1 7.1 Introduction CHAPTER 7 Transportation Route Alignments 7.1 Introduction The famous Silk Road has been one of the best known ancient trade routes. This route consisted of many sections, links, and alternates. The Silk Road was built as a caravan route connecting China and Western Europe. The route was more than 6,000 kilometers long. First Egyptians, then Romans, and other westerners established trade relationships with China. Far East products (primarily silk, paper, and spices) were transported along this route for many centuries. Caravan rest areas were built at distances km. from one another. In this way, it was possible to travel between two caravan stations in eight to ten hours on foot. The Silk Road, as well as many other ancient and modern roads have ben highly influenced by terrain, and they followed the most convenient path, i.e. the path of least resistance. Clearly, the ideal alignment would be a great circle from the point of origin to the point of destination. The most convenient path is usually that one that follows the natural alignment of the countryside. A route alignment represents a defined three-dimensional path. It is usual and convenient to present route alignments in two dimensions: horizontal and vertical alignments. Vertical alignment (also called profile grade line) is composed of a sequence of straight line profiles connected by vertical parabolic curves. In some cases the profile grade increases from a flat alignment. In some other cases, profile grade decreases from a flat alignment. A plus grade denotes the situation when profile grade is increasing from a flat alignment (Figure 7.1). The opposite situation is known as a minus grade (Figure 7.1). 7-1

2 7.1 Introduction G 1 + Tangent Tangent Curve Curve -G 2 Figure 7.1 Definition of Vertical Profiles (Plus Grade G 1 and Minus Grade G 2 ). Grades are expressed in [%] or in [m/m]. Horizontal alignment represents projection of the alignment onto xy plane (Figure 7.2). z (0,0,0) y Horizontal alignment x xy Figure 7.2 Horizontal Alignment. The position of a specific point on a highway is traditionally determined using concept of stations. A datum point on a highway alignment is specified. This initial point is designated station The positions of all other points on the highway are calculated by measuring corresponding distances on a horizontal plane along the highway from the initial point. Each station contains one kilometer of highway alignment distance. For example, the point on a highway located m from the previously specified point, is designated station The station corresponds to the highway point located meters from the initial point. 7-2

3 7.2 Vertical Alignment et us create along horizontal alignment the surface orthogonal to the xy plane. et us also denote h the distance measured along the horizontal alignment. When we stretch this surface, it becomes flat. We call it hz plane. The vertical alignment represents the projection of the alignment onto hz plane (Figure 7.3). xy hz z hz Vertical alignment h Figure 7.3 Vertical Alignment hz. The specification of a route alignment depends on demand for transportation services expected between two points along the future route and should consider construction, operating and maintenance cost as well as safety. 7.2 Vertical Alignment Vertical alignment is composed of straight sections that are connected by vertical curves. These straight sections are called grades or tangents. Once a vertical alignment is designed, the elevations of all the points along the highway are established. Vertical curve are typically classified as crest curves or sag curves (Figure 7.4). The most important points on the vertical curve are: the Vertical Point of Curvature VPC, the Vertical Point of Intersection VPI, and the Vertical Point of Tangency VPT (Figure 7.5). The VPC is the initial point of the curve, while the Vertical Point of Tangency VPT is the final point of the vertical curve. The vertical curve length is indicated in the Figure 7.5. The grades of the initial and final tangent segments are denoted by G 1, and G 2, respectively. The point VPI represents the point of intersection of the initial and final grade. In the most cases, the first half of the vertical curve length is located before the VPI, and the second half after the VPI (Figure 7.5). Such curves are called equal tangent vertical curves. 7-3

4 7.2 Vertical Alignment Crest +G 2 Crest -G1 Crest +G 1 - G 2 +G 1 -G 2 Sag +G 1 +G 2 Sag -G 1 +G 2 -G 1 Sag -G 2 Figure 7.4 Types of Vertical Curves (Crest and Sag Vertical Curves). x VPI parabolic curve VPC PVT +G 1 -G2 /2 /2 Figure 7.5 Elements of a Vertical Curve. 7-4

5 7.2 Vertical Alignment is, Profile grade tangents are connected by the parabolic curve. the basic definition of a parabola where: y a! x 2 + b! x + c (7.1) x - horizontal distance to point on curve measured from the VPC y - elevation of point on curve located at distance x from VPC By the definition x 0 in the point of the vertical curve VPC. This means that the elevation in VPC is: y a! b! 0 + c c We see that the coefficient c represents elevation in PVC. et us determine coefficients a and b. The first derivative of Equation (7.1) is: dy ! a! x + b dx (7.2) At the initial point VPC, the slope equals G 1, and x 0, i.e.: dy ! a! x + b 2! a! 0 + b b dx b G 1 (7.3) equals: We conclude that the coefficient b equals to the initial slope G 1. The second derivative dy ! a dx 2 (7.4) The second derivative of Equation 7.1 represents the rate of slope change, i.e.: dy dx 2 G 2 G (7.5) 7-5

6 7.2 Vertical Alignment This implies, 2! a G 2 G We calculate the coefficient a as: (7.6) a G 2 G ! (7.7) The grades in Equation 7.7 are expressed in [m/m]. et A the difference in grades ( A G 2 G 1 ). The difference in grades A is positive for sag curves and negative for crest curves (Equation 7.5). Table 7.1 shows the maximum recommended grades for urban and rural freeways. Table 7.1 Maximum Grades [%] for Urban and Rural Freeways (Source AASHTO, 1990) Design speed [m.p.h.] Design speed [m.p.h.] Design speed [m.p.h.] Type of terrain evel Rolling Mountainous Example 7.1 The length of the equal tangent vertical curve (Table 7.6 ) equals 300 [m]. The initial and the the final grades are known to be: G [%] ; G [%] The grades intersect at the station and at an elevation of m. (a) Determine the station and the elevation of the VPC and VPT. (b) Calculate the elevation of the point on the curve 100 meters from the VPC.(c) Determine the station and the elevation of the highest point on the curve. 7-6

7 7.2 Vertical Alignment VPI x VPC VPT g [%] /2 /2 g [%] 300[ m ]] Figure 7.6 Vertical Curve for Problem 1. Solution: (a) The grades of the initial G 1 and final tangent G 2 are: 2.5 G m 100 m G m 100 m --- The station of the VPC and VPT. are: VPCSta 300 VPISta VPTSta VPCSta The elevation of the VPC and VPT. are: E VPC E VPI G 1! -- " $ 2# % ! " $ 2 # % [ m] 7-7

8 7.2 Vertical Alignment E VPT E VPI G 2! -- " $ 2# % ! " $ 2 # % [ m] (b) The elevation y of any point on the curve located at distance x from VPC is described by the parabola: y a! x 2 + b! x + c (7.8) After substituting the known values for the coefficients, we get: y G 2 G ! x 2 + G 2! 1! x + E VPC (7.9) y ! 2! 300 x ! x y ! x ! x For x 100 we get: y ! ! The elevation of the point equals [m]. (c) Grades are opposite in sign. This means that the highest point can be estimated by setting the first derivative the equation of the parabola to zero, i.e.: dy ! a! x + b 0 dx 2! ( )! x x [ m] The station of the highest point is: 7-8

