1 Capturing stochastic variations of train event times and process times with goodness-of-fit tests Jianxin Yuan Department of Transport and Planning, Delft University of Technology P.O. Box 5048, 2600 GA Delft, The Netherlands, Abstract In this paper, several statistical distributions selected for capturing stochastic variations of train event times and process times are assessed based on real-world data recorded at a Dutch railway station The Hague Holland Spoor. The assessment is performed using the Kolmogorov-Smirnov goodness-of-fit test. To achieve a precise assessment of those candidate distributions, a new approach to fine-tuning the distribution parameters is proposed. The distributions are compared not only for the arrival and departure times of trains at the station, but also for the arrival times of trains at the boundaries of the local railway network and the train running, dwell and track occupancy times in the network. Furthermore, the selected distributions are assessed for the conditional running and dwell times as well as track occupancy times of trains in case of (no) hinder caused by other trains. The analysis results reveal that the stochastic variations of train event times and process times can be well captured by either the lognormal distribution or the Weibull distribution. These fitted statistical distributions can be used as input models in the analysis of timetable robustness and prediction of the punctuality of train operations. Keywords Train delays, Running & dwell times, Statistical distributions, Parameter estimation, Goodness-of-fit 1 Introduction To analyze the robustness of timetables and predict the punctuality of train operations in a railway network, the distributions of initial delays at the network boundaries and the distributions of additional delays within the network are often assumed. Limited literatures [7], [13], [11], [4], [5] exist for a statistical analysis of the distributions of train delays based on real-world data. It is doubtful whether an analytical or simulation model could accurately predict the propagation of train delays and the punctuality of trains without a realistic description of stochastic variations of the initial and additional delays [6], [12]. The initial delay of a train is the difference between the actual event time and the scheduled time at a network boundary, while an additional delay within the network is the difference between the actual and scheduled time periods for completing a running or dwell process. This paper aims to capture the stochastic variations of train event times and process times using real-world traffic data, i.e. to obtain the distributions of initial and additional delays statistically. For the analysis and prediction of timetable robustness and train punctuality, it is important to make a distinction between primary delays and knock-on delays occurring in an operational process. The primary delays of trains may be due to technical failures, 1

2 running at a speed lower than scheduled, prolonged alighting and boarding times of passengers, and bad weather conditions, while the knock-on delays of trains result from tight headway, route conflicts and late transfer connections at stations. For the primary delays in train running or dwell processes, it appears that the distributions cannot be derived directly from track occupation and release records, which can only show the total delays and may include knock-on delays. Therefore, data filtering is necessary to model the distribution of primary delays. To accurately estimate the knock-on delays of trains suffered before occupying a certain track junction or station platform, the part of delays due to deceleration and acceleration in the case of tight headway and route conflicts must be taken into account. Therefore, the conditional distributions of train running and track occupancy times in case of hinder are to be studied, too. To capture the variability of train event times and process times, several statistical distributions are first selected and then assessed with goodness-of-fit tests. Following this brief introduction, the collection of data is outlined. Afterwards, a discussion on the selection of appropriate statistical distributions and an introduction to the distribution assessment approach, i.e., the goodness-of-fit test is given. Since a hypothesized distribution with grossly estimated parameters can be easily rejected by a goodness-of-fit test especially in case of a large sample size, a new approach to fine-tuning the parameters of hypothesized distributions is proposed. Furthermore, the distribution fitting results are shown. The final section of the paper covers the main conclusions. 2 Obtaining data This statistical analysis is based on the track occupancy and release times of 10,000 trains which were recorded at a Dutch railway station The Hague Holland Spoor (The Hague HS). In the Dutch Railways, the train describers, i.e., TNV systems (Trein- NummerVolgsystemen) keep track of the progress of trains at discrete steps over their routes. The TNV-logfiles of about 25 MB ASCII-format per day per TNV-system contain chronological information about all signalling and interlocking events in a traffic control area. The TNV logfiles give an accurate description of train movements with a maximal error of 1s, but track section messages are not matched to individual train numbers. By posterior analysis of the TNV logfiles, Goverde and Hansen [3] developed the data mining tool TNV-Prepare that couples events of infrastructural elements to train numbers. The TNV-Prepare output consists of chronological TNV-tables per train line service and (sub)route. For each individual train, event times along the route are given, including train description steps, section entries and clearances, signals, and point switches. From this information other interesting process times such as running times, blocking times, and headways can be derived easily. Because the actual arrival and departure times of a train at a platform stop are not recorded in the TNV records, the tool TNV-Filter [4] was developed which estimates these event times based on data generated by TNV-Prepare. The arrival and departure delays as well as the dwell time of each individual train are then calculated with a precision in the order of a second. During the time period of data recording, 24 passenger trains arrived and departed at The Hague HS per hour corresponding to 9 different train series in both the southbound and northbound directions. The types and routes of trains may affect the distributions of train event times and process times. The assessment of those candidate distributions is to be performed per train series in each direction. A train series in one direction is hereafter referred to as a studied case. 2

3 3 Selecting statistical distributions and testing the goodness-of-fit 3.1 Select statistical distributions An appropriate distribution can be selected based on the physical properties of a random variable. However, it is often difficult to know all the properties when the variable represents a result of a great number of complicated processes influenced by human behaviours. The statistical distribution of a random variable can also be selected by inspecting the data. In this case, a histogram is a useful representation since it shows the distribution shape of the data. It is best to use both these approaches to ensure that they are in agreement [10]. Train event times and process times generally have a lower bound, i.e., the earliest or shortest time. Furthermore, the histograms are often skewed to the right especially in the case of train event times, which are subject to an accumulation of the previous delays. It appears that the lognormal, gamma, and Weibull distributions, which are very flexible in the fitting to the shape of the distribution of a data set, may capture the stochastic variations of train event times and process times with a higher accuracy than other distributions. A symmetrical distribution without a lower bound such as the normal distribution cannot be a generic candidate distribution, although this sort of distribution might approximate the variability reasonably well in some situations. The histograms of train arrival and departure times at stations are subject to the alteration of train orders in real-time operations and thus often have a heavy tail on the right. It seems that a mixture distribution may better represent the variability since this sort of distribution enables to incorporate the heavy tail. Güttler [5] fitted a normallognormal mixture distribution to excess running times of trains between two stations using the data obtained from the German Railway. Note that finite mixtures will introduce additional complexity because they have more parameters, whose estimation usually requires solving a complex system of non-linear equations. Moreover, train planners generally prefer to use a simpler distribution model if it can approximate the reality reasonably well. Thus, fitting a mixture distribution to the observed event times and process times will not be studied. Instead, we will pay much attention to conditional distributions of the running times of trains in case of freely and hindered travelling as well as the conditional distribution of the dwell times of trains in case of no hinder. This aims at a provision of input distribution models for predicting knock-on delays and the impact on train punctuality in railway stations and networks [14]. Based on the analysis above, the lognormal, gamma, and Weibull distributions are mainly selected for capturing the stochastic variations of train event times and process times. The exponential distribution, which is widely used to approximate the variability of non-negative delays, is actually incorporated since it is a special case of the gamma and Weibull distributions. The normal, uniform, and beta distributions have been applied in some literatures [1], [4] and we also consider them as the candidate distributions for modelling the variability of train event times and process times. 3.2 Test the goodness-of-fit For assessing the goodness-of-fit of statistical distributions, both graphical approaches and goodness-of-fit tests can be applied. Law and Kelton [8] presented five main graphical approaches for comparing fitted distributions with the true underlying distribution. These approaches include density/histogram overplot, frequency comparison, distribution 3

