1 TNV-Prepare: Analysis of Dutch railway operations based on train detection data Goverde, R.M.P., Hansen, LA. Faculty of Civil Engineering and Geosciences, Delft University of Technology, The Netherlands Abstract TNV-Prepare is a tool that derives detailed information of event times associated to train services from data records of the Dutch train describer systems, the socalled TNV-systems. The data records contain signalling and interlocking information of an entire traffic control area. The TNV-Prepare output consists of TNV-tables per train line service and (sub)route. For each individual train event times (with a precision of a second) along the route are given, including train description steps, section entries and clearances, signals, and point switches. The TNV-tables give excellent analysis opportunities of railway operations that have not been possible before. 1 Introduction The availability of reliable and accurate data of railway operations gives important opportunities in the railway planning process. It can be used for evaluating timetable performance, providing insight in the stochastic processes of railway operations, evaluating station capacity, detecting bottlenecks, and validating and calibrating railway simulation models. At the Delft University of Technology the need for accurate data of railway operations arose to evaluate developed methodologies on robust railway timetable design, station capacity estimation, and operational control strategies. The demand for accurate data was also recognized by several Dutch railway companies, including Railned, NS Verkeersleiding, NS Railinfrabeheer, and Holland Railconsult. Existing data collection methods used by NS Verkeersleiding and the railway customer organization ROVER only give rough estimates in minutes of

2 7 g() Computers in Railways VII arrival and departure times. These figures give some indication about punctuality but lack the precision, accuracy, and detail for research purposes [1]. However, the desired data was recorded by the train describer systems in a most elementary form, although these records were only kept for a few days - to support the investigation of incidents - and then deleted [2]. Therefore, the TNV-Prepare tool has been developed for deriving data from these rough train describer records. 2 TNV-systems A train describer is a system that identifies a train at a particular position and keeps track of its progress from berth to berth. In the Netherlands, the train describer is implemented as the so-called TNV-system (TNV stands for the Dutch abbreviation of 'train number following'). A train description (or train number) is a unique number (per day) identifying the train line service (characterizing the train type, terminal stations, route, and served stations) and including a discriminating counter for successive trains. The location of a train number is based on TNV-positions. A TNV-position consists of one or (usually) more adjacent track sections between two (not necessarily adjacent) signals. A train number is inserted into a TNV-system, either manually or automatically (e.g. at line ends), at the TNV-position of the platform from where the train starts its journey. The movement of a train is detected by signal controls, point detection, and track circuits, and this information is sent to the TNV-system. The route that is set behind the signal that the train is approaching determines the next TNV-position. A TNV-step of the train number to the next TNV-position is triggered when the train enters the first associated track section. So, the TNVposition of a train corresponds with the track circuit occupancy but moves in larger steps. More details about train describers can be found in Bailey [3]. The Dutch railway network has been divided into 16 traffic control areas, each having a separate TNV-system. If a train approaches an adjacent traffic control area, its number is transmitted to the associated TNV-system. When the train enters the next traffic control area the train number is cleared from the present TNV-system and inserted into the next. A main module of a TNV-system is data collection referring to the scanning and recording of inputs. The TNV-system must be continuously aware of the state of all relevant signalling controls and monitoring information, including the attached track, signal, point, and route relays. Therefore it receives information from the interlocking systems (B-relays, VPI), signalling control systems (EBP), and/or combined interlocking/signalling control systems (BBS). Moreover, it must take notice of manual instructions from operators and messages from other TNV-systems. A second main module is data manipulation corresponding to inserting and clearing train numbers, determining TNV-steps, and keeping track of the TNV-positions of all train numbers in the system. The third basic module is transmitting the TNV-positions of train numbers to process supervision systems (PSS), train traffic control systems (TTCS), and passenger information systems (Bepac). Figure 1 shows the data flows between a TNV-system and its

3 Computers in Railways traffic control TTCS passenger info Bepac signal control EBP, BBS interlocking relays,vpi, BBS train detection / railway infrastructure track circuits, points, signals Figure 1 Data flows to and from a TNV-system environment. For more details about the Dutch railway system architecture, see Brok & Vissers [4], Renkema & Vas Visser [5], and Fries & Sprakelaar [6]. A TNV-system keeps a real-time record of received inputs and TNV-steps. These TNV-logfiles are extremely large (about 25 MB ASCII-format per day) and inaccessible since they contain chronological information about all signalling and interlocking events in an entire traffic control area. However, the files clearly contain valuable realization data of the railway operations. Therefore, the TNV-Prepare application has been developed to convert the TNVlogfiles into detailed data suitable for data analysis. 3 TNV-Prepare TNV-Prepare converts TNV-logfiles into tables of successive events on a route of a train line, including TNV-steps, section entries, section clearances, signals, and point switches. In the sequel these tables are called TNV-tables. TNV- Prepare runs on MS Windows 95 and NT operating systems. Within TNV-Prepare, the rail infrastructure is implemented as a set of coupled and connected objects (infra elements). An object can either be a section, TNV-position, point, or signal. The basic objects are the sections. Each section may have up to two successor sections corresponding to a boundary section of the selected area (zero successors), a track section (one successor) and a point (two successors). Moreover, a section may have additional attached objects. A TNV-position is attached to its last section. A point is attached to a section with two successors. The columns of TNV-tables correspond to the successive sections on the route including the attached objects. An exception is a TNV-position, which is located at itsfirstsection, conform the occurrence time of a TNV-step (whereas

4 782 Computers in Railways VII the TNV-position itself is determined by the last section of a set route). Each object on the route has one or more associated events/columns, see Table 1. For a section occupied by the current train three event times are reported: the section entrance time, the next clearance time, and also the previous clearance time. Note that the previous clearance time usually relates to a different train but is interesting for capacity analysis. Likewise, three events are reported for a signal as well: the stop and proceed signal caused by the current train, and the previous proceed signal. Object TNV-position section signal point Table 1 Objects and associated events Events TNV-step last clearance entrance next clearance last proceed stop next proceed last left switch last right switch TNV-Prenare input train lines timetable & route (interactive) J \ feasibility check routes internal database Figure 2 Architecture of TNV-Prepare

