing and share the test evidence with the wider Industry once completed A number of representative Customers (e.g. 2 GT, 2 igt and 4 Shippers) participate in testing by sending in test files and assuring the evidence of the tests once the files are processed The testing window will run for 2 weeks from the 21 st May 1 st June 2108 with 1 week of contingency from 4th to 8 th June This test window will be for XRN4449 and is subject to the successful completion of R2 UAT. Xoserve will verify test files two weeks before this testing phase commences The assured evidence (with all sensitive data masked) will be shared with all customers Details of the files processing dates within the test window will be confirmed prior to the start of testing. This is to ensure that all required tests can be completed in the agreed test window. All input/outputs files will be issued and shared via password protected . The IX file transfer mechanism will not be used Xoserve will contact all customers in March 18 to confirm their nominated representative Benefits Customers participating will be able to test as they will receive files. Non participants will be able to view the evidence of completed tests Risks Non participants won t be able to test their system functionality because the data in the test files will not be part of their portfolio and they will only see the test evidence and not receive test files

23 ing Options continued Option 3 ing is open to all Industry participants to send and receive test files and process them in their own systems Details are the same as Option 2 except the following: All customers can participate in testing with controls around the number transactions and MPRNs to be tested Xoserve will contact all customers in March 18 to confirm their testing participation Benefits Customers will be able to test the functionality of their systems as they will be able to send and receive files and process them in their systems to test business processes Risks Customers will have to plan their testing to align to the test plan defined, test plans should be synced to ensure they are able to complete their testing in this window

24 Appendix 2 - Impacted File Formats Shipper Files CNF - Confirmation Requests File CNC - Customer Amendment Request File CFR - Confirm Response File CNR - Customer Amendment Response File *CRS Shared Supply Meter Point Confirmation Response Template igt Files IDL igt Daily Delta File IQL igt Quarterly Load File GT Files EDL EDL Daily Load EQL EQL Quarterly Load EWS EWS file to EMWS

25 Release 3 Update

26 Changes proposed for R3 for DSG Discussions The following two changes are proposed for R3 however we require further DSG support: XRN Reads failing market breaker tolerance to be accepted for correct date following AQ Correction solution options discussion XRN4453 File Format Should Have changes - Discussion and Recommendation on inclusion of change items

27 XRN4431 As discussed at previous DSG meetings, the above change is within R3 scope. Solution options have previously been discussed which to date have not been acceptable. Following internal discussions we would like to present the following further option: Submit AQ Correction file with the corrected AQ/SOQ, market breaker failed read and read date Remove the current validation rule to check the market breaker read has previously been received. Is this acceptable? If the AQ Correction is accepted, the market breaker failed read will be validated against the new AQ and loaded for the date provided in the AQ Correction file. Should the read be optional or mandatory? Note: read date would be mandatory if a read is supplied.

28 XRN4431 Circumvent the validation rules around the age of the read but should there be a rule around how far back the read can go? Remove the validations to check the age of the read as due to timings for AQ corrections going live, it could be M+2 months on the read being rejected initially before the read could be submitted. Or limit the read date to six months Read date must be within the Registered Users ownership and must come from the Registered User The read will be used for reconciliation Inner/outer tolerance validation would be applied against the new AQ value. There is no inner tolerance override flag in the AQ correction file, to add the flag would require a file format change or apply the outer tolerance only? Proposed solution is only applied for Class 3 and 4 meter points? Simplifies the solution and significantly reduces testing AQ Correction cannot be cancelled once the reading accepted

29 New Change Proposals presented to DSC Change Management Committee

30 New Change Proposals The following 2 change proposals were presented to Change Management Committee in February. ChMC requested DSG input to recommend or reject the changes XRN3656 Change to Meter read validation tolerance Views from DSG XRN4576 Class 4 transfer reads being not visible to shippers in DES Views from DSG

31 DSG Actions

32 Actions from 22/01 Action Ref Meeting Date Action Owner Status /01/2018 XRN To consider impacted reports if known through the impact assessment. Xoserve Open /01/2018 XRN Share the change that this links to with DSG Xoserve Open /01/2018 XRN Xoserve to add to the agenda on 5th February and bring solution options. Xoserve Open /01/2018 XRN The change is to be issued to the Networks and the Networks to confirm that it can be closed. The communication needs to include impacts. Xoserve and DNs Open /01/2018 XRN4443 / XRN Xoserve to release the list containing the 270 changes and DSG to confirm if there are functional changes that need to be considered within R3.0. Xoserve (RH) Open /01/2018 XRN Xoserve to write out to all Shippers who manage shared supply point contracts to seek views Xoserve Open /01/2018 XRN The number of occurrences this has occurred to be shared. Xoserve to check all the hierarchies have been included within the change. Xoserve /01/2018 XRN Impacted records and files to be communicated. Xoserve Open /01/ /01/ /01/ /01/2018 XRN Analysis from across the industry / Xoserve analysis needs to be completed prior to the 5th February meeting. XRN To issue within a Change Pack For ratifying at ChMC XRN The change needs to be communicated - how the reads will be issued. Update to be provided to DSG on 5th February XRN Recommended either requires sponsorship or should be closed as couldn't gauge the benefit of such a report Xoserve (RH) Xoserve Xoserve Xoserve and ChMC /01/2018 XRN Confirm this is prior to the 'plot' change within Release 2.0 Xoserve Open /01/2018 XRN To define the outputs of the reads - how will Shipper Users know of the reads that have been entered manually Xoserve /01/2018 XRN Further analysis to be completed Xoserve Open /01/ /01/2018 XRN3732 -To be confirmed if required based on RAASP requirements. The industry wants to consider further scenarios to establish if there is a need to deliver this change. XRN4541 Clarification will the removal of the outer tolerance validation be included within the change. Potential to introduce new rejection codes. DSG Xoserve /01/2018 XRN Solution to be explored and assessment whether it can be in R3.0 Xoserve Open /01/2018 XRN Solution to be explored and assessment whether it can be in R3.0 Xoserve Open /01/2018 To request the defect drop be added into the bulletin Xoserve Open Open Open Open Open Open Open Open Open

33 Actions from 05/02 Action Ref Meeting Date Action Owner Status /02/2018 EL to check with Matt Smith and advise KB regarding 2 defects Xoserve Open /02/2018 LC to send list of Primary and Secondary Scope items to BC. Xoserve Open /02/2018 LC to consider the question around sequencing and provide BC with an update. Xoserve Open /02/2018 Customers to confirm training requirements at the next DSG meeting on 19th February DSG Open /02/2018 Customers to confirm preferred testing option for XRN4449 at next DSG meeting on 19th February DSG Open /02/2018 Summary document and change packs to be sent to BC. Xoserve Open /02/2018 File format change document to be sent to BC Xoserve Open

34 AOB

35 CNC Updates