Premier Airport Park Airport Haul Road, Fort Myers, FL , ,836 SF FOR LEASE ALL OR PART

Size: px
Start display at page:

Download "Premier Airport Park Airport Haul Road, Fort Myers, FL , ,836 SF FOR LEASE ALL OR PART"

Transcription

1 Phase I Under Construction - Complete 2nd Qtr 2019 Premier Airport Park Airport Haul Road, Fort Myers, FL , ,836 SF FOR LEASE ALL OR PART

2 is a acre Industrial Planned Development (IPD) entitled for 1,875,000 SF of industrial, manufacturing, warehousing, high-cube warehousing and office park use (Project). The Project is being developed under the management of Principal Real Estate Investors (Principal), Des Moines, IA. Principal Real Estate Investors manages or sub-advises $74.9 billion in commercial real estate assets*. The firm s real estate capabilities include both public and private equity and debt investment alternatives. Principal Real Estate Investors is the dedicated real estate group of Principal Global Investors, a diversified asset management organization and a member of the Principal Financial Group. *As of 30 September 2017 Within close proximity to Southwest Florida International Airport (RSW), Interstate 75 (I-75), Florida Gulf Coast University and easy access to all markets, this Project will serve existing business wishing to expand, and welcoming new businesses seeking Class-A industrial/warehousing facilities in Southwest Florida. RSW offers domestic and international passenger and freight flight options, and the Project is also situated in close proximity to numerous brand name hotels, a wide variety of fast food, fast casual and fine dining options, and range of retail opportunities to support needs of employees, executives, vendors, suppliers and visitors.

3 PROPERTY DETAILS AVAILABLE SPACE: BLDG-1B = 106,836 SF (will divide) / DOCK HIGH, REAR LOADED CLEAR HEIGHT: 32 CLEAR HEIGHT BACK TO FRONT COLUMN SPACING: 170 TOTAL - 60 SPEED BAY IN REAR, 55 CENTER, 55 FRONT SIDE TO SIDE COLUMN SPACING: 61.7 TOTAL WIDE END CAPS, 54 WIDE INTERIOR BAYS TENANT SPACES END CAPS 16,693-25,837 SF TENANT SPACES INTERIOR: 9,143 and up TRUCK DOCKS: 30-9 WIDE X 10 TALL OPENINGS ALONG TRUCK COURT AREA. DRIVE-IN RAMPS AT EACH END OF BUILDING (16 WIDE BY 14 TALL OPENINGS) 2 - DRIVE-IN RAMPS AT CENTER OF BUILDING (16 WIDE BY 14 TALL OPENINGS) TRUCK COURT: 180 FOR BACK TO BACK BUILDINGS, 120 FOR SINGLE LOAD BUILDING PARKING: 183 SPACES / ALLOWS FOR MAXIMUM 32.5% OFFICE/ SHOWROOM USE UTILITIES: PUBLIC WATER & SEWER, 1,600 AMP THREE-PHASE ELECTRICAL WITH UP TO AN ADDITIONAL 1,200 AMPS AVAILABLE, CENTURY LINK TELEPHONE, CABLE AND INTERNET SERVICE CONSTRUCTION DETAILS: TILT WALL, IMPACT GLASS WINDOWS, TPO MEMBRANE ROOF SYSTEM, ESFR FIRE SUPPRESSION, 6 THICK RE- INFORCED 4,000 PSI CONCRETE SLAB, 60 WIDE CON- CRETE TRUCK COURT APRON Planned and constructed in accordance with Class A industrial standards for bulk storage distribution and manufacturing. The Project location and the quality of the building and site infrastructure improvements are ideal for corporate presence. Project under construction with Building 1B completion scheduled for 2nd quarter of 2019.

4 P MAI ESRI NAGI R P O R T PA R K 2.R E LE SITE PLAN DRA BLDG NO.5B 168,122 S.F. (830'X200') 230 Parking 51 Loading Docks BLDG NO.5A 168,698 S.F. (824'X200') 230 Parking 50 Loading Docks E-15 NE CONSE AREA E-12 D-8 D-6 NORTH LAKE NORTHERN LOOP DRIVE B-5 E-1 BLDG NO.4A 171 Parking BLDG NO.4B 171 Parking BLDG NO.3A (267 Sf Maint Rm) 171 Parking BLDG NO.3B 171 Parking 277 Parking SOUTHWEST CONSERVATION AREA 1,669,658 sf / Acres 5-Story OFFICE-B 80,000 SF E-9 E-8 BLDG NO.2A 106,750 S.F. (617'X 170') 162 Parking EASTERN LOOP DRIVE E-3 PHASE ONE UNDER CONSTRUCTION 276 Parking E-4 BLDG NO.2B 107,050 S.F. (617'X 170') 160 Parking B-6 5-Story OFFICE-A 87,000 SF EAST LAKE D-7 E-10 BLDG NO.1A 106,750 S.F. (617'X170') 161 Parking/ BLDG NO.1B 106,750 S.F. (617'X170') 161 Parking/ E-6 E-5 E-7 A-1 DRA B-1 DRA D-1 F-1 B-2 D-2 19,577 GSF 156 Pking WESTERN LOOP DRIVE E-11 CENTRAL DRIVE BLDG NO.7A 88,239 S.F. (617'X140') 150 Parking/ BLDG NO.7B 88,239 S.F. (617'X140') 150 Parking/ E-2 F-1 FPL PARCEL (Not Included) NORTHWEST CONSERVATION AREA 863,690 sf / Acres E-13 WESTERN LOOP DRIVE EXTENSION BUILDING NO.6A 88,523 S.F. (543' X 160') 141 Parking/28 Loading Docks BLDG NO.6B 170 Parking/ DRA E-14 A-2 B-3 D-3 1 1"=150'-0" MASTER SITE PLAN_Scheme A1 SE CONSE AREA

