1 GADS and LOLE Considerations in Gas- Electric Coordination ENGCTF June 13, 2013
2 Generating Availability Data System (GADS) National database of electric generator performance, produced by the North American Electric Reliability Corporation (NERC) Historical data on 5,900 generators (78%) of US and Canadian fleet Mandatory reporting for all conventional generation >20 MW Typically, asset owners submit to MISO via PowerGADS and to NERC via WebE-GADS Data complied annually; presented for 5 individual years and for 5-year average Data reported on individual unit Design, Performance, and Events 1
3 Loss of Load Expectation (LOLE) Studies at MISO In accordance with the MISO Tariff, the reliability objective of an LOLE study is to determine a minimum Planning Reserve Margin (PRM) that would result in the MISO system experiencing a less than one day loss of load event every 10 years PRMs provide resource cushion to ensure system reliability Load Serving Entities (LSEs) must meet a Planning Reserve Margin and a Local Clearing Requirement based on their Local Resource Zone LOLE analysis accounts for forced outage rates, planned outages, forecast uncertainty, etc. Many inputs for LOLE analysis are derived from GADS 2
4 GADS Event Classifications IEEE Standard 762 defines Active and Inactive States Inactive unit is unavailable for service for an extended period of time for reasons not related to equipment Inactive State Code Description Inactive Reserve IR the unit isn t available for service but could be brought back into service in days, with some repairs Mothballed MB the unit isn t available for service but could be brought back into service in weeks to months, with some repairs Retired RU the unit isn t available for service and is not expected to return to service in the future 3
5 GADS Event Classifications Active States include Outages - unit is not synchronized to the grid system and not in a Reserve Shutdown state Outage Type Code # Outage Characteristics Planned PO Scheduled well in advance; predetermined duration; lasts for several weeks Maintenance MO Can occur any time during the year; has a flexible start date; may or may not have predetermined duration; usually much shorter than a PO Startup Failure SF Occurs when unit is unable to synchronize within a specified startup following an outage or Reserve Shutdown Unplanned (Forced) - Immediate U1 Requires immediate removal of a unit from service, another Outage State or a Reserve Shutdown state; usually results from immediate mechanical/electrical/hydraulic control systems trips and operatorinitiated trips in response to unit alarms Unplanned (Forced) - Delayed U2 Requires removal of unit from the in-service state within 6 hours Unplanned (Forced) - Postponed U3 Requires removal of unit from the in-service state before the end of the next weekend 4
6 GADS Event Classifications Active States also include Reserve Shutdown - unit is available for load but is not synchronized due to lack of demand; economic outage Lack of Fuel Event Code # Description Lack of Fuel (OMC) 9130 Lack of fuel (water from rivers or lakes, coal mines, gas lines, etc.) where the operator is not in control of contracts, supply lines, or delivery of fuels Lack of Fuel 9131 Lack of fuel (interruptible supply of fuel part of fuel contract); If the operator elected to contract for fuels where the fuel (for example, natural gas) can be interrupted so that the fuel suppliers can sell the fuels to others (part of the plant fuel cost-saving measure), then the lack of fuel is under management control and is not applicable to this case. 5
7 LOLE Analysis Inputs and GADS Definitions Historic unit performance data from GADS used for LOLE analysis includes: Planned maintenance data (average number of events and duration) Generation verification test capability (GVTC) Monthly maximum output profile (net dependable capacity) Unit Forced Outage Rates Forced outage rate (FOR): A measure of the probability that a generating unit will not be available due to forced outages. Attaching the term equivalent to any rate or factor, e.g. equivalent forced outage rate (EFOR), indicates that both full outages and de-ratings have been considered in the calculation. The term demand applied to a rate, e.g. EFORd, indicates that the probability of an occurrence has been estimated for periods when the unit is in demand to generate. 6