5 Computers in Railways VII The TNV-Prepare application consists of three main modules as depicted in Figure 2: TNV-Prepare: builds an internal database from TNV-logfiles and additional inputs; TNV-Report: generates TNV-tables; TNV-View: displays TNV-tables and exports tables to external formats. The next sections present the three modules in more detail. 3.1 The TNV-Prepare module The first main function of the TNV-Prepare tool is to prepare an internal database from which TNV-tables can be composed. It is the core of the tool and hence is also called TNV-Prepare. The module initially requires interaction with the user to fix the basic information data set of the traffic area. Once this information has been stored in the database, TNV-tables can automatically be composed from imported TNV-logfiles, including future TNV-logfiles provided that the used infrastructure, routes, or timetable have not been changed. The TNV-Prepare module contains several functionalities as indicated in Figure 2. First, the import utility reads TNV-logfiles, rejects excessive information, and stores the remaining data in an internal format optimized for search facilities. Second, the rail infrastructure has to be defined. The first and last TNVposition of a train line is interactively chosen, see Figure 3. If a route between the TNV-positions has not yet been defined a session starts to determine the associated objects and their topological relationship. Only rail infrastructure has :30: EHV$210 13:30: EHVS210T 13:30: EHVS117BT 13:30: EHVS193BT 13:30: EHV :30: EHVS131B 13:30: EHVS131A 13:30: EHVdOlB 13:30: EHVflOlA 13:30: EHV4125T 13:30: EHVS108BT 13:30: EHVU48 13:30: EHVS256 13:30: EHVg255T 13:31: EHVS257AT 13:31: EHV(210T 13:31: EHVS261BT 13:31: EHV5256AT 13:31: EHVS256BT T leindhovcncs STOP BEZET Figure 3 TNV-Prepare window to select range of TNV-positions (highlighted) of a train line service

6 784 Computers in Railways VII to be defined for train lines of the user's interest. The rail infrastructure will become more complete with each addition of a train line and route. Additional objects (points and signals) can separately be attached to a section using the object editing utility. Subsequently, the user is asked to add data relating to the timetable, including the route(s), frequency, and the planned arrival time, departure time, and platform track section at a particular station. Standard routes are defined using the route editing utility, and can be defined in terms of predefined subroutes which relieves the manual input session. A defined route is checked on feasibility with respect to the rail infrastructure, i.e., it has to be a sequence of connected sections. The TNV-Prepare module also contains utilities to edit or add objects, and to view and edit timetable information. These functionalities can be used to adjust incorrect input or to reflect onto changes in the infrastructure or timetable. 3.2 The TNV-Report module The TNV-Report module composes TNV-tables based on the data collected by the TNV-Prepare module. The user fills in the desired train line and period and the module generates the associated TNV-tables, see Figure 4. Also several train lines and/or periods can be given before starting the generation of the TNVtables. This is convenient as the generation of a TNV-table may take a few minutes to a few hours depending on the PC-speed, the required period (from a day to several years) and route length (a local route within a station vs. a route over the entire traffic control area covering many stations). Furthermore, after the generation has been started intervention of the user is no longer required. Jokafe EHV gorier* F^o" fieriode, 21 ^! flnwchrijving, IC line 1500 in direction Heerlen at Eindhoven CS - autumn 1999 ' {Eindhoven CS Figure 4 Input window of TNV-Report TNV-Report searches in the database for the first TNV-step of the selected train line. It checks whether the route corresponds to a predefined standard route for the specific train line. If a deviation of a standard route is found the train number is stored as unsolved. Otherwise, a new row is created in the relevant TNV-table and filled with the event times associated to the various objects. Inconsistent data is rejected resulting in empty cells at the particular columns in the TNV-tables. Also lacking data is detected and give empty cells. The rows in

7 Computers in Railways Vll a TNV-table are thus guaranteed to be consistent. If the train path of a train number has been completed TNV-Report looks for the next train number. To increase the computation speed a restricted search time period is used for finding the event times associated to objects along the route. For instance, a point on the route may not have been switched for hours and the exact switching time is then of no interest for the current train. The search period per train number can be set between zero and ten minutes before thefirstand after the last TNV-step of a row. If an event has not been logged within this time period then the associated column in the TNV-table is left empty. TNV-Report terminates when the end of the required period is reached. The results can be displayed by TNV-View. If there are still unsolved trains (that took an unknown route) this is reported in a logfile attached to the TNV-table(s). If necessary the routes of the unsolved trains can be traced and added to the database using the TNV-Prepare module (see Figure 3). 3.3 The TNV-View module The TNV-View module displays the generated TNV-tables. Each row of a TNVtable corresponds to a train number at a particular day. The first four columns contain the date, train number, scheduled arrival time, and scheduled departure time. The next columns give the event times associated to consecutive elements on the train path. Figure 5 shows a part of a TNV-table as displayed by TNV- View. The successive columns correspond to a signal (first three columns), a TNV-step (fourth column), a section (next three columns), a point (next two columns), and thefirsttwo columns of the next section. Note that the empty cells in the columns associated to point 255 imply that the point has not been switched for over 20 minutes, which is the search period up to entering the associated section 255T (see Section 3.2). Equivalently, an empty cell in the clearance columns (columns 5 and 10) denotes that the associated section has been cleared for over 20 minutes before the current occupation. TNV-View has several viewing options. The heading row and thefirstfour [TNV label : T :24: :34:31 08:35:45 : 08:34:31 09:30:05 09:32:44! 09: 35:1 4 =09:32:44 10:23:30 10:36:51 ; 10:38:35 '10: :29:21 11:32:35 11:37:23 J1 1:32:35 12:28:04 12:31:33, 12:34:05 12:31:33 13:28:04 13:30:39 113:35:28 i 13:30:39 14:32:11 Jj, 14:34:59 ll 4:38: 34 i 14:34:59 08:34:31 08:34:53 09:18:01 09:32:44 09:32:59 10:36:51 10:37:11 11:16:44 11:32:35 11:32:58 12:17:02 12:31:33 12:31:52 13:16:35 13:30:39 13:30:55 : 14:30:19 14:34:59 12:17: :35:15 14:26:00 14:32:05 14:30:02 08:34:39 09:18:09 09:32:50 10:36:59 11:16:52 11:32:44 12:31:40 13:30:46 14:35:06 Figure 5 Part of a TNV-table displayed in TNV-View

8 786 Computers in Railways VII columns can be frozen when scrolling through the data cells. Several windows containing different TNV-tables can be viewed simultaneously. Moreover, these windows can be coupled and jointly scrolled to facilitate comparison of related TNV-tables. Furthermore, columns can be automatically hidden to focus on particular events. For instance, hiding all columns except section entries gives a view of the progress of a train over a route. Another functionality of TNV-View is the export utility. TNV-tables can be exported to common spreadsheet formats like tab-delimited and commaseparated. Hidden columns may also be excluded in these exported files. Any spreadsheet and statistical software program can read the exported files. 4 Data accuracy and reliability The event times in the TNV-logfiles correspond to the time instants at which the events are logged by the TNV-system. This logged event time may differ from the actual event time as a result of transmission delays or noise. However, a transmission delay is usually only a fraction of a second, and also the time necessary to log a received message is negligible. Note that event times are given in seconds and so the precision is at least a second. Confirmation of the accuracy and reliability of the (logged) event times can be obtained by tests based on route logic. First, synchronous events should have equal occurrence times. A triple of synchronous events occurs at the first section of a TNV-position that is located near a signal. Figure 5 shows this situation: section 255T after signal 256 is the first section of TNV-position EB1/EB1S.O. The occurrence of a stop sign (column 2) is synchronous with the section entrance (column 6) and the TNVstep (column 4). This implies that the logging of a received message from the signalling system occurred in the same second as the logging of the TNV-step, which has been computed by the TNV-system based on the received section entrance. This synchronicity has been monitored at all data of Eindhoven. It can be concluded that the computation time of a TNV-step is negligible, and the same holds for the recording time of an event. Moreover, it can be concluded that the transmission of messages from the signalling systems is noise-free. A second test is based on the chronological ordering of events. For instance, successive sections of a route must be occupied consecutively (compare the sixth and last column in Figure 5), also a section can only be cleared after the entrance of an adjacent section (compare the seventh and last column in Figure 5). These route logic based tests are performed by TNV-Report, which detects and discards inconsistent data, resulting in empty cells in the TNV-tables. Thus, the generated TNV-tables only contain consistent data with respect to the route logic. Note that the last section clearance before the entrance of the current train usually corresponds to different trains. So the last clearances of successive sections may be caused by a train running in the opposite direction (compare the 5th and 1 Oth column of the last row in Figure 5) or by a crossing train route. These events should therefore not be compared with the route logic of the current train.