4 function differences plot, probability-probability plot and quantile-quantile plot. Graphical approaches give a good guide as to the goodness-of-fit and enable us to weed out poor candidates. Following on from a graphical analysis it is important to perform statistical tests to determine how closely a distribution fits the empirical data. The oldest goodness-of-fit test is the chi-square test, which can be thought of as a more formal comparison of a histogram with the fitted density function. Another commonly used goodness-of-fit test is the Kolmogorov-Smirnov (K-S) test, which compares an empirical distribution function with the hypothesized distribution function. For detailed description as to these goodness-of-fit tests, see Law and Kelton [8]. Both the goodness-of-fit tests have their own advantages and drawbacks. Perhaps the main advantage of the chi-square test is that when unknown parameters must be estimated from the data, a generic correction can be introduced in the statistic distribution by reducing the number of degrees of freedom. If parameters must be estimated from the data to apply the K-S test, no general adjustment is available for the critical value of the statistic distribution. However, the K-S test also has several advantages over the chisquare test. First, the K-S test does not require to group the data in any way, so no information is lost; this also eliminates the troublesome problem of interval specification, which occurs in case of the chi-square test. Secondly, the K-S test is exact for any sample size and any distribution model when the parameters are not estimated from the data, whereas the chi-square test is valid only in an asymptotic sense. For several hypothesized continuous distributions, if the parameters are specified without making use of the data, the K-S test can be applied to accurately assess and rank the goodness-of-fit of those distributions. In the following, the K-S test will be applied to compare the distributions selected for capturing the stochastic variations of train event times and process times. 4 Assessing the selected distributions based on a parameter finetuning approach Having selected the statistical distributions for train event times and process times, we need to further specify the parameters to test the goodness-of-fit. If the parameters of a selected distribution were estimated directly from the data which are used to obtain the empirical distribution in the goodness-of-fit test, the critical value of the test statistic distribution, depending on the type of the hypothesized distribution, could not be obtained accurately. To assess the selected statistical distributions, we will specify the parameters without making use of the data directly, and apply the K-S test and rank the goodness-offit. As mentioned before, if the distribution parameters are specified grossly, the hypothesized distribution can often be rejected especially in case of a large sample size of the data. Therefore, we propose a new approach to fine-tuning the parameters of the selected distributions. The assessment of the candidate distributions will be carried out based on this parameter fine-tuning approach. To specify the parameters and test a selected statistical distribution for a sort of train event times or process times, we first split the data into two subsets randomly, e.g. by assigning the chronologically recorded times alternately. Using the first data subset, an initial estimate of the distribution parameters is obtained. Furthermore, we fine-tune the parameters to improve the goodness-of-fit of the K-S test where the empirical distribution is, however, obtained from the second data subset. The sample size of these data subsets has been halved, but the all-parameters-known form of the K-S test can be applied. In this case, the critical value of the test statistic distribution can be accurately estimated and 4

5 applicable to all distribution types. In addition, randomly splitting the original data into two subsets ensures that the distribution fitted well to the second data subset is the distribution we need for capturing the variability of the original data. The parameters of a given distribution can be estimated on the basis of empirical data using the moment method, maximum likelihood method, and Bayesian estimation. The maximum likelihood method is widely used in practice because a Maximum Likelihood Estimator (MLE) is the minimum variance unbiased as the sample size increases [2]. The estimation of distribution parameters can be influenced by outliers. An outlier is a data point which deviates from the bulk of the data [4]. In the case of train event times and process times, the outliers are mostly some very large values, as has been confirmed by our data analysis. The impact of an outlier depends on the sample size and the spread of the data. However, there is no exact standard method to detect outliers. A new heuristic procedure to deal with outliers is incorporated in the following approach to fine-tuning the parameters of a candidate distribution of a data set: An initial estimate of the distribution parameters is obtained using the MLE based on the first split data subset. The large delays in the data subset are omitted iteratively one by one estimating the distribution parameters correspondingly using the MLE. In each iteration, we compute the p-value of the K-S test where the empirical distribution is obtained from the second split data subset. The iterative procedure terminates if the p-value cannot be increased any more. After the iterative procedure, we fine-tune the parameter estimate again to further improve the estimation by maximizing the p-value of the K-S test, where of course the empirical distribution remains unchanged. In detail, a neighbourhood ±1.0 and a fine-tuning step 0.1 are considered for the parameters of the lognormal distribution as well as the shape parameters of the gamma, Weibull and beta distributions. In case of the other distribution parameters, a neighbourhood ±10 and a fine-tuning step 1.0 are considered. Herein, the time unit is in seconds. The parameters of a statistical distribution can be classified, on the basis of their physical or geometric interpretation, as one of three basic types: location, scale and shape parameters. If the location parameter of a statistical distribution is the lower endpoint of the distribution s range and is nonzero, this location parameter is also called shift parameter and the distribution is called a location-shifted distribution. Train event times and process times generally have a lower bound. Therefore, a location-shifted distribution will be mostly applied. It should be mentioned that we take the shift parameter of a statistical distribution as the minimal value of the data. To assess those candidate distributions, the K-S tests are performed at a commonly adopted significance level of Each type of the distributions is ranked according to the p-value of the K-S test where the hypothesized distribution is specified with the finetuned parameters. In detail, we give rank 1 to the candidate distribution with the biggest p- value, rank 2 to the distribution with the second biggest p-value, and so on. The candidate distribution ranked 1 is considered to be the best one among the selected distributions. The quality of the distribution fitting for train event times and process times is also visualized by comparing the fitted distribution density curve with the kernel density estimate [2] and the histogram and by applying the distribution differences plot for the fitted distribution and the empirical one. 5

6 5 Distribution assessment results 5.1 Train event times The statistical fitting of train arrival time distribution is a prerequisite for predicting the propagation of train delays in stations. To incorporate the impact of knock-on delays suffered before occupying the platform track in a delay propagation model, we need to distinguish the arrival times of trains at the platform track from those at the station approach signal. We have compared the K-S goodness-of-fit among the candidate distributions for the arrival times at those locations. It has been found that the lognormal distribution gives the best fit in 9 and 11 out of 14 studied cases (a case represents a train series in one direction), respectively. Additionally, the lognormal fits have been accepted by the K-S test in most cases. It should be mentioned that the lognormal fits have been specified with a shift parameter corresponding to the earliest arrival time. Figure 1 shows the lognormal density fit, the second best, i.e. gamma density fit, kernel density estimate and empirical histogram for the arrival delays of an intercity train series in the northbound direction at the platform track. The distribution differences plots are also given in Figure 2. Both the density fits match with the kernel density estimate and the histogram rather well. It appears that the lognormal fit is more attractive than the gamma fit since the former has a greater probability around the distribution mode than the latter. The differences between the lognormal distribution and the empirical one are overall smaller than the differences between the gamma distribution and the empirical one, too. Figure 1: Lognormal and gamma density fits, kernel density estimate and histogram for the arrival delays of an intercity train series IC2100N at the platform track Figure 2: Distribution difference plot for the lognormal fit and the arrival delays of IC2100N at the platform track and the plot for the gamma fit and the delays Early arriving trains generally have a longer dwell time than late arriving trains. To estimate the distribution of departure times more realistically by distinguishing the dwell times of late arriving trains from those of early arriving trains, the distribution of nonnegative arrival delays is needed [12]. We have compared the K-S goodness-of-fit among the candidate distributions for non-negative arrival delays at the platform track. The analysis results reveal that the Weibull distribution gives the best fit to the data in 12 out 6