8 GADS & LOLE Analysis Eq. 1 EFORd = (FOHd + EFDHd) / (SH + FOHd) EFORd = Equivalent Forced Outage Rate Demand FOHd = Forced Outage Hours Demand EFDHd = Equivalent Forced De-rated Hours Demand SH = Service Hours; the hours the unit is available for operation on an annual basis EFORd = Equivalent Forced Outage Rate Demand; a measure of the probability that a generating unit will not be available due to forced outages or forced de-ratings when there is demand on the unit to generate XEFORd = EFORd excluding causes of outages that are Outside Management Control (OMC) 7
9 GADS & LOLE Analysis Cont. Eq. 1 EFORd = (FOHd + EFDHd) / (SH + FOHd) Reserve Shutdown events count against Service Hours. Forced outages add to FOHd. Derates add to EFDHd. More time in Reserve Shutdown means fewer Service hours, and this translates to an increased impact on EFORd should an outage occur (OMC) Lack of Fuel events count against Service Hours but do not add to Forced Outages Lack of Fuel events count against Service Hours and add to Forced Outages. 8
10 Considerations EFORd is used in LOLE simulations to model unit forced outage rates. XEFORd (OMC events excluded) is used to determine the unforced capacity (UCAP) rating of each unit and summed per MISO zone to calculate the total UCAP megawatts, which is used in the PRM UCAP calculation. PRM UCAP feeds into the determination of the Planning Reserve Margin Requirement. 9
11 Considerations cont. Each Load Serving Entity has an obligation to meet Planning Reserve Margin Resource Requirements; if the LSE does not have enough capacity resources to meet its Requirement, it will have to procure (pay for) additional capacity resources. Capacity resources will receive payment commensurate with their ability to generate when dispatched, and the Forced Outage Rate serves as an input to the quantification of this ability. A higher Forced Outage Rate translates to lost earning potential in MISO s capacity market (capacity auction). 10
12 Considerations cont. Generators designated as Planning Resources are required to submit an offer into MISO s Day Ahead (DA) Energy Market unless they are on a scheduled outage. If a unit is selected through the Day Ahead process, it is obligated to run in Real Time. Units on Reserve Shutdown are considered on outage for this purpose and are not required to offer into DA. 11
13 Discussion Points MISO s current LOLE study methodology relies heavily upon GADS. A fundamental shift in unit performance will be reflected in GADS, over time. While the GADS Reserve Shutdown status offers cost savings for units that are not needed to meet demand and/or cannot be economically dispatched, it potentially also masks inability of resources to respond to a dispatch call from MISO. The extent to which GADS captures fuel risk impacts the extent to which MISO s LOLE analysis captures fuel risk. 12
14 Links NERC Generating Availability Data System Data Reporting Instructions 20GADS%20Data%20Reporting%20Instructions%20Effective%20Janu ary%201,% pdf IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity System%20Working%20Group/IEEE% %20Task%20Force%20(IEEE762TF)/ pdf MISO s 2013 LOLE Study Report OLE%20Study%20Report.pdf 13
15 APPENDIX 14
16 MISO GADS Data for Lack of Fuel Events for Gas Units Cause Codes # of Times Used Duration (Hrs) Duration (EQ Hrs) Reduction (Avg MW) Loss (MWh) ,584 6, , ,786 1, ,097 15
17 NERC Recommendations for Future GADS Analysis Recommendations from 2013 NERC Report Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power ( NAL.pdf) include: Perform deeper dive analysis to a sample of individual generator outages to determine the cause of the outage. GADS should be able to identify if generator outages were the result of either fuel contract interruptions or uncontrolled gas curtailment events. Overlay GADS outage data on pipeline capacity trends to determine if there is a correlation and identify potential leading indicators. Determine natural gas pipeline and supply conditions during times of gas generator outages. Perform a study to determine approaches where dispatch trends and load duration curves can provide insights to future generator performance. Use GADS data for probabilistic adequacy models and develop scenarios around increased forced outage rates 16
Outage Event Reporting. Module 04 - GADS Data Reporting Workshops
Outage Event Reporting Module 04 - GADS Data Reporting Workshops Why Collect Event Records? Track problems at the plant for Your use Use by others Provide Proof of unit outages for interested parties such
More informationLOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The
1 2 3 4 LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The Transmission Provider will calculate and post the Planning
More informationMaintenance and Planned Outages Capacity Accreditation Under Seasonal Construct Workshop Agenda Item 03c, 3d, 3e.
