1 FLUXYS STORAGE SERVICES : ISP - SC Shippers Day CREG (June 22 th 2005)

2 Indicative Storage Program (ISP( ISP)

3 ISP LOENHOUT & PSP : INTRODUCTION Indicative Storage Program : first introduction (time frame ) in line with Main Conditions in line with market demand (existing agreements) in line with operational needs Storage Loenhout & Transport Grid (executing OBA Loenhout / balancing grid) mainly in line with GGPSSO

4 LOENHOUT: : SERVICES OFFERING (1) 1. INJECTION CAPACITY SERVICES 4 types of capacity» Peak Injection Capacity Firm» Peak Injection Capacity Interruptible» Non-Peak Injection Capacity Firm» Non-Peak Injection Capacity Interruptible FWD / REV nominations + matching on Storage Connection Point with transport grid 2. STORAGE SERVICE firm storage volume (m 3 (n) and energy)

5 LOENHOUT: : SERVICES OFFERING (2) 3. WITHDRAWAL CAPACITY SERVICES 4 types of capacity» Peak Withdrawal Capacity Firm» Peak Withdrawal Capacity interruptible» Non-Peak Withdrawal Capacity Firm» Non-Peak Withdrawal Capacity interruptible FWD / REV nominations + matching on Storage Connection Point with transport grid

6 LOENHOUT: : SERVICES OFFERING (3) 4. DAY-AHEAD AHEAD MARKET CAPACITY SERVICE offer of non-nominated nominated capacities: injection withdrawal period: : at least 7 successive days date service availability depends on date approval Storage Code by CREG 5. INSURANCE SUPPORT SERVICE support by Fluxys for complementary insurance for gas stored in Loenhout

7 PSP: SERVICES OFFERING (1) 1. LNG STORAGE CAPACITY LNG truck unloading at PSP unloading station LNG Storage 2. SEND OUT CAPACITY Firm capacity Interruptible capacity 3. LNG TRANSPORT By LNG truck (only permitted between LNG TML to PSP) Available 7d/7d - 24h/24h

8 PSP & LOENHOUT: : SERVICES (1) 1. METERING SERVICES (communication of data = hourly monthly) LOENHOUT : Storage Connection Point PSP : Delivery - Redelivery Point Included in basic storage services 2. ALLOCATION SERVICES (communication of data = hourly daily monthly) LOENHOUT : Hourly - Monthly Data PSP : Daily - Monthly Data Included in basic storage services

9 PSP & LOENHOUT: : SERVICES (2) 3. LENDING Fluxys = facilitator for Gas in Storage lending quantity and price to be agreed between lender and borrower 4. AUTOMATIC RESERVATION SYSTEM information on standard services information on available capacity capacity reservation (standard services) information on reserved/booked capacity Available: depending on approval Storage Code

10 LOENHOUT: : MAXIMUM CAPACITIES 1. INJECTION: Firm capacity:» Base:» Peak: m³(n)/h (*) m³(n)/h m³(n)/h m³(n)/h Interruptible capacity» Base:» Peak: m³(n)/h (**) m³(n)/h m³(n)/h * Depending on storage pressure levels (see factors) ** For operational reasons Loenhout + Transport grid balancing 2. STORAGE: m³(n)

11 LOENHOUT: : MAXIMUM CAPACITIES 3. WITHDRAWAL: Firm capacity» Base: » Peak: Interruptible capacity» Base: » Pointe: m³(n)/h (*) m³(n)/h m³(n)/h (**) * Depending on storage pressure levels (see factors) *** For operational reasons Loenhout + Transport grid balancing

12 PSP: MAXIMUM CAPACITIES 1. INJECTION: m³ LNG per day 2. LNG STORAGE: m³(n) 3. SENDOUT CAPACITY: Firm Interruptible* m³(n)/h m³(n)/h m³(n)/h *For operational reason PSP + Transport grid balancing

13 LOENHOUT & PSP: CONTRACT TYPE & DURATION YEARLY CONTRACT Start date: 15 April Loenhout & PSP SHORT TERM CONTRACT Minimum 7 successive days Booking at 15 April before storage season at earliest upto 3 months max Only offered for Loenhout storage Available: at earliest as from 15 April 2006 (On study: fast and reliable capacity simulation)

