BACHKHOA ENGINEERING CONSULTANT COMPANY

Size: px
Start display at page:

Download "BACHKHOA ENGINEERING CONSULTANT COMPANY"

Transcription

1 BACHKHOA ENGINEERING CONSULTANT COMPANY Ltd COMPANY PROFILE Trụ sở: 14/24 D.so 9 Kp.1, P. H.B.Chanh Q.Thu Duc, Tp. Ho Chi Minh Website: Tel: (84-8) Fax: (84-8) sc@baecco.com HOCHIMINH CITY SEPTEMBER 2007

2 TABLE OF CONTENTS A. COMPANY LEGAL STATUS...2 A.1 Company introduction:...2 A.2 Main office address...2 A.3 Functions and expertise...2 A.4 Organization and personnel...3 A.5 List of Engineer and experts of our company:...4 A.6 List of equipments of our company...7 A.7 Our services...8 A.7.1 Investment consultant services...8 A.7.2 Building and structural design services,...11 A.7.3 Transportation and infrastructure design...12 A.7.4 Construction Supervision...14 A.7.5 Project Management Service...15 B. OUR CAPACITY AND EXPERIENCES...17 B.1 Work which best illustrates our qualification...17 B.2 Past experience of BAECCO engineers and experts...30 B.2.1Investment consultant service...30 B.2.2Housing and civil engineering design...30 B.2.3Transportation and infrastructure design...30 B.2.4Supervision of construction...30 B.2.5Managing project...30 B.3 Copy list of consultant contracts recently handle by BECCO...31 C. ATTACHMENTS:...33 C.1 Service license and tax registration certificate...33 C.2 Curriculums vitae of our engineers and experts...33 Profile of Bachkhoa Engineering Consultant Company Ltd. 1

3 A. COMPANY LEGAL STATUS A.1 Company introduction: Bachkhoa Engineering Consultant Company Limited has been established by engineers and experts graduated and experienced in international engineering practices. Some of them have long time working with famous international consultant like Scott Willson Kirkpatrick, Maunsall, Wilbur Smith, Delour Catter, PCI, etc. Dual working environmental enhanced them much in transition period of Vietnam into globalization market of WTO. This is the most competent local consultant that can assist you entering into local construction and investment market of Vietnam. Graduation Ceremony of Company Director Ha Tien Nha at Asian Institute of Technology (AIT) Bangkok 1996 With a quality control system following ISO standard with common implementation of international codes and standard, doing business with us you will be served with international services at reasonable local price and heartfelt manner services. A.2 Main office address Caàu (BRIDGE) 100m OÂng Daàu Đường số 7 5 mét 20m 900m Ga Bình Trieäu Railway station Quoác Loä 13 (National Highway No.13) Bieån: Khu phoá 1 toå 1&2 P.HBC Law univercity Road: Kha Vạn Cân Caàu (BRIDGE) Bình Trieäu 14/24 Đsố 9 KP.1 HBC Nhaø thôø Chuch phatima 14/24 D so.9, KP. 1, P. Hiep Binh Chanh, Q. Thu Duc., TP. Ho Chi Minh, Viet Nam Tel: (84-8) sc@baecco.com Fax: (84-8) Web: A.3 Functions and expertise Following license No Investment consultant. 2. Project management consultant; 3. Environmental protection consultant services; 4. Design of Transportation and infrastructure; 5. Design of housing and civil project ; 6. Construction supervision, design revision. Profile of Bachkhoa Engineering Consultant Company Ltd. 2

4 A.4 Organization and personnel Director CEng Ha Tien Nha Vice Director Doctor Trinh Văn Chính Technical Department Transport& Infrastructure Engineer: Nguyen Van Nam Buiding and Industrial Department Architect: Doan Trinh Hien Project Implementati on; Office administratio n & Accountant Environme ntal Ms.CEng: Nguyen Nam Son; Đao Hai Yen; Nguyen Ngoc Anh Soil Investigation: Nguyen Huu Uy Vu; Truong Duc Thanh; Vuong Tran Dung Topogra. survey Ha Manh An Quality control: Pham Nguyen Hong; Pham Van Duong Transport Design Nguyen Van Nam; Bui Vinh Phuc Phan Ngu Nguyen; Le Tran Ky Binh Infrastructure design: Pham Quang Tien; Ha Tien Nam; Architect Design: Arc. Nguyen Quang Thanh Structural design: Eng. Ha Tien Chau; Bui Xuan Khai; Ho Huu Hoc M&E designs: Tran Minh Chung; Pham Nguyen Hong Vo Le Duy Cuong, Le thi Son Ca Pham ngoc Vy phuong Profile of Bachkhoa Engineering Consultant Company Ltd. 3

5 A.5 List of Engineer and experts of our company: No. Name Birth years 1 Ha Tien Nha 1960 Education & Other training Master of Civil Engineering 2 Trinh Van Chinh 1944 Doctor of Science 3 Nguyen Huu Uy Vu 4 Truong Duc Thanh Nguyen Duc Lap Master of Science Geotechnical Engineer Geotechnical Engineer 6 Ha Manh An 1957 Topographic eng Professional certificate No. HCM-6252/TKCT-TÑ KD No /12/1980 TECHNICAL DEPARTMENT (8 persons) Capacity & experience Expertise Investment consultant, Transport design, Construction supervision Transport Planning, traffic & Transport Economic Soil investigation, soil testing, foundation design Soil investigation, soil testing, foundation design Soil investigation, soil testing, foundation design Topographic and cartography surveys 7 Bui Xuan Khai 1952 Civil Engineer Design and supervision 31 8 Trinh Tu Anh 1978 Master of science Social development and resettlement 9 Nguyen Nam Son 1962 Master of science Environmental expert Pham Quang Tien 1973 Environmental Engineer NĐ 0066/TKCT GS.16663/2006/ĐLT Worked Years Environmental expert Đao Hai Yen 1971 Master of science Environmental expert 9 7 Director Vice Director Geotechnical engineer Geotechnical engineer Geotechnical engineer Topographic cartograph Structural Engineer Social development and resettlement expert Environment expert Environmental expert Environmental expert Profile of Bachkhoa Engineering Consultant Company Ltd. 4

