DIOMIS (Developing Infrastructure and Operating Models for Intermodal Shift)

Size: px
Start display at page:

Download "DIOMIS (Developing Infrastructure and Operating Models for Intermodal Shift)"

Transcription

1 DIOMIS (Developing Infrastructure and Operating Models for Intermodal Shift) Growth and Quality of Service : coping with a constrained Infrastructure The example of Combined Transport By Eric Peetermans SNCB Holding, Corporate International Affairs & Chairman of the UIC Combined Transport Group 1 Bratislava, May 4 th 2006

2 CTG Study on Capacity Reserves 2015 Combined Transport Group UIC (CTG): 21 UIC Railway Undertakings, dealing mainly with cooperation issues related to Combined Transport CTG commissioned an investigation to comprehensively examine if the capacity of rail network and intermodal terminals in Europe will be sufficient to absorb the growth of international combined transport by the year The full report can be downloaded from the UIC website The project has been initiated and financed by the UIC (Union Internationale des Chemins de Fer), with the participation of the UIRR (Union Internationale des Sociétés de Transport Combiné Rail- Route). This partnership reflects the joint concern for maintaining an optimum development of this exciting transport mode. The study was carried out by the following team of consultants: Kessel & Partner Transport Consultants, Freiburg KombiConsult GmbH, Frankfurt am Main MVA, Paris 2

3 International unaccompanied CT is a very concentrated business 80% of total traffic concentrated on approx. 100 intermodal intermodal links = services both ways 3

4 International unaccompanied CT is a very concentrated business 4

5 International unaccompanied CT is a very concentrated business 5

6 UIC Combined Transport Group (CTG) Study about Infrastructure Capacity Reserves 2015 : Growth Projections (International non accompanied Combined Transport) 6

7 UIC Combined Transport Group (CTG) Study about Infrastructure Capacity Reserves 2015 : Growth Projections (International non accompanied Combined Transport) ,6 80 6,8 % average annual growth rate million tonnes ,5 % average annual growth rate 44,

8 International unaccompanied CT is a very concentrated business TEU > 10% of all services (195) cover 80% of the total volume -> 16% of all services (307) cover 90% of the total volume Number of Relations 80% of total traffic concentrated on approx. 100 intermodal intermodal links = services both ways 8

9 Concentration of International CT expected in 2015 CT Trains per day High concentration of ICT: primarily NorthSouth, but by 2015 all axes are involved % of the total transhipment volume of international CT handled at intermodal terminals located in 25 major European economic areas 9

10 Utilisation rate of the Railway Infrastructure in 2015 after consideration of planned enlargement investments 10

11 Main international rail axes with bottlenecks by 2015 Country Germany France Belgium Switzerland Spain Main axes with bottlenecks Hamburg Rhein / Main Köln Rhein / Main Saarbrücken - Stuttgart Metz - Dijon Lyon - Avignon Paris Orléans - Tours Freight corridors from / to Anvers Greater Basel area Barcelona - Tarragona 11

12 The Intermodal Terminals: selected representative transport areas Le Havre Rotterdam Antwerp Zeebrugge Paris Taulov Bremerhaven Genk Bremen Duisburg Neuss Köln Lübeck Nürnberg Ludwigshafen/ Mannheim Basel München Novara Milano Hamburg Villach Verona Bologna Poznan Praha Wien Wels Graz Ljubljana Warszawa Gliwice Budapest Madrid Valencia Barcelona Roma 25 largest areas 9 end-of-corridor transport areas 12

13 Main Basic Assumptions of the Study Sustained growth of International Combined Transport (ICT) on all corridors Growth differentiated per corridor but average growth for Unaccompanied ICT estimated at 6,8 % per year (less than historical growth of CT) Which means + 113% 2015/2002 (+ 134,92 % for Unaccompanied International Combined Transport and + 19% for Accompanied ICT) Increase of the number of Conventional Freight Trains by 25% Increase of 20% of the productivity in the use of the Infrastructure by Freight trains: 750 m/ Gross Tons on all corridors studied 80% use of the available length Internationally integrated railway paths Return of quality of service to normal levels (85/90% punctuality) All identified Infrastructure projects have been implemented by 2015 Severe Railway Infrastructure saturation is shown, requiring far reaching boundary crossing actions in terms of investments in rail and terminal infrastructure, technical-operational improvements, working procedures between all stakeholders of CT 13

14 DIOMIS Key Actions and Objectives In 4 domains : - Railway Network Management - Railway Operations Management - Terminal Management - Accompanying Actions And an ultimate deliverable, resulting from those actions : the DIOMIS CT MASTER PLAN 2015 With the objective of : Achieving the productivity gains underlying the conclusions of the Study regarding the rate of utilisation of the available Infrastructure in 2015 Encouraging new types of cooperation between all stakeholders in CT : terminal operators, CT operators, shippers, railway undertakings, infrastructure managers, national and European authorities Describing and helping to implement optimal capacity management models at terminal level in order to use the available capacity in an optimal manner Adapting and improving more effective operating practices in terms of railway operation in order to relieve a saturated network and respond to future market requirements Describing the benefits of an international approach towards planning and production, and lay down the basic principles for a common approach towards improvement of intermodal services Learning to grow Rail Freight traffics on a saturated railway infrastructure The UIC Freight Commission confirmed repeatedly the importance of the project for Rail Freight in general, and mandated the CTG to carry it out. The Executive Committee of the UIC decided on Sept 16 th 2005 to finance it and it will be launched on January 1 st

15 The ultimate deliverable of DIOMIS: CT MASTER PLAN 2015 The DIOMIS CT Master Plan 2015 will be a strategic document centralising the findings of all the work packages and consigning them in a document designed to help decision makers and stakeholders implement improved working procedures in all CT related fields The Master Plan will synthesise for all decision makers and CT stakeholders in clear and concrete terms the information made available by the work packages and will contribute to an adapted infrastructure able to cope with the anticipated modal shift CT terminals with an adapted infrastructure improved operational procedures improved business models between Railway Undertakings and CT Operators, matching the conditions of projected infrastructure and demand an international vision and coordination in terms of infrastructure and development of CT terminals a clear formulation addressed by the RUs to the IMs about their qualitative and quantitative needs in terms of Railway Infrastructure for their freight trains The target date for publishing the CT Master Plan is December