9 7.2 Vertical Alignment HighSta VPCSta The elevation of the highest point is: y ! x ! x For x we get: y ! ! [ m] Example 7.2 Offset Y of curve from initial grade line (Figure 7.7) is especially important parameter in vertical curve design. We consider again the curve from the previous example. VPI Offsets x Y VPC VPT G 1 2.5[%] /2 /2 G 2 1.5[%] 300[ m ]] Figure 7.7 Vertical Curve for Problem 7.2. The length of the equal tangent vertical curve (Figure 7.7) is 300 [m]. The initial and the final grades are: G [%] ; G [%] The grades intersect at station and at an elevation of m. (a) Determine the offset at distance 100 [m] from the VPC. (b) Determine the offset at the end of vertical curve. Solution: 7-9

10 7.2 Vertical Alignment is: The coefficient c represents elevation in VPC (Figure 7.8). The equation of the initial tangent y k! x + c (7.10) where k is the coefficient to be determined. y VPI x Y VPC VPT c x Figure 7.8 Initial Tangent and Parabola. The equation of the parabola is: y a! x 2 + b! x + c (7.11) The first derivative is: dy ! a! x + b dx (7.12) The coordinates of the VPC are ( 0, c). The first derivative in this point is calculated to be: 2! a! 0 + b b We conclude that: k b (7.13) 7-10

11 7.2 Vertical Alignment The equation of the initial tangent is: y b! x + c The offset Y of curve from initial grade line equals: (7.14) Y ( b! x + c) ( a! x 2 + b! x + c) (7.15) Y a! x 2 (7.16) Y G 2 G ! 2! x 2 G 1 G ! x 2 2! (7.17) m where G 1 and G 2 are expressed in ---. m When calculating offsets, grades are expressed in [%]. Equation 7.17 becomes: Y G 1 G ! x 2 200! (7.18) The general offset formula for both sag and crest vertical curves are: Y G 1 G ! x 2 200! (7.19) The offset at a distance 100 [m] from the VPC is: Y 2.5 ( 1.5) ! 200! [ m] The offset at the end of vertical curve is calculated to be: Y( 300) 2.5 ( 1.5) ! 200! [ m] 7-11

12 7.3 Stopping Sight Distance Considerations in Vertical Curve Design 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Vertical curve design requires consideration of the average stopping sight distances. Drivers should have a clear view of the road ahead to stop before and obstacle while driving on a vertical curve. This visible length of a highway ahead is called sight distance. et us assume for this discussion that the vehicle speed is the design speed. The minimum stopping sight distance SSD is the sum of two components: (a) the distance vehicle traveled from the time point the object is observed to point in time when brakes are applied; and (b) the distance traveled by vehicle from the point in time when the brakes are applied until the vehicle is fully stopped. The American Association of State Highway and Transportation Officials (AASHTO) has recommended the minimum sight distances. These distances are shown in Table 7.2. Table 7.2 Stopping Sight Distances on Wet Pavements (Source AASHTO, 1994). Design Speed [km/h] Assumed Speed for Condition [km/h] Brake Reaction Time [s] Brake Reaction Distance [m] Coefficient of friction Braking Distance on evel [m] Computed [m] Rounded for Design [m] The distances shown in the table are calculated under the assumption of a worse case scenario. For example, it is assumed that the driver s perception/reaction time is 2.5 seconds. It is also assumed that the brakes are applied in a situation when the pavement is wet. 7-12

13 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Crest Vertical Curve Design et us note the crest vertical curve shown in Equation 7.9. et S the available sight distance. The length of the crest vertical curve is denoted by. The height of the eye of the average driver is denoted by h 1. The h 2 denotes the height of the object perceived by the driver. The formulae for the crest vertical curve length are presented in Table 3. The formulae are derived using mathematical properties of the parabola made up by two tangent segments. S VPI h1 VPC PVT h 2 Figure 7.9 Crest Vertical Curve: Stopping Sight Distance Analysis. Table 7.3 Formulas to Estimate the ength of a Crest Vertical Curve. Relation between S and ength of the Vertical Curve S & A! S ! ( h 1 + h 2 ) 2 S > 2! S 200! ( h 1 + h 2 ) A Older AASHTO design guidelines assumed 1.08[ m] and h [ m]. Newer design guidelines have modified the value of h 2 to be 0.60 meters without apparent degradation in the safety of the design (AASHTO 2004). This new design rationale produces more cost-effective vertical designs without safety degradation. h

14 7.3 Stopping Sight Distance Considerations in Vertical Curve Design In order to calculate the minimum curve length we assume that the available sight distance S is the same as the stopping sight distance SSD. The minimum curve length equals: min A! SSD 2 A! SSD 2 min SSD < 200! ( ) (7.20) min 404 2! SSD SSD > A (7.21) If the new AASHTO design criteria is used instead (with h meters), the resulting equations are: A! SSD 2 A! SSD 2 min SSD < 200! ( ) min 658 2! SSD SSD > A Stopping sight distances are shown in column 4 of Table 7.4. For example, for a design speed of 120 [km/h], the stopping sight distances range from[ ] meters. The lower value (210 meters) is called minimum SSD. The higher value (290 meters) is known as desirable SSD. The usual assumption made by the highway designers is that SSD <. In this book we exclusively use the following formula to calculate : min A! SSD 2 min (7.22) et K be the following expression: K SSD (7.23) 7-14

15 7.3 Stopping Sight Distance Considerations in Vertical Curve Design The quantity K is called the rate of vertical curvature. The K values are given in the Table 7.4. Table 7.4 Design Controls for Crest Vertical Curves Based on Stopping Sight Distance (Source AASHTO, 1994). Design Speed [km/h] Assumed Speed for Condition [km/h] Coefficient of friction Stopping Sight Distance Rounded for Design [m] Rate of Vertical Curvature K [length[m] per % of A] Computed Rate of Vertical Curvature K [length[m] per % of A] Rounded for Design The length min can be calculated using the following equation: min K! A (7.24) The rate of vertical curvature K equals: K min A (7.25) The units for min are meters, while the units for A are %. This means that the units of K are [length[m] per % of A]. 7-15

16 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Example 7.3 The initial and the final grade of an equal tangent vertical curve are: G [%] ; G [%] The highway designers are considering design speeds ranging from 100 [km/h] to 120 [km/h]. Calculate corresponding minimum length of the vertical curve that satisfies the minimum stopping sight distance. Solution: The grades are: G [%] G [%] The difference in grades A is: A G 2 G A 4 4 The min is: min K! A 4! K The minimum curve length that satisfy minimum stopping sight distance are: For a design speed of 100 [km/h]: min 4! K 4! [ m] For a design speed of 110 [km/h]: min 4! K 4! [ m] 7-16

17 7.3 Stopping Sight Distance Considerations in Vertical Curve Design For a design speed of 120 [km/h]: min 4! K 4! [ m] In some situations there is also a need to design vertical curves allowing a vehicle to overtake another one. Passing sight distance is especially important in the case of two-lane highways. The classical AASHTO design guidelines assumed 1.08[ m] and h 2 1.3[ m] (The height of the vehicle is assumed to be 1.3 meters). Recent trends in vehicle technology has dictated a reduction in the object height used for passing sight distance (PSD). The new AASHTO standard recommends 1.08[ m] instead of the original 1.3 meters recognizing that smaller vehicles h 2 populate the market today. In order to calculate the minimum curve length we assume that the available sight distance S equals the passing sight distance PSD. The minimum curve length is then: h 1 min A! PSD 2 A! PSD 2 min PSD < 200! ( ) (7.26) min 946 2! PSD PSD > A (7.27) If new AASHTO standards are used the following expressions are derived: A! PSD 2 A! PSD 2 min PSD < 200! ( ) min 864 2! PSD PSD > A Passing sight distances recommended by the AASHTO are shown in the Table