6 12 Nguyen Ngoc Anh 1977 Civil Engineer, Design and supervision 7 Quality control 13 Doan Trinh Hien 1954 Architect Profile of Bachkhoa Engineering Consultant Company Ltd. 5 BUILDING AND INDUSTRIAL DEPARTMENT ( 7 persons) 128/05 BXD/KTQH KTS Architect Design, Investment expert in building construction structural design infrastructure design Design of housing& structure 30 Chief of Architect 14 Ha Tien Chau 1973 Civil Engineer HCM 4609/TKCT-NB 4609/TKCT-NB 8 Civil Engineer 15 Pham Van Duong 1957 Civil Engineer, HCM 1619/TKCT-BR- VT 27 Civil engineer 16 Ha Tien Nam 1980 Civil Engineer 12045/03/06-VIM 566/BDNV-ÑHBK Design and supervision 4 Civil engineer 17 Tran Minh Chung 1969 Electrical Engineer M&E Engineer 14 M&E Designer Pham Nguyen 18 Hong 1947 Electrical Engineer 49C BD/LAP M& E design 26 M&E Designer 19 Nguyen Van Chin 1974 Electrical Engineer 147 A BD/IAP HCM 4477/TKCT-BRVT TRANSPORT AND INFRASTRUCTURE DEPARTMENT (9 persons) M&E Engineer 10 M&E Designer 20 Tran Hai 1946 Civil Engineer, Bridge design, Bridge 36 construction supervision engineer 21 Nguyen Văn Nam 1978 Civil Engineer, Chief of Road & bridge designer, 7 transport construction supervision department 22 Le Thuan Hung 1946 Civil Engineer Bridge design, Road & bridge 36 construction supervision designer 23 Vuong Tran Dung 1967 Civil Engineer 044/CC Bridge design, Road & bridge 13 GSXD/VECAS/03 construction supervision designer Huynh Quang Road & bridge Civil Engineer Design and supervision 10 Nhan designer 25 Le Tran Ky Binh 1976 Civil Engineer Design and supervision 10 Road & bridge designer 26 Ho Huu Hoc 1976 Civil Engineer Design and supervision 10 Road & bridge

7 27 Phan Ngu Nguyen 1976 Civil Engineer Design and supervision 8 28 Bui Vinh Phuc 1977 Civil Engineer Design and supervision 7 29 Phan Van Toan 1980 Civil Engineer Design and supervision 4 ADMINISTRATION DEPARTMENT (6 persons) designer Road & bridge designer Road & bridge designer Road & bridge designer Pham Ngoc Vy Chief Bachelor Administration 9 Phuong accountant 31 Le Thi Son Ca 1977 Bachelor Office manager, translator 8 Office Manager 32 Ngo Ngoc Binh 1976 Bachelor Office manager, Project office 8 translator manager 33 Vo Le Duy Cuong 1975 Bachelor of Financial analyzer and Accountant, AF.0835 BTC/KTT economy general accountant 9 finance expert 34 Nguyen Thi Tam 1981 Bachelor Translator Clerk 35 Le Quang Tung 1983 IT IT 1 IT Total : 35 Profile of Bachkhoa Engineering Consultant Company Ltd. 6

8 A.6 List of equipments of our company No. List of equipments Manufacturer Manufacture year 1 Computer HP, ROBO, Compap, Samsung, Acer, LG 2004 set 18 2 Laptop Compaq; IBM 2005 set 5 3 Printer size A0 HP 500 #7770B 2004 set 1 4 Printer size A3 HP 8000 DN 2004 set 1 5 Printer size A3; A4 (color) Canon Pixma, IX ~7 set 2 6 Printer size A4 Canon LBP ~6 set 4 7 Fax Panasonnic 2006 set 1 8 Telephone Panasonic 2006~7 set 4 9 Digital camera Conon 2004 set 2 10 Projector Riconh 2003 set 1 11 Net Modem Speet touch 2006 set 1 12 Leveling equipment Swedish 2003 set 1 13 Theodolite Swedish 2002 set 1 14 Car counting meter Thaiwan 2001 set Boring equipment Soviet Union 2001 set 1 16 Static penetration test tool Soviet Union 2001 Set 1 17 Vale share test tool Soviet Union 2001 Set 1 18 Geological test equipment China 2001 set 2 19 Other office equipments various 2005~6 Unit Quantity Remarks Profile of Bachkhoa Engineering Consultant Company Ltd. 7

