1 NIGERIA PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECT INFRASTRUCTURE CONCESSION REGULATORY COMMISSION (ICRC) ABUJA. Date: January 2011 The ICRC Procurement will soon take a good shape with the proposed recruitment of some Specialists to man the procurement affairs of the Commission. At the moment some procurement activities are being carried out through the PPF facility as a support to the PPP project take off. Procurement arrangements under the proposed PPP project will be conducted in accordance with the World Bank Procurement Guidelines dated May 2004 and revised October, INFRASTRUCTURE CONCESSION REGULATORY COMMISSION (ICRC) Nigeria PPP Project I. General Procurement Plan Project information: Public Private Partnership (PPP) Project 2. Bank s approval Date of the procurement Plan: 2011) 3. Date of General Procurement Notice: Period to be covered by current procurement plan: 18 Months (January 2011 June 2012) II. Goods and Works and non-consulting services. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement Procurement Method Prior Review Threshold Comments 1. ICB and LIB (Goods) 750 All 2. NCB (Goods) <750 None 3. ICB (Works) 5000 million All 4. NCB (Works) <5000 None 5. ICB (Non- Consultant Services) 750 All 6 Shopping <50 None 7 Direct Contracting All Values All 2. Pre-qualification : None. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Yes Reference to (if any) Project Operational/Procurement Manual: i. Project Implementation Manual ii. Project Appraisal Document (PAD) iii. Procurement Manual iv. Financial Management Manual Note: ICB = International Competitive Bidding 60956

2 LIB = Limited International Bidding NCB = National Competitive Bidding DC = Direct Contracting NS = National Shopping Any Other Special Procurement Arrangements: NA ICB, NCB, LIB BS, Direct Contracting, etc depending on the nature, complexity and amount of the package. The method to be used shall be detailed out in the ICRC Procurement Plan. III. Selection of Consultants 1. Prior Review Threshold: Selection Method Prior Review Threshold Comments 1. QCBS (Firms) 200 All 2. Single Source (Firms) All values All 3 Consultants Qualifications (CQs) <200 None 4 Least Cost Selection <200 None 5 Individual Consultants (IC) 100 All 6 Individual Consultants (IC) <100 None QCBS = Quality and Cost Based Selection CQ = Consultants Qualifications LCS = Least Cost Selection IC = Individual Consultants SS = Single Source (a) Short list comprising entirely of national consultants; Short list of consultants for services, estimated to cost less than $200, equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the consultants Guidelines (b) Any Other Special Selection Arrangements: NA (c) Consultancy Assignments with Selection Methods and Time Schedule A) PPP Project 5. Consultancy Assignments with Selection Methods and Time Schedule Ref. No. Description of Assignment Estimated Selection Method Review by Bank Expected Proposals Comments (Prior / Post) Submission Date ICRC ƃ ƒ ÃÅ Ž Ãà à QCBS Prior Jun 2011 MOE à Ãà à QCBS Prior Jun 2011 Žƒ ÃÇ Ž à à QCBS Prior Jun 2011 ƒ à ƒ ŠÃƒ ƒ à QCBS Prior Jun 2011 ƒ à Š à à ÃÄà à à ƒžãä à à à QCBS Prior Jul 2011 È ƒžã à à QCBS Prior Jul 2011 à à Š ƒžãä à à à à Ž à à QCBS Prior Jul 2011 MOW ƒžã à à QCBS Prior Aug 2011 MOT ÃŽƒ à à QCBS Prior Aug 2011 FMOH ƒ Ãà à à QCBS Prior Sept 2011

3 ÃÉ ƒ à à QCBS Prior Oct 2011 DMO Æ Ã ƒ Ž à ƒ à QCBS Prior Oct 2011 É ƒ à à ŠÃ ƒ ÃÉ ƒ à à QCBS Prior Oct 2011 FBO ÉÃÉ ƒ à à QCBS Prior Nov 2011 Éà ƒž Ãà à QCBS Prior Nov 2011 CBN É ƒ ÃÄ Ãà à QCBS Prior Nov 2011 à Š ƒžãä à Ãà à QCBS Prior Dec 2011 STATE ƒ à ƒ ŠÃÄ Ã Ã QCBS Prior Dec 2011 LEGAL ƒžãä à à QCBS Prior Dec 2011 PFI ÉÃÇÃŽƒ Úà à à QCBS Prior Dec 2011

4 PROCUREMENT PLAN - COMPONENT 2 PPP PROJECT PREPARATION AND TRANSACTION ADVISERS OBC Ref No A Expected Proposal Submission Date Estimated Cost in USD Description of Assignment (000) Selection Method Review by Bank (Prior/Post Federal Min of Works - First Movers Technical Advisers for under listed Roads: 1 Shagamu-Benin Highway- 500,000 QCBS Prior May Benin-Asaba Highway 500,000 QCBS Prior May Abuja - Kaduna Highway 500,000 QCBS Prior June Kaduna- Kano 500,000 QCBS Prior July 2011 Federal Ministy of Transport Technical Advisers for under listed B Roads: Kiri Kiri LT I and II 5 Concession 500,000 QCBS Prior July 2011 Onistsha Inland Port June Concession 500,000 QCBS Prior East West Railway 7 (Greenfield) 500,000 QCBS Prior June 2011 Federal Ministry of Aviation- Technical Advisers for under listed C Airports: 8 MMIA Airport Lagos 500,000 QCBS Prior August PHC Int Airport, Omagwa 500,000 QCBS Prior August 2011 Mallam Aminu Int Airport August Kano 500,000 QCBS Prior Margret Ekpo Int Airport 11 Calabar 500,000 QCBS Prior August 2011 Federal Capital Territory- Technical Advisers for D under listed Water Works: 12 Kuje Water Works 500,000 QCBS Prior August Abuja Light Railway Lot 2 500,000 QCBS Prior August 2011 Other Technical E Advisers/consultants Prior Abuja Int Tertiary Military Oct Hospital-FMO Health and 14 Defense 500,000 QCBS Prior FRSC National Driver Oct Behavior Modification PPP 500,000 QCBS Prior 15 NOTAP and ICRC HQs 500,000 QCBS Prior Oct 2011 Comments

5 16 17 Development National Prison Concession Pilot 500,000 QCBS Prior Federal Inland Waterways Concession Expansion 500,000 QCBS Prior Oct 2011 Oct nd Niger Bridge at Onitsha 500,000 QCBS Prior Nov Enugu -PH Expressway Concession 500,000 QCBS Prior Transaction Advisers for FBC 50,000,000 QCBS Prior Nov 2011 Nov SEA and EIA Workflow 3,500,000 QCBS Prior Dec 2011