14 LOENHOUT & PSP: STORAGE SERVICE SUBSCRIPTION (1 1. PRIMARY MARKET : To be signed: Storage Services Agreement Storage Code To reserve capacity: Services Request Forms Automatic Reservation System (ARS) platform 2. SECUNDARY MARKET : Code of Conduct Fluxys = facilitator Organised through Automatic Reservation System (ARS) platform

15 LOENHOUT & PSP: STORAGE SERVICE SUBSCRIPTION (2) SECUNDARY FACILITATION BY FLUXYS : Notification by Storage User to Fluxys of its not used storage capacities on the Primary Market Publication by Fluxys of Shipper s not used capacities on Secondary Market platform Storage capacities transfer agreement between Storage Users Activation by Fluxys of capacity transfer from Selling Storage User to Buying Storage User

16

17 Storage Code (SC) Storage Code Loenhout & Storage Code PSP

18 SC LOENHOUT & PSP: INTRODUCTION Storage Codes : - first introduction by Fluxys of Storage Codes with set of operational rules - in line with Main Conditions (approved in 2004) - in line with existing agreements - mainly in line with GGPSSO - some developments still ongoing

19 SC LOENHOUT & PSP: CAPACITY ALLOCATION 1. YEARLY CAPACITIES Priority Storage Users : pro-rata rata redelivery capacities at Aggregated Receiving Station (Public Distribution) imposed by law Residual capacities : first committed / first served 2. SHORT TERM CAPACITIES first committed / first served 3. DAY AHEAD MARKET CAPACITIES first committed / first served 4. CAPACITIES LIBERATED ON CREG'S REQUEST Allocation by CREG

20 SC LOENHOUT & PSP: CONGESTION MANAGEMENT PROCEDURE TEMPORARY CONGESTION STEP 1: STEP 2: STEP 3: information to CREG (congestion( location / used / not-used capacity + actions already taken by Fluxys) demonstration of future use of applicant(s) requested capacity CREG takes necessary actions if capacity has to be released STEP 4: 45 days after written notification by CREG Fluxys shall release unused capacity based on decision by CREG SUSTAINED CONGESTION Storage Operator shall review allocation rules in consultation with storage users. Rules to be submitted to CREG for approval.

21 SC LOENHOUT & PSP: LNG & NATURAL GAS SPECIFICATION LOENHOUT (H-Gas) NATURAL GAS SPECIFICATIONS AT THE STORAGE CONNECTION POINT» For Injection» For Withdrawal PSP (H-Gas) LNG SPECIFICATIONS AT THE DELIVERY POINT» For Injection NATURAL GAS SPECIFICATIONS AT THE REDELIVERY POINT» For Send Out Publication on Website of Fluxys

22 SC LOENHOUT & PSP: OPERATING PROCEDURES FOR MEASUREMENT AND TESTING GENERAL DESCRIPTION OF METERING ACCURACY OF THE METERING DETAILED DESCRIPTION AND THEORY PROCEDURES FOR CALIBRATION & CHECKING SOFTWARE DESCRIPTION LIST OF INSTRUMENTS

23 SC LOENHOUT & PSP: FUNCTIONING & USE OF THE AUTOMATIC RESERVATION SYSTEM STILL UNDER CONSTRUCTION (DECEMBER 2005) Function & availability Description of ARS Using the ARS:» How to access» Using the web interface

24 SC LOENHOUT & PSP: SECONDARY MARKET Secondary market Fluxys facilitator (see ISP)

25 SC LOENHOUT & PSP: BOOKING PROCEDURE YEARLY STORAGE SERVICES Booking Procedure for Priority Storage Users Booking Procedure for residual capacities PROCEDURE FOR BOOKING OF SHORT TERM STORAGE SERVICES RESERVATION OF STORAGE SERVICES (THROUGH ARS PLATFORM)

26 SC LOENHOUT: : OPERATING PROCEDURE (1) INJECTION/ / WITHDRAWAL NOMINATION RULES (FWD/REV REV) ( nomination rules based on EASEE-GAS CBP) NOMINATION PROGRAMS: - Seasonal program of daily quantities - Weekly program of daily quantities - Daily program of hourly quantities STORAGE FACTORS: - Base - Peak - Interruption - Maintenance Injection & Withdrawal