Maintenance and Planned Outages Capacity Accreditation Under Seasonal Construct Workshop Agenda Item 03c, 3d, 3e April 22 nd, 2016 Seasonal Objective: Accurately represent capacity available to serve summer
More informationLOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals
Loss of Load Expectation (LOLE) Fundamentals March 13, 2014 Last material update: 03/12/2014 LOLE Agenda 2 Loss of Load Expectation (LOLE) Fundamentals Sections LOLE Background LOLE Study Connections to
More informationBusiness Practice Manual RESOURCE ADEQUACY Planning Years 2013 and beyond
0 Manual No. 011 RESOURCE ADEQUACY Planning Years 2013 and beyond 0 Disclaimer This document is prepared for informational purposes only to support the development application of enhancements to MISO s
More informationExpanding Capacity Eligibility
Expanding Capacity Eligibility Zachary T. Smith Manager, Capacity Market Design ICAPWG/MIWG March 7 th, 2019 Agenda Background Installed Capacity Supplier Payment Structure Peak Load Windows Counting MWs
More informationUCAP Calculation Comparison
UCAP Calculation Comparison Dispatchable resources within PJM, NYISO, & MISO September 2017 Draft for Discussion Overview map British Columbia Alberta Manitoba Newfoundland Labrador Ontario Quebec PEI
More informationComparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods. Eligibility WG Meeting #3 July 4, 2017
Comparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods Eligibility WG Meeting #3 July 4, 2017 Overview The following materials provide an examination of the
More informationReliability Pricing Model (RPM) Overview. April 11, 2005
Reliability Pricing Model (RPM) Overview April 11, 2005 Drivers for Capacity Market Reform Generation Net Revenue Shortfall Inconsistency between capacity pricing and reliability requirements Result has
More informationPJM Manual 22: Generator Resource Performance Indices Revision: 17 Effective Date: April 1, Prepared by Resource Adequacy Planning
PJM Manual 22: Generator Resource Performance Indices Revision: 17 Effective Date: April 1, 2017 Prepared by Resource Adequacy Planning PJM 2017 Table of Contents Table of Contents Table of Exhibits...3
More informationNERC Probabilistic Assessments Overview & Future Improvements
NERC Probabilistic Assessments Overview & Future Improvements Noha Abdel-Karim, PhD. NERC IEEE LOLEWG Meeting July 31, 2015 Overview NERC Probabilistic Assessment (ProbA) reports extend the LTRA data with
More informationApril 27, Ms. Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 6546 Mercantile Way P.O. Box Lansing, MI 48909
Matthew R. Dorsett Corporate Counsel Direct Dial: 317-249-5299 E-mail: mdorsett@misoenergy.org April 27, 2011 Ms. Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 6546 Mercantile Way
More informationMidwest ISO Resource Adequacy Overview ATC Network Customer Meeting. Kevin Larson Sr. Manager Resource Adequacy October 20, 2010
Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting Kevin Larson Sr. Manager Resource Adequacy October 20, 2010 Agenda Role of Resource Adequacy Planning Reserve Margin Requirements LSE
More informationResource Availability and Need
Resource Availability and Need Issues Statement Whitepaper March 30, 2018 Table of Contents 1. Executive Summary... 2 2. Aging and Retirement of the Portfolio s Generating Units... 5 2.1. Retirements reduce
More informationReliability Analysis of Power Plant Unit Outage Problems
Reliability Analysis of Power Plant Unit Outage Problems G. Michael Curley President Generation Consulting Services, LLC Agenda What is our objective and why? What tools do we have available? Reliable
More informationReliability Pricing Model (RPM) DRAFT Business Rules
