Performance evaluation of an automated material handling system for a wafer fab

Size: px
Start display at page:

Download "Performance evaluation of an automated material handling system for a wafer fab"

Transcription

1 Robotics and Computer-Integrated Manufacturing 20 (2004) Performance evaluation of an automated material handling system for a wafer fab F.K. Wang a, *, J.T. Lin b a Department of Industrial Engineering and Management, National Taipei University of Technology, No. 1, Chung Hsiao East Rd., Sec. 3, Taipei 10626, Taiwan b Department of Industrial Engineering and Engineering Management, National Tsing Hua University, Taiwan, ROC Received 21 July 2003; accepted 7 August 2003 Abstract Discrete-event simulation model was developed to evaluate the performance of an automated material handling system (AMHS) for a wafer fab with a zone control scheme avoiding all vehicle collision. The layout of this AMHS is a custom configuration. The track option contains turntables, turnouts and high-speed express lanes. The behavior of the interarrival for all stockers from the real data set was analyzed to verify the assumption of the simulation model. The results show that the underlying distributions of most stockers for interarrival times belong to the exponential or Weibull distribution. The simulation results show that the number of vehicles significantly affects the average delivery time and the average throughput. A simple one-factor response surface model is used to determine the appropriate vehicle numbers. This study was also investigated to determine the vehicle numbers in an automated guided vehicle-based intrabay material handling system. r 2003 Elsevier Ltd. All rights reserved. Keywords: AMHS; Interbay; Intrabay; Performance evaluation; Simulation 1. Introduction Semiconductor wafer fabrication is a challenging technological process in this world. The cost of equipment is about 80% of the factory capitalcosts. This type of process is highly reentrant and creates a large amount of material flow between bays (inter- or intrabay movement). The increasing demand for ultraclean areas of semiconductor fabrication is leading to the automated materialhandling and control. The main purpose of an automated materialhandling system (AMHS) is to improve the performance of the overall fabrication process, by reducing manufacturing cycle time and increasing equipment use. This improvement comes by optimizing materialdeliveries to the required areas during the fabrication cycle. Davis and Weiss [1] provide many benefits of an automating wafer material handling in a wafer fab such as an increase of yield rate, the reduced cycle time and particle contamination, etc. Successfulimplementation of an AMHS begins with the collection of all the necessary information and ends with *Corresponding author. address: fukwun@ntut.edu.tw (F.K. Wang). the installation, testing, and operation of the equipment. The effect factors of the AMHS performance are described as follows: (1) Factory layout: farm layout (all like equipment are either the same or adjacent), hybrid layout (distributed metrology), and modified hybrid layout (distribute any equipment to facilitate 4 6 contiguous process steps performed in the same bay). (2) AMHS track layout: spine, perimeter, flexible, and track options such as turntables, turnouts, or highspeed express lanes. (3) Transport vehicles: the number of vehicles, the velocities, and vehicle dispatching. (4) Production planning and scheduling, such as throughput rate, WIP, and stocker capacity distribution and loading along the wafer fab. (5) Production control, stocker operation management and operator behavior. Examples are retrieve trends, delays to output port unloads, and lot requests not from retrieve stockers. In general, there are two types of AMHS in the wafer fab. The first is the interbay system, which is transporting /$ - see front matter r 2003 Elsevier Ltd. All rights reserved. doi: /j.rcim

2 92 F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) cassettes or boxes of wafers between process bays. The other is the intrabay system, which is transporting cassettes or boxes of wafers within one process bay, also called tool-to-tool AMHS. Interbay systems are typically monorail-type movement systems, where vehicles move materialusing monorailand interface with AS/RS machines (stockers) in bay areas where materials are processed. Intrabay automation has been shown to increase process equipment utilization and reduce the labor requirement. Five types of intrabay systems automation vehicles are being developed by material handling equipment suppliers: rail robots, rail guided vehicles, automated guided vehicles (AGV); personnel guided vehicles, and overhead transport vehicles. The analysis of an intrabay system can be found in Cardarelli et al. [2], Jefferson [3], Mackulak et al. [4], Wright et al. [5] and Lin et al. [6]. Many authors have studied the performance of an AMHS. Pillai [7] provides a detailed analysis of the needs and requirements for successfully designing and implementing automated materialhandling controlsystems in a wafer fab. Pierce and Stafford [8] developed discrete-event simulation models to model the performance of conventional cleanroom materialhandling manualand automated systems. The cassette delivery time, cassette cycle time, and resource utilization could be used as the performance metrics. The results show that the track design, vehicle count, and velocity can affect system performance. The most practicalapproach in enhancing interbay AMHS performance is to minimize the traveldistances between stockers by using a custom track layout with turntables. Cardarelli et al. [9] present the performance of an automated interbay materialhandling and storage system. This study was considered the effects of design choices, production planning and scheduling, along with system management and operator behavior. The results show that the storage capacity distribution along the wafer fab is extremely important. Colvin, Lawrence, and Mackulak [10] presents the idea that software-driven simulation is a valuable tool for those evaluating and choosing AMHS for new wafer fabrication facilities. Simulation provides the ability to compare fab automation designs through detailed analyses of system component layouts, system performance, capacity constraints, wafer run rates, operationalrequirements, downtime parameters, automation needs, and the integration of all these elements together. Wright et al. [5] use discrete-event simulation to study the effects of a factory layout. They concluded that the modified hybrid configuration could provide the best performance. However, most of the literatures are studied with the interbay system, where the hallway contains a single loop. With the exception, of the paper by Lin et al. [11] where the layout of an interbay system is a combination configuration in which the hallway contains double loops and the vehicles have double capacity. In order to improve the interbay performance, the layout of an interbay system can be a combination configuration in which the track contains turntables, turnouts, and highspeed express lanes (see Fig. 1). Lin et al. [12] proposed that the connecting transport, AMHS, can accomplish the wafers moving tasks by different types of vehicles between bays and within each bay by a single system with interconnected lines. In the connecting transport system, the time that is spent waiting for an empty vehicle is eliminated effectively, and the WIP level can be reduced. Lin et al. [13] investigated the connecting transport AMHS in a simplified 300 mm wafer fab. The simulation results showed that the combination of vehicles had a significant effect on average travel time, throughput, and vehicle utilization. When travel time was the major concern, the suitable method was the combination of Type-A and Type-D vehicles. When throughput is the major concern, the suitable method was the combination of Type-A and Type-C vehicles. When vehicle utilization was the major concern, the suitable method is the combination of Type-A and Type-B vehicles. However, not one method outperformed the others in all operational scenarios. This study is investigated an interbay system which contains 41 stockers, 25 turntable points, and 82 turnout points. Turntables control an intersection of several tracks by rotating vehicles to appropriate track segments. AMHS vehicles access parking areas by using turnouts. An express lane is a specialized track system used for longer moves at higher speeds. A discrete-event simulation model studies the performance of an AMHS. The analysis of an operation is presented in the following section. The simulation model is discussed in Section 3, followed by a discussion of the simulation Note: S01: stocker; TT1: turntable point; : turnout point; : direction. Fig. 1. The layout of an interbay AMHS system.

