1 A Proposal for an Inter-Regional Transmission Organization Marija D. ILIC Yong T. YOON Laboratory for Information and Decision Systems Massachusetts Institute of Technology 77 Massachusetts Avenue, Rm Cambridge, MA The views expressed here are strictly of the authors and do not necessarily represent the views of others including the research sponsors.
2 Outline Introduction Example: Northeast Power Coordinating Council (NPCC) and Northeast Regional Transmission Organization (NERTO) Revisiting operation of interconnected system Generation dispatch: efficiency and reliability Need for energy, reserve and information sharing Business model for inter-regional transmission organization [1] Enabling energy and reserve sharing through information sharing Economical supplement to current development Concluding remarks
3 Introduction Unlike in the restructuring of telecommunication industry and of gas industry, in the restructuring of electric power industry Operation and planning of various resources by the responsible participants effect system-wide performance and each other's respective functions and thus must be performed in competitive as well as coordinating environment Problems and issues of interposing efficiency and reliability for improved system-wide performance are usually quite difficult but at the same time learning through trial and error is not a practical approach Therefore, market design requires thinking through issues and problems pertaining to replacing parts of operation and planning functions traditionally performed by vertically integrated utility with market mechanisms In this presentation we consider replacing the coordination among Control Areas, which is customarily efficient and reliable but limited to neighboring regions, with a workable business model
4 Example: Geographical Area Covered by Northeast Power Coordinating Council (NPCC) The geographic area covered by NPCC includes New York State, the six New England States, and the Ontario, Québec, and Maritime Provinces. Among Control Areas in NPCC New York and New England combined with Pennsylvania-New Jersey-Maryland (PJM in Mid-Atlantic Area Council) make up Northeast Regional Transmission Organization market being developed.
5 Example: Seams Issues in Northeast Regional Transmission Organization Market (1) [5,6] Commercially significant and other inter-rto seams issues: ensure that generation/transmission expansion in each area are included in planning processes coordinated to ensure system reliability? avoid stranded costs? promote efficiency in the process? address rate pancaking? How homogeneous will the NERTO be? Coordinate with Alliance, MISO, Grid South, and the Canadian companies How will RTO work with adjacent systems to make sure that generation/transmission expansions in each area are included in the adjacent areas planning process to ensure system reliability?
6 Example: Seams Issues in Northeast Regional Transmission Organization Market (2) Technical Issues inter-rto congestion management? transaction scheduling and checkout? ICAP outside the RTO? Will the NE RTO continue to negotiate in good faith to resolve seams issues with other regions? When should interregional coordination (seams) issues be resolved and in put in place?
7 Revisiting Operation of Interconnected System [2,3,4] Generation dispatch in single Control Area single market setting (1) Possible generation dispatches with respect to anticipated load N-1cont. DISTURBANCE Dynamics model Thermal limit Violated? no Thermal limit violated? no Transient stability violated? no yes yes yes Desired operating Condition? no Corrective action through ancillary services Desired operating Condition? no Unacceptable operating conditions Reliability Criteria yes Reliability Criteria yes Reserve Availability Acceptable operating conditions
8 Revisiting Operation of Interconnected System [4,5] Generation dispatch in single Control Area single market setting (2) Acceptable operating conditions Economics of energy allocation Economics of reserve allocation Energy and transmission pricing/ maximum transmission limits/ transmission right settlement Assumption: Clearly defined reliability criteria Full control over generation dispatch and reserve allocation by system operator Availability of dynamics and static model in detail with respect to possible contingencies
9 Revisiting Operation of Interconnected System [ ] Extending generation dispatch method to interconnected system (1) Possible generation dispatches with respect to anticipated load DISTURBANCE Thermal limit Violated? (N-1)x(M-1)x??? Dynamics Model??? no Thermal limit violated? no Transient stability violated? no yes yes yes Desired operating Condition? no Corrective action through ancillary services Desired operating Condition? no Unacceptable operating conditions Reliability Criteria??? yes Reserve Availability??? Reliability Criteria??? yes Acceptable operating conditions