9 Computers in Railways VII Empty cells may also be the result of missing data. TNV-Prepare detects missing events by logical rules. As an example, suppose that a TNV-step has been logged but a section of the previous TNV-position has not yet been occupied. Clearly, the train has passed the section but for some reason this has not been detected, transmitted, or recorded. The missing event results in one or more empty cells in the TNV-table. An event is only registered in a TNV-table if a logical test guarantees its consistency. Analysis of the generated TNV-tables at Eindhoven show that the number of empty cells caused by inconsistent data is negligible, even at periods of heavy (communication) traffic. It can be concluded that the logged event times equal the actual event times with an error smaller than one second and the TNV-tables generated by TNV-Prepare/Report thus accurately represent the actual traffic processes. 5 Data analysis opportunities The TNV-tables allow a variety of opportunities to analyse railway operations including capacity analysis, punctuality analysis, and assessment of stochastic railway processes. The actual arrival and departure times at the platform are not registered and hence neither given in a TNV-table. However, the exact time that a train enters the platform track section is known, and from here the remaining running time to standstill is only small and can be estimated accurately. The speed profile of the train approaching the platform can be estimated from the previous section entrance times and the known section lengths. Furthermore, if the stop location at the platform depends on the train length then this can also be estimated. The estimated train length is the product of the estimated speed at a section border and the necessary time to pass this section border (the elapsed time from an entrance time to the next clearance time of the previous section). In the same way the actual departure times can be estimated as the entrance time of the first section after the platform section subtracted by a computed acceleration time from the platform. From the above follows that also the actual arrival and departure times at a platform can be computed accurately. Therefore, also empirical probability distributions can be derived for arrival and departure times of a train line at a platform, the dwell times at a platform, and the running times between stations. An illustration of a detailed analysis based on TNV-tables is the following. The first six rows of Figure 5 show a regular behaviour for successive trains. The route has here been cleared for over 14 minutes (cf. columns 5 and 6, and 10 and 11). The last row however shows an irregularity. A train has passed point 255 (and sections 257AT and 255T) from the opposite direction. After the point has been reset in its original position it takes another 7 seconds before the route has been set and locked and signal 256 is cleared. Then it still takes another 2 minutes before the current train enters section 255T. This kind of detailed information is valuable for capacity analysis and analysis of process control measures.

10 "7QQ Computers in Railways VII, C.A. Brebbia J.Allan, R.J. Hill, G. Sciutto & S. Sone (Editors) Computers in Railways VII 6 Conclusions TNV-systems keep a real-time record of train description steps and received events from the safety and signalling systems (BBS, EBP, VPI, B-relays), with the precision of a second. Based on these TNV-logfiles, the TNV-Prepare tool generates TNV-tables suitable for data analysis. A TNV-table corresponds to a subroute of a single train line within a traffic control area. The tables consist of the occurrence times of successive events on a train path (columns), for each individual train of the line (rows) during the analysis period. Alternative routes of trains on a line are given in separate TNV-tables. The first experiences with TNV-Prepare are very promising. The TNVtables reliably and accurately represent the actual railway traffic processes. However, if the tool will be used generally throughout the Dutch railway network, manual input of the initial rail infrastructure will be too laborious. Instead, the TNV-Prepare system should then be linked to CARE which also provides the configuration data of the TNV-systems, see Fries & Sprakelaar [6]. Current research includes an extensive statistical analysis of railway operations based on generated TNV-tables of Eindhoven CS, The Hague HS, Rotterdam CS, and the corridor between Rotterdam CS and The Hague HS. These TNV-tables correspond to TNV-logfiles collected during one week in 1997 in the area Eindhoven, and during September 1999 in the area Rotterdam and The Hague. The results will be reported in future papers. Acknowledgement - This publication is a result of the research programme Seamless Multimodal Mobility, carried out within the TRAIL Research School for Transport, Infrastructure and Logistics, and financed by Delft University of Technology. References [1] Goverde, R.M.P., "Analyse van treinpaden in stations m.b.v. TNV- Prepare", Proceedings Workshop modellen voor de beheersing van treinverkeer, TRAIL Research School, Delft, 1999 (in Dutch). [2] Damen, A., Uitvoeringstijden treinactiviteiten in Vervoersgegevensbank VKL, internal document, NS Verkeersleiding, 1997 (in Dutch). [3] Bailey, C. (ed.), European Railway Signalling, Institution of Railway Signal Engineers (IRSE), A&C Black, London, pp , [4] Brok, M. den, Vissers, R., "VPT, a new systems architecture for planning and control of train traffic in The Netherlands", in: T.K.S. Murthy et al (eds.), Computer in Railways IV, Vol. 2, CMP, Southampton, pp , [5] Renkema, M., Vas Visser, H., "TRACE supervision system for dispatching and passenger information", in: J. Allan et al. (eds.), Computer in Railways V, Vol. 2, CMP, Southampton, pp , [6] Fries, G.A., Sprakelaar, J. van, "Computer aided railway engineering", in: B. Mellitt et al. (eds.), Computer in Railways VI, CMP/WIT Press, Southampton, pp , 1998.