3 F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) results. Section 5 investigated an AGV-based intrabay material handling system, with a simulation model of a photoprocess area. The conclusions are made along with suggestions for the further research in the finalsection. 2. The analysis of operation An automated interbay materialhandling system typically consists of a shop floor control system communicating with an AMHS and an automated equipment controlsystem. An interbay system consists of two subsystems: hallway and stockers. The detailed operations of these subsystems can be found in Cardarelli and Pelagagge [14]. The modelcaptures the flow of lots as they are transported between stockers. In the model, a lot enters the system at a source stocker s IO port. The lot is then moved to a storage location within the stocker by the stocker robot. Once the lot reaches its storage location, a vehicle is requested for Track Vehicle RTM Shelf Output Port Input Port Robot Cassette Fig. 2. The layout of the clean stocker and the track. moving the lot to its destination stocker. When the allocated vehicle arrives at the source stocker s horizontaltransfer, the vehicle moves into the stocker. The stocker robot then retrieves the lot and moves it onto the vehicle. Next, the vehicle transports the lot via the AeroTrakt to the destination stocker s horizontal transfer. The vehicle and the lot move into the destination stocker, where the stocker robot moves the lot from the vehicle to a storage location. Finally, the stocker robot moves the lot to the destination stocker s IO port, where the lot leaves the system. Fig. 2 illustrates the layout of the clean stocker and the track through the system. Stocker cycle time accounts for the time it takes to pick a lot from any location and place it at any location. It determines the average times from equipment analysis and data collection. However, there is variability in the overall cycle time of 18 s. This is because the length of time required to complete the cycle depends on how far the stocker robot has to move to reach a location. To account for this variability, the stocker cycle time is modeled with a normal distribution. To model the stocker cycle time, a normal distribution with a mean of 18 s and a standard deviation of 2 s was used. The process-flow data is used to describe the movement rate of lots between stockers. There is variability in the lot movement rate. The source of data set is collected from a wafer fab in Taiwan called a from-to-table (see Table 1) shows the moves per hour in the process flow from its mixed products. This data will be determined by the influence of the distribution of the interarrivaltime for the input rate of the simulation model. The input X (hour per lot) value is the inverse of the value from the from-to table. The data set is grouped by the stocker name, so the parameter of the stocker can be found to represent the behavior of the flow pattern for each stocker from the statisticaltest. Table 1 The from-to-table of an interbay system STK01 STK02 STK03 STK04 STK05 STK06 STK07 STK08 STK09 STK10 STK39 STK40 STK41 Total STK STK STK STK STK STK STK STK STK STK STK STK STK Total

4 94 F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) It is often of interest to test or confirm that the interarrivaltime data is from some particular distribution. Thus, in order to justify the underlying distribution of interarrivaltime from this data set, a goodness of fit technique is implemented to determine the best fitted division. In this study, four candidate distributions (Exponential, Lognormal, Gamma, or Weibull distribution) are used to find the best fitted distribution. Here, the chi-square test and the Kolmogorov Smirnov test are used to measure the goodness-of-fit. To perform the chi-square test, the system organizes the data in a frequency table, and computes the difference between the observed and the expected frequency for each time interval. The sum of these differences builds the chi-square statistic. A large chi-square (significance level o0.05) leads to the conclusion that the chosen modeldoes not provide a good fit for the data. To perform the Kolmogorov Smirnov test, the system computes the maximum distance between the cumulative frequency of the times and the theoreticalcumulative frequency provided by the chosen model. If this distance is large enough, the hypothesis (significance level o0.05) that the chosen modelfits through the times is rejected. Table 2 is the input data for stocker S01 and the testing results of the stocker S01 by different models are listed in Table 3. Table 2 The data set for the stocker S01 For stocker S01 From To From-to data X-value (h/lot) S01 S S01 S S01 S S01 S S01 S S01 S S01 S S01 S S01 S S01 S S01 S S01 S S01 S From above, the fitted modelof S01data is a Weibull distribution, and the maximum likelihood estimation of the parameters is g ¼ 0:847; y ¼ 1:965: The same procedures can be applied to all stockers. Most of the flow move from every stocker can be fitted by the Weibull distribution, but some cannot. From the from-to-table, the interarrivaltime is not exactly an exponential distribution. However, it can be a Weibull distribution. An exponentialdistribution is a specialcase of the Weibull distribution, so the data set still can be approximated to the same family distribution. Consequently, the assumption of the interarrival time from the simulation model is correct at 90% confidence interval. Namely, the input rate is Poisson distribution and the process flow of the interarrivaltime is an exponential distribution. The zone test is also tested and divided by etch, diffusion, thin film, photo, and implant, respectively. The results were shown that the underlying distributions of most stockers are exponentialor of the Weibull distribution. The values of the p-value, b; g; and y for all stockers are shown in Table Simulation model This section provides the assumptions and supporting information used in the design of the simulation model. A simulation model was developed and the model was built and executed using AutoModt simulation software version 8.6. The study evaluated the required number of vehicles that can have the better performance of the throughput movement, the delivery time, the transport time, and the stocker robot utilization. Modeling assumptions are listed as follows: (1) Vehicles have a maximum velocity of 109 ft/min. (2) Turntables have a maximum angular velocity of 90 /s. (3) The average time for a vehicle to cross a turntable is 10 s. (4) Stocker robot cycle times are normally distributed with a mean of 18 s and a standard deviation of 2 s. (5) Interarrivaltimes of lots at the source stockers are exponentialor Weibulldistribution. (6) The dispatching rule of the lots and vehicles is a combination of the shortest distance with nearest vehicle and the primary encounter first served. Table 3 The testing results of the stocker S01 by different models Model w 2 test p-value K S test p-value Exponential2.81 with 2 degrees of freedom Gamma 2.12 with 1 degree of freedom Lognormal4.17 with 1 degree of freedom Weibull 2.94 with 1 degree of freedom

5 Table 4 The values of the p-value, b; g and y for all stockers Zone Stocker # Fitted distribution p-value of Chi-square test p-value of K S test b g y Etch S01 Weibull Etch S02 Exponential Etch S03 Weibull Etch S04 Weibull Etch S05 None Etch S06 Weibull Etch S07 None Etch S08 None Etch S09 Exponential Etch S10 Weibull Etch S11 Weibull Thin film S12 Insufficient data a Thin film S13 Thin film S14 Weibull Thin film S15 Weibull Thin film S16 None Thin film S17 Weibull Thin film S18 None CMP S19 Insufficient data a CMP S20 Insufficient data a Diffusion S21 Weibull Diffusion S22 Weibull Diffusion S23 Weibull Implant S24 None Implant S25 Insufficient data a Implant S26 None F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) Photo S27 Insufficient data a Photo S28 Weibull Photo S29 Weibull Photo S30 None Photo S31 Insufficient data a Photo S32 Insufficient data a Diffusion S33 None Diffusion S34 Exponential Diffusion S35 Insufficient data a Diffusion S36 Weibull Diffusion S37 Insufficient data a Diffusion S38 Weibull Diffusion S39 Weibull Diffusion S40 Weibull Diffusion S41 Insufficient data a a Insufficient data mean that there are very few samples to provide the statistical test. (7) The fab will operate under steady-state conditions. (8) The distributions describing stocker robot cycle times will not change during the simulated period. (9) The distributions describing lot interarrival times will not change during the simulated period. The performance measures collected from the simulation are outlined as follows: (1) Delivery time: The time spent waiting for a vehicle to be allocated plus the time spent waiting for the empty, allocated vehicle travel to the source stocker plus transport time. (2) Transport time: The time from when a lot is removed from a shelf in the source stocker to when the lot is placed on the shelf at the destination stocker. Thus, transport time includes two-stocker robot cycles (one at the source stocker and one at the destination stocker) and traveltime on this interbay system.

6 96 F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) (3) Throughput: The quantity of the cassettes completed transport in an interbay system per hour. A number of trialruns were performed to validate the modeland to determine a proper simulation warm-up period. First, it was observed that severalstatistics in the simulation started to show a smaller variation after about 200 min. Then, there was very little variation among the replications. With this in mind, each simulation in our experiment ran for 1440 min after a warm-up period of 120 min. Statisticaltest using ANOVA has shown that the replication effect did not significantly affect the statistics collected in the simulation. Therefore, each experiment was replicated three times. The software Design-Expert [15] was used for data analysis and a simple one-factor of response surface modelis used to determine the appropriate vehicle number. This experiment design has eight runs where the lowest level of the vehicle number and the upper level of the vehicle number are 70 and 90. Therefore, the totalnumber of simulation experiments performed was The analysis of simulation results The simulation model analyzed different scenarios obtained by altering the number of vehicles available for product movement. The residualanalysis shows that the assumptions can be satisfied for all performance measures, so further statisticalanalysis can be carried out. From the results of the analysis of variance, the vehicle number significantly affects the average delivery time and the average throughput at 95% confidence level. Ordinary least-squares estimation techniques were applied to develop models for each response variable. Thus, the generated models are as follows: Delivery time ¼þ7:43 0:10 vehicle number þ 5:686E-04 vehicle number 2 ; Transport time ¼þ3:72 0:037 vehicle number þ 2:275E-04 vehicle number 2 ; Throughput ¼ 2081:66 þ 69:70 vehicle number 0:42 vehicle number 2 : The analysis of variance tables for each response variable are given in Tables 5(a)-(c). The R 2 values are , and , respectively. The residual analysis of these models validated the assumptions. A two-dimensionalsurface for the desirability function is presented in Fig. 3. Under these models, the optimal setting is found to be (vehicle number=83.36) with the throughput=809, waiting time=2.69, and transport time=2.22. The confirmatory running at that condition (vehicle number=80) shows that all responses satisfy the requirements. The recommendation is to therefore stay with 80 vehicles. The following Figs. 4 6 provide some simulation results of the number vehicles (=80) scenario. The results are obtained by averaging the 10 replications of the 24 h per day. All stockers utilization is less than 70% and the crossing number of all nodes is within an acceptable limit. In addition, the distribution of the moving tasks is reasonable to illustrate the status of the vehicle transportation. Table 5 The analysis of variance Source Sum of squares DF Mean square F-value Prob>F (a) For delivery time Model Residual3.534E E-04 Lack of fit 3.084E E Pure error 4.500E E-04 Cor total (b) For transport time Model9.634E E Residual5.866E E-04 Lack of fit 3.366E E Pure error 2.500E E-05 Cor total1.550e-03 7 (c) For throughput Model Residual Lack of fit Pure error Cor total