Definition and Purpose of Reliability Pricing Model (RPM) 1. The purpose of the RPM is to develop a long term pricing signal for capacity resources and LSE obligations that is consistent with the PJM Regional
More informationIntroduction to the PJM Markets
Introduction to the PJM Markets PJM 2015 1 Objectives Students will be able to: Describe some of the basic functions of PJM PJM 2015 The History of PJM EKPC joins PJM 2013 PJM 2015 3 Our Responsibility
More informationLoad Modifying Resources. Capacity Instruments affecting Resource Availability and Need
Capacity Instruments affecting Resource Availability and Need May 25, 2018 Purpose Statement Review the participation and historic performance of Load Modifying Resources (LMRs) in MISO s Capacity and
More informationGenerating Availability Data System
Generating Availability Data System Data Reporting Instructions Effective January 1, 2019 RC Report Title Report Date I Table of Contents Section I: Introduction Industry Development of GADS... I-2 Unit
More informationAlberta Capacity Market
Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 1: Overview of the Alberta Capacity Market Prepared by: Alberta Electric System Operator Date: January 26, 2018
More informationCapacity Performance FAQ Response
PJM Interconnection September 15, 2014 This page is intentionally left blank. PJM 2014 www.pjm.com 2 P age Contents FAQ Response Introduction... 4 Capacity Products... 4 Methodology for Establishing Maximum
More informationEvolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017
Evolution of the Grid in MISO Region Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017 1 MISO s mission is to ensure reliable delivery of low-cost energy through efficient,
More information2013 PJM Reserve Requirement Study
2013 PJM Reserve Requirement Study 11-year Planning Horizon: June 1 st 2013 - May 31 st 2024 Analysis Performed by PJM Staff October 3, 2013 Reviewed by Resource Adequacy Analysis Subcommittee (RAAS) DOCS
More informationMarket Settlements - Advanced
Market Settlements - Advanced RPM Module PJM State & Member Training Dept. PJM 2017 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency under the capped energy
More informationRRS Education Session #1
RRS Education Session #1 Patricio Rocha Garrido Sr. Engineer Resource Adequacy Planning 11/24/2015 IRM/FPR Basics - Rationale IRM/FPR are computed for future delivery years. And the future is uncertain
More informationGADS Data Reporting Workshop GADS Data Reporting Workshops May, August & October, 2017
GADS Data Reporting Workshop 2017 GADS Data Reporting Workshops May, August & October, 2017 Introduction and Overview 2017 GADS Data Reporting Workshops Module 01 October, 2017 Primary Instructors Introduction
More informationERCOT Public LTRA Probabilistic Reliability Assessment. Final Report
ERCOT Public 2016 LTRA Probabilistic Reliability Assessment Final Report November 21, 2016 Contents Summary... 1 Software Model Description... 3 Demand Modeling... 3 Controllable Capacity Demand Response
More informationCapacity Market. Overview RPM Capacity Market. Market Design
Section 4 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity
More information2012 PJM Reserve Requirement Study
2012 PJM Reserve Requirement Study 11-year Planning Horizon: June 1 st 2012 - May 31 st 2023 Analysis Performed by PJM Staff October 5, 2012 Reviewed by Resource Adequacy Analysis Subcommittee (RAAS) DOCS
More informationThere are 33 columns (fields) of data in the Performance report. 7 are for record identification and status, 16 are required data points and 10 are
1 2 There are 33 columns (fields) of data in the Performance report. 7 are for record identification and status, 16 are required data points and 10 are optional fields that are derates and delays. 3 1.