10 Revisiting Operation of Interconnected System [ ] Generation dispatch in multiple Control Area multiple market setting (2) Acceptable operating conditions Economics of energy allocation Economics of reserve allocation Energy and transmission pricing/ transmission loading relief/ ATC,TTC calculation Assumption: Different reliability criteria Limited control over generation dispatch and reserve allocation by system operator over interconnected system Limited availability of dynamics and static model in detail with respect to possible contingencies in other subsystems
11 Revisiting Operation of Interconnected System [2,3,4] Actual generation dispatch in multiple Control Area multiple market setting (3)
12 Revisiting Operation of Interconnected System Actual generation dispatch in multiple Control Area multiple market setting (4) Other subsystems modeled as uncertain load (or as a simple circuit with little detail) Due to the simplified modeling the change in system operating condition, which occurs outside the system operator s subsystem, is observed only as a change in tie line flows or change in load Fluctuation in level of reliability caused by change in operating condition outside the respective subsystem measurable nearly directly related to change in tie line flow from anticipated more deviation from anticipated typically more reserve required to keep the same level of reliability
13 Need for Energy, Reserve and Information Sharing Need for energy sharing Price of energy in ISO NE significantly lower with the import from Hydro-Québec than without Need for reserve sharing Loss of load probabilities in ISO NE and NYISO are both greater than 1 day in 10 years as two separate systems and less than 1 day in 10 years as two interconnected system with correlation between hourly loads of the subsystems Need for information sharing [2,5,6] Loss of import tie-line between ISO NE and Hydro-Québec (HQT-NE) results in low voltage problems in PJM
14 Business Model for Inter-regional regional Transmission Organization [1] System operators continue to be responsible for the reliable operation in the respective subsystems Direct interest in controlling tie line flows around the anticipated and in reserve sharing with neighboring regions to manage contingencies within the respective subsystem and to prevent further propagation of the effect to other regions Market participants have incentives for lowering electricity price through energy sharing Newly created inter-regional transmission organization (IRTO) becomes responsible for managing inter-regional transactions Initially assigning the anticipated tie-line flow and assisting the maintenance of flows around the anticipated while circumventing the need for transmission loading relief procedures
15 Financial Transactions among Participants under the New Business Model Short Term (1) Scheduling tie-line flows System operators submit bids to IRTO expressing their preferences for amount of flows reflecting the change in cost of reserve necessary to keep the desired level of reliability through bids; either pays (if the resulting tie-line flows scheduled close to the preferred and thus result in significant saving in reserve cost) or gets paid Market participants submit bids to IRTO expressing their preference for inter-regional transactions; always pays in order to achieve arranged transactions IRTO based on bids from system operators and market participants schedule the initial tie-line flows throughout the interconnected system
16 Financial Transactions among Participants under the New Business Model - Short Term (2) Following a change in operating condition System operator causing the change pays the neighboring subsystem (maybe in kind only) with whom reserve sharing agreements exist and pays the IRTO for maintaining tie-line flows close to initial schedule System operators in the affected subsystems get paid for providing reserve to maintain tie-line flows Individual generator owners gets paid by IRTO for providing reserve to maintain tie-line flows IRTO gets paid by the system operator causing the change and pays the system operators in the affected subsystems without reserve sharing agreement and individual generator owners
17 Financial Transactions among Participants under the New Business Model Long Term Coordination of transmission investment for accommodating more inter-regional transactions System operators submit bids to IRTO expressing their preferences for amount of flows reflecting the change in cost of investment necessary to keep the desired level of reliability through bids; gets paid for providing the resources in the future Market participants submit bids to IRTO expressing their preference for inter-regional transactions long term; always pays in order to achieve arranged transactions IRTO based on bids from system operators and market participants arranges for transmission facilities for scheduling the tie-line flows in the future throughout the interconnected system
