1 domaine Recherche & SESAR: a European initiative for an enhanced ATM system General overview and spotlight on the SESAR operational concept Patrick DUJARDIN R&D Manager DSNA/DTI Toulouse - France Tokyo,
2 2/47 1. SESAR overview 2. D3: The operational concept 3. SESAR ATM system evolution
3 3/47 SESAR overview D3: The operational concept SESAR ATM system evolution
4 4/47 Single European Sky (SES): : Background The European Commission, Vice President Ms de Palacio, launched the initiative in Main principles: Reduce fragmentation between: the airspace of Member States. Civil and Military providers and users. Systems. Introduce new technology create synergy EU Eurocontrol
5 5/47 SESAR : objectives & timeline A European Plan to unlock Viable Growth in Air Transport Converging Industry, EC EC & EUROCONTROL Needs: Needs: Turn Turn off offfragmented approach Accelerate ATM ATM evolution in in response to to challenges Synchronise & integrate plans plans from from research to to operations Synchronise airborne and and ground ground deployments Current work Definition Development SESAR Phases Deployment Implementation Development work Planning work
6 6/47 SESAR Consortium More than 50 partners and associates
7 The definition phase Reference to derive technical requirements for architecture & enabling systems Change steps with performance gains from agreed baselines (now, 2013, 2020) 7/47 We are here! Actions of all stakeholdegrs to achieve the performance benefits Air Air Transport Framework: The The Current Situation COMPLETED D1 T0: 6 March 2006 ATM ATM Performance Targets COMPLETED D2 ATM ATM Target Concept COMPLETED D3 ATM ATM Deployment Sequence COMPLETED D4 ATM ATM Master Plan Plan D5 Work Work Programme for for July 06 Dec 06 June 07 Nov 07 Feb 08 March 08 D6 ATM ATM MASTER MASTER PLAN PLAN Shorter Shorter term: term: Implementation Implementation actions actions Longer Longer term: term: R&D R&D actions actions
8 8/47 M1 Deliverable 1: Evaluation / Understanding of the Market Capture of current situation Characterise & Understand Today s Situation plus Future Expectations D1 Strengths, weaknesses, deficiencies Define and prioritise expectations for future Identify most promising enablers Provides some overall recommendations upon which the following stages of the SESAR Definition Phase shall be based 06 Jul 06 D1: A shared view of current situation and the way ahead
9 9/47 Deliverable 2: Market Requirements M1 M2 Define Performance Requirements & Best Practice Outline vision of future air transport industry & role of ATM Setting balanced performance requirements for future ATM System Selection of Best Practices & principles upon which to build D2 06 Dec 06 D2: An agreed set of challenging requirements for future business needs
10 10/47 M1 M2 Deliverable 3: Top Product Definition M3 Develop Future ATM Target Concept D3 Concept of operations Architecture for future ATM System Set of enabling technologies identified Outline of total cost & preliminary assurance that target is viable 06 Jun 07 D3: The selection of a viable concept
11 11/47 M1 M2 M3 M4 Deliverable 4: How to match the Top Product Definition Confirmation of viability (technical, financial, institutional, etc.) Deployment Sequence - Develop Options & Select Best D4 05 Oct 07 Development of options for deployment sequence & recommended best approach Definition of deployment packages (transition from legacy systems/framework) D4: Selection of best deployment scenario
12 12/47 M1 M2 M3 M4 M5 Build the ATM Master Plan D5 Deliverable 5: Action Plan Detailed plan of actions which all relevant organisations need to undertake to implement changes Inputs to future business plans, R&T/D plans, risk assessment régimes, development of future management processes 04 Jan 08 D5: An agreed, achievable and ambitious ATM Master Plan
13 13/47 M1 Deliverable 6: Go! M2 M3 M4 M5 M6 Define Organisation & Programme of Work for Proposed management structure for SESAR implementation (development & deployment) phase Proposed structured lifecycle & methods to support implementation D6 06 Mar 08 Detailed programme of work for first 5 years of implementation phase D6: An agreed basis for the Implementation phase
14 14/47 The final Objective One approved ATM Master Plan Commonly developed Achievable and ambitious Basis for subsequent commitment, financing and implementation.towards a true European federative and strategic project
15 15/47 SESAR overview D3: The operational concept SESAR ATM system evolution
16 16/47 The Principles of the Concept of Operations Based on the ATM Performance Partnership (ATMPP) that will ensure smooth operation of all actors (Airspace Users, ANSPs and Airports), Trajectory Management is being enabled by 1 - System Wide Information Sharing (SWIM) and 2 - Collaborative Decision Making (CDM) Five key enablers altogether are identified, each of them a subject of major improvement: -Information Sharing -Collaborative Decision Making -Network Management -Airport as integrated partners -Airspace Capacity TM Trajectory Management S W I M CDM CDM TM Trajectory Management The Human is the central connecting element at all levels
17 17/47 Overview of Main Aspects Trajectory Management Considering Airspace as a Single Continuum More precision in de-confliction at planning stage Mixed Modes of Operation as basis for conflict management Separation ranging from ATC as done today progressing to airborne self-separation Aircraft with different capabilities enabled by use of : Collaborative Decision Making (CDM) System-wide Information Management