7 of 18 studied cases and it ranks second or third in the other 6 cases. In addition, the Weibull fits have been accepted by the K-S test in all the cases. Figure 3 shows the Weibull density fit, the second best, i.e. gamma density fit as well as the empirical histogram for the non-negative arrival delays of an interregional train series in the northbound direction. It appears that the Weibull density fit matches with the histogram better than the gamma fit. Figure 4 displays the distribution differences plots. The differences between the Weibull distribution and the empirical distribution are overall smaller than the differences between the gamma distribution and the empirical one. Probability density Weibull fit gamma fit Fitted distribution Empirical distribution Weibull fit gamma fit Non negative arrival delay IR2200N [s] Figure 3: Fitted Weibull and gamma density curves and histogram of the nonnegative arrival delays of an interregional train series IR2200N Non negative arrival delay IR2200N [s] Figure 4: Distribution differences plot for the Weibull fit and the non-negative arrival delays of IR2200N and the plot for the gamma fit and the delays The distribution of departure times at stations can be used to predict the distribution of outbound track release times and the distribution of arrival times at the following stations. For the departure delays of trains, the Weibull distribution fits best to the data in 11 out of 18 studied cases. Furthermore, the Weibull fits have been accepted by the K-S test in most cases. Figure 5 and Figure 6 visualize the goodness-of-fit of the Weibull and gamma distributions for the departure delays of an intercity train series in the southbound direction. It appears that the Weibull density fit matches with the data better than the gamma fit and the maximum difference between the Weibull distribution and the empirical distribution is smaller than the maximum difference between the gamma distribution and the empirical one. For both non-negative arrival delays and departure delays, the Weibull distribution fits the data generally better than the gamma distribution. This may result from a more flexible property of the Weibull model than the gamma model for capturing the distribution shape of a data set. The kernel density curves estimated for non-negative arrival delays and departure delays are decreasing except for few cases. As a result, the shape parameter of a Weibull distribution fit is generally smaller than 1.0. If the finetuned shape parameter is around 1.0, the exponential distribution, as a special type of the Weibull distribution, can be used to capture the stochastic variations of both non-negative arrival delays and departure delays. 7

8 Probability density Weibull fit gamma fit Fitted distribution Empirical distribution Weibull fit gamma fit Departure delay IC2400S [s] Figure 5: Fitted Weibull and gamma density curves and the empirical histogram of the departure delays of an intercity train series IC2400S Departure delay IC2400S [s] Figure 6: Distribution differences plot for the Weibull fit and the departure delays of IC2400S and the plot for the gamma fit and the delays 5.2 Train process times Train process times include the dwell times, running times, and track occupancy times of trains. The dwell times of trains at a station are the difference between the arrival and departure times. To estimate knock-on delays and departure delays of trains at a station, we need to know the necessary dwell times of trains for passenger alighting and boarding in the absence of hindrance from other trains. These necessary dwell times of trains are defined as the free dwell times in Yuan [12]. To accurately incorporate the impact of the knock-on delays of trains suffered before occupying a platform track or a junction in the modelling of delay propagation in a railway network, the conditional distributions of train running times and track occupancy times in case of (no) hinder are needed. To obtain the distribution of the free dwell times of trains, we need the corresponding data. However, it is hardly possible to measure the free dwell time of an individual train which is hindered at the platform track due to occupancy of the next signal block only based on the track occupancy and release records, i.e. TNV data. Therefore, the free dwell time distributions will be only fitted for early and late arriving trains respectively by using the observed dwell times of a subset of those trains which are not hindered at the station. In case of early arriving trains, the subset contains the trains whose outbound route has been set to Free and the departure signal to Go before it is ready for departure assumed at the scheduled departure time. In case of late trains, the subset includes the trains whose outbound route has been set to Free and the departure signal to Go before it is ready for departure after an assumed minimal dwell time of 30s. In fact, some trains which do not belong to the subsets are not hindered by other trains, too, when they have a longer necessary dwell time. Note that the free dwell time of an early arriving train is influenced by the arrival earliness significantly, and the knock-on delay and the departure delay may be estimated based on the scheduled arrival time and the free dwell time excluding the arrival earliness [12]. Therefore, we take only this part of the free dwell time as the free dwell time for an early train in this analysis. 8

9 The statistical analysis results reveal that for the free dwell times of early arriving trains, the Weibull distribution gives the best fit in 8 out of 15 studied cases. For the free dwell times of late arriving trains, the Weibull distribution fits best to the data in 7 out of 18 studied cases. Additionally, the Weibull distributions fitted to the free dwell times of both early and late arriving trains have been accepted by the K-S test except for one studied case. Figure 7 shows the Weibull density fit, the second best, i.e. normal density fit, kernel density estimate and empirical histogram for the free dwell times of the late arriving trains of an interregional train series in the northbound direction. The fitted Weibull distribution with a shape parameter of 1.8 matches with the kernel estimate for the empirical data much better than the normal fit with respect to overall shape and the tails of the distribution. The better fitting of the Weibull model is also illustrated by the distribution differences plots given in Figure 8. Figure 7: Weibull and normal fits, kernel estimate and histogram for the free dwell times of late arriving trains of an interregional train series IR2200N Figure 8: Distribution differences plots for the Weibull and normal fits and the free dwell times of late arriving trains of IR2200N The density estimate and empirical histogram of the free dwell times of trains are generally skewed to the right. The free dwell times of early arriving trains cannot be shorter than the scheduled dwell time. The free dwell times of late arriving trains may be shorter than the scheduled time, but they are longer than the minimum time for opening the doors of a train, announcing the departure, and closing the doors. Taking into account the skewness to the right and the lower bound, a location-shifted Weibull distribution better captures the variability of the free dwell times of trains than a normal distribution. In case of an early arrival, the train driver may not feel in hurry and hence wait for some late passengers boarding the train. In case of a late arrival, the train may stop at the platform longer than the minimum dwell time due to an increased number of passengers boarding the train. Obviously, the probability of large free dwell times is very small. Therefore, the probability density curve of the free dwell times of trains is generally nondecreasing and unimodal, and the shape parameter of the Weibull distribution fit is mostly bigger than 1.0. Only if the scheduled dwell time is much longer than the necessary times for passenger alighting and boarding, the shape parameter of the Weibull distribution fitted to the free dwell times of early arriving trains (excluding the arrival earliness) can be smaller than

10 In the following, we deal with the conditional distributions of the running times of trains on the preceding block of The Hague HS station and those of the occupancy times of the adjacent junctions around this station. Considering an approaching train, if the inbound route is released earlier than the train arrives at sight distance of the approach signal of the station home signal, the train proceeds freely to the platform. Otherwise, the train is hindered and has to decelerate and even to stop before the home signal. The conditional distributions of train running and track occupancy times in case of (no) hinder differ from each other significantly. To obtain those conditional distributions, the first step is to classify the data. By comparing the arrival time of each train at the station approach signal to the clearance time of the inbound route, we have extracted a data set suited for fitting the distribution of freely running times in each studied case. A hindered approaching train will pass the station home signal at a reduced speed if it may proceed to this signal. Otherwise, the hindered train will pass the home signal accelerating after a stop before this signal. Since the standstill of a train on a track is not recorded, we cannot directly identify whether or not a hindered train stops before the home signal based on track occupancy and release records. However, we have realized that the difference between the arrival time of a hindered train at the station approach signal and the clearance time of the inbound route is generally longer in case the train stops before the home signal. On the other hand, the difference between the route clearance time and the passing time of the train at the station home signal is generally shorter in case the train stops before the home signal than if it may proceed. Adopting the k-means data clustering routine included in the statistical analysis tool S-Plus [9], we split the data sample of hindered trains for each studied train series into two separate parts which correspond approximately to the aforementioned two cases. Applying the k-means data clustering method, the data sets suited for fitting the conditional distributions of inbound junction occupancy times by each relevant passing train series were also extracted. In case of a departing train, if it is hindered due to outbound route conflicts, it dwells at the station for a longer time. However, it will not be hindered on the next track sections. Thus, the conditional distributions are not applicable to the running times of trains on the outbound track sections and outbound track occupancy times. For the distributions and conditional distributions of train running and track occupancy times, either the Weibull or normal model may be the best fit to the data. However, a generic distribution model suitable for capturing the variability has not been found. This might be caused by the big variation of train speeds on the short track sections in the complicated station and interlocking area. The data classification and the further data split, which reduce the size of the data sample, also affect the determination of a generic distribution model for the conditional train running and track occupancy times. 6 Conclusions We have compared the K-S goodness-of-fit among several distribution models selected for train event times and process times by fine-tuning the distribution parameters. The track occupancy and release times recorded at the Dutch railway station The Hague HS were used. It has been found that a location-shifted lognormal distribution can be considered as the best model among the candidate distributions for both the arrival times of trains at the platform track and at the station approach signal. The Weibull distribution can generally be considered as the best distribution model for non-negative arrival delays, 10