9 A.7 Our services A.7.1 Investment consultant services Our Investment Consultant services include: Market study, investment option and design solutions proposal; feasibility study; procurement for good and service; A Market study Market study will provide deep insight into nature and magnitude of demand on service or group of services (called SPI or Services Profitable for Invest) and payable level of SPI in conjunction with demand-supply relationship. The criteria of SPI with maximum efficiency then will be defined. Market study and analysis can be done properly only by experienced experts that well trained in investment studies, data processing and marketing. Due to very important role of SPI that will define the succeed level of investment and the complexity of SPI subjects in future, market study should be carried out in detail from beginning of investment preparation with optimal analyst methodology. As shown in the developed countries, financial foundations and banks will consider the quality of market study and reputation of the market study consultant to decided whether they will finance the project or not. The practice also shown that in the developed stock and security market, there is no lacking of fund. There are only lacking of SPI with high internal rate of return (IRR) and low risk. Magnitude and rate of return of SPI will define the development rate of economic body and the overall economy. During the investment study, criteria of SPI with maximum efficiency and low risk are the most important so it should be carefully carried out to make sound basic for the next steps. The accurate and detail SPI study in the early stage of investment preparation is because of the next steps usually related to much bigger expenditures and the decision to terminate finance for low SPI rate of return will protect investors from bigger lost later. A Investment option and design solution When SPI is clearly defined, consultant will have sound basic to concentrate into study of investment option and design solution to meet the requirement of SPI with lowest cost. Many solutions will be carefully studied by specialized personnel with accurate and defined input data that can guaranty the minimum cost and high efficiency. With sound SPI and high efficiency design solution, investment efficiency will be defined with IRR and NPV as the base of investment. All possible scenarios of the market also will be carefully studied to evaluate the risk level and counter options for each risk. The next is successive services to be carried out. Our engineers and experts will assist you in all of these tasks Our engineers and experts have completed many effective investment projects. Their expertise has been verified in the following projects: Profile of Bachkhoa Engineering Consultant Company Ltd. 8

10 In association with FinnRoad consultant Ltd. (Finland) for appraisement to investment project documentations of Ho Chi Minh Long Thanh Dau Giay Expressway funded by the Asia Development Bank. Feasibility study report and consulting for investment project of Building Hospital and Medical Centre in Hanoi City under BOT form invested by VC Invest, Venture Capital & Equity Investment Holding Inc. Procurement for services and bidding document preparation for excavated materials transportation from the underground carpark and retail complex beneath the Le Van Tam Park, Dist.1, and Hochiminh City. Feasibility study report preparation and consulting for investment project for construction project AA high office building and 6 stars Hotel at No. 6 Hai Ba Trung St., Dist.1, Ho Chi Minh City invested by VC Invest, Venture Capital & Equity Investment Holding Inc.. Investment proposal preparation for the Southern thermo-power Factory under BOT form with capacity of 750 MW and total estimated investment capital is 450 million US Dollars. Project owner is VC Invest, Venture Capital & Equity Investment Holding Inc. Consultant for project investment, Procurement for International consultant for basic design and bidding document preparation, feasibility study report submitting to the Government for approval, and BOT contract preparation to Building the Underground space for Carpark and retail complex beneath Le Van Tam Park invested by the Investment Development Underground Space (IUS) Inc. Feasibility study report and consulting for investment project of High office building at 152 Dien Bien Phu Str., Binh Thanh Dist., Ho Chi Minh City under BOT form. The project owner is Infrastructure Investment Corporation (CII). Supervision Consultant for Wastewater treatment plant in Quang Trung Software Park invested by Quang Trung Software Park City. Mekong delta inland waterway project funded by World Bank (WB). Our engineers have participated in the consultant team with Padeco Consultant from Netherlands in designing of road, bridge and infrastructure. We had proposed some good design solutions like landing stages, ports and a wet dock that enhanced to increase the overall efficiency of the project. Participating in pre-feasibility study of projects such as: traffic forecast, dredge waterway, marking buoy leading jet, clearance compensative tasks, economy and finance evaluation., Feasibility study of express way from Saigon to Vungtau City financed by DAEWOO Corporation under BOT scheme. Our engineer has participated in the feasibility study consultant team as associated director responsible for technical mater of the project. Feasibility study and detail design of upgrading highway No.1, section from Quangngai to Nhatrang, financed by ADB. Our engineers have worked in consultant team of Wilbur Smith Associated (WSA) in designing of road and bridge, preparing of bidding documents and quantity surveyor. Public urban traffic development project as: Metro Ben Thanh Thu Duc Dist. line (line MRT No.1) and the pre-feasibility project for two lines Metro Ben Thanh- Tham Luong and Ben Thanh- Western Bus Station (line MRT No.2 and No.3), presidented by the foreign consultant companies such as Profile of Bachkhoa Engineering Consultant Company Ltd. 9

11 JARTS from Japan, TEWET from Federal Republic of Germany and cooperate with TDSI South s consultant, our engineers had participated in the feasibility study tasks, in which including tasks from traveling forecast, setting the lines and stations, automatic control equipment and information signal equipments tasks, railway fixing and maintenance firms, Among the bus public traffic development projects of Hochiminh city and other provinces, our engineers had ever participated in the tasks of investment consulting these projects. Well familiar with local and international investment procedures, those investment programs and documentation prepared by our engineers has been promptly approved. Many projects showed high economic efficiency has been selected for funding by international financial foundations and banks like WB, ADB and other. The key to make a project to be funded depends on capability of consultant in preparing a qualified investment program that yielded in high efficiency and high rate of return and in capacity of consultant to ensure investors about efficiency of projects. The competence of investment consultant becomes more important for the success of an investment. We again stress on the role of the potential customer study because the customer needs will define acceptable cost level and the return magnitude of an investment. To make a good decision, consultant shall have full insight into invested field and shall carefully study the potential customer in details. The study should provide accurate estimation of customer attracted volume to each investment option and their reaction to each fare level (service cost) with possible sensitivity analysis. Result of study will be presented in a basic design but basic design report may not necessary presented in form of a set of drawings. Valuable basic design is a report that provides all scientific foundations for a right investment decision and all required inputs for the next design stage. In a central regulated economic system, basic design report was considered as a preliminary design with maybe more details required. Both preliminary and detail design have very similarity nature and undertaken by similar personals. The study of potential customers was done in cursory way or ignored. There are poor practices and personnel capable in doing competent market surveys and studies. One the market service done in cursory way, the efficiency analysis will also is careless evaluation. Difficulties may arise to foreign investors during approval process and investment period since procedure and practices of governmental authorities may differ from international. The consultant who has experiences in both international and local practices will be very useful for you in avoiding these difficulties. A Procurement for good and services and bidding document preparation Our engineers and experts have provided procurement consultant services and bidding document for many projects. Many of these projects were funded and executed by international investors and financial foundations as following: Beer plant in Cantho City; Fish powder plant in Hamtan; Office building of district police, ward 9 and ward 13, District 10; Office building in Catlo port Vungtau city; Profile of Bachkhoa Engineering Consultant Company Ltd. 10