16 DIOMIS Project : Positioning and inputs/outputs Approach Infra corridor Infra utilisation Quality of IM- Train Infra Technical Business approach capacities & operations RU operations interface approach Freight Time Horizon Long Term >10y Medium Term 5-10 y Short Term <5 y ERIM CTG Report June 2004 (incl. database) DIOMIS A2 DIOMIS A3 DIOMIS A6 DIOMIS A9 BMQS DIOMIS A5 EUROPTIRAILS Core of DIOMIS DIOMIS A 12 Master Plan 2015 DIOMIS A8 DIOMIS A7 DIOMIS A4 NEW OPERA DIOMIS A10 TREND DIOMIS A1 DIOMIS A11 16

17 DIOMIS Project : Modules Action Description The Railway Network Management Input/Output A 2 A 3 A 6 A 5 A 7 A 9 A 10 A 4 A 8 A 1 A 11 A 12 Assessment of main bottlenecks and Infra measures proposed Assessment of Cost of relieving Bottlenecks Harmonised procedures for planning train paths The Railway Operations Improving the use of the available train lenghts ICT Production systems, including Long & Heavy Trains Opportunity Costs Non Accompanied vs Accompanied CT Assessing New Technologies in the wagon field The Terminals Best Practices for the Management of CT Terminals, including Extension of the opening times of the CT terminals International coordination for the development of CT terminals The Accompanying Actions Trends in Domestic Combined Transport Periodical Report on CT in Europe The End Deliverable CT Master Plan 2015 From ERIM, to TREND, NEW OPERA Idem From Europtirails, RNE To ERIM, NEW OPERA To ERIM, TRENDS, NEW OPERA To NEW OPERA To NEW OPERA To ERIM, NEW OPERA To ERIM, NEW OPERA To ERIM, NEW OPERA To TREND, NEW OPERA Inputs from all modules Outputs to the all stakeholders 17

18 DIOMIS Project : the main Partners Action Description The Railway Network Management Main Partners A 2 A 3 A 6 A 5 A 7 A 9 A 10 A 4 A 8 A 1 A 11 A 12 Assessment of main bottlenecks and Infra measures proposed Assessment of Cost of relieving Bottlenecks Harmonised procedures for planning train paths The Railway Operations Improving the use of the available train lenghts ICT Production systems, including Long & Heavy Trains Opportunity Costs Non Accompanied vs Accompanied CT Assessing New Technologies in the wagon field The Terminals Best Practices for the Management of CT Terminals, including Extension of the opening times of the CT terminals International coordination for the development of CT terminals The Accompanying Actions Trends in Domestic Combined Transport Periodical Report on CT in Europe The End Deliverable CT Master Plan 2015 RUs, IMs Idem Idem (including RNE) RUs, IMs,CT Operators, Terminal Managers RUs, IMs, CT Operators RUs, IMs, CT Operators RUs, CT Operators RUs, Terminal Managers, CT Operators, Shippers RUs, Terminal Managers, CT Operators RUs, CT Operators RUs, CT Operators Inputs from all modules Outputs to the whole Railway Community 18

19 Quality Framework Commitment between the UIC Railway Undertakings (RUs) and the UIRR CT Operators : Common awareness Based on the common awareness and recognition of several points : It is mainly thanks to CT that the rail mode has managed to maintain its freight traffic volumes. And the main growth sector for rail freight will be CT CT must now tailor its product range to the qualitative needs of the market. The further development of CT requires that the railway undertakings and operators voluntarily set the different standards ensuring delivery of CT services that are competitive with road transport on quality. The specific requirements of CT in terms of quality are particularily sharp given that road transport is not only the benchmark but also the natural traffic source for CT. A degradation of quality in the CT service reduces product attractiveness, decreases the productivity of assets deployed, and increases costs for each of the stakeholders in the CT chain. Combined transport is a very low margin activity especially for the railways, the CT operators and the terminal operators. Therefore, increased costs due to slack resulting from inadequate quality of service cannot be tolerated. The expectations of the customers and the external stakeholders (the European and National Authorities and the public, mainly) are high, although sometimes incoherent and without adequate follow up, but they must be answered. Traffic growth on a severely constrained infrastructure will necessitate from all stakeholders lean production and operational methods and strict management. 19

20 Quality Framework Commitment RUs-UIRR : A sample of the General level of reliability of CT trains (@ UIRR trains over 18 lines of route) 100,00 90,00 80,00 70,00 60,00 60,00 57,29 64,26 61,84 50,00 47,83 43,14 48,49 40,00 30,00 20,00 10,00 0,00 12,42 10,61 7,43 6,15 3,39 16,21 17,66 14,04 14,60 14,03 12,03 10,70 11,86 10,49 11,04 10,78 11,19 10,25 8,27 8,80 7,26 7,11 7,36,94 7,61 8,70 7,37 6,98 5,10 4,30 4,73 5,335,37 6,02 3, (9 m.) Catégories de retards < 0,5 h 0,5 < 1h 1 < 3h 3 < 6 h > 6h > 24h 20

21 Quality Framework Commitment RUs-UIRR : Contractual Freedom and Scope signed on July 5 th 2005 between the Railway Undertakings, members of the UIC Freight Forum and the CT Operators, members of the UIRR, to develop and strengthen, by means of contracts, the quality of railway services provided in block train traffic in international combined transport, the framework lists the essential components to be developed in the practical and specific arrangements to be developed route-byroute and contract-by-contract, it does not impinge on the principle of contractual freedom of parties nor on the possibility to adopt specific arrangements required to cover some market segments and open certain opportunities, it applies only to non-accompanied international CT block train traffic, including the antennas, that are listed in the production programs agreed, on the different routes, between RUs and Operators, 21

22 Quality Framework Commitment RUs-UIRR : Commitments and signal effects with mutual and reciprocal commitments: the RUs are committed, within their field of responsibility, to deliver and maintain a quality-of-service level in line with specific and strict criteria flanked by suitable penalty provisions for non-compliance. the Operators - in the context of inclusive capacity purchases are committed to observe the quality criteria falling within their area of competence, and to pay, in circumstances and under forms/procedures to be foreseen in specific quality-related contracts, penalties for nonobservance of these criteria. the underlying objective is to operate as a signal that incites the defaulting RU to deliver the service package sold to the customer, and encourages the defaulting Operator to abide by the rules that have been agreed. to ensure that their quality-of-service contracts are as effective as possible, the parties signatory parties shall arrange for similar agreements to be signed with their respective suppliers and sub-contractors. results will be jointly evaluated from end