18 18/47 Main Features - Trajectory Based Operations Trajectory based concept of operations Entails the systematic sharing of aircraft trajectory data between various participants in the ATM process Ensures that all participants have a common view of a flight and access to the most accurate data available to perform their tasks Main Characteristics Business/Mission Trajectory expresses the specific needs of Airspace Users Safe-guarding integrity Minimising changes Trajectory ownership When & how the trajectory is executed 4D trajectories Described & executed with required precision in 4 dimensions
19 19/47 Main Features - From Airspace to Trajectory Orientation Managed airspace Information on all traffic is shared Pre-determined separator is Service provider (this role may be delegated) Unmanaged airspace Traffic may not share information Pre-determined separator is Airspace User Airspace treated as a Single Continuum TM requires dynamic adjustment of airspace to minimise impact on trajectories Co-ordination procedures based on shared trajectory data Military co-ordination & information sharing incorporated
20 20/47 Main Features - Flexibility Operation philosophy Users have freedom to change BTs up to shortly before departure and in exceptional circumstances during execution Service providers facilitate changes resulting in minimum delays / distortions Acknowledged that, at times, need to constraint individual trajectories for safety / network capacity reasons Achieved by Planning decisions as late as possible, plans constantly updated Reference BT agreed before departure user agrees to fly, service providers agree to enable Flexibility by providing capacity headroom & techniques to (re-)deploy resources based on real-time demand information
21 21/47 Main Features - User Preferred Routing Environment Managed airspace user preferred routing without need to adhere to fixed routes The execution of the Reference BT is subject to appropriate clearances Take into account the airspace volumes established for the operation of diverse (mainly military) aerial activities Trade-off between flight efficiency & capacity may require a fixed route structure Will be suspended when traffic density is no longer requires their use Major HUBS Below a (tbd) level operated as an extended terminal area, with route structures eventually extending also into en-route airspace
22 22/47 Main Features - Collaborative Planning To achieve agreed, stable demand and capacity situation Mediated by network management & based on Collaborative Decision Making (CDM) Assisted by use of Network Operations Plan (NOP) Facilitates process to reach agreement Set of collaborative applications to access : air traffic demand airspace / airport capacity constraints scenarios
23 23/47 Network Operations Plan
24 24/47 Main Features - Airspace Capacity The ConOps will increase capacity by reducing tactical interventions Achieved in highly congested airspace with descending / climbing traffic flows by Deploying route structures supporting strategic de-confliction Procedures that capitalize on greater accuracy of aircraft navigation Further reduction of controller task-load by Reducing uncertainty / increasing the clearance duration by new separation modes supported by controller tools, utilizing shared precise trajectory data Air / ground data link communications Delegation of some spacing, separation and flow optimization tasks to pilot
25 25/47 Main Features - New Separation Modes Separation modes that take advantage of trajectory sharing & advanced longitudinal / vertical navigation capabilities : Conventional modes New ANSP Modes: purely applied by ATC Precision Trajectory Clearances Trajectory Control by Ground Based Speed Adjustment New Airborne Modes : in which the pilot is the separator either by delegation or as the standard case Co-operative separation (ASAS-Separation) Self-separation (ASAS-Self Separation) Co-operative 3D Routes
26 26/47 Main Features - Airports Fully Integrated into ATM System Improved Airport operations by: More efficient and environment friendly Approach and Descent Profiles Increasing throughput & safety on the runway Eliminating Holding & Ground Queues The airport turnaround phase is completely integrated in the trajectory management Improved surface movement management and reduced runway occupancy time, e.g. Wake Vortex detection, brake to vacate and time-based spacing Improved management of busy hubs and increasing numbers of clustered airports All-weather / low visibility conditions are supported by new aircraft/airport surveillance and navigation technologies to improve landing and taxiway operations to ensure close to normal capacity Bulk of required capacity provided by secondary airports
27 27/47 Main Features - Collaborative Decision Making Sharing of information as well as acting on shared information Decisions driven by common situational awareness and improved understanding on network effects Not affecting Controller or Pilot tactical decisions Empowers new and innovative solutions (such as use of User Driven Prioritisation Process (UDPP))
28 28/47 Collaborative Planning Decision Phase Making Execution Phase BTD SBT SBT RBT PT/ RBT Airspace and Airport Organisation Management Layered Planning and Queue Management Conflict Management ATM Components ATM Service Delivery Management Collaborative Decision Making (CDM) Network Operation Plan Development
29 29/47 Speaking with one Language = a Powerful Information Management Network A new System-wide Information Management (SWIM) Network using trajectories as the principal language shared by all actors of the air transport industry is the necessary underlying infrastructure: To enable CDM To enable Trajectory Management To support planning, analysis and shifting from tactical control to anticipated and pre-deconfliction management To support the automation tools on air and ground To support more efficient conflict management with less tactical intervention
