1 PetroChina (Halfaya) Tender Announcement for Provision of Drilling Unit Ref. No.: TA/ /01 Announcement period: From 10:00 am on April 19 th, 2010 to 10:00 am on May 9 th, 2010 (Beijing time, P.R. China) From 5:00 am on April 19 th, 2010 to 5:00 am on May 9 th, 2010 (Baghdad time, Iraq) Tender by: PetroChina (Halfaya), Operator at Halfaya Oil Field in Iraq, hereinafter referred to as Company if necessary. Background Information : Within the framework of Iraq s second petroleum bidding round organized by the Iraqi Ministry of Oil on December 12 th, 2009, the consortium led by PetroChina Company Ltd. signed on January 27 th, 2010 a 20-year Development and Production Contract with Missan Oil Company for super-giant Halfaya oil field. PetroChina is assigned the operator in the consortium, alongside partners Total E&P Iraq Petronas Carigali Sdn. Bhd. and the State Partner South Oil Company. Halfaya oil field is located in the Missan governorate at the Southeast of Iraq, 35 kilometers southeast of Amarah city, and spreads across 30 kilometers long and 10 kilometers wide. Purpose: As the contract became effective from March 1 st, 2010, PetroChina launched the project and would invite sealed bids from eligible suppliers worldwide for the supply of the following service by way of International Competitive Bidding. This Tender Announcement was released on at 8:00 am (Beijing time, China) on April 19 th, 2010 and on at 3:00 am (Baghdad time, Iraq) on April 19 th, 2010 respectively. Page 1 of 7

2 1. TENDER DETAILS: Bidding Details Contract Details Work Description ITB Package Request Fee: ITB Package Distribution Period: Bid Closing Time and Date: Technical and Commercial Bid Opening Time and date: Offer Validity Period: Contracting Mode: Contract Duration: Currency: Type of Offer: Work Area: Terrain of Work Area: Type of Operation: Main Equipments Requirements: Drilling Unit USD (Cash only). From 10:00 am April 19 th, 2010 to 10:00 am May 9 th, (Beijing time, P.R. China) From 5:00 am April 19 th, 2010 to 5:00 am May 9 th, (Baghdad time, Iraq) At 10:00 am on May 9 th, (Beijing time, P.R. China) At 5:00 am on May 9 th, (Baghdad time, Iraq) At 2:00 pm on May 9 th, (Beijing time, P.R. China) At 9:00 am on May 9 th, (Baghdad time, Iraq) 90 days after Bid Closing Date. Competitive bidding through open tender. 1 year + 1 year (optional). USD only. Mixed rate as per ITB requirement. Halfaya Oil Field. Relatively smooth with elevation from 8m to 12m, portion of swamp in the southeast part. Vertical and horizontal well drilling. 1. GENERAL SPECIFICATIONS HP rig, less than 10 years old and must have been completely refurbished and upgraded within the last three (3) years. - electrically driven (SCR or VFD) with sufficient capacity to set 7, 29ppf casing to 3500m. - lifting system capacity: API Load rating Min 3150 kn Page 2 of 7

3 - c/w TDS, Varco TDS-11SA or equivalent - Rotary Table, independent electric or hydraulic driven. 2. POWER PLANT - CAT3512 generators - one backup generator - Minimum 3 each 50m3 baffled fuel tanks. 3. TUBULARS - Min 2,500m of 5-1/2 OD, 21.9ppf & 2,500m of 5 OD, 19.5ppf & 4,500m of 3-1/2 OD, 13.3ppf, 18 degree friction welded tool joint, R2, Grade G-105 DP. Brand new or as new Premium Grade, internally plastic coated, smooth surface flush hard facing. - 9 x 9, 15x 8, 24 x 6-1/2, 24 x 4-3/4 OD spiral DC, 2 each of 8, 6-1/2 Non-magnetic DC - 80 x 5 OD HWDP and 60 x 3-1/2 OD HWDP 4. CASING & TUBING RUNNING EQUIPMENT - complete casing handling and running equipment manual rotary & hydraulic power tongs for 20, 13-3/8, 9-5/8, 7, 5-1/2 and 4-1/2 casing - slip type casing spider / elevator for 13-3/8, 9-5/8, 7, 5-1/2, 4-1/2 casing 5. MUD CIRCULATING SYSTEMS - Min three (3) sets of 1300HP mud pump, Single acting Triplex, electrical or mechanical independent drive with torque converter - Active Tanks Min. 300m3, reserve Tanks Min. 180m3 - mud shearing system and mud mixing system - Minimum 2 50m3 water tank, each C/W circulating / transfer pumps - Shale shakers, three (3) sets of DERRICK, SWACO, or equivalent - desander - desilter - centrifuge, two (2) sets Page 3 of 7