More informationCAPACITY MARKETS 5. Overview. RPM Capacity Market Market Design. Market Structure
2009 Quarterly State of the Market Report for PJM: January through September Section 5 - Capacity Markets Each organization serving PJM load must meet its capacity obligations by acquiring capacity resources
More informationConcepts for Behind-the- Meter Net Generation
Concepts for Behind-the- Meter Net Generation Pradip Ganesan Donna Pratt New York Independent System Operator Joint Meeting of Installed Capacity, Market Issues and Price Responsive Load Working Groups
More informationParticipation in the monthly auction and the capability period auction shall consist of:
New York Capacity Market (NYISO Installed Capacity Market) The term Installed Capacity in the ICAP Manual and the NYISO Services Tariff Manual describes the market as opposed to the product. For example,
More informationSection IV Performance Reporting
Performance data provide information, in a summarized format, pertaining to overall unit operation during a particular month in a given year. These data are needed to calculate unit performance, reliability,
More informationSpecial Case Resources: Evaluation of the Performance and Contribution to Resource Adequacy
Special Case Resources: Evaluation of the Performance and Contribution to Resource Adequacy Report by the New York Independent System Operator to the Installed Capacity Subcommittee of the New York State
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination of Ancillary Service Standards... 4 8.2.2 Time-Frame for Revising Ancillary Service
More informationResource Adequacy Modeling update. Technical Workgroup #4 June 14, 2018 AESO External
Resource Adequacy Modeling update Technical Workgroup #4 June 14, 2018 Demand Curve Workgroup Objective: AESO Resource Adequacy Model Through the WG process, AESO seeks workgroup members review and feedback
More informationPJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations
Style Definition: PJM_Normal PJM Manual 18: PJM Capacity Market Revision: 287 Effective Date: January 22, 2015 Prepared by PJM Capacity Market Operations PJM 2015 PJM 2015 i PJM Manual 18: PJM Capacity
More informationNYSRC RELIABILITY RULES For Planning And Operating the New York State Power System
NYSRC RELIABILITY RULES For Planning And Operating the New York State Power System Version 18 January 5, 2007 NYSRC RELIABILITY RULES For Planning and Operating the New York State Power System Version
More informationATTACHMENT DD. Reliability Pricing Model
OF NEW SERVICE REQUESTS; R - OATT ATTACHMENT DD ATTACHMENT DD Reliability Pricing Model References to section numbers in this Attachment DD refer to sections of this Attachment DD, unless otherwise specified.
More information4 Calculation of Demand Curve Parameters
4 Calculation of Demand Curve Parameters This section addresses the demand curve for the Alberta capacity market, including the calculations for the components of the demand curve. 4.1 Resource adequacy
More informationDefining Outage States to Include a Mothball Outage
Defining Outage States to Include a Mothball Outage Emilie Nelson Director, Operations Josh Boles Manager ICAP Market Market Issues Working Group November 7, 2013 2013 New York Independent System Operator,
More informationPJM Resource Adequacy Analysis
PJM Manual 20: PJM Resource Adequacy Analysis Revision: 05 Effective Date: February 1, 2013 Prepared by Resource Adequacy Planning PJM 2013 1 PJM Manual 20: Manual 20: PJM Resource Adequacy Analysis Table
More informationInstalled Capacity Manual. August 2017
MANUAL 4 Installed Capacity Manual August 2017 Version: 6.37 Effective Date: 08/25/2017 Committee Acceptance: 08/09/2017 BIC This document was prepared by: NYISO Capacity Market Products New York Independent
More information2008/ 2009 RPM Base Residual Auction Results
Introduction The purpose of this document is to provide additional information for PJM stakeholders regarding the 2008/2009 Reliability Pricing Model (RPM) Base Residual Auction results. The discussion
More informationPJM Manual 20: PJM Resource Adequacy Analysis Revision: 08 Effective Date: July 1, Prepared by Resource Adequacy Planning
PJM Manual 20: PJM Resource Adequacy Analysis Revision: 08 Effective Date: July 1, 2017 Prepared by Resource Adequacy Planning PJM 2017 Table of Contents Table of Contents Table of Exhibits...4 Approval...5
