1 Presented in the Thirteenth International Working Seminar on Production Economics, Igls/Innsbruck, February 16-20, 2004 A Solution for the Material Delivery Problems in Construction Projects Timo Ala-Risku*, timo.ala-risku@hut.fi Mikko Kärkkäinen*, mikko.karkkainen@hut.fi *Helsinki University of Technology TAI Research Centre P.O. Box 5500 FIN TKK FINLAND Abstract: The new project management methods emerging for construction projects generate new kinds of challenges for the delivery process of the project materials. The basic philosophy of the emerging methods is to create short-term schedules for project tasks based on a constraint analysis of project resources. This approach places two requirements for the material deliveries: Transparency to material availability, and short response times in the supply chain. In this paper, we propose a potential solution for managing the material logistics of construction projects. The solution consists of a shipment tracking-based approach tested in pilot implementations to provide inventory transparency, and a pro-active delivery approach for efficient material deliveries validated in expert group discussions. Keywords: supply chain management, logistics, inventory transparency, construction 1

2 Introduction New project management methods addressing the shortcomings of traditional methods by adding flexibility to the execution of construction projects create new challenges to material delivery processes (e.g. Ballard, 2000; Choo et al., 1999; Chua et al., 2001; Koskela and Howell, 2002). The new methods acknowledge the impossibility of creating an exact schedule beforehand for a large, complex project. Instead, the methods use continuous planning on single construction task level. The basic philosophy of the methods is to create short-term schedules for project tasks based on a constraint analysis of project resources. The approach places two requirements for the material deliveries: The analysis of material constraints requires transparency to material availability in site inventories and other parts of the supply chain, and the short time-span of planning demands for short response times in the supply chain. The aim of this paper is to present a potential solution for managing the material logistics of construction projects. The solution consists of a shipment tracking-based approach to provide inventory transparency, and a pro-active material delivery approach for timely material availability. In the first section of the article we will review literature related to the new project management methods and its implications for material replenishments of construction projects. In the second section, we present our research problem and discuss our research design. The proposed solution for material replenishments of construction projects is presented in the third section. And, in the final sections we make concluding remarks on the proposals and outline directions for further research. Literature review In this section we review literature dealing with shortcomings of traditional project management practices, proposed developments, and their implications for logistics. First, we make a short overview on the criticism calling for developments in the traditional project management approach, and present a framework developed by Ballard (2000) the Last Planner System that introduces a novel approach in line with the suggested 2

3 development directions. Then, we discuss the material delivery related capabilities that are needed for the Last Planner approach to be effectively utilised. Challenges in prevalent project management practices The prevalent project management methods have recently been stated as inadequate for controlling the progress of construction projects (e.g. Ballard, 2000; Choo et al., 1999; Chua et al., 2001; Koskela and Howell, 2002). Some of the strongest opinions have been presented by Koskela and Howell in their statements that the underlying theory of project management is obsolete and there in fact exists no explicitly stated theory on project management (Koskela and Howell, 2001; Koskela and Howell, 2002). Their main objection is that planning, execution, and control are not utilised in practice as suggested by PMBOK Guide of Project Management Institute. In similar vein, Johnston and Brennan (1996) have argued that the general interpretation of project management is management-as-planning based on a strong causal connection between generating a plan and the resulting operational activity. They conclude that such a straightforward coupling is not feasible, since no plan can ever be detailed enough to enable mere execution with no feedback from the environment. Koskela and Howell (2002) note that reliance on a general plan leads to poor short-term planning. These observations are confirmed, for example, in a study of six construction projects in England and Brazil (Santos et al., 2002). Koskela and Howell (2002) recognise that maintaining a comprehensive up-to-date plan is difficult. Therefore, being based on an out-of-date plan, the tasks pushed to execution often cannot be performed, as they lack either predecessor tasks or other inputs. As Johnston and Brennan (1996) state, That this approach works at all is largely attributable to tacit knowledge and improvisation at the operational level. From the supply chain point of view however, this management approach including last-minute improvisation leads to inefficient practices to guard against material shortages. Materials are often ordered either very late leading to buffering at supplier to guarantee service level, or too early leading to buffering at the site (Vrijhoef and Koskela, 2000). 3

4 Therefore, there has been a clear need for a more interactive management method, where the next steps to take in a construction project are determined from the current status of the project, not from predefined and outdated schedules obsolete for controlling practical actions. More flexible project management practices have been developed to overcome the challenges of traditional project management approaches (e.g. Ballard, 2000; Chua et al; 2001). In the following, we give the Last Planner System of Ballard (2000) as an example of such approaches. Last Planner - a novel method for managing projects The Last Planner System has been developed by Ballard (2000) since It is a project execution system that uses the overall project plan as the general frame, but suggests that the day-to-day activities of the actual production should be managed by a more flexible approach accounting for the actual progress of the project. The main philosophy is to ensure that all the prerequisites needed for performing a distinct task are in place, before it is assigned to a work group. This is the task of the last planner in the chain of plans of increasing detail in a project. Therefore, Last Planner has been used to mean both the system and the person responsible for the final arrangement of tasks. Project Objective Information PLANNING THE WORK SHOULD CAN LAST PLANNER PLANNING PROCESS WILL Resources Production DID Figure 1. The Last Planner System (Ballard, 2000) The four main categories for any executable assignment are SHOULD, CAN, WILL, and DID (Figure 1). 4

5 - SHOULD: assignments that need to be done in the near future according to the overall project plan - CAN: assignments that have all their prerequisites ready: e.g. previous project steps are completed, necessary materials are at hand, and work force is available - WILL: the tasks that are commenced before the next planning round - DID: the assignments that are completed The Last Planner System includes rules and procedures, and a set of tools that facilitate the implementation of those procedures. The two main procedures are Production Unit Control and Work Flow Control. Production Unit Control coordinates the execution of work within production units (e.g. construction crews) and includes processes for directing workers through continuous learning and corrective actions. Work Flow Control coordinates the flow of design, supply, and installation to proactively arrange work to flow in the best achievable sequence and rate. From the supply chain perspective, the most important feature of the Last Planner System is the way the work flow control utilises a lookahead process. The traditional use for a lookahead process is only to highlight what SHOULD be done in the near term. However, within the Last Planner System, the process serves several functions, e.g. work flow sequence shaping, decomposing master schedule activities into assignments and revising higher level schedules as needed, and maintaining a backlog of work ready to be performed. These are accomplished through specific processes, such as matching load and capacity and constraints analysis. The vehicle for the entire lookahead process is a schedule of potential assignments for the next 3 to 12 weeks (Figure 2), the extent depending on project characteristics, such as lead times for acquiring materials or labour force. 5

6 Master schedule activities entering 6 th week Assignments Workable Backlog Screen assignments & make ready each week enough work to maintain 2 week workable backlog Explode scheduled activities into work packages on entry to the lookahead window Reasons why planned work not completed Notify coordinator of constraints status Figure 2. A schematic illustration of the lookahead process, showing work flowing through time from right to left (Ballard, 2000). Constraints analysis is used on the potential assignments to determine what must be done to make it ready for execution. If the planner thinks that constraints of a specific assignment (e.g. materials, prerequisite work, or equipment) cannot be removed in time, it is shifted to a later date. The assignments enter the lookahead window at the far end, and move forward as time progresses. As all of their constraints are removed, they enter the workable backlog. The objective is to constantly have a backlog of work that CAN be performed, and based on the backlog the actual workplan (WILL) for the next period is created. The aim of the constraints analysis of Last Planner is to ensure that all resources are available for a given project task at the time of the execution. Therefore, from a material replenishments perspective information about the availability of the relevant material is crucial for the constraints analysis to function. Material flow management related challenges of the last planner -method Two distinct material flow management related challenges can be associated with using the last planner methodology: The Last Planner needs to have access to as comprehensive 6