4 - mud gas separator (poor boy), H2S certified - vacuum degasser - dual stand pipe 6. FISHING TOOLS - complete range of fishing tools and accessories to fish all contractors down hole equipment in 26, 17-1/2, 12-1/4, 8-1/2, and 6 hole sizes. 7. BLOWOUT PREVENTION EQUIPMENT (BOP) - Complete BOP system must be API certified and suitable for use in an H2S / CO2 environment /8 10k single ram BOP /8 10k double rams BOP /8 5k spherical/bag type BOP /4 2k double rams BOP /4 2k spherical/bag type BOP psi kill line psi choke lines, choke manifold - 15,000psi working pressure test pump unit - accumulator unit 8. CAPM AND CATERING FACILITIES - full of camp and catering facilities - Max. 20 personnel catering services for Company, third party personnel 9. VEHICLES - one set of 50 tons Crane - one set of 5 tons Forklift Page 4 of 7

5 Terms and Conditions Personnel: Bid Bond: Payment Terms: Split Award: Liquidated Damages: Performance Bank Guarantee: Additional Documents Required: - one set of 10 tons trailer - two sets of pickups - one sets of mini-bus c/w min. 15 seats Contractor s WORKSITE Personnel - Rig Manager, Eight (8) years [two (2) years international] experience, fluent english; - Toolpusher, Eight (8) years [two (2) years international] experience, fluent english; - Driller, Six (6) years [two (2) years international] experience, fluent english; - Assistant Driller, Two (2) years [one (1) year international] experience; - Crane Operator, Two (2) years experience; - Roustabout Foreman, Iraqi preferred; - Medic, Medic (Class - 1) or equivalent. - IADC Well Control, HSE, H 2 S and Healthy Certification 10% of the proposed contract value. Within 60 days from receiving invoice and supporting documents. Not allowed. 0.2% per day delayed up to a maximum of 10% of the proposed contract value. 10% of the proposed contract value. Winning Bidder shall submit a Bank Guarantee acceptable by the Company to guarantee that the bidder shall perform all of his obligations under the contract. Shall submit an authorization letter from proposed contractor if bidder is an agent. Shall submit Performance Guarantee from Principal if winning bidder is a subsidiary or branch company. 2. QUALIFICATIONS AND DOCUMENTS REQUIRED FOR ITB PACKAGE REQUEST: All interested companies with full capability to perform the service described above are welcome. However, successful experience for similar service is mandatory. Only after receiving the following documents and ITB Package Request Fee, Company will process the request and issue ITB Package to eligible bidders: Page 5 of 7

6 2.1 Filled ITB Package Request Form (please refer to the attachment). 2.2 Copy of Certificate of Incorporation. 2.3 Copy of Certificate in which the name of legal representative is registered. 2.4 Copy of Certificate of Trade. 2.5 Original Power of Attorney to whom ITB package will be received. This Power of Attorney must be signed by the legal representative of the interested company. 2.6 Performance experiences for last three (3) calendar years, containing the name of the project(s), name of the client(s), value of contract(s), scope of work, and location(s) of service provided. 2.7 Audited financial statement for last three (3) fiscal years in support of sound financial standing. All the documents required hereinabove shall be delivered to the following address within valid ITB Package Distribution Period either in person or by mail through EMS, or DHL, or UPS, or FEDEX, or TNT, costs incurred therefrom shall be borne and paid by applicants. 3. CONTACT INFORMATION: All interested companies registered in Iraq shall submit all the required documents with request fee to Amarah Office located in Amarah, Iraq. All other interested companies registered outside Iraq shall submit all the required documents with request fee to Beijing Office located in Beijing, P. R. China. Beijing Office (Beijing, P.R. China): Contact : Mr. YAO, Jianping, Manager of CPL Dept., PetroChina (Halfaya) Office Hours: 8:00 am to 5:00 pm, local time Tel : (0086) Fax : (0086) yaojp@cnpcint.com Address : Room 461 West Wing, # 8 Liupukang Street, Xicheng District, Beijing , P. R. China Page 6 of 7

7 Amarah Office (Amarah, Iraq): Contact : Mr. YAN, Shihe, Field Manager, PetroChina (Halfaya) Office Hours: 8:00 am to 5:00 pm, local time Tel : (00964) , , yanshihe@cnpcint.com Address : PetroChina (Halfaya), in the yard of Missan Oil Company, Industrial Area, Amarah City, Missan Governorate, Iraq Remarks: The ITB Package Request Fee is nonrefundable. Company reserves the right to curtail/enhance the scope of the work stated above or cancel if required. Company reserves the right to accept or reject request(s) for ITB Package without assigning any reasons. Page 7 of 7

8 PetroChina(Halfaya) CPL Department Halfaya Room 461 West Wing # 8 Liupukang Street, Xicheng District, Beijing , P.R. China Tel: Fax: Mobile: yaojp@cnpcint.com Part A (Filled by Applicants) Request Details: Name of the Project: Ref. No.: ITB Package Request Date: Request Form for ITB Package Company Information: Name of the Company: Registered Address: Registration No. of Certificate of Incorporation: Name of Legal Representative: Contact: Fax: Address: Scope of Business Registered Capital: Tel: Required Documents: Check the box if attached 1. Filled ITB Package Request Form 2. Copy of Certificate of Incorporation 3. Copy of Certificate in which the name of legal representative is registered 4. Copy of Certificate of Trade 5. Original Power of Attorney 6. Summary of Performance Experiences for last three (3) calendar years 7. Audited financial statement for last three (3) fiscal years Part B (For Official Use Only) Received by: Date: Signature: Date: