Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer

Size: px
Start display at page:

Download "Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer"

Transcription

1 Line Item Description of Goods Quantity Physical unit Unit Price Desktop Computer Model 1 (without 3839 DVD RW and Front USB) Desktop Computer Model 2 ( with DVD 36 RW and Front USB) Dot Matrix Printer with one printer 1296 ribbon 1KVA Standalone UPS with 3 minutes 1 back up SMF batteries 1 KVA on-line UPS with 4 hours back 21 2 KVA on-line UPS with 4 hours back 6 3 KVA on-line UPS with 4 hours back 43 5 KVA on-line UPS with 4 hours back KVA on-line UPS with 4 hours back 13 1 KVA on-line UPS with 4 hours back 8 15 KVA on-line UPS with 4 hours back 19 2 KVA on-line UPS with 4 hours back 66 Sub Total -1 (Computer and Printer) (S.No 1 to 3)

2 Sub Total - 2 (UPS items with SMF type batteries) (S.No 4 to 12) KVA Standalone UPS with 3 minutes 1 backup Tubular batteries 1 KVA on-line UPS with 4 hours back 21 2 KVA on-line UPS with 4 hours back 6 3 KVA on-line UPS with 4 hours back 43 5 KVA on-line UPS with 4 hours back KVA on-line UPS with 4 hours back 13 1 KVA on-line UPS with 4 hours back 8 15 KVA on-line UPS with 4 hours back 19 2 KVA on-line UPS with 4 hours back 66 Sub Total - 3 (UPS items with Tubular type batteries) (S.No 13 to 21) Supply of Output MCB with MS Enclosure 4 amps 2 pole Supply of Output MCB with Enclosure 63 amps 4 pole Supply of Input MCB with MS Enclosure 1 amps 2 pole

3 Supply of Input MCCB with MS Enclosure 1 amps 3 pole 153 Supply of Output MCB with Enclosure amps 2 pole Supply of Input MCB with Enclosure amps 2 pole Supply of input MCCB with Enclosure amps 4 pole Supply of Input MCB with MS Enclosure 1 amps 2 pole 286 Supply of Output MCB with MS Enclosure 1 amps 2 pole 286 Supply of multi strand fire retardant flexible copper cable with ISI mark of 16sq mm 2 runs, 4sq mm 1 run in PVC rigid pipe with necessary fixing screws, saddle, and fasteners for distributing Mains power to UPS DB Supply of multi strand fire retardant flexible copper cable with ISI mark of 1sq mm 4 runs, 4sq mm 1 run in PVC rigid pipe with necessary fixing screws, saddle, and fasteners for distributing Mains power to UPS DB Supply of multi strand fire retardant flexible copper cable with ISI mark of 1sq mm 2 runs, 4sq mm 1 run in PVC rigid pipe with necessary fixing screws, saddle, and fasteners for distributing Mains power to UPS DB Supply of multi strand fire retardant flexible copper cable with ISI mark of 6sq mm 2 runs, 2.5sq mm 1 run in PVC rigid pipe with necessary fixing screws, saddle, and fasteners for distributing Mains power to UPS DB Copper cable 6sq mm 4 runs, 4sq mm 1 run Supply of multi strand fire retardant flexible copper cable with ISI mark of 6sq mm 4 runs, 4sq mm 1 run in PVC rigid pipe with necessary fixing screws, saddle, and fasteners for distributing Mains power to UPS DB (meters) (meters) 1697 (meters) 4255 (meters) 225 (meters) 7256 (meters)

4 Laying of multi strand fire retardant flexible copper cable with ISI mark of 4 sq mm 2 runs, 2.5 sq mm 1 run in PVC rigid pipe with necessary fixing screws, saddle and fasteners for distributing UPS power to various clients / nodes 7 prints Supply of Aluminum / 4x25 sq mm PVC armoured LTUG cable, in trench, wall with suitable glands and lug for distributing the Power from one block of hospital to other, within the Hospital premises Supply of Aluminum / 2x6 sq mm PVC armoured LTUG cable, in trench, wall with suitable glands and lug for distributing the UPS Power from one block of hospital to other, within the Hospital premises Supply of Aluminum / 2x16 sq mm PVC armoured LTUG cable, in trench, wall with suitable glands and lug for distributing the UPS Power from one block of hospital to other, within the Hospital premises Supply of 4way, Double pole, Mains MCB Distribution Board with phase selector switch to fix 25A/2P MCB flush with wall and making good with earth connection Supply of 4way, Double pole, Mains MCB Distribution Board with phase selector switch to fix 4A/2P MCB flush with wall and making good with earth connection Supply of 8way, Single pole, UPS MCB Distribution board to distribute power through 16A MCB various branch circuit Supply of small junction box with bus bar and MCB control to connect LTUG cable with multi stand flexible wire on wall Supply of 6/1 amps MCB with enclosure 6188 (meters) 968 (meters) 6683 (meters) 4698 (meters)

