PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014"

Transcription

1 PLAN 2040 Regional Transportation Plan Update Final Recommendations Transportation and Air Quality Committee March 13, 2014

2 TIP/RTP Update Milestones Official public comment period closed February 21 Final documentation, including Public Comment Report (Volume I, Appendix F) posted on web on February 28 TCC approval of TIP/RTP occurred on March 7 GRTA briefing occurred on March 12 TAQC action on TIP/RTP on March 13 ARC Board action on TIP/RTP on March 26 GRTA action on TIP on April 9

3 Public Comment Themes Managed lanes equity and emphasis Interchanges and Bottlenecks support for solutions Safety elevate in priority Options demand for alternatives, but concerns over cost effectiveness Other projects personal statements of support/opposition

4 April 2013 Policy Direction on Strategies Optimize /Manage Existing Assets Strategically Expand the System Planning & Execution Improvements Maximize Throughput Use Existing ROW Incident Response TDM Asset Management Promote Accessibility Arterials Bottlenecks Managed Lanes TDM Expand Transit Development Coordination Promote Accessibility Project Benefits Real-Time Data Planning and Scoping

5 PLAN 2040 RTP $58.6 Billion Investment in Our Future

6 FY TIP Investments = $7.05 billion $480 million $270 million $1.2 billion $2.4 billion Roadway Capacity and Interchanges Road Optimization and Safety Transit Operations and Maintenance Managed Lanes $1.1 billion $1.5 billion TDM Related Planning and Future Solicitations

7 Emphasis Areas for Future Solicitations STP Urban - $70 million annually Last Mile Connectivity Road Safety Freight Safety Livable Centers Initiative Transit Capital and Preventive Maintenance CMAQ - $29 million annually Travel Demand Management Clean Vehicle and Technology Programs Transit Service Start-Up Operation Roadway ITS / Operations / Incident Management Managed Lanes Transportation Alternatives - $7.5 million annually Regional Trail Network Safe Routes to School Transit and Station Area Access Comprehensive Activity Center Accessibility Programs

8 TIP Project Highlights

9 Fix it First Approach Over $600 million will be invested over the next six years just to resurface roads and maintain bridges.

10 Improving Reliable Trips for Drivers and Transit Patrons I-75 South I-85 North I-75 / I-575 North These three projects result in a 56 mile expansion of the network, which is the largest investment in the freeway network since the 1980s

11 Cost Effective Interchange Bottleneck Relief EXISTING PLANNED Reconfiguration as a diverging diamond interchange can usually be done at a fraction the cost of a full rebuild.

12 Improving Key Interchanges for Commuters and Freight Collector/distributor lanes on SR 400 north of I-285 Collector distributor lanes on I-75 in vicinity of I-285 Conversion of at-grade intersections on SR 316 to grade separated interchanges Reconstruction of I-20 East and Panola Road interchange New interchange at Poplar Road Reconstruction of I-285 interchanges at SR 155 and Bouldercrest Road

13 Strategic Expansion of the Arterial Network SR 92 current alignment Realignment avoids downtown congestion and eliminates circuitous route due to at-grade railroad crossing 80 construction projects 61 federal-aid 19 locally funded 145 miles 20 additional projects entering right-of-way acquisition SR 92, a key north/south thoroughfare on the west side of the region, will be realigned and widened to eliminate a major bottleneck in downtown Douglasville.

14 Minor Investments; Big Return on Investment The FY TIP continues the state s and region s commitment to a number of critical programs, such as TRIP Signal upgrades/timing ITS The entire annual cost of the Towing Recovery and Incentive Program (TRIP) can be recouped in the time and fuel savings from just one or two major incidents

15 Expanding Options Planning continues for making job centers of the region more accessible by transit, biking and walking. Studies to expand transit service to Cobb County, the I- 20 East corridor, Emory University, the SR 400 corridor, and within the City of Atlanta are ongoing.

16 Building on the Framework for the 2016 TIP/RTP Update Incorporate new counties within the urbanized area into the planning process Use data and analysis tools effectively and efficiently Continue to explore ways to increase revenue in order to expedite projects Adjust to changes in the economy, emerging growth and mobility trends, and technological innovations

17 For Additional Information: John Orr Division Manager Transportation Access and Mobility Division David Haynes Planning Section Manager

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

SECTION III - REGIONAL ARTERIAL SYSTEM. The Regional Arterial System is a subcomponent of a broader regional thoroughfare system.