30 30/47 Main Features - Minimising Segregation Aim to minimize / avoid segregation of traffic No segregation on basis of CNS capability or type of separation service provided Inherent prioritisation towards more capable aircraft will occur Special provisions for military operations A degree of segregation inevitable (e.g., for new Military aircraft types / particular Military activities), but impact minimized through : more accurate planning time management and level segmentation of the segregation procedures that can flexibly manage real-time changes to volumes and times and promptly return any unused segregated airspace to general use
31 31/47 Main Features - Access and Equity Need for managed airspace will inevitably increase The trade off here is between the needs of general aviation and commercial and military aviation Better reflecting performance of modern aircraft allow the base to be raised in many areas giving greater freedom to those who do not require a separation service
32 32/47 Main Features - Enhanced Integration of Diverse Airspace Use Airspace design and management remains a State prerogative Need for some flights & activities to be managed within defined airspace blocks remains. Physical & temporal dimensions will be minimised (may be dynamic and/or moving) Location will aim to satisfy the military requirements Better cooperation by Integrating appropriate Military and State partners in the information sharing environment (with proper protection of sensitive information) Optimising the Military and State activity processes
33 33/47 The Human in SESAR is the ultimate Decision-maker Airspace User Operation Pilot ATC Civ/Mil Landside Operations Airports More effective integration of knowledge and expertise
34 34/47 SESAR overview D3: The operational concept SESAR ATM system evolution
35 35/47 Lines of Change ATM operational concept can be divided into clearly defined lines that will evolve step by step in order to reach the target performance objectives: L01 - Information management L02 - Moving from airspace to trajectory based operations L03 - Collaborative planning using the Network Operations Planner L04 - Managing the Network L05 - Managing Business Trajectories in real time L06 - Cooperating ground and airborne decision making tools L07 - Queue management tools L08 - New separation modes L09 - Effective ground and airborne safety nets L10 - Airport throughput, Safety and Environment
36 36/47 Lines of Change these lines are built from operational improvement elements made by the various SESAR actors. They are planned along the global SESAR roadmap. The service performance level increases step by step. Line of Change Operational improvement OI OI ATM Target Concept IP 1 IP 2 IP 3
37 37/47 Implementation Packages 3 time based IP : IP1 IP2 IP3 Gathering every Line of Change Provide homogeneous service improvement in the various contexts (En-Route, Terminal Area Operations, Airports) in Europe
38 LoC vs operation context 38/47 Information Management Network En Route Terminal Area Airports Information management Moving from airspace to trajectory based operations Airport throughput, Safety and Environment a b c d e
39 39/47 Service Enhancement Transition Steps (SETS) IP1 IP2 IP3 IM-1 IM-2 IM-3 NET-1 NET-2 NET-3 ENR-1 ENR-2 ENR-3 TAO-1 TAO-2 TAO-3 APT-1 APT-2 APT-3
40 40/47 Service Enhancement Transition Steps as LoCs, SETS are built from operational improvements elements. Within SETS, operational improvements elements are grouped according to : The operational concept The level of service (from 1 to 4).
41 41/47 Global view SESAR ConOps Lines of Changes Operational Improvements Implementation Packages Service Enhancement Transition Steps Time Operating Context Time Performance Why? How? What? Enablers Operational Improvements Steps Time Operating Context Performance
42 42/47 Enablers identification SESAR ConOps Lines of Changes Operational Improvements Operational Improvements Steps Implementation Packages Service Enhancement Transition Steps Time Operating Context Performance Time ATM level Operating Context Performance Performance Time Enablers Enablers group Enablers Packages Time Start date Benefit start gate End date (IOC) ATM capability level Stakeholder asset type
43 43/47 Transition Naturally long and gradual Aircraft and system life Change cost training Easier where Traffic level is low System is less complex Various systems and equipments Air-ground synchronization Continuous and revertible transformation
44 ATM systems life cycle 44/47 procedures Equipments, functions System architecture More stable, change is more difficult
45 45/47 Step by Step Introduction 4 Available 2025+: Trajectory Sharing Air-Air; Met data sharing (Air- Air/Air-Ground); Avionics with Longitudinal Navigation Performance Capability (4D Contract) and Airborne Self-Separation ATM Capability Level SESAR 2020 Requirements: Trajectory Sharing meeting ATM requirements; Avionics with Vertical Navigation Performance capability; multiple RTA and Airborne Separation capability Co-operative Separation Aircraft Delivered 2013 onwards: ADS-B/IN and avionics enabling airborne spacing Sequencing and Merging ; Datalink: Link applications Current Aircraft : ADS-B/out (position/aircraft/met data); Avionics with 2D-RNP, vertical constraint management and a single RTA; Datalink: Event reporting/intent Sharing
46 46/47 To conclude: the Master Plan Target Concept Lines of Change Safety Screening Sec. Screening Env. Screening Institutional Enablers Enabler Packages Service Enhancement Transition Steps Benefit Mechanisms R&D Plan Regulatory & Legislative Plan Estimated Costs Economic Impact (incl. CBA) Performance Benefits Finance Model Funding & Incentives Risk Management Plan Performance Requirements
47 47/47 Any question?
