1 Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to describe the changes and additions each time this document is re-published. The description should include as many details of the changes as possible. #.# Section Modified and Revision Description Date Author 1.0 Initial release 7/13/2011 Celine McCulloch Revised requirement for sub-suppliers used for calibration services to comply with GEE QMS 7.6. Updated to align with the requirements of API Spec Q1 section Revised table in with instructions for supplier deviation requests. Updated heat treat certification requirements in section 5.1. Added heat treat chart definition in section 6.1. Clarified record requirements for supplier approval and routine production jobs. Changed responsibilities from Corporate Quality and Engineering to Global Sourcing Quality and MPE team. 9/26/2012 Celine McCulloch 10/14/2014 Ashley Weatherington GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 1 OF 9
2 Table of Contents 1.0 PURPOSE SCOPE / APPLICATION PROCEDURE RESPONSIBILITIES QUALITY RECORDS DEFINITIONS REFERENCES COMPLIANCE REQUIREMENTS...9 GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 2 OF 9
3 1.0 Purpose This specification defines the minimum quality requirements for suppliers providing heat-treatment services to facilities. 2.0 Scope / Application This specification is applicable to all suppliers of heat treatment services; such as heat treatment, stress relieving, normalizing, tempering, annealing, nitriding, and gas carburizing processes. 3.0 Procedure General Requirements Quality Verification Element Quality Verification General Requirements The supplier's quality system shall be described in a written manual or procedure with revision control and identification. The quality system manual should be approved and supported by the supplier's management and cover the requirements of either API Spec Q1 or ISO 9001 as a minimum. The quality system manual shall be submitted to the Pressure Control Sourcing Quality department for review and approval upon initial issue and/or revision. When the supplier is the holder of a current API License, ASME Certificate of Authorization, or ISO 9001 Registration Certificate, a copy of the applicable certificate may be submitted to the Sourcing Quality department in lieu of the quality system manual as objective evidence of quality system implementation. When a supplier is approved by based on an API License, ASME Certificate of Authorization, or ISO Registration Certificate, the supplier is required by this specification to invoke the provisions of the applicable API License, ASME Certificate of Authorization, or ISO Registration to the work performed for facilities. Use of Sub- Tier Suppliers The use of sub-tier suppliers by the heat-treatment supplier to perform heat treatment operations for facilities is expressly prohibited by this specification. GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 3 OF 9
4 Element Conflicts in Specified Requirements General Requirements In cases where the purchase order disagrees with the referenced drawings or specifications, the supplier shall contact the buyer at the location that issued the affected purchase order to discuss and resolve the issue Specific Quality Control Requirements Elements Document Control Material Control Process Control System Heat Treatment Special Quality Control Requirements The material manufacturer or material supplier shall ensure that materials provided to GE Oil & Gas Pressure Control are in compliance with the requirements of the drawings, specifications and instructions specified by the applicable purchase order. The supplier shall ensure that materials are properly identified and supported with documentation required by the applicable purchase order (i.e., heat-treat charts; materials test reports, hardness test reports). The heat-treatment operations shall be controlled and documented in accordance with the requirements of the supplier s quality system manual, API License or ISO Registration used as the basis for supplier approval by. As defined by the GE Oil & Gas Material Specification or VGS, the supplier shall ensure the following: Availability of required equipment Use of specific methods (including operating parameters) Identification of acceptance criteria The heat treatment of materials for facilities shall be performed in accordance with the requirements of the material or heat treatment specification required by the purchase order. Heat-treating furnaces used for heat treatment/stress relieving, normalizing, tempering, or annealing operations shall have temperature uniformity surveys performed at least annually according to the requirements of Section of this procedure. Furnace controllers and recorders shall be calibrated according to the requirements of Section of this procedure. GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 4 OF 9
