1 Military Specifications Current and Future Trends Larry Harzstark Distinguished Engineer The Aerospace Corporation 1 November 2012 The Aerospace Corporation 2009 Page 1

2 Purpose The Aerospace Corporation What Is An FFRDC Topics of Discussion Principal Functions Background Military Specs and Standards Philosophy Specification Process Specification Challenges Current Specifications Non-Government Specifications and Standards Future Trends Summary Page 2

3 Purpose of Presentation This presentation will provide an overview of the current and future trends for military specifications as viewed by The Aerospace Corporation for use in US Air Force and NASA Space Programs Page 3

4 The Aerospace Corporation Created in 1960 as a California non-profit corporation Governed by a Board of Trustrees Operates a Federally Funded Research and Development Center (FFRDC) sponsored by the US Air Force Page 4

5 What Is An FFRDC FFRDCs Are sponsored by government agencies (DOD, DOE, IRS, others) Provide objective advice and perform research and development activities in highly complex technological disciplines Work in the national interest Are administered independently to ensure objectivity Are dedicated to the success of their sponsors Page 5

6 Aerospace Principal Functions Launch Certification (Mission Assurance) Validation of flight vehicle processing Certifies readiness for flight Systems of Systems Engineering Architecture planning and development Space Systems Development and Engineering Assess design performance and risk Full lifecycle support Process Implementation Military specifications, standards and process development Page 6

7 Background The current US Air Force space programs utilize the Aerospace Parts, Materials and Processes (PMP) Technical Operating Reports (TORs) as the basis for the contractually obligated management and technical requirements Programs can tailor or modify the requirements based upon the nature of the program, purpose of the program, duration, etc The documents govern how parts are selected, characterized, screened, qualified, controlled and monitored for change The documents identify the parts, materials and processes that are known to be reliable and have a heritage for space missions The documents define the use of the military specifications and standards as the first order of precedence in the selection process If a military specification or standard is not available or additional requirements need to be imposed, a contractor Specification or Source Controlled Document is generated utilizing the military document as the guideline Page 7

8 Military Specifications and Standards Military specifications and standards are controlled by the Defense Logistics Agency (DLA) Land and Maritime in Columbus, Ohio DLA Land and Maritime has two (2) organizations that interact relative to the specifications and standards Document Standardization Division Responsible for the technical and administrative functions of a document including generation and maintenance Responsible for the interpretation of the requirements within a document Sourcing and Qualification Division Responsible for evaluating suppliers and qualification and the maintenance activity Responsible for the auditing of the supply base to ensure compliance to the requirements of the documents DLA Land and Maritime maintains lists of the Qualified Manufacturer s Lines (QML) and Qualified Products Lists (QPL) Page 8

9 Military Specifications and Standards Philosophy In the mid 1990 s, the government revised the philosophy of the military specifications and standards from defining the requirements and specific How To perform and meet the requirements to just defining the requirements This was now referred to as Performance Specifications The purpose of the philosophy change was to allow the suppliers to utilize their Best Commercial Practices in meeting the performance requirements and thereby reduce the costs of the parts and materials being procured This concept change also allowed a manufacturer to gain approval of his manufacturing facility and processes that governed all or many of his products and then qualify the individual product Page 9

10 Specification Process DLA Land and Maritime assigns a spec writer to a supplier who wants to develop a part or material that is new and does not have a current document written The supplier and DLA work closely together to generate the document listing all the pertinent information Maximum Ratings Recommended Operating Conditions Temperature and Electrical Testing Qualification and Quality Conformance Inspection Screening Electro Static Discharge - ESD (if applicable) Handling and Packaging If another manufacturer wants to be added to the document, they must meet all the requirements defined Page 10

11 Specification Change Process When it is determined that a change(s) is required to the document, DLA will send a notice to the industry describing the change and rationale and request comments within a specified time period (usually 30 days) Based on the comments, DLA will incorporate or reject the proposed change If the changes are considered major or needs further discussion, the supplier will discuss with the industry at the JEDEC/G-12 meetings held three (3) times/year Based upon those discussions, another round of comments are requested for approval/rejection If approved, DLA incorporates into the document and identifies a date that implementation must be completed After that implementation date, DLA will audit the manufacturer to ensure compliance to the changes Page 11

