1 LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN Prepared for: City of Colorado Springs Prepared by: Felsburg Holt & Ullevig 508 South Tejon Street Colorado Springs, CO / Project Manager: Steve Murray, PE Project Engineer: Todd S. Frisbie, PE, PTOE (report preparer) FHU Reference No November 2011

2 TABLE OF CONTENTS Page I. INTRODUCTION A. Purpose and Organization B. Access to City Transportation Network C. Origin / Destination Study D. Project History II. EXISTING CONDITIONS A. Roadway Conditions B. Traffic Volumes C. Traffic Operations III. ROYER STREET CROSSING IMPROVEMENTS A. Geometric and Traffic Control Features B. Traffic Volume Forecasts C. Traffic Operations IV. SPRING CREEK CROSSING IMPROVEMENTS A. Geometric and Traffic Control Features B. Traffic Volume Forecasts C. Traffic Operations V. SUMMARY/CONCLUSIONS

3 LIST OF FIGURES Page Figure 1. Study Area Figure 2. Royer Street Origin/Destination Study Figure 3. Royer Street Crossing Existing Traffic Conditions Figure 4. Royer Street Crossing Improvements Figure 5. Royer Street Crossing Improvements Future Traffic Conditions Figure 6. Spring Creek Crossing Improvements Figure 7. Travel Shed Analysis Figure 8. Spring Creek Crossing Improvements Future Traffic Conditions LIST OF TABLES Table 1. Royer Street Crossing Traffic Volumes Table 2. Las Vegas / Royer Street 95 th Percentile Queue Lengths Table 3. Spring Creek Crossing Traffic Volumes Table 4. Spring Creek Drive 95 th Percentile Queue Lengths

4 I. INTRODUCTION A. Purpose and Organization This report provides traffic operational comparison of two railroad crossings in the Las Vegas Street corridor. These crossings known at Royer Street and Spring Creek are shown relative to the surrounding roadway network in Figure 1. Specially, this report will provide an evaluation of existing conditions at the Royer Street crossing which will include information on traffic volumes, truck percentages, queuing, level of service and accidents. Also included are operational analyses based on 5-year and 25-year planning horizons for both the existing Royer Street crossing with proposed improvements and at the proposed Spring Creek crossing. These analyses will include results on projected traffic volumes, truck percentages, level of service and queuing. B. Access to City Transportation Network In the past Las Vegas Street between Nevada Avenue and Academy Boulevard had four atgrade railroad crossings and one local street (Janitell) connecting it to other city arterial roadways. Three of these at-grade railroad crossings were eliminated when the US 24 Bypass was constructed which left nearly a five mile stretch of the Las Vegas Street corridor with only one railroad crossing (Royer Street) and one local street connection (Janitell) to the city s arterial network. This rather limited access to the City s arterial street network is atypical. For example, typical urban arterial streets in Colorado Springs have public street connections to other city arterials every ½ to one mile. By comparison Las Vegas Street from Nevada Avenue to Academy Boulevard has a connection to another city arterial about once every two miles. This limited amount of access effectively isolates Las Vegas Street from the rest of the city roadway network. In addition, the Royer Street connection, which is the only at-grade railroad crossing in a five stretch of Las Vegas Street, has restricted truck access due to design deficiencies at the railroad crossing which causes large trucks to high center on the tracks. This situation presents significant safety issues for both the railroad and the City of Colorado Springs. C. Origin / Destination Study Furthermore, the city conducted an origin-destination study of vehicle-trips using Royer Street. Figure 2 shows the primary origin-destination patterns observed in the study. These three patterns were approximately equal in magnitude at 650 to 750 vehicles per day. These patterns show that the majority of vehicles using the Royer Street crossing travel between Fountain Blvd. and the southern areas of the Las Vegas Street corridor. This suggests that the primary users of the Royer Street crossing are residents of the nearby Hillside Neighborhood. For it is unlikely that residents further east of Hancock Expressway would travel west to Royer and then back track south on Las Vegas. These residents are more likely to use Circle Drive to Janitell Road to Las Vegas Street. Page 1

5 Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 10/28/11 Nevada Ave. 25 Royer St. Existing Crossing Fountain Blvd. HILLSIDE NEIGHBORHOOD Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design Figure 1 Study Area NORTH Janitell Rd. Proposed Replacement Crossing Union Blvd. Spring Creek Dr. Hancock Expwy. Circle Dr. EVERGREEN CEMETERY 24 25

6 Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design HILLSIDE NEIGHBORHOOD Fountain Blvd. Royer St. Existing Crossing 25 EVERGREEN CEMETERY Hancock Expwy. 24 Nevada Ave. Union Blvd. Circle Dr. 25 Janitell Rd. Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 11/10/11 Figure 2 Royer Street Origin / Destination Survey Results Significant Travel Patterns NORTH

7 D. Project History The City of Colorado Springs is motivated in maintaining their lone railroad crossing in the Las Vegas corridor. Closing of the Royer Street crossing would impact the city s ability to access their water treatment plant, would add to local area business employees and their patrons to up to additional mile of out-of-direction travel and would hamper access to Hillside Neighborhood residents who have a high percentage of low income and minority families. In response to these issues at the Royer Street crossing the City began working on solutions to correct the design deficiencies at the Royer Street crossing. Given the constraints at the Royer Street crossing the solution was less than desirable. The solution impacted access and property of businesses along Las Vegas and still did not address design deficiencies such as the distance between the Las Vegas/Royer intersection and the railroad crossing. So in October 2010, the City of Colorado Springs began an evaluation of potential railroad crossings in the Las Vegas Street corridor to replace the deficient and unsafe Royer Street crossing. The result of this evaluation was a replacement crossing located south of the existing Royer Street crossing near the US 24 Bypass overpass. This replacement crossing shown in Figure 1 is known as the Spring Creek crossing. This location was chosen because it is relatively close in proximity to Royer Street, it directly accesses Hancock Expressway which better integrates Las Vegas into the city roadway network, there are no private property impacts and the location has the greatest separation between the railroad tracks and Las Vegas Street in the corridor. Page 4