23 Quality Framework Commitment RUs-UIRR : the main elements to be developed in the quality contracts the scheduling of the trains, meaning, among other things: the maximum gross tonnage, the maximum length, origin/departure points, in principle terminals, the itinerary, the timetable, in other words the days on which services are operated, the handover deadline (HLR),departure/arrival and placing at disposal (MAD), the appropriate procedures and communication circuits needed for implementing quality contracts, particularly in terms of operational and financial train monitoring, analysis of causes of malfunctioning, information feedback, technical adjustments, and reporting. updated train punctuality indicators in respect of the different routes and for the trains covered by the quality contracts. Other indicators may be agreed, especially ones related to causes of delays. reciprocal penalities, charged to the defective party, in case of : delays relative to MAD and/or HLR, possible agreed tolerances being taken into account, cancellation of trains at the initiative of one of the parties, outside the agreed exemptions or notices, the different penality rates shall be set at an appropriate level. This level shall be determined jointly and shall mainly take into account the requirements of the market segment concerned and the performance required as specified by the Operators, the characteristics of the route, and the specific features of the particular service. cases of exemption cases of capacity reduction the operational information to be supplied: by the RUs, by the Operators, the agreed penalties, in case of non compliance. the cases the RUs cannot avoid and which they are not required to cure (force majeure). 23

24 Quality Framework Commitment RUs-UIRR : the relationship with the Infrastructure Managers (IMs) Railway Undertakings shall pursue all appropriate efforts to ensure that IMs and Regulators : allocate paths that correspond to CT needs in terms of quality and quantity, which implies that they should accord higher priority to freight operations, accept full liability with respect to these operations should they be prevented from performing the service expected, and guarantee, jointly with the Railway Undertakings, operation of an adequate quota of CT trains in the event of sectoral strike. RUs shall take steps to secure, from the IMs, transparent information on the causes of operational delays, all corrective action within their field of competence and relevant to the overall quality-of-service improvement objective. Development and implementation of a European Performance Regime between IMs and RUs see further slide 24

25 Quality Framework Commitment : a similar framework agreement is under development with FIATA FIATA is the international association of Freight Forwarders Regular contacts take place between FIATA and UIC Considering the work done in Combined Transport with UIRR, the idea arised to establish "General Recommendations for Quality contracts for dedicated international block trains of the conventional rail freight traffic", That document is based largely on the CT one, and will be finalized by end of this year It concerns only block trains, the issue of quality for single wagons is much more complex and will be handled in the context of a broader UIC project, still to be outlined (Definition of an international high level offer in single wagon load traffic and implementing it in the framework of a pilot relation) Shippers must be involved in the further evolutions 25

26 Involving the IMs : The European Performance Regime project (EPR) between IMs and RUs While the described framework agreements concern mainly the relationship between RUs and Customers, the involvement of the IMs in the quality process through EPR will enhance the robustness of the system and the confidence of the stakeholderswioflof tl enhance the robustness of the system and the confidence of the stakeholders UIC is developing between IMs and RUs a system which: monitors the performance of the European railway services, stimulates a good behaviour of IMs and RUs in terms of service-quality, provides penalization to bad performances of IMs and RUs as well is consistent with contractual and business goals of IMs and RUs shall improve the quality of the railway transportation service An Advisory Group where the RUs are represented recommended to : adopt a model based on delays - minutes pursue a corridor based approach include secondary delays and an incentive to delay recovery limit penalties to a warning function foresee a single contract start with a test-run of at least one year on 2 lines of route, including Antwerp-Basel-Milan The end result will be, by end of 2006, a international contractual framework on performance, robustness and reliability of service between IMs and RUs 26

27 Process of corridor-based Quality Management : the necessary tools Monitoring the current performance Analysis Setting targets of punctuality Defining measures and responsibilities (IM, RU) Reporting system Quality Circle Data collection by IMs aggregation on a corridor level Total number of delays and incidents -> ranking current punctuality of corridor/ru Measurable, operational and reachable targets levels of targets: macro level micro level Purpose: improving quality stated on macro and micro level prioritisation of measures Standardised reporting process between parties documenting the QM process basis for penalization International analysing and improvement meetings programmed between RUs and IMs 27

WP24, Geneva, October 2007

WP24, Geneva, October 2007 Developing Infrastructure and Operating Models for Intermodal Shift http://www.uic.asso.fr/diomis WP24, Geneva, October 2007 Sandra Gehenot Senior Freight Advisor Study on Infrastructure Capacity Reserves

More information

DIOMIS Conference, Paris, 10/3/2009. The Case for Infrastructure: How can we ensure sufficient Network & Terminal Capacity?

DIOMIS Conference, Paris, 10/3/2009. The Case for Infrastructure: How can we ensure sufficient Network & Terminal Capacity? DIOMIS Conference, Paris, 10/3/2009 The Case for Infrastructure: How can we ensure sufficient Network & Terminal Capacity? Introduction to Session 2 by Eric Peetermans (SNCB/CTG UIC) & Uwe Sondermann (KombiConsult)

More information

Developing Infrastructure and Operating Models for Intermodal Shift SIAFI 24 APRIL 2007 SANDRA GEHENOT SENIOR FREIGHT ADVISOR

Developing Infrastructure and Operating Models for Intermodal Shift SIAFI 24 APRIL 2007 SANDRA GEHENOT SENIOR FREIGHT ADVISOR Developing Infrastructure and Operating Models for Intermodal Shift SIAFI 24 APRIL 2007 SANDRA GEHENOT SENIOR FREIGHT ADVISOR UIC Combined Transport Group (CTG) Study on Infrastructure Capacity Reserves

More information

Developing Infrastructure and Operating Models for Intermodal Shift - DIOMIS Intermodal Rail/Road Transport In Europe 2007

Developing Infrastructure and Operating Models for Intermodal Shift - DIOMIS  Intermodal Rail/Road Transport In Europe 2007 Developing Infrastructure and Operating Models for Intermodal Shift - DIOMIS http://www.uic.org/diomis Intermodal Rail/Road Transport In Europe 2007 Geneva 12&13 October 2009 Main objectives To deliver

More information

European Economic Interest Grouping (EEIG) corridor D TECHNICAL TERMS OF REFERENCE FOR THE TRANSPORT MARKET STUDY ON THE EUROPEAN FREIGHT CORRIDOR 6

European Economic Interest Grouping (EEIG) corridor D TECHNICAL TERMS OF REFERENCE FOR THE TRANSPORT MARKET STUDY ON THE EUROPEAN FREIGHT CORRIDOR 6 TECHNICAL TERMS OF REFERENCE FOR THE TRANSPORT MARKET STUDY ON THE EUROPEAN FREIGHT CORRIDOR 6 1 Table of Contents Introduction... 3 1 Objectives of the Transport Market Study... 3 2 Scope of the Transport