THE FUTURE OF AIR TRAFFIC MANAGEMENT SAFE & EFFICIENT. An Update on SESAR. Prof. Dr. Peter Hecker Member of the Scientific Committee
THE FUTURE OF AIR TRAFFIC MANAGEMENT SAFE & EFFICIENT An Update on SESAR Prof. Dr. Peter Hecker Member of the Scientific Committee EIWAC Tokyo - 10 November 2010 SETTING THE SCENE.. 2 EUROPEAN ATM CHALLENGES
More informationSESAR & NextGen Working together for Aviation Interoperability
SESAR & NextGen Working together for Aviation Interoperability Royal Aeronautical Society Annual Conference - London April 14 th 2011 Peter Hotham Chief of Technology & Innovation SESAR Joint Undertaking
More informationSingle European Sky Interoperability Regulation
Single European Sky Interoperability Regulation EUROPEAN COMMISSION SINGLE EUROPEAN SKY WORKSHOP Sophia Antipolis, France 17.-18. December 2008 EU Single Aviation Market based on high common EU standards
More informationTHE ROADMAP FOR DELIVERING HIGH PERFORMING AVIATION FOR EUROPE. European ATM Master Plan
THE ROADMAP FOR DELIVERING HIGH PERFORMING AVIATION FOR EUROPE European ATM Master Plan Executive Summary for ANSPs Edition 2015 EUROPEAN ATM MASTER PLAN EXECUTIVE VIEW EDITION 2015 EUROPEAN ATM MASTER
More informationSESAR development and deployment
SESAR development and deployment Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 13 February 2015 Rolf TUCHHARDT European Commission, DG MOVE SESAR
More informationSESAR Overview. WAKENET3 Europe Workshop. Paul Adamson SJU Programme Manager (WP6/12)
SESAR Overview WAKENET3 Europe Workshop Paul Adamson SJU Programme Manager (WP6/12) EUROPEAN CONTEXT Page 2 TODAY S SITUATION IN EUROPE Traffic growth cannot be sustained through the current fragmented
More informationThe SESAR Joint Undertaking is a EU body created by the EU Council (REG 219/2007)
EUROPEAN COMMISSION The SESAR family The SESAR Joint Undertaking is a EU body created by the EU Council (REG 219/2007) Its founding members are the European Community and the Eurocontrol Organisation Members
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title Airborne Full 4D Trajectory Management Project Number 9.02 Project Manager Marianne MOLLER Deliverable Name Final Project Report Deliverable ID D07
More informationThe future of Air Traffic Management
The future of Air Traffic Management Patrick KY, Executive Director Madrid 1 April 2011 Plenary Session 4 The future is creating the CHANGE in European ATM FACTS & FIGURES FOUNDING MEMBERS TOGETHER = 2.1
More informationEPISODE 3. Episode 3 paves the way for SESAR validation
EPISODE 3 Episode 3 paves the way for SESAR validation 3 Scope The objective of SESAR is to develop a performance oriented ATM system that exploits the advanced capabilities of 21st century technology
More informationMaster Plan edition 2
SESAR s first with Updated developments The Roadmap for Sustainable Air Traffic Management European ATM Master Plan edition 2 Executive Summary - Military October 2012 European Union The Roadmap for Sustainable
More informationICB Industry Consultation Body A high level vision for achieving the Single European Sky
ICB Industry Consultation Body A high level vision for achieving the Single European Sky January 2015 Foreword from the ICB Chairman When I was selected Chairman of the ICB, I set out to transform the
More informationSESAR European ATM Master Plan & SESAR2020
SESAR European ATM Master Plan & SESAR2020 Paul Bosman EUROCONTROL ICNS 2017 GLOBAL MOBILITY CHALLENGES AND OPPORTUNITIES 2010 2020 2030 2040 2 SINGLE EUROPEAN SKY - SES Driven by performance Increased
More informationSESAR and ASAS Opportunity
SESAR and ASAS Opportunity Bob Graham EUROCONTROL Experimental Centre Presentation Overview SESAR Concept Focus Opportunity for ASAS Challenges to overcome SESAR The objectives of SESAR are to eliminate
More informationSubject matter and scope
PCP Active APT AOP05 REG ASP MIL APO USE INT IND NM Subject matter and scope Implement Airport CDM (A-CDM) to enhance the operational efficiency of airports and improve their integration into the Air Traffic
More informationSESAR The European ATM Improvement Programme. Regional ANC 2012 Preparatory Symposium Michael STANDAR Moscow March 2012
SESAR The European ATM Improvement Programme Regional ANC 2012 Preparatory Symposium Michael STANDAR Moscow 20-21 March 2012 SES II: builds on five pillars Performance Safety (EASA) Technology (SESAR)
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT MANDATE TO CEN/CENELEC/ETSI FOR THE DEVELOPMENT OF
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT DIRECTORATE F - Air Transport Air Traffic Management Brussels, 12 July 2006 M/390 EN MANDATE TO CEN/CENELEC/ETSI FOR THE DEVELOPMENT OF
More informationSESAR Exploratory Research. David Bowen Chief ATM, SESAR JU
SESAR Exploratory Research David Bowen Chief ATM, SESAR JU 1 SESAR vision targets 7 improvement areas LOOKING AT THE FLIGHT AS A WHOLE, WITHIN A FLOW AND NETWORK CONTEXT SESAR to enable step change in
More informationTHE SESAR PROGRAMME R&I 2020: FUTURE DEVELOPMENTS
THE SESAR PROGRAMME R&I 2020: FUTURE DEVELOPMENTS THE SESAR PARTNERSHIP Change in Air Traffic Management infrastructure is inevitable 3 Implementing the Single European Sky Performance Safety Technology
More informationEpisode 3 D FTS on 4D trajectory management and complexity reduction - Experimental Plan EPISODE 3
EPISODE 3 Single European Sky Implementation support through Validation Document information Programme Sixth framework programme Priority 1.4 Aeronautics and Space Project title Episode 3 Project N 037106
More informationNEFAB Project Feasibility Study Initiative 6 Harmonisation of Operational Rules and Procedures
NEFAB Project Feasibility Study Initiative 6 Harmonisation of Operational Rules and Procedures Page 1 of 20 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 3 2. DESCRIPTION OF THE INITIATIVE... 5 3. RATIONALE
More informationSESAR. M. STANDAR Chief Strategy & External Affairs. Forsknings-och innovationsdagen inom luftfartsområdet Stockholm, March 23 rd, 2017
SESAR M. STANDAR Chief Strategy & External Affairs Forsknings-och innovationsdagen inom luftfartsområdet Stockholm, March 23 rd, 2017 SESAR Why? Who? How? What it means for Europe? GLOBAL MOBILITY CHALLENGES
More informationEpisode 3 D WP4 Contribution Validation Strategy. Single European Sky Implementation support through Validation. Document information.