7 as possible materials availability information for individual project tasks, and the material delivery lead-times need to be as short as possible to enable timely response to the shortterm planning of the approach. The two challenges give pressures for increasing the site inventory, as the materials on site are readily available for possible changes in production plan. However, excessive site inventories create problems for materials handling at site (Alves and Tommelein, 2003) and the materials have a big risk of getting lost or stolen (Kärkkäinen et al., 2003). And most importantly, the inventories at sites are often not registered in information systems, but need to be visually controlled to make sure they are available (Halmepuro and Nysten, 2003; ISI Industry Software, 2003). This is a serious problem for the constraint analysis of the Last Planner approach. To avoid increasing site inventory levels, the closely situated suppliers can requested finished goods inventory for the project. A more scalable solution is to establish temporary intermediate storages near the actual site to have materials available at short notice. This approach is actually directly analogous to the supplier hubs already common in the field of discrete manufacturing. Obviously, transparency to inventories in these locations needs to provided for the Last Planner. Creating supply chain transparency for project deliveries is however challenging: the networks supplying construction projects are short-term, often set up for single projects only, and the project delivery network often involves a large number of rather small companies. The most significant challenge of generating transparency for project supply network is that the networks are mostly created for one project only, and disbanded after the project is completed (Dainty et al., 2001). This has resulted in low long-term commitment, which is needed with most information technology development projects (Voordijk, 1999). Thus, solutions seeking to increase inventory transparency in project supply chains should be quick and easy to take into use and not demand significant investment due to the short time span of the usability of the solution (Cheng et al., 2001). Supply networks of construction projects are also usually characterised by including several small or medium sized enterprises (SME). For example, almost 98% of UK construction companies are SME s, employing 24 or fewer workers (Dainty et al. 2001). 7

8 The ability to make investments in IT infrastructure is rather limited in the whole for these small companies, and thus can rarely engage in heavy integration efforts (Anumba and Ruikar, 2002; Elliman and Orange, 2000). Research problem and design Based on the gap in the current body of literature we formulated the following research problem: How to construct an effective material delivery model for construction projects with short-term task level scheduling? Due to the specific requirements for the solution pointed out by the current literature we developed two more detailed research questions: RQ1) How to gather and convey material availability information to project task scheduling? RQ2) How to organise efficient material deliveries for project materials when operating with a flexible project schedule? The research reported in this paper is based on the Innovation Action Research - paradigm, first presented by Kaplan (1998). In innovation action research the aim is to initially document major limitations in contemporary practice, identify a new concept to overcome the limitation, and to continually apply and improve the concept through publication, teaching and active intervention in companies. The general flow of innovation action research is illustrated in Figure 3. 8

9 2. Teach and speak about the innovation Cases Feedback and learning 3. Write articles and books Invitations 1. Observe and document innovative practice New practices Management and organizational phenomena Advanced implementation Intermediate Initial implementation Base case 4. Implement concept in new organizations Create changes in practice Figure 3. Innovation Action Research process (Kaplan, 1998) This research is still on the first stages of the development cycle. The roots of the research are founded in summer 2001, when we worked with a group of supplier companies to construction projects. The companies had severe difficulties in building transparency to their supply chains, and were thus not able to inform their customers on the availability of the goods they were supplying. One of the major difficulties was to manage the information of what goods had already arrived at the project site, as well as locating goods at site inventory. During the project, a simple tool for tracking the goods was developed. Thereafter we have been continuously working with the problems associated with building transparency to short-term supply networks. Later in another case study, a supplier company had problems with the delivery accuracy of project materials. This caused significant difficulties in the management of the construction activities. It was even claimed that material shortages occurred much too often for successful operations to be possible. To uncover a solution, we performed an initial literature survey, focusing on logistics literature. In the survey, we did not find any solutions directly answering the material delivery challenges of the case company. Our research team thus developed a potential solution model to these challenges. The solution model was basically a project finite scheduling approach that took into account 9

10 the constraints proposed by material delivery problems. In a more extensive literature survey, now focusing also on project management literature, to link our proposed solution to the current body of knowledge, we identified the Last Planner project management approach. The Last Planner proved to be a more comprehensive approach than our scheduling model, as it incorporates also other scheduling constraints than material availability (e.g. prerequisite tasks, personnel availability). Also, there has been software development based on the Last Planner approach making it easier to take the system into use (e.g. Choo et al. 1999). Nevertheless, we recognised that our replenishment model initially developed to work with our own finite scheduling approach is also a complementing element for the Last Planner System, and addresses the transparency and lead-time requirements it poses to the material delivery process. In this paper, we present the delivery model and its linkages to the Last Planner System. The transparency solution has been tested and developed in two installations, but we do not yet have any experiences of the finite scheduling model in a real life setting. The initial scheduling model has been validated in expert group discussions in one supplier and one installation company operating with construction projects. Therefore, our proposed solution can be considered to be in the early stages of its innovation action research development cycle. The proposed material delivery solution We will present our proposal in two parts. First, we address the transparency needed for determining material constraints. And second, we demonstrate how the finite scheduling of project tasks can be used to help the supplier to provide timely deliveries. Visibility to material constraints The first challenge of the material delivery process in relation to Last Planner type project management approaches is to provide the planner reliable information on material availability for project tasks. This means that the material needs of each task have to be known. The materials needed for a task can be thought of as a bill of materials (BOM) for a task. An example BOM for a project task 29 is illustrated in Figure 4. 10

11 Project Task_29 2 x ITEM A ITEM XYZ 5kg ITEM C Figure 4. An example bill of materials for project task 29. Transparency to materials in the project supply chain is needed to enable checking whether the identified task materials are available or not. If the Last Planner can be provided with availability information, the material constraints for the project task can be determined. The situation when project tasks and materials are linked and transparency to materials is achieved is illustrated in Figure 5. When equipped with the availability information, those project tasks in which material delays are detected, can be transferred to later dates where the delays are satisfied. Task_01 Task_02 Task_06 Present day All materials available at site Task_08 Task_14 Task_13 Task_28 Task_16 Detected delay of some material(s) Task_24 Task_54 Task_56 Task_66 Materials in interim storage Material status not defined Task _78 Task _29 Task _17 Task _65 Task_27 Task _69 Task _21 Task _07 Task _25 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Figure 5. Illustration of the results of materials constraint analysis. However, as discussed earlier, providing transparency to the materials is not very straightforward in construction projects, whether the inventory is located at the site or elsewhere in the supply chain. To address this challenge, we have developed a tool for creating inventory transparency based on shipment tracking. The tool has been designed for site inventories and short-term storages, where traditional inventory transparency solutions are extremely difficult to apply, and which are the most critical inventories for the finite scheduling of the project (Kärkkäinen and Ala-Risku, 2003). The tool is also suitable for building transparency to inventories located in any other part of the supply 11