Abstract. 1 Introduction

Abstract. 1 Introduction TRACE supervision system for dispatching and passenger information M. Renkema, H. Vas Visser Railverkeerssystemen, Holland Railconsult, Utrecht, The Netherlands Abstract This paper describes the TRACE

More information

DELAY DISTRIBUTIONS IN RAILWAY STATIONS

DELAY DISTRIBUTIONS IN RAILWAY STATIONS The 9th World Conference on Transport Research, Seoul, Korea, July 22-27, 2001 Paper No. 3605 Topic Area: C6-3605 Method of Presentation: OHP DELAY DISTRIBUTIONS IN RAILWAY STATIONS Rob M.P. GOVERDE, MSc

More information

Joint design standard for running times, dwell times and headway times

Joint design standard for running times, dwell times and headway times Computers in Railways X 611 Joint design standard for running times, dwell times and headway times V. A. Weeda & P. B. L. Wiggenraad Department of Transport & Planning, Delft University of Technology,

More information

Transactions on the Built Environment vol 34, 1998 WIT Press, ISSN

Transactions on the Built Environment vol 34, 1998 WIT Press,  ISSN Improving the Dutch railway services by network-wide timetable simulation Jurjen S. Hooghiemstra", Dick M. Middelkoop", Maurice J.G. Teunisse^ " Railned, Dept. of Innovation, P.O.Box 2025, 3500 HA Utrecht,

More information

Station capacity and stability of train operations

Station capacity and stability of train operations Station capacity and stability of train operations LA. Hansen Faculty of Civil Engineering and Geo Sciences, Delft University of Technology, The Netherlands Abstract The capacity of railway stations is

More information

Simulation of different railway signalling systems

Simulation of different railway signalling systems Simulation of different railway signalling systems M. Grimm', B.Sandbla

More information

Capturing stochastic variations of train event times and process times with goodness-of-fit tests

Capturing stochastic variations of train event times and process times with goodness-of-fit tests Capturing stochastic variations of train event times and process times with goodness-of-fit tests Jianxin Yuan Department of Transport and Planning, Delft University of Technology P.O. Box 5048, 2600 GA

More information

Chapter 1. Introduction. 1.1 Research motivation

Chapter 1. Introduction. 1.1 Research motivation Chapter 1 Introduction 1.1 Research motivation This thesis is about a more sophisticated timetable compilation and capacity analysis for a selected Dutch railway line compared to the existing tools applied

More information

Performance analysis: improving the Dutch railway service

Performance analysis: improving the Dutch railway service Computers in Railways XI 463 Performance analysis: improving the Dutch railway service V. A. Weeda 1,2 & K. S. Hofstra 2 1 Delft University of Technology, Department of Transport & Planning, The Netherlands

More information

Automated analysis of train event recorder data to improve micro-simulation models

Automated analysis of train event recorder data to improve micro-simulation models Operations Analysis 125 Automated analysis of train event recorder data to improve micro-simulation models S. de Fabris, G. Longo & G. Medeossi Department of Civil and Environmental Engineering, University

More information

Automated analysis of train event recorder data to improve micro-simulation models

Automated analysis of train event recorder data to improve micro-simulation models Computers in Railways XI 575 Automated analysis of train event recorder data to improve micro-simulation models S. de Fabris, G. Longo & G. Medeossi Department of Civil and Environmental Engineering, University

More information

The European project COMBINE 2 to improve knowledge on future rail Traffic Management Systems

The European project COMBINE 2 to improve knowledge on future rail Traffic Management Systems The European project COMBINE 2 to improve knowledge on future rail Traffic Management Systems M. Giannettoni & S. Savio Dipartimento di Ingegneria Elettrica, Università di Genova, Italy Abstract In this

More information

Capacity measurement with the UIC 406 capacity method

Capacity measurement with the UIC 406 capacity method Computers in Railways XI 55 Capacity measurement with the UIC 406 capacity method A. Landex 1, B. Schittenhelm 1,2, A. H. Kaas 3 & J. Schneider-Tilli 4 1 Department of Transport, Technical University of

More information

A new tool for railway planning and line management

A new tool for railway planning and line management Computers in Railways XI 263 A new tool for railway planning and line management J. Garzón Núñez 1, J. de D. Sanz Bobi 2, J. Gómez Ramírez 2 & J. Cano Nogueras 1 1 CITEF Research Centre on Railway Technologies,

More information

Ensuring timetable stability with train traffic data

Ensuring timetable stability with train traffic data Computers in Railways XIII 427 Ensuring timetable stability with train traffic data T. Graffagnino SBB AG, Switzerland Abstract Swiss Federal Railways plan and operate one of the densest rail networks

More information

ViziRail Description

ViziRail Description ViziRail Description Table of Contents ViziRail Train Scheduling Software... 3 Timetabling and Trains... 4 Train Graphing... 9 Possessions... 14 Speed Restrictions... 16 Train Notices... 17 Train Control

More information

RCS-DISPO The rail control system for all situations.

RCS-DISPO The rail control system for all situations. RCS-DISPO The rail control system for all situations. SBB We keep Switzerland moving. Travel in comfort. Get there in time. The Swiss are world champions in rail travel. Every day, some 11,000 trains travel

More information

UIC CODE 406. Capacity. 1st edition, June 2004 Original. La Capacité Kapazität

UIC CODE 406. Capacity. 1st edition, June 2004 Original. La Capacité Kapazität UIC CODE 1st edition, June 2004 Original Capacity La Capacité Kapazität Leaflet to be classified in Volume: IV - Operating Application: With effect from 1 June 2004 All members of the International Union

More information

Design and implementation of a distributed railway signalling simulator

Design and implementation of a distributed railway signalling simulator Computers in Railways XII 81 Design and implementation of a distributed railway signalling simulator X. Hei 1,2, W. Ma 1, L. Wang 1 & N. Ouyang 1 1 School of Computer Science and Engineering, Xi an University

More information

From single to double track: effects of alternative extension measures

From single to double track: effects of alternative extension measures Computers in Railways XIII 313 From single to double track: effects of alternative extension measures O. Lindfeldt Vectura Consulting AB, Stockholm, Sweden Abstract Extension of single-track lines into

More information

Evaluation of energy saving strategies in heavily used rail networks by implementing an integrated real-time rescheduling system

Evaluation of energy saving strategies in heavily used rail networks by implementing an integrated real-time rescheduling system Energy Management in the Train Operation 75 Evaluation of energy saving strategies in heavily used rail networks by implementing an integrated real-time rescheduling system M. Luethi Swiss Federal Institute

More information

TRENOExport. The Simulationbooster

TRENOExport. The Simulationbooster TRENOExport The Simulationbooster TRENOEXPORT Microscopic simulation is the most accurate method for reproducing railway operations. It supports engineers in a series of tasks, from long-range to short-term

More information

UIC CODE 406. Capacity. 2nd edition, June 2013 Original. Capacité Kapazität

UIC CODE 406. Capacity. 2nd edition, June 2013 Original. Capacité Kapazität UIC CODE 406 2nd edition, June 2013 Original Capacity Capacité Kapazität Leaflet to be classified in volumes: IV - Operating pplication : With effect from 01.06.2013 ll members of the International Union

More information

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond Transportation Metrolinx US & USRC Track Capacity Study Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga, ON, Canada L4W 4P2 905 238 0038 fax www.aecom.com AECOM Project Number:

More information

Assessment of mass transit turn-back capacity using dynamic simulation models. DC Gill Projects Delivery Department, Westinghouse Signals Limited, UK

Assessment of mass transit turn-back capacity using dynamic simulation models. DC Gill Projects Delivery Department, Westinghouse Signals Limited, UK Assessment of mass transit turn-back capacity using dynamic simulation models DC Gill Projects Delivery Department, Westinghouse Signals Limited, UK Abstract The line capacity of a mass transit railway

More information

A multi-train movement simulator with moving

A multi-train movement simulator with moving A multi-train movement simulator with moving block signalling Mark T.K. Ho Department of Electrical Engineering Hong Kong Polytechnic University Hung Horn, Kowloon, Hong Kong Email: eetkho@polyu.edu. hk

More information

Traffic management in moving block railway systems: the results of the EU project COMBINE

Traffic management in moving block railway systems: the results of the EU project COMBINE Traffic management in moving block railway systems: the results of the EU project COMBINE M. Giannettoni & S. Savio Dipartimento di Ingegneria Elettrica - Universita di Genova (Italy) Abstract In this

More information

Simulation of freight train operations with departures ahead of schedule

Simulation of freight train operations with departures ahead of schedule Computers in Railways XIV 239 Simulation of freight train operations with departures ahead of schedule A. Lindfeldt & H. Sipilä Department of Transport Science, Royal Institute of Technology (KTH), Sweden

More information

Supporting tools for automated timetable planning

Supporting tools for automated timetable planning Computers in Railways XIV 565 Supporting tools for automated timetable planning N. Bešinović, E. Quaglietta & R. M. P. Goverde Department of Transport and Planning, Delft University of Technology, The

More information

Simulation model of a Single Track Railway Line

Simulation model of a Single Track Railway Line Simulation model of a Single Track Railway Line Sanjin Milinković *, Nenad Grubor*, Slavko Vesković*, Milan Marković*, Norbert Pavlović* * University of Belgrade, Faculty of transport and traffic engineering,

More information

Comparing the performance of ERTMS level 2 fixed block and ERTMS level 3 moving block signalling systems using simulation techniques

Comparing the performance of ERTMS level 2 fixed block and ERTMS level 3 moving block signalling systems using simulation techniques Comparing the performance of ERTMS level fixed block and ERTMS level 3 moving block signalling systems using simulation techniques J.A. Koning Railin@abeheer, BB Programme, The Netherlands. Abstract The

More information

Smart Supply Chain Oriented Rail Freight Services. GA No

Smart Supply Chain Oriented Rail Freight Services. GA No Smart Supply Chain Oriented Rail Freight Services GA No. 636071 Deliverable No. D8.5 Deliverable Title Implementation of measures and design of monitoring approach Document ID Dissemination level Main

More information

COMBINE: A decision support system for real time traffic control

COMBINE: A decision support system for real time traffic control COMBINE: A decision support system for real time traffic control D. de Vries Holland Railconsult, The Netherlands Abstract This paper addresses the need for and benefits of advanced real-time traffic management

More information

Application of computer simulation to rail capacity planning. W.M. Barter Comreco Rail Ltd., York, England - www:comreco-rail.co.

Application of computer simulation to rail capacity planning. W.M. Barter Comreco Rail Ltd., York, England - www:comreco-rail.co. Application of computer simulation to rail capacity planning W.M. Barter Comreco Rail Ltd., York, England - www:comreco-rail.co.uk Abstract Developing arrangements for "open access" to rail networks, together

More information

Remote Access to Vehicles and Condition Monitoring. Synopsis. Overview. Open standards PAPER

Remote Access to Vehicles and Condition Monitoring. Synopsis. Overview. Open standards PAPER PAPER g Remote Access to Vehicles and Condition Monitoring Synopsis In order to lower maintenance cost of rolling stock whilst raising the availability of the vehicles continuous knowledge about the state

More information

Simulation of fruit pallet movement in the port of Durban: A case study

Simulation of fruit pallet movement in the port of Durban: A case study Volume 21 (1), pp. 63 75 http://www.orssa.org.za ORiON ISSN 0529-191-X c 2005 Simulation of fruit pallet movement in the port of Durban: A case study J Bekker M Mostert FE van Dyk Received: 1 February

More information

Implementation of the Timetable Planning System STRAX/TPS in Denmark

Implementation of the Timetable Planning System STRAX/TPS in Denmark Implementation of the Timetable Planning System STRAX/TPS in Denmark A. H. Kaas 1 & R. Goossmann 2 1 Atkins Transportation Scandinavia, Denmark 2 HaCon, Germany Abstract The TPS Timetable Planning System,

More information

CHAPTER 4A SALES ORDERS MAINTENANCE

CHAPTER 4A SALES ORDERS MAINTENANCE CHAPTER 4A SALES ORDERS MAINTENANCE Chapter 4A Maintenance...1 Sales Order Maintenance...2 Sales Order Maintenance...3 Creating a New Sales Order...5 Manually Creating a New Sales Order...5 Copying an

More information

Converting existing service to fully automatic operation

Converting existing service to fully automatic operation Computers in Railways X 373 Converting existing service to fully automatic operation F. Fabbian MTR Corporation Limited, Hong Kong Abstract Fully Automatic Operation (FAO) is rapidly becoming the system

More information

Optimizing railway timetables with OpenTimeTable

Optimizing railway timetables with OpenTimeTable Optimizing railway timetables with OpenTimeTable A. Nash & M. Ullius Swiss Federal Institute of Technology, Institute for Transportation Planning and Systems, Switzerland Abstract OpenTimeTable is a computer

More information

Evaluation of punctuality on a heavily utilised railway line with mixed traffic

Evaluation of punctuality on a heavily utilised railway line with mixed traffic Computers in Railways XI 545 Evaluation of punctuality on a heavily utilised railway line with mixed traffic O. Lindfeldt Division of Traffic and Logistics, Department of Transport and Economics, Royal

More information

RAILROAD & CO. +Street. Version 9. Manual

RAILROAD & CO. +Street. Version 9. Manual RAILROAD & CO. +Street Version 9 Manual September 2017 RAILROAD & CO. +Street Control of Car Systems Version 9 Manual September 2017 Copyright Freiwald Software 1995-2017 Contact: Freiwald Software Kreuzberg

More information

Safety principles of SIMIS interlocking systems

Safety principles of SIMIS interlocking systems Safety principles of SIMIS interlocking systems J. Kiefer*, H. Newi* & M. Steingraber^ ^SIEMENS Transportation Systems, Signalling and Control Systems Main Line, Braunschweig, Germany. ^SIEMENS S.p.A.

