SELF STORAGE LAND FOR SALE

Size: px
Start display at page:

Download "SELF STORAGE LAND FOR SALE"

Transcription

1 An opportunity to acquire 5 Acres gross of C1 zoned land on Amethyst Road. This site is ideal for a Self Storage or Neighborhood Retail Center that is in the path of growth making it strategic asset that will appreciate well into the future. N Seneca Road Amethyst Road Palmdale Road Hwy 18

2 Property Highlights Two parcels totaling 5 acres Gross consisting of ±4.09 acres Net Future self storage development site could yield ±92,000 SF of rentable space Frontage on Amethyst Rd a heavily traveled north/south thoroughfare and proposed super arterial roadway surrounded by growing population Contiguous 5 acre gross parcel sold in 2017 for $2.63 /psft ($520,000.00) Reliable Self Storage an existing 92,000 SF 564 unit project on 5 acres gross to the north has an assessed value of $3.8MM

3 Located on 2 Future Super Arterial Roadways Victorville has invested an estimated $500 million in its infrastructure systems, which includes runways, natural gas and electricity interconnects, roadways, public utility systems, and a wastewater treatment plant. Located below the intersection of Seneca Rd and Amethyst Rd the site benefits from high daily traffic volume. Super Arterials transport large volumes of intercity and regional traffic at higher speeds than arterial roads and connect to freeways to distribute traffic to other facilities such as major and secondary arterials in the City. Super arterials have a 124-foot wide right of way consisting of six travel lanes, Onstreet parking, is restricted to distances 300 feet or greater from the signalized intersections. This city of Victorville has made road improvements a top priority to accommodate the increase of population and traffic volume on the major thoroughfares.

4 Ready to Build Commercial Site C1- Neighborhood retial zoning allows for a variety of neighborhood retial related services uses including self storage, neighborhood shopping center and commercial pads. Development in the City of Victorville is gaining momentum in retail, residential and industrial sectors. Identified as the logical path of progress public home builders like DR Horton, Frontier Communities and KB Homes are selling out inventory and picking up more projects expanding the city limits west. To the south of the site is Hwy 18 Palmdale Rd the dominant goods-movement corridor East- West through the High desert. Highway 18 corridor services the communities of Palmdale, Adelanto and Victorville and continues to experience steady growth. With increased residential traffic, as well as commercial traffic on the highway, the 2013 traffic count is beyond 40,000 per day.

5 Property Information Seneca Rd APN s & Acres - 92,000 SF 564 Units SIZE 5 Acres Gross Acres Net ZONING C1 - Commercial Amethyst Rd 5 Acres Sold for $2.63 / psft or $520, Herbert St TOPOGRAPHY MUNICIPALITY VISIBILITY FRONTAGE Level Site City of Victorville Located on Amethyst Road 260 feet on Amethyst Road UTILITIES Curb/Gutter, Electricity, Gas, Sewer, Water Buyer to Verify. PRICE $2.24/psft or $488,000.00

PREMIER DEVELOPMENT LAND (For Sale or Lease)

PREMIER DEVELOPMENT LAND (For Sale or Lease) An opportunity to acquire 110 Acres of business park land on a proposed freeway offramp. This prime development site located across from the Southern California Logistics Airport (SCLA) with the 2nd longest

More information

INDUSTRIAL LAND FOR SALE

INDUSTRIAL LAND FOR SALE INDUSTRIAL LAND FOR SALE An opportunity to acquire 27.50 Acres of Industrial land. This prime development site located near SCLA and contiguous to Northwest Pipe has several factors making this a desirable

More information

CANNABIS CULTIVATION LAND

CANNABIS CULTIVATION LAND An opportunity to acquire 38.21 Acres of (LM) Light Manufacturing zoned land in the heart of Adelanto s industrial area. This prime development site just south of the Southern California Logistics Airport

More information

Chapter Six Future Transportation and Land Use

Chapter Six Future Transportation and Land Use Chapter Six Future Transportation and Land Use Master Thoroughfare Plan Purpose The purpose of the Master Thoroughfare Plan is to determine the size and distribution of the roadway network, taking into

More information

COMPREHENSIVE PLAN Executive Summary C ITY OF ENNIS, TEXAS

COMPREHENSIVE PLAN Executive Summary C ITY OF ENNIS, TEXAS COMPREHENSIVE PLAN 2000-2020 Executive Summary CITY OF ENNIS, TEXAS COMPREHENSIVE PLAN 2000 2020 EXECUTIVE SUMMARY! The Future Land Use Plan! Public Facilities Plan (Map) Table of Contents! Parks, Recreation

More information

1. SUMMARY. Volume Two contains the summaries of key specific plan background data, information and all appendices that are referenced in Volume One.