12 network (e.g. at the suppliers or sub-suppliers). The material inventory information with the tool is established by tracking the incoming shipments (materials received at the site / warehouse) and outgoing materials (materials installed / sent from the warehouse) (Kärkkäinen and Ala-Risku, 2003). Shipment tracking system Intermediate Storage 1 Tracking database Code Location Timestamp ID_2364 Intermediate Storage ID_6421 Intermediate Storage ID_1536 Intermediate Storage ID_5423 Site Inventory ID_1416 Site Inventory Intermediate Storage 2 Figure 6. Inventory transparency provided with a tracking tool. When building tracking based inventory transparency, deliveries arriving at the project site or an intermediate storage have to be equipped with an identifying code (e.g. order number or task number), which can be used to link the shipment that arrived to the materials it contains. These codes are registered with a tracking system, when packages arrive or are taken out of a given storage location. The tracking software then conveys the tracking code, the location of the inventory and the time of the read to a tracking database, illustrated in Figure 6. The codes read to the tracking database need to be linked to the materials in the shipment. Using the link between materials and tasks (cf. Figure 4) enables the use of the tracking information in the constraint analysis for the finite schedule. If these functionalities are built, the following information can be interrogated from the databases: What is the location of the different goods needed for a certain project task What materials are at a given location (e.g. site inventory or intermediate storage inventory) 12

13 What is the location of a certain shipment This information is sufficient for checking the availability of material for the project tasks, and it can also be used to optimise inventory allocation in the supply chain. If a further database table containing the delivery dates promised by the suppliers, the ordering date, and shipping date is also connected to the tracking database, also the following pieces of information can be generated: The on-time delivery rate of a supplier The lead-time of orders (from ordering to receiving of the goods) The lead-time of deliveries (from the dispatch to the receiving of the delivery) And, if the packages are traced in several locations the de-constructed lead-times can be used for performance analysis of the supply chain (Jahnukainen et al., 1995). Material delivery triggering The Last Planner allocates tasks on the finite schedule and removes the material constraints of each task by making sure the necessary materials are ordered before the tasks are allowed to move to the workable backlog. Since the tasks are positioned on the finite schedule, they can also be used to produce forecasts of upcoming delivery needs for the suppliers. This is the best forecast available, as the Last Planner continuously updates the most likely schedule for the project tasks in the near future based on the progression of the project. When having visibility to upcoming material needs, the suppliers are able to inform the Last Planner of potential delivery disruptions. The Last Planner can then adjust the task schedule taking the emerged material constraint in to account. Also, if any changes in the task sequence are made, the supplier gets informed of delayed (or advanced) material needs. Thus, the finite project schedules can be used for enabling the suppliers to better cope with the changes in the required delivery dates of the project material. The efficiency of operations for the Last Planner can be increased by removing the need for frequent material orders. If the upcoming material requirements are conveyed directly 13

14 to the suppliers (e.g. via www), the suppliers can move to a pro-active delivery of the goods needed for the project tasks (a kind of VMI for projects). The suppliers can be given the responsibility to deliver the goods needed for a certain task to the project site in time. For the pro-active delivery, we have added an extra parameter to the task schedule the project buffer time. The project buffer time is used to ensure that suppliers make the materials available in time for the tasks moving to the workable backlog. This means that suppliers are given a material needs view, where the needs are advanced the amount of buffer days (illustrated in Figure 7). To be dispatched on the present day 2 x ITEM_A 56kg ITEM_C 1 x ITEM_XYZ 3 x ITEM_B Present day 1 x ITEM_FZC 5 x ITEM_D Expected call-offs 5 x ITEM_D 1 x ITEM_FZC 1 x ITEM_XYZ 3 x ITEM_K 12 x ITEM_L 1 x ITEM_FZC 1 x ITEM_KYL 9 x ITEM_M 1 x ITEM_FZC 5 x ITEM_D 1 x ITEM_FZC 5 x ITEM_D 12 x ITEM_L 1 x ITEM_FZC 1 x ITEM_KYL 9 x ITEM_M Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Task_01 Task_02 Task_06 Present day Task_08 Task_14 Task_13 Task_28 Task_16 Task_24 Task_54 Task_56 Task_66 Task _78 Task _29 Task _17 Task _65 Task_27 Task _69 Task _21 Task _07 Task _25 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Project determined buffer time (3 days) Figure 7. Pro-active deliveries for project materials. For example, in Figure 7, the project has determined that it should have the materials available for the next three days. A supplier with a delivery time of two days would be requested to deliver the materials for tasks on Day 5. The materials for upcoming tasks would be given as a forecast to ensure that the supplier is prepared to deliver those according to the schedule. To summarise, this material control system allows material call-offs to be done automatically, according to the project progress and based on the workflow logic. The entire operating model is illustrated in Figure 8. 14

15 SUPPLIER A Material flow tracking on project task level Rolling delivery plan SUPPLIER B Interim Interim storages Interim Storage* Storage* PROJECT SITE Rolling delivery plan Project schedule updated based on material availability and other constraints Project schedule used to trigger material deliveries Project construction schedule Figure 8. An illustration of the proposed material delivery system. Conclusions A solution consisting of two parts was proposed for answering the research problem: How to construct an effective material delivery model for construction projects with short-term task level scheduling? The solution consisted of a tracking based approach for building inventory transparency for short-term supply chains, and a pro-active material delivery model for the materials for specific project tasks. Both of these elements are needed when using the Last Planner System. The presented tracking based method for solving the difficulties of site and intermediate inventory management and transparency can be considered a clear addition to the current body of literature. Its practical relevance is emphasised in project-oriented industries, as it is challenging and often infeasible to establish traditional inventory management systems to temporary storage locations used during projects. Also, we consider the pro-active delivery model for construction task materials a novel idea. However, as we are not too familiar with project management literature and 15

16 terminology, we acknowledge that similar approaches may already be presented with descriptions that we have not recognised. During our research we identified the change resistance of the project management to be the most difficult issue for taking the finite scheduling model into use. The project management people were unwilling to formally state that disturbances in material deliveries are a legitimate reason for re-scheduling project tasks: It was considered next to stating that it is acceptable to miss promised delivery dates. The potential for heavy claims for the time that installation workers have been present at the construction site unnecessarily due to lack of materials, has served as a motivator for on-time deliveries (Halmepuro and Nysten, 2003). If the project is re-scheduled when material shortages occur, different methods for ensuring availability need to be developed. Further research We have identified two relevant areas in the need of further research efforts. A case study with a company using the finite scheduling approach is needed in order to determine the most critical points of the supply chain where transparency is required (our experiences thus far have all pressed the importance of site inventories). Also the effects of the finite scheduling model and the established demand visibility on the material delivery process need to be studied more comprehensively. If a company that has already adopted the approach cannot be accessed, we will pursue piloting the approach for example with manual plan updating methods. The already tested method for building inventory transparency can easily be used for determining the material constraints for the upcoming tasks. Another interesting area for future research is to identify the similarities and differences of material flow challenges in construction projects of various industries. For example, does the execution of previous tasks have less importance when establishing communication or power networks (e.g. when building the upcoming digital television network or an electric network) than building construction? 16