18 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Table 7.5 Design Controls for Crest Vertical Curves Based on Passing Sight Distance. Design Speed [km/h] Minimum Passing Sight Distance for Design [m] Rate of Vertical Curvature K [length[m] per % of A] Rounded for Design Sag Vertical Curve Design Sight distance on a sag vertical curve is not limited during a day. H S VPC ' PVT VPI Figure 7.10 Sag Vertical Curve: Stopping Sight Distance Analysis 7-18

19 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Driving conditions at night are the key factor that influences sag vertical curve design. The highway length lighted by the vehicle headlights depends on headlight height above the highway H, and on the angle ' between the headlight beam and the car horizontal plane (Equation 7.10). It has been shown that the minimum curve length could be calculated using the relations shown in the Table (AASHTO, 2004). Table 7.6 ength of the Sag Vertical Curves. Relation between S and ength of the Vertical Curve S & A! S ! ( h + S! tan' ) S > 2! S 200! ( h + S! tan' ) A AASHTO design guidelines assumes h 0.6[ m] and ' 1 [ ]. In order to calculate the minimum curve length we assume that the available sight distance S equals the stopping min sight distance SSD. The minimum curve length equals: A! SSD 2 A! SSD 2 A! SSD SSD & 200! ( h + S! tan' ) 200! ( SSD! tan1 ) ! SSD (7.28) 200! ( h + SSD! tan' ) ! SSD 2! SSD ! SSD SSD > A A (7.29) The usual assumption made by the highway designers is that the following formula to calculate : min SSD <. In this book we use 7-19

20 7.3 Stopping Sight Distance Considerations in Vertical Curve Design A! SSD 2 min ! SSD (7.30) et K be: K SSD ! SSD (7.31) The K values are given in the Table 7.7. Table 7.7 Design Controls for Sag Vertical Curves Based on Stopping Sight Distance (Source AASHTO, 1994). Design Speed [km/h] Assumed Speed for Condition [km/h] Coefficient of friction Stopping Sight Distance for Design [m] Stopping Sight Distance Rounded for Design [m] Rate of Vertical Curvature [length[m] per % of A] Computed Rate of Vertical Curvature [length[m] per % of A] Rounded for Design Example 7.4 The highway alignment should follow a crest vertical curve, then a constant grade section, and finally a sag vertical curve (Figure 7.11). The starting and ending alignment grades are 0 [%]. The elevation and the stationing at point A are: 7-20

21 7.3 Stopping Sight Distance Considerations in Vertical Curve Design E A 225[ m] ; ASta The constant grade is G 1.5 [%]. The length of the constant grade section is planned to be 150 [m]. The design speed is 110 [km/h]. Determine the stationing and the elevations at points B, C, and D in Figure A B Constant grade section c C D s Figure 7.11 Vertical Alignment Geometry for Problem 7.4. Solution: The grades are: Constant grade: G 1.5 [%] Crest vertical curve (index c): G 1 c 0 G 2 c G 1.5 [%] A c [%] G 2 c G 1 c 7-21

22 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Sag vertical curve (index s): G 1 s G 1.5 [%] G 2 s 0 A s min 0 ( 1.5) 1.5 [%] is: G 2 s G 1 s min K! A know: The rates of the vertical curvature are shown in Table 7.7 For a design speed of 110 [km/h] we K c 80 ; K s 43 The minimum curve length that satisfies the minimum stopping sight distances are: min c! 1.5! [ m] A c K c min s! 1.5! [ m] A c K s In other words, the length of the vertical curves are: c 120[ m] s 64.5[ m] The stationing at point B is : BSta ASta + c The offset Y of curve from initial grade line is: 7-22

23 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Y G 1 G ! x 2 200! (7.32) In the case of the crest vertical curve, the offset in the point B : G Y 1c G 2c 2 G B ! 1c G 2c ! c ! c 200 c ! [ m] 200 The elevation at point B is: E B E B E A Y B [ m] The stationing of point C is: CSta BSta The constant grade G : E B E C G (7.33) E C m 150 m --- The elevation of the point C: E C [ m] The stationing at point D is: DSta CSta + s In the case of the sag vertical curve, the offset in the point C: G Y 1s G 2s 2 G C ! 1s G 2s ! s ! s 200 s ! [ m] 200 The elevation at point D: 7-23

24 7.3 Stopping Sight Distance Considerations in Vertical Curve Design E D E C Y C [ m] Example 7.5 The highway alignment should follow crest vertical curve, constant grade section, and finally a sag vertical curve (Figure 7.12). The starting and ending alignment grades are 0 [%]. The elevation and the stationing of the points A and D are known to be: E A 240[ m] ; ASta E D 225[ m] ; DSta Points should be connected with crest and sag equal tangent vertical curves with a constant grade section in between (Figure 7.12). The design speed equals 70 [km/h]. Determine the grade of the constant section, and the lengths of the crest vertical curve, sag vertical curve, and the constant grade section. A Y B B C Y E A E D Y C c s D Figure 7.12 Geometry for Problem 7.5. Solution: The grades are: Constant grade: G [%] 7-24

25 7.3 Stopping Sight Distance Considerations in Vertical Curve Design Crest vertical curve (index c): G 1 c 0 G 2 c G [%] A c G 0 G G 2 c G 1 c Sag vertical curve (index s): [%] G 1 s G [%] G 2 s 0 A s 0 ( G) G G 2 s G 1 s [%] The difference in the elevation E A E D between points A and D (Figure 7.12) are: Y B + Y + Y C E A E D (7.34) Since: i.e.: Y -- G Y -- [%] G m 100 m --- and: Y B A c A c ! 200! c ! c 200 c G ! 200 c (7.35) Y C A s A s ! 200! s ! s 200 s G ! 200 s (7.36) we get: 7-25

26 7.3 Stopping Sight Distance Considerations in Vertical Curve Design G ! 200 c G! G ! s E A E D (7.37) Since: c K c! A c and s K s! A s, we have: G ! K 200 c! A c G ! K 200 c! G G! G ! K s! A s E A E D G! G ! K s! G E A E D (7.38) (7.39) The rates of the vertical curvature (Tables 7.6 and 7.7) for a design speed of 100[km/h] are: K c 22 ; K s 20 Our equation reads: ! G G! ! G ! G 2 + 2! G! + 20! G ! G 2 + 2! G! The total length of the curve is: c + + s DSta ASta ( DSta ASta) c s ( DSta ASta) ( K c! G ) ( K s! G ) [( ) ( ) ] ( 22! G ) ( 20! G ) ! G Further substitution yields: 7-26