5 46 47 Supply of good quality PVC box with 15 amps switch and Socket mounted on the wall Supply of good quality PVC box with 3nos of 5amps switch and 3nos of 5amps Socket mounted on the wall (sets) 48 Supply of good quality earth electrode of min 5ft height with copper earth plate, in pit with charcoal and common salt and connecting nuts and bolts / Galaxy earthing electrode with moisture retaining compound 518 (sets) 49 5 Supply of UPS EARTHING CABLE 6sq mm 1 run from earth electrode to the main DB box and UPS system Providing of 12 sweep light AC Exhaust Fan in the UPS room (meters) 77 Providing of 48 AC Ceiling fan with 51 down rod to be fixed in the UPS room to 77 maintain the proper air circulation Supply of isolator 1A / 3 pole changeover switch on wall to change power from main to Gen set wherever necessary Supply of isolator 125 amps / 4 poles Changeover switch on wall to change power from main to Gen set wherever necessary Supply of Isolator 1amps / 3 pole TPN on wall to isolate power from Hospital Main Panel to the UPS room wherever necessary Supply of Isolator 125amps / 3 pole TPN on wall to isolate power from Hospital Main Panel to the UPS room wherever necessary Sub Total - 4 (UPS wiring and components) (S.No 22 to 55) 56 Cat 6 UTP Cable (meters) port L3 managed switch (with 1% standby) port panel I/O outlet switch with SMB 4145

6 6 Patch cord- 1mtr Patch cord- 2mtr Net work rack 42 U(6mm x 8mm) Network rack 12U Network rack 6U Fiber optic cable single mode 6 core 2295 (meters) 66 HDPE pipe 2295 (meters) 67 Single mode converter 1/1/1 (with 1% standby) SC adaptor Patch panel LIU Pigtail cable 1539 (sets) 71 Fiber path cord Networking Service Kit 169 Site preparation Wall Cutting for LAN nos (Locations) cable routing to fix rack) Lumpsum CAT 6 cable laying with conduct / (meters) channel 75 Fiber termination charge (splicing between pigtail cable and fiber cable ) 1539 (Lumpsum charges in units) 76 Laying of fiber cable in HDPE pipe Rack with patch panel fixing charge Digging of earth, tunneling (1 X 1.5mtrs),laying, refilling fixing route markers and fine finish Digging of Tar Road, tunneling (1 X 1.5mtrs), Laying, Refilling, Fixing route makers and fine finish Digging of CC Road, tunneling (1 X 1.5mtrs), Laying, Refilling, Fixing route makers and fine finish (meters) 2 (Labour charges in meters) (Lumpsum charges in units) (Unit rates ion meters The work requirement is not known at present. Hence unit rate is asked) (Unit rates ion meters The work requirement is not known at present. Hence unit rate is asked) 81 Site Survey, route sketching and preparation of reports with BOM for sites having 1 to 1 Network points. 153 (Lumpsum per site)

7 Site Survey, route sketching and preparation of reports with BOM for sites having 11 to 2 Network points. Site Survey, route sketching and preparation of reports with BOM for sites having more than 2 Network points IP Configuration, IP Conflict resolution, recrimping & correction, Rack, Switch and I/O checking, correction and firm fixing after installation and handover sitefor sites having 1 to 1 Network points. IP Configuration, IP Conflict resolution, recrimping & correction, Rack, Switch and I/O checking, correction and firm fixing after installation and handover sitefor sites having 11 to 2 Network points. IP Configuration, IP Conflict resolution, recrimping & correction, Rack, Switch and I/O checking, correction and firm fixing after installation and handover sitefor sites having more than 2 Network points. 14 (Lumpsum per site) 2 (Lumpsum per site) 153 (Lumpsum per site) 14 (Lumpsum per site) 2 (Lumpsum per site) Sub Total - 5 (LAN components, wiring site survey etc) (S.No 56 to 86) Total cost for all items with SMF battery (Computers, Printers, UPS with SMF batteries, UPS wiring, LAN components) without VAT - Grand Total (ST-1 + ST-2 + ST-4 and ST-5) Total cost for all items with Tubular battery (Computers, Printers, UPS with Tubular batteries, UPS wiring, LAN components) without VAT - Grand Total (ST- 1 + ST-3 + ST-4 and ST-5) Total Cost for Price and Completion Schedule - Related Services Projected maintenance costs, for six years including warranty period with SMF batteries Projected maintenance costs, for six years including warranty period with Tubular batteries

8 Total without tax (SMF Batteries) Total without tax (Tubular Batteries)

9

10

11

12

13

14