8 II. EXISTING CONDITIONS A. Roadway Conditions The intersection of Las Vegas Street and Royer Street does not have turn lanes on any approach. Royer Street has a posted speed limit of 25 mph and Las Vegas has a eastbound posted speed of 30 mph and a westbound posted speed of 40 mph. The distance between the stop bar and the center of the railroad tracks is about 60 feet and grade between the tracks at Las Vegas Street is 14 percent. This steep grade the short distance between the tracks and Las Vegas Street has caused many trucks with long trailers to high center on the tracks. To prevent this city has posted signs and flashing beacons warning trucks to not use the Royer Street crossing. B. Traffic Volumes Figure 3 shows existing daily and peak hour traffic volumes collected in October 2010 along Las Vegas and Royer Streets. The data was collected in October 2010 and shows a daily traffic volume of about 5,500 vehicles per day on Las Vegas Street and about 3,860 vehicles per day on Royer Street. The traffic data also shows that PM peak hour traffic volumes are higher than the AM peak hour. On Las Vegas Street, trucks with three axels or more comprise of about 6% of the traffic. On Royer Street the truck percentage is about 2% of the traffic. However, the truck percentage is artificially low since operators of vehicles with long trailers are warned to not use the Royer Street railroad crossing. C. Traffic Operations Figure 3 also shows level of service and queue lengths at the Las Vegas / Royer intersection. Existing peak hour volumes at the intersection are relatively which results in good level of service for all intersection turn movements. As shown all turn movements currently operate at LOS C or better during the peak hours. With only about 60 feet between the stop bar and the railroad tracks only a car or two could store between Las Vegas and the railroad tracks. Therefore, it is likely that the queue of vehicles turning onto Las Vegas Street will extend across the railroad tracks. The analysis using SimTraffic simulations show the 95 th percentile queue of 70 feet which is over 10 feet past the railroad crossing. Page 5

9 Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design 73(93) 1(2) 54(77) 3,860 Royer St. 54(80) 96(128) 2(6) 94(88) 143(141) 1(1) 0(0) 1(7) 2(3) 5,680 a/a a/a a/a a/a 55'(70') 5,200 20'(35') LEGEND XXX(XXX) XXXX x/x XX'(XX') = AM(PM) Peak Hour Traffic Volumes = Daily Traffic Volumes = Unsignalized Movement Level of Service = AM(PM) 95th Percentile Queue = Stop Sign Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 11/9/11 Figure 3 Royer St. Crossing - Existing Conditions NORTH

10 III. ROYER STREET CROSSING IMPROVEMENTS This section details the operation analysis of the improvements proposed at the existing atgrade railroad crossing at Royer Street. A. Geometric and Traffic Control Features Figure 4 shows the conceptual layout for improvements at the existing Royer Street crossing. As shown, the improvements would include turn lanes, raising Las Vegas Street by four feet and modifications to several existing utilities. These are enhancements to the current conditions at the Royer / Las Vegas intersection; however, the design has the following short comings: The distance between the stop bar and the center of the railroad tracks is 45 feet which does not meet railroad quiet zone standards. The grade from the railroad tracks to Las Vegas is 9% which does not meet roadway design criteria for grades approaching a roadway. Five and 25 year projected traffic volumes at Las Vegas / Royer intersection would not meet any of the volume related MUTCD signal warrant guidelines. However, MUTCD Signal Warrant 9 (Intersection near a Grade Crossing) states that traffic signal control should be considered if the distance between a grade crossing and the nearest intersection is less than 140 feet and intersection volumes plot above certain applicable curves. At the Royer Street crossing the distance between and the anticipated intersection volume satisfies the signalization criteria of MUTCD Warrant 9. Therefore, the intersection is proposed to be signalized. This signalization would include preemption protocols to ensure that queues are cleared from the tracks prior to the arrival of a train. B. Traffic Volume Forecasts Figure 5 shows five and 25-year projected daily and peak hour traffic volumes at the Royer Street crossing. These projected traffic volumes were developed from traffic volume forecasts and patterns observed between PPACG s 2015 and 2035 travel demand models. Travel demand estimates from these models were calibrated to differences between existing traffic counts and PPACG existing conditions travel demand model. This model over estimates existing traffic volumes on by 2,000 vehicles per day (vpd) on Royer Street by 2,200 vpd and on Las Vegas Street; therefore 2015 and 2035 travel demand model estimates for Royer Street and Las Vegas Street were reduced respectively. An additional growth factor was applied to Royer Street counts to account for the potential increase in truck volumes which is expected to increase when truck restrictions are removed at the crossing. Existing data shows Royer Street truck volumes at about 2%. Truck percentage data is not available prior to when the crossing restrictions were put in place, so it was assumed that the Royer Street truck percentage would likely be about 6% which is the current truck percentage observed on Las Vegas Street. Page 7

11 Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design Figure 4 Conceptual Geometry Royer Street Crossing Improvements Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 11/9/11 NORTH

12 Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design Daily & Peak Hour Volumes Levels of Service Daily & Peak Hour Volumes XX'(XX') = AM(PM) 95th Percentile Queue Levels of Service a. 5-Year Scenario b. 25-Year Scenario Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 11/9/11 Figure 5 Royer St. Crossing Improvements - Future Conditions NORTH 7,600 30'(25') 115(145) 190(235) 165(155) 275(260) 100'(110') 50'(50') 5,600 4,400 Royer St. 5,800 Royer St. Royer St. Royer St. A/A A/B 30'(30') 65(95) 110(145) 105(100) 160(155) 65'(75') 45'(35') 50'(55') 70'(85') 85(105) 65(90) 75'(90') 105'(145') 130(175) 130(155) LEGEND XXX(XXX) XXXX X/X = AM(PM) Peak Hour Traffic Volumes = Daily Traffic Volumes = Signalized Level of Service = Traffic Signal