12 Specification Challenges Testing Requirements Defining the tests that can be performed for production versus characterization Test equipment capabilities for new generation parts Changes Changes being requested by manufacturers and industry with little or no data for justification Changes to older documents that no longer have viable sources Reviews and Comments By Industry Reviews within the timeframes identified Additional changes requested as part of the review cycle Additional changes requested outside the review cycle Space Requirements Addition of requirements to electrical performance across temperature Addition of radiation requirements Validation of thermal requirements Page 12

13 Specification Challenges (contd) Obsolescence No current supplier due to technology changes and/or profitability Identification of Users Not all users are registered and therefore when changes are being discussed, users may not be queried as to impact of a change Integrated Circuit and Hybrid Manufacturing Specifications being interpreted broadly to allow hybrid manufacturers to build monolithic devices and monolithic manufacturers to build hybrid type devices Concern is which specification is employed to manufacturer the devices Page 13

14 Current Specifications Discrete Semiconductors MIL-PRF Rev P, dated 16 May 2012 MIL-STD-750 Rev F, dated 3 January 2012 Hybrids MIL-PRF Rev H, dated 13 September 2010 MIL-STD-883 Rev H, 26 February 2010 Microcircuits MIL-PRF Rev J, dated 14 May 2012 MIL-STD-883 Rev H, 26 February 2010 Passives Capacitors MIL-PRF-123 Rev D, 28 September 2007 Transformers and Inductors MIL-STD-981 Rev C, dated 1 July 2010 Capacitors MIL-PRF Rev M, dated 15 March 2011 Resistors MIL-PRF Rev H, 16 August 2012 MIL-STD-202 Rev G, 8 February 2002 Page 14

15 Non-Government Specifications Specifications and standards not controlled by DLA Land and Maritime are either under the auspices of other government agencies such as NASA or industry societies such as the Society of Automotive Engineers (SAE) These other agencies are responsible for the generation and maintenance of the documents but not for evaluating compliance to the requirements DLA Land and Maritime does not and will not perform audits against these other documents DLA will only perform audits against the specifications and standards they control Revisions to these non-government documents are controlled by the agency responsible for the document (i.e SAE, JEDEC, etc) Agencies wanting a voice or knowledge of the changes would need to inform that agency of their interests Page 15

16 Future Trends Do not foresee changes to the systems that currently govern the military specifications and standards and how changes are processed Changes being requested/implemented to reduce costs Do see that more commercial device suppliers are requesting to get into the military QML system Expand their usage of devices beyond commercial Need to educate suppliers about military QML system and requirements More concern for counterfeit and malware Potential changes in specifications to mitigate concerns based on US Presidential Law National Defense Authorization Act (NDAA) relative to financial responsibility by users if counterfeit product is observed in defense hardware/software Page 16

17 Summary Presentation described The Aerospace Corporation role and responsibilities as a Federally Funded Research and Development Center Independent agency providing information to customers Presentation provided an overview of current and future responsibilities of DLA Land and Maritime relative to specifications and standards Sets the process for specification requirements and controls The process for generating specification and standards was described in addition to how changes are proposed and implemented The basic number and current revision of military part specifications was defined Several challenges with the current military specifications and standards were identified Non-governmental controlled specifications were discussed Future trends for specifications were defined Page 17

Review of US Air Force Parts, Materials and Processes (PMP) Requirements

Review of US Air Force Parts, Materials and Processes (PMP) Requirements Review of US Air Force Parts, Materials and Processes (PMP) Requirements Page 1 Larry Harzstark Dr. Steven Robertson The Aerospace Corporation (310) 336-5883 10-16-09 Topics of Discussion Introduction

More information

MIL System Overview EEE Parts

MIL System Overview EEE Parts 1 MIL System Overview EEE Parts CONTENT 2 MIL system & DSCC MIL system & documentation MIL-STD example: MIL-STD-883 Screening tests Qualification and Quality Conformance Procedures General Specifications