SECTION III - REGIONAL ARTERIAL SYSTEM. The Regional Arterial System is a subcomponent of a broader regional thoroughfare system. SECTION III - REGIONAL ARTERIAL SYSTEM SYSTEM IDENTIFICATION The Regional Arterial System is a subcomponent of a broader regional thoroughfare system. The NCTCOG Regional Thoroughfare Plan (RTP) recognizes

More information

Central Phoenix Transportation Framework Study

Central Phoenix Transportation Framework Study Central Phoenix Transportation Framework Study Study Area 2013, All Rights Reserved. 1 Agenda Introductions Work Products Feedback on previous products Draft products for Planning Partner review SR-30

More information

Current Trends in Traffic Congestion Mitigation

Current Trends in Traffic Congestion Mitigation Current Trends in Traffic Congestion Mitigation April 24, 2009 NCSL Spring Forum Washington, DC Jeff Lindley Associate Administrator, Office of Operations Federal Highway Administration U.S. Department

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Chapter 5: Highway Investment Direction and Plan

Chapter 5: Highway Investment Direction and Plan 5.1 Chapter 5: Highway Investment Direction and Plan 2040 2040 TRANSPORTATION POLIC PLAN version 1.0 5.2 Chapter 5: Highway Investment Direction and Plan Highway Investment Direction 3 Current Revenue

More information

Congestion Management Process 2013 Update

Congestion Management Process 2013 Update OVERVIEW OF THE DALLAS-FORT WORTH CONGESTION MANAGEMENT PROCESS Traffic Congestion In The Dallas-Fort Worth Region With the Dallas-Fort Worth (DFW) urban area as its center, the North Central Texas region

More information

KAW CONNECTS EXECUTIVE SUMMARY

KAW CONNECTS EXECUTIVE SUMMARY Executive Summary Page E-1 Introduction KAW CONNECTS EXECUTIVE SUMMARY The Kansas Department of Transportation (KDOT) and the Kansas Turnpike Authority (KTA) have both recognized the need to plan for the

More information

Project Funding Documentation. Congestion Mitigation and Air Quality Program: 2013 Project Solicitation

Project Funding Documentation. Congestion Mitigation and Air Quality Program: 2013 Project Solicitation Project Funding Documentation Congestion Mitigation and Air Quality Program: 2013 Project Solicitation Table of Contents Background on Funding Decisions. Pages 3-8 Project Funding Recommendations Roadway

More information

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm Goal Development Workshop TCATS October 12- Works 5:30-7pm NATS October 19-Niles District Library 6-7:30pm SAFETEA-LU Goals 2035 TwinCATS Goals 2030 TwinCATS Goals 1. Support the economic vitality of the

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

Chapter 6: Highways. Existing System. Roadways

Chapter 6: Highways. Existing System. Roadways Chapter 6: Highways The region s roadways provide connections that are essential to the metro area s economic vitality and quality of life. But the demand for travel is enormous and growing posing difficult

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Congestion Management Process Update

Congestion Management Process Update report Congestion Management Process Update prepared for Houston-Galveston Area Council prepared by Cambridge Systematics, Inc. 10415 Morado Circle, Building II, Suite 340 Austin, TX 78759 with Alliance

More information

Chapter 8. Transportation Element

Chapter 8. Transportation Element Chapter 8. Transportation Element Introduction/Overview Element Requirements Transportation is a key issue and priority in Longview. State highways, local roads, transit, railroads, and the port are lifelines

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999

More information

Tier 1 Recommendations October 30, 2017

Tier 1 Recommendations October 30, 2017 Tier 1 Recommendations October 30, 2017 Page Left Intentionally Blank Bristol District B.2 B.9 Need Tier 1 District Needs Need Description Within the Bristol MPO, the I-81 interchanges in Abingdon have

More information

I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA

I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA 15th International Conference on Managed Lanes I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA Case Study for Funding of Transit Service and Transportation Demand Management