13 So considering the travel demand model adjustments along with this anticipated increase in truck volumes, 5-year and 25-year forecasts were developed at the Las Vegas / Royer Street intersection. Figure 5 shows daily and peak hour forecasts for vehicles crossing the railroad tracks. As shown, the 4,400 vehicles per day will cross the tracks in the 5-year scenario and 5,800 vehicles will cross the tracks in the 25-year scenario. Table 1 show the percentage and number of trucks with three or more axels expected to cross the tracks each day in each future scenario. It is forecasted that in the five and 25-year scenarios 260 and 350 trucks per day, respectively, would cross the tracks on Royer Street. The posted speed limit on Royer Street is 25 mph which will continue to be the posted speed after improvements have been constructed. Table 1. Royer Street Crossing Traffic Volumes Scenario Daily Vehicle Traffic Truck Percent Daily Truck Traffic Speed Limit (mph) 5-Year 4,400 6% Year 5,800 6% C. Traffic Operations Using projected traffic volumes and level of service 95 th percentile queue lengths were calculated at the Las Vegas / Royer Street intersection. The results are shown in Figure 5. As expected, a signalized intersection operates well in both the 5-year and 25-year scenarios with a LOS A or B achieved during peak hours. Figure 5 also shows 95 th percentile queue lengths while Table 2 compares Royer Street 95 th percentile queue lengths to the distance between the stop bar and the center of the railroad tracks. As shown, even with intersection improvements at Royer Street and Las Vegas Street the 95 th percentile queues will cross the tracks in all scenarios. Table 2. Las Vegas / Royer Street 95 th Percentile Queue Lengths 95 th Percentile Queue (Feet) Distance From Stop Bar to Scenario AM Peak PM Peak Center of Tracks 5-Year Year Page 10

14 IV. SPRING CREEK CROSSING IMPROVEMENTS This section details the operation analysis of the improvements proposed at the replacement atgrade railroad crossing at Spring Creek Drive. A. Geometric and Traffic Control Features Figure 6 shows the conceptual layout for improvements at the replacement crossing at Spring Creek. As shown, the improvements would include turn lanes on the approaches and two full lanes between the railroad crossing and Las Vegas Street. The distance between the stop bar and the center of the railroad tracks is 120 feet. Projected traffic volumes at the Las Vegas/Spring Creek intersection would not meet any of the volume related MUTCD signal warrant guidelines in the 5-year scenario but would marginally meet some signal warrant criteria in the 25-year scenario. Furthermore, the distance between the crossing and the nearest intersection and intersection volumes satisfy the signalization criteria of MUTCD Warrant 9 (Intersection near a Grade Crossing). Given these conditions the Las Vegas Street / Spring Creek intersection would be signalized. This signalization would include preemption protocols to ensure that queues are cleared from the tracks prior to the arrival of a train. B. Traffic Volume Forecasts Future five and 25-year projected daily and peak hour traffic volumes were developed at the Spring Creek Drive crossing. Since the Spring Creek Drive does not exist today, the PPACG travel demand model was used to estimate volumes for the Spring Creek connection and the impact this new connection would have on Las Vegas Street traffic volumes. The PPACG travel demand model forecasts for the Spring Creek crossing are about double the forecasts on Royer Street. In addition, Las Vegas Street forecasts with the Spring Creek crossing are higher than with the Royer Street. For instance, 25-year forecasts for Las Vegas Street are 30 percent higher with the Spring Creek crossing. A likely explanation is the Spring Creek crossing provides more regional access to Las Vegas Street for areas to the north and east but is still close enough to the existing Royer Street crossing to provide local access for the Hillside neighborhood. Figure 7 illustrates this pattern. The location of the Royer Street crossing provides primary access between travel sheds B and C. On the other hand, the location of the Spring Creek Crossing can still serve travel shed B while making Las Vegas Street more accessible for portions of travel shed A. In other words, the Spring Creek crossing helps to integrate Las Vegas Street into the city s transportation network as it now has more direct connections to major roadways such as Hancock Expressway, Union Boulevard and US 24. Figure 8 shows daily and peak hour traffic volume forecasts for the 5-year and 25-year scenarios. Las Vegas Street forecasts were developed by reducing 25-year model forecasts by 2,200 vehicles per day which is the amount the model over predicts existing traffic volumes. Similarly, Spring Creek Drive projections from the travel demand model were reduced by 2,000 vehicles per day again to account for the existing model s over prediction of existing traffic volumes on Royer Street. Accordingly, 5-year forecasts were developed using the assumption Page 11

15 Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design Figure 6 Conceptual Geometry Spring Creek Crossing Improvements Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 11/9/11 NORTH