5 Elements Process Qualification Personnel Qualification Inspection and Testing Control of Nonconforming Products Inspection, Measuring and Test Special Quality Control Requirements The temperature at any point in the working zone shall not vary by more than ±25 F (±14 C) from the furnace set-point temperature after the furnace working zone has been brought up to temperature. Furnaces which are used for tempering, ageing and/or stress-relieving shall not vary by more than ±15 F (±8 C) from the furnace set-point temperature after the furnace working zone has been brought up to temperature. When performing heat treatment or surface finishing processes such as nitriding, carbonitriding, gas carburizing, etc., that will not be validated by subsequent mechanical property testing (subsequent monitoring and measurement) shall be validated based on destructive testing of a material test coupon. The results of this validation shall be submitted to the Global Sourcing Quality and MPE departments for review and approval of the process prior to use for production. When changes are made to these processes, such as time and temperatures or other parameters that could affect the output of the process, the supplier shall re-validate the process in accordance with the applicable heat treat specification and re-submit validation documentation to the Sourcing Quality department, where these records will be maintained. A personnel qualification program shall be in place to ensure personnel performing heat treatment operations are qualified. All materials heat-treated for facilities shall be inspected to ensure compliance with the applicable purchase order requirements. When suppliers detect nonconformities to purchase order requirements that cannot be corrected without the use of heat treatment, or if the supplier wishes to have an issue reviewed for possible concession, the supplier shall prepare and submit a Supplier Deviation Request for review and disposition prior to shipment of the affected items. Note: Contact the GE Oil & Gas Purchasing Department for guidance in submitting these requests. Inspection, measuring and testing equipment used in these inspections shall be calibrated and traceable GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 5 OF 9
6 Elements Equipment Marking of Materials Revalidation Special Quality Control Requirements to national standards. Physical constants may be used as the basis for calibration reference in case where national standards do not exist. Sub-suppliers used for calibration services shall comply with the requirements of ISO or equivalent international or national standard. When documents referenced by the purchase order require marking, such marking shall be applied using low stress steel stamps. The supplier shall maintain a defined process for revalidation of heat treatment processes Temperature Uniformity Surveys Element General Requirements Calibration Special Quality Control Requirements A temperature survey within the furnace working zone(s) shall be performed on each furnace at the maximum and minimum temperatures for which each furnace is to be used. At minimum, a temperature survey in accordance with API Specification 6A, Annex M must be completed every 12 months. General Automatic controlling and recording instruments shall be used. Thermocouples shall be located in the furnace working zone(s) and protected from atmospheres by means of suitable protecting devices. Accuracy The controlling and recording instruments used for the heat treatment processes shall posses an accuracy of +/- 1% of their full scale range. Calibration Temperature controlling and recording instruments shall be calibrated at least once every three (3) months. Equipment used to calibrate the production equipment shall be accurate to +/- 0.25% of full scale range. GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 6 OF 9
7 4.0 Responsibilities The Sourcing Quality Manager, Quality Management Representative, and the personnel responsible for the purchasing of products and services for each operating unit are jointly responsible for ensuring complete implementation and compliance with this specification. 5.0 Quality Records The following records produced by this procedure are considered Quality Records and shall be maintained and controlled according to the requirements in OGQ Record Control: 5.1 Supplier Approval Record Requirements The following records shall be maintained and, upon request, shall be submitted to GE Oil & Gas. Record Type Personnel Qualification Calibration Furnace Surveys Documentation Requirements Qualification records for personnel (or record of verification by on-site assessment of the personnel qualification program Calibration records for furnace controllers and recorders (or record of verification by on-site assessment of the implemented calibration program Furnace survey records (or record of verification by on-site assessment of the implemented furnace survey program) meeting the requirements of API Specification 6A, Annex M 5.2 Production Record Requirements The following documentation shall be submitted to for each order. Record Type Certificate of Heat Treatment Documentation Requirements Date processed Purchase Order number Part Number and revision Part Description Heat Numbers & Heat Treat Lot numbers Serial numbers (PSL 3 and PSL 4) Heat Treat Specification and revision Type and Method Furnace thermocouple and set point of soak temperature GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 7 OF 9