11 departure delays and the free dwell times of trains. The shape parameter of a Weibull distribution fitted to either non-negative arrival delays or departure delays is mostly smaller than 1.0. However, the shape parameter of a Weibull distribution fitted to the free dwell times of trains is generally bigger than 1.0. These distribution fitting results can be used as input models of any analytical or simulation models for predicting the propagation of train delays and the punctuality of trains at certain stations. Based on this prediction, we are able to maximize railway capacity utilization while assuring a desired reliability and punctuality level of train operations. Although the distribution assessment has been done using the data recorded at a case station, the fitted lognormal and Weibull distributions can be applicable to other existing and new stations thanks to the flexibility of these two distribution models. However, it should be kept in mind that the distribution parameters of train event times and process times may vary in time and space. When timetables for a new infrastructure project are designed and evaluated and real data of train event times and process times are not available, the distribution parameters must be estimated as accurately as possible by adopting advises from experts. Moreover, a sensitivity study of the modelling results to the estimated parameters of the input distributions may be required. The distributions and conditional distributions of train running and track occupancy times have also been studied. However, a generic distribution model suitable for capturing the variability has not been found. Further research work will be carried out to capture the variability by collecting a bigger size of data sample. The variability of train running times between stations will also be studied. References [1] Carey, M., Carille, S, Testing schedule performance and reliability for train stations, Journal of the Operational Research Society 51, pp , [2] Dekking, F.M., Kraaikamp, C., Lopuhaä, H.P., Meester, L.E., A Modern Introduction to Probability and Statistics, Springer, London, [3] Goverde, R.M.P., Hansen, I.A., TNV-Prepare: Analysis of Dutch Railway Operations Based on Train detection Data', In: Allan, J., Hill, R.J., Brebbia, C.A., Sciutto, G., Sone, S. (eds.), Computers in Railways VII, pp , WIT Press, Southampton, [4] Goverde, R.M.P., Punctuality of Railway Operations and Timetable Stability Analysis, Ph.D. thesis, Delft University of Technology, [5] Güttler, S., Statistical modelling of Railway Data, M.Sc. thesis, Georg-August- Universität zu Göttingen, [6] Hansen, I.A., Improving Railway Punctuality by Automatic Piloting, In: 2001 IEEE Intelligent Transportation Systems Conference Proceedings, Oakland (CA), USA, pp , [7] Hermann, U., Untersuchung zur Verspätungsentwicklung von Fernreisezügen auf der Datengrundlage der Rechnerunterstützten Zugüberwachung Frankfurt am Main (Investigation of the Development of Delays of Long-distance Passenger Trains Based on Data from the Computer-aided Train Monitoring Frankfurt am Main), Ph.D. thesis, Technischen Hochschule Darmstadt, [8] Law, A. M., Kelton, W.D., Simulation Modeling and Analysis, McGraw-Hill Higher Education, [9] MathSoft, S-Plus 2000, User s Guide, Seattle, USA, [10] Robinson, S., Simulation: The Practice of Model Development and Use, John Wiley 11

12 & Sons, Ltd, Chichester, [11] Wendler, E., Naehrig, M., Statistische Auswertung von Verspätungsdaten (Statistical Analysis of Delay Data), Eisenbahningenieurkalender EIK 2004, pp , [12] Yuan, J., Stochastic Modelling of Train Delays and Delay Propagation in Stations, Ph.D. thesis, Delft University of Technology, [13] Yuan, J., Goverde, R.M.P. & Hansen, I.A., Propagation of Train Delays in Stations, In: Allan, J., Hill, R.J., Brebbia, C.A., Sciutto, G., Sone, S. (eds.), Computers in Railways VIII, pp , WIT Press, Southampton, [14] Yuan, J., Hansen, I.A., Optimizing Capacity Utilization of Stations by Estimating Knock-on Delays, Transportation Research Part B 41(2), pp ,

Joint design standard for running times, dwell times and headway times

Joint design standard for running times, dwell times and headway times Computers in Railways X 611 Joint design standard for running times, dwell times and headway times V. A. Weeda & P. B. L. Wiggenraad Department of Transport & Planning, Delft University of Technology,

More information

Capacity measurement with the UIC 406 capacity method

Capacity measurement with the UIC 406 capacity method Computers in Railways XI 55 Capacity measurement with the UIC 406 capacity method A. Landex 1, B. Schittenhelm 1,2, A. H. Kaas 3 & J. Schneider-Tilli 4 1 Department of Transport, Technical University of

More information

Automated analysis of train event recorder data to improve micro-simulation models

Automated analysis of train event recorder data to improve micro-simulation models Operations Analysis 125 Automated analysis of train event recorder data to improve micro-simulation models S. de Fabris, G. Longo & G. Medeossi Department of Civil and Environmental Engineering, University

More information

Automated analysis of train event recorder data to improve micro-simulation models

Automated analysis of train event recorder data to improve micro-simulation models Computers in Railways XI 575 Automated analysis of train event recorder data to improve micro-simulation models S. de Fabris, G. Longo & G. Medeossi Department of Civil and Environmental Engineering, University

More information

Station capacity and stability of train operations

Station capacity and stability of train operations Station capacity and stability of train operations LA. Hansen Faculty of Civil Engineering and Geo Sciences, Delft University of Technology, The Netherlands Abstract The capacity of railway stations is

More information

DELAY DISTRIBUTIONS IN RAILWAY STATIONS

DELAY DISTRIBUTIONS IN RAILWAY STATIONS The 9th World Conference on Transport Research, Seoul, Korea, July 22-27, 2001 Paper No. 3605 Topic Area: C6-3605 Method of Presentation: OHP DELAY DISTRIBUTIONS IN RAILWAY STATIONS Rob M.P. GOVERDE, MSc

More information

Transactions on the Built Environment vol 34, 1998 WIT Press, ISSN

Transactions on the Built Environment vol 34, 1998 WIT Press,  ISSN Improving the Dutch railway services by network-wide timetable simulation Jurjen S. Hooghiemstra", Dick M. Middelkoop", Maurice J.G. Teunisse^ " Railned, Dept. of Innovation, P.O.Box 2025, 3500 HA Utrecht,

More information

TNV-Prepare: Analysis of Dutch railway operations based on train detection data

TNV-Prepare: Analysis of Dutch railway operations based on train detection data TNV-Prepare: Analysis of Dutch railway operations based on train detection data Goverde, R.M.P., Hansen, LA. Faculty of Civil Engineering and Geosciences, Delft University of Technology, The Netherlands

More information

Performance analysis: improving the Dutch railway service

Performance analysis: improving the Dutch railway service Computers in Railways XI 463 Performance analysis: improving the Dutch railway service V. A. Weeda 1,2 & K. S. Hofstra 2 1 Delft University of Technology, Department of Transport & Planning, The Netherlands

More information

Computation and evaluation of scheduled waiting time for railway networks

Computation and evaluation of scheduled waiting time for railway networks Computers in Railways XII 911 Computation and evaluation of scheduled waiting time for railway networks A. Landex Department of Transport, Technical University of Denmark, Denmark Abstract Timetables are

More information

Control rules for dispatching trains on general networks with multiple train speeds

Control rules for dispatching trains on general networks with multiple train speeds Control rules for dispatching trains on general networks with multiple train speeds SHI MU and MAGED DESSOUKY* Daniel J. Epstein Department of Industrial and Systems Engineering University of Southern

More information

Chapter 1. Introduction. 1.1 Research motivation

Chapter 1. Introduction. 1.1 Research motivation Chapter 1 Introduction 1.1 Research motivation This thesis is about a more sophisticated timetable compilation and capacity analysis for a selected Dutch railway line compared to the existing tools applied

More information

Modeling occupancy in single person offices

Modeling occupancy in single person offices Energy and Buildings 37 (2005) 121 126 www.elsevier.com/locate/enbuild Modeling occupancy in single person offices Danni Wang a, *, Clifford C. Federspiel a, Francis Rubinstein b a Center for Environmental