7 F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) The analysis of an intrabay system DESIGN-EXPERT Plot Actual Factor X = vehicle number Desirability One Factor Plot vehicle number Fig. 3. Three-dimensionalsurface for the desirability function. A discrete-event simulation model was developed for Bays 27/28 in order to predict the operationalperformance of the intrabay materialhandling system. The Bays 27/28 is the one of the set comprising the photoprocess. The layout is illustrated in Fig. 7. AGV are used in this study. The process-flow data is used to describe the movement rate of lots between tools. The source of data set is collected from a wafer fab in Taiwan (see Table 6), which shows the moves per hour in the process flow from mixed products. This intrabay system is designed as a pull system. When a processed lot is picked up at a tool by intrabay transportation AGV, a demand request is generated for a new lot to be transported to that tool. In a pull system, the toolprocessing time drives the number of intrabay moving per hour. Modeling definitions are listed as follows: (1) Bi-directional control: This is the normalcontrol method for the AGV controller, where AGVs travelin both directions in and out of the process bay. Bi-directionalrouting requires the AGV controller to determine which AGV should yield the right way if there is a conflict for travelspace. (2) Delivery time: Delivery time is the time spent waiting for an AGV to be allocated, plus the time spent waiting for the allocated AGV to travel to 80% Stocker Robot Utilization 1 70% 60% 50% 40% 30% 20% 10% 0% Fig. 4. The stocker utilization for 80 vehicles scenario. Car Status, MAIN Precentage Move to Load Load Move to Unload Unload Move to Park Park Fig. 5. The distribution of the moving tasks for 80 vehicles scenario.

8 98 F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) Node Crossings Crossing per hour Fig. 6. The number of crossings on turnout points and turntable points for 80 vehicles scenario. Fig. 7. The layout of an intrabay system in photoarea (bays 27/28). Table 6 The data of from-to-table from the intrabay bays 27/28 STK27 STK28 PH051-1 IF4-In PH105-7 PH105-8 PH901-1 PH901-2 PH901-3 PH905-6 Total STK STK PH IF4-In 0.00 PH PH PH PH PH901-3 PH Total the source stocker (or source tool), plus the transport time (as defined below), added on to the loading and unloading time. (3) Transport time: The time from when a lot is loaded onto an AGV untilit is unloaded at the destination. (4) Waiting time: AGV is waiting for a stocker load port or a process toolload port to move in the prior cassette on a multiple load/unload. Or, the AGV is waiting for another AGV to move out of the way. (5) Empty travel: AGV is moving without a cassette(s) on the AGV. (6) Unloading: AGV is at a stocker or process tool unloading a cassette(s). (7) Loaded travel: AGV is moving with a cassette(s) on the AGV.

9 Table 7 The simulation results of two scenarios F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) Performance measure Number of AGVs 2 3 Delivery time (minutes) (average/standard deviation) (3.44/0.040) (2.15/0.038) Transport time (minutes) (average/standard deviation) (1.75/ (1.73/0.035) Throughput (lots/hour) (average/standard deviation) (49.3/1.5) (48.0/1.4) Average AGVs utilization (%) (average/standard deviation) (83.58/2.5) (60.57/2.48) (8) Loading: AGV is at a stocker or process tool loading a cassette(s). (9) Busy: AGV is either processing a task or moving it. (10) Idle: AGV has no assigned tasks and is parked. A number of trialruns were performed to validate the modeland to determine a proper simulation warm-up period. First, it was observed that several statistics in the simulation started to show a smaller variation after about 60 min. Then, there was very little variation among the replications. With this in mind, each simulation in our experiment was run for 1440 min after a warm-up period of 60 min. Statistical test using ANOVA has shown that the replication effect did not significantly affect the statistics collected in the simulation. Therefore, each experiment was replicated 10 times. The total number of simulation experiments performed is 2(scenarios) 10(replications) which are 20. The performance measures collected from the simulation are given as delivery time, transport time, throughput, and AGVs utilization. The simulation model analyzed two different scenarios obtained by altering the number of AGVs available for product movement. The residualanalysis shows that the assumptions be satisfied for all performance measures, so that further statisticalanalysis can be carried out. From the results of the analysis of variance, the AGVs number drastically affects the average delivery time, the average throughput, and the average AGVs utilization at 95% confidence level. The least significant difference method is used to contrast all pairs of the two scenarios under each of the performance measures. Results of the paired test analysis are summarized in Table 7. As can be seen, these two scenarios are ranked best (left) to worst for average delivery time and are ranked best (right) to worst for average throughput and average AGVs utilization. Each value is the mean of the performance data collected in the 10 replications. The simulation results indicated that a balance among delivery time, throughput, and AGVs utilization be realized with AGVs number (=2). 6. Conclusions The performance evaluation was to analyze an AMHS with a zone controlscheme in avoiding a l vehicle collisions, considering the effects of the vehicle number. In this study, the fab layout is a custom configuration and the track option contains turntables, turnouts, and high-speed express lanes. The behavior of the interarrivalfor allstockers from the realdata set was shown that the underlying distributions of most stockers belong to an exponential or Weibull distribution. In particular, the following factors were examined: the delivery time, the transport time, the interbay throughput, the stocker robot utilization, and the number of crossings on turnout points and turntable points. The results show that the number of vehicles (=80) were able to meet the requirements. In addition, AGV-based intrabay material handling system with a simulation modelof the photoprocess was investigated. The results show that the AGVs number (=2) could meet the requirements. Thus, the number of vehicles on inter- or intrabay system can be determined by a simulation study. These studies concern the fab layout only as a custom configuration and as a track option, which contains turntables, turnouts, and high-speed express lanes for an interbay AMHS system. Further research is needed to compare the performance of a custom configuration with other types of configuration. More works are needed for studying how to use direct transport systems such as a continuous flow transport in 300-mm wafer fab to eliminate the differentiation between interbay and intrabay systems, in which lots would be directly transported from equipment to equipment or from stockers. Acknowledgements The authors are gratefulfor partialsupport by NationalScience Councilin Taiwan under the grant (NSC E ). References [1] Davis F, Weiss M. Addressing automated materials handling in an existing wafer fab. Semicond Int 1995;18:3.