8 Record Type Documentation Requirements Quench Media Type (oil, polymer, water) Temperature and times held at temperature For continuous type furnaces only: Statement that material was heat treated in a continuous furnace Temperature exiting the austenitizing furnace Time in the austenitizing furnace Temperature exiting tempering furnace Time in tempering furnace Heat Treat Furnace Charts Hardness Test Reports For PSL 4 material only, showing times and temperatures For PSL 3 and PSL 4 material which is tempered or quench and tempered only 6.0 Definitions and Acronyms Italicized terms have been defined in the GE O&G QMS Lexicon. Their definitions have been repeated here for convenience purposes. In case of conflict, the GE O&G QMS Lexicon will take precedence. 6.1 Definitions 6.2 Acronyms Heat Treat Charts uneditable, graphical representation of the temperature-time cycle including heat up and cool down, including legible scale markings for time and temperature. Operating Unit identifies the various organizations that make up GE Oil & Gas. Quality Management Representative as used in this procedure refers to the designated quality management representative for one of the Pressure Control operating units. The following acronyms are applicable to the use and implementation of this procedure: EPS - Engineering Part Specification; the part description and bill of material document that defines design. Replaces legacy EDC in Syteline. MPE Materials & Process Engineering GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 8 OF 9
9 7.0 References The latest effective editions of the following specifications are included by reference in the text of this specification: API Specification Q1 Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry ANSI/API Specification 6A - Specification for Wellhead and Christmas Tree Equipment ISO/IEC General Requirements for the Competence of Calibration and Testing Laboratories ISO Quality System Standards SAE-AMS-H Process for Heat Treatment of Steels 8.0 Compliance Requirements Full compliance required by 14-NOV-2014 Title: Reference: Revision: 1.2 Application Date: 10/14/2014 Expiration Date: 10/14/2017 Author: Ashley Weatherington External References: GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 9 OF 9
#.# Section Modified and Revision Description Date Author 1.0 Initial release 7/13/2011 Celine McCulloch
Approved by: Awet Tesfagiorgis Supplier Quality Engineer Ravi Bhatla Supplier Quality Engineer Ashley Weatherington QMS Quality Leader Document Revision Chart The following chart lists the revisions made
More informationPressure Control Supplier Quality Requirements Raw Materials Forgings and Wrought Forms SQ-12 Rev: 1.1
Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to
More informationPressure Control Supplier Quality Requirements Coating & Plating Services SQ-03 Rev: 1.1
Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to
More informationPressure Control Supplier Quality Requirements Non-Metallic Seals SQ-04 Rev: 1.1
Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to
More informationPressure Control Supplier Quality Requirements Machining Services SQ-09 Rev: 1.1. Table of Contents
Approved By: Jerry Longmire Vice President - Quality Jim Harris Continuous Improvement Leader Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use
More informationGE Oil & Gas Quality Management System Pressure Control Supplier Quality Requirements - Outsourced Manufacturing Services SQ-08 Rev: 2.
Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to describe the changes and additions each time this document is re-published. The description
More informationAPI Standards 20H. Heat Treatments Services Batch Type for Equipment Used in the Petroleum and Natural Gas Industries. First Edition, October 2015
Heat Treatments Services Batch Type for Equipment Used in the Petroleum and Natural Gas Industries First Edition, October 2015 Joel Russo, Chairman TechnipFMC 1 This standard specifies requirements for
More informationOverview of Draft API Standard 20M
Overview of Draft API Standard 20M Qualification of Suppliers of Machining Services for Use in the Petroleum and Natural Gas Industries API STANDARD 20M Slide 1 of 9 Overview Standard 20M provides methods
More informationCorrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries
Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries API SPECIFICATION 20F FIRST EDITION, XXX 201X 1 1. Scope 1.1 Purpose This API specification specifies requirements for the
More informationGE Oil & Gas Quality Management System Sourcing Guidelines for FPQ/PLQ inspection ARSB-O&G-004 Rev: 2.0
Approved By: Type name or written signature Giovanni Cecchi TMS Quality Leader Livio Loschiavo Global Supply Chain & Global Operations QMS Leader Michele Serpi TMS Leader (Not required if controlled by
More informationQuality Management System
Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material
More informationHelical Products Company
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
More informationQUALITY CONTROL MANUAL
QUALITY CONTROL MANUAL Page 1 of 10 TABLE OF CONTENTS CONTENTS PAGE General Information 3 Statement of Policy and Authority 3 Control of the QC Manual (Section I) 4 Responsibility of Key Personnel (Section
More informationMETALLIC MATERIAL SPECIFICATION
1. Scope: Page: 1 of 5 1.1. This specification shall be utilized in procurement of AISI 8630 modified steel (UNS G86300) in quenched and tempered condition to 22 HRc maximum hardness. 1.2. These materials
More informationPURCHASING QUALITY CLAUSES
PURCHASING QUALITY CLAUSES AS9120:2016, Clause 8.4 AvAir, Inc. Chandler, AZ Revision C Approvals Purchasing Quality Clauses Refer to the Documented Information Register. Revision History Listed below are
More informationGuide for the preparation of quality programs for licensing of companies performing BPE regulated work.