More information

3. STATION SPACING AND SITING GUIDELINES

3. STATION SPACING AND SITING GUIDELINES 3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

Des Moines Area MPO. MPO Planning Subcommittee Meeting March 3, Des M oines Area M etropolitan Planning Organization

Des Moines Area MPO. MPO Planning Subcommittee Meeting March 3, Des M oines Area M etropolitan Planning Organization Des Moines Area MPO MPO Planning Subcommittee Meeting March 3, 2014 2014 Des M oines Area M etropolitan Planning Organization Agenda 1. Call To Order 2. VOTE: Approval of Agenda 3. VOTE: Approval of Meeting

More information

Greenhouse Gas Emission Reduction Strategies

Greenhouse Gas Emission Reduction Strategies Greenhouse Gas Emission Reduction Strategies 2011 ITE Quad Conference April 18 19, 2011, Embassy Suites; Lynnwood, WA Victor L. Sl Salemann, PE Senior Associate David Evans and Associates Bellevue, WA

More information

September Public Meetings. Developing a Blueprint for the Corridor

September Public Meetings. Developing a Blueprint for the Corridor September Public Meetings Developing a Blueprint for the Corridor Study Background Study initiated by the Commonwealth Transportation Board (CTB) and administered by VDOT in association with VDRPT. Addresses

More information

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

GUIDING PRINCIPLES MEMORANDUM

GUIDING PRINCIPLES MEMORANDUM M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino

More information

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

Final Report SPALDING COUNTY COMPREHENSIVE TRANSPORTATION PLAN INCLUDING THE CITY OF GRIFFIN, THE CITY OF ORCHARD HILL AND THE CITY OF SUNNY SIDE

Final Report SPALDING COUNTY COMPREHENSIVE TRANSPORTATION PLAN INCLUDING THE CITY OF GRIFFIN, THE CITY OF ORCHARD HILL AND THE CITY OF SUNNY SIDE SPALDING COUNTY COMPREHENSIVE TRANSPORTATION PLAN INCLUDING THE CITY OF GRIFFIN, THE CITY OF ORCHARD HILL AND THE CITY OF SUNNY SIDE Final Report PREPARED BY: IN ASSOCIATION WITH: INTERNATIONAL April,

More information

TEXAS FREIGHT MOBILITY PLAN 2017

TEXAS FREIGHT MOBILITY PLAN 2017 TEXAS FREIGHT MOBILITY PLAN 2017 Texas Transportation Commission September 28, 2017 Overview of the Texas Freight Mobility Plan 2016 Plan First multimodal freight mobility plan Identified freight network,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

Updating Virginia s Statewide Functional Classification System. Briefing to MPOs, PDCs, and Local Governments

Updating Virginia s Statewide Functional Classification System. Briefing to MPOs, PDCs, and Local Governments Updating Virginia s Statewide Functional Classification System Briefing to MPOs, PDCs, and Local Governments October 15 & 19, 2012 Functional Class 101 Shelton s FC Game Research Phase Today s Review New

More information

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016 Overall project Johnson County Gateway Interchange Project Improvements 87th Street The $288 million Phase 2 DesignBuild project starts construction this spring, with completion by December 31, 2016 Phase

More information

Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life. March Washington, DC

Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life. March Washington, DC Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life March 2015 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,

More information

Funding Intelligent Transportation Systems in the Los Angeles Region

Funding Intelligent Transportation Systems in the Los Angeles Region Funding Intelligent Transportation Systems in the Los Angeles Region 2017 ITS California Annual Meeting Ed Alegre, PTP Los Angeles County Metropolitan Transportation Authority (Metro) Los Angeles Region

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

ROSEMOUNT TRANSPORTATION PLAN

ROSEMOUNT TRANSPORTATION PLAN ROSEMOUNT TRANSPORTATION PLAN April 2008 (Revised April, July 2009) Prepared by: WSB & Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 (763) 541-4800 (763) 541-1700 (Fax) WSB Project

More information

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE The following guidance provides additional details regarding the process followed by PSRC to evaluate projects for potential air quality benefits. As