10 100 F.K. Wang, J.T. Lin / Robotics and Computer-Integrated Manufacturing 20 (2004) [2] Cardarelli G, Pelagagge PM, Granito A. Track-robot for wafer fabrication intrabay handling. Assem Automat 1993; 13:25 9. [3] Jefferson T. Simulation in the design of ground-based intrabay automation systems. Proceedings of the IEEE Winter Simulation Conference, Coronado, CA, USA p [4] Mackulak GT, Lawrence FP, Rayter J. Simulation analysis of 300 mm intrabay automation vehicle capacity alternatives. IEEE/ SEMI Advanced Semiconductor Manufacturing Conference, Boston, MA, USA p [5] Wright R, Cunningham C, Benhayoune K, Campbell E, Swaminathan V, White R. 300 mm factory layout and automated materials handling. Solid State Technol 1999;35: [6] Lin JT, Wang FK, Yen PY. Simulation analysis of 300 mm intrabay automation for a wafer fab 2003, working paper. [7] Pillai D. Material handling automation for wafer fabrication facilities. Proceedings of the IEEE/CHMT Ninth International Electronic Manufacturing Technology Symposium, Washington, DC, USA p [8] Pierce NG, Stafford R. Modeling and simulation of material handling for semiconductor wafer fabrication. Proceedings of the IEEE Winter Simulation Conference, Lake Buena Vista, FL, USA p [9] Cardarelli G, Pelagagge PM, Granito A. Performance analysis of automated interbay material-handling and storage systems for large wafer fab. Robotics Comput-Integr Manuf 1996;12: [10] Colvin TD, Lawrence FP, Mackulak GT. Soft simulation crucial for new automated fab decisions. Solid State Technol 1998; 41:161 8 (June). [11] Lin JT, Wang FK, Yen PY. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. Int J Prod Res 2001;39: [12] Lin JT, Wang FK, Wu CK. Connecting transport AMHS in a wafer fab. Int J Prod Res 2003;41: [13] Lin JT, Wang FK, Wu CK. Simulation analysis of the connecting transport AMHS in a wafer fab. IEEE Trans Semicond Manuf 2003;16:1 11. [14] Cardarelli G, Pelagagge PM. Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab. IEEE Trans Semicond Manuf 1995;8:44 9. [15] Design-Expert, Version 5.0.8, Stat-Ease, Minneapolis, MN, 1997.

Simulation Analysis of the Connecting Transport AMHS in a Wafer Fab

Simulation Analysis of the Connecting Transport AMHS in a Wafer Fab IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 16, NO. 3, AUGUST 2003 555 Simulation Analysis of the Connecting Transport AMHS in a Wafer Fab James T. Lin, Fu-Kwun Wang, and Chun-Kuan Wu Abstract

More information

A Simulation Based Experiment For Comparing AMHS Performance In A Semiconductor Fabrication Facility

A Simulation Based Experiment For Comparing AMHS Performance In A Semiconductor Fabrication Facility University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Industrial and Management Systems Engineering Faculty Publications Industrial and Management Systems Engineering 2002 A

More information

OPERATIONAL MODELING AND SIMULATION OF AN INTER-BAY AMHS IN SEMICONDUCTOR WAFER FABRICATION. Dong-Jin Kim

OPERATIONAL MODELING AND SIMULATION OF AN INTER-BAY AMHS IN SEMICONDUCTOR WAFER FABRICATION. Dong-Jin Kim Proceedings of the 2002 Winter Simulation Conference E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds. OPERATIONAL MODELING AND SIMULATION OF AN INTER-BAY AMHS IN SEMICONDUCTOR WAFER FABRICATION

More information

SIMULATION BASED COMPARISON OF SEMICONDUCTOR AMHS ALTERNATIVES: CONTINUOUS FLOW VS. OVERHEAD MONORAIL

SIMULATION BASED COMPARISON OF SEMICONDUCTOR AMHS ALTERNATIVES: CONTINUOUS FLOW VS. OVERHEAD MONORAIL SAT Simulations- und Automations- Technologie GmbH Gesellschaft für IT-Consulting und Systemintegration Proceedings of the 2 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A.

More information

The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories

The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories Journal of Physics: Conference Series PAPER OPEN ACCESS The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories To cite this article:

More information

CAPACITY ANALYSIS OF AUTOMATED MATERIAL HANDLING SYSTEMS IN SEMICONDUCTOR FABS. Michael E. Kuhl Julie Christopher

CAPACITY ANALYSIS OF AUTOMATED MATERIAL HANDLING SYSTEMS IN SEMICONDUCTOR FABS. Michael E. Kuhl Julie Christopher Proceedings of the 2004 Winter Simulation Conference R.G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, eds. CAPACITY ANALYSIS OF AUTOMATED MATERIAL HANDLING SYSTEMS IN SEMICONDUCTOR FABS Michael

More information

MODELING LOT ROUTING SOFTWARE THROUGH DISCRETE-EVENT SIMULATION. Chad D. DeJong Thomas Jefferson

MODELING LOT ROUTING SOFTWARE THROUGH DISCRETE-EVENT SIMULATION. Chad D. DeJong Thomas Jefferson Proceedings of the 1999 Winter Simulation Conference P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds. MODELING LOT ROUTING SOFTWARE THROUGH DISCRETE-EVENT SIMULATION Chad D. DeJong

More information

The Evaluation of Manual FOUP Handling in 300mm Wafer Fab

The Evaluation of Manual FOUP Handling in 300mm Wafer Fab The Evaluation of Manual FOUP Handling in 300mm Wafer Fab Mao-Jiun J. Wang a *, Hsiu-Chen Chung b, and Hsin-Chieh Wu c a Department of Industrial Engineering and Engineering Management, National Tsing

More information

Modeling, Analysis, Simulation and Control of Semiconductor Manufacturing Systems: A Generalized Stochastic Colored Timed Petri Net Approach

Modeling, Analysis, Simulation and Control of Semiconductor Manufacturing Systems: A Generalized Stochastic Colored Timed Petri Net Approach Modeling, Analysis, Simulation and Control of Semiconductor Manufacturing Systems: A Generalized Stochastic Colored Timed Petri Net Approach Ming-Hung Lin and Li-Chen F u Dept. of Computer Science and

More information

Julie Christopher. IBM Microelectronics 2070 Route 52 Hopewell Junction, NY 12533, USA

Julie Christopher. IBM Microelectronics 2070 Route 52 Hopewell Junction, NY 12533, USA Proceedings of the 2008 Winter Simulation Conference S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. STUDY OF OPTIMAL LOAD LOCK DEDICATION FOR CLUSTER TOOLS Julie Christopher

More information

Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds.

Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds. Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds. DECENTRALIZED DISPATCHING FOR BLOCKING AVOIDANCE IN AUTOMATED

More information

Design and Operational Analysis of Tandem AGV Systems

Design and Operational Analysis of Tandem AGV Systems Proceedings of the 2008 Industrial Engineering Research Conference J. Fowler and S. Mason. eds. Design and Operational Analysis of Tandem AGV Systems Sijie Liu, Tarek Y. ELMekkawy, Sherif A. Fahmy Department

More information

OPTIMIZATION OF AMHS DESIGN FOR A SEMICONDUCTOR FOUNDRY FAB BY USING SIMULATION MODELING. Jacky Tung Tina Sheen Merlin Kao C.H.

OPTIMIZATION OF AMHS DESIGN FOR A SEMICONDUCTOR FOUNDRY FAB BY USING SIMULATION MODELING. Jacky Tung Tina Sheen Merlin Kao C.H. Proceedings of the 2013 Winter Simulation Conference R. Pasupathy, S. H. Kim, A. Tolk, R. Hill, and M. E. Kuhl, eds OPTIMIZATION OF AMHS DESIGN FOR A SEMICONDUCTOR FOUNDRY FAB BY USING SIMULATION MODELING

More information

4 ème FORUM ARCSIS. Industrie 4.0 : A 200mm Semi-Conductor Fab Modernization

4 ème FORUM ARCSIS. Industrie 4.0 : A 200mm Semi-Conductor Fab Modernization 4 ème FORUM ARCSIS Industrie 4.0 : A 200mm Semi-Conductor Fab Modernization Alain PLANCHAIS, PMP Rousset Digital Front-End Manufacturing & Technology R&D, Projects & Program Manager Summary 2 ARCSIS January

More information

Mathematical Modeling Approach for the FAB Design Process in Semiconductor Manufacturing

Mathematical Modeling Approach for the FAB Design Process in Semiconductor Manufacturing Mathematical Modeling Approach for the FAB Design Process in Semiconductor Manufacturing Gwangjae Yu Junghoon Kim Young Jae Jang Dept. of Industrial and Systems Eng. KAIST ygjgy@kaist.ac.kr 1 1. Research

More information

CHIP makers have been challenged with the potential advantages

CHIP makers have been challenged with the potential advantages 324 IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 17, NO. 3, AUGUST 2004 Neural-Network-Based Delivery Time Estimates for Prioritized 300-mm Automatic Material Handling Operations Da-Yin Liao,