16 that traffic volumes will increase at a constant rate between existing traffic volumes and 2035 forecasts. It is estimated that Spring Creek Drive will carry about 8,600 vehicles per day across the railroad tracks in the 5-year scenario and about 12,400 vehicles per day across the railroad tracks in 25-year scenario. Table 3 shows forecasted trucks percentages and volumes for both the five and 25-year scenarios. Since Spring Creek Drive is a new street, existing truck percentage data is not available. So it was assumed that the Spring Creek Drive truck percentage would likely be about 6% which is the current truck percentage observed on Las Vegas Street. As shown, the percentage and number of trucks with three or more axels expected to cross the railroad tracks each day is just over 500 in the 5-year scenario and about 750 in the 25-year scenario. The posted speed limit on Spring Creek is anticipated to be set at 25 mph. Table 3. Spring Creek Crossing Traffic Volumes Scenario Daily Vehicle Daily Truck Speed Limit Truck Percent Traffic Traffic (mph) 5-Year 8,600 6% Year 12,400 6% C. Traffic Operations Using projected traffic volumes, level of service and 95 th percentile queue lengths were calculated at the Hancock Expressway and Las Vegas Street intersections with Spring Creek Drive. These results are shown in Figure 8. As expected, signalized intersections at both ends of Spring Creek operate well in both the 5-year and 25-year scenarios with LOS B during peak hours. Figure 8 also shows 95 th percentile queue lengths while Table 4 compares Spring Creek 95 th percentile queue lengths to the distance between the stop bar and the center of the railroad tracks. As shown, in the near future 95 th percentile queues on Spring Creek Drive will not extend past the railroad tracks from either direction. In the 25-year scenario, only the southbound queue at Las Vegas is projected to extend to or past the railroad tracks. Table 4. Spring Creek Drive 95 th Percentile Queue Lengths Southbound Spring Creek at Las Vegas Northbound Spring Creek at Hancock Expressway 95 th Percentile Queue (Feet) Distance From Stop Bar to 95 th Percentile Queue (Feet) Distance From Stop Bar to Scenario AM Peak PM Peak Center of Tracks AM Peak PM Peak Center of Tracks 5-Year Year Page 13

17 Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design B Royer Railroad Crossing: Primary Users: B C Royer St. Fountain Blvd. Royer Crossing Spring Creek Crossing Hancock Expwy. Union Blvd. 24 A Spring Creek Railroad Crossing: Primary Users: B C Nevada Ave. D Janitell Rd. Circle Dr. Secondary Users: A C LEGEND X = Travel Sheds = Crossing Locations = Additional Areas Served by Spring Creek Crossing 25 C Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 11/10/11 Figure 7 Travel Sheds NORTH

18 Las Vegas Railroad Crossing : RR/PUC Coordination and Preliminary Design Daily & Peak Hour Volumes Levels of Service XX'(XX') = AM(PM) 95th Percentile Queue Daily & Peak Hour Volumes Levels of Service a. 5-Year Scenario b. 25-Year Scenario Felsburg Holt & Ullevig Colorado Springs Railroad Crossing (Task IIa), , 11/9/11 Figure 8 Spring Creek Crossing Improvements - Future Conditions NORTH 13,300 11,300 12,400 10,300 8,100 Spring Creek Spring Creek Spring Creek 8,600 Spring Creek Hancock Expwy. Hancock Expwy. Hancock Expwy. Hancock Expwy. B/B B/B B/B B/B 205(170) 155(145) 75(245) 5(0) 165(120) 1 140(210) 110(215) 155(225) 135(225) 35(15) 230(125) 145(100) 90(140) 210(175) 180(275) 200(315) 115(335) 5(0) 235(190) 1 575(1035) 155(270) 175(250) 265(200) 300(240) 220(180) 35(15) 1240(575) 360(150) 140'(90') 150'(140') 30(10) 5(0) 25(20) 140'(190') 75'(65') 195'(280') 65'(60') 125'(170') 130'(155') LEGEND XXX(XXX) XXXX X/X = AM(PM) Peak Hour Traffic Volumes = Daily Traffic Volumes = Signalized Level of Service = Traffic Signal 80'(60') 95'(90') 65'(125') 80'(65') 30(10) 5(0) 25(20)

19 V. SUMMARY/CONCLUSIONS The existing at-grade railroad crossing at Royer Street has several safety issues. These include a very short distance between the crossing the next intersection at Las Vegas Street and a steep grade between the tracks and Las Vegas Street that causes trucks with long trailers to high center on the tracks. The City of Colorado Springs has attempted to temporarily address the safety issues by warning truck traffic through signing to not use the crossing. Concurrently, the City has also evaluated design solutions to mitigate the high centering safety issue. The City has taken these steps because they desire to keep the one at-grade railroad crossing in the Las Vegas Street corridor open. Simply eliminating the Royer Street crossing without a replacement crossing has following negative consequences on the city. Disconnects Las Vegas Street from the city s roadway network to the north and to the east. Hampers the city s ability to access their water treatment plant, Adds to local area business employees and their patrons up to additional mile of out-ofdirection travel and Restricts access to the Hillside Neighborhood which has the highest percentage of minority families in El Paso County. Therefore, the City has put forth two proposals to address the safety issues and to keep an atgrade railroad crossing open in the Las Vegas corridor. One option is to improve the existing Royer Street crossing. This option would add turn lanes on Las Vegas Street and raise Las Vegas Street to stop vehicles with trailers from high centering on the tracks. This option impacts existing property and business access on Las Vegas Street, existing utilities and still would not meet roadway design criteria for approach grades to intersections or quiet zone design criteria. The other option is too replace the Royer Street at-grade crossing with a new railroad crossing at Spring Creek Drive. This crossing does not have private property impacts, meets roadway design criteria and meets design criteria for quiet zones. Compared to improvements at the existing Royer Street crossing, the Spring Creek Drive option provides a greater separation between the railroad tracks and Las Vegas Street and provides a more convenient connection between Las Vegas Street and other major city roadways such as Union Boulevard, Hancock Expressway and US 24. Therefore, the City of Colorado Springs requests approval to replace the existing Royer Street crossing with a crossing at Spring Creek Drive. The Spring Creek Crossing meets roadway and quiet zone design criteria and eliminates the existing safety issue at the Royer Street crossing. Operational analyses show the intersection would operate with acceptable levels of service. The 95 th percentile queue lengths from Las Vegas could exceed the distance between the stop bar and the center of the tracks but this can be addressed with signal preemption that would clear the approach area of vehicles prior to the train s arrival. Page 16

CHAPTER 2: MODELING METHODOLOGY

CHAPTER 2: MODELING METHODOLOGY CHAPTER 2: MODELING METHODOLOGY 2.1 PROCESS OVERVIEW The methodology used to forecast future conditions consisted of traditional traffic engineering practices and tools with enhancements to more accurately