17 References Alves, T.C.L. and Tommelein, I.D., (2003). "Buffering and Batching Practices in the HVAC Industry." Proceedings of the 11th Conference of the International Group for Lean Construction (IGLC11), July 2003, Virginia Tech, Blacksburg, Virginia. Anumba, C.J., Ruikar, K., (2001), "Electronic commerce in construction - trends and prospects", Automation in Construction, Vol. 11, pp Ballard, G., (2000) The Last Planner System of Production Control. A thesis submitted to the Faculty of Engineering of The University of Birmingham for the degree of Doctor of Philosophy. School of Civil Engineering, Faculty of Engineering, The University of Birmingham. Cheng, E.W.L., Li, H., Love, P.E.D., Irani Z., (2001), "An e-business model to support supply chain activities in construction", Logistics Information Management, Vol, 14, No. 1/2, pp Choo, H.J., Tommelein, I.D., Ballard, G., and Zabelle, T.R., (1999). "WorkPlan: Constraint-based Database for Work Package Scheduling." ASCE, Journal of Construction Engineering and Management, Vol. 125, No. 3, pp Chua, D.K.H., and Shen, L.J., (2001), Constraint modelling and buffer management with integrated production scheduler, Proceedings of the 9 th Annual Conference of the International Group for Lean Construction, 6-8 August, 2001, Singapore. Dainty, A.R.J., Briscoe, G.H., and Millett, S.J., (2001), New perspectives on construction supply chain integration, Supply Chain Management: An International Journal, Vol. 6, No. 4, pp Elliman, T., Orange, G., (2000), "Electronic commerce to support construction design and supply-chain management: a research note", International Journal of Physical Distribution & Logistics Management, Vol. 30, No. 3/4, pp Halmepuro, J. and Nystén, C., (2003), an interview with Department Manager Jorma Halmepuro and Expediter Christer Nystén from Jaakko Pöyry Oy on 23 rd January

18 ISI Industry Software, (2003), Consignment Tracking for Heavy Industry, News Release of Oy ISI Industry Software Ab, 10. February 2003, available at: Jahnukainen, J., Lahti, M., and Huhtala, M., (1995), LOGIPRO : towards world class make-to-order supply chains, Research report, no 162, Helsinki University of Technology, Industrial Economics and Industrial Psychology, Finland. Johnston, R.B., and Brennan, M., (1996), Planning or Organising: the Implications of Theories of Activity for Management of operations, Omega, International Journal of Management Science, Vol. 24, No. 4, pp Kaplan, R.S., (1998), "Innovation Action Research: Creating New Management Theory and Practice", Journal of Management Accounting Research, Vol. 10, pp Koskela, L., and Howell, G., (2001), Reforming project management: the role of planning, execution and controlling, Proceedings of the 9 th International Group for Lean Construction conference, Kent Ridge Crescent, Singapore, 6-8 August, Koskela, L., and Howell, G., (2002), The underlying theory of project management is obsolete, Proceedings of the PMI Research Conference, 2002, pp Kärkkäinen, M., and Ala-Risku, T., (2003): "Facilitating the integration of SME s to supply networks with lean IT solutions", Proceedings of echallenges 2003, October 22-24, 2003, Bologna, Italy, pp Kärkkäinen, M., Holmström, J., Främling, K., and Artto, K., (2003), "Intelligent products a step towards a more effective project delivery chain", Computers in Industry, Vol. 50, No. 2, pp Santos, A., Powell, J.A., Sarshar, M., (2002), Evolution of management theory: the case of production management in construction, Management Decision, Vol. 40, No. 8, pp Voordijk, H., (1999), "Preconditions and dynamics of logistics networks in the Dutch building industry", Supply Chain Management, Vol. 4, No. 3, pp

19 Vrijhoef, R., Koskela, L., (2000), The four roles of supply chain management in construction, Journal of Purchasing & Supply Management, Vol. 6, pp

PLANNED WORK READY : A PROACTIVE METRIC FOR PROJECT CONTROL

PLANNED WORK READY : A PROACTIVE METRIC FOR PROJECT CONTROL 235 PLANNED WORK READY : A PROACTIVE METRIC FOR PROJECT CONTROL Panagiotis Takis Mitropoulos 1 ABSTRACT Traditional project controls use percent complete and earned value to assess the project status.

More information

Demo Script. Manufacturing Basics Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. Version:

Demo Script. Manufacturing Basics Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. Version: Demo Script Classification: Internal and for Partners Version: 20171218 SAP Business ByDesign Reference Systems Disclaimer This demo script is based on the ByD Reference System for the Almika model company.

More information

Applying Object-oriented Analysis and Design to Digital Construction Logistics Planning from a Material Flow Perspective

Applying Object-oriented Analysis and Design to Digital Construction Logistics Planning from a Material Flow Perspective Applying Object-oriented Analysis and Design to Digital Construction Logistics Planning from a Material Flow Perspective Ningshuang Zeng a, Markus König a and Chao Mao b a Department of Civil and Environmental

More information

Combating Uncertainty in the Workflow of Systems Engineering Projects

Combating Uncertainty in the Workflow of Systems Engineering Projects attributed copies permitted 1 Combating Uncertainty in the Workflow of Systems Engineering Projects Barry Papke L3 Communications Greenville, TX 75402, USA barry.papke@l-3com.com Rick Dove Stevens Institute

More information

Business case studies. (Logistic and production models)

Business case studies. (Logistic and production models) Business case studies (Logistic and production models) 1. Logistics planning in the food industry The logistic system of the food manufacturing company consists of a network whose nodes represent suppliers

More information

APPLYING LAST PLANNER IN THE NIGERIAN CONSTRUCTION INDUSTRY

APPLYING LAST PLANNER IN THE NIGERIAN CONSTRUCTION INDUSTRY APPLYING LAST PLANNER IN THE NIGERIAN CONSTRUCTION INDUSTRY ABSTRACT Ismail Adamu 1 and Gregory Howell 2 The Nigerian construction industry has yet to adapt Lean Construction modern to eliminate or minimize

More information

Best practices in demand and inventory planning

Best practices in demand and inventory planning whitepaper Best practices in demand and inventory planning WHITEPAPER Best Practices in Demand and Inventory Planning 2 about In support of its present and future customers, Aptean sponsored this white

More information

A Study of the Application of Supply Chain Management in Construction Industry

A Study of the Application of Supply Chain Management in Construction Industry Association for Information Systems AIS Electronic Library (AISeL) WHICEB 2013 Proceedings Wuhan International Conference on e-business Summer 5-25-2013 A Study of the Application of Supply Chain Management

More information

CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER

CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER ABSTRACT CONSTRAINT MODELING AND BUFFER MANAGEMENT WITH INTEGRATED PRODUCTION SCHEDULER David, K. H. Chua 1, and Li Jun Shen 2 Constraint modeling is a necessary step in construction planning. The basic

More information

LEAN WAREHOUSE OPERATIONS.

LEAN WAREHOUSE OPERATIONS. LEAN WAREHOUSE OPERATIONS www.fourprinciples.com BACKGROUND Warehousing s historical core responsibility has been the storage of goods. However, the scope and core responsibilities of warehouse management

More information

THE COMBINATION OF LAST PLANNER SYSTEM AND LOCATION-BASED MANAGEMENT SYSTEM

THE COMBINATION OF LAST PLANNER SYSTEM AND LOCATION-BASED MANAGEMENT SYSTEM 467 THE COMBINATION OF LAST PLANNER SYSTEM AND LOCATION-BASED MANAGEMENT SYSTEM ABSTRACT Olli Seppänen 1, Glenn Ballard 2, Sakari Pesonen 3 The Last Planner System 4 (LPS) and Location-Based Management

More information

Best Practices in Demand and Inventory Planning

Best Practices in Demand and Inventory Planning W H I T E P A P E R Best Practices in Demand and Inventory Planning for Chemical Companies Executive Summary In support of its present and future customers, CDC Software sponsored this white paper to help

More information

A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION

A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION Håkan Norberg and Thomas Olofsson Department of Civil, Mining and Environmental Engineering