More information

A Machine Setup Model for TFT-LCD Cell Back-End Process

A Machine Setup Model for TFT-LCD Cell Back-End Process A Machine Setup Model for TFT-LCD Cell Back-End Process Y.-C. Chang 1, P.-S. Chen 2, P.-C. Chen 1 1 Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan

More information

UNIT III GROUP TECHNOLOGY AND FMS

UNIT III GROUP TECHNOLOGY AND FMS UNIT III GROUP TECHNOLOGY AND FMS GROUP TECHNOLOGY Group technology is a manufacturing technique and philosophy to increase production efficiency by exploiting the underlying sameness of component shape,

More information

Introduction to Automated Material Handling Systems in LCD Panel Production Lines

Introduction to Automated Material Handling Systems in LCD Panel Production Lines Proceeding of the 2006 IEEE International Conference on Automation Science and Engineering Shanghai, China, October 7-10, 2006 Introduction to Automated Material Handling Systems in LCD Panel Production

More information

ARCHITECTURE OF FMS. Typical Elements of FMS. Two Kind of Integration. Typical Sequence of Operation

ARCHITECTURE OF FMS. Typical Elements of FMS. Two Kind of Integration. Typical Sequence of Operation Typical Elements of FMS ARCHITECTURE OF FMS Versatile NC machines equipped with automatic tool changing and inprocess gauging, with capability to carry out a variety of operations An automated Material

More information

A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing

A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing International Journal of Industrial Engineering, 15(1), 73-82, 2008. A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing Muh-Cherng Wu and Ting-Uao Hung Department of Industrial Engineering

More information

EVALUATION OF CLUSTER TOOL THROUGHPUT FOR THIN FILM HEAD PRODUCTION

EVALUATION OF CLUSTER TOOL THROUGHPUT FOR THIN FILM HEAD PRODUCTION Proceedings of the 1999 Winter Simulation Conference P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds. EVALUATION OF CLUSTER TOOL THROUGHPUT FOR THIN FILM HEAD PRODUCTION Eric J.

More information

Development of Material Control System for Next Generation Liquid Crystal Glass

Development of Material Control System for Next Generation Liquid Crystal Glass Vol. No. Development of Material Control System for Next Generation Liquid Crystal Glass HASEGAWA Fumio : Senior Researcher, Control System Project Department, Products Development Center, Corporate Research

More information

Determining the Effectiveness of Specialized Bank Tellers

Determining the Effectiveness of Specialized Bank Tellers Proceedings of the 2009 Industrial Engineering Research Conference I. Dhillon, D. Hamilton, and B. Rumao, eds. Determining the Effectiveness of Specialized Bank Tellers Inder S. Dhillon, David C. Hamilton,

More information

Blocking Effects on Performance of Warehouse Systems with Automonous Vehicles

Blocking Effects on Performance of Warehouse Systems with Automonous Vehicles Georgia Southern University Digital Commons@Georgia Southern 11th IMHRC Proceedings (Milwaukee, Wisconsin. USA 2010) Progress in Material Handling Research 9-1-2010 Blocking Effects on Performance of Warehouse

More information

REAL-TIME DISPATCHING SYSTEM OF GIGA-FAB

REAL-TIME DISPATCHING SYSTEM OF GIGA-FAB REAL-TIME DISPATCHING SYSTEM OF GIGA-FAB YING-MEI TU Department of Industrial Management, Chung-Hua University, Taiwan, R.O.C. E-mail: amytu@chu.edu.tw Abstract Semiconductor manufacturing companies have

More information

Proceedings of the 2017 Winter Simulation Conference W. K. V. Chan, A. D'Ambrogio, G. Zacharewicz, N. Mustafee, G. Wainer, and E. Page, eds.

Proceedings of the 2017 Winter Simulation Conference W. K. V. Chan, A. D'Ambrogio, G. Zacharewicz, N. Mustafee, G. Wainer, and E. Page, eds. Proceedings of the 2017 Winter Simulation Conference W. K. V. Chan, A. D'Ambrogio, G. Zacharewicz, N. Mustafee, G. Wainer, and E. Page, eds. DESIGN AND SIMULATION ANALYSIS OF : A MULTIPLE-LOAD AUTOMATED

More information

SIMULATING CONVEYOR-BASED AMHS LAYOUT CONFIGURATIONS IN SMALL WAFER LOT MANUFACTURING ENVIRONMENTS

SIMULATING CONVEYOR-BASED AMHS LAYOUT CONFIGURATIONS IN SMALL WAFER LOT MANUFACTURING ENVIRONMENTS Proceedings of the 2011 Winter Simulation Conference S. Jain, R.R. Creasey, J. Himmelspach, K.P. White, and M. Fu, eds. SIMULATING CONVEYOR-BASED AMHS LAYOUT CONFIGURATIONS IN SMALL WAFER LOT MANUFACTURING

More information

Proceedings of the 2017 Winter Simulation Conference W. K. V. Chan, A. D'Ambrogio, G. Zacharewicz, N. Mustafee, G. Wainer, and E. Page, eds.

Proceedings of the 2017 Winter Simulation Conference W. K. V. Chan, A. D'Ambrogio, G. Zacharewicz, N. Mustafee, G. Wainer, and E. Page, eds. Proceedings of the 2017 Winter Simulation Conference W. K. V. Chan, A. D'Ambrogio, G. Zacharewicz, N. Mustafee, G. Wainer, and E. Page, eds. A SIMULATION-BASED APPROACH FOR AN EFFECTIVE AMHS DESIGN IN

More information

Family-Based Scheduling Rules of a Sequence-Dependent Wafer Fabrication System

Family-Based Scheduling Rules of a Sequence-Dependent Wafer Fabrication System IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 16, NO. 1, FEBRUARY 2003 15 Family-Based Scheduling Rules of a Sequence-Dependent Wafer Fabrication System Ching-Chin Chern and Yu-Lien Liu Abstract

More information

Assigning Storage Locations in an Automated Warehouse

Assigning Storage Locations in an Automated Warehouse Proceedings of the 2010 Industrial Engineering Research Conference A. Johnson and J. Miller, eds. Assigning Storage Locations in an Automated Warehouse Mark H. McElreath and Maria E. Mayorga, Ph.D. Department

More information

A GREEDY HEURISTIC FOR LOCATING CROSSOVERS IN CONVEYOR-BASED AMHS IN WAFER FABS. 237K Zachry Engineering Center P.O. Box 9043

A GREEDY HEURISTIC FOR LOCATING CROSSOVERS IN CONVEYOR-BASED AMHS IN WAFER FABS. 237K Zachry Engineering Center P.O. Box 9043 Proceedings of the 2009 Winter Simulation Conference M. D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin and R. G. Ingalls, eds. A GREEDY HEURISTIC FOR LOCATING CROSSOVERS IN CONVEYOR-BASED AMHS IN WAFER

More information

Bottleneck Detection of Manufacturing Systems Using Data Driven Method

Bottleneck Detection of Manufacturing Systems Using Data Driven Method Proceedings of the 2007 IEEE International Symposium on Assembly and Manufacturing Ann Arbor, Michigan, USA, July 22-25, 2007 MoB2.1 Bottleneck Detection of Manufacturing Systems Using Data Driven Method

More information

Simulation Modeling for End-of-Aisle Automated Storage and Retrieval System

Simulation Modeling for End-of-Aisle Automated Storage and Retrieval System Simulation Modeling for End-of-Aisle Automated Storage and Retrieval System Behnam Bahrami 1, a) El-Houssaine Aghezzaf 3, c) and Veronique Limere 1,2 Department of Industrial Systems Engineering and product

More information

CLUSTER TOOL SIMULATION ASSISTS THE SYSTEM DESIGN. Sarayuth Poolsup Salil Deshpande

CLUSTER TOOL SIMULATION ASSISTS THE SYSTEM DESIGN. Sarayuth Poolsup Salil Deshpande Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. CLUSTER TOOL SIMULATION ASSISTS THE SYSTEM DESIGN Sarayuth Poolsup Salil Deshpande The

More information

PLANNING AND CONTROL FOR A WARRANTY SERVICE FACILITY

PLANNING AND CONTROL FOR A WARRANTY SERVICE FACILITY Proceedings of the 2 Winter Simulation Conference M. E. Kuhl, N. M. Steiger, F. B. Armstrong, and J. A. Joines, eds. PLANNING AND CONTROL FOR A WARRANTY SERVICE FACILITY Amir Messih Eaton Corporation Power