27 7.3 Stopping Sight Distance Considerations in Vertical Curve Design 42! G 2 + 2! G! ( ! G ) A quadratic equation is: 42! G ! G The solutions are: G and G We must reject the solution curves would be: G If we accepted this solution the length of the c K c! G 22! [ m] s K s! G 20! [ m] The total length of the vertical curves would be greater than the difference in stationing between points D and A, i.e.: c > 500 DSta ASta s The final solution is: G G [%] The length of the curves are: c K c! G 22! [ m] s K s! G 20! [ m] [ m] 7-27

28 7.6 Horizontal Alignment and Horizontal Curves 7.6 Horizontal Alignment and Horizontal Curves Consider the simple horizontal curve shown in Figure We denote PC as the point of the curve. This is the point where the horizontal curve starts. The curve ends at point PT that is called point of tangency. The central angle of the curve ( is equal to the deflection angle between the curve tangents (Figure 7.13). Point PI is called point of tangent intersection. et R the radius of the horizontal curve, the length of curve (from PC to PT ), T tangent length, E the external distance, and M the middle ordinate. T PI E ( Arc ength PC M PT ( -- 2 R ( -- 2 ( -- 2 R Figure 7.13 Simple horizontal Alignment Circular Curve. The following circular curve equations are obtained (Figure 7.13): T -- R ( tan-- 2 (7.40) i.e., the tangent length is calculated to be: T R (! tan-- 2 (7.41) The length of curve is: 7-28

29 7.6 Horizontal Alignment and Horizontal Curves 2! R! )! ( R! )! ( (7.42) The quantities E and M can be calculated as: E R ( R R * * $ ( %! cos-- " cos-- # 2 2 (7.43) ( ( M R R! cos-- R! 1 cos-- 2 " $ 2# % (7.44) Example 7.6 The stationing of PC is The curve radius is 650 [m]. The central angle is 30 [ ]. Determine the stationing of PI and PT. T PI Arc ength PC PT R 650 ( Figure 7.14 Horizontal curve with the radius R 650 and the central angle ( 30 Solution: The tangent length is: 7-29

30 7.6 Horizontal Alignment and Horizontal Curves T ( 30 R! tan-- 650! tan The stationing of PI is: PISta PCSta + T The length of curve is: R! )! ( 650! )! ! The stationing of PT is: PTSta PCSta Different forces act on the vehicle as vehicle travels around a horizontal curve of constant radius. Basic analysis of the forces acting in a vehicle negotiating a horizontal curve shows the following relationship: R v g! ( e + f) where: R - curve radius v - vehicle speed [m/s] g - gravitational constant e - rate of superelevation (the vertical rise - in meters - for every 100 meters of horizontal distance) f - coeeficient of side friction (7.45) AASHTO recommendations for minimum radii for limiting values of e and f are given in the Table

31 7.6 Horizontal Alignment and Horizontal Curves Table 7.8 Minimum Radius for imiting Values of e and f (Source AASHTO, 1994) Design Speed [km/h] Maximum Maximum Total e f ( e + f) Calculated Radius [m] Rounded Radius [m]

32 7.6 Horizontal Alignment and Horizontal Curves Table 7.8 Minimum Radius for imiting Values of e and f (Source AASHTO, 1994) Design Speed [km/h] Maximum Maximum Total e f ( e + f) Calculated Radius [m] Rounded Radius [m] Example 7.7 Calculate minimum radius for a design speed of 120 [km/h]. The superelevation rate is limited to 0.06 due to icing effects in winter. Solution: The minimum radius formula is: R v g! ( e + f) The speed expressed in [m/s] is: 7-32

33 7.6 Horizontal Alignment and Horizontal Curves 120 km 1000 m ! [ ] m h 3600[ s] --- s At 120 km/hr AASHTO recommends using a side friction coefficient of This value is read from Table 7.8. Therefore, the minimum radius is: R ( 33.33) ! ( ) [ m ] Depending on a terrain, the length of horizontal curves need to be adjusted to allow drivers be able to see ahead and potentially avoid obstacles. In the context of horizontal curves, sight distance depends on the presence of obstruction (Figure 7.15). The stopping sight distance SSD is measured along the horizontal curve. SSD Object Eye M s Highway centerline ( s ine of sight R R v Figure 7.15 Horizontal Curve: Analysis of the Stopping Sight Distance and Middle Ordinate. The radius of the vehicle traveled path is denoted by curve, we can express the stopping sight distance SSD as: R v. Using formulae for the length of the 7-33

34 7.6 Horizontal Alignment and Horizontal Curves SSD R v! )! ( s 180 (7.46) where ( s is the angle that corresponds to the arc that is equal to the SSD length (Figure 7.15). (7.47) This angle is: 180! SSD ( s R v! ) (7.48) The value of the midle ordinate that can satisfy SSD is: M s ( M s R v! 1 cos-- " $ 2# % (7.49) After substitution from equation (7.48) into equation (7.49), we get: 180! SSD ( M s R v! 1 cos-- " $ 2# % R R v 1 v! ) * * $ cos %! * 2 + " # (7.50) 90! SSD M s R v! 1 " $ cos R v! ) # % (7.51) M s 90! SSD cos " $ R v! ) # % R v (7.52) M s 90! SSD cos " $ R v! ) # % R v (7.53) M s 90! SSD acos R v! ) " $ # % R v (7.54) 7-34

35 7.6 Horizontal Alignment and Horizontal Curves The stopping sight distance SSD is then, SSD R v! ) M ! acos s 90 " $ # % R v (7.55) 7-35

36 7.6 Horizontal Alignment and Horizontal Curves 7-36

Improved Methods for Superelevation Distribution: I. Single Curve

Improved Methods for Superelevation Distribution: I. Single Curve Improved Methods for Superelevation Distribution: I. Single Curve Udai Hassein 1, Said Easa 2, Kaarman Raahemifar 3 1 Ph.D Candidate, 2 Professor, Dept. of Civil Engineering, Ryerson University, Toronto,

More information

Highway Motor Transportation. Concentrate On Commercial Motor Vehicles (CMV) Trucks Busses

Highway Motor Transportation. Concentrate On Commercial Motor Vehicles (CMV) Trucks Busses Highway Motor Transportation Concentrate On Commercial Motor Vehicles (CMV) Trucks Busses History 1913 Lincoln Highway 1916 1 st Federal Aid Legislation 1919 Army Convoy took 62 days 1921 2 nd Federal

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

CHAPTER 7 ROADWAY STANDARDS AND TECHNICAL CRITERIA

CHAPTER 7 ROADWAY STANDARDS AND TECHNICAL CRITERIA Table of Contents CHAPTER 7 ROADWAY STANDARDS AND TECHNICAL CRITERIA Table of Contents 7-01 ROADWAY DESIGN AND TECHNICAL CRITERIA...1 7-01-01 General...1 7-01-02 Required Design Submittals...2 7-01-03

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

Railway Alignment Design and Geometry

Railway Alignment Design and Geometry Railway Alignment Design and Geometry Pasi Lautala, Michigan Tech University Tyler Dick, HDR, Inc. Topics Horizontal and Vertical geometry Clearances Turnout design Structures and loading 1 REES Module

More information

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours COURSE OUTLINE CIV216 Course Number Highway Engineering Course Title 3 _ 2/2 Credits Lecture/Laboratory Hours COURSE DESCRIPTION Explores the planning, design, construction, and characteristics of highways

More information

Geometric Design Requirements to Improve Surface Drainage. Zita Langenbach Arup

Geometric Design Requirements to Improve Surface Drainage. Zita Langenbach Arup Geometric Design Requirements to Improve Surface Drainage Zita Langenbach Arup Reason for developing IAN 09/13 Road geometry constructed that does not facilitate adequate surface drainage of carriageways

More information

Introduction to Highway Engineering and Traffic Analysis อ. ธ รพจน ศ ร ไพโรจน. 28 August 2014

Introduction to Highway Engineering and Traffic Analysis อ. ธ รพจน ศ ร ไพโรจน. 28 August 2014 Introduction to Highway Engineering and Traffic Analysis อ. ธ รพจน ศ ร ไพโรจน 28 August 2014 1 About myself Ph.D. in Transportation Engineering from the Hong Kong Polytechnic university, Hong Kong. M.S.