12 Central botanical laboratory of cell technology - Science and technology institute in Southern central focal zone of Vietnamese; Sewage treatment plant 1000cub.m/day of sodium glutamate VIFON plant; new office and guest house; Bidding document for road rehabilitation, national highway No.1 section from Quangngai to Nhatrang; Detail design Consultant procurement for Hochiminh City East-West highway project- team leader; Supervision consultant procurement document for Hochiminh City East-west highway project consultant member; Feasibility study Consultant procurement for southern Tauhu-Bennghe road improvement project team leader; With experiences and success in the passed projects, our engineer has been invited to consultant team for project Vietnamese road and bridge design and construction standard following AASHTO and international standards. The project funded by WB with leading consultants from Wilbur Smith Associates (US) and Deleuw Cather Intl. Ltd. (Europe). Our engineers were responsible for road and bridge construction specifications. A.7.2 Building and structural design services, A Define of housing uses If construction was a part of investment program prepared by a competent consultant, the use of project should be clearly defined during the project feasibility study. In case before construction design stage, the use of project still not defined by any other consultant, the design consultant should work closely with project owner to define general use and uses of any part of the project. This task is very important for the project owner to serve his/her money. For accurate definition of a project use, we provide you with following definition form. A Feng-shui and environmental design Environment were considered as vital important factor to ensure quality of life for people living inside a project. Environmental design should ensure certain criteria that directly affects to human health. Such criteria like air quality, temperature, voice proof, lighting, water proof, etc. should be maintained as good as possible. Apart from model environmental achievement, Feng-shui (a South-east Asian environmental culture) increasingly finds its implementation. Nowadays fengshui has gone beyond mystery to serve and improve human life in such sensitive aspects like human emotions, smart level of nerve system, balancing level of human health, etc. Although feng-shui conclusions still not be explained with model scientific basic, positive feng-shui affects become increasingly evident. The feng-shui art that we ready to serve you here has been combined from ancient esoteric together with modern achievement and programmed into a form of software to make the service more comprehensive and quicker. Profile of Bachkhoa Engineering Consultant Company Ltd. 11

13 A Architect and interior design Best architects from oversea and local are ready to save all your need. We owned many reputable projects in Saigon and the southern of Vietnam. A Structural design Structural design will start after completion of the project use definition, environment and maybe feng-shui design and architectural design. Computer design software will be used to produce optimal and accurate design solution with minimum cost. In some cases, structural engineer will work closely with project manager, architect, and feng-shui expert for optimization of designed options and some changes to get better design that satisfied all design criteria. A E&M and ventilation design Model project design always comes along with model M&E system. We have good engineers and experts specializing in the following design fields: - Electric services design - Telecommunication service design; - Air-conditioning and ventilation system design; - Sanitary, Plumbing and gas system design; - Lighting design - Fire protection design; - Lift and internal transportation system design. - Building management system design; A.7.3 Transportation and infrastructure design A Traffic study: Traffic engineering becomes a vital important step for an efficient transportation investment project. Traffic study should provide main basic technical criteria like traffic volume, flow characteristics, loading characteristics etc. Traffic characteristic will become basic for the geometric and structural design later. Our engineers have performed traffic study for a rank of transportation projects in Hochiminh City and other southern provinces of Vietnam. Such projects include: Tran Asian highway network from Hochiminh city to Phnom Penh highway improvement project, HCMC to Vungtau expressway project in BOT scheme, ADB3 road improvement project funded by ADB for highway No.1 section from Quangngai to Nhatrang, HCMC East-west highway project, HCMC MRT master planning, etc. We own a comprehensive data base for most regional socio-economic characteristics, traffic counts data, traffic volume estimation and a traffic model processing program for data analysis of HCMC, southern focal zone and other southern provinces of Vietnam. Profile of Bachkhoa Engineering Consultant Company Ltd. 12

14 A Topographical and geotechnical survey: The most updated technique and equipment for topographic, geotechnical surveys, analysis and laboratory testing are available in our company. Here we can provide the most accurate survey and testing service with reasonable price. Experienced engineers and technicians are familiar with ISO quality control system ready to save all of your requirements. Geotechnical testing equipment A Geometric highway and transportation project design : Most qualified transportation project in HCMC and other province has been done or proposed by our engineers. These include, HCMC to Phnomphenh highway; HCMC to Vungtau city Expressway, 4 out of 5 main traffic junction of HCMC East-west highway project (Geometric design option for Chava, Khanhhoi, Calmette bridges and Thuthiem tunnel). A Structural design Our engineers have strong capacity and experience in structural design for bridges, pavement and other facilities. A Hydrographic survey, drainage and flood mitigation design Our most successful project in drainage and flood mitigation design was highway No.1 Quanngai to Nhatrang flood mitigation work. Our proposal has replaced design proposal of other 9 biggest consultants in the transportation consultant field. The design later has proved with high drainage capacity and flood mitigation affect with much low cost compare with other section (from Dongha to Quangngai). This project was recognized and accepted in the project monitoring and evaluation conference in Danang in 2003, four years after completion of our project. - Our engineers have amended the design plan which was previously designed by Truong Son Consultant company (Ministry of Defence) for Luc Khau bridge construction for the Song Cau District s flood protection, Phu Yen Province, resulting to basic improvement for flooded circumstance and save 70% construction cost( reducing the cost from $2,9 billion to $850 million) - Bong Son area of Binh Dinh province has been reduced flooded circumstance due to the initiative of unstop the flow of Doi bridge which allow to lower significantly the high level yearly submersion of the thousand hectas area with the minimum cost of VND24 million. - Participation in design drawings of Intake, Outlet Dams and Hydropower Plant of Dai Ninh Hydropower plant at Dai Ninh Village, Duc Trong district., Lam Dong province with the Main contractor Kajima-Kumagai- Song Da. JV A Uniform designs With various design experience in drainage structure, we has produce a Profile of Bachkhoa Engineering Consultant Company Ltd. 13

15 uniform box and pipe culvert design with reliable working performance, ease in construction and cheep in cost. A.7.4 Construction Supervision Our supervision services for construction work provide you best quality with reasonable cost and shortest construction time. We also ensure for smooth project implementation and assist project owner in avoiding most trouble may arise during construction time. Our engineers have been trained by professional courses for supervision Consultant and have supervised many important projects: - Supervion consultant and Project management for Wastewater treatment plant in Quang Trung Software Park Ho Chi Minh City. - Construction Supervision for C9 Ly Thuong Kiet Apartment Building, Dist.10 (9 floors) - Construction Supervision Le Thi Rieng Apartment Building, Dist.10 (6 floors, 250 apartments) - Construction Supervision for Ho Chi Minh City Government Treasury, Cu Chi District Treasury, Hoc Mon District Treasury, District 6 Treasury, Ect - Construction Supervision the Highway No.1A improvement project, section Can Tho - BAC Lieu, mainly consultanted Halcrow Company, our company s engineers are supervision consultants for this project. - Flood protection implementation for the Highway 1A from Quang Ngai to Nha Trang supported by ADB, Wilbur Smith Associates (America) Company is Main consultant. Our engineer is vice-resident engineer (Vice chief Engineer) - Construction Supervision of technical infrastructure of Tan Binh Industrial zone, the group of warehouse 1-3 Tan Binh Industrial zone and clean water supplying station, Wastewater treatment Plant Textilewwtp For Tran ASIA Indisustrial Park, Wastewater treatment basin for the Ven Ven Rubber Sap processing factory in Tay Ninh. A Preparation work: The task includes but not limit to the following tasks: - Check legitimating documentation for compliances with Vietnamese laws. - Remedy for compliances with Vietnamese laws - Site condition checking for compliances with contract documentation and/or Design; - Fixing project on site; - Agreeing on working procedure between contractors, consultant and client. A Supervisor staff and organization Base on nature of project, an organization charge will be proposed with experienced engineer/experts. Mobilization then will be done. Site engineering office will be established. Profile of Bachkhoa Engineering Consultant Company Ltd. 14

16 A Construction planning and planning management Construction planning will be prepared by contractor and verified by engineer to ensure technical requirement and timing of the construction. A Checking forms Various type of checking forms will be prepared and distribute to the site engineers for checking. The forms should be as much as simple, direct visual check and include all information needed to guaranty the construction work quality. A Supervision daily notes Supervision daily notes must be maintained, check and include all information fully describes all occurrence and activities of contractor, engineers and other parties. A Stage acceptant Those subjects to be covered by excessive construction work should be carefully checked to ensure its quality before starting the next works. Acceptant of engineer may not exclude contractor responsibility for quality of work but it provides reliable information for the final acceptance and reference or remedial measures in case of failure. A Overall acceptant This work can be done only after all requirements of constructions are met. Overall acceptant will be a main basic for final payment terms. A As build drawing and Completion documentation Before handover project to the client, all documentation related to investment process including all authorized letter, design documentation, supervision daily notes and documents, all quality control certificates, as build drawings and so on will be gathered A Payment Base on the contract condition and stage and/or overall acceptant, invoice will be made by contractors and verified by engineer before submitting to the client. Engineer must be responsible for their verification and wrongful acceptant that may lead to client lost. A.7.5 Project Management Service A Ensure compliance with current law For most project owner and/or investors, particular that first time comes into Vietnam, legitimating in this country may be the most headache issue they have to encounter. They may lose time, money and investment chance for compliance with local investment law. We will assist you to overcome all this mater with less time consumes and money lost. Our staff has passed many investment circles in different investment field so they know exactly when, what and where you have to refer to. We also have our own lawyer to prepare all Profile of Bachkhoa Engineering Consultant Company Ltd. 15