More informationGas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead
Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Harvard Electricity Policy Group 68 th Plenary Session Paul M. Sotkiewicz, Ph.D. Chief Economist PJM Interconnection October
More informationPJM Manual 18: PJM Capacity Market. Revision: 14 Effective Date: February 23, Prepared by PJM Capacity Market Operations PJM 2012
PJM Manual 18: PJM Capacity Market Revision: 14 Effective Date: February 23, 2012 Prepared by PJM Capacity Market Operations PJM 2012 PJM 2012 i Table of Contents PJM Manual 18: PJM Capacity Market Table
More informationHydro Coalition Briefing Paper in Response to the PJM Capacity Performance Proposal
Hydro Coalition Briefing Paper in Response to the PJM Capacity Performance Proposal Coalition Members: Brookfield Energy Marketing, L.P., American Municipal Power, Inc., Olympus Power, LLC, American Electric
More informationAppendix K Outside Management Control
Appendix K Outside Management Control Following this introduction of Outside Management Control (OMC) guidelines, we have listed those cause codes that GADS recognizes as being outside plant management
More informationReliability Modelling: Review Process & Methodology
Reliability Modelling: Review Process & Methodology Adequacy and Demand Curve Workgroup Sept 20 th, 2017 Public Reliability Modelling Background Per SAM 2.0: AESO is the responsible party for modelling
More informationCapacity Performance Training. March 16, 2015
Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance
More informationRPM 301 Performance in Reliability Pricing Model
RPM 301 Performance in Reliability Pricing Model PJM State & Member Training Dept. PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The
More informationCapacity Resource Performance in NYISO Markets
Capacity Resource Performance in NYISO Markets An Assessment of Wholesale Market Options Paul Hibbard Todd Schatzki Sarah Bolthrunis Analysis Group Inc. October 2017 Acknowledgments This report reviews
More informationCapacity Market. Overview. RPM Capacity Market. Market Design
Section 5 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity
More informationPJM Manual 20: PJM Resource Adequacy Analysis Revision: 0910 Effective Date: July 1, 2017March 21, Prepared by Resource Adequacy Planning
PJM Manual 20: PJM Resource Adequacy Analysis Revision: 0910 Effective Date: July 1, 2017March 21, 2019 Prepared by Resource Adequacy Planning PJM 20182019 Table of Contents Table of Contents Table of
More informationPJM Manual 18: PJM Capacity Market
PJM Manual 18: PJM Capacity Market Revision: 23 Effective Date: June 1, 2014 Prepared by PJM Capacity Market Operations PJM 2014 PJM 2014 i PJM Manual 18: PJM Capacity Market Manual 18: PJM Capacity Market
More informationCUSTOMER GUIDE TO PJM BILLING
CUSTOMER GUIDE TO PJM BILLING Billing Line Items include PJM Open Access Tariff (OATT) references, PJM Operating Agreement (OpAgr) references, and PJM Manual references. Reports are available for viewing,
More information2005 Integrated Electricity Plan. Resource Options Workshop #2 Planning Criteria March 09, 2005
2005 Integrated Electricity Plan Resource Options Workshop #2 Planning Criteria March 09, 2005 Agenda for Presentation Introduction Review industry reliability standards and regulatory Generation Reliability
More informationThe US, Canada and parts of Mexico are divided into 8 regions. There is a regional coordinator for each NERC region. The regional coordinator or
1 2 The US, Canada and parts of Mexico are divided into 8 regions. There is a regional coordinator for each NERC region. The regional coordinator or their assistant will be responsible for data submittal
More informationCapacity Performance Training. June 24, 2015
Capacity Performance Training June 24, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance
More informationPJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations
PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, 2017 Prepared by Capacity Market Operations PJM 2017 Table of Contents Table of Contents Table of Exhibits...9 Approval...10 Current
More informationOutage Types and Entering Tickets PJM State & Member Training Dept.