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

ENGINEERING DESIGN MANUAL

ENGINEERING DESIGN MANUAL CITY OF BRIDGEPORT, TEXAS ENGINEERING DESIGN MANUAL Updated September 2009 By: Baird, Hampton & Brown, Inc. Engineering and Surveying Grapevine, Texas Prepared by: Freeman Millican, Inc Consulting Engineers

More information

Weld County Engineering and Construction Guidelines. April 2012 Updated July 2017

Weld County Engineering and Construction Guidelines. April 2012 Updated July 2017 Weld County Engineering and Construction Guidelines April 2012 Updated July 2017 TABLE OF CONTENTS Chapter 1 GENERAL PROVISIONS...1 1.1 Title...1 1.2 Purpose and Background...1 1.3 Applicability...1 1.4

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 1 501.1 General... 1 501.2 Interchange Type... 1 501.2.1 General... 1 502 Interchange Design Considerations... 2 502.1 Determination of

More information

CHAPTER 6 VERTICAL ALIGNMENT

CHAPTER 6 VERTICAL ALIGNMENT CHAPTER 6 VERTICAL ALIGNMENT INTRODUCTION...6-3 VERTICAL ALIGNMENT CONTROLS...6-3 Figure 6-1 Contrast of Poor Grade Line Design (Left) with...6-4 Preferred Grade Line Design (Right)...6-4 Figure 6-2 Example

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS November 25, 2013 Table of Contents Cuyahoga County Engineer's

More information

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS APRIL 2011 APRIL 2011 Page 1 Chapter Table of Contents 12.1 Policy... 12-3 12.1.1 Table 1... 12-3

More information

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering, Indian Institute of Technology Madras

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering, Indian Institute of Technology Madras PRESTRESSED CONCRETE STRUCTURES Amlan K. Sengupta, PhD PE Department of Civil Engineering, Indian Institute of Technology Madras Module 2: Losses in Prestress Lecture 09: Friction and Anchorage Slip Welcome

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Turnouts and Yard Tracks TM 2.1.8 Prepared by: Signed document on file 21 June 09 George Harris Date Checked by: Signed document on file 15 July 09 Thomas Carroll Date Approved by:

More information

Geometric Design: Past, Present, and Future

Geometric Design: Past, Present, and Future A2A02: Committee on Geometric Design Chairman: Daniel B. Fambro Geometric Design: Past, Present, and Future DANIEL B. FAMBRO, Texas A&M University JOHN C. COLLINGS, Delcan Corporation ROBERT DELLA VEDOVA,

More information

Phase III Guideline for Barrier Selection and Design

Phase III Guideline for Barrier Selection and Design R E P O R T P R O P O S A L AUGUST 2011 BRITISH COLUMBIA Ministry of Forests, Lands and Natural Resource Operations Phase III Guideline for Barrier Selection and Design REPORT Table of Contents SECTION

More information

Table of Contents TOC. General Information. Street Classifications. Geometric Design Criteria

Table of Contents TOC. General Information. Street Classifications. Geometric Design Criteria Design Manual Chapter 5 - Roadway Design Table of Contents TOC Table of Contents Chapter 5 - Roadway Design 5A General Information 5A-1---------------------------------General Information A. Concept.....

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Automated Tools for Reducing Earthwork Costs

Automated Tools for Reducing Earthwork Costs Automated Tools for Reducing Earthwork Costs Engineering problems are under-defined, there are many solutions, good, bad and indifferent. The art is to arrive at a good solution. This is a creative activity,

More information

Nevada Department of Transportation. Road Design Guide Edition

Nevada Department of Transportation. Road Design Guide Edition Nevada Department of Transportation Road Design Guide 2010 Edition Nevada Department of Transportation 1263 South Stewart Street Carson City, Nevada 89712 State of Nevada Jim Gibbons, Governor Department

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

Transportation Standards TITLE 12 KLICKITAT COUNTY CODE

Transportation Standards TITLE 12 KLICKITAT COUNTY CODE KLICKITAT COUNTY ORDINANCE NO. 0111604 Transportation Standards TITLE 12 KLICKITAT COUNTY CODE Klickitat County Public Works Department 115 S. Golden St., MSCH 19 Goldendale, WA 98620 Phone (509) 773-4616

More information

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

CHAPTER 18 TEMPORARY ROADS AND BRIDGES Change #1 - Revised 12/12 CHAPTER 18 TEMPORARY ROADS AND BRIDGES 18.0 INTRODUCTION These guidelines are to be used to design temporary roads and bridges where traffic will be maintained at the construction

More information

LAYING OUT THE OVERHEAD CONVEYOR SYSTEM

LAYING OUT THE OVERHEAD CONVEYOR SYSTEM LAYING OUT THE OVERHEAD CONVEYOR SYSTEM Following is a step by step guide that is offered as just that, a guide, and is not intended to be an engineering manual. For a well engineered overhead conveyor

More information

KITSAP COUNTY ROAD STANDARDS 2007 TABLE OF CONTENTS

KITSAP COUNTY ROAD STANDARDS 2007 TABLE OF CONTENTS KITSAP COUNTY ROAD STANDARDS 2007 TABLE OF CONTENTS Chapter 1 Introduction 1.1 Authority and Intent...1 1.2 Application...2 1.3 Associated Regulations and Specifications...2 1.4 Design Approval and Technical

More information

TABLE OF CONTENTS CHAPTER 2D - PLAN DESIGN. SECTION 2D-1 PROJECT REVIEW General... 2D-1

TABLE OF CONTENTS CHAPTER 2D - PLAN DESIGN. SECTION 2D-1 PROJECT REVIEW General... 2D-1 TABLE OF CONTENTS CHAPTER 2D - PLAN DESIGN SECTION 2D-1 PROJECT REVIEW General... 2D-1 SECTION 2D-2 PREPARATION OF INFORMATIONAL BROCHURES Responsibility... 2D-2 Purpose of Brochure... 2D-2 Review of Draft

More information

49-2A Clear-Zone Width for New Construction or Reconstruction B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve...