Labour and Advanced Education Guide for the preparation of quality programs for licensing of companies performing BPE regulated work. Company Name: QC Program issue#: Revision# Overview: 1. This guideline
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 Contents Page
More informationSupplier Quality Requirements Document (SQRD)
Supplier Quality Requirements Document (SQRD) D127135 Rev. AE Supplier Quality Requirements Document Page 2 of 8 1.0 SCOPE This document applies to all worldwide production suppliers of Coherent, Inc.
More informationQUALITY CONTROL INSTRUCTION
QUALITY CONTROL INSTRUCTION NUMBER QCI 103 REVISION N TITLE: Servotronics Inc. Quality Clauses PURPOSE: To establish a system to implement Servotronics & Customer flow down Quality Requirements to Servotronics
More informationThe Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.
ISO 9001 The Standard Illustrations The International Standard for Quality Management Systems Year 2000 Edition Leland R. Beaumont ISO 9001, The Standard Illustrations Figures excerpted from ISO 9001,
More informationWelding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS
TECHNICAL SAFETY BC Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS Date: October 12, 2017 Controlled Document: MAN-4017-02 MAN-4017-02 (2017-10-12) Page 1 of
More informationWelding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS
BRITISH COLUMBIA SAFETY AUTHORITY Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS Date: May 1, 2017 Controlled Document: MAN-4017-01 MAN-4017-01 (2017-05-01)
More informationNR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26
Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including
More informationISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER
SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM WWW.SYSTEMKARAN.COM 1 www.systemkaran.org Foreword... 5 Introduction... 6 0.1 General... 6 0.2 Process approach... 6 0.3 Relationship
More informationRailroad Friction Products Corporation
Railroad Friction Products Corporation Our Quality Philosophy: "At Railroad Friction Products Corporation we will consistently provide products that meet and exceed customer and regulatory requirements
More informationElectro-Miniatures Corp. 68 West Commercial Ave. Moonachie New Jersey Phone: Fax:
Electro-Miniatures Corp. 68 West Commercial Ave. Moonachie New Jersey 07074 Phone: 201-460-0510 Fax: 201-935-8153 1. PURPOSE GENERAL SUPPLIER REQUIREMENTS CLAUSE This general requirement describes the
More informationHACCP audit checklist
Requirement HACCP audit checklist Prerequisite Program Management Commitment 1. Senior management ensures that the responsibilities and authorities are defined and communicated within the company Internal
More informationProcurement Quality Assurance Requirements
1. REQUIREMENTS 1.1 Quality System This document provides the minimum Quality System Requirements to externally provided processes, products and services to Superior Thread Rolling (STR). Suppliers must
More informationRequirements for Suppliers
1.0 INTRODUCTION This document establishes requirements designed to ensure Park Engineering & Manufacturing Inc. (PEM) suppliers produce product that meets PEM s quality expectations and terms. Only suppliers
More information14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
More informationSupplier Quality Terms & Conditions
Rev 01. February 20, 2018 Page 1 of 5 Supplier Quality Terms & Conditions Century Spring Corporation (CSC) maintains a quality management system that adheres to the requirements of ISO 9001:2015 and AS9100
More informationQP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE
Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products
More informationTELEPHONICS SUPPLIER QUALITY MANAGEMENT AS9102 FIRST ARTICLE INSPECTION GUIDELINES
WELCOME TELEPHONICS SUPPLIER QUALITY MANAGEMENT AS9102 FIRST ARTICLE INSPECTION GUIDELINES -1 BACKGROUND Telephonics customer base is increasingly requiring by contract that Telephonics provide full AS9102
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 PDF disclaimer
More informationSpecification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry (Draft 10)
Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry (Draft 10) ANSI/API SPECIFICATION Q1 NINTH EDITION, XXXX 2012 EFFECTIVE DATE: XXXX 2012 + 6 Months \iii Contents
More informationProcedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept
ALTA Quality Requirements for Suppliers 25 Sept 2017 1 2 3.2. Purchase order information a- When Alta customer is indicated on the purchase order or related engineering documents, customer quality requirements
More informationSUPPLIER QUALITY PROGRAM, IV (U)
PRODUCT QUALITY REQUIREMENTS PQR 1050 PAGE 1 OF 14 FEDERAL MANUFACTURING & TECHNOLOGIES (PQR 1050_L.doc) SUPPLIER QUALITY PROGRAM, IV (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE D CORRECTED
More informationSHELTON INDUSTRIAL PATTERN INC.
Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System
More informationCMI Guidance Document
CMI Guidance Document for Product Quality Plan Requirements Reference CMI-GD-PQP This document has been produced by the Administration Department of CertMark International (CMI). For technical information
More informationRosen Aviation Supplier Quality Assurance Requirements
1. Purpose This document establishes the Quality Assurance Requirements for all Rosen Suppliers. This document is applicable to all Rosen Aviation Purchase Orders (POs). In addition to the requirements
More informationACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS
ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS [Not applicable to ASME Sec. IV, Cast Iron and Aluminum Boilers, ASME Sec. VIII Div 1, UG-90 (c) (2) and Graphite Vessels, ASME Sec. VIII, Div.
More informationPurchasing- requirements Attachment A ALLEN AIRCRAFT PRODUCTS MINIMUM REQUIREMENTS FOR SUPPLIERS AGREEMENT
Purchasing- requirements Attachment A ALLEN AIRCRAFT PRODUCTS MINIMUM REQUIREMENTS FOR SUPPLIERS AGREEMENT Allen Aircraft Products has implemented an ISO 9001:2000/AS9100, quality management system and
More informationGeneral Purchase Order Requirements
General Purchase Order Requirements [NOTE: Some of the requirements listed below are contingent upon other variables (i.e. aerospace products, when required by Purchase Order, if applicable, as applicable
More informationTT Electronics Integrated Manufacturing Services Supplement to Purchase Order Quality Clauses TT Electronics Purchase Order
Q01 Quality System Requirements The supplier shall establish and maintain a quality system that conforms to the requirements of ISO 9001:2008 or AS9100 current revision or previous revision prior to its
More informationGRMA-032-PRO-00 Page 1 of 8
GRMA-032-PRO-00 Page 1 of 8 GR9100 - Goodrich Quality Requirements for Suppliers Author: Frank Reynolds Issue Date: January 2, 2012 Effective Date: March 2, 2012 1.0 PURPOSE / SCOPE 1.1 This document,
More informationISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER
SYSTEM KARAN ADVISER & INFORMATION CENTER PETROLEUM, PETROCHEMICAL AND NATURAL GAS INDUSTRIES -- SECTOR-SPECIFIC QUALITY MANAGEMENT SYSTEMS -- REQUIREMENTS FOR PRODUCT AND SERVICE SUPPLY ORGANIZATIONS
More informationQUALITY SYSTEM MANUAL
TITLE: QUALITY SYSTEM MANUAL Page 1 of 15 QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 2 of 15 Index PARAGRAPH TITLE... PAGE 1.0 GENERAL INFORMATION... 3 2.0 DEFINITIONS... 5 3.0 RELATED DOCUMENTS...
More informationEVANS CAPACITOR COMPANY
DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution
More informationAEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard
More informationSupplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Bobby Gravison Quality Assurance Manager Accurus Tulsa Machining & Manufacturing 1 Record of Revisions Revision
More informationSpecification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry
Addendum 1 June 2010 Effective Date: December 1, 2010 Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry ANSI/API SPECIFICATION Q1 EIGHTH EDITION, DECEMBER 2007
More informationSUPPLIER QUALITY PROGRAM Procurement Standard
SUPPLIER QUALITY PROGRAM Procurement Standard Revision: E Notice: This standard is subject to periodic review and may be revised at any time; users are cautioned to obtain the latest revision. 1.0 Purpose:
More informationRevision Date Change Author Change Summary A 04/23/2015 S. Oluwole
Title: Supplier Quality Clauses Page: 1 of 11 Revision Date Change Author Change Summary A 04/23/2015 S. Oluwole In case of any conflict with this document and any other requirements, the order of precedence
More informationTITLE: SQR-001 Supplier Quality Requirements
Page: Page 1 of 8 TITLE: SQR-001 Supplier Quality Requirements Page: Page 2 of 8 Contents REVISION HISTORY... 3 REFERENCED QUALITY DOCUMENTS... 3 DOCUMENT DETAILS... 3 1. PURPOSE OF DOCUMENT... 4 2. DOCUMENT
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 9001 Quality management systems Requirements Systèmes de management de la qualité Exigences Fourth edition 2008-11-15 Reference number ISO 9001:2008(E) ISO 2008 PDF disclaimer
More informationPressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b
QMS written description verification CHECKLIST AB-518b Company Name: Company Address: Title of the written description of the management system or manual(s): Person responsible for the overall management
More informationCTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.