More information

Supplier Quality Requirements POWER

Supplier Quality Requirements POWER Supplier Quality Requirements POWER This document is an Appendix and therefore additional requirements to GRP-0087 (Global note: GRM-0123 is part of GRP0087). All exceptions to the hereunder requirements

More information

Parts Management Implementation Spring LMI. PSMC Spring

Parts Management Implementation Spring LMI. PSMC Spring Parts Management Implementation Spring 2016 - LMI 1 PM Implementation Goal Develop and define processes and training for the implementation of the Parts Management requirements in MIL-STD-3018 Initial

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 10/14/13 CAUTION: ELECTROSTATIC DISCHARGE SENSITIVE PART REVISION PAGE NO. 1 2 3 4 5 6 7 8 9 10 11 INDEX REVISION 0 0 0 0 0 0 0 0 0 0 0 REVISION PAGE

More information

QUALIFICATION OF NON- STANDARD EEE PARTS IN SPACEFLIGHT APPLICATIONS

QUALIFICATION OF NON- STANDARD EEE PARTS IN SPACEFLIGHT APPLICATIONS PAGE 1 OF 6 PREFERRED RELIABILITY PRACTICES QUALIFICATION OF NON- STANDARD EEE PARTS IN SPACEFLIGHT APPLICATIONS Practice: The source for selection of acceptable flight quality EEE parts for use on Goddard

More information

Supply Inventory Management

Supply Inventory Management May 14, 2002 Supply Inventory Management Evaluation of the Defense Supply Center Columbus Qualified Products List and Qualified Manufacturers List Program (D-2002-090) Department of Defense Office of the

More information

DLA s Counterfeit Protection Program

DLA s Counterfeit Protection Program DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY DLA s Counterfeit Protection Program Electronics Technician Lead DLA Electronics Product Test Center 614-692-9884/DSN 850-9884 Agenda

More information

A Practitioner s Guide for Implementing DoD Parts Management

A Practitioner s Guide for Implementing DoD Parts Management A Practitioner s Guide for Implementing DoD Parts Management By John Becker and Donna McMurry dsp.dla.mil 11 11 The DoD Parts Management Program is an integrated effort to streamline the selection of preferred

More information

Supplier Quality Clauses

Supplier Quality Clauses Requirement Name Management System Design, Process, or Material Changes Submission of Nonconforming Material to POC Deviation / Waiver Resubmission of Material Notification of Previous Delivery of Defective

More information

Tom Davidson Senior Electronic Engineer NAVSEA Crane Component Engineering Branch

Tom Davidson Senior Electronic Engineer NAVSEA Crane Component Engineering Branch Tom Davidson Senior Electronic Engineer NAVSEA Crane Component Engineering Branch Davidson_t@crane.navy.mil 812-854-2381 Date: 7 March, 2000 Background Department of Defense Acquisition Reform The Department

More information

DDC Standard Product Quality Provisions

DDC Standard Product Quality Provisions DDC Standard Product Quality Provisions 1.0 Quality Management System: DDC s Quality Management System is certified to ISO9001:2015 and AS9100D by ULDQS. In addition, DDC s hybrid manufacturing process

More information

CAUTION: ELECTROSTATIC DISCHARGE SENSITIVE PART

CAUTION: ELECTROSTATIC DISCHARGE SENSITIVE PART REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/14/99 A PAGE 9, FIGURE 4, CHANGED θja 09/29/99 B PAGE 3, PARAGRAPH 3. 8 CHANGED VERBIAGE ADDED HEREIN AFTER TABLE 1. 01/04/00 PAGE 4, PARAGRAPH

More information

RH1083CK, 7.5A Low Dropout Positive Adjustable Regulator Dice

RH1083CK, 7.5A Low Dropout Positive Adjustable Regulator Dice REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 01/28/09 A Page 2, amended section 3.3 Special Handling of Dice to more accurately describe our current 04/03/12 procedures and requirements. B Page

More information

RH1078M, DICE Micropower, Dual, Single Supply Precision Op Amp

RH1078M, DICE Micropower, Dual, Single Supply Precision Op Amp REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/01/06 A PAGE 3, PARAGRAPH 3.7.1 CHANGED VERBIAGE 05/06/08 PAGE 4, PARAGRAPH 5.8 CHANGED ALLOY 42 TO KOVAR REQUIRED ON TO5 PACKAGE. B PAGE 11, ADDED

More information

Design Guideline for Electrical & Electronic Parts used in Satellite Applications to Support Class T. October 4, 2016

Design Guideline for Electrical & Electronic Parts used in Satellite Applications to Support Class T. October 4, 2016 Design Guideline for Electrical & Electronic Parts used in Satellite Applications to Support Class T October 4, 2016 1. SCOPE This document is intended as a guide to assist a piece part manufacturer with

More information

MIL-STD-11991A Overview

MIL-STD-11991A Overview MIL-STD-11991A Overview For Parts Standardization Management Committee April 2016 AMRDEC MIL-STD-11991A Summary General Standard for Parts, Materials, and Processes (PM&P) Reinstated 28 Aug 2015 Electronic

More information

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE.

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE. REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 04/08/08 A CHANGED PART NUMBER FROM RH1034-1.2M TO RH1034M-1.2 THROUGH OUT SPEC. 07/08/09 PAGE 2 ADD OPTION 2 OF DEVICE IN A TO46 METAL CAN PAGE 3,

More information

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE.

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE. REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/18/08 REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE. CAUTION: ELECTROSTATIC DISCHARGE SENSITIVE PART REVISION PAGE NO. 1 2 3 4 5 6 7 8

More information

SPEC NO REV. T RH1056A, PRECISION, HIGH SPEED, JFET INPUT OPERATIONAL AMPLIFIER

SPEC NO REV. T RH1056A, PRECISION, HIGH SPEED, JFET INPUT OPERATIONAL AMPLIFIER REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/12/96 A PAGE 18, TABLE II, DELETED VOS PARAMETER AND CHANGED +IB AND IB DELTA LIMITS. 04/15/97 B RELAXATION OF MAX VOS AT 25 C, FROM 180 μv to

More information

PERFORMANCE SPECIFICATION HYBRID MICROCIRCUITS, GENERAL SPECIFICATION FOR

PERFORMANCE SPECIFICATION HYBRID MICROCIRCUITS, GENERAL SPECIFICATION FOR INCH-POUND This document and process conversion measures necessary to comply with this revision shall be completed by 13 March 2011 MIL-PRF-38534H 13 September 2010 SUPERSEDING MIL-PRF-38534G 9 March 2009

More information

FOR OFFICIAL USE ONLY LINEAR TECHNOLOGY CORPORATION MILPITAS, CALIFORNIA ORIG DSGN ENGR RH117H AND RH117K POSITIVE ADJUSTABLE REGULATOR DICE

FOR OFFICIAL USE ONLY LINEAR TECHNOLOGY CORPORATION MILPITAS, CALIFORNIA ORIG DSGN ENGR RH117H AND RH117K POSITIVE ADJUSTABLE REGULATOR DICE REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 01/22/98 A ADDED PARAGRAPH 3.3, SPECIAL HANDLING OF DICE, TO PAGE 2. THE PARAGAPHS WERE 07/16/99 RENUMBERED AND PARAGRAPHS THAT FOLLOWED WERE RELOCATED

More information

MILPITAS, CALIFORNIA DSGN MICROCIRCUIT, LINEAR, MFG

MILPITAS, CALIFORNIA DSGN MICROCIRCUIT, LINEAR, MFG REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/12/96 A PARAGRAPH 3.8 NOW REFLECTS THE CORRECT FIGURES FOR BURN-IN CIRCUITS FOR EACH PERTINENT PACKAGE. DELETION OF PARAGRAPHS 3.12.1 AND 3.12.2,

More information

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE.