1. SUMMARY. Volume Two contains the summaries of key specific plan background data, information and all appendices that are referenced in Volume One. 1. SUMMARY This Imperial Center Specific Plan has been prepared to establish policy and development guidelines for a regional commercial center that will be designed for specialty, retail and wholesale

More information

exclusive LEASE OFFERING memorandum MAIN STREET, hesperia, ca

exclusive LEASE OFFERING memorandum MAIN STREET, hesperia, ca exclusive LEASE OFFERING memorandum MIDTOWN SQUARE COMMERCIAL CENTER 16808-16988 MAIN STREET, hesperia, ca Broker Contact Ryan Travis Executive Vice President 760.983.2594 RTravis@KurschGroup.com BRE #01358790

More information

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal May 2012 Draft Report: Alternatives Screening Version 1.0 1.0 Introduction This document outlines the alternatives screening process used

More information

YOUR GATEWAY TO GLOBAL DISTRIBUTION

YOUR GATEWAY TO GLOBAL DISTRIBUTION YOUR GATEWAY TO GLOBAL DISTRIBUTION INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #44 9.954 GROSS ACRES DLH PARCEL #45 10.83 GROSS ACRES DLH PARCEL #47C 5.7+/- GROSS ACRES 4300 TELEPHONE ROAD DALLAS, TEXAS T

More information

YOUR GATEWAY TO GLOBAL DISTRIBUTION

YOUR GATEWAY TO GLOBAL DISTRIBUTION YOUR GATEWAY TO GLOBAL DISTRIBUTION INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #44 9.954 GROSS ACRES DLH PARCEL #45 10.83 GROSS ACRES DLH PARCEL #47C 5.7+/- GROSS ACRES 4300 TELEPHONE ROAD DALLAS, TEXAS T

More information

2016 MAJOR GENERAL PLAN AMENDMENT

2016 MAJOR GENERAL PLAN AMENDMENT 2016 MAJOR GENERAL PLAN AMENDMENT GROWTH AREAS ELEMENT GROWTH AREAS ELEMENT 4.0 GOALS 1. Encourage orderly development within Growth Areas. 2. Encourage balanced, mixed use and multi-modal development

More information

For Sale. Fort Knox Self Storage Railroad Avenue Pittsburg, CA. ±125,000 SF of rentable storage area on ±5.54 AC lot

For Sale. Fort Knox Self Storage Railroad Avenue Pittsburg, CA. ±125,000 SF of rentable storage area on ±5.54 AC lot Fort Knox Self Storage 3865 Railroad Avenue Pittsburg, CA ±125,000 SF of rentable storage area on ±5.54 AC lot Built in two phases in 1999 and 2005 Ideal location and a full suite of storage options Self

More information

SECTION 5. Existing Conditions TRANSPORTATION NETWORK TRANSPORTATION

SECTION 5. Existing Conditions TRANSPORTATION NETWORK TRANSPORTATION SECTION 5 TRANSPORTATION Transportation systems are vital for moving people and goods and serving existing businesses. They also play a major role in guiding the location and type of development. The following

More information

+4.09 Acres (178,160 SF) - For Sale ($1.4 M)

+4.09 Acres (178,160 SF) - For Sale ($1.4 M) SWC Technology Dr. & Trade Center Dr. Palmdale, CA 93551 Mark Hong BRE 01067529 Tel (213) 251-9000 markhong@korusre.com Michelle Suh BRE 01335563 Tel (213) 220-6005 michellesuh@korusre.com The information

More information

COLLEGE STATION SHOPPING CENTER

COLLEGE STATION SHOPPING CENTER COLLEGE STATION SHOPPING CENTER RETAIL PROPERTY FOR LEASE 100 COLLEGE STATION Presented By DEWEY PROPERTY ADVISORS 9 Pack Square SW Asheville, NC 28801 deweypa.com EXECUTIVE SUMMARY OFFERING SUMMARY Lease

More information

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives CHAPTER 5 TRANSPORTATION Introduction The transportation system forms the backbone of the community. I-74 provides the community with connections to larger metropolitan areas such as Indianapolis and Cincinnati.