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

Traffic Impact Analysis Guidelines. Town of Queen Creek

Traffic Impact Analysis Guidelines. Town of Queen Creek Traffic Impact Analysis Guidelines Town of Queen Creek January 2016 1. INTRODUCTION The purpose of this document is to outline the procedures and requirements for preparing a Transportation Impact Analysis

More information

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS HPTER 5 PRLLEL PRKWY ORRIDOR IMPROVEMENTS nother key area within the Village West study area is the Parallel Parkway corridor. This chapter focuses on the segment of Parallel Parkway between 106 th Street

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

APPENDIX J. DRO Traffic Analysis Report Felsburg Holt & Ullevig

APPENDIX J. DRO Traffic Analysis Report Felsburg Holt & Ullevig APPENDIX J DRO Traffic Analysis Report Felsburg Holt & Ullevig DURANGO-LA PLATA COUNTY AIRPORT MASTER PLAN: TRAFFIC ANALYSIS REPORT Prepared for: Jviation 900 South Broadway, Suite 350 Denver, CO 80209

More information

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts

More information

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH

More information

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee MEMORANDUM Date: July 14, 2006 Project #: 6389 To: US 97 & US 20 Refinement Plan Steering Committee From: Sonia Hennum, P.E., Andrew Cibor, E.I.T., & Julia Kuhn, P.E. Project: US 97 & US 20 Refinement

More information

BCEO TRAFFIC IMPACT STUDY GUIDELINES

BCEO TRAFFIC IMPACT STUDY GUIDELINES BCEO TRAFFIC IMPACT STUDY GUIDELINES February 2006 TABLE OF CONTENTS INTRODUCTION..... i TRAFFIC IMPACT STUDY STRUCTURE... 1 WHEN IS A TRAFFIC IMPACT STUDY NEEDED?..... 1 STUDY AREA, SITE PLAN & HORIZON

More information

Benefit Cost Analysis Narrative

Benefit Cost Analysis Narrative Chicago Region Environmental and Transportation Efficiency Program (CREATE) Grade Separations of: GS21a - Union Pacific and 95 th Street GS11 - Belt Railway Company of Chicago and Columbus Ave. GS 9 -

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Future Build Alternative Traffic Forecasts and Level of Service Analysis 4.2.10 Future Build Alternative Traffic Forecasts and Level of Service Analysis For the five Build Alternatives, study intersections within one mile of potential station locations were analyzed, as it

More information

Traffic Impact Study Requirements

Traffic Impact Study Requirements [TYPE THE COMPANY NAME] Traffic Impact Study Requirements County of San Mateo Department of Public Works Roadway Services 9/1/2013 I. Introduction The County of San Mateo (County), Department of Public

More information

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS FINAL REPORT SEPTEMBER 2010 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 EXISTING TRAFFIC CONDITIONS 2 3.0 FUTURE TRAFFIC CONDITIONS 3 4.0 POTENTIAL IMPACTS

More information

Access Operations Study: Analysis of Traffic Signal Spacing on Four Lane Arterials

Access Operations Study: Analysis of Traffic Signal Spacing on Four Lane Arterials Mn/DOT Access Management Guidelines Background Technical Report Access Operations Study: Analysis of Traffic Signal Spacing on Four Lane Arterials November 2002 Minnesota Department of Transportation Office

More information

Preliminary Assessment of Interchange Concepts. Seven Corners Task Force March 11, 2014

Preliminary Assessment of Interchange Concepts. Seven Corners Task Force March 11, 2014 Preliminary Assessment of Interchange Concepts Seven Corners Task Force March 11, 2014 Presentation overview Introduction Concept selection and refinement Future volume development and assignment Preliminary

More information

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES Adopted by Town Council on November 25, 2008 Prepared By: HNTB Engineering Department Planning Department TABLE OF CONTENTS I. INTRODUCTION... 1 II.

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

M D 355 [FR E D E R IC K R O A D] OVER

M D 355 [FR E D E R IC K R O A D] OVER M D 355 [FR E D E R IC K R O A D] OVER LITTLE BENNETT CREEK MAINTENANCE OF TRAFFIC ALTERNATIVE ANA LYSIS Prepared by: INTRODUCTION The purpose of this report is to present the results of traffic analyses

More information

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS CITY OF ALBANY DEPARTMENT OF PUBLIC WORKS DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS Prepared By PUBLIC WORKS DEPARTMENT ALBANY, OREGON 97321 Telephone: (541) 917-7676 TABLE OF CONTENTS

More information

Article 16 Traffic Impact Analysis

Article 16 Traffic Impact Analysis Article 16 Traffic Impact Analysis Table of Contents... 16-1 Chapter 16.1 Purpose and Intent... 16-2 Chapter 16.2 Applicability... 16-2 Chapter 16.3 Exemptions... 16-2 Chapter 16.4 Trip Generation Data...

