1 Impact sheets for selected major Temporary Capacity Restrictions (TCR) Foreword On RFC Rhine Alpine we introduce the TCR Impact sheets to present in one glance general and important information about upcoming TCRs. These impact sheets highlight some infrastructure works which have a big impact on international rail freight traffic along RFC Rhine-Alpine. This version 1.0. presents the information in a slightly different way for each country / Infrastructure Manager along RFC Rhine Alpine. Consultation with our customers on the different approaches of presenting these TCR impact sheets will lead to an updated format for this information for timetable Disclaimer: The content of this document has been compiled with meticulous care based on information available at the publication date. However we cannot assume any liability for accuracy and accept no liability for damages suffered as a result of defects of this document. For detailed and complete customer information we kindly refer to the information which is available via the involved national Infrastructure Managers. Further information (e.g. in form of an excel list on all planned TCR) is available on the website of RFC RALP under link: Version 1.0 Publication Date 31st July 2017

2 Impact of Major Temporary Capacity Restrictions TT 2018 on Northern Corridor Part State of play: Section: (1) Amsterdam Meteren (2) Zevenaar - Emmerich (3) Vlissingen Roosendaal (4) Bilzen Montzen (Bassenge-Visé) (5) Bilzen Montzen (Fouron-Remersdael) (6) Emmerich Oberhausen (7) Oberhausen Cologne (8) Cologne Wiesbaden (9) Mannheim Offenburg The content of this document has been compiled with meticulous care based on informations available at the publication date. However we cannot assume any liability for accuracy and accept no liability for damages suffered as a result of defects of this document.

3 Impact of Major Temporary Capacity Restrictions TT 2018 on Southern Corridor Part Section: (10) Node Basel: Gellert Basel RB (11) Bern Domo (mountain line) (12) Bellinzona - Luino (Cadenazzo Pino) (13) Chiasso Milano (14) Luino Novara (Laveno Sesto C.) (15) Luino Novara (Luino-Laveno) 13 The content of this document has been compiled with meticulous care based on informations available at the publication date. However we cannot assume any liability for accuracy and accept no liability for damages suffered as a result of defects of this document.

4 Impact of TCR TT 2018 at ProRail Line section Amsterdam-Meteren (1) Section: Utrecht-Meteren Type: total line closure Period see calendar till and till Type of works: track/sleepers renewal Duration: 52 hours Capacity reduction: 100% Deviation: 10 trains per day to reroute via Utrecht-Arnhem-Emmerich Extra running time for freight trains : ca. 0 min In yearly timetable: yes

5 Impact of TCR TT 2018 at ProRail Line section Zevenaar Emmerich (2) Section: Zevenaar - Emmerich Type: single track/total closure Period: see kalander 2018 Type of works: track building third track Duration: Capacity reduction: 50%/100% Deviation: 50 trains per day to reroute via Venlo Extra running time for freight trains : ca. 90 min In yearly timetable: yes

6 Impact of TCR 2018 at Prorail Line Section Vlissingen/Sloe Roosendaal (3) Section: Vlissingen/Sloe - Roosendaal Type: total Closure Period: till , Type of works: Rail safty system and Refresh all flush walls (2x250m) dry extinguisher Duration: 52 hours Capacity reduction: 100% Extra running time for freight trains : no traffic possible Deviation: Not available In yearly timetable: no

7 Impact of TCR 2018 at Infrabel Line section Bilzen Montzen (4) Section: Bassenge Visé Type: Total Line Closure (TLC): 9/03/18 13/03/ /09/18 and 17-18/11/18 Single track operation (see calendar) Type of works: renewing of bridge and switches Deviation: via Bressoux- Kinkempois Leuven (TLC) Estimated extra running time: tbd Restrictions in train parameters: yes class 66 train weight limited to 1760 ton towards Aachen Restrictions in container profile: yes needs C 60 C390 P 60 P 380 In annual timetable: NO