More information

SEEKING RETAIL, RESTAURANT, AND ENTERTAINMENT TENANTS

SEEKING RETAIL, RESTAURANT, AND ENTERTAINMENT TENANTS Republic Development Site -580/El Charro Road, Livermore SEEKING RETAIL, RESTAURANT, AND ENTERTAINMENT TENANTS STEVEN DOLL Sales Associate 408.98.846 sdoll@newmarkccarey.com CA RE License #0995836 & CA

More information

CITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report

CITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report City of Tehachapi CITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report SCH No. 2009101084 Prepared for: City of Tehachapi Community Development Department 115 South Robinson Street Tehachapi,

More information

SECTION III - REGIONAL ARTERIAL SYSTEM. The Regional Arterial System is a subcomponent of a broader regional thoroughfare system.

SECTION III - REGIONAL ARTERIAL SYSTEM. The Regional Arterial System is a subcomponent of a broader regional thoroughfare system. SECTION III - REGIONAL ARTERIAL SYSTEM SYSTEM IDENTIFICATION The Regional Arterial System is a subcomponent of a broader regional thoroughfare system. The NCTCOG Regional Thoroughfare Plan (RTP) recognizes

More information

Application Number: SP Project Name: Lidl Grocery Store, Major Site Plan

Application Number: SP Project Name: Lidl Grocery Store, Major Site Plan Town of Clayton Planning Department 111 E. Second Street, Clayton, NC 27520 P.O. Box 879, Clayton, NC 27528 Phone: 919-553-5002 Planning Board June 26, 2017 STAFF REPORT Application Number: 2017-76-SP

More information

CHAPTER 5: TRANSPORTATION

CHAPTER 5: TRANSPORTATION CHAPTER 5: TRANSPORTATION GOAL 12: TRANSPORTATION BACKGROUND SUMMARY INTRODUCTION Albany s location and transportation facilities provide excellent advantages for commerce and economic development. Albany

More information

Chapter 2 Transportation Element Goals, Objectives and Policies

Chapter 2 Transportation Element Goals, Objectives and Policies Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

INDUSTRIAL LAND FOR SALE. 280 Acres

INDUSTRIAL LAND FOR SALE. 280 Acres An opportunity to acquire 280 Acres of land. This large development site located on the east side of SCLA a 8,500 acre industrial freight hub with a proposed 3,500 acre rail-served multi-modal facility

More information

Transportation Facility Inventory

Transportation Facility Inventory CHAPTER 3 Transportation Element Section 3.1 Introduction Movement of people, goods, and services within and through the Town is an integral part of everyday life for the citizens of Hull. Decisions made

More information

Fairfield Corporate Commons

Fairfield Corporate Commons Campus Ln. Kaiser Dr. SACRAMENTO ±30 mi Business Center Dr. Mangels Blvd. NAPA (HWY 12) ±1 mi Suisun Valley Rd. SAN FRANCISCO ±0 mi CONCORD (I-6) ±21 mi Fairfield Corporate Commons ±36.9 Acres of Land

More information

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Functional classification identifies the role a highway or street plays in the transportation system. Some highways

More information

Richard Clarke Executive Director Program Management. Capital Program Management

Richard Clarke Executive Director Program Management. Capital Program Management Richard Clarke Executive Director Program Management Capital Program Management Department Overview > Transit, Highway Programs, and Regional Rail o Transit Deliver construction projects on-time and within

More information

Traffic Impact Analysis Guidelines. Town of Queen Creek

Traffic Impact Analysis Guidelines. Town of Queen Creek Traffic Impact Analysis Guidelines Town of Queen Creek January 2016 1. INTRODUCTION The purpose of this document is to outline the procedures and requirements for preparing a Transportation Impact Analysis

More information

WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017

More information

Hillsborough County Future Land Use 160

Hillsborough County Future Land Use 160 RURAL-AGRICULTURE LAND USE CLASSIFICATION Agricultural/Mining -1/20 (AM-1/20) RESIDENTIAL GROSS DENSITY TYPICAL USES MAXIMUM FLOOR AREA RATIO OR Up to 1 dwelling unit per 20 gross acres. Alternative methods

More information

SITE- DO NOT DISTURB TENANT; STRICTLY NO ACCESS WITHOUT APPOINMENT. SPECIFICATIONS Vineyard Rd, Edison, New Jersey Block 1100, Lots 37.A & 39.