17 required submitting documentation to save your time and money. A Project preparation and execution Project preparation stage relate to the feasibility study and investment report that has been explained in detail in the investment services, designing service and maybe resettlement works for some project. Project execution will require the following services: A Service procurements We have good experiences in bidding document preparation and bidding execution. We also have good database of potential contractors and suppliers. Our engineers are also in service procurements for consulting and construction work like HCMC East-west highway project. A Contract management A Risk management A Monitoring and evaluation Our company has good experience for all kind of listed services. We have good personnel to assist you in all of this matter. Profile of Bachkhoa Engineering Consultant Company Ltd. 16

18 B. OUR CAPACITY AND EXPERIENCES B.1 Work which best illustrates our qualification Our engineers and experts had actively advanced into international market orientation from the first year of nineteen s ninety s by encouraging direct task assignment and deployed into many important projects in the condition of central economy with strong monopoly of the state consulting firms. We have actively worked in many ODA project, providing key personals for most of the ODA projects in southern part of Vietnam. We can guarantee about our service in the listed projects below. We are sorry can not provide full financial statement of those projects we had involved in. Attached herewith is a list of projects that s best illustrates our qualification Profile of Bachkhoa Engineering Consultant Company Ltd. 17

19 Project Name: Hochiminh City Longthanh Daugiay Expressway Project Location Within Country: Name of Client: VEC Donor: ADB Vietnam Country: Vietnam Professional Staff Provided by our Company: No. of Staff: No. of Man months: Start (month/year): June 2007 Completion (month/year): Jan 2008 Name of associated firm(s) if any: - Finnroad Name of Senior Staff involved and functions performed: 8 43 No. of Man months of professional staff provided by associated firm(s): 12 Leader consultant Project Team Leader : Dr. Trinh Van Chinh Highway Engineer : Ha Tien Nha Structural engineer 1 : Tran Hai Geotechnical Engineer : Nguyen Duc Lap Structural engineer : Nguyen Minh Hien Environmental expert : Nguyen Nam Son Hydrologist : Ha Tien Chau Social Expert : Trinh Tu Anh Detailed Narrative Description of Project: This will be the most modern Expressway in southern of Vietnam connecting Hochiminh City to Highway No.1 through Longthanh, Dau giay and the future Longthanh Airport with total length of 55 km. This road will shorten the distance from HCMC to Vungtau City about 40 km and travel time from 2 and haft hour to 1 1/2 hours. The project will have 6 to 8 lines Expressway with total Right of way (ROW) is 120~140 meter. Total estimated project cost is 275 millions US$. The Feasibility Study of the project has been done by local consultant (TEDI South) and has been approved by the Vietnamese Government. The project was expected to be financed by ADB and JBIC in the coming Year. Detailed Description of Actual Services provided by our Company: BAECCO has been selected as local consultant together with an International consultant (Finnroad) for revision of the FS report (in vietnamese) to ensure the project Contents meet the requirements of ADB and International standard. The services we provide to this project include: - Carry out review of surveying works including traffic survey, topographic survey, and Geotechnical survey to ensure it s accuracy for the design work. - Review of hydrologic survey and hydraulic calculation to ensure that the hydraulic design and calculation is sufficient and correct. - Carry Socio-Environmental survey and study in accordance to the ADB standard and requirements. - Assist International experts in Reviewing of geometric design, pavement design, structural design, M&E design and design of surveillance system of the expressway. - Assist the international expert in the reporting work. Profile of Bachkhoa Engineering Consultant Company Ltd. 18

20 Project Name: FS of office building at 152 DienBienPhu, ward 25, Binhthanh, Hochiminh City Project Location Within Country: Name of Client: CII Donor: No! Vietnam (Self financing) Country: Vietnam Professional Staff Provided by our Company: No. of Staff: No. of Man months: Start (month/year): February 2006 Completion (month/year): October 2007 Name of associated firm(s) if any: No Name of Senior Staff involved and functions performed: No 7 45 No. of Man months of professional staff provided by associated firm(s): In separated consultant contracts Project Manager, Arch. Doan Trinh Hien Financial & Economic Trinh Van Chinh Structural Engineer Tran Khai Geotecnical egnieer Ha Tien Chau Parking design Nguyen Minh Hien Quantity survey Ha Tien Nam M&E Designer Tran Minh Chung Detailed Narrative Description of Project: Construct an Office building (B+ grade) in BOT scheme. The building is 27 stories with total floor area of square meters. Total estimated project cost is 580 billions VND or 36 millions US$. Detailed Description of Actual Services provided by our Company: BAECCO has been selected for this project because of its experience and competence inherits by its staffs in many BOT. The services we provide to this project include: - Preparation of pre-feasibility study report; - Preparation of Feasibility study report - Arrange of architectural design criteria - Prepare BOT Contract - Assist the client in various aspects of the investment preparation process Profile of Bachkhoa Engineering Consultant Company Ltd. 19