More information

Simulation of freight train operations with departures ahead of schedule

Simulation of freight train operations with departures ahead of schedule Computers in Railways XIV 239 Simulation of freight train operations with departures ahead of schedule A. Lindfeldt & H. Sipilä Department of Transport Science, Royal Institute of Technology (KTH), Sweden

More information

Evaluation of energy saving strategies in heavily used rail networks by implementing an integrated real-time rescheduling system

Evaluation of energy saving strategies in heavily used rail networks by implementing an integrated real-time rescheduling system Energy Management in the Train Operation 75 Evaluation of energy saving strategies in heavily used rail networks by implementing an integrated real-time rescheduling system M. Luethi Swiss Federal Institute

More information

Simulation of different railway signalling systems

Simulation of different railway signalling systems Simulation of different railway signalling systems M. Grimm', B.Sandbla

More information

State-of-the-art of railway operations research

State-of-the-art of railway operations research Computers in Railways X 565 State-of-the-art of railway operations research I. A. Hansen Delft University of Technology Abstract The paper discusses the current state of research concerning the modelling

More information

Postprint. This is the accepted version of a paper presented at RailTokyo2015. Citation for the original published paper:

Postprint.   This is the accepted version of a paper presented at RailTokyo2015. Citation for the original published paper: http://www.diva-portal.org Postprint This is the accepted version of a paper presented at RailTokyo15. Citation for the original published paper: Lindfeldt, A. (15) Validation of a simulation model for

More information

Evaluation of punctuality on a heavily utilised railway line with mixed traffic

Evaluation of punctuality on a heavily utilised railway line with mixed traffic Computers in Railways XI 545 Evaluation of punctuality on a heavily utilised railway line with mixed traffic O. Lindfeldt Division of Traffic and Logistics, Department of Transport and Economics, Royal

More information

Simulation of fruit pallet movement in the port of Durban: A case study

Simulation of fruit pallet movement in the port of Durban: A case study Volume 21 (1), pp. 63 75 http://www.orssa.org.za ORiON ISSN 0529-191-X c 2005 Simulation of fruit pallet movement in the port of Durban: A case study J Bekker M Mostert FE van Dyk Received: 1 February

More information

Abstract. 1 Introduction

Abstract. 1 Introduction TRACE supervision system for dispatching and passenger information M. Renkema, H. Vas Visser Railverkeerssystemen, Holland Railconsult, Utrecht, The Netherlands Abstract This paper describes the TRACE

More information

Ensuring timetable stability with train traffic data

Ensuring timetable stability with train traffic data Computers in Railways XIII 427 Ensuring timetable stability with train traffic data T. Graffagnino SBB AG, Switzerland Abstract Swiss Federal Railways plan and operate one of the densest rail networks

More information

ABSTRACT. Timetable, Urban bus network, Stochastic demand, Variable demand, Simulation ISSN:

ABSTRACT. Timetable, Urban bus network, Stochastic demand, Variable demand, Simulation ISSN: International Journal of Industrial Engineering & Production Research (09) pp. 83-91 December 09, Volume, Number 3 International Journal of Industrial Engineering & Production Research ISSN: 08-4889 Journal

More information

From single to double track: effects of alternative extension measures

From single to double track: effects of alternative extension measures Computers in Railways XIII 313 From single to double track: effects of alternative extension measures O. Lindfeldt Vectura Consulting AB, Stockholm, Sweden Abstract Extension of single-track lines into

More information

Timetable management and operational simulation: methodology and perspectives

Timetable management and operational simulation: methodology and perspectives Computers in Railways X 579 Timetable management and operational simulation: methodology and perspectives A. Radtke Institut für Verkehrswesen, Eisenbahnbau und betrieb, University of Hannover, Germany

More information

COMBINE: A decision support system for real time traffic control

COMBINE: A decision support system for real time traffic control COMBINE: A decision support system for real time traffic control D. de Vries Holland Railconsult, The Netherlands Abstract This paper addresses the need for and benefits of advanced real-time traffic management

More information

Reliability Engineering

Reliability Engineering Alessandro Birolini Reliability Engineering Theory and Practice Sixth Edition Springer 1 Basic Concepts, Quality and Reliability Assurance of Complex Equipment & Systems.. 1 1.1 Introduction 1 1.2 Basic

More information

Testing schedule performance and reliability for train stations

Testing schedule performance and reliability for train stations Journal of the Operational Research Society (2000) 51, 666±682 #2000 Operational Research Society Ltd. All rights reserved. 0160-5682/00 $15.00 www.stockton-press.co.uk/jors Testing schedule performance

More information

Near-Balanced Incomplete Block Designs with An Application to Poster Competitions

Near-Balanced Incomplete Block Designs with An Application to Poster Competitions Near-Balanced Incomplete Block Designs with An Application to Poster Competitions arxiv:1806.00034v1 [stat.ap] 31 May 2018 Xiaoyue Niu and James L. Rosenberger Department of Statistics, The Pennsylvania

More information

KopyKitab. Quality, Reliability and Maintainability. Statistical Methods for. K. Muralidharan A. Syamsundar. Maintainability

KopyKitab. Quality, Reliability and Maintainability. Statistical Methods for. K. Muralidharan A. Syamsundar. Maintainability Statistical Methods for Quality, Reliability and Maintainability LSL Design width USL Bathtub failure rate curve Maintainability Time K. Muralidharan A. Syamsundar Statistical Methods for Quality, Reliability

More information

Simulation analysis of the effect of doubling and electrification on the reliability of the rail networks: A Case Study of Tehran-Mashhad railroad

Simulation analysis of the effect of doubling and electrification on the reliability of the rail networks: A Case Study of Tehran-Mashhad railroad Simulation analysis of the effect of doubling and electrification on the reliability of the rail networks: A Case Study of Tehran-Mashhad railroad M. Shakibayifar a, *, A. Sheikholeslami b, F. Corman c,

More information

PERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES

PERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES PERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES Werner Sandmann Department of Information Systems and Applied Computer Science University of Bamberg Feldkirchenstr. 21 D-96045, Bamberg, Germany

More information

Assessment of mass transit turn-back capacity using dynamic simulation models. DC Gill Projects Delivery Department, Westinghouse Signals Limited, UK

Assessment of mass transit turn-back capacity using dynamic simulation models. DC Gill Projects Delivery Department, Westinghouse Signals Limited, UK Assessment of mass transit turn-back capacity using dynamic simulation models DC Gill Projects Delivery Department, Westinghouse Signals Limited, UK Abstract The line capacity of a mass transit railway

More information

Determining the Causes of Train Delay

Determining the Causes of Train Delay Determining the Causes of Train Delay Mark Dingler *, Amanda Koenig, Sam Sogin and Christopher P.L. Barkan Railroad Engineering Program, Department of Civil and Environmental Engineering, University of

More information

TRENOExport. The Simulationbooster

TRENOExport. The Simulationbooster TRENOExport The Simulationbooster TRENOEXPORT Microscopic simulation is the most accurate method for reproducing railway operations. It supports engineers in a series of tasks, from long-range to short-term

More information

TSC-MT Spatial, Temporal and Size Distribution of Freight Train Time Delay in Sweden. Farzad FakhraeiRoudsari

TSC-MT Spatial, Temporal and Size Distribution of Freight Train Time Delay in Sweden. Farzad FakhraeiRoudsari TSC-MT 11-027 Spatial, Temporal and Size Distribution of Freight Train Time Delay in Sweden Farzad FakhraeiRoudsari Master's thesis at: School of Architecture and the Built Environment Division of Traffic

More information

Supporting tools for automated timetable planning

Supporting tools for automated timetable planning Computers in Railways XIV 565 Supporting tools for automated timetable planning N. Bešinović, E. Quaglietta & R. M. P. Goverde Department of Transport and Planning, Delft University of Technology, The

More information

Capacity estimation of new single track stations. Solomon Kinfe

Capacity estimation of new single track stations. Solomon Kinfe Capacity estimation of new single track stations Solomon Kinfe Master of Science Thesis Stockholm, Sweden 2012 TCS-MT 12-036 Capacity estimation of new single track stations Solomon Kinfe Master thesis