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Intermodal transportation in urban framework: a discrete-events simulative approach A. Di Febbraro", V. Recagno* & S. Sacone" ^Department of Communications, Computer, and System Sciences Dipartimento di

More information

Chapter 2 QAS Components

Chapter 2 QAS Components Chapter 2 QAS Components Chrysler In This Chapter Overview AVI/VMS Reader Empty Carrier Photoeye Floor QAS PLC Encoder Very High Speed Counter (VHSC) Module QAS Workcell Configuration Database Server Tool

More information

Well-Informed to Your Destination. MOFIS Dynamic Passenger Information System

Well-Informed to Your Destination. MOFIS Dynamic Passenger Information System Well-Informed to Your Destination MOFIS Dynamic Passenger Information System Well-Informed to Your Destination MOFIS Dynamic Passenger Information System Our MOFIS Dynamic Passenger Information (DPI) System

More information

2016 INFORMS RAS Problem Solving Competition

2016 INFORMS RAS Problem Solving Competition 2016 INFORMS RAS Problem Solving Competition Routing Trains through a Railway Network: Joint optimization on train timetabling and maintenance task scheduling RAS Problem Solving Competition Committee

More information

Applying multiscaling analysis to detect capacity resources in railway networks

Applying multiscaling analysis to detect capacity resources in railway networks Computers in Railways XI 595 Applying multiscaling analysis to detect capacity resources in railway networks A. Gille, M. Klemenz & Th. Siefer Institute of Transport, Railway Construction and Operation,

More information

Superimposing Activity-Travel Sequence Conditions on GPS Data Imputation

Superimposing Activity-Travel Sequence Conditions on GPS Data Imputation Superimposing Activity-Travel Sequence Conditions on GPS Data Imputation Tao Feng 1, Harry J.P. Timmermans 2 1 Urban Planning Group, Department of the Built Environment, Eindhoven University of Technology,

More information

Control rules for dispatching trains on general networks with multiple train speeds

Control rules for dispatching trains on general networks with multiple train speeds Control rules for dispatching trains on general networks with multiple train speeds SHI MU and MAGED DESSOUKY* Daniel J. Epstein Department of Industrial and Systems Engineering University of Southern

More information

Unidirectional Simulation Objectives

Unidirectional Simulation Objectives Performance Evaluation of Two Conceptual Designs for Rail Service to Transbay Terminal Bi-Directional Unidirectional Bi-Directional R. Shiloh AREMA CONFERENCE Tuesday, September 12, Unidirectional Simulation

More information

Proceedings of the 1996 Winter Simulation Conference edt J. M. Charnes, D. J. Morrice, D. T. Brunner, and J. J. Swain

Proceedings of the 1996 Winter Simulation Conference edt J. M. Charnes, D. J. Morrice, D. T. Brunner, and J. J. Swain Proceedings of the 1996 Winter Simulation Conference edt J. M. Charnes, D. J. Morrice, D. T. Brunner, and J. J. Swain UTILIZING AN EXPERT SYSTEM FOR CONFLICT RESOLUTION IN A "TRAIN SIDING SELECTION" SIMULATION

More information

Tools for S-BPM To Go

Tools for S-BPM To Go Tools for S-BPM 13 13.1 To Go A. Fleischmann et al., Subject-Oriented Business Process Management, DOI 10.1007/978-3-642-32392-8_13, # The Author(s) 2012 241 242 13 Tools for S-BPM In the following sections,

More information

9. Verification, Validation, Testing

9. Verification, Validation, Testing 9. Verification, Validation, Testing (a) Basic Notions (b) Dynamic testing. (c) Static analysis. (d) Modelling. (e) Environmental Simulation. (f) Test Strategies. (g) Tool support. (h) Independent Verification

More information

Computation and evaluation of scheduled waiting time for railway networks

Computation and evaluation of scheduled waiting time for railway networks Computers in Railways XII 911 Computation and evaluation of scheduled waiting time for railway networks A. Landex Department of Transport, Technical University of Denmark, Denmark Abstract Timetables are

More information

KCS 3 rd Subdivision. Dispatch Console Operating Instructions. Console Orientation. CTC System Orientation (center screen)

KCS 3 rd Subdivision. Dispatch Console Operating Instructions. Console Orientation. CTC System Orientation (center screen) 1 Dispatch Console Operating Instructions KCS 3 rd Subdivision Dispatch Console Operating Instructions Console Orientation The Dispatch Console consists of three screens, from left to right: Left screen:

More information

Applying multiple Big Data sources. to improve public transport planning and operations

Applying multiple Big Data sources. to improve public transport planning and operations Applying multiple Big Data sources to improve public transport planning and operations dr. ir. N. van Oort Assistant professor public transport Smart Public Transport Lab UITP INDIA SEMINAR ON URBAN RAIL

More information

2015 HDR, all rights reserved.

2015 HDR, all rights reserved. 2015 HDR, all rights reserved. How do you Spell Capacity on a Railroad? - A Primer on Railroad Operations Design Kevin Keller, PE HDR Engineering, Inc. 2015 HDR, all rights reserved. Outline Introduction

More information

Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems

Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Fenggang Shi, PhD; Thales Canada Transportation Solutions; Toronto, Canada Keywords: safety engineering,

More information

Modeling and analyzing of railway container hub scheduling system based on multi-agent system

Modeling and analyzing of railway container hub scheduling system based on multi-agent system ISSN 1816-6075 (Print), 1818-0523 (Online) Journal of System and Management Sciences Vol. 2 (2012) No. 1, pp. 31-39 Modeling and analyzing of railway container hub scheduling system based on multi-agent

More information

Intermodal Terminals

Intermodal Terminals Intermodal Terminals DB Schenker Rail Competence Center Logistics L.RVI. Y Intermodal Terminals_ 21.11.2014 Anubis Documentation Template Version 1.0.0 Processing status Technical Version Status Name Editor

More information

TIKOS. Route Optimisation BUSINESS SOLUTIONS. Copyright SoCom Informationssysteme GmbH 2018, All rights reserved

TIKOS. Route Optimisation BUSINESS SOLUTIONS. Copyright SoCom Informationssysteme GmbH 2018, All rights reserved TIKOS BUSINESS SOLUTIONS Route Optimisation Copyright SoCom Informationssysteme GmbH 2018, All rights reserved support@socom.de 05.03.2018 Contents 1. General information... 3 2. Vehicle parameters...

More information

TIKOS. Scale Linkage BUSINESS SOLUTIONS. Copyright SoCom Informationssysteme GmbH 2017, All Rights Reserved

TIKOS. Scale Linkage BUSINESS SOLUTIONS. Copyright SoCom Informationssysteme GmbH 2017, All Rights Reserved TIKOS BUSINESS SOLUTIONS Scale Linkage Copyright SoCom Informationssysteme GmbH 2017, All Rights Reserved support@socom.de 07.03.2017 Table of contents 1. General notes... 3 2. Pre-settings... 3 2.1. Quantity

More information

Amadeus Activities & Entertainment

Amadeus Activities & Entertainment Amadeus Activities & Entertainment User Manual Version 1.1 Contents 1 Introduction... 3 2 Available Functions... 4 3 Description of booking procedure... 4 3.1 Accessing Amadeus Activities & Entertainment...