More information

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI) 2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima

More information

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA Effective August 1, 2007 Amended March 4, 2013, December 1, 2014, May 1, 2017 TOWN OF MOORESVILLE,

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR

More information

Traffic Impact Study Guidelines. City of Guelph

Traffic Impact Study Guidelines. City of Guelph Traffic Impact Study Guidelines City of Guelph April 2016 Engineering and Capital Infrastructure Services Infrastructure, Development & Enterprise 1 Carden Street Guelph, Ontario Canada N1H 3A1 Page 1

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

Military Highway Interchange

Military Highway Interchange III. Military Highway Interchange Deficiencies Design Challenges Proposed Alternatives III.1.2 Volumes & Operations Figure III.2: Existing Volumes displays the existing volumes for the Military Highway

More information

2017 TIGER DISCRETIONARY GRANT APPLICATION

2017 TIGER DISCRETIONARY GRANT APPLICATION 2017 TIGER DISCRETIONARY GRANT APPLICATION Spokane International Airport Spokane, WA APPENDIX D 2015 Airport Drive Couplet at Spotted Road Airport Drive Couplet at Spotted Road April 2015 Prepared for:

More information

GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (ZONING PETITIONS)

GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (ZONING PETITIONS) GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (ZONING PETITIONS) (A) INTENT This Section is intended to help ensure that new development does not adversely affect the capacity of streets and intersections to

More information

O Street Arterial Corridor Study

O Street Arterial Corridor Study Prepared for: Weld County Public Works Department P.O. Box 758 1111 H Street Greeley, Colorado 80631 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 303-721-1440

More information

TOWN OF BARGERSVILLE DEPARTMENT OF DEVELOPMENT TRAFFIC STUDY GUIDELINES

TOWN OF BARGERSVILLE DEPARTMENT OF DEVELOPMENT TRAFFIC STUDY GUIDELINES TOWN OF BARGERSVILLE DEPARTMENT OF DEVELOPMENT TRAFFIC STUDY GUIDELINES Town of Bargersville Department of Development 24 North Main Street, P.O. Box 420 Bargersville, Indiana 46106 Adopted by the Bargersville

More information

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines Public Works Department Traffic Impact Analysis Guidelines Revised: August 2015 TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE... 3 EXEMPTIONS... 3 SCOPING... 4 METHODOLOGY... 5 STUDY AREA... 6 STUDY SCENARIOS...

More information

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850)

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL 32447 (850) 482-2786 TRANSPORTATION CONCURRENCY ANALYSIS CITY OF MARIANNA CONCURRENCY MANAGEMENT SYSTEM (CMS) This form

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

Environmental Consequences and Mitigation

Environmental Consequences and Mitigation Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives

More information

MOBILITY AND ALTERNATIVES ANALYSIS

MOBILITY AND ALTERNATIVES ANALYSIS 6 MOBILITY AND ALTERNATIVES ANALYSIS BACK OF SECTION DIVIDER 6.0 Mobility and Alternatives Analysis Travel demand analysis provides a framework for the identification of transportation facilities and services

More information

9.0 AGENCY CORRESPONDENCE. Correspondence. Agency

9.0 AGENCY CORRESPONDENCE. Correspondence. Agency 9.0 AGENCY CORRESPONDENCE Agency Correspondence This chapter contains the correspondence received from agencies regarding the Woodmen Road Corridor Improvements Project. The following lists the correspondence

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information

Chapter 6 Freight Plan

Chapter 6 Freight Plan Chapter 6 Freight Plan Overview This chapter presents a review and assessment of needs, deficiencies, policies and improvement options affecting the freight transportation system within the Medford Urban

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... Amendment No. 2 to Reclamation Plan 2006-01 Traffic Impact Analysis TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX

More information

I-10 CONNECT. Public Meeting #1

I-10 CONNECT. Public Meeting #1 I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY STATE PROJECT NUMBER: 0066-96A-493,P101, C501, B686; UPC: 110629 FEDERAL PROJECT NUMBER: NHPP-066-1(356) FAIRFAX COUNTY, VIRGINIA TRA N S F O R M I - 6 6 : I N S ID E THE BE LTWAY Route 7 Connector Ramp

More information

Traffic Data Quality Analysis. James Sturrock, PE, PTOE, FHWA Resource Center Operations Team

Traffic Data Quality Analysis. James Sturrock, PE, PTOE, FHWA Resource Center Operations Team Traffic Analysis James Sturrock, PE, PTOE, FHWA Resource Center Operations Team Source Material Traffic Measurement http://ntl.bts.gov/lib/jpodocs/repts_te/14058.htm Seven DEADLY Misconceptions about Information

More information

RAPID CITY ARTERIAL SAFETY STUDY. Prepared for: City of Rapid City 300 Sixth Street Rapid City, South Dakota DRAFT.

RAPID CITY ARTERIAL SAFETY STUDY. Prepared for: City of Rapid City 300 Sixth Street Rapid City, South Dakota DRAFT. RAPID CITY ARTERIAL SAFETY STUDY Prepared for: City of Rapid City 300 Sixth Street Rapid City, South Dakota 57701 DRAFT Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse Way, Suite 600 Centennial,

More information

Community Advisory Committee Meeting No. 2. June 22, 2006

Community Advisory Committee Meeting No. 2. June 22, 2006 Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept

More information

UPTOWN TRAFFIC IMPACT ANALYSIS

UPTOWN TRAFFIC IMPACT ANALYSIS UPTOWN TRAFFIC IMPACT ANALYSIS This memorandum summarizes the results of the traffic analysis conducted to evaluate the traffic operations of the intersections along Post Oak Boulevard within Uptown Houston

More information

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County 07 - LA - 605 - PM 2.87/PM 6.36 07 - LA - 91 - PM 14.10/PM 19.81 Vicinity Map N On Routes Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County I-605 between Excelsior Dr UC (PM 6.36)

More information

Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES

Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES TABLE OF CONTENTS 1.0 Introduction.. 2 1.1 Transportation Impact Study...... 2 1.2 Need and Justification... 2 1.3 Purpose of Guidelines... 2

More information

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES 1 st Edition City of San Luis Obispo 2035 Circulation Element 1 Table of Contents Introduction... 2 Process... 2 When Impact Studies Are Required... 3

More information

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT 2.1 EXISTING TRAVEL DEMAND MODEL In order to accurately project future year traffic volumes within this regional study area, it was first necessary to construct

More information

The TIS is to be signed and sealed by a Florida Registered Professional Engineer.