18 Advantage of Newly Proposed Business Model Supplemental to current RTO development Requires no artificial changes to market development of each subsystem; software tool compatible with any market currently being established Adapts the market-based minimal coordination among market participants eliminating the need for transmission loading relief procedures Separate flow-based tariff for executing inter-regional transactions between any one subsystem to another reflecting system usage and change in reliability; no rate pancaking Introduces first market based reliability standards [7] in overseeing inter-regional transactions
19 Conclusion and Future Research Under the proposed market mechanism Optimization of reliability and efficiency throughout interconnection Streamlined scheduling and transmission reservation process Accurate transfer capability computation and liability placement Investment incentives for fostering inter-regional transactions Currently the proposed market mechanism and relevant algorithms are patent pending and under development for commercial application
20 References: [1] M.D. Ilic and Y, Yoon, " Inter-regional Transmission Organization: Design, Functions and Tariffs, October 14, 2000 MIT Patent, Case No [2] Ilic, M., "Voltage-Related Power Systems Monitoring and Control: A Revised and Expanded Research Agenda," MIT Laboratory for Electromagnetic and Electronic Systems, WP91-001, March [3] Ilic, M.D. and S.X. Liu, Hierarchical Power Systems Control: Its Value in a Changing Electric Power Industry, Springer-Verlag London Limited Series, Advances in Industrial Control, March [4] Ilic, M., Zaborszky, J., Dynamics and Control of Large Power Systems, John Wiley &Sons, 2000 (chapter 13) [5] Ilic, M., Yoon, Y., RTO Filing, Regarding Order 2000 Compliance Filing Docket No..RT01 000, January [6] Ilic, M., Graves, F.C., ``Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public Utilities, Reply Comments to the Federal Energy Regulatory Commission, Docket No. RM , October, [7]Yoon, Y., Ilic, M., ``A Possible Notion of Short-term Value-based Reliability, Proceedings of the IEEE PES Winter Power Meeting, New York City, NY, January 27-31, 2002.
Update on Northeast Seams Issues. February 20, 2008 NYISO Business Issues Committee Meeting
Update on Northeast Seams Issues February 20, 2008 NYISO Business Issues Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have
More informationINTERREGIONAL COORDINATION OF ELECTRICITY MARKETS
INTERREGIONAL COORDINATION OF ELECTRICITY MARKETS William W. Hogan Center for Business and Government John F. Kennedy School of Government Harvard University Cambridge, Massachusetts 02138 Federal Energy
More informationDave LaPlante Vice President, Markets Development September 18, 2002
Northeast Power Coordinating Council 2002 General Meeting ISO New England Perspectives on the FERC SMD NOPR Dave LaPlante Vice President, Markets Development September 18, 2002 Restructuring in the Northeast:
More informationMidwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration. March 7-8, 2011
Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration March 7-8, 2011 Agenda Greetings and Introductions Introduction of the Midwest ISO Overview of the Midwest
More informationJCM Drill Down Report -- Draft. March 21, 2014
JCM Drill Down Report -- Draft March 21, 2014 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill
More informationEIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015
EIPC Interconnection-wide Webinar and Stakeholder Discussion November 17, 2015 Webinar Outline Presentation on 2025 Summer Peak (2025S) and 2025 Winter Peak (2025W) Roll-up Case Development Report to be
More informationJCM Drill Down Report. February 19, 2015
JCM Drill Down Report February 19, 2015 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill Down Report
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting February 14, 2018, Rensselear, NY 1 Market-to-Market Coordination-PJM Implement
More informationKey Issues and Consideration in Market Design, Operational and Oversight
Key Issues and Consideration in Market Design, Operational and Oversight Patrick Donlon Amanda Gordon Kathryn Sophy Kenneth Villwock Public Utilities Commission of Ohio & Pennsylvania Public Utilities
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting June 20, 2018, Rensselear, NY 1 Market-to-Market Coordination-PJM Implement
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting April 11, 2018, Rensselear, NY 1 Market-to-Market Coordination-PJM Implement
More informationPage 1 of 1. NPCC Methodology and Guidelines for Forecasting TTC and ATC
Page 1 of 1 NPCC Methodology and Guidelines for Forecasting TTC and ATC Page 3 of 3 Table of Contents TABLE OF CONTENTS... 3 1. SUMMARY... 5 2. STATUS OF OPEN ACCESS IN NPCC... 6 3. OBJECTIVE OF THE NPCC
More informationPJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia
PJM Wholesale Markets Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM RTO Functions Grid Operation Non-discriminatory treatment Monitoring transmission system Reliability
More informationNOVA SCOTIA TO NEW YORK AN EMERA PERSPECTIVE
NOVA SCOTIA TO NEW YORK Emera Snapshot AN EMERA PERSPECTIVE NPCC 2002 General Meeting Common Market Developments Panel $4 B in assets $1 B in revenues 550,000 customers Business interests along the energy
More informationReview of Interconnection Assistance Reliability Benefits. May 12, NPCC CP-5 Working Group
Review of Interconnection Assistance Reliability Benefits May 12, 1999 NPCC CP-5 Working Group NORTHEAST POWER COORDINATING COUNCIL WORKING GROUP CP-5 REVIEW OF INTERCONNECTION ASSISTANCE RELIABILITY BENEFITS
More informationIndustry Perspectives on FERC Standard Market Design
Industry Perspectives on FERC Standard Market Design By Dr. Roberto F. Paliza Midwest Independent Transmission System Operator, Inc. IEEE Summer Meeting July 23, 2002 Chicago, IL Overview MISO Markets
More informationELECTRICITY MARKET RESTRUCTURING: REFORMS OF REFORMS
ELECTRICITY MARKET RESTRUCTURING: REFORMS OF REFORMS William W. Hogan Center for Business and Government John F. Kennedy School of Government Harvard University Cambridge, Massachusetts 02138 20 th Annual
More informationMISO-PJM Joint and Common Market Drill Down Report
MISO-PJM Joint and Common Market Drill Down Report February 28, 2017 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan
More informationFederal Energy Regulatory Commission/RTO Training Session
Federal Energy Regulatory Commission/RTO Training Session Scott H. Strauss Jeffrey A. Schwarz Institute for Policy Integrity NYU Law School June 2011 Agenda FERC -- Who and what is it? History of FERC
More informationISO New England Available Transfer Capability. Implementation Document. Version 1.0
ISO New England Available Transfer Capability Implementation Document Version 1.0 1 Effective: 04/01/2011 Table of Contents 1. Introduction... 3 2. Transmission Service in the New England Markets... 6
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting August 13, 2018, Rensselear, NY 1 Market-to-Market Coordination-PJM Implement
More informationWide-Area Trans-Regional Northeast Reliability Assessment
Wide-Area Trans-Regional Northeast Reliability Assessment Philip A. Fedora Kollin Patten Northeast Power Coordinating Council PowerWorld Corporation 1515 Broadway 43 rd Floor 1816 South Oak Street New
More informationThe Virtues of A Virtual RTO
The Virtues of A Virtual RTO Jim Mayhew Mirant September 26, 2003 Harvard Electricity Policy Group 1 A Virtual RTO? An Organization That is a RTO in All but Name? Minimum Attributes? Regional Security
More informationMISO-PJM Joint and Common Market Drill Down Report
MISO-PJM Joint and Common Market Drill Down Report August 22, 2017 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan
More informationAdequate Summer Electricity Supplies Projected
Adequate Summer Electricity Supplies Projected Summer 2017 Reliability Assessment Overview The comprehensive reliability assessment conducted by the Northeast Power Coordinating Council, Inc. (NPCC) projects
More informationDraft Whitepaper to Platte River Board of Directors
Draft Whitepaper to Platte River Board of Directors Report on Organized Power Markets RTOs and ISOs Presented for the October 2016 Board Meeting Overview This report on the potential formation of a regional
More informationJCM Drill Down Report. May 27, 2015
JCM Drill Down Report May 27, 2015 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill Down Report
More informationIllinois State Institute for Regulatory Policy Studies Conference
Illinois State Institute for Regulatory Policy Studies Conference Rob Berntsen 10/20/2011 Overview MISO RTOs What We Do FERC Order 1000 MISO s View of FERC Order 1000 MISO s Planning Process MVPs Benefits
More informationINDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)
INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting February 13, 2019, Rensselaer, NY 1 Market-to-Market Coordination-PJM Implement
More informationCO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2011 Monitoring Report
CO 2 from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2011 Monitoring Report June 27, 2013 1 This report was prepared on behalf of the states participating in the second
More informationApproved by Standing Committees Approved by Board of Trustees
Reliability Functional Model Function Definitions and Responsible Entities Prepared by the Functional Model Working Group Version 4 Approved by Standing Committees Approved by Board of Trustees August
More information2016 Summer Reliability Assessment
Table of Contents Preface... 3 Overview... 5 FRCC... 6 MISO... 7 MRO-Manitoba Hydro... 8 MRO-SaskPower... 9 NPCC-Martimes... 10 NPCC-New England... 11 NPCC-Ontario... 13 NPCC- Québec... 14 PJM... 15 SERC...