More information

Optimizing railway timetables with OpenTimeTable

Optimizing railway timetables with OpenTimeTable Optimizing railway timetables with OpenTimeTable A. Nash & M. Ullius Swiss Federal Institute of Technology, Institute for Transportation Planning and Systems, Switzerland Abstract OpenTimeTable is a computer

More information

UIC CODE 406. Capacity. 2nd edition, June 2013 Original. Capacité Kapazität

UIC CODE 406. Capacity. 2nd edition, June 2013 Original. Capacité Kapazität UIC CODE 406 2nd edition, June 2013 Original Capacity Capacité Kapazität Leaflet to be classified in volumes: IV - Operating pplication : With effect from 01.06.2013 ll members of the International Union

More information

Data processing. In this project, researchers Henry Liu of the Department of Civil Engineering and

Data processing. In this project, researchers Henry Liu of the Department of Civil Engineering and Data mining of transit vehicle location, passenger count, and fare collection databases for intelligent transportation applications Supporting efficient transit service by maximizing the use of available

More information

A SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS

A SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS A SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS Mark B. Duinkerken, Joseph J.M. Evers and Jaap A. Ottjes Faculty of OCP, department of Mechanical

More information

The European project COMBINE 2 to improve knowledge on future rail Traffic Management Systems

The European project COMBINE 2 to improve knowledge on future rail Traffic Management Systems The European project COMBINE 2 to improve knowledge on future rail Traffic Management Systems M. Giannettoni & S. Savio Dipartimento di Ingegneria Elettrica, Università di Genova, Italy Abstract In this

More information

Simulation of Urban Rail Operations: Models and Applications

Simulation of Urban Rail Operations: Models and Applications Simulation of Urban Rail Operations: Models and Applications Haris. Koutsopoulos Department of Civil and Environmental Engineering ortheastern University Boston, MA 025 haris@coe.neu.edu and Zhigao Wang

More information

Outlining the timetable of a railway system according to its capacity computation

Outlining the timetable of a railway system according to its capacity computation Outlining the timetable of a railway system according to its capacity computation L. Florio, L. Mussone2 DIIA R, Polytechnic of Milan, Italy. 2 DITIC, Polytechnic of Turin, Italy. Abstract The paper concerns

More information

Comparing the performance of ERTMS level 2 fixed block and ERTMS level 3 moving block signalling systems using simulation techniques

Comparing the performance of ERTMS level 2 fixed block and ERTMS level 3 moving block signalling systems using simulation techniques Comparing the performance of ERTMS level fixed block and ERTMS level 3 moving block signalling systems using simulation techniques J.A. Koning Railin@abeheer, BB Programme, The Netherlands. Abstract The

More information

ViziRail Description

ViziRail Description ViziRail Description Table of Contents ViziRail Train Scheduling Software... 3 Timetabling and Trains... 4 Train Graphing... 9 Possessions... 14 Speed Restrictions... 16 Train Notices... 17 Train Control

More information

EXPLORING THE POSSIBILITIES OF CONJOINT MEASUREMENT AS A DECISION-MAKING TOOL FOR VIRTUAL WAYFINDING ENVIRONMENTS

EXPLORING THE POSSIBILITIES OF CONJOINT MEASUREMENT AS A DECISION-MAKING TOOL FOR VIRTUAL WAYFINDING ENVIRONMENTS EXPLORING THE POSSIBILITIES OF CONJOINT MEASUREMENT AS A DECISION-MAKING TOOL FOR VIRTUAL WAYFINDING ENVIRONMENTS Eindhoven University of Technology, Faculty of Architecture, Building and Planning P.O.

More information

Dynamic delay management at railways: a Semi-Markovian Decision approach Al Ibrahim, A.

Dynamic delay management at railways: a Semi-Markovian Decision approach Al Ibrahim, A. UvA-DARE (Digital Academic Repository) Dynamic delay management at railways: a Semi-Markovian Decision approach Al Ibrahim, A. Link to publication Citation for published version (APA): Al Ibrahim, A. (2010).

More information

Evaluation of an Integrated Real-Time Rescheduling and Train Control System for Heavily Used Areas

Evaluation of an Integrated Real-Time Rescheduling and Train Control System for Heavily Used Areas Evaluation of an Integrated Real-Time Rescheduling and Train Control System for Heavily Used Areas Marco Lüthi Swiss Federal Institute of Technology, Institute for Transportation Planning and Systems Wolfgang-Pauli-Str.

More information

DEVELOPMENT AND IMPLEMENTATION OF NEW FEATURES IN A ROUTE SELECTION AND DISTANCE MEASUREMENT SYSTEM

DEVELOPMENT AND IMPLEMENTATION OF NEW FEATURES IN A ROUTE SELECTION AND DISTANCE MEASUREMENT SYSTEM DEVELOPMENT AND IMPLEMENTATION OF NEW FEATURES IN A ROUTE SELECTION AND DISTANCE MEASUREMENT SYSTEM G. Svenson Skogforsk, Forestry Research Institute of Sweden MSc in Forestry at SLU (Swedish University

More information

Application of computer simulation to rail capacity planning. W.M. Barter Comreco Rail Ltd., York, England - www:comreco-rail.co.

Application of computer simulation to rail capacity planning. W.M. Barter Comreco Rail Ltd., York, England - www:comreco-rail.co. Application of computer simulation to rail capacity planning W.M. Barter Comreco Rail Ltd., York, England - www:comreco-rail.co.uk Abstract Developing arrangements for "open access" to rail networks, together

More information

A parametric model of the train delay distribution to improve planning of heavy haul cycle times

A parametric model of the train delay distribution to improve planning of heavy haul cycle times A parametric model of the train delay distribution to improve planning of heavy haul cycle times M.C. Shih, C.T. Dick & C.P.L. Barkan University of Illinois at Urbana-Champaign, Urbana, Illinois, USA Page

More information

Availability target of the railway infrastructure: an analysis

Availability target of the railway infrastructure: an analysis Availability target of the railway infrastructure: an analysis Ambika P. Patra, MTech, Luleå University of Technology Uday Kumar, PhD, Luleå University of Technology Per-Olof Larsson Kråik, PhD, Swedish

More information

ONTIME, for creating and managing timetables

ONTIME, for creating and managing timetables , for creating and managing timetables Creation and Management of Timetables Passenger satisfaction is at the heart of any transport operation. And we know that passengers value, amongst other things,

More information

Implementation of the Timetable Planning System STRAX/TPS in Denmark

Implementation of the Timetable Planning System STRAX/TPS in Denmark Implementation of the Timetable Planning System STRAX/TPS in Denmark A. H. Kaas 1 & R. Goossmann 2 1 Atkins Transportation Scandinavia, Denmark 2 HaCon, Germany Abstract The TPS Timetable Planning System,

More information

A macroscopic railway timetable rescheduling approach for handling large scale disruptions

A macroscopic railway timetable rescheduling approach for handling large scale disruptions A macroscopic railway timetable rescheduling approach for handling large scale disruptions Lucas P. Veelenturf 1, Martin P. Kidd 2, Valentina Cacchiani 2, Leo G. Kroon 1,3, Paolo Toth 2 1 Rotterdam School

More information

Classification of Probability Densities on the Basis of Pearson Curves with Application to Small Hydro Potential Analysis

Classification of Probability Densities on the Basis of Pearson Curves with Application to Small Hydro Potential Analysis International Journal of Applied Engineering Research ISSN 097-456 Volume 1, Number 4 (017) pp. 14589-14595 Classification of Probability Densities on the Basis of Pearson Curves with Application to Small

More information

CS626 Data Analysis and Simulation

CS626 Data Analysis and Simulation CS626 Data Analysis and Simulation Instructor: Peter Kemper R 14A, phone 221-3462, email:kemper@cs.wm.edu Office hours: Monday, Wednesday 2-4 pm Today: Stochastic Input Modeling based on WSC 21 Tutorial