SITE- DO NOT DISTURB TENANT; STRICTLY NO ACCESS WITHOUT APPOINMENT. SPECIFICATIONS Vineyard Rd, Edison, New Jersey Block 1100, Lots 37.A & 39. For Sale or Lease 18-24 Vineyard Rd., Edison, N.J. ±1.377 Acres Zoned Local Business Location: Strategic Access to Every Major Highway in New Jersey. Direct Off Route 1 Retail Corridor SITE- DO NOT DISTURB

More information

Prime Commercial BTS Site in Madera, CA

Prime Commercial BTS Site in Madera, CA Prime Commercial BTS Site in Madera, CA Proposed +/- 5,000 Square Feet Commercial Building Great Signage / Frontage on Country Club Drive AKA Road 26 Surrounded with Ample Parking and Quality Tenants Great

More information

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT 2.1 EXISTING TRAVEL DEMAND MODEL In order to accurately project future year traffic volumes within this regional study area, it was first necessary to construct

More information

STAFF REPORT. DATE: March 27, Bryan Montgomery, City Manager. Joshua McMurray, Planning Manager

STAFF REPORT. DATE: March 27, Bryan Montgomery, City Manager. Joshua McMurray, Planning Manager STAFF REPORT DATE: March 27, 2018 TO: Bryan Montgomery, City Manager Approved and Forwarded to the City Council FROM: Joshua McMurray, Planning Manager SUBJECT: ARCO Tentative Map, Conditional Use Permit

More information

What is the Dakota County Principal Arterial Study?

What is the Dakota County Principal Arterial Study? What is the Dakota County Principal Arterial Study? The Dakota County is underway and will address future designations of certain highways as Principal Arterials. What Are Principal Arterials? Principal

More information

Chapter 4: Transportation and Circulation

Chapter 4: Transportation and Circulation Chapter 4: Transportation and Circulation 4.1 Introduction Circulation improvements constructed for the West Valley Logistics Center will improve the functional efficiency of the circulation system in

More information

January 17, Ron Waldthausen Platte Valley LLC 1378 Promontory Bluff View Colorado Springs, CO 80921

January 17, Ron Waldthausen Platte Valley LLC 1378 Promontory Bluff View Colorado Springs, CO 80921 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633 2868 FAX (719) 633 5430 E mail: lsc@lsctrans.com Website: http://www.lsctrans.com January

More information

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016 Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016 Presentation Outline Project Background Demographic and Economic Data Review Competitive Market Analysis Feasibility Assessment

More information

City of Avon Park. Highlands County, Florida Comprehensive Plan

City of Avon Park. Highlands County, Florida Comprehensive Plan City of Avon Park Highlands County, Florida 2030 Comprehensive Plan City of Avon Park Highlands County, Florida 2030 Comprehensive Plan Adopted December 26, 1990 Last Amended June 25, 2012 CITY OF AVON

More information

on Access Management Howard Preston CH2M HILL 7 th Annual Conference

on Access Management Howard Preston CH2M HILL 7 th Annual Conference I-394 Business 7 th Annual Conference on Access Management Howard Preston CH2M HILL hpreston@ch2m.com 651-688 688-87728772 ext. 14 Park City, Utah August, 2006 David Plazak Iowa State University CTRE dplazak@iastate.edu

More information

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015 VDOT Land Use Overview Brad Shelton, AICP Transportation and Mobility Planning Division June 2015 VDOT Land Development Programs Local/State Plan and Program Consistency Review local comp plan transportation

More information

Council Committee Memorandum

Council Committee Memorandum Council Committee Memorandum TO: Joint Council Committee THROUGH: Tim Murray, City Administrator FROM: Deanna Kuennen, Community & Economic Development Director MEETING DATE: November 13, 2018 SUBJECT:

More information

19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO

19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO 19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO PROPERTY OWNERS: WIILAIM D. FRIERSON, GRACE A. FRIERSON, DONALD S. CLARKE, PRICE M. CLARKE, CITY OF VIRGINIA BEACH STAFF PLANNER:

More information

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA Effective August 1, 2007 Amended March 4, 2013, December 1, 2014, May 1, 2017 TOWN OF MOORESVILLE,