More information

Blacklands Corridor Feasibility Study

Blacklands Corridor Feasibility Study Blacklands Corridor Feasibility Study Public Meeting May 13, 2014 The Atrium at the Granville Arts Center 300 N. Fifth Street, Garland, Texas 1 Overview Welcome and Public Involvement Efforts Amanda Wilson

More information

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by: Technical Memorandum MULTIMODAL NEEDS Prepared for: Oklahoma Department of Transportation Prepared by: May 2015 Technical Memorandum The Technical Memos were written to document early research for the

More information

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements Section Five Section 5: Subarea Mobility Enhancements 5.1 Transit and Pedestrian Improvements From the outset of the master planning process, one of the primary goals was to integrate transit and pedestrian-oriented

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

THE REGION S PLAN POLICY FRAMEWORK. August 2015

THE REGION S PLAN POLICY FRAMEWORK. August 2015 THE REGION S PLAN POLICY FRAMEWORK August 2015 2 What is The Policy Framework? Cover photo credit: Sinan Sinharoy for Atlanta BeltLine, Inc. Atlanta is one of the world s most dynamic metropolitan areas,

More information

ITEM 8 Action May 17, 2017

ITEM 8 Action May 17, 2017 ITEM 8 Action May 17, 2017 Approval of Maryland Department of Transportation (MDOT) Additional Project Submission for the Out-Of-Cycle Air Quality Conformity Analysis for the Amendment to the 2016 CLRP

More information

Executive Summary October 2017

Executive Summary October 2017 Executive Summary The King of Prussia Rail Draft Environmental Impact Statement/Draft Section 4(f) Evaluation (DEIS) describes and summarizes the transportation and environmental benefits and impacts of

More information

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017 REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES TAB September 20, 2017 2 2016 Application Categories Bridge Incorporate Highway Truck Corridor Study Tiers instead of Freight Project Elements

More information

Appendix J-12 Adaptive Signal Control Systems

Appendix J-12 Adaptive Signal Control Systems Appendix J-12 Adaptive Signal Control Systems ADAPTIVE SIGNAL CONTROL SYSTEMS INTRODUCTION An Adaptive Traffic Signal Control System can adjust signal timings (offsets, cycle lengths, and splits) incrementally

More information

Land Use/Transportation Joint Venture Program

Land Use/Transportation Joint Venture Program Land Use/Transportation Joint Venture Program Sustainable Development Workshop July 14, 2005 Transportation Department North Central Texas Council of Governments October 2001, RTC Approval 19 Land Use/Transportation

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

The Indian Nations Council of Governments (INCOG) 2035 Plan: Roadways Element

The Indian Nations Council of Governments (INCOG) 2035 Plan: Roadways Element Roadways The Indian Nations Council of Governments (INCOG) The Indian Nations Council of Governments is the designated regional planning organization for the Tulsa Transportation Management Area (TMA).

More information

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ 1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ Executive Summary 3UHSDUHGýIRUã 3UHSDUHGýE\ã.DQVDVý'HSDUWPHQWýRI 7UDQVSRUWDWLRQ,QýDVVRFLDWLRQýZLWKã (DUWKý7HFKý,QFï EXECUTIVE SUMMARY Introduction This Northwest

More information

San Francisco Freeway Corridor Management Study (SF FCMS)

San Francisco Freeway Corridor Management Study (SF FCMS) Item 6 Enclosure B Plans and Programs Committee March 17, 2015 San Francisco Freeway Corridor Management Study (SF FCMS) Phase 1 Findings and Recommendations Agenda Item 6 SAN FRANCISCO COUNTY TRANSPORTATION

More information

FUTURE BUS RAPID TRANSIT PLANS

FUTURE BUS RAPID TRANSIT PLANS ATTACHMENT 1 Preferred Configuration Saskatoon Bus Rapid Transit - Preferred Configuration FUTURE BUS RAPID TRANSIT PLANS Plan For Growth Transportation Plan BRT Plan October 2017 saskatoon.ca/engage 1

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office VDOT and MAP-21 Performance Management VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office Overview Map-21- How is VDOT Preparing?