Outage Types and Entering Tickets PJM State & Member Training Dept. Objectives Students will be able to: Describe the outage reporting process and requirements 2 edart edart stands for Dispatcher Applications
More informationCapacity Market Topics Resource Targets, Qualifications, Performance Standards, Must Offer. Jacqueline DeRosa, Senior Market and Product Economist
Capacity Market Topics Resource Targets, Qualifications, Performance Standards, Must Offer Jacqueline DeRosa, Senior Market and Product Economist Capacity Market Stakeholder Meeting September 19, 2007
More informationDay-ahead ahead Scheduling Reserve (DASR) Market
Day-ahead ahead Scheduling Reserve (DASR) Market Agenda Implementation Overview of the DASR Market Market Clearing Process Market Clearing Example Performance Compliance Market Settlements Appendix: emkt
More information2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool
2016 Probabilistic Assessment December 5, 2016 Southwest Power Pool Table of Contents 1. Summary...2 a. SPP Planning Coordinator Footprint...2 b. Seasonal Capacity Totals... Error! Bookmark not defined.
More informationStakeholder Comments Template. RA Enhancements
Stakeholder Comments Template RA Enhancements This template has been created for submission of stakeholder comments on the RA Enhancements Issue Paper that was published on October 22, 2018. The Issue
More informationRecent Development in Reliable Energy Market in the US and Singapore
Recent Development in Reliable Energy Market in the US and Singapore 18-19 th June 2008 Electrical Engineering and Maintenance Forum World Engineering Congress, Bangkok, Thailand Dr. Panida Jirutitijaroen
More informationLOAD SERVING ENTITIES PJM REGION
Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date:
More information2017 Assessment of Reliability Performance Summary Report April 2018
2017 Assessment of Reliability Performance Summary Report April 2018 1 Table of Contents Introduction Page 3 Registration Page 4 Summary of 2017 Key Findings and Observations Page 5 2017 at a Glance Page
More informationKeith Beall; Edith L. Bandy;
From: Kim McCloud To: MPSCEDOCKETS; CC: Keith Beall; Edith L. Bandy; Subject: Date: Attachments: U-16160 Midwest ISO 2010 Summer Assess Comments Thursday, April 29, 2010 6:16:08 PM Midwest ISO 2010 Summer
More information2013/2014 RPM Base Residual Auction Results
Executive Summary The 2013/2014 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 152,743.3 MW of unforced capacity in the RTO at a Resource Clearing Price of $27.73/MW-day. This MW and
More informationWhat is a Capacity Market?
What is a Capacity Market? Mechanism that ensures sufficient generation to meet reliability and peak load needs. Additional potential benefit of capacity markets is the incentive to build new generation.
More information2011/2012 RPM Base Residual Auction Results
Executive Summary The 2011/12 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 132,221.5 MW of unforced capacity in the RTO at a uniform Resource Clearing Price of $110.00/MW-day. This
More information2013/2014 RPM Base Residual Auction Planning Period Parameters
Introduction The RPM Base Residual Auction (BRA) for the 2013/2014 Delivery Year is scheduled to be conducted in May of 2010. The planning period parameters to be used as input into the 2013/2014 BRA are
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...
More informationAlberta Capacity Market
Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 3: Calculation of Capacity Market Demand Parameters Prepared by: Alberta Electric System Operator Date: January
More informationAdequate Summer Electricity Supplies Projected
Adequate Summer Electricity Supplies Projected Summer 2017 Reliability Assessment Overview The comprehensive reliability assessment conducted by the Northeast Power Coordinating Council, Inc. (NPCC) projects
More informationIntroduction to NERC GADS
Introduction to NERC GADS General Overview to GADS Reporting for Beginners Mike Curley, GADSWG Observer, Navigant Consulting, Inc. GADS Data Reporting Training Introduction - Mike Curley Former Manager
More informationAlberta Capacity Market Information Session
Alberta Capacity Market Information Session November 1, 2018 Public Approach for today The content for today represents the common themes stakeholders requested additional information on during the last
More informationMethodology to Perform Long Term Assessments
Methodology to Perform Long Term Assessments MARCH 21, 2017 March 21, 2017 Public Page 1 Caution and Disclaimer The contents of these materials are for discussion and information purposes and are provided
More informationThird Incremental Auction shall mean an Incremental Auction conducted three months before the Delivery Year to which it relates.