More information

Rezoning Petition Final Staff Analysis June 18, 2018

Rezoning Petition Final Staff Analysis June 18, 2018 Rezoning Petition 2018-021 Final Staff Analysis June 18, 2018 REQUEST Current Zoning: B-1(CD) (neighborhood business, conditional) Proposed Zoning: B-1 (neighborhood business) LOCATION Approximately 0.37

More information

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES A. GENERAL Traffic Impact Analyses (TIAs) are tools that have historically been utilized to evaluate the interaction between existing transportation infrastructures

More information

DRAFT: SUBJECT TO CHANGE PRIOR TO COMMISSION ACTION

DRAFT: SUBJECT TO CHANGE PRIOR TO COMMISSION ACTION TEXAS TRANSPORTATION COMMISSION ALL Counties MINUTE ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to adopt amendments to.0 and.0, relating to major shopping

More information

2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES

2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES 2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES Early in the development of the Access Control Plan update project, it was important for the project team to develop initial objectives of what access management

More information

Market-to-Market Market influences on Transportation and Development. Dawn Cartier & Tom Hester January 2015

Market-to-Market Market influences on Transportation and Development. Dawn Cartier & Tom Hester January 2015 Market-to-Market Market influences on Transportation and Development Dawn Cartier & Tom Hester January 2015 To Market, To Market Discussion Contents Part 1: Land Use & Infrastructure Internal Capture &

More information

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Applicant Property Owner Holland Century Associates, LLP Public Hearing January 13, 2016 Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Location 3949 Holland Road

More information

STAFF REPORT. Permit Number: Port Orchard Airport. Kitsap County Board of Commissioners; Kitsap County Planning Commission

STAFF REPORT. Permit Number: Port Orchard Airport. Kitsap County Board of Commissioners; Kitsap County Planning Commission STAFF REPORT Permit Number: 15 00703 Port Orchard Airport DATE: November 9, 2015 TO: FROM: Kitsap County Board of Commissioners; Kitsap County Planning Commission Katrina Knutson, AICP, Senior Planner,

More information

Sec. 12. District and intent -- C-G, General Commercial District.

Sec. 12. District and intent -- C-G, General Commercial District. The provisions of this district are intended to apply to an area intended to be developed and preserved as a major commercial center serving the commercial needs of the community and region. The type of

More information

Prime Brand New Commercial Spaces in Madera

Prime Brand New Commercial Spaces in Madera B r and New Office/Retail Suites YOUR SIGN HERE YOUR SIGN HERE Prime Brand New Commercial Spaces in Madera 1-9 Suites Available: 500-9,999 SF Suites Built To Suits Needs Great Signage / Frontage on Country

More information

APPENDIX D ACCESS MANAGEMENT GUIDELINES

APPENDIX D ACCESS MANAGEMENT GUIDELINES APPENDIX D ACCESS MANAGEMENT GUIDELINES Access management has become an important tool in transportation planning. Access management guidelines are intended to preserve the integrity of roadways by balancing

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone: DIVISION 14. - PLANNED MIXED USE DEVELOPMENT (PMUD) Sec. 78-1021. - Purpose. The town is a community with a rich tradition of mixed use neighborhoods and a paucity of land area dedicated for large commercial,

More information

84 Kennedy. Road South. Automotive Building with Great Exposure AVAILABLE FOR SALE. 2,400 sf BRAMPTON, ON. For more information, please contact:

84 Kennedy. Road South. Automotive Building with Great Exposure AVAILABLE FOR SALE. 2,400 sf BRAMPTON, ON. For more information, please contact: AVAILABLE FOR SALE 84 Kennedy Road South BRAMPTON, ON 2,400 sf Automotive Building with Great Exposure Partnership. Performance. For more information, please contact: Scott Morrison Sales Representative

More information

There are 8,960 sq ft of CN uses around the corner of Tarpon & Gunn Hwy. The Hillsborough County Comp plan permits up to 20,000 sf.