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

Operations in the 21st Century DOT Meeting Customers Needs and Expectations Operations in the 21st Century DOT Meeting Customers Needs and Expectations 1 Purpose of this Meeting: Share Thoughts & Discuss Challenges brought about by the changing transportation environment and public

More information

Transit Oriented Development Study

Transit Oriented Development Study Federal Way Link Extension Transit Oriented Development Study Table of Contents Executive Summary ES 1 Chapter 1: Introduction.. 1-1 Chapter 2: Methodology. 2-1 Chapter 3: Project Overview 3-1 Chapter

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 23, Alexander Road to Maple Lake Road DBNUM: 11424 / UPC: 114240 Initiated from the Pavement Management System, this project will resurface within the project limits. ADA upgrades and guiderail repair

More information

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper Niagara-Hamilton Trade Corridor Technical Paper 1. Purpose In the report to Council on the Regional Council Strategic Priorities Implementation Plan, pursuing Provincial commitment for the Niagara to Greater

More information

The Cost Savings Potential of Sustainability Practices

The Cost Savings Potential of Sustainability Practices The Cost Savings Potential of Sustainability Practices The Sustainability Triple Bottom Line The Triple Bottom Line (TBL) means addressing Environmental, Economic and Social Equity dimensions of a project

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

Project Evaluation Criteria

Project Evaluation Criteria Project Evaluation Criteria Goals and Objectives were developed to guide Envision 35 Long Range Transportation Plan (LRTP) Update. These guiding principles were based on the requirements included in the

More information

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from

More information

Regional Initiatives on Land Use and Transportation

Regional Initiatives on Land Use and Transportation Regional Initiatives on Land Use and Transportation Alicia Hopkins, AICP, Senior Transportation Planner North Central Texas Council of Governments SEE Development Excellence Day November 2005 North Central

More information

Incorporating TMS into Planning. Jianming Ma, Ph.D., P.E.

Incorporating TMS into Planning. Jianming Ma, Ph.D., P.E. Incorporating TMS into Planning Jianming Ma, Ph.D., P.E. Table of Contents 1 What is TMS 3-4 2 Transportation Environment is Changing 5-6 3 Benefits from TMS 7-8 4 Traditional Approach to Managing Transportation

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM INTERSTATE HIGHWAY 820 TO INTERSTATE HIGHWAY 30 CITY OF FORT WORTH TARRANT COUNTY, TEXAS

ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM INTERSTATE HIGHWAY 820 TO INTERSTATE HIGHWAY 30 CITY OF FORT WORTH TARRANT COUNTY, TEXAS ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM INTERSTATE HIGHWAY 820 TO INTERSTATE HIGHWAY 30 CITY OF FORT WORTH TARRANT COUNTY, TEXAS CSJ Nos. 0014-16-179 0014-16-268 PREPARED BY: UNITED STATES

More information

CALIFORNIA HIGHWAY PATROL AGREEMENT

CALIFORNIA HIGHWAY PATROL AGREEMENT 18 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net PLANNING AND PROGRAMMING COMMITTEE MAY 15, 2013 SUBJECT: ACTION: CALIFORNIA HIGHWAY PATROL AGREEMENT EXECUTE AN AGREEMENT WITH

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information

Twin Cities Regional Truck Corridors Study. MnDOT Metro Freight Studies Roundup

Twin Cities Regional Truck Corridors Study. MnDOT Metro Freight Studies Roundup Twin Cities Regional Truck Corridors Study MnDOT Metro Freight Studies Roundup February 3, 2017 Study Background Transportation Policy Plan Goal: The regional transportation system supports the economic

More information

Congestion Management Process Keeping the Region Moving Efficiently, Reliably, and Safely

Congestion Management Process Keeping the Region Moving Efficiently, Reliably, and Safely Congestion Management Process Keeping the Region Moving Efficiently, Reliably, and Safely Reviewed and Adopted By Tri-County Regional Planning Commission May 24, 2017 Prepared by the Tri-County Regional

More information

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Appendix B Highway 407 Interchange Review - Cochrane Street Area Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,

More information

Executive Summary. Overview

Executive Summary. Overview Executive Summary Overview The Genesee-Finger Lakes Diversion Route Initiative identifies the most suitable diversion routes for Principal Arterial roads in the nine-county Genesee-Finger Lakes Region.