49-2A Clear-Zone Width for New Construction or Reconstruction B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve... 49-2A Clear-Zone Width for New Construction or Reconstruction...6 49-2B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve...6 49-2C Clear-Zone Transition for Curve Adjustment, Radius 3000 ft...6

More information

SUBDIVISION SECTION STREET DESIGN MANUAL

SUBDIVISION SECTION STREET DESIGN MANUAL CITY OF ANAHEIM SUBDIVISION SECTION STREET DESIGN MANUAL A. INTRODUCTION : POLICY STATEMENT B. STREET CLASSIFICATION C. STREET STANDARDS REQUIREMENTS Requirements Approval of Street Improvement Plans Widening

More information

100 Design Controls and Exceptions

100 Design Controls and Exceptions 100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria...

More information

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled "STREETS" of the Layton Municipal Code.)

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled STREETS of the Layton Municipal Code.) STREET IMPROVEMENTS (Refer to Title 18, chapter 18.24 entitled "STREETS" of the Layton Municipal Code.) I. Street widths STREET TYPE (ALL MEASUREMENTS IN FEET) ROW WIDTH LAYTON CITY STANDARD STREET SECTIONS

More information

Chapter URBAN & RURAL FREEWAY DESIGN

Chapter URBAN & RURAL FREEWAY DESIGN Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides

More information

CITY OF KILGORE, TEXAS ENGINEERING DESIGN MANUAL

CITY OF KILGORE, TEXAS ENGINEERING DESIGN MANUAL CITY OF KILGORE, TEXAS ENGINEERING DESIGN MANUAL Prepared by: KSA Engineers, Inc. Longview, Texas February 2008 CITY OF KILGORE ENGINEERING DESIGN MANUAL TABLE OF CONTENTS PART 1 GENERAL... 1 1.1. PURPOSE...

More information

County Road Standards and Regulations

County Road Standards and Regulations County Road Standards and Regulations Pend Oreille County August 28, 2007-1 - (Page intentionally left blank.) - 2 - (Page intentionally left blank.) Table of Contents Chapter 1 General...9 1.010 Purpose...

More information

Special Provision No. 103F31 January 2014

Special Provision No. 103F31 January 2014 AMENDMENT TO OPSS 313, APRIL 2007 Special Provision No. 103F31 January 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler

More information

Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS

Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS GENERAL CONCEPTS...2 General...2 Design Vehicle...2 Driver Expectancy...2 Design Speed...2 Sight Distances...3 Exhibit

More information

PERFORMANCE BASED PRACTICAL DESIGN

PERFORMANCE BASED PRACTICAL DESIGN PERFORMANCE BASED PRACTICAL DESIGN DOT S FACE INCREASING CHALLENGES ENGINEERING CULTURE We learned from those who taught us how and why we follow the standards There are valid reasons that tell us we now

More information

University Region FY 2023 Final Scoping Package

University Region FY 2023 Final Scoping Package September 30, 2016 University Region FY 2023 Final Scoping Package I-496/US-127 Scoping From I-96 to the I-496/US- 127 Interchange CS 33045 JN 126442 I-496/US-127 STUDY EXECUTIVE SUMMARY UNIVERSITY REGION

More information

100 Introduction Functional Classification Traffic Data Terrain & Locale Design & Legal Speed...

100 Introduction Functional Classification Traffic Data Terrain & Locale Design & Legal Speed... Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General...1 101.2 Urban & Rural...1 101.3 Classification Used in ODOT Design Criteria...1 102 Traffic Data... 2 102.1 General...2

More information

CHAPTER 9 - HIGHWAY DESIGN

CHAPTER 9 - HIGHWAY DESIGN CHAPTER 9 - HIGHWAY DESIGN TABLE OF CONTENTS 9.1 GENERAL... 9-1 A. Role of the Designer B. Design Standards 1. Policy 2. Design Exceptions 3. Mitigating Design Exceptions C. Computer Aided Design and Drafting

More information

An Introduction to the. Safety Manual

An Introduction to the. Safety Manual An Introduction to the Highway Safety Manual An Introduction to the HIGHWAY SAFETY MANUAL Table of Contents Section 1: HSM Overview... 1 What is the Highway Safety Manual?... 1 How is the HSM Applied?...

More information

ANSYS Customization for Bridges and Prestressed Concrete Structures Analysis and Design

ANSYS Customization for Bridges and Prestressed Concrete Structures Analysis and Design ANSYS Customization for Bridges and Prestressed Concrete Structures Analysis and Design Javier Aparicio Ingeciber, S.A. Isabella Maia Ingeciber, S.A. Eduardo Salete Ingeciber, S.A. Abstract This paper

More information

SECTION 6. ROAD CONSTRUCTION STANDARDS

SECTION 6. ROAD CONSTRUCTION STANDARDS SECTION 6. ROAD CONSTRUCTION STANDARDS Construction of new roads or reconstruction of existing roads proposed for dedication to the County shall conform to the standards set forth in this section. Roads

More information

Special Provision No. 103F31 December 2014

Special Provision No. 103F31 December 2014 ASPHALTIC CONCRETE SURFACE SMOOTHNESS Special Provision No. 103F31 December 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial

More information

Design of rural and urban roads contributes a lot towards safety of users. Identify some low-cost

Design of rural and urban roads contributes a lot towards safety of users. Identify some low-cost COST EFFECTIVE DESIGNS TO IMPROVE HIGHWAY SAFETY Author: Brent T Allman, E.I.T. Construction Engineering Arizona State University Responding to the following Topic: Design of rural and urban roads contributes

More information

AED Design Requirements: CERP Road - Geometric Requirements and Flexible Pavement Section Design

AED Design Requirements: CERP Road - Geometric Requirements and Flexible Pavement Section Design US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: CERP Road - Geometric Requirements and Flexible Pavement Section Design Various Locations, Afghanistan JUNE 2009 TABLE

More information

Bridge Deck Drainage

Bridge Deck Drainage Bridge Deck Drainage Introduction The presence of bridge barriers, curbs, and raised medians impedes the ability of rainfall runoff to drain off of bridge decks into ditch systems, as it does on a typical

More information

TRAFFIC DIRECTION FOR RAIL LAP AS SHOWN (SEE NOTE 7) "SPLICE BOLT" WITH NUT MIDWEST GUARDRAIL SYSTEM (STANDARD AND REDUCED POST SPACING)

TRAFFIC DIRECTION FOR RAIL LAP AS SHOWN (SEE NOTE 7) SPLICE BOLT WITH NUT MIDWEST GUARDRAIL SYSTEM (STANDARD AND REDUCED POST SPACING) TRAFFIC DIRECTION FOR RAIL LAP AS SHOWN GR-MGS1, 1A (SEE NOTE 7) NOTES: 1. 2. 3. 4. 5. 6. 236 6'-3" 6'-3" 3'-1 " 3'-1 " 3'-1 " 3'-1 " GR-MGS1 (6'-3" POST SPACING) SPLICE DETAIL W-BEAM RAIL SPLICE MID-SPAN

More information

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS CITY OF ALBANY DEPARTMENT OF PUBLIC WORKS DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS Prepared By PUBLIC WORKS DEPARTMENT ALBANY, OREGON 97321 Telephone: (541) 917-7676 TABLE OF CONTENTS

More information

TRANSPORTATION RESEARCH BOARD. Design of Interchange Loop Ramps and Pavement/ Shoulder Cross-Slope Breaks. Monday, November 13, :00-3:30PM ET

TRANSPORTATION RESEARCH BOARD. Design of Interchange Loop Ramps and Pavement/ Shoulder Cross-Slope Breaks. Monday, November 13, :00-3:30PM ET TRANSPORTATION RESEARCH BOARD Design of Interchange Loop Ramps and Pavement/ Shoulder Cross-Slope Breaks Monday, November 13, 2017 2:00-3:30PM ET The Transportation Research Board has met the standards

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

DETERMINING THE END LIMITS OF QUIETER PAVEMENT PROJECTS

DETERMINING THE END LIMITS OF QUIETER PAVEMENT PROJECTS DETERMINING THE END LIMITS OF QUIETER PAVEMENT PROJECTS Bruce Rymer, M Eng., P.E. (CA) (Corresponding author) Sr. Engineer California Department of Transportation Division of Environmental Analysis 110

More information

Special Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction.