1.0 PURPOSE The purpose of this work instruction is to control the content of the Quality clauses. 2.0 PROCEDURE Only the clauses spelled out on the face of the Purchase Order apply. If the supplier cannot
More informationTexas International Oilfield Tools, Ltd.
Originated by: J. Tuttle Texas International Oilfield Tools, Ltd. QUALITY SYSTEM MANUAL Revision Date: May 26, 2010 Number: QSM000 Subject: Texas International Quality System Revision: A 1.0 INTRODUCTION
More informationReplaces: Not applicable.
Page 1/12 SCOPE - defines the quality requirements for purchasing materials, parts and services that may affect product quality of Airborne items. does not include requirements for design and development
More informationACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS
ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West
More informationALTA Precision Inc. Quality Procedure
ALTA Precision Inc. Quality Procedure Procedure QAP 7.4.2 Issue 7 Date September 28, 2015 Page 1 of 5 ALTA Quality Requirements for Suppliers Prepared and issued by Marc Dumouchel Approved by Sonia Alonso
More informationI. Development, Submittal, and Acceptance of a Quality Management System
I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor
More informationControlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70
Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller
More informationSpecification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry
Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry ANSI/API SPECIFICATION Q1 NINTH EDITION, XXXX 2012 EFFECTIVE DATE: XXXX 2012 + 6 Months iii Contents Page Special
More informationUNCONTROLLED DOCUMENT
Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision
More informationVendor Qualification Survey
1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service
More informationOperating Procedure 6-02 Supplier Quality Requirements
Page: 1 of 6 1 Purpose 1.1 To define DCI Aerotech s supplier quality assurance requirements. 2 Scope 2.1 These requirements apply to all DCI Aerotech suppliers. 3 Responsibilities 3.1 Acceptance of DCI
More informationWilson-Hurd ATF Quality Manual
Wilson-Hurd ATF Quality Manual Wilson-Hurd Manufacturing Company Advanced Technical Facility (ATF) 311 Winton Street Wausau, WI 54403 Rev. Date: 04 May 2017 Pete Dehne Vice President, Operations Table
More informationREQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES
Special Quality Assurance Documents (SQAD) (Continued) SQAD-1 REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES 1.1 QA PROGRAM: Items or services supplied under the PO/ Contract shall
More informationQuality Control Manual Submission Information
Table of Contents Quality Control Manual Submission Information 1.0 Legislative Requirement 1.1 Exemption to Legislative Requirement 2.0 Required content of Quality Control Manual 2.1 Title Page 2.2 Scope/
More informationCorrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries
Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries API SPECIFICATION 20F SECOND EDITION, XXXXX 201X API MONOGRAM PROGRAM EFFECTIVE DATE: XXXXXXXXXX XX, 201X Corrosion Resistant
More informationAEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,
More informationISO 9001:2000 Revision G
ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational
More informationSUPPLIER QUALITY SYSTEM SURVEY
SUPPLIER QUALITY SYSTEM SURVEY DATE (M/d/yy): 55 Dragon Court Woburn, MA 01801 Tel: (781) 933-7300 Fax: (781) 935-4529 GENERAL INFORMATION Supplier Name: Physical Address: City: State: Zip: Sr. Company
More informationVOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS
The requirements of this supplement apply to the purchase order to which it is attached / referenced, to the extent applicable. Acceptance of the purchase order by the vendor constitutes acceptance of
More informationPURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions)
PURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions) Requirements 1-12 and 18 are applicable to all Mission Aerospace, Inc. purchase orders issued. Requirements 13-17 are applicable when specifically
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationSupplier Quality Requirements
1 of 7 NOTE: YELLOW HI-LITE INDICATES CHANGE FROM THE PREVIOUS REVISION GENERAL REQUIREMENTS (Applies to all orders issued from GMW referencing this document) QR-01 Quality Management Systems AS9100 Suppliers:
More informationIn case of of differences or inconsistencies with texts in the Main Contract, the stipulations in the Main Contract will prevail.