There are 8,960 sq ft of CN uses around the corner of Tarpon & Gunn Hwy. The Hillsborough County Comp plan permits up to 20,000 sf. There are 8,960 sq ft of CN uses around the corner of Tarpon & Gunn Hwy. The Hillsborough County Comp plan permits up to 20,000 sf. The planners subtract the existing approx 9000 sq ft off the 20,000 sq

More information

Updated Traffic Impact Analysis Regulations Administrative Guidelines

Updated Traffic Impact Analysis Regulations Administrative Guidelines Updated Traffic Impact Analysis Regulations Administrative Guidelines 24VAC30-155 January 2012 Land Development Section Transportation and Mobility Planning Division Virginia Department of Transportation

More information

Elkton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Elkton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Land Use INTRODUCTION

Land Use INTRODUCTION Land Use INTRODUCTION The Land Use Element provides the policy context for the Centre Region to achieve its goals for the preservation and future development of rural, suburban, and urban land uses. This

More information

Inland Port Shopping Center Bainbridge, GA

Inland Port Shopping Center Bainbridge, GA Inland Port Shopping Center Bainbridge, GA Inland Port PROPERTY DETAILS Address Year Built 2006 Acreage Square footage 1408 Tallahassee Hwy Bainbridge, GA 6.84 acres 37,500 Occupancy 81.82% Tenants As

More information

APPENDICES. Table 46: Quantified Objectives (October 2013 to October 2021) New Construction Rehabilitation Conservation/Preservation

APPENDICES. Table 46: Quantified Objectives (October 2013 to October 2021) New Construction Rehabilitation Conservation/Preservation VI. APPENDICES APPENDIX A. QUANTIFIED OBJECTIVES The City of Placerville has established quantified (numerical) objectives for several program categories to provide measurable standards for monitoring

More information

Welcome High Desert Corridor

Welcome High Desert Corridor Los Angeles County Metropolitan Transportation Authority Welcome High Desert Corridor Open House Meeting December 2012 Agenda for Today s Meeting Introduction Project Background Major Updates HDC Strategic

More information

IMPLEMENTING THE PLAN

IMPLEMENTING THE PLAN IMPLEMENTING THE PLAN SELECTED KEY MESSAGES 1. Protect the Core Functions. Assuming a stable revenue and cost scenario, the financial analysis indicates that there are likely enough resources to cover

More information

MEDIAN OPENINGS AND ACCESS MANAGEMENT

MEDIAN OPENINGS AND ACCESS MANAGEMENT Approved: Effective: February 20, 2013 Office: Systems Planning Topic No.: 625-010-021-h Department of Transportation PURPOSE: MEDIAN OPENINGS AND ACCESS MANAGEMENT This procedure provides direction on

More information

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider

More information

COMMERCIAL LAND FOR SALE 9595 MANSFIELD RD. SHREVEPORT, LA 71118

COMMERCIAL LAND FOR SALE 9595 MANSFIELD RD. SHREVEPORT, LA 71118 LA 3132 Summer Grove Baptist Church Walker Rd Bert Kouns Industrial Loop Ridgewood Middle School SITE Baird Rd. Crabapple Drive Heritage Manor Wesla Federal Credit Union Williamson Way SHREVEPORT DEVELOPMENT

More information

HICKORY RIDGE PAVILION

HICKORY RIDGE PAVILION HICKORY RIDGE PAVILION 318,379 SF RETAIL Community Center For Sale 6385-6491 Winchester Rd., Memphis, TN 38115 Southeast Submarket N HICKORY HILL RD RIDGEWAY RD Hickory Ridge Pavilion Hickory Commons Winchester

More information

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS FINAL REPORT SEPTEMBER 2010 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 EXISTING TRAFFIC CONDITIONS 2 3.0 FUTURE TRAFFIC CONDITIONS 3 4.0 POTENTIAL IMPACTS

More information

WHITNEY ROAD 10% CORRIDOR PLAN. Open House Meeting #1 November 8, 2017

WHITNEY ROAD 10% CORRIDOR PLAN. Open House Meeting #1 November 8, 2017 WHITNEY ROAD 10% CORRIDOR PLAN Open House Meeting #1 November 8, 2017 AGENDA Introductions Project Overview Limits Purpose and Goals Overall Study Process What to expect (i.e. Schedule)? Identifying the

More information

Hardee County Comprehensive Plan

Hardee County Comprehensive Plan Hardee County 2030 Comprehensive Plan Amended through November 2014 Hardee County 2030 Comprehensive Plan Amended through November 2014 Updated August 2014 HARDEE COUNTY 2030 COMPREHENSIVE PLAN TABLE OF