More information

PC-Based real time transportation control services

PC-Based real time transportation control services ICT-2011.8 GET Service Project 2012-318275 PC-Based real time transportation control services 18 December 2015 The GET Service project (http://www.getservice-project.eu) has received funding from the European

More information

IBM Business Process Manager Version 8 Release 5. Hiring Tutorial IBM

IBM Business Process Manager Version 8 Release 5. Hiring Tutorial IBM IBM Business Process Manager Version 8 Release 5 Hiring Tutorial IBM Note Before using this information and the product it supports, read the information in Notices on page 95. This edition applies to

More information

Postprint. This is the accepted version of a paper presented at RailTokyo2015. Citation for the original published paper:

Postprint.   This is the accepted version of a paper presented at RailTokyo2015. Citation for the original published paper: http://www.diva-portal.org Postprint This is the accepted version of a paper presented at RailTokyo15. Citation for the original published paper: Lindfeldt, A. (15) Validation of a simulation model for

More information

Operating instructions and installation information. METTLER TOLEDO MultiRange ID7-Form-XP application software

Operating instructions and installation information. METTLER TOLEDO MultiRange ID7-Form-XP application software T Operating instructions and installation information METTLER TOLEDO MultiRange ID7-Form-XP application software ID7-Form-XP Contents Contents Page 1 Introduction and assembly... 2 1.1 Introduction...

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Responsibilities of Rail Traffic Crews Rule Number: 2027 Version 1.0, 31 March 2016 Responsibilities of Rail Traffic Crews Rule Number: 2027 Document Control Identification

More information

Expert System Applied to High-Speed Railway Track Circuit Coding and Its Simulation

Expert System Applied to High-Speed Railway Track Circuit Coding and Its Simulation Expert System Applied to High-Speed Railway Track Circuit Coding and Its Simulation Yan Li, Dewang Chen, and Xuan Yang State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University,

More information

Determining the Effectiveness of Specialized Bank Tellers

Determining the Effectiveness of Specialized Bank Tellers Proceedings of the 2009 Industrial Engineering Research Conference I. Dhillon, D. Hamilton, and B. Rumao, eds. Determining the Effectiveness of Specialized Bank Tellers Inder S. Dhillon, David C. Hamilton,

More information

A macroscopic railway timetable rescheduling approach for handling large scale disruptions

A macroscopic railway timetable rescheduling approach for handling large scale disruptions A macroscopic railway timetable rescheduling approach for handling large scale disruptions Lucas P. Veelenturf 1, Martin P. Kidd 2, Valentina Cacchiani 2, Leo G. Kroon 1,3, Paolo Toth 2 1 Rotterdam School

More information

ShipperConnect User s Guide. Electronic Customer Interface for Rail Shippers

ShipperConnect User s Guide. Electronic Customer Interface for Rail Shippers ShipperConnect User s Guide Electronic Customer Interface for Rail Shippers Copyright Copyright 2006 RMI. All Rights Reserved. Printed in the United States of America. RMI - Delivered under license agreement.

More information

INVESTIGATION ON THE CAPACITY CONSUMPTION AT DUTCH RAILWAYS FOR VARIOUS SIGNALLING TECHNOLOGIES AND TRAFFIC CONDITIONS

INVESTIGATION ON THE CAPACITY CONSUMPTION AT DUTCH RAILWAYS FOR VARIOUS SIGNALLING TECHNOLOGIES AND TRAFFIC CONDITIONS INVESTIGATION ON THE CAPACITY CONSUMPTION AT DUTCH RAILWAYS FOR VARIOUS SIGNALLING TECHNOLOGIES AND TRAFFIC CONDITIONS Rob M.P. Goverde a, Francesco Corman bc, Andrea D Ariano d* a Department of Transport

More information

L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION

L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION Engineering Standard Signalling L1-CHE-STD-067 SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION Version: 1 ENGINEERING STANDARD SIGNALLING PRINCIPLES - AXLE COUNTER APPLICATION L1-CHE-STD-067 Version:

More information

Smart Supply Chain Oriented Rail Freight Services. GA No Deliverable No. D8.3 Information exchange for necessary level of transparency

Smart Supply Chain Oriented Rail Freight Services. GA No Deliverable No. D8.3 Information exchange for necessary level of transparency Smart Supply Chain Oriented Rail Freight Services GA No. 636071 Deliverable No. D8.3 Deliverable Title Information exchange for necessary level of transparency Document ID Dissemination level Main Author

More information

An Analysis Mechanism for Automation in Terminal Area

An Analysis Mechanism for Automation in Terminal Area NASA/CR-2001-211235 ICASE Report No. 2001-32 An Analysis Mechanism for Automation in Terminal Area Stavan M. Parikh University of Virginia, Charlottesville, Virginia ICASE NASA Langley Research Center

More information

Combined Transit and Freeway Real-Time Information for Smarter Modal Choices

Combined Transit and Freeway Real-Time Information for Smarter Modal Choices Combined Transit and Freeway Real-Time Information for Smarter Modal Choices Joerg Nu Rosenbohm Rockville, MD Dan van Kley Suwanee, GA Bryan Mulligan Suwanee, GA Transit Commuter Information System Project

More information

Trapeze Rail System Operations Management

Trapeze Rail System Operations Management OPERATIONS MANAGEMENT SYSTEM FOR RAIL SYSTEM English Software for optimised crew and vehicle allocation and management Trapeze Rail System Operations Management www.trapezegroup.eu Operations Management

More information

Slaughtering Softproviding Meat User Documentation

Slaughtering Softproviding Meat User Documentation Great ideas are always simple Softproviding simply makes them happen. Slaughtering Softproviding Meat User Documentation Version: 1.00 Date: 24. August 2017 Release: v5.50 Softproviding AG Riehenring 175

More information

Dynamic delay management at railways: a Semi-Markovian Decision approach Al Ibrahim, A.

Dynamic delay management at railways: a Semi-Markovian Decision approach Al Ibrahim, A. UvA-DARE (Digital Academic Repository) Dynamic delay management at railways: a Semi-Markovian Decision approach Al Ibrahim, A. Link to publication Citation for published version (APA): Al Ibrahim, A. (2010).