More information

Active Transportation Management for the Automotive Industry

Active Transportation Management for the Automotive Industry Active Transportation Management for the Automotive Industry How Companies Can Sustainably Reduce Costs by Optimizing Transportation Processes Automotive manufacturers and suppliers fight with high costs

More information

Test-king.C_TSCM42_65.80 Questions

Test-king.C_TSCM42_65.80 Questions Test-king.C_TSCM42_65.80 Questions Number: C_TSCM42_65 Passing Score: 800 Time Limit: 120 min File Version: 4.9 http://www.gratisexam.com/ C_TSCM42_65 SAP Certified Application Associate - Production -

More information

Supply Chain Process and Systems Optimization for a Leading Global Manufacturer of Elevators, Escalators and Automatic Doors

Supply Chain Process and Systems Optimization for a Leading Global Manufacturer of Elevators, Escalators and Automatic Doors www.hcltech.com Supply Chain Process and Systems Optimization for a Leading Global Manufacturer of Elevators, Escalators and Automatic Doors Executive Summary The client is a leading global manufacturer

More information

APPLICATION OF JUST IN TIME TO THE FABRICATION AND INSTALLATION OF PREFABRICATED CONCRETE FACADES IN BUILDINGS

APPLICATION OF JUST IN TIME TO THE FABRICATION AND INSTALLATION OF PREFABRICATED CONCRETE FACADES IN BUILDINGS APPLICATION OF JUST IN TIME TO THE FABRICATION AND INSTALLATION OF PREFABRICATED CONCRETE FACADES IN BUILDINGS ABSTRACT Jorge G. Cossio 1 and Antonio G. Cossio 22 This paper will demonstrate the advantages

More information

Beyond the hype: RPA uncovered The Arvato way

Beyond the hype: RPA uncovered The Arvato way Beyond the hype: RPA uncovered The Arvato way The Arvato Approach to RPA 30% 60% 50% of Order to Cash BPO contracts have deployed RPA Potential cost reductions from RPA implementation of work generally

More information

A simulation model of a retail distribution centre with RFID technology

A simulation model of a retail distribution centre with RFID technology A simulation model of a retail distribution centre with technology Hellström, Daniel 2003 Link to publication Citation for published version (APA): Hellström, D. (2003). A simulation model of a retail

More information

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample Pearson BTEC Levels 5 Higher Nationals in Engineering (RQF) Unit 48: Manufacturing Systems Engineering Unit Workbook 1 in a series of 1 for this unit Learning Outcome LO1 to LO4 Manufacturing Systems Engineering

More information

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING Kim Hindle Project

More information

LEAN PROCUREMENT.

LEAN PROCUREMENT. LEAN PROCUREMENT www.fourprinciples.com BACKGROUND Procurement s core responsibilities have traditionally provided purchased materials and services on time, at the lowest costs, and highest quality to

More information

Implementation of a VMI production and distribution control system

Implementation of a VMI production and distribution control system Implementation of a VMI production and distribution control system S.M. Disney *~, J. Holmström #, R. Kaipia # and D.R. Towill ~ ~ Logistics Systems Dynamics Group, Cardiff Business School, Cardiff University,

More information

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders. Manufacturing Functionlity in Microsoft Dynamics GP Gain complete control over your inventory, production and orders. Control your Inventory Costing and Inventory Control Are you confident and in control

More information

Exploring IoT Business Opportunities In Manufacturing By : Jim Brown President Tech-Clarity

Exploring IoT Business Opportunities In Manufacturing By : Jim Brown President Tech-Clarity 1 Exploring IoT Business Opportunities In Manufacturing By : Jim Brown President Tech-Clarity 2 Manufacturing in an Era of Innovation The manufacturing industry is currently in an era of significant innovation.

More information

MASTER PRODUCTION SCHEDULE (MPS)

MASTER PRODUCTION SCHEDULE (MPS) MASTER PRODUCTION SCHEDULE (MPS) Anticipated build schedule for manufacturing end products (or product options) A statement of production, not a statement of market demand MPS takes into account capacity

More information

Web: Phone:

Web:    Phone: STUDY GUIDE CILT (UK) LEVEL 3 CERTIFICATE IN LOGISTICS AND TRANSPORT DELIVERED BY: AWARDING ORGANISATION: Web: www.logisticslearningalliance.com Email: enquiry@logisticslearningalliance.com Phone: 0800

More information

Manufacturing Efficiency Guide DBA Software Inc.

Manufacturing Efficiency Guide DBA Software Inc. Contents 3 Table of Contents 1 Introduction 5 2 What Is Manufacturing Efficiency? 7 3 The Seven Essential Processes 8 4 Essential #1 - Plan a Strategic Inventory 1 Strategic Inventory - Overview 10 11

More information

Thesis Projects Outline & Examples

Thesis Projects Outline & Examples Logistics, Procurement and Supply Chain Management MSc Thesis Projects Outline & Examples Dr Hendrik Reefke Email: hendrik.reefke@cranfield.ac.uk 1 www.cranfield.ac.uk/som Benefits Provides external expertise

More information

Deltek Costpoint Manufacturing Solutions

Deltek Costpoint Manufacturing Solutions Deltek Costpoint Manufacturing Solutions Leverage the industry s proven solution made for government contractors to help modernize operations and lower costs. Meeting Your Needs Today, and for the Future

More information

Supplier Portal. QAD Inc.

Supplier Portal. QAD Inc. QAD SUPPLIER PORTAL BENEFITS Reduce inventory investment without risking material shortages and down time Eliminate waste and reduce errors by replacing forms with electronic communication Reduce expediting

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

Time to Shipment MRP Guide DBA Software Inc.

Time to Shipment MRP Guide DBA Software Inc. Contents 3 Table of Contents 1 Benefits and Features 4 2 MRP Overview 6 3 MRP Phases 10 4 Phase 1 - Plan Times to Shipment 12 5 Phase 2 - Plan Supply Pipelines 25 6 Phase 3 - Generate Jobs and POs 34 7

More information

A Guide to the Last Planner for Construction Foremen and Supervisors Gregory A. Howell, P.E.

A Guide to the Last Planner for Construction Foremen and Supervisors Gregory A. Howell, P.E. A Guide to the Last Planner for Construction Foremen and Supervisors Gregory A. Howell, P.E. Last Planners prepare assignments for people who do work. Last Planners can be found throughout construction

More information

Infor Food & Beverage for the dairy industry

Infor Food & Beverage for the dairy industry Food & Beverage Infor Food & Beverage for the dairy industry Always be prepared for the next day s shipment Dairies like yours differ greatly from each other in many ways. You may produce a variety of

More information

White Paper Cloud Strategy for Improving Legacy MRP & Supply Chain Processes

White Paper Cloud Strategy for Improving Legacy MRP & Supply Chain Processes White Paper Cloud Strategy for Improving Legacy MRP & Supply Chain Processes Abstract: A fundamental change is taking place in the nature and application of supply chain technologies, a change with profound

More information

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS About this Topic Outline This outline details the concepts and applications coved in all five of the APICS Principles of

More information

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 -

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 - CPIM(Certified In Production & Inventory Management) MPR Sample Test. 1. Which of the following would NOT be a key operating objective? A. Inventory dollars. B. Shipment dollars. C. Factory location selection.