The TIS is to be signed and sealed by a Florida Registered Professional Engineer. CHAPTER 900. SECTION 901. DEVELOPMENT STANDARDS INFRASTRUCTURE STANDARDS 901.5. Transportation Impact Study A. Intent and Purpose The intent and purpose of the Traffic Impact Study (TIS) is to identify

More information

Regional Cashless Tolling Planning Study ASSESSMENT OF FUTURE IMPACTS TO I-76 INTERCHANGES AND ADJACENT ROADWAYS

Regional Cashless Tolling Planning Study ASSESSMENT OF FUTURE IMPACTS TO I-76 INTERCHANGES AND ADJACENT ROADWAYS Regional Cashless Tolling Planning Study ASSESSMENT OF FUTURE IMPACTS TO I-76 INTERCHANGES AND ADJACENT ROADWAYS September 15, 2016 Prepared by: In association with: SPC would like to thank our Technical

More information

Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830

Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 Functional Planning Study :06 December 2016 E00311A Executive Summary Strathcona County, as requirement of the roadside development permit from Alberta Transportation for the intersection upgrade of

More information

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design ABSTRACT Several analysis methods have been proposed to analyze the vehicular capacity of roundabouts.

More information

4.11 TRANSPORTATION AND CIRCULATION

4.11 TRANSPORTATION AND CIRCULATION 4.11 TRANSPORTATION AND CIRCULATION 4.11.1 INTRODUCTION This section addresses the potential for the Proposed Project to impact traffic and circulation. Information in this section is summarized from the

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

HALDIMAND COUNTY DESIGN CRITERIA SECTION T TRAFFIC IMPACT STUDY GUIDELINES

HALDIMAND COUNTY DESIGN CRITERIA SECTION T TRAFFIC IMPACT STUDY GUIDELINES HALDIMAND COUNTY DESIGN CRITERIA SECTION T TRAFFIC IMPACT STUDY GUIDELINES Revised 2015 TRAFFIC IMPACT STUDIES PAGE 1 T 1.00 T 1.01 INTRODUCTION TRAFFIC IMPACT STUDY One of Haldimand County s key objectives

More information

Exit 61 to Exit 67 Corridor Study

Exit 61 to Exit 67 Corridor Study 63 67 61 90 Exit 61 to Exit 67 Corridor Study submitted to: The South Dakota Department of Transportation in conjunction with: City of Box Elder The Rapid City Area MPO and The Federal Highway Administration

More information

Rivers Edge Alternative Urban Areawide Review (AUAR) Traffic Study

Rivers Edge Alternative Urban Areawide Review (AUAR) Traffic Study Appendix F Rivers Edge Alternative Urban Areawide Review (AUAR) Traffic Study Prepared by Westwood Professional Services, Inc. for City of St. Paul Park Grey Cloud Island Township October 14, 2003 Introduction

More information

MOUNTAIN VISTA SUBAREA PLAN FORT COLLINS, COLORADO TRAFFIC NOISE EVALUATION REPORT

MOUNTAIN VISTA SUBAREA PLAN FORT COLLINS, COLORADO TRAFFIC NOISE EVALUATION REPORT MOUNTAIN VISTA SUBAREA PLAN FORT COLLINS, COLORADO TRAFFIC NOISE EVALUATION REPORT Prepared for: City of Fort Collins 250 N. Mason Street Fort Collins, CO 80522 Prepared by: Felsburg Holt & Ullevig 6300

More information

The Secrets to HCM Consistency Using Simulation Models

The Secrets to HCM Consistency Using Simulation Models The Secrets to HCM Consistency Using Simulation Models Ronald T. Milam, AICP David Stanek, PE Chris Breiland Fehr & Peers 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 r.milam@fehrandpeers.com (916)

More information

Appendix B. Benefit-Cost Technical Memorandum

Appendix B. Benefit-Cost Technical Memorandum Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH

More information

Comparison of I-210 and I-710 as Potential ICM Corridors

Comparison of I-210 and I-710 as Potential ICM Corridors Comparison of I-210 and I-710 as Potential ICM Corridors Positive Aspects Traffic sensors Very good PeMS coverage of freeway mainline, HOV lanes, and ramps Many intersections within Pasadena already equipped

More information

CITY OF CLOVIS Traffic Impact Study Guidelines

CITY OF CLOVIS Traffic Impact Study Guidelines CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer

More information

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES June 1, 2012 Draper City Traffic Impact Study Guidelines Table of Contents Introduction... 1 Traffic Impact Classification Levels... 1 Analysis Approach

More information

CITY OF LA MESA MIXED-USE OVERLAY ZONE PROJECT La Mesa, California August 15, 2007 Revised January 16, 2008

CITY OF LA MESA MIXED-USE OVERLAY ZONE PROJECT La Mesa, California August 15, 2007 Revised January 16, 2008 TRAFFIC IMPACT STUDY CITY OF LA MESA MIXED-USE OVERLAY ZONE PROJECT La Mesa, California August 15, 2007 Revised January 16, 2008 Prepared for: DUDEK & ASSOCIATES 605 Third Street Encinitas, California

More information

Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson, IBI Group PTSL

Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson, IBI Group PTSL 100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention From cc Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson,

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

8.0 Chapter 8 Alternatives Analysis

8.0 Chapter 8 Alternatives Analysis 8.0 Chapter 8 Alternatives Analysis The primary purpose for using CORSIM in the context of this manual is to guide the design process and program delivery. To this point in the manual, you have been given

More information

VIII. LAND USE ISSUES

VIII. LAND USE ISSUES VIII. LAND USE ISSUES The & Route 57 Land Use and Circulation Study (Land Use Study, Figure 6) was completed for the Town of Clay in November 1999 (Clough, Harbour & Associates). This study investigated

More information

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES A. GENERAL Traffic Impact Analyses (TIAs) are tools that have historically been utilized to evaluate the interaction between existing transportation infrastructures