Special Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction. ASPHALTIC CONCRETE SURFACE SMOOTHNESS - Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler Special Provision No. 103F31 June

More information

PE Exam Review - Geotechnical

PE Exam Review - Geotechnical PE Exam Review - Geotechnical Resources and Visual Aids Item Page I. Glossary... 11 II. Parameters... 9 III. Equations....11 IV. Tables, Charts & Diagrams... 14 1. Module 1 - Soil Classification... 14

More information

Highway Surveys and Location

Highway Surveys and Location Highway Surveys and Location Dr Antonis Michael Department of Civil Engineering Frederick University Highway Location Location of proposed highway is an important first step in its design. Particular location

More information

Computer-Aided Geometric Design of Road and Safety Evaluation Using Vehicle Simulation Model

Computer-Aided Geometric Design of Road and Safety Evaluation Using Vehicle Simulation Model Computer-Aided Geometric Design of Road and Safety Evaluation Using Vehicle Simulation Model 1 Pankaj M. Thakare, 2 Vipul S. Bawner 1 ME Student (Transportation Engineering and Management), 2 Assistant

More information

Performance Based Practical Design. An FHWA Perspective

Performance Based Practical Design. An FHWA Perspective Performance Based Practical Design An FHWA Perspective Early Adopters Research on PBPD and Background Materials http://www.fhwa.dot.gov/design/pbpd/ FAST Act Changes that Encourage PBPD On the NHS, design

More information

Chapter GRADE SEPARATIONS & INTERCHANGES

Chapter GRADE SEPARATIONS & INTERCHANGES Chapter 9 GRADE SEPARATIONS & INTERCHANGES 2012 ODOT Highway Design Manual Grade Separations And Interchanges 9.1 GENERAL INFORMATION There are three types of roadway intersections: intersections at-grade,

More information

Environmental Conscious Highway Design for Vertical Crest Curves

Environmental Conscious Highway Design for Vertical Crest Curves Environmental Conscious Highway Design for Vertical Crest Curves by Mr. Myunghoon Ko* Zachry Department of Civil Engineering Texas A&M University, TAMU College Station, TX - Phone: () - E-mail: kmh@tamu.edu

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

ALIGNMENT ANALYSIS AND COMPARISON TECHNIQUES FOR SMALL RAILROAD PROJECTS IN THE 21 ST CENTURY. C. Tyler Dick, P.E.

ALIGNMENT ANALYSIS AND COMPARISON TECHNIQUES FOR SMALL RAILROAD PROJECTS IN THE 21 ST CENTURY. C. Tyler Dick, P.E. ALIGNMENT ANALYSIS AND COMPARISON TECHNIQUES FOR SMALL RAILROAD PROJECTS IN THE 21 ST CENTURY C. Tyler Dick, P.E. HDR Engineering Inc. 210 E 3 rd Street Suite 300 Fort Worth TX 76102 Phone: 817-333-2803

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Design guidance and a description of Steel Beam Guide Rail systems, including various types and treatments, are provided in the Roadside Design Manual (RDM). 721-2.2

More information

Welcome!! Temporary Traffic Control During Maintenance and Short Duration Activities. Training Course 1-1

Welcome!! Temporary Traffic Control During Maintenance and Short Duration Activities. Training Course 1-1 Welcome!! Temporary Traffic Control During Maintenance and Short Duration Activities Training Course 1-1 About This Course This material is based upon work supported by the Federal Highway Administration

More information

not to be republished NCERT Chapter 6 Non-competitive Markets 6.1 SIMPLE MONOPOLY IN THE COMMODITY MARKET

not to be republished NCERT Chapter 6 Non-competitive Markets 6.1 SIMPLE MONOPOLY IN THE COMMODITY MARKET Chapter 6 We recall that perfect competition was theorised as a market structure where both consumers and firms were price takers. The behaviour of the firm in such circumstances was described in the Chapter

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Bridge Barrier Development Presentation to the MFLNRO April John Deenihan Ph.D., EIT Julien Henley M.A.Sc., P.Eng

Bridge Barrier Development Presentation to the MFLNRO April John Deenihan Ph.D., EIT Julien Henley M.A.Sc., P.Eng Bridge Barrier Development Presentation to the MFLNRO April 2014 John Deenihan Ph.D., EIT Julien Henley M.A.Sc., P.Eng Contents Introduction Contents Introduction Background Information / Synopsis Contents

More information

Stepping into Variable Height Retaining Walls

Stepping into Variable Height Retaining Walls Stepping into Variable Height Retaining Walls Eric Cylwik Sundt Construction, Inc. CR 2499 - Mechanically-stabilized earth (MSE) walls are inherently complex shapes; smoothly curving in all 3 dimensions

More information

Flexbeam Guardrail Roadside Safety Barrier

Flexbeam Guardrail Roadside Safety Barrier Flexbeam Guardrail Roadside Safety Barrier Product Manual Release 09/15 www.ingalcivil.com.au Flexbeam Guardrail Roadside Safety Barrier 1.0 Introduction Roadside barriers have been developed over the

More information

Visual Performance and Safety Benefits of Adaptive Curve Headlighting Systems

Visual Performance and Safety Benefits of Adaptive Curve Headlighting Systems A Transportation Lighting Alliance Report TLA 2013-01 Visual Performance and Safety Benefits of Prepared by: J. D. Bullough Lighting Research Center Rensselaer Polytechnic Institute Troy, NY October 2013

More information

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7 ii TABLE OF CONTENTS Manual Section Pages Introduction 1 Using This Manual 2-3 Administrative Actions 4-6 Road and Bridge Project Types 7 Road and Bridge Funding Programs 8-9 Project Planning and Eligible

More information

Geometric Design to Improve Surface Drainage (including Amendment No. 1, dated February 2014 and Amendment No. 2, dated December 2014)

Geometric Design to Improve Surface Drainage (including Amendment No. 1, dated February 2014 and Amendment No. 2, dated December 2014) Geometric Design to Improve Surface Drainage (including Amendment No. 1, dated February 2014 and Amendment No. 2, dated December 2014) DN-GEO-03057 December 2013 DN Design Technical TRANSPORT INFRASTRUCTURE

More information

AS THE EFFECT ON BRIDGE BARRIERS

AS THE EFFECT ON BRIDGE BARRIERS ABSTRACT AS5100.2 2017 THE EFFECT ON BRIDGE BARRIERS David Coe, Senior Principal, Pitt & Sherry The revision to AS5100 in 2017 resulted in significant changes to the design loading and impact heights for