This Appendix I with the Supplier Quality Assurance Requirements for the E-LIGHTER program defines Fokker Aerostructures (Buyer) additional Program Specific Quality Requirements for contracts where AQAP
More informationThese requirements apply to all suppliers:
Page 1 of 5 These requirements apply to all suppliers: A. Right of Entry Tri Models, Tri Model s customer and their customers or applicable regulatory agencies shall have right of access to all facilities,
More informationProcess Specification for the Heat Treatment of Nickel Alloys
Process Specification for the Heat Treatment of Nickel Alloys Engineering Directorate Structural Engineering Division August 2009 National Aeronautics and Space Administration Lyndon B. Johnson Space Center
More informationPurchase Order Quality Terms and Conditions
Section I: General Quality Assurance Requirements Applicable To All Purchase/Subcontract Orders; A. Quality System The Supplier s Quality System shall comply with ISO 9001:2008. All sample inspection must
More informationQUALITY REQUIREMENTS FOR SUPPLIERS
Rights of Intellectual Property This document is the property of ASE S.p.A and is delivered on the express condition that it is not to be disclosed, reproduced in whole or in part or used for manufacture
More informationPP Quality Assurance Procurement Clauses for Suppliers
PP 360.3 Quality Assurance Procurement Clauses for Suppliers Version No: 7 Created By: Approved By: Erik Keim on 01/29/2019 at 10:44 PM Eric Deffarges on 02/05/2019 at 09:17 AM Valid From: 06/12/2017 Strictly
More informationLT Industries SQFR 101
Page 1 of 5 LT Industries SQFR 101 Supplier Quality Flow down Requirements 1.0 GENERAL REQUIREMENTS: The supplier must flow down these requirements from LTI to their sub tier suppliers whenever those sub
More informationQuality Control Manual Submission Information
330 1855 Victoria Avenue Regina, SK S4P 3T2 PH: (306)798-7111 Toll Free: (866)530-8599 FAX: (306)787-9273 Toll Free: (866)760-9255 Website: www.tsask.ca Table of Contents Quality Control Manual Submission
More informationBYRON PRODUCTS QUALITY TERMS AND CONDITIONS
001 CERTIFICATION OF COMPLIANCE: All parts/processes supplied by the supplier must be certified as to their compliance with all purchase order requirements. The certification must contain, as a minimum:
More informationQuality Assurance Audit Checklist
Quality Assurance Audit Checklist Form: ASQF-406 Rev. 5 Date: 01-22-2018 Page: 1 of 14 The following is a checklist for process approach internal auditing conducted by Analytic Stress Relieving Inc. based
More informationQUALITY REQUIREMENTS FOR SUPPLIERS
Rights of Intellectual Property This document is the property of ASE S.p.A and is delivered on the express condition that it is not to be disclosed, reproduced in whole or in part or used for manufacture
More informationDocument Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:
POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner A. SCOPE This document contains requirements for conducting business with Tri Star Metals, LLC and its customers. It is applicable to suppliers that provide
More informationQualification of manufacturers of special materials
SERVICE SPECIFICATION DNVGL-SE-0079 Edition June 2016 Qualification of manufacturers of special materials The electronic pdf version of this document found through http://www.dnvgl.com is the officially
More informationQUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip
UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013
More informationTo establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.
1.0 PURPOSE To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 2.0 APPLICATION When (QAM) Appendix 8.4 is specified on the purchase order,
More informationDelegated Product Release Verification RATIONALE
AEROSPACE STANDARD Issued 01 October 2015 Draft Standard Technically equivalent writings published in all IAQG sectors. Delegated Product Release Verification RATIONALE The process for Delegated Product
More informationSUPPLIER SURVEY FORM Instructions
SUPPLIER SURVEY FORM Instructions 1. The following Supplier Survey was developed by Vishay Measurements Group, Inc. to assess and document the capability of its supplier base. 2. The Supplier Survey is
More informationQuality Code Matrix Appendix A for 8.4.3
Quality Code Matrix Code Subject Requirements 1 Quality System Requirements 1) The supplier must meet all applicable requirements of Arconic, Washington Operations (WO), Purchasing requirments located
More informationWelding Performance Qualification Test Administrators GUIDE FOR APPLICANTS
TECHNICAL SAFETY BC Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS Date: October 12, 2017 Controlled Document: MAN-4018-02 MAN-4018-02 Page 1 of 27 Contents 1.0 Introduction...
More informationWelding Performance Qualification Test Administrators GUIDE FOR APPLICANTS
BRITISH COLUMBIA SAFETY AUTHORITY Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS Date: April 25, 2017 Controlled Document: MAN-4018-01 MAN-4018-01 Page 1 of 27 Contents Contents...
More informationAPS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.
Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...
More information