More informationNew York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules
New York Independent System Operator, Inc. NYISO Tariffs OATT Schedules Document Generated On: 6/30/2010 Page 1 Contents 6 Schedules... 7 6.1 Schedule 1 Scheduling, System Control and Dispatch Service...
More informationLessons Learned from Market Monitoring in North American Electricity Markets
Lessons Learned from Market Monitoring in North American Electricity Markets Presented at: World Bank Electricity Forum David B. Patton, Ph.D. Potomac Economics February 24, 2003 The Importance of Market
More informationCURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION
CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION Randy Rismiller Manager, Federal Energy Program Illinois Commerce Commission 1 THE FEDERAL ENERGY REGULATORY COMMISSION
More informationThe Narragansett Electric Company. d/b/a National Grid (Interstate Reliability Project) RIPUC Dkt. No Joint Testimony of
(Interstate Reliability Project) RIPUC Dkt. No. 0 Joint Testimony of Gabriel Gabremicael, P.E. and Mark Stevens, P.E. November, 0 0-v R.I.P.U.C. Dkt. No. 0 0 0 Q. Mr. Gabremicael, please state your name
More informationEnergy Markets - The Basics
Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures.
More informationA Market Solution to the Duck Curve
WHITEPAPER Rick Hoefer, Utilicast A Market Solution to the Duck Curve I. INTRODUCTION In the operation of today s power systems, renewables (especially solar and wind) are becoming a larger and larger
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting December 12, 2018, Rensselaer, NY 1 Market-to-Market Coordination-PJM Implement
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting January 16, 2019, Rensselaer, NY 1 Market-to-Market Coordination-PJM Implement
More informationBACKGROUNDER on the first fully functioning regional transmission organization in the United States: PJM Interconnection
BACKGROUNDER on the first fully functioning regional transmission organization in the United States: PJM Interconnection The Transmission and Delivery of Electricity Electricity transmission refers to
More informationBroader Regional Markets Report
Broader Regional Markets Report Rana Mukerji SENIOR VICE PRESIDENT MARKET STRUCTURES, NYISO Business Issues Committee Meeting November 14, 2018, Rensselaer, NY 1 Market-to-Market Coordination-PJM Implement
More informationRevenues from Ancillary Services and the Value of Operational Flexibility
Revenues from Ancillary Services and the Value of Operational Flexibility October 31, 2002 LCG Consulting The Issue Research Highlights In a restructured electricity industry, markets govern the operation
More informationRegional Transmission Organizations. D. William VanderLaan Illinois Commerce Commission January 30, 2014
Regional Transmission Organizations D. William VanderLaan Illinois Commerce Commission January 30, 2014 History of Regional Transmission Organizations (RTOs) RTOs grew out of FERC Order Nos. 888/889 where
More informationCO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2015 Monitoring Report
CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2015 Monitoring Report April 27, 2018 1 This report was prepared on behalf of the states participating
More information2015 Northeastern Coordinated System Plan. ISO New England, New York ISO, and PJM
ISO New England, New York ISO, and PJM April 11, 2016 Contents Preface... iv 1. Executive Summary...1 2. FERC Order No. 1000: Transmission Planning and Cost Allocation...2 2.1 Interregional Coordination
More informationAncillary Services Matrix
Ancillary Services Matrix ERCOT Primary frequency response is not an Ancillary Service Market Product. All online Generation Resources must have their turbine governors in service and unblocked. is deployed
More informationSummary of the Enron Trading Strategies in California
Summary of the Enron Trading Strategies in California Presented to: Midwest Board of Directors David B. Patton, Ph.D. Independent Market Monitor June 20, 2002 Summary of Enron Trading Strategies This presentation
More informationThe Virtues of Virtual RTOs
The Virtues of Virtual RTOs Presented by Scott M. Harvey Harvard Electricity Policy Group September 26, 2003 The author is or has been a consultant on electricity market design and transmission pricing,
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnecton, L.L.C. ) Docket No. ER
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnecton, L.L.C. ) Docket No. ER17-1138-000 MOTION TO INTERVENE AND PROTEST OF THE MISO INDEPENDENT MARKET MONITOR RELATED