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE. REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/12/96 A BURN-IN CIRCUIT CHANGED TO MATCH THE JAN BURN-IN CIRCUIT. 1/23/97 B PAGE 2, PARAGRAPH 3.3.b: ADDED (SEE PARAGRAPH 3.2). 10/17/98 PAGE 3,

More information

Counterfeit Prevention, Detection and Avoidance Standards Gap Analysis for Hardware Products

Counterfeit Prevention, Detection and Avoidance Standards Gap Analysis for Hardware Products International Organization for ization (ISO), ISO 9001 Quality Management Systems - Requirements Assemblies and Equipment ISO/IEC 20243:2015 - Information Technology Open Trusted Technology ProviderTM

More information

LINEAR TECHNOLOGY CORPORATIION PAGE 1 OF 14 PDF created with pdffactory trial version

LINEAR TECHNOLOGY CORPORATIION PAGE 1 OF 14 PDF created with pdffactory trial version REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/12/96 A PAGE 2, ADDED PARAGRAPHS 3.2.1, 3.2.2, AND 3.2.3. PARAGRAPH 3.3b, ADDED (SEE 11/25/97 PARAGRAPH 3.2). PAGE 4, PARAGRAPH 3.12, WAFER LOT

More information

DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT

DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT NOT MEASUREMENT SENSITIVE MIL-STD-3018 27 October 2011 SUPERSEDING MIL-STD-3018 15 October 2007 DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT AMSC 7730 AREA STDZ FOREWORD 1. This standard is

More information

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED HYBRIDB6 10/18/2017

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED HYBRIDB6 10/18/2017 REVISIONS LTR DESCRIPTION DTE (YR-MO-D) PPROVED HYBRIDB6 10/18/2017 NOTE: RH paragraphs and references are optional and are only used if they are applicable to the devices in the SMD. (Insert QR code here)

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 10/05/10 CAUTION: ELECTROSTATIC DISCHARGE SENSITIVE PART REVISION PAGE NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 INDEX REVISION 0 0 0 0 0 0 0 0 0 0

More information

Counterfeit Parts: A Lockheed Martin perspective

Counterfeit Parts: A Lockheed Martin perspective Counterfeit Parts: A Lockheed Martin perspective Parts Standardization & Management Committee Conference Deputy Director Procurement Quality LM Space Systems Counterfeit Parts Agenda Industry involvement

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/12/96 A PAGE 2, ADDED PARAGRAPHS 3.2.1 AND 3.2.2. PARAGRAPH 3.3.b, ADDED (SEE 11/27/97 PARAGRAPH 3.2). PAGE 3, ADDED PARAGRAPHS 3.8.1 AND 3.8.3.

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/12/96 A PAGE 2, ADDED PARAGRAPHS 3.2.1 AND 3.2.2. PARAGRAPH 3.3.b, ADDED (SEE 03/10/98 PARAGRAPH 3.2). PAGE 4, PARAGRAPH 4.4.2, GROUP B INSPECTION,

More information

Responsible Office: Code 500/Applied Engineering and Technology Directorate Title: GSFC EEE Parts Policy

Responsible Office: Code 500/Applied Engineering and Technology Directorate Title: GSFC EEE Parts Policy Goddard Procedures and Guidelines DIRECTIVE NO. GPG APPROVED BY Signature: NAME: A. V. Diaz TITLE: Director Responsible Office: Code 500/Applied Engineering and Technology Directorate Title: GSFC EEE Parts

More information

INTRODUCTION TO PARTS MANAGEMENT

INTRODUCTION TO PARTS MANAGEMENT INTRODUCTION TO PARTS MANAGEMENT Parts Standardization and Management Committee LMI Approved for Public Release COURSE INFORMATION Defense Acquisition University Continuous Learning Register Browse CLL

More information

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Replaced reference to MIL-STD-973 with reference to MIL-PRF rrp R.