8 Impact of TCR 2018 at Infrabel Line section Bilzen Montzen (5) Section: Fouron Remersdael Typ: Single track operation Period: 22/10/18 31/03/19 Type of works: Tunnel Veurs draining improvements Deviations: no Estimated extra running time: Not applicable Restrictions for ad-hoc requests might occur Restrictions in train parameters: no Restrictions in container profile: no In annual timetable: YES

9 Impact of TCR 2018 at DB Netz AG Section Emmerich Oberhausen (6) Section: Emmerich -Oberhausen Type of work: Building third track Total closure and single track operation Duration see calendar Deviations total closure operation: diversion via Venlo and Bad Bentheim (depending on the destination of a train) Deviations single track operation: marginal residual capacity during the night available. If no capacity is left, same diversion routes as during total closure operation Detailed information on extra running time is distributed by DB Netz individually for every customer for each affected train. Additionally DB Netz offers train path advice free of charge Restrictions in Container Profile: No restrictions over Venlo and Bad Bentheim In annual TT: YES

10 Impact of TCR TT 2018 at DB Netz AG Section Oberhausen Cologne (7a) Section: Leverkusen Morsbroich Köln Kalk Nord Type: total closure Works: Track Renewal and Noise Barrier Construction Duration : Diversion route via Viersen and Neuss, partially via Altenbeken/Kassel Detailed information on extra running time is distributed by DB Netz individually for every customer for each affected train. Additionally DB Netz offers train path advice free of charge In annual TT: YES Container profile: no restrictions

11 Impact of TCR TT 2018 at DB Netz AG Section /Node Cologne (7b) Section: Köln Südbrücke - Bonntor Type: total closure Type of Works: Track Renewal Duration: Total closure operation Südbrücke Köln Bonntor: Diversion route via left/right Rhine track, Wedau, Neuss, Viersen with change in direction, Altenbeken/Kassel Detailed information on extra running time is distributed by DB Netz individually for every customer for each affected train. Additionally DB Netz offers train path advice free of charge In annual TT: YES Container profile: no restrictions

12 Impact of TCR TT 2018 at DB Netz AG Section Cologne Wiesbaden (8) Section: Troisdorf Bonn Beuel Type of works: Extension of the rail line Troisdorf Bonn Beuel Type: Single track operation / total closure Duration: see calendar Diversion route via left Rhine track and Altenbeken/Kassel Detailed information on extra running time is distributed by DB Netz individually for every customer for each affected train. Additionally DB Netz offers train path advice free of charge Container profile restrictions: Sieg route: 60/390, Ruhr-Sieg-route : 50/380

13 Impact of TCR TT 2018 at DB Netz AG Section Mannheim Offenburg (9) Section: Neu-Edingen Mannheim- Friedrichsfeld Süd Type: single track operation Type of Works: Renewal of the junction building Duration: Deviation via Worms, Mannheim-Rheinau or Heidelberg-Bruchsal (depending on construction phase) Detailed information on extra running time is distributed by DB Netz individually for every customer for each affected train. Additionally DB Netz offers train path advice free of charge In annual TT: YES Container profile: no restrictions

14 Impact of TCR 2018 at SBB Infra/BLS Netz Section Node Basel (10) Basel 3 Olten Brugg Bern Thun Frutigen Brig Domodossola Premosello Borgomanero Vignale Novara SEMPIONE Arona Sesto C. Oleggio S. GOTTARDO Laveno Gallarate Pino T Luino Busto A. B. Rosales Parabiago Rotkreuz Erstfeld Biasca Bellinzona CENERI Mendrisio Chiasso Albate Carimate Seregno Monza Milano Section: Basel RB Gellert Type: Total closure Works: Street tunnel renewal (ASTRA) Period see calendar Diversion route via Basel PB with and inversion route in Basel GB delays and reduction of available capacity Extra running time: max 30 Min Profile restrictions No In annual TT : No Total closure Sa 6pm Mo 3 am