21 Project Name: Feasibility Study Report for Underground Parking Project Location Within Country: Name of Client: INVESTMENT DEVELOPMENT FOR UNDERGROUND SPACE Inc. (IUS) Under Levantam Park in Hochiminh City Donor: Maybank Group Country: Vietnam Professional Staff Provided by our Company: No. of Staff: No. of Man months: Start (month/year): February 2006 Completion (month/year): October 2006 Name of associated firm(s) if any: - BECA Catter and partners for basic design - Cheston Petty: Property Consultant - Grand Thornton: Certified Chartered Accountants & Management Consultant Name of Senior Staff involved and functions performed: 9 72 No. of Man months of professional staff provided by associated firm(s): In separated consultant contracts Project Director Ha Tien Nha Transport Economic Trinh Van Chinh Project Manager Nguyen Minh Hien Sociologist Nguyen Nam Son Structural engineer Ha Tien Chau Geotechnical Engineer Nguyen Huu Uy Vu Transport planner Nguyen Hung Dung Quantity survey Ha Tien Nam Detailed Narrative Description of Project: Construct an underground car park in BOT scheme. The project locates under an existing park with total area of 5.9 ha. Foot print of the project is 2.9 ha with 3 and 5 levels for commercial and parking zone respectively. Total planned underground area is 10,100 sq.m that will provide for more than 2600 parking lots with 35,000 vehicle turns per day. Part of the project will be used for commercial purpose to improve its financial feasibility. This will be the first and biggest car park and commercial complex in Vietnam, build and operating in BOT scheme. Total estimated project cost is 1200 billions VND or 75 millions US$. The project was generated in line with a master transport planning of HCMC to improve parking facility, traffic and road condition in the most congested area of HCMC central business district. The growing traffic demand of this city has been forecasted as high as 12% per year. Car ownership currently at low level because of high import tax (250%). Number of cars expected will be increased much more after Vietnam entering into WTO. Levantam car park is one of 9 projects planned by HCMC to cope with these challenges. Detailed Description of Actual Services provided by our Company: BAECCO has been selected for this project because of its international experience and competence inherits by its staffs in many ODA projects for transport and infrastructure in southern part Vietnam in the passed 15 years. The services we provide to this project include: - Preparation of a program for the project preparation and implementation; - Preparation of procurement programs & document for international consultant procurement for basic design report. - Coordinating international consultants during feasibility study of the project. The international consultants include: BECA Cater provides basic technical design service, Grand Thornton provides Accountants & Management service; Chesterton Petty provides Property Consultant - Managing traffic and transport study for the projects to improve parking performance and traffic condition of the surrounding project area. - Preparation of feasibility study report for the project in BOT scheme and getting its approval. - Provide technical basics for draft BOT contract to be used during BOT contract negotiation. Profile of Bachkhoa Engineering Consultant Company Ltd. 20

22 Project Name: Feasibility Study of the first priority lines of Mass Rapid Transit (MRT) system in Hochiminh City Project Location Within Country: Hochiminh City Name of Client: Department of Transport and Public Works of HCMC Start (month/year): 3 / 2004 Donor: Name of associated firm(s) if any: TeweT German Government Name of Senior Staff involved and functions performed: Country: Vietnam Professional Staff Provided by our Company: No. of Staff: No. of Man months: Completion (month/year): 12 / 2005 No. of Man months of professional staff provided by associated firm(s): On part time basic Alignment surveyor Nguyen Hung Dung Geotechnical Engineer Nguyen Huu Uy Vu Resettlement surveyor Ha Tien Nam Sociologist Nguyen Nam Son Detailed Narrative Description of Project: For growing traffic congestion in the biggest city of Vietnam with more than 7 millions citizen, mass rapid transit (MRT) has been recognized as optimal transportation mode to cater the growing traffic demand. As the result of a master planning for MRT system, two traffic corridors from Benthanh to Cholon and Benthanh to Tansonnhat airport has been recognized as priority lines for MRT implementation. Traffic volume on these two corridors is the heaviest whereas road conditions are poor with narrows streets. Congested residential and commercial along these two corridors cause thousand of people vulnerable to any road widening. Resettlement has become increasingly a problem for any transport and infrastructure along these corridors. The objective of the project is to provide more efficient transport mode for the commuters on this corridor and to study the design criteria, alignment, cost of the project and mitigation measure for the project affected people. The survey and route alignment design shown a total length of these two line was 20.4 km including 10.2 km from Benthanh to Thamluong and 10.2 km from Benthanh to Mientay bus terminal: Section from Benthanh to Mientay has 4.6 km underground line, 5.6 km elevated line with 11 stations including 5 underground stations and 6 elevated stations. Section from Benthanh to Thamluong has 8.5 km underground line,1.1km elevated and 0.6 km at grade line with total 11 stations; 9 stations underground, 1 station at grade and one station elevated. Total cost of the project estimated as 965 millions US$ of what HCMC will finance 30%; the remained will be provided by ODA and/or borrowed. Detailed Description of Actual Services provided by our Company: - Traffic surveys - Road condition and Route alignment surveys - Geotechnical and natural condition data gathering; - Social and resettlement surveys along route alignment, - Quantity surveys; Profile of Bachkhoa Engineering Consultant Company Ltd. 21