Definitions T U - V Tangible Net Worth: Tangible Net Worth shall mean all assets (not including any intangible assets such as goodwill) less all liabilities. Any such calculation may be reduced by PJMSettlement
More informationEmergency Demand Response in PJM and the NYISO
Emergency Demand Response in PJM and the NYISO Demand Response Task Force 05 March 2007 1 Introduction Overview This presentation describes the emergency demand response programs adopted by PJM and the
More informationIntroduction to NERC GADS
Introduction to NERC GADS General Overview to GADS Reporting for Beginners Mike Curley, GADSWG Observer, Navigant Consulting, Inc. GADS Data Reporting Training Introduction - Mike Curley Former Manager
More informationKey Issues and Consideration in Market Design, Operational and Oversight
Key Issues and Consideration in Market Design, Operational and Oversight Patrick Donlon Amanda Gordon Kathryn Sophy Kenneth Villwock Public Utilities Commission of Ohio & Pennsylvania Public Utilities
More informationModule E-1 Capacity Tracking Tool
Module E-1 Capacity Tracking Tool Page 1 of 82 I. Disclaimer... 4 II. Document Change History... 5 1. INTRODUCTION... 6 1.1. Purpose... 6 1.2. Scope... 7 2. OVERVIEW... 7 3. RELATED DOCUMENTS AND REQUIREMENTS...
More informationRegional Resource Adequacy Draft Regional Framework Proposal. Stakeholder Meeting December 8, 2016
Regional Resource Adequacy Draft Regional Framework Proposal Stakeholder Meeting December 8, 2016 Acronyms ADR Alternative Dispute Resolution BAA Balancing Authority Area BPM Business Practice Manual CEC
More informationEnergy Efficiency in RPM. Adam Keech Director, Market Operations PJM January 13, 2015
Energy Efficiency in RPM Adam Keech Director, Market Operations PJM January 13, 2015 PJM Capacity Market PJM Capacity Market Reliability Pricing Model (RPM) PJM secures capacity on behalf of LSEs to satisfy
More informationRules and Procedures for Determination of Generating Capability
PJM Manual 21 Rules and Procedures for Determination of Generating Capability Revision: 11 Effective Date: March 5, 2014 Prepared by System Planning Department PJM 2014 PJM 2007 Revision 05, Effective
More informationCALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL
VOLUME NO. III Page No. 655 CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL VOLUME NO. III Page No. 656 ANCILLARY SERVICES REQUIREMENTS PROTOCOL Table of Contents ASRP 1
More informationReliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective
Reliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective Mark Lauby, Senior Vice President and Chief Reliability Officer North American Electric Reliability Corporation
More informationAugust 15, Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Lansing, Michigan, 48917
Melissa Seymour Regional Executive Central Region Direct Dial: 317-249-5709 Email: mseymour@misoenergy.org Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway
More informationPJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia
PJM Wholesale Markets Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM RTO Functions Grid Operation Non-discriminatory treatment Monitoring transmission system Reliability
More informationCalifornia Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring
k California Independent System Operator Corporation California ISO Import resource adequacy September 10, 2018 Department of Market Monitoring Summary This report provides an update of analysis and trends
More informationCalifornia Independent System Operator Corporation Fifth Replacement Tariff
Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing
More informationCalifornia Independent System Operator Corporation Fifth Replacement Tariff
Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing
More informationAncillary Service Markets
Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;
More informationPJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017
PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 Prepared by System Planning Department PJM 2017 Table of Contents Table of Contents
More informationFlexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting
Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting Karl Meeusen, Ph.D. September 26, 2017 2017 CAISO - Public Page 1 FRACMOO 2 Working Group Meeting Agenda 9/26/2017 Time
More informationPJM Sell Back Price Status Quo and Proposed Alternatives
PJM Sell Back Price Status Quo and Proposed Alternatives IASTF Meeting October 19, 2017 www.pjm.com Contents Example of Status Quo use of the Updated VRR Curve Decrement in determining the PJM Sell Offer
More information