EPISODE 3 Single European Sky Implementation support through Validation Document information Programme Sixth framework programme Priority 1.4 Aeronautics and Space Project title Episode 3 Project N 037106
More informationSESAR PJ09 DCB
SESAR 2020 - PJ09 DCB Advanced Demand & Capacity Balancing 6 th 7 th March 2018 (Madrid) Hamid KADOUR PJ09 - Partner Organisations 24 Partner Organisations - EUROCONTROL Experimental Centre - Network Manager
More informationSUPPORTING GLOBAL HARMONISATION AND. Michael Standar, SESAR JU Chief Strategy & External Affairs
SESAR SUPPORTING GLOBAL HARMONISATION AND INTEROPERABILITY Michael Standar, SESAR JU Chief Strategy & External Affairs Mobility challenges and opportunities 2010 2020 2030 2040 The need for harmonisation/interoperability
More informationAirport Collaborative Decision Making Enhancing Airport Efficiency
Airport Collaborative Decision Making Enhancing Airport Efficiency David Gamper Director, Safety & Technical ACI World SWIFT Conference, Banff 18 September 2012 1 Airports are facing challenges Capacity
More informationLiterature Review. HALA!-PhD Management Plan. Deliverable D4. February 2012 HALA! RESEARCH NETWORK
Application of the Theory of Formal Languages to the Modeling of Trajectory Uncertainty and the Analysis of its Impact in Future TBO Literature Review HALA!-PhD Management Plan Deliverable D4 February
More informationSESAR Progress. Specific focus on ATC related WPs (WP4, WP5,WP10) Prepared for ODT by Bernard Brunner 17th September 2009
SESAR Progress Specific focus on ATC related WPs (WP4, WP5,WP10) Prepared for ODT by Bernard Brunner 17th September 2009 European Organisation for the Safety of Air Navigation Agenda General : Project
More informationThe Network Strategy Plan. Brian Flynn
The Network Strategy Plan Brian Flynn Head OMR, Directorate of Network Management 13 th February 2013 The Network Manager and the NSP The Network Manager (Function) has been created by the Single European
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title TMA-2 Co-Operative Planning in the TMA Project Number 05.04.02 Project Manager DFS Deutsche Flugsicherung GmbH Deliverable Name Final Project Report
More informationNextGen ATM Concept of Operations: ASAS-Reliant
NextGen ATM Concept of Operations: ASAS-Reliant See http://www.jpdo.gov for the latest JPDO info Doug Arbuckle, Rose Ashford NextGen Joint Planning & Development Office 18-Sep-2007 Joint 5th ASAS TN2 Workshop
More informationNot all or nothing, not all the same: classifying automation in practice
Not all or nothing, not all the same: classifying automation in practice by Dr Luca Save Different Levels of Automation Since the seminal work of Sheridan & Verplanck 39 it has become apparent that automation
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title Improving Vertical Profiles Project Number 05.06.02 Project Manager DSNA Deliverable Name Final Project Report Deliverable ID D000 Edition 00.01.03
More informationInternational Civil Aviation Organization AIR TRAFFIC MANAGEMENT REQUIREMENTS AND PERFORMANCE PANEL (ATMRPP) TWENTY SIXTH WORKING GROUP MEETING
International Civil Aviation Organization ATMRPP-WG/WHL/4-WP/ ATMRPP-WG/26-WP/632.././06 27/06/14 WORKING PAPER AIR TRAFFIC MANAGEMENT REQUIREMENTS AND PERFORMANCE PANEL (ATMRPP) TWENTY SIXTH WORKING GROUP
More informationWork Package Final Report
Work Package Final Report Document information Work Package Title TMA Operations Work Package Number SWP05.00, SWP 05.04, SWP 05.05, SWP 05.06, SWP 05.07 WP Leader(s) NATS Deliverable Name Work Package
More informationCollaborative Decision Making in Aviation
the way we do it Collaborative Decision Making in Aviation In an uncertain world there is reasonable certainty in stating that air travel will increase in the future. How airlines and airports will work
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 9/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through global collaborative
More informationH2020-SESAR WA 1: Exploratory Research
H2020-SESAR-2016-2 WA 1: Exploratory Research David Bowen and Olivia Nunez 22 nd March 2017 Topics in H2020-SESAR-2016-2 Work Area 1: Exploratory Research Work Area 2: Very Large Scale Demonstrations (VLD)
More informationMeteorology in Collaborative Decision Making at Paris Charles de Gaulle Airport
Meteorology in Collaborative Decision Making at Paris Charles de Gaulle Airport July 23 rd, 2018 WMO COMMISSION FOR AERONAUTICAL METEOROLOGY 16 th SESSION TECHNICAL CONFERENCE Exeter, UK Emmanuel LEFEVRE
More informationEuropean RPAS Roadmap RPAS Activities in SESAR 2020
European RPAS Roadmap RPAS Activities in SESAR 2020 Connecting the dots DEPLOYMENT DEFINITION DEVELOPMENT Why we need to act What needs to be done When it needs to be done THE MASTER PLAN DEFINES THE PRIORITIES