More informationWith funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development
With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development www.fourcornerswind.org Photo courtesy of Avangrid Renewables, LLC UNDERSTANDING REGIONAL ELECTRICITY
More informationSeminar on African Electrical Interconnection. Module 7 - Market Operational Structures
Seminar on African Electrical Interconnection Module 7 - Market Operational Structures Module 7 - Market Operational Structures Contents 1) Power Market Principles 2) Major Operational Issues 3) Transmission
More informationFederal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design
Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design To enhance competition in wholesale electric markets and broaden the benefits
More informationRTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011
RTO Overview and Day 2 Markets EAI Technical Conference May 26, 2011 1 Agenda RTO Day 2 markets and Locational Marginal Pricing (LMP) Why RTO Day 2 markets may benefit Entergy s customers Quantifiable
More informationPrice Formation Education 4: Shortage Pricing and Operating Reserve Demand Curve
Price Formation Education 4: Shortage Pricing and Operating Reserve Demand Curve Patricio Rocha Garrido Lisa Morelli Laura Walter Disclaimer This is not a committee meeting. This session is for educational
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION POST-TECHNICAL CONFERENCE COMMENTS OF SOUTHERN CALIFORNIA EDISON COMPANY
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent
More informationCoordinated Procurement Transmission in the Northeast
Coordinated Procurement Transmission in the Northeast February 26, 2016 New England States Committee on Electricity NESCOE is New England s Regional State Committee, governed by a Board of Managers appointed
More informationEnergy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal
Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal September 8, 2015 Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal Table of Contents 1 Introduction... 3
More informationCARIS Procedure Development and Simulation Model Evaluation
CARIS Procedure Development and Simulation Model Evaluation Bill Lamanna Manager Long Term Planning New York Independent System Operator ESPWG Meeting NYISO September 16, 2009 Draft 1 for discussion only
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Uplift Cost Allocation and Transparency ) in Markets Operated by Regional ) Docket No. RM17-2-000 Transmission Organizations and
More informationMC Legal Report Summary of Significant Filings And Federal Energy Regulatory Commission ( Commission ) Orders (April 18, 2016 May 8, 2016)
MC Legal Report Summary of Significant Filings And Federal Energy Regulatory Commission ( Commission ) Orders (April 18, 2016 May 8, 2016) COMMISSION ORDERS On April 18, 2016, in Docket Nos. ER16-535-000
More informationSingle Schedule Market Pricing Issues
Single Schedule Market Pricing Issues Presented by Scott Harvey and Susan Pope Phase 1 - Session 3 Module G: Market Power Mitigation June 29, 2017 Toronto, Ontario TOPICS June 2: Module A: Energy Pricing
More informationMarket Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation
Market Monitoring Presented by: Dr. Robert Sinclair Presented to: Georgian Energy Policy Delegation April 30, 2012 Kentucky Public Service Commission Potomac Economics Potomac Economics is a leading provider
More informationNERC Reliability Functional Model
Comment Version NERC Reliability Functional Model Function Definitions and Responsible Entities Comments due February 27, 2004 Approved by Standing Committees: Approved by Board of Trustees: February 27,
More informationNERC Reliability Functional Model
NERC Reliability Functional Model Function Definitions and Responsible Entities Version 3 Approved by Standing Committees: Operating Committee: December 6, 2006 Planning Committee: December 6, 2006 Standards
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Electric Storage Participation in Markets Operated by Regional Transmission Operators and Independent System Operators Docket Nos.
More informationBILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. RM ]
This document is scheduled to be published in the Federal Register on 05/04/2018 and available online at https://federalregister.gov/d/2018-09455, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF
More informationHow Do We Manage the Complexity of the Grid?
