IFTSTA APPENDIX. for Message Implementation Guideline. based on. IFTSTA International multimodal status report message UN D.01C S3

Size: px
Start display at page:

Download "IFTSTA APPENDIX. for Message Implementation Guideline. based on. IFTSTA International multimodal status report message UN D.01C S3"

Transcription

1 APPENDIX for Message Implementation Guideline IFTSTA based on IFTSTA International multimodal status report message UN D.01C S3 Version: D.01C Variant: Status message for and non transports Issue date: Author: CI/OSI4 Contact:

2 Appendix for IFTSTA D.01C Status message for transport services Appendix 1 Value HCO CFS HCD WHS CUS DIS POL POD Description HUB/CC origen CFS, port gateway position HUB/CC destination Warehouse Customer Dispatch area supplier Port of loading Port of discharge Appendix IFTSTA D.01C Issue date: Page: 2 /5

3 Appendix for IFTSTA D.01C Status message for transport services Pickup Code Responsible* Follow-up*** Examples P01 Pick-up delayed by carrier P03 Pick-up delayed by Supplier supplier P04 Pick-up delayed by hub Hub P05 Pick-up cancelled due to missing container P06 Pick-up cancelled. No pick-up possible (missing goods/closed gate) P07 Pick-up delayed due to late assignment by P09 Pick-up cancelled due to wrong pick-up address P10 Pick-up cancelled due to cargo damaged Supplier Hub - Supplier/HUB Delay due to any operational delay/issue of execution Team e.g.: TO assigned after agreed cutoff Cargo damaged, handover canceled. Hub/CC H01 Special X-Ray needed / Black Alarm X-ray - H02 Goods damaged at HUB Hub Hub H03 Sorting error Hub Hub H04 Hand-over after cut-off from carrier Hub Cargo not ready by agreed cut-off time when pick-up. Transit T01 Flight cancelled Aircraft/vessel/rail delay late departure, postponed, cancelled T02 Flight/Vessel rerouted T03 Port congestion T04 Not loaded in planned flight / vessel T05 Cargo received after cut-off T07 Goods not available for pick-up at port / airport Appendix IFTSTA D.01C Issue date: Page: 3 /5

4 IFTSTA D.01C Transport status message for services T08 Goods lost Shipment declared as lost by LSP. T09 Space limitation Aircraft/vessel/rail overbooked/balance issue T10 Security delay - Delay due to aviation security check or screening delay. T12 Goods damaged during transport Shipment received damaged during carriage. Delivery D01 Delivery delayed by carrier D02 Delivery delayed by hub Hub Hub D03 Delivery cancelled due to wrong delivery address D04 Delivery refused by the Consignee consignee D05 Delivery attempt failed Consignee Consignee (customer closed) D06 Delivery attempt failed (improper equipment) D07 Delivery incomplete D08 Goods missing, only data D09 Consignee address no accessible Consignee Consignee D10 Name of consignee unclear D11 Second delivery Shipment sent to wrong destination or shipment received mislabelled with the wrong HB or MB label. Consignee rejected the shipment due to any reason. Consignee closed on delivery date. Shipment is missing / unlocated under the custody of LSP. Consignee Consignee Name of consignee unreadable (printing, special letters etc.) D12 Booking customer Delivery refused by receiver. Wrong delivery date, missing AVIS. Documents C01 Invoice missing C02 MRN missing C03 Packlist missing C04 Documents don t match TO C05 Documents don t match actual physical shipment C06 Customs hold - Missing pre-announcement / documents TO content is missing or wrong Higher/lower volume than in PO Missed or incomplete information from LSP causing shipment to be delayed during shipping. EDIFACT IFTSTA D.01C Issue date: Page: 4 /5

5 IFTSTA D.01C Transport status message for services C07 Customs hold - Special or random check - C08 Customs hold - Contains goods with export restrictions C09 Other documents missing Others O01 Transport order cancelled Shipment booking cancelled by consignor O02 Other reasons - To be defined, reviewed and confirmed bilateraly (excl. Weather & Force Majeure) O03 In clarification - Problem not identified yet O04 Special cargo - Oversize cargo (size, weight), dangerous goods O05 Shipment OK - Shipment ontime without deviations. O06 Delayed due to force - Extreme weather, unforeseen strike, terrorism majeure O07 Traffic jam - Weather, strike, holiday, road condition, terrorism O08 TO is missing or incomplete One or more TOs are physically not on the load. action needed. * is contractually responsible for shipment, also when using subcontractors. ** Exception can be charged to responsible party. *** Follow-up party for clarification of exception EDIFACT IFTSTA D.01C Issue date: Page: 5 /5