More information

A DECISION TOOL FOR ASSEMBLY LINE BREAKDOWN ACTION. Roland Menassa

A DECISION TOOL FOR ASSEMBLY LINE BREAKDOWN ACTION. Roland Menassa Proceedings of the 2004 Winter Simulation Conference R.G. Ingalls, M. D. Rossetti, J. S. Smith, and. A. Peters, eds. A DECISION TOOL FOR ASSEMLY LINE REAKDOWN ACTION Frank Shin ala Ram Aman Gupta Xuefeng

More information

MATERIAL HANDLING IN FLEXIBLE MANUFACTURING SYSTEM Mr. Neeraj Nirmal 1, Mr. Neeraj Dahiya 2

MATERIAL HANDLING IN FLEXIBLE MANUFACTURING SYSTEM Mr. Neeraj Nirmal 1, Mr. Neeraj Dahiya 2 International Journal of Computer Science and Management Studies, Vol. 11, Issue 02, Aug 2011 40 MATERIAL HANDLING IN FLEXIBLE MANUFACTURING SYSTEM Mr. Neeraj Nirmal 1, Mr. Neeraj Dahiya 2 1 M.Tech. Scholar,

More information

Proceedings of the 2008 Winter Simulation Conference S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds.

Proceedings of the 2008 Winter Simulation Conference S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. Proceedings of the 28 Winter Simulation Conference S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. SIMULATION ANALYSIS OF SEMICONDUCTOR MANUFACTURING WITH SMALL LOT SIZE AND

More information

半導體生產自動化與 智慧工廠 UMC/IT 王邦明 5/22/2012

半導體生產自動化與 智慧工廠 UMC/IT 王邦明 5/22/2012 半導體生產自動化與 智慧工廠 UMC/IT 王邦明 5/22/2012 Contents 半導體產業資訊系統 半導體生產自動化系統 半導體智慧工廠的需求 半導體智慧工廠的新挑戰 P. 2 Information System of Foundry Planning Applications Production Information EDA AMAS Reporting Enterprise Applications

More information

Closed-Loop Measurement of Equipment Efficiency and Equipment Capacity. Prof. Rob Leachman University of California at Berkeley

Closed-Loop Measurement of Equipment Efficiency and Equipment Capacity. Prof. Rob Leachman University of California at Berkeley Closed-Loop Measurement of Equipment Efficiency and Equipment Capacity Prof. Rob Leachman University of California at Berkeley Introduction Important concept from "TPM" paradigm: Overall Equipment Efficiency

More information

AGV Controlled FMS. The ITB Journal. Fergus G. Maughan. Volume 1 Issue 1 Article 5

AGV Controlled FMS. The ITB Journal. Fergus G. Maughan. Volume 1 Issue 1 Article 5 The ITB Journal Volume 1 Issue 1 Article 5 2000 AGV Controlled FMS Fergus G. Maughan Follow this and additional works at: http://arrow.dit.ie/itbj Part of the Other Operations Research, Systems Engineering

More information

Simulation based Performance Analysis of an End-of-Aisle Automated Storage and Retrieval System

Simulation based Performance Analysis of an End-of-Aisle Automated Storage and Retrieval System Simulation based Performance Analysis of an End-of-Aisle Automated Storage and Retrieval System Behnam Bahrami, El-Houssaine Aghezzaf and Veronique Limère Department of Industrial Management, Ghent University,

More information

A Dynamic Releasing Scheme for Wafer Fabrication

A Dynamic Releasing Scheme for Wafer Fabrication A Dynamic Scheme for Wafer Fabrication A Dynamic Scheme for Wafer Fabrication 1 Yu-Hsin Lin, 2* Chih-Hung Tsai, 3 Ching-En Lee and 3 Sheng-Kaung Liu 1 Department of Industrial Engineering and Management

More information

A SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS

A SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS A SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS Mark B. Duinkerken, Joseph J.M. Evers and Jaap A. Ottjes Faculty of OCP, department of Mechanical

More information

RESOURCE-DRIVEN AND JOB-DRIVEN SIMULATIONS

RESOURCE-DRIVEN AND JOB-DRIVEN SIMULATIONS RESOURCE-DRIVEN AND JOB-DRIVEN SIMULATIONS Theresa M. Roeder*, Seth A. Fischbein, Mani Janakiram, and Lee W. Schruben* *Department of Industrial Engineering and Operations Research University of California,

More information

Closed-book part (total time for parts I and II: 100 minutes) + 10 minutes for those with roll-over minutes from Test 1.

Closed-book part (total time for parts I and II: 100 minutes) + 10 minutes for those with roll-over minutes from Test 1. Closed-book part (total time for parts I and II: 100 minutes) + 10 minutes for those with roll-over minutes from Test 1. Part I: Use α of 5% for all problems. Problem 1 (20 points) An IE is to conduct

More information

SIMULATION OF A LARGE-SCALE BREWERY DISTRIBUTION SYSTEM. K. Heinz Weigl. ESLA Scheibengasse 5 A-1190 Vienna, AUSTRIA

SIMULATION OF A LARGE-SCALE BREWERY DISTRIBUTION SYSTEM. K. Heinz Weigl. ESLA Scheibengasse 5 A-1190 Vienna, AUSTRIA Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. SIMULATION OF A LARGE-SCALE BREWERY DISTRIBUTION SYSTEM K. Heinz Weigl ESLA Scheibengasse

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds Proceedings of the 0 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds OPTIMAL BATCH PROCESS ADMISSION CONTROL IN TANDEM QUEUEING SYSTEMS WITH QUEUE

More information

ENERGY AND CYCLE TIME EFFICIENT WAREHOUSE DESIGN FOR AUTONOMOUS VEHICLE-BASED STORAGE AND RETRIEVAL SYSTEM. Banu Y. Ekren 1 Anil Akpunar 2

ENERGY AND CYCLE TIME EFFICIENT WAREHOUSE DESIGN FOR AUTONOMOUS VEHICLE-BASED STORAGE AND RETRIEVAL SYSTEM. Banu Y. Ekren 1 Anil Akpunar 2 ENERGY AND CYCLE TIME EFFICIENT WAREHOUSE DESIGN FOR AUTONOMOUS VEHICLE-BASED STORAGE AND RETRIEVAL SYSTEM Banu Y. Ekren 1 Anil Akpunar 2 1,2 Department of Industrial Engineering, Izmir University of Economics,

More information

Optimal Design Methodology for an AGV Transportation System by Using the Queuing Network Theory

Optimal Design Methodology for an AGV Transportation System by Using the Queuing Network Theory Optimal Design Methodology for an AGV Transportation System by Using the Queuing Network Theory Satoshi Hoshino 1, Jun Ota 1, Akiko Shinozaki 2, and Hideki Hashimoto 2 1 Dept. of Precision Engineering,

More information

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations Why use simulation? Accurate Depiction of Reality Anyone can perform a simple analysis manually. However, as the complexity of the analysis increases, so does the need to employ computer-based tools. While

More information

Simulation Using. ProModel. Dr. Charles Harrell. Professor, Brigham Young University, Provo, Utah. Dr. Biman K. Ghosh, Project Leader

Simulation Using. ProModel. Dr. Charles Harrell. Professor, Brigham Young University, Provo, Utah. Dr. Biman K. Ghosh, Project Leader T H R D E D T 0 N Simulation Using ProModel Dr. Charles Harrell Professor, Brigham Young University, Provo, Utah Director, PROMODEL Corporation, Oram, Utah Dr. Biman K. Ghosh, Project Leader Professor,

More information

Ch 19 Flexible Manufacturing Systems

Ch 19 Flexible Manufacturing Systems Ch 19 Flexible Manufacturing Systems Sections: 1. What is a Flexible Manufacturing System? 2. FMS Components 3. FMS Applications and Benefits 4. FMS Planning and Implementation Issues 5. Quantitative Analysis

More information

Scheduling of Three FMS Layouts Using Four Scheduling Rules

Scheduling of Three FMS Layouts Using Four Scheduling Rules Scheduling of Three FMS Layouts Using Four Scheduling Rules Muhammad Arshad1 m.arshad8@bradford.ac.uk Milana Milana1 m.milana@student.bradford.ac.uk Mohammed Khurshid Khan1 M.K.Khan@bradford.ac.uk 1 School