More information

PRODUCT CENTRIC INTEGRATION: EXPLORING THE IMPACT OF RFID AND AGENT TECHNOLOGY ON SUPPLY CHAIN MANAGEMENT

PRODUCT CENTRIC INTEGRATION: EXPLORING THE IMPACT OF RFID AND AGENT TECHNOLOGY ON SUPPLY CHAIN MANAGEMENT 01 PRODUCT CENTRIC INTEGRATION: EXPLORING THE IMPACT OF RFID AND AGENT TECHNOLOGY ON SUPPLY CHAIN MANAGEMENT Jan Holmström* and Kary Främling Industrial Engineering and Management Helsinki University of

More information

IMPROVING CONSTRUCTION WORK FLOW THE CONNECTIVE ROLE OF LOOKAHEAD PLANNING

IMPROVING CONSTRUCTION WORK FLOW THE CONNECTIVE ROLE OF LOOKAHEAD PLANNING IMPROVING CONSTRUCTION WORK FLOW THE CONNECTIVE ROLE OF LOOKAHEAD PLANNING Farook R. Hamzeh 1, Glenn Ballard, and Iris D. Tommelein 3 ABSTRACT Lookahead planning is a fundamental process in the Last Planner

More information

OTM 101 Chris Gumz XPO Logistics OTM SIG User Conference Philadelphia, PA

OTM 101 Chris Gumz XPO Logistics OTM SIG User Conference Philadelphia, PA OTM 101 Chris Gumz XPO Logistics OTM SIG User Conference Philadelphia, PA August 11, 2014 Agenda Introduction Transportation Market Oracle Transportation Management Domain Structure User Roles Navigation

More information

Advancements in ERP for FMCG

Advancements in ERP for FMCG Advancements in ERP for FMCG Introduction Prior to a discussion of the advancements in Enterprise Resource Planning (ERP) for the Fast Moving Consumer Goods (FMCG) industry, it is important to first take

More information

INTEGRATING PRODUCTION AND QUALITY CONTROL: MONITORING MAKING-DO AND UNFINISHED WORK

INTEGRATING PRODUCTION AND QUALITY CONTROL: MONITORING MAKING-DO AND UNFINISHED WORK INTEGRATING PRODUCTION AND QUALITY CONTROL: MONITORING MAKING-DO AND UNFINISHED WORK Marcus C. T. Fireman 1, Carlos T. Formoso 2 and Eduardo L. Isatto 3 ABSTRACT The lack of integration between production

More information

ARC VIEW. TCS Seeks to Enable a Digital Integrated Business Planning Process. Keywords. Summary. From IBP to Digital IBP.

ARC VIEW. TCS Seeks to Enable a Digital Integrated Business Planning Process. Keywords. Summary. From IBP to Digital IBP. ARC VIEW DECEMBER 21, 2017 TCS Seeks to Enable a Digital Integrated Business Planning Process By Steve Banker Keywords Integrated Business Planning, Digital, Cognitive Summary On October 25 th, 2017 Tata

More information

Optimising Inbound, Warehousing and Outbound Strategies

Optimising Inbound, Warehousing and Outbound Strategies Warehouse Management EXECUTIVE SUMMARY Optimising Inbound, Warehousing and Outbound Strategies Control the movement of stock within a warehouse or across multiple facilities. Process associated transactions

More information

Digital Transformation - What s Happening in Waste and Recycling Tech, Software, Cloud, Data, Mobile & Analytics?

Digital Transformation - What s Happening in Waste and Recycling Tech, Software, Cloud, Data, Mobile & Analytics? Delivering Digital Transformation in Waste & Recycling Companies Digital Transformation - What s Happening in Waste and Recycling Tech, Software, Cloud, Data, Mobile & Analytics? ISB Global Software Platforms

More information

TOUCH IOT WITH SAP LEONARDO

TOUCH IOT WITH SAP LEONARDO TOUCH IOT WITH SAP LEONARDO PROTOTYPE CHALLENGE MANUFACTURING FACTORY VISIBILITY AND AUTOMATION (SAP LEONARDO ENABLED INFORMED MANUFACTURING FOR HIGHER MANUFACTURING OPERATING EFFICIENCY) Template Description

More information

Supply Chain Visibility Roadmap. Author Ranjan Arora WHITE PAPER

Supply Chain Visibility Roadmap. Author Ranjan Arora WHITE PAPER Supply Chain Visibility Roadmap Author Ranjan Arora WHITE PAPER JULY 2012 TABLE OF CONTENTS Abstract 3 Supply Chain Visibility: Definition and Key Trends 3 SCV Framework: The Need 4 Supply Chain Visibility:

More information

SUPPLY CHAIN & DISTRIBUTION INVENTORY

SUPPLY CHAIN & DISTRIBUTION INVENTORY SUPPLY CHAIN & DISTRIBUTION INVENTORY Greentree Inventory Key Benefits Flexible Maintenance Options Unlimited Pricing Options Multi-Locations Multiple Pricing Books User-Defined Trees Streamlined Stocktaking

More information

Validation of NORM (Needs Oriented Framework for Producing Requirements Decision Material) Framework in Industry

Validation of NORM (Needs Oriented Framework for Producing Requirements Decision Material) Framework in Industry Master Thesis Software Engineering Thesis no: MSE-2012:102 09 2012 Validation of NORM (Needs Oriented Framework for Producing Requirements Decision Material) Framework in Industry Salman Nazir Rizwan Yousaf

More information

Xerox International Partners (XIP), established in 1991 as a joint venture between Fuji Xerox Co. Ltd.

Xerox International Partners (XIP), established in 1991 as a joint venture between Fuji Xerox Co. Ltd. IMPROVED ORDER FILL RATE, DSI AND OPERATIONAL EFFICIENCY FOR DEMAND DRIVEN SUPPLY CHAIN BY UPGRADING AND INTEGRATING MANUGISTICS SCPO AND COLLABORATE SOLUTION TO JDA 7.4.X SUCCESSFULLY Sudam Sahoo, President,

More information

INFORMATION TECHNOLOGY IN THE SUPPLY CHAIN

INFORMATION TECHNOLOGY IN THE SUPPLY CHAIN INFORMATION TECHNOLOGY IN THE SUPPLY CHAIN Introduction Information is crucial to the performance of a supply chain because it provides the basis upon which supply chain managers make decisions. Information

More information

VELOCITY 2017 META-PLATFORMS AND THE EVOLUTION OF DELIVERY LOGISTICS. Copyright 2017 Oliver Wyman

VELOCITY 2017 META-PLATFORMS AND THE EVOLUTION OF DELIVERY LOGISTICS. Copyright 2017 Oliver Wyman META-PLATFORMS AND THE EVOLUTION OF DELIVERY LOGISTICS CONSUMERS TODAY ARE MOTIVATED by convenience when it comes to purchases of products or services getting what they want, when and where they want it.