23 Project Name: Vietnamese Road and Bridge design and construction standard Project Location Within Country: Name of Client: Ha Noi Ministry of Transport, PMU-1 Donor: World Bank Country: Vietnam Professional Staff Provided by our Company: No. of Staff: No. of Man months: Start (month/year): Aug 1999 Completion (month/year): December 1999 Name of associated firm(s) if any: Main consultant were Wilbur Smith Associate in association with Delour Catter Name of Senior Staff involved and functions performed: Specification specialist for Road & Bridge Construction Ha Tien Nha No. of Man months of professional staff provided by associated firm(s): Detailed Narrative Description of Project: For more than 10 years, each of ODA projects to improve transport and infrastructure in Vietnam should produce its own design standard and technical specifications. This work had repeated for many projects where as local practice remained unchanged from former soviet standard and technical specifications in design and construction of other local financed projects. These discrepancies make the design and approval process a time consumes and low efficiency. By the last years of twentieth century, World Bank had agreed with other main donor like ADB, JBIC to assist Vietnam to harmonize the design standard, technical specification and project implementation procedure to make project implementation more simply and more efficient. The most qualified engineers and specialists in the field of transportation design and construction of Vietnam has been mobilized and gathered together with an consulting association of Wilbur Smith Associate (WSA) and Delour Catter to produce new design standard and technical specification for road and bridge construction of Vietnam. The contents of project armed to produce: - New standard for Bridge design. - New standard for geometric design of highways; - New standard for Asphalt concrete pavement design and rigid pavement design following AASHTO standard and specification; - New technical specifications for road and bridge construction. Detailed Description of Actual Services provided by our Company: Our expert was invited to this project because of his international experience and competence service provided for many ODA projects in transport and infrastructure in southern part Vietnam in the passed 12 years. He was assigned for this project from the beginning but the project he work at this time (the ADB-2 for flood mitigation work for highway No.1, section from Quangngai to Nha Trang) has been delayed due to resettlement problems for 7 months. His position has been replaced by other expert, a Doctor of science associate professor from Hanoi Civil Engineering University. After 6 month, the expert from Hanoi Civil Engineering University failed to meet the requirements of project and our engineer had been mobilized for his replacement. The services we provide to this project include: - Review former Vietnamese technical specifications used in transportation and infrastructure projects and redone the work of the expert from Hanoi Civil Engineering University. - Produce new technical specification to be used for all ODA and local projects in an effort of harmonizing the engineering standard and management procedure for ODA and local financed projects; 1 5 Profile of Bachkhoa Engineering Consultant Company Ltd. 22

24 Project Name: ADB-2 Flood mitigation (supervision work) for 400 km road section from Quangngai To Nhatrang Project Location Within Country: Name of Client: Central zone of Vietnam Ministry of Transport, PMU-1 Donor: ADB Country: Vietnam Professional Staff Provided by our Company: No. of Staff: No. of Man months: Start (month/year): March 1998 Completion (month/year): July 1999 Name of associated firm(s) if any: - Wilbur Smith Associate (main consultant) - TECO -5 Name of Senior Staff involved and functions performed: Vice Residence Engineer Ha Tien Nha 1 17 No. of Man months of professional staff provided by associated firm(s): Main consultant Detailed Narrative Description of Project: Construction supervision for flood mitigation work and road and bridge upgrade of national highway No.1, section from Quangngai to Nhatrang. Fourteen road sections affected by annual flooding have been upgraded to meet 10 year frequency of no flooding. The most updating of design and technical standard has been used in construction of road and culvert for this section. Detailed Description of Actual Services provided by our Company: Our engineer has been mobilized for this project because of emergency of the project construction and because of difficulties of the international consultant (WSA) and its partner in managing the local contractors working at international standard. The services we provide to this project include: - Managing local contractors in producing construction drawings for road and drainage structure in international standard; - Training and managing local staff in supervision works. Particular effort has been make to overcome the discrepancies of local and international design standard, technical specification and managing procedures. Profile of Bachkhoa Engineering Consultant Company Ltd. 23

25 Project Name: Hochiminh City Mass Rapid Transit master planning Project Location Within Country: Name of Client: Hochiminh City HCMC people Committee Donor: None Country: Vietnam Professional Staff Provided by our Company: No. of Staff: No. of Man months: Start (month/year): November 1997 Completion (month/year): February 1998 Name of associated firm(s) if any: - Transport Economic Strategic Institute, southern Branch (TESI south) - Benthanh consulting Engineering firm 9 36 No. of Man months of professional staff provided by associated firm(s): - Main consultant Name of Senior Staff involved and functions performed: - Traffic survey (counting) firm. Project Director Trinh Van Chinh Transport planner Tran Ty Project Manager Ha Tien Nha Structural engineer Ha Tien Chau Socio-economic expert Nguyen Nam Son Route alignment survey Detailed Narrative Description of Project: For growing traffic congestion in the biggest city of Vietnam with more than 7 millions citizen, mass rapid transit (MRT) has been recognized as optimal transportation mode to cater the growing traffic demand. To managing MRT of Hochiminh City (HCMC), People committee has assigned Transport Economic Strategic Institute in the South (TESI south) to mobilized the most competent engineers and experts in the field of transport and public transit to make a master plan for implementation of MRT system. The objective of the plan is to identify the possibility and timing for MRT implementation, drafting the MRT network for the city architect planning and land reservation, set preference of the sequence implementation and outline of the policy for the feasible MRT implementation. The plan then should set up the content (or term of reference) for the next step of the MRT implementation. Detailed Description of Actual Services provided by our Company: Our experts have been mobilized to this project because of his broad experience and knowledge in urban traffic planning and competent service for many ODA projects. Our experts have been assigned as Project Director (Dr. Trinh Van Chinh) and the Project Manager (M.s CEng. Ha Tien Nha) because he had successful carried out a traffic planning study in the field of public transit for Hochiminh city with budget donor from SIDA for his Master degree of civil engineering in AIT. His work later has been published and recognized in the International Conference on Urban Engineering in Asian Cities in the 21 st Century in Bangkok from November 20 th ~23th The service we provide to this project include: - Collection and review of socio- economic data of the passed years to define the possibility of MRT implementation and the measures to divert commuters to this transit mode; - To review available traffic data and to study of public transit and urban planning of Hochiminh City to identify main traffic conjunctions suitable for MRT line planning, - To survey and study of existing condition and architect planning to design an MRT master planning for it implementation; - To identify priority line to be implemented as the next step of the MRT implementation. - To prepare a master planning report to Hochiminh City People Committee for its approval. Profile of Bachkhoa Engineering Consultant Company Ltd. 24