More information

Tactical Planning using Heuristics

Tactical Planning using Heuristics Tactical Planning using Heuristics Roman van der Krogt a Leon Aronson a Nico Roos b Cees Witteveen a Jonne Zutt a a Delft University of Technology, Faculty of Information Technology and Systems, P.O. Box

More information

CONTROLLING OPERATIONS OF PUBLIC TRANSPORT TO IMPROVE RELIABILITY: THEORY AND PRACTICE

CONTROLLING OPERATIONS OF PUBLIC TRANSPORT TO IMPROVE RELIABILITY: THEORY AND PRACTICE CONTROLLING OPERATIONS OF PUBLIC TRANSPORT TO IMPROVE RELIABILITY: THEORY AND PRACTICE Prepared for the 88 th Annual Meeting of the Transportation Research Board 2009 Niels van Oort HTM Urban Transport

More information

Risk Assessment for the Acceptance of Construction Materials

Risk Assessment for the Acceptance of Construction Materials International Journal Of Engineering Research And Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 13, Issue 12 (December 2017), PP.54-58 Dimitrios G. Goulias 1,Sahand Karimi 2 1

More information

A passenger-centric approach to enhance railway services

A passenger-centric approach to enhance railway services A passenger-centric approach to enhance railway services Yousef Maknoon Michel Bierlaire August 5, 216 Report TRANSP-OR 1685 Transport and Mobility Laboratory School of Architecture, Civil and Environmental

More information

CROSS-DOCKING: SCHEDULING OF INCOMING AND OUTGOING SEMI TRAILERS

CROSS-DOCKING: SCHEDULING OF INCOMING AND OUTGOING SEMI TRAILERS CROSS-DOCKING: SCHEDULING OF INCOMING AND OUTGOING SEMI TRAILERS 1 th International Conference on Production Research P.Baptiste, M.Y.Maknoon Département de mathématiques et génie industriel, Ecole polytechnique

More information

A multi-train movement simulator with moving

A multi-train movement simulator with moving A multi-train movement simulator with moving block signalling Mark T.K. Ho Department of Electrical Engineering Hong Kong Polytechnic University Hung Horn, Kowloon, Hong Kong Email: eetkho@polyu.edu. hk

More information

INVESTIGATION ON THE CAPACITY CONSUMPTION AT DUTCH RAILWAYS FOR VARIOUS SIGNALLING TECHNOLOGIES AND TRAFFIC CONDITIONS

INVESTIGATION ON THE CAPACITY CONSUMPTION AT DUTCH RAILWAYS FOR VARIOUS SIGNALLING TECHNOLOGIES AND TRAFFIC CONDITIONS INVESTIGATION ON THE CAPACITY CONSUMPTION AT DUTCH RAILWAYS FOR VARIOUS SIGNALLING TECHNOLOGIES AND TRAFFIC CONDITIONS Rob M.P. Goverde a, Francesco Corman bc, Andrea D Ariano d* a Department of Transport

More information

Fitting the Statistical Distribution for Daily Rainfall in Ibadan, Based On Chi-Square and Kolmogorov-Smirnov Goodness-Of-Fit Tests.

Fitting the Statistical Distribution for Daily Rainfall in Ibadan, Based On Chi-Square and Kolmogorov-Smirnov Goodness-Of-Fit Tests. Fitting the Statistical Distribution for Daily Rainfall in Ibadan, Based On Chi-Square and Kolmogorov-Smirnov Goodness-Of-Fit Tests. *Oseni, B. Azeez And **Femi J. Ayoola. *Department of Mathematics and

More information

Munenori SHIBATA Transport Planning and Marketing Laboratory, Signalling and Transport Information Technology Division

Munenori SHIBATA Transport Planning and Marketing Laboratory, Signalling and Transport Information Technology Division PAPER A Study on Passengers Train Choice Model in Urban Railways Noriko FUKASAWA Munenori SHIBATA Transport Planning and Marketing Laboratory, Signalling and Transport Information Technology Division This

More information

Reliability and heterogeneity of railway services

Reliability and heterogeneity of railway services European Journal of Operational Research 172 (2006) 647 665 O.R. Applications Reliability and heterogeneity of railway services Michiel J.C.M. Vromans a, Rommert Dekker b, Leo G. Kroon c,d, * a ProRail,

More information

International Journal of. Railway Research. Train Scheduling Problem - Phase I: A General Simulation Modeling Framework

International Journal of. Railway Research. Train Scheduling Problem - Phase I: A General Simulation Modeling Framework International Journal of Railway Research, (2014), Vol.1, No2, pp 23-30 ISSN: 236153768187 International Journal of Railway Research Train Scheduling Problem - Phase I: A General Simulation Modeling Framework

More information

A simple model for low flow forecasting in Mediterranean streams

A simple model for low flow forecasting in Mediterranean streams European Water 57: 337-343, 2017. 2017 E.W. Publications A simple model for low flow forecasting in Mediterranean streams K. Risva 1, D. Nikolopoulos 2, A. Efstratiadis 2 and I. Nalbantis 1* 1 School of

More information

A new tool for railway planning and line management

A new tool for railway planning and line management Computers in Railways XI 263 A new tool for railway planning and line management J. Garzón Núñez 1, J. de D. Sanz Bobi 2, J. Gómez Ramírez 2 & J. Cano Nogueras 1 1 CITEF Research Centre on Railway Technologies,

More information

Planning tomorrow s railway - role of technology in infrastructure and timetable options evaluation

Planning tomorrow s railway - role of technology in infrastructure and timetable options evaluation Planning tomorrow s railway - role of technology in infrastructure and timetable options evaluation D. Wood, S. Robertson Capacity Management Systems, AEA Technology Rail, UK Abstract Whether upgrading

More information

Secondary Queuing Models for Railway Reservation System with Truncation of the Range of Probability of Surrendering Reserved Tickets.

Secondary Queuing Models for Railway Reservation System with Truncation of the Range of Probability of Surrendering Reserved Tickets. Secondary Queuing Models for Railway Reservation System with Truncation of the Range of Probability of Surrendering Reserved Tickets. S. P. Kane * & S. V. Shinkar ** * Vice-Chancellor, Rashtrasant Tukadoji

More information

A CUSTOMER-PREFERENCE UNCERTAINTY MODEL FOR DECISION-ANALYTIC CONCEPT SELECTION

A CUSTOMER-PREFERENCE UNCERTAINTY MODEL FOR DECISION-ANALYTIC CONCEPT SELECTION Proceedings of the 4th Annual ISC Research Symposium ISCRS 2 April 2, 2, Rolla, Missouri A CUSTOMER-PREFERENCE UNCERTAINTY MODEL FOR DECISION-ANALYTIC CONCEPT SELECTION ABSTRACT Analysis of customer preferences

More information

Passenger simulation modelling in station planning and design P. Clifford Halcrow Fox, 44 Brook Green, Hammersmith, London W6 7BY, UK

Passenger simulation modelling in station planning and design P. Clifford Halcrow Fox, 44 Brook Green, Hammersmith, London W6 7BY, UK Passenger simulation modelling in station planning and design P. Clifford Halcrow Fox, 44 Brook Green, Hammersmith, London W6 7BY, UK Abstract This paper summarises how a station passenger simulation model

More information

MULTIMODAL NETWORK DESIGN AND ASSESSMENT

MULTIMODAL NETWORK DESIGN AND ASSESSMENT 11 th TRAIL Congress November 2010 MULTIMODAL NETWORK DESIGN AND ASSESSMENT Proposal for a dynamic multi-objective approach Ties Brands MSc 1, Gijs van Eck MSc 2 1 Faculty of Engineering Technology, Centre

More information

2016 INFORMS RAS Problem Solving Competition

2016 INFORMS RAS Problem Solving Competition 2016 INFORMS RAS Problem Solving Competition Routing Trains through a Railway Network: Joint optimization on train timetabling and maintenance task scheduling RAS Problem Solving Competition Committee

More information

FITTING THE STATISTICAL DISTRIBUTION FOR DAILY RAINFALL IN IBADAN, BASED ON CHI-SQUARE AND KOLMOGOROV- SMIRNOV GOODNESS-OF-FIT TESTS.