More information

20 years of rail liberalisation in Europe: key lessons and future prospects

20 years of rail liberalisation in Europe: key lessons and future prospects 20 years of rail liberalisation in Europe: key lessons and future prospects Views of SNCF 1 SNCF SNCF 4th European Rail Transport Regulation Forum OVERVIEW Why introduce competition? Pillars of the European

More information

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors Boosting International Rail Freight Sector Statement on Rail Freight Corridors Brussels, 20 May 2016 1 Sector Statement on Rail Freight Corridors: Boosting International Rail Freight 20 May 2016 - final

More information

International Corridor Rhine-Alpine Conference

International Corridor Rhine-Alpine Conference A cooperation between Supported by International Corridor Rhine-Alpine Conference 2014 2014 18. September 2014 Guus de Mol PMO International Corridor Rhine-Alpine Conference (Genoa, 18/09/2014) Chairman

More information

***I POSITION OF THE EUROPEAN PARLIAMENT

***I POSITION OF THE EUROPEAN PARLIAMENT EUROPEAN PARLIAMENT 2004 2009 Consolidated legislative document 23.4.2009 EP-PE_TC1-COD(2008)0247 ***I POSITION OF THE EUROPEAN PARLIAMENT adopted at first reading on 23 April 2009 with a view to the adoption

More information

Track Price Analysis in Transalpine Combined Transport

Track Price Analysis in Transalpine Combined Transport Track Price Analysis in Transalpine Combined Transport Executive Summary of the Study for 31 Rue Montoyerstraat, B-1000 Brussels Author TransCare GmbH Danziger Str. 14 D - 65191 Wiesbaden Contact persons:

More information

Action Plan RFC North Sea - Mediterranean

Action Plan RFC North Sea - Mediterranean Action Plan RFC North Sea - Mediterranean G Confais Morieux 16 April 2018 Agenda 1. Reminder The 10 priorities of the Sector 2. Action Plan RFC North Sea - Med 2/20 2/23 Opening RFC Strategy Sessions -

More information

UIRR s successful approach

UIRR s successful approach The contribution of Combined Transport to more efficient and environment-friendly logistics UIRR s successful approach Balkans Intermodal and Logistics Conference Sofia 06/07.11.2006 1 Brief reminders

More information

ERTMS. European Rail Traffic Management System. and the TEN-T Programme + Corridor implementation

ERTMS. European Rail Traffic Management System. and the TEN-T Programme + Corridor implementation ERTMS European Rail Traffic Management System and the 2007-2013 TEN-T Programme + Corridor implementation ERTMS Corridors ERTMS Corridor TEN-T supported section Corridor A Rotterdam Genoa ERTMS Corridor

More information

INTERMODAL TRANSPORT AND THE WHITE PAPER IRU POSITION

INTERMODAL TRANSPORT AND THE WHITE PAPER IRU POSITION GETC/G3311/SPR Geneva, 29 November 2001 INTERMODAL TRANSPORT AND THE WHITE PAPER IRU POSITION INTRODUCTION The White Paper EUROPEAN TRANSPORT POLICY FOR 2010: DECISION TIME published by the European Commission

More information

Capacity Allocation. Railway Advisory Group October 1, 2014 Rotterdam. Thomas Vanbeveren

Capacity Allocation. Railway Advisory Group October 1, 2014 Rotterdam. Thomas Vanbeveren Capacity Allocation Railway Advisory Group October 1, 2014 Rotterdam Thomas Vanbeveren Agenda 1. Results 2015 timetable allocation 2. Forecast 2016 timetable PaP supply 3. Evolution of priority rule for

More information

Market Place Seminar Rail Crossroads

Market Place Seminar Rail Crossroads Market Place Seminar Rail Crossroads 24-25 September 2015 Tom Paeshuys, General Manager IFB Key facts & figures (2014) Over 520,000 TEUs handled Operated 11,107 trains Door-to-door solutions in over 15

More information

RFC2 Transport Market Study

RFC2 Transport Market Study RFC2 Transport Market Study End of task 3 and task 4 Eric Guenther 9 October 2013 Strength Handling large and regular volumes, More access points than IWW (Inland Waterways), Less hampered by driving bans

More information

DECISIONS CONCERNING THE ACCOUNTS OF PROJECTS / ACTIVITIES FREIGHT

DECISIONS CONCERNING THE ACCOUNTS OF PROJECTS / ACTIVITIES FREIGHT DECISIONS CONCERNING THE ACCOUNTS OF PROJECTS / ACTIVITIES FREIGHT 2009 REPORT SUMMARY P000022 - DIOMIS phase II... 3 P000023 - RIC/RIV... 4 P000024 - Other Freight Activities... 5 P000025 - Hermes messages

More information

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member

More information

Eurailspeed Parallel Session B.1. Colin Hall Deputy Executive Director, CER

Eurailspeed Parallel Session B.1. Colin Hall Deputy Executive Director, CER Eurailspeed Parallel Session B.1 Colin Hall Deputy Executive Director, CER 1 1 Rail Interoperability and European Transport Policy The view of CER Eurailspeed Milano, 7 th November 2005 Colin Hall, Deputy

More information

Brussels, April 4 th Performance Regimes: the Italian experience & the European Performance Regime project

Brussels, April 4 th Performance Regimes: the Italian experience & the European Performance Regime project Brussels, April 4 th 2008 Performance Regimes: the Italian experience & the European Performance Regime project Agenda q Italian Performance Regime q Why a Performance Regime q A short history q Basic

More information

Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018

Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018 Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018 RFC North Sea Med is co-financed by the European Union's CEF. The sole responsibility

More information

Performance of the corridor

Performance of the corridor Performance of the corridor RAG 27 May 2015 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Total Corridor Traffic KPI 02: Ton KMs KPI 03: Punctuality OM 01: Cross

More information

Ralf-Charley Schultze

Ralf-Charley Schultze Ralf-Charley Schultze Mr. Ralf-Charley Schultze is 50 years old and lives in Vienna with his family. Before going to Austria he was responsible during five years within the freight department of the swiss

More information

Presentation of the Study Transport of semi-trailers in UCT through Switzerland. Bern,

Presentation of the Study Transport of semi-trailers in UCT through Switzerland. Bern, Presentation of the Study Transport of semi-trailers in UCT through Switzerland Bern, 28.11.2012 Programme Introduction Frank Furrer, VAP Development of Combined Transport: From the early stages to the

More information

Good Practice N 11. Gateway Slovenia. Slovenske železnice - Tovorni promet, d.o.o. (SŽ), 04/2013