More information

REAL TIME PERFORMANCE INFORMATION SYSTEM USING MOBILE PHONE

REAL TIME PERFORMANCE INFORMATION SYSTEM USING MOBILE PHONE 331 REAL TIME PERFORMANCE INFORMATION SYSTEM USING MOBILE PHONE Yoshitaka Nakagawa 1 ABSTRACT The author explained the importance of standard operating procedure documents and visualization in order to

More information

DESIGNING FOR SECOND GENERATION VALUE FUTURE PROOFING CONSTRUCTIONS

DESIGNING FOR SECOND GENERATION VALUE FUTURE PROOFING CONSTRUCTIONS DESIGNING FOR SECOND GENERATION VALUE FUTURE PROOFING CONSTRUCTIONS Søren Lindhard 1 and Søren Wandahl 2 1 Department of Mecanical and Manufacturing Engeneering, Aalborg University, Fibigerstræde 16, 9220

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

Cost reductions through standardization and automation at company X. Heini Guldmyr

Cost reductions through standardization and automation at company X. Heini Guldmyr Cost reductions through standardization and automation at company X Heini Guldmyr November 2015 Abstract 16.11.2015 Author(s) Heini Guldmyr Degree programme Bachelor of Business Administration Report/thesis

More information

Logistics Agreement Version 2

Logistics Agreement Version 2 Logistics Agreement Version 2 Introduction Introduction The present recommendation offers operational guidelines for logistics exchanges between parties, in the attempt to clarify traditional rules, to

More information

Introduction. E-Business B2B Infrastructure

Introduction. E-Business B2B Infrastructure E-Business B2B Infrastructure Michael B. Spring Department of Information Science and Telecommunications University of Pittsburgh spring@imap.pitt.edu http://www.sis.pitt.edu/~spring Introduction B2B business

More information

SOLUTION BRIEF. Streamlined Product Migration Management with Datalliance VMI

SOLUTION BRIEF. Streamlined Product Migration Management with Datalliance VMI SOLUTION BRIEF Streamlined Product Migration Management with Datalliance VMI Introduction One of the most challenging activities suppliers and distributors need to manage together is the migration from

More information

Access MRP Software. Material requirements planning software for growing manufacturers. Designed to support small to medium manufacturers

Access MRP Software. Material requirements planning software for growing manufacturers. Designed to support small to medium manufacturers Access MRP Software Material requirements planning software for growing manufacturers Designed to support small to medium manufacturers Designed for mid-tier manufacturers, including those with ambitious

More information

The Collaborative Power of VMI 2.0

The Collaborative Power of VMI 2.0 WHITE PAPER The Collaborative Power of VMI 2.0 For more than a decade, out-of-stock rates have hovered at an average of 8 percent, according to a GMA/FMI Trading Partner Alliance report 1. More troubling

More information

INVESTIGATION OF BUFFER DYNAMICS IN SHEET METAL DUCTWORK SUPPLY CHAINS

INVESTIGATION OF BUFFER DYNAMICS IN SHEET METAL DUCTWORK SUPPLY CHAINS INVESTIGATION OF BUFFER DYNAMICS IN SHEET METAL DUCTWORK SUPPLY CHAINS Thais da C. L. Alves 1 and Iris D. Tommelein 2 ABSTRACT The model discussed in this paper represents the interactions between design

More information

UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING

UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 2 Process Planning Product design for each product has been developed in the design department. To convert the product design into

More information

WIP DESIGN IN A CONSTRUCTION PROJECT USING TAKT TIME PLANNING

WIP DESIGN IN A CONSTRUCTION PROJECT USING TAKT TIME PLANNING Faloughi, M., Linnik, M. and Murphy, D., 2015. WIP Design in a Construction Project Using Takt Time Planning. In: Proc. 23rd Ann. Conf. of the Int l. Group for Lean Construction. Perth, Australia, July

More information

THE ROLE OF SIMULATION IN ADVANCED PLANNING AND SCHEDULING. Kenneth Musselman Jean O Reilly Steven Duket

THE ROLE OF SIMULATION IN ADVANCED PLANNING AND SCHEDULING. Kenneth Musselman Jean O Reilly Steven Duket Proceedings of the 2002 Winter Simulation Conference E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds. THE ROLE OF SIMULATION IN ADVANCED PLANNING AND SCHEDULING Kenneth Musselman Jean O Reilly

More information

Lean Production Management In Design

Lean Production Management In Design Lean Production Management In Design Future Concrete 2017 16.05.2017 www.jacobs.com worldwide Lean: Improving Efficiency and Reducing Waste Its foundation relies on the lean approach of getting value to

More information

Advantages and Disadvantages of. Independent Tests. Advantages. Disadvantages

Advantages and Disadvantages of. Independent Tests. Advantages. Disadvantages 8.0 Test Management Outline 8.1 Test organisation 8.2 Test planning and estimation 8.3 Test program monitoring and control 8.4 Configuration management 8.5 Risk and testing 8.6 Summary Independent Testing

More information

SAP Thought Leadership Paper Supply Chain Management. Inventory Optimization A New Approach to Operational Inventory Planning

SAP Thought Leadership Paper Supply Chain Management. Inventory Optimization A New Approach to Operational Inventory Planning SAP Thought Leadership Paper Supply Chain Management Inventory Optimization A New Approach to Operational Inventory Planning Table of Contents 4 Executive Summary 5 Inventory Management Has Changed The

More information

Using Outside Processing in Oracle Supply Chain Management Cloud

Using Outside Processing in Oracle Supply Chain Management Cloud Using Outside Processing in Oracle Supply Chain Management Cloud Manage and Execute Your Outsourced Manufacturing Operations Efficiently O R A C L E W H I T E P A P E R J U N E 2 0 1 7 Disclaimer The following

More information

University of Groningen. Effective monitoring and control with intelligent products Meyer, Gerben Gerald

University of Groningen. Effective monitoring and control with intelligent products Meyer, Gerben Gerald University of Groningen Effective monitoring and control with intelligent products Meyer, Gerben Gerald IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's PDF) if you wish

More information

Management Thinking in the Earned Value Method System and the Last Planner System

Management Thinking in the Earned Value Method System and the Last Planner System Management Thinking in the Earned Value Method System and the Last Planner System Yong-Woo Kim, A.M.ASCE 1 ; and Glenn Ballard 2 Downloaded from ascelibrary.org by University of California, Berkeley on

More information

Order-To-Delivery Process Architecture in Cement Factories: The Case of Derba Midroc Cement Factory

Order-To-Delivery Process Architecture in Cement Factories: The Case of Derba Midroc Cement Factory Order-To-Delivery Process Architecture in Cement Factories: The Case of Derba Midroc Cement Factory Ayda Gebru HiLCoE, Computer Science Programme, Ethiopia aydageb12@gmail.com Berhanu Borena HiLCoE, Ethiopia

More information

AdvAnced Business MAnAger The NexT GeNeraTioN of accounting software

AdvAnced Business MAnAger The NexT GeNeraTioN of accounting software Advanced Business Manager The Next Generation of accounting software Overview Advanced Business Manager (ABM) has been designed and developed by accountants to create the next generation of accounting

More information

Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras

Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Lecture - 37 Transportation and Distribution Models In this lecture, we

More information

AUTOMATION FROM LEAN PERSPECTIVE-POTENTIALS AND CHALLENGES. Keywords: Lean automation, automation development, competitive manufacturing

AUTOMATION FROM LEAN PERSPECTIVE-POTENTIALS AND CHALLENGES. Keywords: Lean automation, automation development, competitive manufacturing Proceedings of the 11 th International Conference on Manufacturing Research (ICMR2013), Cranfield University, UK, 19th 20th September 2013, pp 437-442 AUTOMATION FROM LEAN PERSPECTIVE-POTENTIALS AND CHALLENGES

More information

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success  Presented by Larry Akre May 17, 2007 "Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007 LAKRE 2007 1 Lean Manufacturing What is Lean Manufacturing? A philosophy

More information

Lean Construction. Moonseo Park Building Construction Technology Building Construction Technology

Lean Construction. Moonseo Park Building Construction Technology Building Construction Technology Lean Construction Moonseo Park Associate Professor, PhD 39 동 433 Phone 880-5848, Fax 871-5518 E-mail: mspark@snu.ac.kr Department of Architecture College of Engineering g Seoul National University 1 Discussion

More information

Eindhoven University of Technology MASTER. Measuring and improving productivity in a job shop environment the applicability of the ProMES methodology