27 SC LOENHOUT: : OPERATING PROCEDURE (2) MATCHING STORAGE/TRANSPORT NOMINATIONS AT STORAGE CONNECTION POINT Application of lesser rule" NATURAL GAS ALLOCATION RULE deemed to nomination within OBA OBA today +/- 10 TJ (*) Hourly / Daily allocation Hourly / Daily data communication (*) could be reduced depending on approval of balancing agreement t CREG

28 SC LOENHOUT: : OPERATING PROCEDURE (3) GAS & VOLUME IN STORAGE rules for using storage capacity, a.o.:.: - minimum / maximum energy/volume - run off (residual gas at end of contract term) - gas transfers

29 SC LOENHOUT: : OPERATING PROCEDURES (4) NATURAL GAS QUALITY DEFICIENCY AT STORAGE CONNECTION POINT Notifications to be used Acceptance rules

30 SC LOENHOUT: : OPERATING PROCEDURES (5) MAINTENANCE AND TESTING Planned Maintenance Procedures:» Injection period» Withdrawal period Tests» To be agreed upon between storage users and operator Storage Extension Programs» Test of extended capacities and volume to be agreed upon between storage users and operator

31 SC PSP: OPERATING PROCEDURE (1) INJECTION / SEND OUT NOMINATION RULES (FWD/REV REV) ( nomination rules based on EASEE-GAS CBP) NOMINATION PROGRAMS: - Yearly program LNG Trucks - Weekly program of daily quantities - Daily program of hourly quantities STORAGE FACTORS: - Interruption - Maintenance Injection & Send Out

32 SC PSP: OPERATING PROCEDURES (2) ALLOCATION OF LNG AT DELIVERY POINT INJECTION ENERGY / VOLUME ALLOCATION SUM DAILY LNG TRUCK LOADINGS Daily and Monthly Allocation & data Communication ALLOCATION OF GAS AT REDELIVERY POINT SEND OUT ENERGY / VOLUME ALLOCATION Rule: PRO-RATA RATA TO NOMINATIONS BOIL OFF ENERGY / VOLUME ALLOCATION Rule: PRO-RATA RATA TO SUBSCRIBED CAPACITY Daily and Monthly Allocation & data communication

33 SC PSP: OPERATING PROCEDURE (3) GAS & VOLUME IN STORAGE rules for using storage capacity, a.o.:.: - minimum / maximum volume - run off rules - LNG transfer

34 SC PSP: OPERATING PROCEDURES (4) LNG QUALITY DEFICIENCY AT DELIVERY POINT Notifications to be used Acceptance rules GAS QUALITY DEFICIENCY AT REDELIVERY POINT Notifications to be used Acceptance rules

35 SC PSP: OPERATING PROCEDURES (5) MAINTENANCE AND TESTING PLANNED MAINTENANCE PROCEDURES» LNG unloading / injection» Send out TEST SEND OUT» To be agreed upon between storage users and operator

36 SC PSP : LNG TRUCK APPROVAL PROCEDURE STEP 1: STEP 2: STEP 3: STEP 4: STEP 5: PREPARATORY INFORMATION EXCHANGE Information to be submitted by the Storage Operator to the Storage User Information to be submitted by the Storage User to the Storage operator INTERFACE STUDY Document analysis Preliminary LNG Truck/unloading unloading station interface study TRUCK SAFETY INSPECTION UNLOADING TEST & LNG TRUCK APPROVAL TRUCK APPROVAL FOLLOW UP

37 SC PSP : LNG TRUCK WEIGHTING LNG WEIGHTING OF EACH LNG TRUCK before unloading at the Delivery Point PSP after unloading at the Delivery Point PSP For LNG injection ALLOCATION purposes (Injection( Energy/Volume allocation) USE OF WEIGHTBRIDGE OF ZEEBRUGGE LNG TERMINAL DAILY NOTIFICATION OF THE WEIGHT OF EACH LNG LOADING WEIGHTBRIDGE CHECKED AND CALIBRATED ON A YEARLY BASIS

38 THE END