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

CHAPTER 8: INTERGOVERNMENTAL COOPERATION

CHAPTER 8: INTERGOVERNMENTAL COOPERATION CHAPTER 8: INTERGOVERNMENTAL COOPERATION Photos above by Randy Uhl 8.1 Introduction Intergovernmental cooperation involves working with neighboring communities, school districts and agencies to understand

More information

For Sale 700 Gardiners Road, Kingston, Ontario

For Sale 700 Gardiners Road, Kingston, Ontario INDUSTRIAL PROPERTY Sale Price: $4,180,000 Price Per Square Foot: $8.36 psf Large industrially zoned building contained on approx. 100 acres next to a major shopping centre (Rio Can Centre). The property

More information

High Desert Corridor Draft EIS/EIR Public Hearings

High Desert Corridor Draft EIS/EIR Public Hearings High Desert Corridor Draft EIS/EIR Public Hearings Agenda > Registration/Open House (6pm 6:30pm) > Draft EIS/EIR Presentation (6:30pm 7pm) > Public Comment (7pm 8:30pm) Purpose of Today s Hearing > Provide

More information

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment DR-15-11/LLA-15-01 Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment Existing Zoning and Land Uses Enter footer information 2 Office Business Center (OBC)

More information

CULTIVATION LAND FOR SALE

CULTIVATION LAND FOR SALE CULTIVATION LAND FOR SALE Investment opportunity to acquire 163 Acres of land in the unincorporated County of Humboldt, Northern California. Application in place for a CUP to cultivate 19,000 SF with 13

More information

GMA Periodic Update Policy/Text Requirements

GMA Periodic Update Policy/Text Requirements Periodic Update Policy/Text s Key: = Growth Management Act = VISION 2040 = Pierce County Countywide Planning Policies Periodic Update Policy/Text s Capital Facilities Element Essential Public Facilities

More information

5900 Northampton Blvd.

5900 Northampton Blvd. PADS/LAND AVAILABLE NEW SITE CONCEPT DRAWING COMING SOON FUTURE INTERCHANGE MODIFICATION NORTHAMPTON BOULEVARD NORTHAMPTON TON BOULEVARD LOOKING FOR RESTAURANTS, RETAIL AND SERVICE PROVIDERS TO BE IKEA

More information

ARROWS RANSPORTATION LAN

ARROWS RANSPORTATION LAN ARROWS RANSPORTATION LAN Developed by the Transportation Planning Division Of the Virginia Department of Transportation In Cooperation With The U.S. Department Of Transportation, Federal Highway Administration

More information

Northeast Real Estate Development Specialists

Northeast Real Estate Development Specialists Northeast Real Estate Development Specialists 1 2 About Condyne was formed in 1998 to capitalize on development opportunities within the warehousing and transportation industries originating from clients

More information

Chapter Seven: Selecting the Appropriate Market and Location

Chapter Seven: Selecting the Appropriate Market and Location Chapter Seven: Selecting the Appropriate Market and Location Location, location, location. William Dillard, founder, Dillard's department stores 7-2 Integrated Retail Management Flow Chart 7-3 Objectives

More information

Ledges East Master Owners Association. Architectural Guidelines for the Community-Wide Areas

Ledges East Master Owners Association. Architectural Guidelines for the Community-Wide Areas Ledges East Master Owners Association Architectural Guidelines All improvements proposed or required to be constructed in Community-Wide Areas (whether located in Commercial Areas or Residential Areas)

More information

Once known as warehousing and distribution, the process

Once known as warehousing and distribution, the process Map III-2.3 Proposed Agile Port Industrial Area AGILE PORT INDUSTRIAL AREA PLAN Once known as warehousing and distribution, the process of moving goods to market has evolved dramatically. No longer is

More information

UPTOWN TRAFFIC IMPACT ANALYSIS

UPTOWN TRAFFIC IMPACT ANALYSIS UPTOWN TRAFFIC IMPACT ANALYSIS This memorandum summarizes the results of the traffic analysis conducted to evaluate the traffic operations of the intersections along Post Oak Boulevard within Uptown Houston

More information

Mall Area Redevelopment TIF District Proposal

Mall Area Redevelopment TIF District Proposal Mall Area Redevelopment TIF District Proposal (SDFPAB) Economic Development Committee April 7, 2014 Purpose Provide background for each redevelopment area Provide overview of proposal for new TIF district