5 2. PREMIER LEASING AIRPORT PARK BUILDING PLAN BAY 1-2 BAY 3-4 7, (BLDG) (ENTRY) (COMMON) 7, GSF BAY 2-3 9, (BLDG) 00.0 (ENTRY) (COMMON) 9, GSF 9, (BLDG) 00.0 (ENTRY) (COMMON) 9, GSF BAY 4-5 9, (BLDG) (COMMON) 9, GSF BAY 5-6 9, (BLDG) (COMMON) 9, GSF BAY 6-7 9, (BLDG) (COMMON) 9, GSF BAY 7-8 9, (BLDG) (COMMON) 9, GSF LOADING DOCKS BAY 8-9 9, (BLDG) 65.01(ENTRY) (COMMON) 9, GSF BAY , (BLDG) (COMMON) 9, GSF BAY , (BLDG) 00.0 (ENTRY) (COMMON) GSF BAY , (BLDG) 00.0 (ENTRY) (COMMON) 9, GSF BAY , (BLDG) (ENTRY) (COMMON) 7, GSF EASTERN LOOP DRIVE ENTRANCE

6 BEN HILL GRIFFIN PKWY LOCATION The Project Is accessed from Interstate I-75 at the Alico Road interchange (Exit 128) and situated along Airport Haul Road to the east. The Project is bounded by Southwest Florida International Airport to the north and Airport Haul road to the east. Existing Lee County potable water storage tanks and future FPL substation site are located adjacent to the northeast corner of Project and separated from approved development area by a 43+/- acre Conservation Area open space. Over the period of 2018 through 2020 Lee County will be expanding Alico Road to a four-lane divided highway from Ben Hill Griffin Parkway to approximately 1,000 east of Airport Haul Road. County will also be reconstructing the Alico/Airport Haul Road intersection to a full median opening align with the proposed CR-951 roadway connection to Corkscrew Road to the south providing direct access to ample management housing opportunities. The Alico/AHR intersection is planned for future signalization when warranted. Lee County long range transportation plans also provide for Alico Road extension to the northeast connecting to SR-82 in Lehigh Acres providing direct access to worker housing opportunities and an road connecting Airport Haul Road to Ben Hill Griffin Parkway extending in part along the Project southern boundary. Public bus transportation is also proposed to serve the Project along Airport Haul Road with routes along Alico and Ben Hill Griffin Pkwy to the south and west, and through the Airport, Treeline Road and Daniels/Gateway Roads to the north and east. TERMINAL ACCESS RD ALICO ROAD

7 DANIELS PARKWAY SKYPLEX TERMINAL ACCESS RD AIRPORT HAUL ROAD ALICO ROAD - EXIT 128 GULF COAST TOWN CENTER SHOPPES AT UNIVERSITY PLAZA Wild Blue 1,000 Planned Residences Center Place 1,950 Planned Residences ESTERO PARKWAY NORTH

8 2. PREMIER LEASING AIRPORT PARK Convenient accessibility to Southwest Florida International Airport, Interstate 75, and several east-west arterials make this Project an ideal centrally situated distribution facility with convenient access to the following regional business and transportation hubs within Florida: 35 +/- miles from downtown Naples, FL (via I-75 / Co Rd 886 / US-41) 90 +/- miles from downtown Sarasota, FL (via I-75 / FL-780) 110 +/- miles from Port Manatee, Palmetto, FL (via I-75 / I-275 / US-41) 125 +/- miles from Fort Lauderdale International Airport and Port Everglades (via I-75 / I-595) 140 +/- miles from Port of Tampa (via I-75 / FL-618) 140 +/- miles from Port of Fort Pierce (via I-75 / FL-80 / FL-70) 145 +/- miles to Tampa International Airport via I-75 / I-275) 150 +/- miles to Miami International Airport and Port of Miami (via I-75 / SR-826 / SR-836) /- miles to Orlando International Airport via I-75 to I-4) 340 +/- miles to Jacksonville Airport and Port of Jacksonville (via I-75, I-10, and I-295)

9 PREPARED BY: COLLIERS INTERNATIONAL University Dr., Suite# 101 Fort Myers, FL CONTACT US DAN MILLER FRED KOLB, MBA, CCIM