More information

Suzhou AGV Robot Co,.Ltd

Suzhou AGV Robot Co,.Ltd Suzhou AGV Robot Co,.Ltd Suzhou AGV Robot Co,.Ltd www.agvsz.com We always supply AGVs meeting our customers' needs. Suzhou AGV Robot Co,.Ltd Cost-effective & versatile AGVs Robot Ltd, (simplified as AGV

More information

SIMULATION FRAMEWORK FOR COMPLEX MANUFACTURING SYSTEMS WITH AUTOMATED MATERIAL HANDLING. Rene Driessel Lars Mönch

SIMULATION FRAMEWORK FOR COMPLEX MANUFACTURING SYSTEMS WITH AUTOMATED MATERIAL HANDLING. Rene Driessel Lars Mönch Proceedings of the 2007 Winter Simulation Conference S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds. SIMULATION FRAMEWORK FOR COMPLEX MANUFACTURING SYSTEMS WITH AUTOMATED

More information

A SIMULATION STUDY OF ROBOTIC WELDING SYSTEM WITH PARALLEL AND SERIAL PROCESSES IN THE METAL FABRICATION INDUSTRY

A SIMULATION STUDY OF ROBOTIC WELDING SYSTEM WITH PARALLEL AND SERIAL PROCESSES IN THE METAL FABRICATION INDUSTRY Proceedings of the 2002 Winter Simulation Conference E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds. A SIMULATION STUDY OF ROBOTIC WELDING SYSTEM WITH PARALLEL AND SERIAL PROCESSES IN THE

More information

Design of an Automated Transportation System in a Seaport Container Terminal for the Reliability of Operating Robots

Design of an Automated Transportation System in a Seaport Container Terminal for the Reliability of Operating Robots Design of an Automated Transportation System in a Seaport Container Terminal for the Reliability of Operating Robots Satoshi Hoshino and Jun Ota Abstract For the design of an automated transportation system

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing

More information

Gang Scheduling Performance on a Cluster of Non-Dedicated Workstations

Gang Scheduling Performance on a Cluster of Non-Dedicated Workstations Gang Scheduling Performance on a Cluster of Non-Dedicated Workstations Helen D. Karatza Department of Informatics Aristotle University of Thessaloniki 54006 Thessaloniki, Greece karatza@csd.auth.gr Abstract

More information

Design of an AGV Transportation System by Considering Management Model in an ACT

Design of an AGV Transportation System by Considering Management Model in an ACT Intelligent Autonomous Systems 9 Book Editors IOS Press, 2006 1 Design of an AGV Transportation System by Considering Management Model in an ACT Satoshi Hoshino a,1,junota a, Akiko Shinozaki b, and Hideki

More information

Highly Efficient AGV Transportation System Management Using Agent Cooperation and Container Storage Planning

Highly Efficient AGV Transportation System Management Using Agent Cooperation and Container Storage Planning Highly Efficient AGV Transportation System Management Using Agent Cooperation and Container Storage Planning Satoshi Hoshino and Jun Ota Dept. of Precision Engineering, School of Engineering The University

More information

CONGESTION-AWARE DYNAMIC ROUTING IN AUTOMATED MATERIAL HANDLING SYSTEMS

CONGESTION-AWARE DYNAMIC ROUTING IN AUTOMATED MATERIAL HANDLING SYSTEMS CONGESTION-AWARE DYNAMIC ROUTING IN AUTOMATED MATERIAL HANDLING SYSTEMS A Thesis Presented to The Academic Faculty by Kelly K. Bartlett In Partial Fulfillment of the Requirements for the Degree Doctor

More information

Material Handling Systems

Material Handling Systems Material Handling Systems Vehicle Based Systems Mehmet Güray Güler, ph.d. IE2732 Yıldız Technical University 1 Analysis of Material Handling Systems Charting techniques are helpful for visualizing the

More information

Automation in Plant Factory with Labor-saving Conveyance System

Automation in Plant Factory with Labor-saving Conveyance System Technical Report Environ. Control Biol., 53 (2), 101 105, 2015 DOI: 10.2525/ecb.53.101 Automation in Plant Factory with Labor-saving Conveyance System Minoru TOKIMASA 1 and Yoshifumi NISHIURA 2 1 Itoh

More information

Simulation Modeling as a Decision Analysis Support Tool at the Vancouver Container Terminal

Simulation Modeling as a Decision Analysis Support Tool at the Vancouver Container Terminal Simulation Modeling as a Decision Analysis Support Tool at the Vancouver Container Terminal by AIMEE(ZHIWEI) ZHOU B.Econ(World Economics), Fudan University 2000 A THESIS SUBMITTED IN PARTIAL FULFILMENT

More information

A Simulation Study of Lot Flow Control in Wafer Fabrication Facilities

A Simulation Study of Lot Flow Control in Wafer Fabrication Facilities Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, July 3 6, 2012 A Simulation Study of Lot Flow Control in Wafer Fabrication Facilities

More information

APPLICATION OF SIMULATION AND THE BOEHM SPIRAL MODEL TO 300-MM LOGISTICS SYSTEM RISK REDUCTION. Robert J. Gaskins

APPLICATION OF SIMULATION AND THE BOEHM SPIRAL MODEL TO 300-MM LOGISTICS SYSTEM RISK REDUCTION. Robert J. Gaskins Proceedings of the 1999 Winter Simulation Conference P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds. APPLICATION OF SIMULATION AND THE BOEHM SPIRAL MODEL TO 300-MM LOGISTICS SYSTEM

More information

Planning for the Semiconductor Manufacturer of the Future

Planning for the Semiconductor Manufacturer of the Future From: AAAI Technical Report SS-92-01. Compilation copyright 1992, AAAI (www.aaai.org). All rights reserved. Planning for the Semiconductor Manufacturer of the Future Hugh E. Fargher 8~ Richard A. Smith

More information

Chapter 7 Entity Transfer and Steady-State Statistical Analysis

Chapter 7 Entity Transfer and Steady-State Statistical Analysis Chapter 7 Entity Transfer and Steady-State Statistical Analysis What We ll Do... Types of Entity Transfers Resource-Constrained Transfers Transporters (Model 7.1) Conveyors Non-accumulating (Model 7.2)

More information

Paper Review: Proactive Traffic Merging Strategies for Sensor-Enabled Cars. Brian Choi - E6778 February 22, 2012

Paper Review: Proactive Traffic Merging Strategies for Sensor-Enabled Cars. Brian Choi - E6778 February 22, 2012 Paper Review: Proactive Traffic Merging Strategies for Sensor-Enabled Cars Brian Choi - E6778 February 22, 2012 Objective Highway traffic throughput at a ramp merging section can be optimized when sensor-enabled

More information

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP Deidra L. Donald

More information

Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study

Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study Robotics and Computer-Integrated Manufacturing ] (]]]]) ]]] ]]] www.elsevier.com/locate/rcim Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study V. Vinod

More information

EFFECTIVE SIMULATION MODEL REUSE: A CASE STUDY FOR AMHS MODELING

EFFECTIVE SIMULATION MODEL REUSE: A CASE STUDY FOR AMHS MODELING Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. EFFECTIVE SIMULATION MODEL REUSE: A CASE STUDY FOR AMHS MODELING Gerald T. Mackulak

More information

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Journal of Mechanical Engineering Vol SI 4 (1), 47-60, 2017 Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process Seha Saffar * Centre

More information

Flexible Manufacturing systems. Lec 4. Dr. Mirza Jahanzaib

Flexible Manufacturing systems. Lec 4. Dr. Mirza Jahanzaib Flexible Manufacturing systems AB A. Bottleneck kmdl Model Lec 4 Dr. Mirza Jahanzaib Where to Apply FMS Technology The plant presently either: Produces parts in batches or Uses manned GT cells and management

More information

LOAD SHARING IN HETEROGENEOUS DISTRIBUTED SYSTEMS

LOAD SHARING IN HETEROGENEOUS DISTRIBUTED SYSTEMS Proceedings of the 2 Winter Simulation Conference E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds. LOAD SHARING IN HETEROGENEOUS DISTRIBUTED SYSTEMS Helen D. Karatza Department of Informatics