M A Y 2 0 1 6 How Do We Manage the Complexity of the Grid? Control at Large Scales: Energy Markets and Responsive Grids, Minneapolis Eugene Litvinov 1 complex systems are counterintuitive. That is, they
More informationPROPOSALFOR INCLUSION OF A TRANSCO INCLUDING ENTERGY WITHIN THE SPP RTO
PROPOSALFOR INCLUSION OF A TRANSCO INCLUDING ENTERGY WITHIN THE SPP RTO This Proposal outlines the terms and conditions in a proposed Appendix to the Southwest Power Pool's ("SPP's") Membership Agreement
More informationCapacity Revenues for Existing, Base Load Generation in the PJM Interconnection
Capacity Revenues for Existing, Base Load Generation in the PJM Interconnection A Pennsylvania Case Study Prepared by: Paul Peterson, David White, and Bruce Biewald 22 Pearl Street, Cambridge, MA 02139
More informationApproved by the RCC November 27, Review of Interconnection Assistance Reliability Benefits. November 6, NPCC CP-8 Working Group
Approved by the RCC November 27, 27 Review of Interconnection Assistance Reliability Benefits November 6, 27 NPCC CP-8 Working Group NORTHEAST POWER COORDINATING COUNCIL, Inc. CP-8 WORKING GROUP REVIEW
More informationTransmission To Capture Geographic Diversity of Renewables
Transmission To Capture Geographic Diversity of Renewables Cost Savings Associated with Interconnecting Systems with High Renewables Penetration Presented to TransForum West, San Diego Integrating Renewables
More informationNew England Power Sector Overview
USAID/NARUC East Africa Regional Regulatory Partnership Exchange: New England Power Sector Overview Andrew Greene Massachusetts Dept. of Public Utilities Energy Facilities Siting Board Dar es Salaam, Tanzania
More informationEIPC Gas-Electric Coordination Study Update: Target 3 Results
EIPC Gas-Electric Coordination Study Update: Target 3 Results John P Buechler NYISO Executive Regulatory Policy Advisor NYISO EGCWG/IPTF Meeting March 19, 2015 Outline Overview Target 3 Highlights Remaining
More information2003 Program Plan. Open Scheduling System (OSS) Decision Support System (DSS) Market Structures Working Group March 10, 2003
2003 Program Plan Open Scheduling System (OSS) Decision Support System (DSS) Market Structures Working Group March 10, 2003 Agenda OSS Issues and Purpose OSS Release 1.0 Deliverables OSS 2003 Program Plan
More informationSPP at a Glance. Located in Little Rock. Approximately 600 employees
SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment
More informationGreening the Grid. Challenges & Opportunities. Tom Rumsey. Transition to a Green Economy
Greening the Grid Challenges & Opportunities Tom Rumsey Vice President External Affairs New York Independent System Operator Transition to a Green Economy Newburgh, NY November 20, 2013 Topics About the
More informationDistributed Energy Resources (DERs) and electricity sector evolution: an Ontario perspective on challenges and opportunities
Distributed Energy Resources (DERs) and electricity sector evolution: an Ontario perspective on challenges and opportunities Presentation to the Electric Power Industry of Quebec (EPIQ) Katherine Sparkes
More informationMISO-PJM Joint and Common Market Drill Down Report
MISO-PJM Joint and Common Market Drill Down Report May 30, 2018 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan Timeline
More informationApproved at the 2/27/07 BOD Meeting 2007 Corporate Goals
Approved at the 2/27/07 BOD Meeting 2007 Corporate Goals The Board of Directors of NPCC Inc. and NPCC CBRE have established the following regional corporate goals for 2007 which are consistent with the
More informationMid-Continent Independent System Operator (MISO) Overview. INCMA February 15, 2017
Mid-Continent Independent System Operator (MISO) Overview INCMA February 15, 2017 1 2 ISO s/rto s manage flows on the transmission system by directing generator usage 3 North American Electric Grid Operators
More informationU. S. SPOT MARKET REGULATION
U. S. SPOT MARKET REGULATION NARUC ENERGY REGULATORY PARTNERSHIP WITH GEORGIAN NATIONAL ENERGY AND WATER SUPPLY REGULATORY COMMISSION & MICHIGAN PUBLIC SERVICE COMMISSION TBILISI, GEORGIA November 30,
More informationNew York Independent System Operator System Reliability Impact Study Criteria and Procedures
New York Independent System Operator System Reliability Impact Study Criteria and Procedures Note: Project Developers are advised that these documents do not address cost allocation Approved by the Operating
More informationLast revised: March 1, 2018 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS
Last revised: March 1, 2018 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Business Operations, Engineering & Process, has primary responsibility for the overall planning, operations and control
More informationNew Brunswick Electricity Business Rules. Chapter 3 Reliable Operations
New Brunswick Electricity Business Rules Chapter 3 Reliable Operations TABLE OF CONTENTS CHAPTER 3 RELIABLE OPERATIONS... 2 3.0 System Operator Roles and Responsibilities... 2 3.1 Reliability Assessments...
More informationCALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF Sheet No. 691 ORIGINAL VOLUME NO. III
FERC ELECTRIC TARIFF Sheet No. 691 (a) (b) (c) adjust interchange transaction schedules (ITSs) as required under Existing Contracts in accordance with the procedures in the SBP and the SP for the management
More informationICA Demand Curve Development:
ICA Demand Curve Development: Proposed Approach for Ontario PRESENTED TO Market Renewal Incremental Capacity Auction Stakeholder Group PRESENTED BY Kathleen Spees Johannes Pfeifenberger Yingxia Yang John
More informationAn Agent-Based Computational Laboratory for Wholesale Power Market Design
1 An Agent-Based Computational Laboratory for Wholesale Power Market Design Junjie Sun and Leigh Tesfatsion, Member, IEEE Abstract This study reports on the model development and open-source implementation
More informationDemand Response Parity in Wholesale Markets Hinges on FERC 745 Outcome
RESEARCH North America Power and Utilities Energy Efficiency Demand Response Parity in Wholesale Markets Hinges on FERC 745 Outcome Supreme Court Review of Order 745 Key to Demand Response s Future in
More informationEvaluating Cooperation Opportunities Under CAA 111(d)
Evaluating Cooperation Opportunities Under CAA 111(d) PRESENTED TO Eastern Interconnection States Planning Council PRESENTED BY Kathleen Spees Judy Chang October 2, 2015 Copyright 2014 The Brattle Group,
More informationNERC Reliability Functional Model Technical Document Version 5
Reliability Functional Model Technical Document Version 5 Prepared by the Functional Model Working Group This document is a companion to Version 5 of the Functional Model. It provides context, explanations,
More informationSection 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.
Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required
More information5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection.
5.1 Transmission Congestion Calculation. 5.1.1 Calculation by Office of the Interconnection. When the transmission system is operating under constrained conditions, or as necessary to provide third-party
More informationNYSRC RELIABILITY RULES For Planning And Operating the New York State Power System
NYSRC RELIABILITY RULES For Planning And Operating the New York State Power System Version 18 January 5, 2007 NYSRC RELIABILITY RULES For Planning and Operating the New York State Power System Version
More informationManaging Director Transmission Operations
Managing Director Transmission Operations Responsible for the safe, reliable, cost-effective, and profitable operational management of AEP's transmission assets including: 1) directs and manages AEP's
More informationIntertie Capacity Value for Alberta
Intertie Capacity Value for Alberta PREPARED FOR PREPARED BY Johannes Pfeifenberger Judy Chang Kathleen Spees Yingxia Yang David Luke Oates Colin McIntyre November 1 st, 2017 This report was prepared for
More informationContents. DRAFT Capacity Deliverability Fact Finding Summary Report
DRAFT Capacity Deliverability Fact Finding Summary Report Contents 1 Background... 3 2 Overview of findings... 5 2.1 Implement methods for setting limits that respect the physical topology of the system
More informationIntegrating High Levels of Variable Renewable Energy Sources
Integrating High Levels of Variable Renewable Energy Sources Erik Ela EPRI Grid Ops and Planning eela@epri.com NYISO Environmental Advisory Council Troy, NY May 6, 2016 EPRI Grid Operations & Planning
More informationPROPOSAL OF INDEPENDENT POWER PRODUCERS OF NEW YORK, INC. FOR INTEGRATING CARBON PRICING INTO THE WHOLESALE ENERGY MARKET
NEW YORK STATE PUBLIC SERVICE COMMISSION Matter 17-01821 In the Matter of Carbon Pricing in New York Wholesale Markets PROPOSAL OF INDEPENDENT POWER PRODUCERS OF NEW YORK, INC. FOR INTEGRATING CARBON PRICING