Good Practice N 11. Gateway Slovenia. Slovenske železnice - Tovorni promet, d.o.o. (SŽ), 04/2013 Good Practice N 11 Slovenske železnice - Tovorni promet, d.o.o. (SŽ), 04/2013 Contents Good practice form Introduction (summary) Starting position (gaps and challenges) Concept and components Application

More information

Mediterranean Corridor - RFC 6 connections to OSJD corridors from China Odessa, 2 June 2017

Mediterranean Corridor - RFC 6 connections to OSJD corridors from China Odessa, 2 June 2017 Mediterranean Corridor - RFC 6 connections to OSJD corridors from China Odessa, 2 June 2017 EU Regulation 913/2010 Regulation concerning the European Rail Network for Competitive Freight (913/2010) Regulation

More information

Gateway to European Rail Infrastructure. UIC ebusiness Conference. October 12 th 2006

Gateway to European Rail Infrastructure. UIC ebusiness Conference. October 12 th 2006 Gateway to European Rail Infrastructure UIC ebusiness Conference October 12 th 2006 1 The Association RailNetEurope is an Association of European Infrastructure Managers to promote international railway

More information

Ports and their Connection within the TEN-T

Ports and their Connection within the TEN-T Ports and their Connection within the TEN-T July 7, 2010 (Centre Albert Borschette) Peter Wolters, Deputy Secretary General European Intermodal Association 1 Port-Hinterland Policies, Networks, Players

More information

ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT. Brussels. August 2008

ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT. Brussels. August 2008 ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT Brussels August 2008 This report only represents the opinion of the European coordinator and does not prejudge the official position of the

More information

Presentation HUPAC Net Work for Combined Traffic: Focus on the services with the Ligurian Ports

Presentation HUPAC Net Work for Combined Traffic: Focus on the services with the Ligurian Ports Presentation HUPAC Net Work for Combined Traffic: Focus on the services with the Ligurian Ports Stuttgart, 23.03.2011 Hupac Intermodal SA Erasmo Simoncelli Business Manager Maritime Inland Services FACTS

More information

Rastatt lessons learnt and our way forward. Hans-Jörg Bertschi President of Hupac Group

Rastatt lessons learnt and our way forward. Hans-Jörg Bertschi President of Hupac Group Rastatt lessons learnt and our way forward Hans-Jörg Bertschi President of Hupac Group Rastatt disruption: Europe-wide consequences for supply chains Major temporary impact on European intermodal logistics

More information

Transcontinental Connections

Transcontinental Connections Rolf Köppen, Rolf Köppen, Transcontinental Connections Europe Asia FUTURE-ORIENTED LOGISTICS SOLUTIONS FOR THE EXCHANGE OF GOODS BETWEEN EUROPE AND ASIA North Rhine-Westphalia is connected by rail with

More information

B Logistics, Be Connected. We take rail freight to the next level, making connections between economic hubs in Europe better and faster.

B Logistics, Be Connected. We take rail freight to the next level, making connections between economic hubs in Europe better and faster. Be connected B Logistics, Be Connected We take rail freight to the next level, making connections between economic hubs in Europe better and faster. B Logistics is determined to change the standards of

More information

The Marco Polo programme: key for sustainable mobility

The Marco Polo programme: key for sustainable mobility The Marco Polo programme: key for sustainable mobility Cristóbal Millán de la Lastra Marco Polo programme coordinator European Commission Directorate-General for Energy & Transport Unit G2 MACO POLO -

More information

TASK FORCE INTERMODAL TRANSPORT

TASK FORCE INTERMODAL TRANSPORT BEWAG Seminar 26.04.2017 TASK FORCE INTERMODAL TRANSPORT BRUSSELS Eric FEYEN - Technical Director 1 UIRR - Overview 2 UIRR:founded in 1970 -seat in Brussels since 1988 Members: Combined Transport Operators

More information

European Rail Research Advisory Council

European Rail Research Advisory Council MARKET IMPACT EVALUATION ERRAC was set up in 2001 and is the single European body with the competence and capability to help revitalise the European rail sector : To make it more competitive To foster

More information

Preface. The Airports of Brussels and Liege are important hubs for Full Freighters and the preferred location for the European head offices of

Preface. The Airports of Brussels and Liege are important hubs for Full Freighters and the preferred location for the European head offices of 1 Preface Belgium is the perfect country in which to set up a European logistics base, headquarters or distribution center because the country s infrastructure, skilled workforce and the IT opportunities

More information

Rail Freight Corridor North Sea - Baltic. Corridor Information Document. Book 1

Rail Freight Corridor North Sea - Baltic. Corridor Information Document. Book 1 Rail Freight Corridor North Sea - Baltic Corridor Information Document Book 1 Generalities Timetable 2018 Version Control Version number Chapter changed Changes 05.01.2017 Final version Version for publication

More information

RFC North Sea Med 2017 Customer Satisfaction Survey Results

RFC North Sea Med 2017 Customer Satisfaction Survey Results RFC North Sea Med 2017 Customer Satisfaction Survey Results Matthieu Maeselle RAG meeting Basel, 31 of January 2018 Survey design Survey organised by RNE and supplier MarketMind Common for all 8 participating

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 320/8 Official Journal of the European Union 17.11.2012 COMMISSION REGULATION (EU) No 1078/2012 of 16 November 2012 on a common safety method for monitoring to be applied by railway undertakings, infrastructure

More information

Luka Koper - Connecting markets eregions Think Thank Meeting, Castle Jablje, Ljubljana, 15th March, 2016

Luka Koper - Connecting markets eregions Think Thank Meeting, Castle Jablje, Ljubljana, 15th March, 2016 Luka Koper - Connecting markets eregions Think Thank Meeting, Castle Jablje, Ljubljana, 15th March, 2016 Port of Koper connecting markets of Central and Eastern Europe with Mediterranean Sea and Far East

More information

Rail Cargo Group. China Belt and Road Initiative and Logistics Solutions

Rail Cargo Group. China Belt and Road Initiative and Logistics Solutions China Belt and Road Initiative and Logistics Solutions Rafi Papo, Product Manager Turkey / South East Europe / Middle East, Rail Cargo Operator - Austria GmbH Topics INNOVATION Changsha Budapest via Ukraine

More information

International co-ordination of combined transport terminal development (Workpackage A8)

International co-ordination of combined transport terminal development (Workpackage A8) Developing Infrastructure and Operating Models for Intermodal Shift International co-ordination of combined transport terminal development (Workpackage A8) ISBN 2-7461-1403-8 Warning No part of this publication

More information

European Rail Infrastructure Managers Handbook for International Contingency Management