More information

Sunrise Project South I-205 Corridor Improvement Project

Sunrise Project South I-205 Corridor Improvement Project Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205

More information

DRAFT Congestion Management Process Keeping the Region Moving Efficiently, Reliably, and Safely

DRAFT Congestion Management Process Keeping the Region Moving Efficiently, Reliably, and Safely Congestion Management Process Keeping the Region Moving Efficiently, Reliably, and Safely February 28, 2017 Prepared by the Tri-County Regional Planning Commission 3135 Pine Tree, Suite 2C Lansing, Michigan

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

INTERSTATE CORRIDOR PLANNING

INTERSTATE CORRIDOR PLANNING INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides

More information

Geometric Design: Past, Present, and Future

Geometric Design: Past, Present, and Future A2A02: Committee on Geometric Design Chairman: Daniel B. Fambro Geometric Design: Past, Present, and Future DANIEL B. FAMBRO, Texas A&M University JOHN C. COLLINGS, Delcan Corporation ROBERT DELLA VEDOVA,

More information

National Traffic Signal Report Card

National Traffic Signal Report Card National Traffic Signal Report Card Executive Summary 2007 The National Transportation Operations Coalition (NTOC) serves as an important foundation for institutionalizing management and operations into

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

Los Angeles County Congestion Reduction Demonstration Project

Los Angeles County Congestion Reduction Demonstration Project Los Angeles County Congestion Reduction Demonstration Project frequently asked questions update #1 /august 2008 Los Angeles County Metropolitan Transportation Authority (Metro), California Department of

More information

FINAL. Technical Memorandum #2: Alternative Scenarios Performance Report

FINAL. Technical Memorandum #2: Alternative Scenarios Performance Report General Planning Consultant Services RFP P5413 Contract No. 200703566 Work Order No. 2009-01 / Task 2-3 FINAL S O U T H F U LTO N PA R K W AY T R A N S I T F E A S I B I L I T Y S T U DY Technical Memorandum

More information

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan. 8.4-1 REPORT Meeting Date: 2014-06-26 Regional Council For Information DATE: June 17, 2014 REPORT TITLE: PEEL GOODS MOVEMENT STRATEGIC PLAN UPDATE 2014 FROM: Dan Labrecque, Commissioner of Public Works

More information

Intelligent Transportation Systems Master Plan

Intelligent Transportation Systems Master Plan Space Coast Transportation Planning Organization Intelligent Transportation Systems Master Plan April 15, 2014 Version 1.0 Prepared for: Space Coast Transportation Planning Organization 2725 Judge Fran

More information

Engineers Perspective on the State of Transportation Infrastructure in NC

Engineers Perspective on the State of Transportation Infrastructure in NC Engineers Perspective on the State of Transportation Infrastructure in NC Pamela B. Townsend, PE MS Civil Engineering, BSCE, NC State University Vice President, Earth Tech, Inc. David Peterson, PE Past

More information

IOWA TRANSPORTATION BY THE NUMBERS:

IOWA TRANSPORTATION BY THE NUMBERS: IOWA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MARCH 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

HB2 Implementation Policy Guide

HB2 Implementation Policy Guide report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date August 1, 2015 6.0 Appendix A: Safety Measures Table 6.1 Safety Factor Measures Summary ID Measure Name Weight

More information

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting TEXAS FREIGHT MOBILITY PLAN Greater Houston Freight Committee Kick-Off Meeting July 11, 2016 Overview of Texas Freight Mobility Plan The Freight Plan is TxDOT's first multimodal transportation plan that

More information

Governor Baldacci s Transportation Bond Proposal

Governor Baldacci s Transportation Bond Proposal Governor Baldacci s Transportation Bond Proposal Talking Points Highway and Bridge Investment The lifeblood of the Maine economy $100 HF Bond Maine s Bridges are old and getting older - Nearly 10% are

More information

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission,

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission, , and ODOT s Updated, and Since the Vision 2000 effort under taken in 1995, ODOT has operated under a, Vision, and. These were updated in 2000 and are updated again here by Senior Leadership to reflect

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

Mobility and System Reliability Goal

Mobility and System Reliability Goal Mobility and System Reliability Goal Provide surface transportation infrastructure and services that will advance the efficient and reliable movement of people and goods throughout the state. Background:

More information