More information

SIWAREX FTC-B Weighing Module for Belt Scales Set-up of SIWAREX FTC with SIWATOOL FTC_B

SIWAREX FTC-B Weighing Module for Belt Scales Set-up of SIWAREX FTC with SIWATOOL FTC_B SIWAREX FTC-B Weighing Module for Belt Scales Set-up of SIWAREX FTC with SIWATOOL FTC_B Quick Guide For modules with order number 7MH4900-3AA01 1 Hardware Requirements... 3 2 Connections... 5 3 SIWATOOL

More information

TLM 2.1 User's Manual

TLM 2.1 User's Manual Software Package for Water Sciences TLM 2.1 User's Manual By Miloš Gregor 2010 Product Name: FDC 2.1 Version: 2.1 Build: 6 Author: Miloš Gregor 1,2,3 1 Department of Hydrogeology, Faculty of Natural Science,

More information

RailSys Suite. Innovative IT solution for railway transport. a product by

RailSys Suite. Innovative IT solution for railway transport. a product by RailSys Suite Innovative IT solution for railway transport a product by Timetable construction Simulation Innovation Working timetable Remaining capacity Railway Redundancy-free Graphical timetable Punctuality

More information

RAIL TRAFFIC MANAGEMENT. High-level full-scale solutions for centralised traffic management

RAIL TRAFFIC MANAGEMENT. High-level full-scale solutions for centralised traffic management RAIL TRAFFIC MANAGEMENT High-level full-scale solutions for centralised traffic management PROVEN RAILWAY SAFETY EXPERTISE Mipro is a Finnish railway system specialist with nearly 30 years of experience

More information

CHAPTER 11 SIGNALLING SYSTEM

CHAPTER 11 SIGNALLING SYSTEM CHAPTER 11 SIGNALLING SYSTEM 11.1 SIGNALLING 11.2 SIGNALLING AND TRAIN CONTROL 11.3 SPACE REQUIREMENT FOR SIGNALLING INSTALLATIONS 11.4 MAINTENANCE PHILOSOPHY FOR SIGNALLING SYSTEMS TABLES TABLE 11.1 SIGNALLING

More information

Hello and welcome to this overview session on SAP Business One release 9.1

Hello and welcome to this overview session on SAP Business One release 9.1 Hello and welcome to this overview session on SAP Business One release 9.1 1 The main objective of this session is to provide you a solid overview of the new features developed for SAP Business One 9.1

More information

Expert Group Meeting on Documentation and Procedures for Rail- Based Intermodal Transport Services in Northeast and Central Asia

Expert Group Meeting on Documentation and Procedures for Rail- Based Intermodal Transport Services in Northeast and Central Asia Expert Group Meeting on Documentation and Procedures for Rail- Based Intermodal Transport Services in Northeast and Central Asia Bangkok 30-31 August 2016 Item 8: Detailed presentation on the proposed

More information

Macroscopic and Microscopic Simulation for the Evaluation of People Mover Systems. Dr.-Ing. Peter Mott Sven Beller PTV AG, Karlsruhe, Germany

Macroscopic and Microscopic Simulation for the Evaluation of People Mover Systems. Dr.-Ing. Peter Mott Sven Beller PTV AG, Karlsruhe, Germany Macroscopic and Microscopic Simulation for the Evaluation of People Mover Systems Dr.-Ing. Peter Mott Sven Beller PTV AG, Karlsruhe, Germany 1. Introduction This paper is intended to show how a comprehensive

More information

AUTOMATIC TRAIN ROUTE SETTING IN CZECH REPUBLIC

AUTOMATIC TRAIN ROUTE SETTING IN CZECH REPUBLIC 5 th International Scientific Conference Theoretical and Practical Issues in Transport Pardubice, 11 th 12 th February, 2010 429 AUTOMATIC TRAIN ROUTE SETTING IN CZECH REPUBLIC Vlastmil Polach 1, Martin

More information

A Conflict Probe to Provide Early Benefits for Airspace Users and Controllers

A Conflict Probe to Provide Early Benefits for Airspace Users and Controllers A Conflict Probe to Provide Early Benefits for Airspace Users and Controllers Alvin L. McFarland Center for Advanced Aviation System Development, The MITRE Corporation, USA 08/97 The MITRE Corporation

More information

Linkage of a conventional line dispatch system with the Shinkansen dispatch system

Linkage of a conventional line dispatch system with the Shinkansen dispatch system Computers in Railways XII 121 Linkage of a conventional line dispatch system with the Shinkansen dispatch system Y. Yoshino Administration Division, Transportation Department, Kyushu Railway Company, Japan

More information

Analysis and design on airport safety information management system

Analysis and design on airport safety information management system Analysis and design on airport system Lin Yan School of Air Transportation, Shanghai University of Engineering Science, China Abstract. Airport system is the foundation of implementing safety operation,

More information

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan Chapter 10 Intelligent Transportation Systems Ohio Kentucky Indiana Regional Council of Governments 2030 Regional Transportation Plan Chapter 10 Intelligent Transportation Systems INTRODUCTION Intelligent

More information

USING SIMULATION MODELING TO ASSESS RAIL TRACK INFRASTRUCTURE IN DENSELY TRAFFICKED METROPOLITAN AREAS

USING SIMULATION MODELING TO ASSESS RAIL TRACK INFRASTRUCTURE IN DENSELY TRAFFICKED METROPOLITAN AREAS Proceedings of the 22 Winter Simulation Conference E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds USING SIMULATION MODELING TO ASSESS RAIL TRACK INFRASTRUCTURE IN DENSELY TRAFFICKED METROPOLITAN

More information

Product Planning and Detailed Scheduling (PP/DS)

Product Planning and Detailed Scheduling (PP/DS) Product Planning and Detailed Scheduling (PP/DS) This case study describes implementation of the production planning process of SNP-Scheduling agreements as part of the Heuristic-based and Optimization-based

More information

The Application of Blaise III to the Israel Labour Force Survey

The Application of Blaise III to the Israel Labour Force Survey The Application of Blaise III to the Israel Labour Force Survey Edith Noy and Gad Nathan, Central Bureau of Statistics, Jerusalem, Israel 1. Introduction The Central Bureau of Statistics has only recently

More information

VS-PLUS Introduction. Even this knotty problem can be solved. Dr. Thomas Riedel. April 2001 page 1

VS-PLUS Introduction. Even this knotty problem can be solved. Dr. Thomas Riedel. April 2001 page 1 VS-PLUS Introduction Even this knotty problem can be solved Dr. Thomas Riedel April 2001 page 1 Presentation Contents Company introduction The traffic engineering workflow The workflow support tools Basic

More information

RiskyProject Lite 7. Getting Started Guide. Intaver Institute Inc. Project Risk Management Software.

RiskyProject Lite 7. Getting Started Guide. Intaver Institute Inc. Project Risk Management Software. RiskyProject Lite 7 Project Risk Management Software Getting Started Guide Intaver Institute Inc. www.intaver.com email: info@intaver.com Chapter 1: Introduction to RiskyProject 3 What is RiskyProject?

More information

Robust Integration of Acceleration and Deceleration Processes into the Time Window Routing Method

Robust Integration of Acceleration and Deceleration Processes into the Time Window Routing Method Robust Integration of Acceleration and Deceleration Processes into the Time Window Routing Method Thomas Lienert, M.Sc., Technical University of Munich, Chair for Materials Handling, Material Flow, Logistics,

More information