15 Impact of TCR 2018 at SBB Infra/BLS Netz Section Bern Domo (mountain line) (11) Basel Olten Bern Thun Frutigen Brig Domodossola Premosello Borgomanero Vignale Novara Arona Oleggio 2 SEMPIONE Sesto C. S. GOTTARDO Laveno Gallarate Pino T Luino Busto A. B. Rosales Parabiago Brugg Rotkreuz Erstfeld Biasca Bellinzona CENERI Mendrisio Chiasso Albate Carimate Seregno Monza Milano Section: SPIEZ BRIG (mountain line) Type: 1/6 tunnel closure with partially single track Type of Works: Tunnel renewal Period: From 10/06/2018 to 2022 Impact on International Rail Freight Reduction of available capacity; possible delays due speed reduction Possible rerouting rail freight via Luino and Chiasso necessary, if the requested capacity in some hours is not enough Marginal residual capacity during works in the annual TT: Yes Extra running time max 30 Min Profile restrictions No

16 Impact of TCR 2018 at SBB Infra/BLS Netz Section Bellinzona Luino (12) Alternative itinerary for freight trains Section: CADENAZZO - PINO Type: daytime interruptions (9 am - 5 pm) Works: finalization of 750mt station module extension, track renewal, partially double track extension Period: Daytime interruption of 480min Monday-Saturday from 09/12/2017 to 28/4/2018 (no works beetween 23/12/17 to 07/01/2018) Reduction of available capacity Rerouting rail freight via Domodossola and Chiasso will be necessary In the annual TT: Yes Extra running time depending of capacity via Domodossola or Chiasso Profile restrictions No Total closure Mo Sa 9 am to 5 pm

17 Impact of TCR for TT 2018 at RFI Section Chiasso Milano (13) Via «Domodossola» Via «Luino» 14 Section: CARIMATE ALBATE / CHIASSO Type: single track operation 24h and night total closure for 4 hours. Type of Works: Cucciago tunnel reprofiling to PC80/410 and Bivio Rosales tracks and switches new configuration Period: from 28/04/2018 to 09/06/2018 Work affected section Alternative itinerary for freight trains Reduction of available capacity for rail freight. Rerouting via Domodossola and Luino will be necessary. During this period works will not be planned from RFI and SBB/BLS on the diversion lines. In the annual TT: yes Meeting with RUs will be organized with RFI TT department to illustrate in detail consequences on capacity. Extra running time depends on the capacity on diversion lines. Profile restrictions:no

18 Impact of TCR for TT 2018 at RFI Section Luino Novara (14) Via «Domodossola» 15 Via «Ternate» Via «Chiasso» Section: LAVENO - SESTO C. Type: Total closure Type of Works: Tunnel reprofiling to PC 80/410 in Monvalle tunnel Period: from 10/06/2018 to 15/09/2018 Work affected section Alternative itinerary for freight trains Reduction of available capacity for freight trains Additional capacity will be ensured through alternative paths via Domodossola/Chiasso or via Laveno Gallarate Extra running in some time slots depend on the capacity on diversion lines. Profile restrictions:no In the annual TT: Yes

19 Impact of TCR for TT 2018 at RFI Section Luino - Novara (15) Via «Domodossola» 16 Via «Chiasso» Work affected section Alternative itinerary for freight trains Section: LUINO - LAVENO Type: daytime + nighttime interruptions Works: finalization of PC80 enlargement and 750mt station module extension in Porto Valtravaglia Period: Daytime interruption of 240' (9:20 13:20) Monday-Saturday + nighttime 300' (00:05-4:55) interruption Sat/Sun and Sun/Mon. Start/end times could change during TT definition in order to harmonize with commercial requests. From 10/12/2017 to 27/4/2018 Reduction of available capacity for rail freight Extra running time depends only on the capacity on diversion lines. Profile restrictions: no In the annual TT: yes