Eindhoven University of Technology MASTER. Measuring and improving productivity in a job shop environment the applicability of the ProMES methodology Eindhoven University of Technology MASTER Measuring and improving productivity in a job shop environment the applicability of the ProMES methodology de Boer, T. Award date: 2007 Link to publication Disclaimer

More information

JD Edwards EnterpriseOne Order Promising: Save Time and Improve Accuracy. An Oracle White Paper January 2004

JD Edwards EnterpriseOne Order Promising: Save Time and Improve Accuracy. An Oracle White Paper January 2004 JD Edwards EnterpriseOne Order Promising: Save Time and Improve Accuracy An Oracle White Paper January 2004 JD Edwards EnterpriseOne Order Promising: Save Time and Improve Accuracy EXECUTIVE OVERVIEW When

More information

Reinventing Supply Chain Efficiencies. Solutions for Fast Moving Consumer Goods and Distribution Companies

Reinventing Supply Chain Efficiencies. Solutions for Fast Moving Consumer Goods and Distribution Companies Reinventing Supply Chain Efficiencies Solutions for Fast Moving Consumer Goods and Distribution Companies How quickly can you process and turnaround your customer orders? Intense price pressure at the

More information

ASSIGNMENT BUFFER CONTROL FOR CONSTRUCTION PROJECTS

ASSIGNMENT BUFFER CONTROL FOR CONSTRUCTION PROJECTS ASSIGNMENT BUFFER CONTROL FOR CONSTRUCTION PROJECTS Jeongki, Kim 39-dong 426-ho, Sillim-dong kjk0305@gmail.com Moonseo, Park 39-dong 433-ho, Sillim-dong mspark@snu.ac.kr Hyunsoo, Lee 39-dong 430-ho, Sillim-dong

More information

KEY ISSUES in Advanced Operations Management. Timo Seppälä

KEY ISSUES in Advanced Operations Management. Timo Seppälä KEY ISSUES in Advanced Operations Management Timo Seppälä Production as a value creation process Operations system forms the transformation process between the inputs and the outputs of a manufacturing

More information

Intranets and Manufacturing

Intranets and Manufacturing Intranets and Manufacturing Sistem e-businesse (MG-652) Jurusan Manajemen Outline 1. Defining the terminology 2. Emerging Business Requirements 3. Manufacturing Information Systems 4. Intranet-Based Manufacturing

More information

Transportation Optimization: Is This the Next Step?

Transportation Optimization: Is This the Next Step? Transportation Optimization: Is This the Next Step? By Irista, An HK Systems Company Cost reduction through effective transportation management remains a high priority for most organizations. The challenges

More information

ebecs Distribution Accelerator for Microsoft Dynamics

ebecs Distribution Accelerator for Microsoft Dynamics On-premise and cloud solutions with Microsoft Dynamics NAV or Microsoft Dynamics 365 Business Central Available functionality is dependent on the Microsoft Dynamics licence type and deployment options.

More information

Top 10 Tasks Complete Sample Work Order Status Updates for Quality Assurance During Upgrade/Repair Simulations

Top 10 Tasks Complete Sample Work Order Status Updates for Quality Assurance During Upgrade/Repair Simulations Top 10 Tasks Complete Sample Work Order Status Updates for Quality Assurance During Upgrade/Repair Simulations 03/01/2017 Here we describe simulation models for repair processes of field-level aircraft,

More information

S U P P L Y C H A I N S O L U T I O N S F O R T H E

S U P P L Y C H A I N S O L U T I O N S F O R T H E i collaboration S U P P L Y C H A I N S O L U T I O N S F O R T H E A U T O M O T I V E I N D U S T R Y information The rules are changing again. If you ve ever had a major delivery rejected for lack of

More information

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer May 2017 CloudSuite Industrial Where Did APS Come From? APS grew out of the convergence of two movements.

More information

SCM Workshop, TU Berlin, October 17-18, 2005

SCM Workshop, TU Berlin, October 17-18, 2005 H.-O. Günther Dept. of Production Management Technical University of Berlin Supply Chain Management and Advanced Planning Systems A Tutorial SCM Workshop, TU Berlin, October 17-18, 2005 Outline Introduction:

More information

Integration of Process Planning and Scheduling Functions for Batch Manufacturing

Integration of Process Planning and Scheduling Functions for Batch Manufacturing Integration of Process Planning and Scheduling Functions for Batch Manufacturing A.N. Saravanan, Y.F. Zhang and J.Y.H. Fuh Department of Mechanical & Production Engineering, National University of Singapore,

More information

COMPANY... 3 SYSTEM...

COMPANY... 3 SYSTEM... Wisetime Ltd is a Finnish software company that has longterm experience in developing industrial Enterprise Resource Planning (ERP) systems. Our comprehensive system is used by thousands of users in 14

More information

Production Management and Scheduling

Production Management and Scheduling Production Management and Scheduling Meet Your Due Dates Your production process can be simple or complex, time consuming or quick, but one thing remains constant the drive to meet your customer s delivery

More information

MANAGERIAL PROCESS STANDARDIZATION THROUGH ILLUSTRATIVE CASE STUDY

MANAGERIAL PROCESS STANDARDIZATION THROUGH ILLUSTRATIVE CASE STUDY MANAGERIAL PROCESS STANDARDIZATION THROUGH ILLUSTRATIVE CASE STUDY Younghan Jung 1 and Thomas Mills 2 1 Department of Construction Management and Civil Engineering, Georgia Southern University, Statesboro,

More information

Supply chain planning and optimization solution for retail operations

Supply chain planning and optimization solution for retail operations Supply chain and optimization solution for retail operations All levels in one integrated solution Escalating retail complexity In retail, challenges never seem to end. Margins are under constant pressure

More information

Swan Purchase Order Acceptance Policy

Swan Purchase Order Acceptance Policy Swan Purchase Order Acceptance Policy Purchase orders should be submitted via: Email swanezpo@swanstone.com or Fax (800) 342-7926 To ensure accurate and timely processing and shipping of orders, all purchase

More information

Research on Middle and Small Manufacture Enterprise E-commerce Application Systems Mingqiang Zhu a, Zuxu Zou b

Research on Middle and Small Manufacture Enterprise E-commerce Application Systems Mingqiang Zhu a, Zuxu Zou b Advanced Materials Research Online: 2014-05-21 ISSN: 1662-8985, Vol. 933, pp 819-823 doi:10.4028/www.scientific.net/amr.933.819 2014 Trans Tech Publications, Switzerland Research on Middle and Small Manufacture

More information

Part IV Methods for Dependent Demand

Part IV Methods for Dependent Demand Part IV Methods for Dependent Demand Chapter 9 Material Requirements Planning 1 Aims of the Chapter After reading this chapter you should be able to do the following: Understand the limitations of independent

More information

Shop Control Guide DBA Software Inc.

Shop Control Guide DBA Software Inc. Contents 3 Table of Contents 1 Introduction 4 2 Why You Need Shop Control 5 3 Total Control Workflow 8 4 Shop Control Overview 10 5 Setup - Work Center Capacities 13 6 Setup - Job Labor Options 16 7 Setup

More information

James Chambers Ltd improves operational efficiencies with Encore ERP software for timber merchants

James Chambers Ltd improves operational efficiencies with Encore ERP software for timber merchants James Chambers Ltd improves operational efficiencies with Encore ERP software for timber merchants Summary Originally established in 1905, James Chambers Timber Merchants Ltd is a successful, family owned

More information