More information

WSU SITE PROJECT BONNEY LAKE DRAFT ENVIRONMENTAL IMPACT STATEMENT

WSU SITE PROJECT BONNEY LAKE DRAFT ENVIRONMENTAL IMPACT STATEMENT WSU SITE PROJECT BONNEY LAKE DRAFT ENVIRONMENTAL IMPACT STATEMENT August 2009 -?BONNE,Y Community Development Department 8720 Main St. E. POB 7380 Bonney Lake, WA 98391-0944 Phone: 253-447-4356 Fax: 253-826-1921

More information

CHAPTER 70 PUBLIC WORKS DEPARTMENT DEVELOPMENT STANDARDS ARTICLE 70 BASIC PROVISIONS

CHAPTER 70 PUBLIC WORKS DEPARTMENT DEVELOPMENT STANDARDS ARTICLE 70 BASIC PROVISIONS CHAPTER 70 PUBLIC WORKS DEPARTMENT DEVELOPMENT STANDARDS ARTICLE 70 BASIC PROVISIONS 70.010 - PURPOSE The purpose of this chapter is to establish standards for the design and development of sites in order

More information

CHAPTER 4: TRANSPORTATION GUIDELINES FOR LOCAL LAND USE DECISIONS PURPOSE

CHAPTER 4: TRANSPORTATION GUIDELINES FOR LOCAL LAND USE DECISIONS PURPOSE CHAPTER 4: TRANSPORTATION GUIDELINES FOR LOCAL LAND USE DECISIONS PURPOSE Local land use decision-makers are more than ever faced with increasingly complicated decisions. With new initiatives in many states

More information

TEJON RANCH COMMERCE CENTER

TEJON RANCH COMMERCE CENTER BUILD-TO-SUIT OR GROUND LEASE OPPORTUNITY TEJON RANCH COMMERCE CENTER Tejon Ranch, California SITE AGENT: JJ WOODS, CLS SENIOR VICE PRESIDENT 661 631 3807 LICENSE NUMBER 01420570 jj.woods@colliers.com

More information

Larry Oglesby SVP, National Operations Regional President, Central. Matt Mandino Regional President

Larry Oglesby SVP, National Operations Regional President, Central. Matt Mandino Regional President Larry Oglesby SVP, National Operations Regional President, Central Matt Mandino Regional President Introduction: Larry Oglesby 31 years at KB Home Previous roles: Regional President (Austin, Dallas/Fort

More information

The Planning Commission is the land use authority on Conditional Use Permits for billboards. BILLBOARD LOCATION PROPOSED IMPROVEMENTS

The Planning Commission is the land use authority on Conditional Use Permits for billboards. BILLBOARD LOCATION PROPOSED IMPROVEMENTS PLANNING COMMISSION STAFF REPORT MEETING DATE: April 18, 2019 PROJECT NUMBER: C-19-011 REQUEST: Conditional Use Permit approval to relocate, increase the height, and add an EMC to the South sign face of

More information

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA This report was prepared to present development information (Utility availability, Development Regulations, Flood Plain information,

More information

Centerpoint of the Southwest

Centerpoint of the Southwest Casa Grande, Arizona 17 8 Phoenix Casa Grande SUN CORRIDOR MEGAREGION Runs nearly 300 miles from Prescott, AZ to northern Sonora, Mexico with Casa Grande at the center point of the Megaregion. SUN CORRIDOR

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES JANUARY 2018

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES JANUARY 2018 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Former Home to Red River Valley REA Memorial Dr, Marietta, OK 73448

Former Home to Red River Valley REA Memorial Dr, Marietta, OK 73448 Former Home to Red River Valley REA 1003 Memorial Dr, Marietta, OK 73448 Former Home to Red River Valley REA 1003 Memorial Dr, Marietta, OK 73448 Property Details Main building, of 13,000 SF, contains

More information

3125 Germanna Hwy Locust Grove, VA 22508

3125 Germanna Hwy Locust Grove, VA 22508 COMMERCIAL LAND FRONTING ON RT-3 3125 Germanna Hwy Locust Grove, VA 22508 Two Lots Totaling 17 Acres Lots Are Predominantly Wooded In Close Proximity Of New Super Wal Mart Zoned C2 And A Approx. 650 Ft

More information

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination 4-65 Interstate 73 FEIS: I-95 to the Myrtle Beach Region 4-66 Comment noted. The use of existing roadways was considered during alternative development (refer to Chapter 2, Section 2.1, page 2-1 and the

More information