More information

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge Client: AJR or IJR? This is a TO-MAY-TO This is a TO-MAH-TO Practical Design PRACTICAL

More information

Township of McNab/Braeside Reconstruction/Rehabilitation of Goshen Road

Township of McNab/Braeside Reconstruction/Rehabilitation of Goshen Road Township of McNab/Braeside Reconstruction/Rehabilitation of Goshen Road Prepared for: Mr. Ryan Frew, P. Eng. Township of McNab/Braeside 2508 Russett Drive Arnprior, ON K7S 3G8 Prepared by: McIntosh Perry

More information

Proceedings of Meetings on Acoustics

Proceedings of Meetings on Acoustics Proceedings of Meetings on Acoustics Volume 19, 2013 http://acousticalsociety.org/ ICA 2013 Montreal Montreal, Canada 2-7 June 2013 Engineering Acoustics Session 5aEA: Sound Emission from Vehicle and Rotating

More information

A proposed performance-based highway design process: incorporating safety considerations

A proposed performance-based highway design process: incorporating safety considerations Urban Transport XVII 517 A proposed performance-based highway design process: incorporating safety considerations C. E. Carrigan & M. H. Ray RoadSafe LLC, USA Abstract The current highway design practice

More information

Application of Road Safety Audits to Urban Streets

Application of Road Safety Audits to Urban Streets Application of Road Safety Audits to Urban Streets ABSTRACT EUGENE M. WILSON Professor Civil Engineering Dept. University of Wyoming Laramie, WY 82071 MARTIN E. LIPINSKI Professor Department of Civil Engineering

More information

Two-way slabs. Flat plate with or without drop panels / capitals

Two-way slabs. Flat plate with or without drop panels / capitals Two-way slabs Two-way slab behavior is described by plate bending theory which is a complex extension of beam bending. Codes of practice allow use of simplified methods for analysis and design of two-way

More information

Portable Changeable Message signs have a wide variety of

Portable Changeable Message signs have a wide variety of Part 6F (devices) Minnesota MUTCD 2005 with 2007 09 Revisions Part 6F (devices) Federal MUTCD 2009 Part 6F (devices) MN MUTCD Rearranged Sections 6F.55 Portable Changeable Message Signs Portable Changeable

More information

1. (a) Explain the necessity and objects of highway planning. (b) Briefly explain the engineering surveys needed for locating a new highway.

1. (a) Explain the necessity and objects of highway planning. (b) Briefly explain the engineering surveys needed for locating a new highway. Code No: R31016 R10 Set No: 1 1. (a) Explain the necessity and objects of highway planning. (b) Briefly explain the engineering surveys needed for locating a new highway. 2. (a) Derive an expression for

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

NEVADA DEPARTMENT OF TRANSPORTATION. Road Design Guide. Edition. Brian Sandoval Governor. Rudy Malfabon P.E. Director

NEVADA DEPARTMENT OF TRANSPORTATION. Road Design Guide. Edition. Brian Sandoval Governor. Rudy Malfabon P.E. Director NEVADA DEPARTMENT OF TRANSPORTATION Road Design Guide 2019 Edition Brian Sandoval Governor Rudy Malfabon P.E. Director Scott Hein P.E. Chief Road Design Page 2 2019 Road Design Guide NEVADA DEPARTMENT

More information

HY-12 User Manual. Aquaveo. Contents

HY-12 User Manual. Aquaveo. Contents Y-12 User Manual Aquaveo Contents Overview...2 Watershed Parameters...3 Channel Parameters...3 Storm Drain Parameters...3 Design of new systems...4 Analysis of existing systems...4 Steady flow...4 ydrographic

More information

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: -- ROADWAY CONSTRUCTION NOTES 1. ALL RIGHT-OF-WAY OTHER THAN ROADWAY AREAS SHALL BE SODDED. ALL SLOPE STEEPER THAN 6:1 SHALL REQUIRE SODDING. THE CITY RESERVES THE RIGHT TO REQUIRE SODDING IN SPECIAL AREAS

More information

MIDAS Training Series

MIDAS Training Series MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session

More information

Development of Decision Support System for Highway Capital Planning in Alberta, Canada

Development of Decision Support System for Highway Capital Planning in Alberta, Canada Development of Decision Support System for Highway Capital Planning in Alberta, Canada By Ashraf El-Assaly, PhD, P Eng. Alberta Infrastructure and Transportation Peter Ho, MBA, P Eng. Alberta Infrastructure

More information

Leveling-Theory, Methods, Equipments, Filed procedure and Computation

Leveling-Theory, Methods, Equipments, Filed procedure and Computation Leveling-Theory, Methods, Equipments, Filed procedure and Computation Dr. Khalil Al-Juboori UOB Department of Civil Engineering and Architecture Semester 2 2013-2014 3/21/2014 Dr. Khalil Al-Juboori 1 Outline

More information

Alaska Department of Transportation and Public Facilities. Alaska Construction Surveying Requirements (US Customary Units)

Alaska Department of Transportation and Public Facilities. Alaska Construction Surveying Requirements (US Customary Units) Alaska Department of Transportation and Public Facilities Alaska Construction Surveying Requirements (US Customary Units) Alaska Construction Surveying Requirements Table of Contents Description Page

More information

Post-tensioned prestressed concrete bridge - assignment

Post-tensioned prestressed concrete bridge - assignment Post-tensioned prestressed concrete bridge - assignment Design a post-tensioned prestressed concrete bridge of a three-span arrangement. The construction is prestressed at the age of 7 days and put into

More information

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception TRAFFIC SAFETY EVALUATION Using the Highway Safety Manual and the Interactive Highway Safety Design Model I 15 Dry Lakes Design Exception Prepared for: Nevada Department of Transportation Safety Engineering

More information

I 244 Arkansas River LRT Track & Bridge Design Criteria Report

I 244 Arkansas River LRT Track & Bridge Design Criteria Report OKLAHOMA DEPARTMENT OF TRANSPORTATION I 244 Arkansas River LRT Track & Bridge Design Criteria Report Lockwood, Andrews & Newnam, Inc. 7/20/2009 TABLE OF CONTENTS Chapter 1 Track Alignment... 1 1.1 Introduction...

More information

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES Revised August 13, 2014 Prepared by: City of Elk Grove Public Works Department 1. INTRODUCTION BACKGROUND In 2002, e Public Works Department developed

More information

DESIGN OF MULTILEVEL CAR PARKING BUILDING

DESIGN OF MULTILEVEL CAR PARKING BUILDING International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 11, November 2018, pp. 1164 1169, Article ID: IJCIET_09_11_111 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=11

More information

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION Section 7 Roadway GENERAL REQUIREMENTS... 7-1 I. TYPICAL SECTION... 7-1 7.1 LANE WIDTHS... 7-1 7.2 SHOULDER WIDTHS... 7-1 7.3 CROSS SLOPE... 7-2 7.4 CURB AND UNDERDRAINS... 7-2 7.5 SIDEWALKS AND DRIVEWAYS...

More information

LOADS AND FORCES ON TIMBER BRIDGES

LOADS AND FORCES ON TIMBER BRIDGES LOADS AND FORCES ON TIMBER BRIDGES 6.1 INTRODUCTION A bridge must be designed to safely resist all loads and forces that may reasonably occur during its life. These loads include not only the weight of

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information