1 ANNEXURE "C1" Summary of Prices and Schedule for Specification ZB-1530 for 220VDC STATION STORAGE BATTERY for Rutenberg Power Station, Unit 3&4 30/10/2017 Page C1 - G2-1 - of - 7

2 General Important Instructions 1. The Summary of Prices and Schedule is subject to all the relevant provisions in the Agreement and the general Conditions. In case of inconsistencies between and the Agreement and/or the General Conditions, the Agreement and the General Conditions shall prevail. 2. Contractor's signature shall bear proof to its agreement to timely provide each and every item in the Summary of Prices and Schedule, unless specifically indicated otherwise. 3. The Summary of Prices and Schedule shall form the basis for all reports contractually required to be provided by Contractor (Contractor's Project Schedule, Equipment Shipment Schedule, Progress Report). 30/10/2017 Page C1 - G2-2 - of - 7

3 The breakdown of the Contract Price per allocations is as follows: Allocation Allocation Description Remark Country of Terms of Currency Basic Contract Price No. Origin 1 Equipment Total Equipment Price 5 (A) Spare Parts (Optional) DDP refer to 5 (B) Miscellaneous (Optional) Agreement subject to tax Performed 6 Services (Optional) deduction at source In Israel Total for Special Allocations for Optional equipment and services Each combination of Currency (USD, EURO, NIS.), Scope of Work Allocation (Main Equipment, Raw Materials, Israeli Content ), Country of Origin, Payee (Main Contractor, Israeli Sub-Contractors...), Terms (FOB, FAS, DDP...) and Terms of Payment is defined below and is given a Code No. The deliverable items having the same Code No. shall be separated into orders to allow follow up on deliveries and payments. 25/10/2017 Page C1 - G2-3 - of - 7

4 The following tables are divided into columns containing the information specified below: Column 1: Item Number: The item number, in hierarchical format, of a product tree, first digit to the left denotes related Unit. Column 2: IEC Catalogue No.: Unique reference No. for each identifiable deliverable item, to be provided by Purchaser prior to its delivery and payment therefore. Column 3: Description of the deliverable item: The term Equipment shall be deemed to include all the related engineering, design, export packing, quality assurance, quality control and certificates required in the Contract. Column 4: Quantity: As specified by Purchaser, or in the absence of Purchaser's recommendation - as recommended by Contractor to meet Specification requirements. Column 5: unit of measure: As specified by Purchaser, or in the absence of Purchaser's recommendation - as recommended by Contractor to meet Specification requirements. Column 6: Mode of : As specified by Purchaser, or in the absence of Purchaser's recommendation - as recommended by Contractor to meet Specification requirements. Column 7: Latest Date of : Each actual delivery should be completed within a two (2) months period ending not later than the date specified herein. In case a date is not specified, the date for the closest item immediately higher in the Product Tree hierarchy shall apply. Column 8: Related Milestone: (as stipulated in chapter C1 - Schedule below) Column 9: Manufacturer's Country of Origin: To be clearly stated by Contractor Columns 10 - Price in (Currency) as per Code no. (of a unique set of terms of Payment): onwards: The price of the deliverable item stated in the relevant currency, subject to the Terms and Mode of Payment designated in the Contract for that portion of the work, as designated and summarized by the Code No. defined in the above chapter G3. In the tables showing the breakdown per Unit, the prices set out in columns 10 onwards, are, due to shortage in printing space, the total prices calculated by Contractor as its unit prices multiplied by the quantity specified in column 4. In the options for services and spare parts list the itemized and the total prices per each line item must be specified. 25/10/2017 Page C1 - G2-4 - of - 7

5 Item No. IEC Catalog. No. Description Qty. unit of measure Mode of Latest Date of Related Milestone Manufacturer's Country of Origin code No. 1 code No. 2 code No. 3 column column column column column column column column column column column column column (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) 1 Design' manufacture, shop, test, preserve, pack and furnish for main equipment for Rutenberg Power Station units 3&4, as detailed in Annex. B, dubdivided as follows: DDP CD Main equipment for unit 3, subdivided as follows: VDC STORAGE BATTERY - stationary vented lead acid type GroE 1100 Ah 2 unit Earthquake proof battery racks 2 unit Spare dry cell 2 unit Set of Maintenance Tools and Equipment 1 set All other parts and accessories necessary to meet the requirements of the Specification and not listed above (aas detailed by Contractor) 1 set Disassembling, evacuating and transporting of the old batteries from the site to an autorized recycling plant: 2x107 flooded Lead Acid cell 220VDC; 1100AH 1 work Instalation and comisioning and putting in to operation 1.2 Main equipment for unit 4, subdivided as follows: 1 work VDC STORAGE BATTERY - stationary vented lead acid type GroE 1100 Ah 2 unit Earthquake proof battery racks 2 unit Spare dry cell 2 unit Set of Maintenance Tools and Equipment 1 set All other parts and accessories necessary to meet the requirements of the Specification and not listed above (aas detailed by Contractor) 1 set Disassembling, evacuating and transporting of the old batteries from the site to an autorized recycling plant: 2x107 flooded Lead Acid cell 220VDC; 1100AH 1 work Instalation and comisioning and putting in to operation 1 work code No. 4 25/10/2017 Rutenberg Power Station Page C1 - G2-5 - of - 7

6 Item Number Description Required Schedule Code of Milestone Months from estimated Commencement Date to delivery to Site* column column column (1) (2) (3) (4) (5) Rutenberg Units 3&4 * The schedule requirements are stated herein in months from estimated date of execution of the Contract for DDP site deliveries. For FOB deliveries the schedule requirements are one (1) month shorter (to allow timely shipment to site within the same time frame). The exact delivery dates shall be stipulated in the Price breakdown upon Contract Signature. Estimated date of Execution of Contract: Estimated Commencement Date: 1.1 Main Equipment for Rutenberg Power Station Unit 3 CD-0 3 months 1.2 Main Equipment for Rutenberg Power Station Unit Disassembling, evacuating and transporting of the old batteries from the site to an autorized recycling plant: 2x107 flooded Lead Acid cell 220VDC; 1100AH Instalation and comisioning and putting in to operation 9 months 2 week per Unit Supplier's Confirmation:, erection, start up and testing schedule required for the project: Can Supplier meet the above schedule? (Yes/No) What is the shortest delivery schedule supplier can meet? 25/10/2017 Page C1 - G2-6 - of - 7

7 Shipping Weights and Volumes Item Number Description Code of Milestone Estimated Shipping Weights and Volumes to be filled in and submitted by supplier as an integral part of its Proposal column column column column column column column (1) (2) (3) (4) (5) (6) (7) Weight (kg) Container size (m 3 ) No. of Containers Remark 1.1 Main Equipment and related Accessories for Rutenberg, Unit 3&4 1.2 Main Equipment and related Accessories for Rutenberg, Unit 3&4 CD-0 CD-0 25/10/2017 Page C1 - G2-7 - of - 7