More informationCommission hearing on the preparation for RP3
Commission hearing on the preparation for RP3 14th December 2016 Brussels Discussion document Introduction The performance scheme is at the heart of Single European Sky (SES) policy and is a major driver
More informationCOFLIGHT AS A SERVICE
COFLIGHT AS A SERVICE REMOTE FLIGHT DATA PROCESSING 1 AGENDA 1.Coflight product overview 2. Coflight as a service Concept 3. Coflight as a service programme 4.Benefits from a customer point of view 5.Questions
More informationPreliminary Cost-Benefit Analysis
Preliminary Cost-Benefit Analysis CS#8 PENS Pan-European Network Service Bo Redeborn Principal Director ATM 9 July 2013 CBA Method Preliminary CBA at feasibility stage to assess value of the CS concept
More informationProject Overview: SMALL AIR TRANSPORT ROADMAP
http://sat-rdmp.eu/ Project Overview: In the SAT-Rdmp (Support Action) a Vision and Research Agenda on the development of a Small Aircraft Transportation system (SAT system) have been developed. The major
More informationSESAR Deployment Programme
SESAR Deployment Programme (Edition 2017) FPA MOVE/E2/2014-717/SESAR FPA SGA MOVE/E3/SUB/2016-402/SI2.745134 Deliverable D1.1 31 st May 2017 Control Approved by Massimo Garbini Managing Director Date 19/05/2017
More informationDEPLOYMENT PROGRAMME Mai 2017 LET S DELIVER TOGETHER
DEPLOYMENT PROGRAMME 2017 31 Mai 2017 LET S DELIVER TOGETHER SESAR Deployment Programme (Edition 2017) FPA MOVE/E2/2014-717/SESAR FPA SGA MOVE/E3/SUB/2016-402/SI2.745134 Deliverable D1.1 31 st May 2017
More informationRPAS DEFINITION PHASE. 2nd Workshop SJU, Brussels 6th November 2014
RPAS DEFINITION PHASE 2nd Workshop SJU, Brussels 6th November 2014 OBJECTIVE & SCOPE European objective Safe integration of RPAS operations into European aviation system and ATM from 2016 - Non-segregated
More informationResults & Impacts of ICAO ANC/12. Integration & Harmonisation of SESAR and NextGen into the global framework
Results & Impacts of ICAO ANC/12 Integration & Harmonisation of SESAR and NextGen into the global framework ATM 2013 Seminar June 13 2013 Michael Standar Has endorsed: Revised Global Air Navigation Plan
More informationAnnual Work Programme* Amendment n 1 Edition October 2015
20 October 2015 Annual Work Programme* 2015 Amendment n 1 Edition 00.01.01 * For the definition, see Article 16(1)(b) of Council Regulation (EC) No 219/2007 as amended. This term corresponds to the term
More informationLocal and network impact assessment of ACDM
Local and network impact assessment of ACDM ATM R&D Seminar Denis HUET EUROCONTROL 27 June 2017 Implementation of A-CDM in Europe 23 full A-CDM airports in Europe. Acceleration since 2013. Represents 38%
More informationSESSION 7A SESAR INNOVATIONS. Peter Hotham Chief of Technology & Innovation
SESSION 7A SESAR INNOVATIONS Peter Hotham Chief of Technology & Innovation SESAR Innovations 7A-1 1 International ATM & Airports New Network Solutions New Generation of Network Management Tools Francisco
More informationTrajectory prediction and conflict resolution for Enroute-to-enroute Seamless Air traffic management TESA
Trajectory prediction and conflict resolution for Enroute-to-enroute Seamless Air traffic management TESA Wolfgang Schuster 1, Washington Ochieng, Arnab Majumdar Department of Civil and Environmental Engineering
More informationWHAT IS THE SESAR DEPLOYMENT PROGRAMME
WHAT IS THE SESAR DEPLOYMENT PROGRAMME 2. What is the SESAR Deployment Programme? 2.1 The regulatory framework In line with the overall arrangement of the SESAR Programme (depicted within the previous
More informationATM RESEARCH - SESAR
Single european sky ATM RESEARCH - SESAR SESAR came to life on the recognition of serious inadequacies with the current air traffic management system. Today, the shortcomings of the European ATM system
More informationPreparing an initial Assessment of the SESAR Concept of Operations EP3: Single European Sky Implementation Support through Validation
Preparing an initial Assessment of the SESAR Concept of Operations EP3: Single European Sky Implementation Support through Validation Robert V Graham, EUROCONTROL Experimental Centre, France David Young
More information30 Years of ATM Strategies and Concepts
30 Years of ATM Strategies and Concepts US-Europe ATM Seminar 2015 Bernard Miaillier Hd of ATM Strategies, EUROCONTROL Lisbon, 23 June2015 Behind the Title: Some (Last) Personal Thoughts Some sort of assessment,
More informationICB Industry Consultation Body
ICB POSITION PAPER EASA RMT on revision of the SPI IR The European Commission is following a two-step approach for the revision of the SPI IR and has signalled that it is most likely to ask EASA to launch
More information22 nd June 2010 Pullman Hotel, Brussels