FITTING THE STATISTICAL DISTRIBUTION FOR DAILY RAINFALL IN IBADAN, BASED ON CHI-SQUARE AND KOLMOGOROV- SMIRNOV GOODNESS-OF-FIT TESTS. Abstract FITTING THE STATISTICAL DISTRIBUTION FOR DAILY RAINFALL IN IBADAN, BASED ON CHI-SQUARE AND KOLMOGOROV- SMIRNOV GOODNESS-OF-FIT TESTS. OSENI, B. Azeez 1 and Femi J. AYOOLA. 2* 1. Department of

More information

Gang Scheduling Performance on a Cluster of Non-Dedicated Workstations

Gang Scheduling Performance on a Cluster of Non-Dedicated Workstations Gang Scheduling Performance on a Cluster of Non-Dedicated Workstations Helen D. Karatza Department of Informatics Aristotle University of Thessaloniki 54006 Thessaloniki, Greece karatza@csd.auth.gr Abstract

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Half Pilot Keys and Pilot Key Working Rule Number: 5003 Version 1.0, 31 March 2016 Half Pilot Keys and Pilot Key Working Rule Number: 5003 Document Control Identification

More information

New Customer Acquisition Strategy

New Customer Acquisition Strategy Page 1 New Customer Acquisition Strategy Based on Customer Profiling Segmentation and Scoring Model Page 2 Introduction A customer profile is a snapshot of who your customers are, how to reach them, and

More information

USDOT Region V Regional University Transportation Center Final Report

USDOT Region V Regional University Transportation Center Final Report MN WI MI IL IN OH USDOT Region V Regional University Transportation Center Final Report NEXTRANS Project No 071IY03. Computing Moving and Intermittent Queue Propagation in Highway Work Zones By Hani Ramezani

More information

Unidirectional Simulation Objectives

Unidirectional Simulation Objectives Performance Evaluation of Two Conceptual Designs for Rail Service to Transbay Terminal Bi-Directional Unidirectional Bi-Directional R. Shiloh AREMA CONFERENCE Tuesday, September 12, Unidirectional Simulation

More information

Distinguish between different types of numerical data and different data collection processes.

Distinguish between different types of numerical data and different data collection processes. Level: Diploma in Business Learning Outcomes 1.1 1.3 Distinguish between different types of numerical data and different data collection processes. Introduce the course by defining statistics and explaining

More information

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design ABSTRACT Several analysis methods have been proposed to analyze the vehicular capacity of roundabouts.

More information

Improved Methods for Superelevation Distribution: I. Single Curve

Improved Methods for Superelevation Distribution: I. Single Curve Improved Methods for Superelevation Distribution: I. Single Curve Udai Hassein 1, Said Easa 2, Kaarman Raahemifar 3 1 Ph.D Candidate, 2 Professor, Dept. of Civil Engineering, Ryerson University, Toronto,

More information

USING SIMULATION MODELING TO ASSESS RAIL TRACK INFRASTRUCTURE IN DENSELY TRAFFICKED METROPOLITAN AREAS

USING SIMULATION MODELING TO ASSESS RAIL TRACK INFRASTRUCTURE IN DENSELY TRAFFICKED METROPOLITAN AREAS Proceedings of the 22 Winter Simulation Conference E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds USING SIMULATION MODELING TO ASSESS RAIL TRACK INFRASTRUCTURE IN DENSELY TRAFFICKED METROPOLITAN

More information

New control strategies and user interfaces for train traffic control

New control strategies and user interfaces for train traffic control New control strategies and user interfaces for train traffic control Bengt Sandblad 1 (Bengt.Sandblad@hci.uu.se) Arne W Andersson 1 (Arne.Andersson@hci.uu.se) Jan Byström 2 (Jan.Bystrom@Banverket.se) Arvid

More information

Traffic management in moving block railway systems: the results of the EU project COMBINE

Traffic management in moving block railway systems: the results of the EU project COMBINE Traffic management in moving block railway systems: the results of the EU project COMBINE M. Giannettoni & S. Savio Dipartimento di Ingegneria Elettrica - Universita di Genova (Italy) Abstract In this

More information

COMP9334 Capacity Planning for Computer Systems and Networks

COMP9334 Capacity Planning for Computer Systems and Networks COMP9334 Capacity Planning for Computer Systems and Networks Week 7: Discrete event simulation (1) COMP9334 1 Week 3: Queues with Poisson arrivals Single-server M/M/1 Arrivals Departures Exponential inter-arrivals

More information

Simulations of railway junction operation

Simulations of railway junction operation ID Number: 005 Simulations of railway junction operation Antonín Kavicka, Valent Klima Faculty of Management Science and Informatics University of Zilina, Slovak Republic kavicka@frdsa.fri.utc.sk, klima@frdsa.fri.utc.sk

More information

Examining and Modeling Customer Service Centers with Impatient Customers

Examining and Modeling Customer Service Centers with Impatient Customers Examining and Modeling Customer Service Centers with Impatient Customers Jonathan Lee A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF BACHELOR OF APPLIED SCIENCE DEPARTMENT

More information

Department of Economics, University of Michigan, Ann Arbor, MI

Department of Economics, University of Michigan, Ann Arbor, MI Comment Lutz Kilian Department of Economics, University of Michigan, Ann Arbor, MI 489-22 Frank Diebold s personal reflections about the history of the DM test remind us that this test was originally designed

More information

Business Analytics & Data Mining Modeling Using R Dr. Gaurav Dixit Department of Management Studies Indian Institute of Technology, Roorkee

Business Analytics & Data Mining Modeling Using R Dr. Gaurav Dixit Department of Management Studies Indian Institute of Technology, Roorkee Business Analytics & Data Mining Modeling Using R Dr. Gaurav Dixit Department of Management Studies Indian Institute of Technology, Roorkee Lecture - 02 Data Mining Process Welcome to the lecture 2 of

More information

p. 21 Positive train control initiatives in North America: technological and institutional issues

p. 21 Positive train control initiatives in North America: technological and institutional issues Advanced Train Control Systems Satellite based train control p. 3 Moving block and traffic management in railway applications: the EU project COMBINE p. 11 Positive train control initiatives in North America:

More information

MODELING EFFECTS OF TRAVEL-TIME RELIABILITY ON MODE CHOICE USING PROSPECT THEORY

MODELING EFFECTS OF TRAVEL-TIME RELIABILITY ON MODE CHOICE USING PROSPECT THEORY Ghader et al. 1 MODELING EFFECTS OF TRAVEL-TIME RELIABILITY ON MODE CHOICE USING PROSPECT THEORY Sepehr Ghader, Graduate Research Assistant (Corresponding Author) Department of Civil and Environmental

More information

Traffic Impact Study Requirements

Traffic Impact Study Requirements [TYPE THE COMPANY NAME] Traffic Impact Study Requirements County of San Mateo Department of Public Works Roadway Services 9/1/2013 I. Introduction The County of San Mateo (County), Department of Public

More information

A Modeling Tool to Minimize the Expected Waiting Time of Call Center s Customers with Optimized Utilization of Resources

A Modeling Tool to Minimize the Expected Waiting Time of Call Center s Customers with Optimized Utilization of Resources A Modeling Tool to Minimize the Expected Waiting Time of Call Center s Customers with Optimized Utilization of Resources Mohsin Iftikhar Computer Science Department College of Computer and Information

More information

Train simulation on British Rail M. McGuire & D. Linder British Rail Research, PO Box 2, London Road, Derby, UK

Train simulation on British Rail M. McGuire & D. Linder British Rail Research, PO Box 2, London Road, Derby, UK Train simulation on British Rail M. McGuire & D. Linder British Rail Research, PO Box 2, London Road, Derby, UK Abstract A successful railway operation depends on providing a reliable service at a competitive

More information