European Rail Infrastructure Managers Handbook for International Contingency Management European Rail Infrastructure Managers Handbook for International RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu www.rne.eu Version 1.5, 23.03.2018

More information

Modelo multimodal del Puerto de Barcelona. Jornada Quo Vadis Mercancías - SIL

Modelo multimodal del Puerto de Barcelona. Jornada Quo Vadis Mercancías - SIL Modelo multimodal del Puerto de Barcelona Jornada Quo Vadis Mercancías - SIL The Port of Barcelona s mission To contribute to the competitiveness of the customers of the Port by providing efficient services

More information

The Content of TAF TSI: RU/IM Communication and Legal Obligations

The Content of TAF TSI: RU/IM Communication and Legal Obligations 7th ERA TAF TSI Regional Workshop (Romania, Bulgaria, Greece) The Content of TAF TSI: RU/IM Communication and Legal Obligations ERA Telematics Team Bucharest, 7-8 March 2018 TAF TSI Regulation - Communication

More information

Challenges and solutions for transport in the Danube region

Challenges and solutions for transport in the Danube region Challenges and solutions for transport in the Danube region Business models and solutions for the Adriatic Danube multimodal platform Ljubljana, November 2012 Rail transport Does it matter? CNT Modal split

More information

BOLANO. (BOlogna LA Spezia NApoli)

BOLANO. (BOlogna LA Spezia NApoli) BOLANO (BOlogna LA Spezia NApoli) Introduction The BOLANO demonstrator has set distinctive and incremental priorities regarding the "terminals of the future" aiming at positioning them as dynamic and collaborative

More information

TimeTableRedesign Pilot Brenner

TimeTableRedesign Pilot Brenner Pilot Information Document TimeTableRedesign Pilot Brenner (on RFC-Routing ScanMed) Report for Phase 1 Preparations for Phase 2 DRAFT - Version V001 Frankfurt, Vienna, Roma 19-12-2018 1 P a g e Table of

More information

Swiss transport policy from A to Z

Swiss transport policy from A to Z New routes through Europe Swiss transport policy from A to Z Approach routes Switzerland has concluded international treaties with its neighbours Germany and Italy to ensure the expansion of the approach

More information

Management Board 16 June 2011 Budapest, Hungary

Management Board 16 June 2011 Budapest, Hungary mb 16 06 11 item 9 doc 7 Update on EFSA s science strategy Management Board 16 June 2011 Budapest, Hungary Subject : Update on EFSA s science strategy Document number: mb 16 06 11 item 9 doc 7 Submitted

More information

Consultation on the Implementation plan

Consultation on the Implementation plan Consultation on the Implementation plan Railway Undertaking Advisory Group 29 May 2013 Paul Mazataud Steps of the Implementation plan (2013) 15 April to 29 April: consultation phase 30 April to 7 May:

More information

Eurostat Working Group Meeting on intermodal statistics, November Douglas Harris

Eurostat Working Group Meeting on intermodal statistics, November Douglas Harris Eurostat Working Group Meeting on intermodal statistics, 11-12 November 2002 Douglas Harris Quality Project Manager Intercontainer-Interfrigo (ICF) SA, Basel Eurostat 2002 1 Eurostat 2002 2 Intercontainer-Interfrigo

More information

Rail Freight Solutions for Greening Logistics

Rail Freight Solutions for Greening Logistics Rail Freight Solutions for Greening Logistics 11th UIC Sustainability Conference Madrid, 16 June 2010 Oliver Sellnick, Director Freight UIC Transportation is the only sector of the world economy with growing

More information

Promoting Digital Transport Wagon Keeper s View

Promoting Digital Transport Wagon Keeper s View Promoting Digital Transport Wagon Keeper s View 1 / Background Digital Agenda is number 2 of the top ten priorities of the Europe 2020 Strategy presented by the Juncker Commission. The Plan sets objectives

More information

Overview of SmartRivers 2006 Report

Overview of SmartRivers 2006 Report Overview of SmartRivers 2006 Report --- Folding Inland Waterways into the Global Supply Chain --- Arno Hart Group Integrated Logistics Chain Management Slide courtesy of ViaDonau What is SmartRivers? The

More information

CID Book 1. Generalities

CID Book 1. Generalities CID Book 1 Generalities Harmonised text proposal 2019 timetable year Version control Version Chapter changed Changes compared to the previously published version X marks which part in the chapter concerned

More information

The Mediterranean corridor From a road corridor to a multimodal corridor A success story for the regional economy

The Mediterranean corridor From a road corridor to a multimodal corridor A success story for the regional economy The Mediterranean corridor From a road corridor to a multimodal corridor A success story for the regional economy Jordi Torrent Strategy Manager Barcelona Port Authority May 2014 Index of contents 1 Trends

More information

Key challenges for intermodal traffic movement across Europe. Alessandro Valenti Director Sales & Operations Shuttle Net ECTA - Düsseldorf,

Key challenges for intermodal traffic movement across Europe. Alessandro Valenti Director Sales & Operations Shuttle Net ECTA - Düsseldorf, Key challenges for intermodal traffic movement across Europe Alessandro Valenti Director Sales & Operations Shuttle Net ECTA - Düsseldorf, 22.11.12 Facts & Figures Foundation 1967 Share capital Shareholders

More information

Eu Public- Private Smart Move High Level Group

Eu Public- Private Smart Move High Level Group Eu Public- Private Smart Move High Level Group Final Recommendations Follow up to the European Commission Transport White Paper and contribution to the EU 2020 Growth Agenda European Union // Eu Public-Private

More information

User-friendly access to information about last-mile infrastructure for rail freight. Executive summary

User-friendly access to information about last-mile infrastructure for rail freight. Executive summary User-friendly access to information about last-mile infrastructure for rail Executive summary November 2016 EUROPEAN COMMISSION Directorate-General for Mobility and Transport Directorate C - Land Unit

More information

A new network of multimodal platforms for an extended and intermodal efficient logistics system in the Mediterranean area

A new network of multimodal platforms for an extended and intermodal efficient logistics system in the Mediterranean area A new network of multimodal platforms for an extended and intermodal efficient logistics system in the Mediterranean area Maurizio Campanai Regione Emilia-Romagna Regione Emilia Romagna Agenda The Accessibility

More information

Update on Corridor KPI s and Train Performance Management

Update on Corridor KPI s and Train Performance Management Update on Corridor KPI s and Train Performance Management RAG September 2017 Content 1. Update on Corridor KPI s 2. Update on Train Performance Management 2/23 2/20 Ecco KPI 1. CAPACITY MANAGEMENT 1.1