22 nd June 2010 Pullman Hotel, Brussels A European Commission Seventh Framework Programme This document is produced by the ALICIA consortium and the research leading to these results has received funding
More informationEpisode 3 D a - Annex to En-Route Expert Group Report - Questionnaires EPISODE 3. Single European Sky Implementation support through Validation
EPISODE 3 Single European Sky Implementation support through Validation Document information Programme Sixth framework programme Priority 1.4 Aeronautics and Space Project title Episode 3 Project N 037106
More informationSESAR Deployment Programme
SESAR Deployment Programme (Edition 2017) Proposal for update to European Commission FPA MOVE/E2/2014-717/SESAR FPA SGA MOVE/E3/SUB/2016-402/SI2.745134 Deliverable D1.1 March 29 th, 2018 Control Approved
More informationEnvironmental Issues and application of corresponding Models in the context of Total Airport Management. October, 29 th 2009 CEAS 2009 Manchester, UK
Environmental Issues and application of corresponding Models in the context of Total Airport Management Florian Piekert Holger Feldhaus (DLR/AT-One) (DLR/AT-One) October, 29 th 2009 CEAS 2009 Manchester,
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title CWP prototyping Project Number 10.10.03 Project Manager THALES Deliverable Name Final Project Report Deliverable ID D37 Edition 00.02..00 Template
More informationMilitary Impact assessment of ATM Master Plan Deployment Packages and Deployment Scenarios
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION Military Impact assessment of ATM Master Plan Deployment Packages and Deployment Scenarios Edition Number : 1.0 Edition Date : 18/06/2015 Status :
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title Airport Performance Assessment and Management Support Systems Project Number 12.07.03 Project Manager Indra Deliverable Name Final Project Report
More informationAssessing ATM performance with simulation and optimisation tools: The APACHE Project
Assessing ATM performance with simulation and optimisation tools: The APACHE Project Xavier Prats, Cristina Barrado (UPC) Andrija Vidosavljevic, Daniel Delahaye (ENAC) Fedja Netjasov, DusanCrnogorac (UB
More informationPotential Benefits of Operations
Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 Potential Benefits of Operations John-Paul B. Clarke Associate Professor Daniel Guggenheim School of Aerospace
More informationOutbound Punctuality Sequencing by Collaborative Departure Planning
Outbound Punctuality Sequencing by Collaborative Departure Planning MSc. Ing. Eugène Tuinstra R&D Engineer Validation & Concepts ATM & Airports Department 6 th USA / Europe ATM 2005 R&D Seminar Eurocontrol
More informationGuidance Material for SESAR Deployment Programme Implementation
Guidance Material for SESAR Deployment Programme Implementation Planning View 2017 FPA MOVE/E2/2014-717/SESAR FPA SGA MOVE/E3/SUB/2016-402/SI2.745134 Deliverable D1.2 including D3.1.1 31 st July 2017 1
More informationEuropean Air Traffic Management Performance Enhancement Activities. Main Document 2006 Edition
European Air Traffic Management Performance Enhancement Activities Main Document 2006 Edition page 2 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 INTRODUCTION 1.1 Context 1.2 Document objective 1.3 Document scope
More informationFinal Safety and Performance Requirements (SPR)
P04.07.07 Safety and Performance s (SPR) Document information Project Title Implementation of Dynamic Capacity Management in a High Density Area Project Number 04.07.07 Project Manager Deliverable Name
More informationP Final Project Report
P 09.24.00 Final Project Report Document information Project Title ADS-B In/Out for military aircraft Project Number 09.24.00 Project Manager Alenia Aermacchi Deliverable Name P.09.24.00 Final Project
More informationOperational Goals WP/12
ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Operational Goals WP/12 Independent Expert Operational Goals Group (IEOGG) Montreal 12-14 may 2010 Committee on
More informationNEFAB Project Initiative 10 Joint Evaluation of Technology within CNS and ATM
NEFAB Project Initiative 10 Joint Evaluation of Technology within CNS and ATM Page 1 of 15 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 3 2. DESCRIPTION OF THE INITIATIVE... 4 3. RATIONALE AND PURPOSE OF
More informationSESAR Definition Phase - Deliverable 4. The ATM Deployment Sequence D4
SESAR Definition Phase - Deliverable 4 The ATM Deployment Sequence D4 DLM-0706-001-02-00 2 The ATM Deployment Sequence SESAR Definition Phase - Milestone Deliverable 4 Preface...007 Table Of Contents Executive
More informationCEF Transport Info day 2016 Greece
Calls for proposal CEF-T 2016 CEF Transport Info day 2016 Greece Athens- 02 December 2016 Gaspare L'Episcopia- Innovation and Networks Executive Agency (INEA) Summary - - - - CEF Transport Priorities CEF
More informationBlueprint. What is U-space?