More information

Modifying Production Line for Productivity Improvement: A Case Study of Vision Lens Factory

Modifying Production Line for Productivity Improvement: A Case Study of Vision Lens Factory Modifying Production Line for Productivity Improvement: A Case Study of Vision Lens Factory Roongrat Pisuchpen 1, Wongsakorn Chansangar 2 1 Department of Industrial Engineering 1 Kasetsart University,

More information

Part III MATERIAL HANDLING AND IDENTIFICATION TECHNOLOGIES

Part III MATERIAL HANDLING AND IDENTIFICATION TECHNOLOGIES Part III MATERIAL HANDLING AND IDENTIFICATION TECHNOLOGIES Chapters: 10.Material Transport Systems 11.Storage Systems 12.Automatic Identification and Data Capture Material Handling Technologies in the

More information

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY Quynh-Lam Ngoc LE 1, Ngoc-Hien DO 2, Ki-Chan NAM 3 1 Ho Chi Minh City University of Technology, 268 Ly Thuong

More information

A Flexsim-based Optimization for the Operation Process of Cold- Chain Logistics Distribution Centre

A Flexsim-based Optimization for the Operation Process of Cold- Chain Logistics Distribution Centre A Flexsim-based Optimization for the Operation Process of Cold- Chain Logistics Distribution Centre X. Zhu 1, R. Zhang *2, F. Chu 3, Z. He 4 and J. Li 5 1, 4, 5 School of Mechanical, Electronic and Control

More information

Path Planning for Multi-AGV Systems based on Two-Stage Scheduling

Path Planning for Multi-AGV Systems based on Two-Stage Scheduling Available online at www.ijpe-online.com vol. 13, no. 8, December 2017, pp. 1347-1357 DOI: 10.23940/ijpe.17.08.p16.13471357 Path Planning for Multi-AGV Systems based on Two-Stage Scheduling Wan Xu *, Qi

More information

IEOR 130 Methods of Manufacturing Improvement Practice Examination Problems Part I of Course Prof. Leachman Fall, 2017

IEOR 130 Methods of Manufacturing Improvement Practice Examination Problems Part I of Course Prof. Leachman Fall, 2017 IEOR 130 Methods of Manufacturing Improvement Practice Examination Problems Part I of Course Prof. Leachman Fall, 2017 1. The thickness of a film deposited on wafers at a particular process step is subject

More information

Metrics for 300 mm Automated Material Handling Systems (AMHS) and Production Equipment Interfaces: Revision 1.0

Metrics for 300 mm Automated Material Handling Systems (AMHS) and Production Equipment Interfaces: Revision 1.0 Metrics for 300 mm Automated Material Handling Systems (AMHS) and Production Equipment Interfaces: Revision 1.0 SEMATECH and the SEMATECH logo are registered service marks of SEMATECH, Inc. and the logo

More information

Sequencing and Scheduling of Jobs and Tools in a Flexible Manufacturing System using Jaya Algorithm

Sequencing and Scheduling of Jobs and Tools in a Flexible Manufacturing System using Jaya Algorithm Sequencing and Scheduling of Jobs and Tools in a Flexible Manufacturing System using Jaya Algorithm Modapothula Chaithanya 1, N Siva Rami Reddy 2, P Ravindranatha Reddy, 1 PG Student, Dept of Mechanical,

More information

USING SIMULATION TO UNDERSTAND CAPACITY CONSTRAINTS AND IMPROVE EFFICIENCY ON PROCESS TOOLS. Kishore Potti. Todd LeBaron

USING SIMULATION TO UNDERSTAND CAPACITY CONSTRAINTS AND IMPROVE EFFICIENCY ON PROCESS TOOLS. Kishore Potti. Todd LeBaron Proceedings of the 2002 Winter Simulation Conference E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds. USING SIMULATION TO UNDERSTAND CAPACITY CONSTRAINTS AND IMPROVE EFFICIENCY ON PROCESS

More information

DISPATCHING HEURISTIC FOR WAFER FABRICATION. Loo Hay Lee Loon Ching Tang Soon Chee Chan

DISPATCHING HEURISTIC FOR WAFER FABRICATION. Loo Hay Lee Loon Ching Tang Soon Chee Chan Proceedings of the 2001 Winter Simulation Conference B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, eds. DISPATCHING HEURISTIC FOR WAFER FABRICATION Loo Hay Lee Loon Ching Tang Soon Chee

More information

COMPARISON OF TWO CROSSDOCKING LAYOUTS AT A JIT MANUFACTURER

COMPARISON OF TWO CROSSDOCKING LAYOUTS AT A JIT MANUFACTURER COMPARISON OF TWO CROSSDOCKING LAYOUTS AT A JIT MANUFACTURER Dr. Karina Hauser, Utah State University, khauser@b202.usu.edu Dr. Chen Chung, University of Kentucky, bad180@pop.uky.edu ABSTRACT In this study,

More information

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY Ramesh Marasini, Nashwan Dawood School of Science and Technology, Univerisity of Teesside, Middlesbrough

More information

PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES AND SETUP TIMES UNDER OPTIMAL SETTINGS. Silvanus T. Enns

PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES AND SETUP TIMES UNDER OPTIMAL SETTINGS. Silvanus T. Enns Proceedings of the 2007 Winter Simulation Conference S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds. PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES

More information

WeE10.4 I. INTRODUCTION CHALLENGE IN THE SEMICONDUCTOR INDUSTRY /07/$ IEEE. 1597

WeE10.4 I. INTRODUCTION CHALLENGE IN THE SEMICONDUCTOR INDUSTRY /07/$ IEEE. 1597 2007 IEEE International Conference on Robotics and Automation Roma, Italy, 10-14 April 2007 WeE10.4 Jonathan, Chang Yung-Cheng Member, IEEE Institute of Manufacturing Engineering National Cheng Kung University

More information

Optimal Design, Evaluation, and Analysis of AGV Transportation Systems Based on Various Transportation Demands

Optimal Design, Evaluation, and Analysis of AGV Transportation Systems Based on Various Transportation Demands Optimal Design, Evaluation, and Analysis of Systems Based on Various Demands Satoshi Hoshino and Jun Ota Dept. of Precision Engineering, School of Engineering The University of Tokyo Bunkyo-ku, Tokyo 113-8656,

More information

Hybrid search method for integrated scheduling problem of container-handling systems

Hybrid search method for integrated scheduling problem of container-handling systems Hybrid search method for integrated scheduling problem of container-handling systems Feifei Cui School of Computer Science and Engineering, Southeast University, Nanjing, P. R. China Jatinder N. D. Gupta

More information

Studying the Effect of Facility Size on the Selection of Automated Guided Vehicle Flow Configurations

Studying the Effect of Facility Size on the Selection of Automated Guided Vehicle Flow Configurations Journal of Automation and Control Engineering Vol. 4, No. 2, April 206 Studying the Effect of Facility Size on the Selection of Automated Guided Vehicle Flow Configurations Tarek Al-Hawari, Ena'am S. Al-Zoubi,

More information

Tips for Deploying Wireless Networks for AS/RS and AGV Systems. Calvin Chuko Product Manager

Tips for Deploying Wireless Networks for AS/RS and AGV Systems. Calvin Chuko Product Manager Tips for Deploying Wireless Networks for AS/RS and AGV Systems Calvin Chuko Product Manager Abstract Modern factories are increasingly deploying AS/RS and AGV systems in their facilities worldwide to optimize

More information

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Teerapun Saeheaw, Nivit Charoenchai, and Wichai Chattinnawat Abstract Simulation model is an easy way to build up models to represent

More information

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques

Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Line Balancing in the Hard Disk Drive Process Using Simulation Techniques Teerapun Saeheaw, Nivit Charoenchai, and Wichai Chattinnawat Abstract Simulation model is an easy way to build up models to represent

More information

Evaluation of Value and Time Based Priority Rules in a Push System

Evaluation of Value and Time Based Priority Rules in a Push System Evaluation of Value and Time Based Priority Rules in a Push System Dr. V. Arumugam * and Abdel Monem Murtadi ** * Associate Professor, Business and Advanced Technology Center, Universiti Teknologi Malaysia,

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information