More information

Luka Koper Port of Koper SHORTER > SMARTER > PARTNER

Luka Koper Port of Koper SHORTER > SMARTER > PARTNER Luka Koper Port of Koper SHORTER > SMARTER > PARTNER Gateway to the Central Europe and the Future Vision of the Port of Koper Brussels, March 2018 Dimitrij Zadel, President of the Management Board About

More information

Atelier : Découvrir l offre de service internationale

Atelier : Découvrir l offre de service internationale Atelier : Découvrir l offre de service internationale 26 juin 2014 L EQUIPE DE l ATELIER Harald REISINGER CIO RailNetEurope Michel DUPUIS Directeur adjoint RailNetEurope Philippe GALLEY Chef du service

More information

The logistics service provider on a European scale

The logistics service provider on a European scale The logistics service provider on a European scale A joint company Strong partners in the network 2 Services for our clients What we offer Modern commercial and handling facilities in our public ports

More information

Redesign of the International Timetabling Process (TTR) Project results

Redesign of the International Timetabling Process (TTR) Project results Redesign of the International Timetabling Process (TTR) Project results (Version 0.6) RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu www.rne.eu

More information

Smart Supply Chain Oriented Rail Freight Services. GA No Deliverable No. D8.3 Information exchange for necessary level of transparency

Smart Supply Chain Oriented Rail Freight Services. GA No Deliverable No. D8.3 Information exchange for necessary level of transparency Smart Supply Chain Oriented Rail Freight Services GA No. 636071 Deliverable No. D8.3 Deliverable Title Information exchange for necessary level of transparency Document ID Dissemination level Main Author

More information

Vienna Declaration Progress on boosting rail freight

Vienna Declaration Progress on boosting rail freight Vienna Declaration Progress on boosting rail freight Statement of the Austrian Presidency as follow-up of the Ministerial Rotterdam Declaration 6 December 2018 Seizing the opportunity of the Presidency

More information

Open letter on the Commission proposal for a Regulation establishing a European Fund for Strategic Investments.

Open letter on the Commission proposal for a Regulation establishing a European Fund for Strategic Investments. Open letter on the Commission proposal for a Regulation establishing a European Fund for Strategic Investments. Brussels, 11 February 2015 The undersigned stakeholder associations highlight the important

More information

Chapter changed. V1 all layout X

Chapter changed. V1 all layout X RFC North Sea Baltic Corridor Information Document Book 1 Generalities Timetable 2019 Version control Version Chapter changed Changes compared to the previously published version X marks which part in

More information

WRITTEN SUBMISSION FROM NETWORK RAIL 28 OCTOBER 2008

WRITTEN SUBMISSION FROM NETWORK RAIL 28 OCTOBER 2008 WRITTEN SUBMISSION FROM NETWORK RAIL 28 OCTOBER 2008 Thank you for inviting Network Rail to participate in the Transport, Infrastructure and Climate Change Committee inquiry into the potential benefits

More information

Study on Single Wagonload Traffic in Europe challenges, prospects and policy options. Executive Summary

Study on Single Wagonload Traffic in Europe challenges, prospects and policy options. Executive Summary Study on Single Wagonload Traffic in Europe challenges, prospects and policy options Executive Summary July 2015 EUROPEAN COMMISSION Directorate-General for Mobility and Transport Directorate C Land Unit

More information

Coping with administrative bottlenecks in ports and international rail freight transport

Coping with administrative bottlenecks in ports and international rail freight transport Coping with administrative bottlenecks in ports and international rail freight transport Fourth session of the Expert Group on Hinterland Connections of Seaports Geneva, 23 June 2009 Dr. Erik Evtimov Senior

More information

Network Statement NETWORK STATEMENT. Annex A.1 Glossary. 1. Definitions. Applicant (article 3, 11 of the Rail Code)

Network Statement NETWORK STATEMENT. Annex A.1 Glossary. 1. Definitions. Applicant (article 3, 11 of the Rail Code) NETWORK STATEMENT Annex A.1 Glossary 1. Definitions Applicant (article 3, 11 of the Rail Code) Area Asset Management -Infrabel Area Traffic Management & Services - Infrabel Auxiliary company of a railway

More information

Bohemia Express - Switch accompanied to unaccompanied transport

Bohemia Express - Switch accompanied to unaccompanied transport Good Practice N 03 - Switch accompanied to unaccompanied transport Bohemiakombi spol. s.r.o., 04/2013 Contents Good practice form Introduction (summary) Starting position (gaps and challenges) Concept

More information

Update 1st Semester 2018 easier, faster, safer

Update 1st Semester 2018 easier, faster, safer Annual Performance Report Update 1st Semester 2018 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Traffic Volume (Total) KPI 02: Corridor Punctuality OM 01: Traffic

More information

Report on CLECAT activities on EU RAIL FREIGHT CORRIDORS

Report on CLECAT activities on EU RAIL FREIGHT CORRIDORS Report on CLECAT activities on EU RAIL FREIGHT CORRIDORS Ivan Petrov, Chairman of the Clecat Rail Transport Institute Ivan Petrov, Chairman of the Clecat Rail Transport Institute for the Debate on European

More information

Port de Barcelona participation in TEN-T program. Carles Rúa Strategic projects and innovation manager

Port de Barcelona participation in TEN-T program. Carles Rúa Strategic projects and innovation manager Port de Barcelona participation in TEN-T program Carles Rúa Strategic projects and innovation manager January 2014 01 02 03 04 Port of Barcelona policy in European projects Port of Barcelona participation

More information

ESCAP Regional Cooperation Framework for Facilitation of International Railway Transport

ESCAP Regional Cooperation Framework for Facilitation of International Railway Transport ESCAP Regional Cooperation Framework for Facilitation of International Railway Transport Sandeep Raj Jain Economic Affairs Officer Transport Facilitation & Logistics Section Transport Division Outline

More information

Smart Supply Chain Oriented Rail Freight Services. GA No

Smart Supply Chain Oriented Rail Freight Services. GA No Smart Supply Chain Oriented Rail Freight Services GA No. 636071 Deliverable No. D8.5 Deliverable Title Implementation of measures and design of monitoring approach Document ID Dissemination level Main

More information

An EU coordinated approach to R&I in the rail sector under H2020

An EU coordinated approach to R&I in the rail sector under H2020 An EU coordinated approach to R&I in the rail sector under H2020 EC DG MOVE Open Stakeholder Hearing Brussels, 12 September 2013 Agenda State of play General context Objectives of the initiative General