More information

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR PROJECT NO. WIP-599-1(102) CONTROL NO. D5SF2 APRIL 2010 Prepared for: New Mexico Department of Transportation Northern Design Bureau P.O. Box 1149

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

13. Traffic and Transport

13. Traffic and Transport 13. Traffic and Transport 13.1 Executive Summary The traffic impact of the Facility has been examined for both transport of materials and staff, and with regard to the latter, accessibility of the site

More information

Central Manatee Network Alternatives Analysis

Central Manatee Network Alternatives Analysis District One CMNAA Central Manatee Network Alternatives Analysis Central Manatee Network Alternatives Analysis The Florida Department of Transportation (FDOT) is conducting the Central Manatee Network

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

5.0 ALTERNATIVE REFINEMENTS AND EVALUATION

5.0 ALTERNATIVE REFINEMENTS AND EVALUATION 5.0 ALTERNATIVE REFINEMENTS AND EVALUATION During Alternatives Evaluation, several technical studies were performed on the Final Set of Alternatives. The purpose of these studies was to elicit evaluative

More information

Technical Memorandum. 720 SW Washington Suite 500 Portland, OR dksassociates.com. DATE: July 12, 2017

Technical Memorandum. 720 SW Washington Suite 500 Portland, OR dksassociates.com. DATE: July 12, 2017 Technical Memorandum DATE: July 12, 2017 TO: Kay Bork City of Veneta Bill Johnston, AICP Oregon Department of Transportation Christina McDaniel-Wilson, PE Oregon Department of Transportation Keith Blair,

More information

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W District One CMNAA Central Manatee Network Alternatives Analysis December 12, 2017 5:00 pm - 7:00 pm First Baptist Church 1306 Manatee Ave. W, Bradenton, FL 34205 Central Manatee Network Alternatives Analysis

More information

Chapter 4 Construction Effects and Mitigation

Chapter 4 Construction Effects and Mitigation Chapter 4 Construction Effects and Mitigation This chapter discusses the direct and indirect s of project related construction on the elements of the built and natural environments. Direct s are s caused

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

Torbram Road Improvements From Queen Street East to Bovaird Drive

Torbram Road Improvements From Queen Street East to Bovaird Drive Torbram Road Improvements From Queen Street East to Bovaird Drive Municipal Class EA Study Public Information Centre No. 1 November 16 2017 6:30 pm 8:30 pm Please sign in so we can keep you updated on

More information

APPENDIX I. Traffic Study

APPENDIX I. Traffic Study APPENDIX I Traffic Study May 24, 2017 Mr. Tom Dodson Tom Dodson & Associates 2150 North Arrowhead Avenue San Bernardino, CA 92405 SUBJECT: LIBERTY LANE APARTMENTS FOCUSED TRAFFIC ASSESSMENT Dear Mr. Tom

More information

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR : Douglas Avenue to NW 86 th Street FOR Iowa Department of Transportation City of Urbandale City of Grimes February 7, 2013 FINAL Prepared by: HR Green, Inc. HR Green Project Number: 40110031 TABLE OF

More information

January 17, Ron Waldthausen Platte Valley LLC 1378 Promontory Bluff View Colorado Springs, CO 80921

January 17, Ron Waldthausen Platte Valley LLC 1378 Promontory Bluff View Colorado Springs, CO 80921 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633 2868 FAX (719) 633 5430 E mail: lsc@lsctrans.com Website: http://www.lsctrans.com January

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Interstate, NHS Non-Interstate and Non-NHS (IJR / IMR Guidance) SPECIFIC SUBJECT:

More information

Harlem Avenue Interchange Design Discussion. August 24, 2015

Harlem Avenue Interchange Design Discussion. August 24, 2015 Harlem Avenue Interchange Design Discussion August 24, 2015 1 Expressway Construction Pre-dates Modern Design Standards Expressway designed and constructed in 1950 s No past experience to base design standards

More information

Traffic and Parking. Introduction. 3G.2 Environmental Setting. Description of Key Roadways

Traffic and Parking. Introduction. 3G.2 Environmental Setting. Description of Key Roadways 3G 3G.1 Traffic and Parking Introduction This section presents the methodology, findings, and conclusions of the traffic impact analysis prepared by Allyn D. Rifkin, transportation planner/engineer for

More information

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1)

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1) EXHIBIT A SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1) TABLE OF CONTENTS OBJECTIVE... 1 SERVICES... 1 PROJECT MANAGEMENT... 1 SCHEDULE/STATUS REPORTS... 2 MEETINGS...

More information

6 FLORIDA FREIGHT AND PASSENGER RAIL PLAN AND GENERALIZED ASSESSMENT

6 FLORIDA FREIGHT AND PASSENGER RAIL PLAN AND GENERALIZED ASSESSMENT 6 FLORIDA FREIGHT AND PASSENGER RAIL PLAN AND GENERALIZED ASSESSMENT The State of Florida developed the Florida Freight and Passenger Rail Plan (Rail Plan) in February 2007. The Rail Plan is required by

More information

Executive Summary. Overview

Executive Summary. Overview Executive Summary Overview The Genesee-Finger Lakes Diversion Route Initiative identifies the most suitable diversion routes for Principal Arterial roads in the nine-county Genesee-Finger Lakes Region.

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

4.1 BACKGROUND ON DEVELOPMENT OF ALTERNATIVES

4.1 BACKGROUND ON DEVELOPMENT OF ALTERNATIVES 4 Alternatives CEQA mandates consideration and analysis of alternatives to the proposed General Plan. According to CEQA Guidelines, the range of alternatives shall include those that could feasibly accomplish

More information

CE 452 Traffic Impact Assessment

CE 452 Traffic Impact Assessment CE 452 Traffic Impact Assessment 1 Why Required? New developments Produce/ attract new traffic Production: Residences Attraction: Shops, Offices, Schools, Hospitals etc. etc. Changes in traffic pattern

More information