Blueprint The demand for drone services is steadily increasing, with the potential to generate significant economic growth and societal benefits 1, as recognised in the 2015 EU Aviation Strategy 2, and
More informationSeparation Assurance in the Future Air Traffic System
ENRI International Workshop on ATM/CNS. Tokyo, Japan. (EIWAC 2009). Separation Assurance in the Future Air Traffic System H. Erzberger Adjunct Professor of Electrical Engineering University of California,
More informationNCLB AIM Workshop Cairo,11-13 September 2017 SWIM. IATA s Perspective
NCLB AIM Workshop Cairo,11-13 September 2017 SWIM IATA s Perspective IATA at 30,000 ft Mission to represent, lead and serve the airline industry Founded in Havana, Cuba on 1945 274 airline members Representing
More informationDCB/ASM Scenario Step1 System Definition Final
DCB/ASM Scenario Step1 System Definition Final Document information Project title Network Operations & Monitoring sub-system definition Project N 13.02.03 Project Manager ECTRL Deliverable Name DCB/ASM
More informationAERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)
AIS-AIMSG9/-SN/10 17/04/14 AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) NINTH MEETING Tokyo, 21 to 25 April 2014 Agenda Item 7 Other Business SESAR SWIM
More informationIndustry Consultation Body. Role of the Interoperability sub-group. 18 th December 2008 ETSI
Industry Consultation Body Role of the Interoperability sub-group 18 th December 2008 ETSI The Industry Consultation Body Created in 2004 by the SES Framework Regulation (Article 6, 549/2004): Without
More informationCivil-military ATM performance based partnership
ATC Global China EUROCONTROL Workshop Civil-military ATM performance based partnership Driving Excellence in ATM Performance Goran REDZEPOVIC EUROCONTROL / PRISMIL Programme Manager Beijing, 19 September
More informationSome Trends in Next Generation Air Traffic Management
Some Trends in Next Generation Air Traffic Management Ruy Brandao and Mike Jackson Presented by Pam Binns National Workshop on Research Directions for High Confidence Transportation CPS: Aerospace 19 November
More informationSingle European Sky ATM Research (SESAR) Friday 6 th June 2008
Single European Sky ATM Research (SESAR) Friday 6 th June 2008 Agenda 1. 11:00 Introductions 2. 11:10 Presentations from guest speakers 3. 12:00(ish) Open question forum 4. 13:30(ish) Lunch Running Order
More informationDate August 9, Edition
Tender Specifications annexed to Invitation to Tender Ref. SJU/LC/0082-CFT Performance of an economic study to elaborate Business Cases associated to a pilot common project Date August 9, 2012 Edition
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title V&V Platform Development Project Number 03.03.02 Project Manager EUROCONTROL Deliverable Name Final Project Report Deliverable ID D01 Edition 01.00.01
More informationAgent-Based Modelling and Simulation of Trajectory Based Operations under Very High Traffic Demand
Agent-Based Modelling and Simulation of Trajectory Based Operations under Very High Traffic Demand Henk Blom Bert Bakker SESAR Innovation Days 2016, Delft, November 8-10, 2016 Agent-Based Modelling and
More informationMETHODOLOGY FOR SAFETY RISK ASSESSMENT IN FUTURE AIR TRAFFIC MANAGEMENT CONCEPT OF OPERATIONS
METHODOLOGY FOR SAFETY RISK ASSESSMENT IN FUTURE AIR TRAFFIC MANAGEMENT CONCEPT OF OPERATIONS BOJANA MIRKOVIĆ 1, TATJANA KRSTIĆ SIMIĆ 2, FEĐA NETJASOV 3, OBRAD BABIĆ 4 University of Belgrade - Faculty
More informationNEW ATM MANAGERIAL DEVELOPMENT TRAINING
ADVANCED PROFESSIONAL CERTIFICATE NEW ATM MANAGERIAL DEVELOPMENT TRAINING The information, documents and material contained in this APC in ATM managerial development training is subject to constant review
More informationA vision for the ATM 2050
A vision for the ATM 2050 Global - Virtual - Automated CEAS Berlin September 07 Marc Brochard EUROCONTROL Experimental Centre Long Term Research Programme Manager EUROCONTROL An inter-governmental, civil-military
More informationSummary impact assessment
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 24.1.2007 SEC(2006) 1687 COMMISSION STAFF WORKING DOCUMENT Accompanying document to the Communication from the Commission to the Council, the European Parliament,
More informationSingle Sky II and the aviation package
Single Sky II and the aviation package Achieving more sustainable and better performing aviation SCG 11-13 May 2009 SES and Modernisation of Air Traffic Control European Commission What Challenges is SES
More informationL 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL.
L 96/26 EN Official Journal of the European Union REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 10 March 2004 on the interoperability of the European Air Traffic Management
More informationSATCAS Standard Air Traffic Control Automation System
SATCAS Standard Air Traffic Control Automation System SATCAS (Standard Air Traffic Control Automation System) is the latest generation of Selex ES ATC Systems, which integrates a wide range of products
More informationAIR NAVIGATION SERVICE PROVIDERS
THE DATA LINK COMPANY AIR NAVIGATION SERVICE PROVIDERS DATA LINK SOLUTIONS AIRTEL IS THE DATA LINK COMPANY We deliver Air Traffic Management (ATM) modernisation through the implementation of data link
More informationFinal Evaluation of the SESAR Joint Undertaking ( ) operating under the SESAR 1 Programme (FP7) Final Report
Final Evaluation of the SESAR Joint Undertaking (2014-2016) operating under the SESAR 1 Programme (FP7) Final Report Written by: Paul Ravenhill, Tatjana Bolic Expert group: Tatjana Bolic, Paul Ravenhill,
More informationImplementation of the Single European Sky and its extension to Third countries
Implementation of the Single European Sky and its extension to Third countries Needs and expectations of the stakeholders with regard to the Network Manager Massimo GARBINI Network Management Board Chairman
More informationAVIATION MONITORING SOLUTIONS AND DATA ANALYTICS. Streamline and optimize your business operations through Big Data
AVIATION MONITORING SOLUTIONS AND DATA ANALYTICS Streamline and optimize your business operations through Big Data USERS Air navigation service providers CNS service providers Manufacturers Civil aviation
More informationPrioritising safety in unmanned aircraft system traffic management
White paper: drones Prioritising safety in unmanned aircraft system traffic Drones are proliferating throughout the world s airspace, making them impossible to ignore. As their numbers rise, the importance
More informationNM Ops and technical evolutions
NM Ops and technical evolutions Juan Rodriguez Poveda Network Operations Idalina Mendes Videira Network Strategy 27/01/2016 NM User Forum 2016 -Network Evolutions in 2016 1 Overview of NM Evolutions NM
More information