More information

World Rail Research. UIC assemblies, Executive Board, General Assembly and Regional Assembly Asia to be held in Korea in connection with WCRR

World Rail Research. UIC assemblies, Executive Board, General Assembly and Regional Assembly Asia to be held in Korea in connection with WCRR THE ELECTRONIC NEWSLETTER OF THE INTERNATIONAL UNION OF RAILWAYS World Rail Research All major stakeholders involved in railway research expected at the 8th World Congress on Railway Research WCRR 2008

More information

CONTRACTUAL AND REGULATORY REFORM WORKSTREAM. RDG vision for the charges and incentives regime in the long run

CONTRACTUAL AND REGULATORY REFORM WORKSTREAM. RDG vision for the charges and incentives regime in the long run CONTRACTUAL AND REGULATORY REFORM WORKSTREAM RDG vision for the charges and incentives regime in the long run Published December 2014 What is the Rail Delivery Group? The Rail Delivery Group (RDG) seeks

More information

UNECE Working Party on Intermodal Transport and Logistics (WP.24)

UNECE Working Party on Intermodal Transport and Logistics (WP.24) UNECE Working Party on Intermodal Transport and Logistics (WP.24) Serviced by Sustainable Transport Section Transport Division UNECE What is WP.24? Status Permanent body under the auspices of the UNECE

More information

WE WILL FIND YOUR WAY.

WE WILL FIND YOUR WAY. ISSUE 01 05 2017 WE WILL FIND YOUR WAY. WWW.NESKA.COM 02 03 LOGISTICS AND INTERMODAL TRANSPORT TO THE DESTINATION WITH SEAMLESS PERFORMANCE. Having grown with substance over the years and now set up for

More information

European Data Economy

European Data Economy CER position Brussels, 26 April 2017 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2 213 08 70 F: +32 (0)2 512 52 31 @CER_railways

More information

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS. Results of the D-Rail project

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS. Results of the D-Rail project REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS Results of the D-Rail project WP 5 Integration of Monitoring Concepts D-Rail final seminar, 12.11.2014 Stockholm Matthias Krüger (DB AG)

More information

The transport modes need to share the load

The transport modes need to share the load Press release 2016 financial year: 9 million tonnes of goods moved by inland waterway and rail; container throughput up 3.12%; investment of around 12 million. The transport modes need to share the load

More information

YOUR FREIGHT & LOGISTIC SOLUTION

YOUR FREIGHT & LOGISTIC SOLUTION Who we are Furlog works from many years as terminal supervisor and MTO (Multimodal Transport Operator) offering spaces ( with intermodal and traditional wagons) on its own trains to interested enterprises.

More information

Rotterdam. Duisburg. Antwerp. Mannheim. Basel. Kiel. Lübeck. Hamburg. Bremen. Amsterdam. Nijmegen. Hannover. Magdeburg. Münster. London.

Rotterdam. Duisburg. Antwerp. Mannheim. Basel. Kiel. Lübeck. Hamburg. Bremen. Amsterdam. Nijmegen. Hannover. Magdeburg. Münster. London. www.ccr-zkr.org Kiel Hamburg Lübeck Bremen Amsterdam Rotterdam Nijmegen Münster Hannover Magdeburg London Antwerp Duisburg Dunkirk Lille Valenciennes Brussels Liège Cologne Koblenz Frankfurt am Main Le

More information

"Transport statistics" MEETING OF THE WORKING GROUP ON RAIL TRANSPORT STATISTICS. Luxembourg, 9 and 10 November Bech Building.

Transport statistics MEETING OF THE WORKING GROUP ON RAIL TRANSPORT STATISTICS. Luxembourg, 9 and 10 November Bech Building. Document: Rail/2011/5 "Transport statistics" MEETING OF THE WORKING GROUP ON RAIL TRANSPORT STATISTICS Luxembourg, 9 and 10 November 2011 Bech Building Room Ampère Beginning 10:00 a.m. Freight co-modality

More information

European information portal on last-mile infrastructure for rail freight

European information portal on last-mile infrastructure for rail freight European information portal on last-mile infrastructure for rail freight Niklas Galonske (HaCon) + Mattias Hennigson (Triona) TAF-TSI Steering Committee Brussels, 05/07/2016 Background & Objectives Insufficient

More information

Multimodal Transport Meeting Working Group Rail Transport

Multimodal Transport Meeting Working Group Rail Transport Multimodal Transport Meeting Working Group Rail Transport Chairman: Dr. Ivan Petrov FIATA Senior Vice President Delhi, India 28 September 2018 COOPERATION FIATA / OSJD OSJD and FIATA have signed a memorandum

More information

Bulk shipping. C.RO Ports. CLdN CARGO. CLdN Group. CLdN roro. - Worldwide transportation owned vessels

Bulk shipping. C.RO Ports. CLdN CARGO. CLdN Group. CLdN roro. - Worldwide transportation owned vessels CLdN roro SA C.RO Ports CLdN CARGO Bulk shipping - 25 owned vessels - 120 sailings per week - Freight: containers, trailers, cars and other heavy rolling equipment - 10 Ro-Ro terminals in the Netherlands,

More information

Freight at UIC. UN, Geneva, 3 November Sandra Géhénot, Senior Freight Advisor

Freight at UIC. UN, Geneva, 3 November Sandra Géhénot, Senior Freight Advisor Freight at UIC UN, Geneva, 3 November 2011 Sandra Géhénot, Senior Freight Advisor UIC a global association with over 200 members around the world Members 80 Active 82 Associate 35 Affiliate 2 2 The World-wide

More information

European Commission. TEN Transport Policy and projects in the future. E. THIELMANN Head of Division DG TREN. January 2005

European Commission. TEN Transport Policy and projects in the future. E. THIELMANN Head of Division DG TREN. January 2005 European Commission TEN Transport Policy and projects in the future E. THIELMANN Head of Division DG TREN Directorate general for Energy and Transport January 2005 Background to the High Level Group European

More information

A successful Intermodal Rail Corridor

A successful Intermodal Rail Corridor A successful Intermodal Rail Corridor Hamburg South East European Countries Key Factors and Best Practices Madrid, 12 th November 2009 Innovative Logistics Consultancy Solutions for Your Success Content

More information

Towards truly multimodal EU corridors ERTICO- ITS EUROPE

Towards truly multimodal EU corridors ERTICO- ITS EUROPE Towards truly multimodal EU corridors ERTICO- ITS EUROPE Table of Contents The ERTICO Partnership Freight Transport and Logistics programme Connectivity for freight and Logistics Interfaces for an integrated

More information