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Replaced reference to MIL-STD-973 with reference to MIL-PRF rrp R. REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED A Replaced reference to MIL-STD-973 with reference to MIL-PRF-38535. -rrp 03-10-24 R. MONNIN Five year review requirement. -rrp 12-09-18 C. SAFFLE THE

More information

Supplier Quality Clauses

Supplier Quality Clauses Requirement Name Management System Design, Process, or Material Changes Submission of Nonconforming Material to POC Deviation / Waiver Resubmission of Material Notification of Previous Delivery of Defective

More information

DEFENSE LOGISTICS AGENCY THE NATION S COMBAT LOGISTICS SUPPORT AGENCY. DLA Trusted Obsolescence and Long Term Sustainment

DEFENSE LOGISTICS AGENCY THE NATION S COMBAT LOGISTICS SUPPORT AGENCY. DLA Trusted Obsolescence and Long Term Sustainment DEFENSE LOGISTICS AGENCY THE NATION S COMBAT LOGISTICS SUPPORT AGENCY DLA Trusted Obsolescence and Long Term Sustainment Alan Clark DMSMS/GEM Program Manager October 12 2017 FOR OFFICIAL USE ONLY Agenda

More information

National Aeronautics and Space Administration

National Aeronautics and Space Administration National Aeronautics and Space Administration Dryden Flight Research Center Procurement Quality Assurance has developed a comprehensive process that outlines our suppliers capabilities and exposes their

More information

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Update drawing to the latest requirements of MIL-PRF gc Charles F.

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Update drawing to the latest requirements of MIL-PRF gc Charles F. REVISIONS LTR DESCRIPTION DTE (YR-MO-D) PPROVED Update drawing to the latest requirements of MIL-PRF-38534. gc 18-03-12 Charles F. Saffle REV REV REV STTUS REV OF S 1 2 3 4 5 6 7 8 PMIC N/ STNDRD MICROCIRCUIT

More information

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/14/96 A PAGE 2, ADDED PARAGRAPHS 3.2.1, 3.2.2, AND

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/14/96 A PAGE 2, ADDED PARAGRAPHS 3.2.1, 3.2.2, AND REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/14/96 A PAGE 2, ADDED PARAGRAPHS 3.2.1, 3.2.2, AND 3.2.3. 12/01/97 PARAGRAPH 3.3.b: ADDED (SEE PARAGRAPH 3.2). PAGE 3, ADDED PARAGRAPHS 3.8.1,

More information

PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR LAUNCH VEHICLES

PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR LAUNCH VEHICLES BY ORDER OF THE COMMANDER SMC Standard SMC-S-011 03 July 2012 ------------------------ Supersedes: SMC-S-011 (2008) Air Force Space Command SPACE AND MISSILE SYSTEMS CENTER STANDARD PARTS, MATERIALS, AND

More information

MIL-PRF SUMMARY OF CHANGES FOR REVISION K November 15, 2017

MIL-PRF SUMMARY OF CHANGES FOR REVISION K November 15, 2017 The following table summarizes the changes made to MIL-PRF-38534 Revision J resulting in MIL-PRF-38534 Revision K. REF No. 1 3 4 5 Paragraph Change Source Reason Page No. Cover page Add cover page to document.

More information

Changes since 14 Jan 99 are in BOLD font.; changes since 4 Mar 99 are in BOLD ITALIC font. (5 Mar 99)

Changes since 14 Jan 99 are in BOLD font.; changes since 4 Mar 99 are in BOLD ITALIC font. (5 Mar 99) Status of DSIC Decisions or Implementation Actions to Improve Documents Identified by the Willoughby 10, HOT 62, Coopers & Lybrand Study, or other DSIC review STANDARDS Document Title Decision (Date of

More information

ATC ATC. Commercial Off-the-Shelf (COTS) Commercial Off The Shelf. High Reliability Certification Program. Applications:

ATC ATC. Commercial Off-the-Shelf (COTS) Commercial Off The Shelf. High Reliability Certification Program. Applications: ATC High Reliability Program Commercial Off The Shelf ATC Commercial Off-the-Shelf (COTS) High Reliability Program HA HB HC HD A Cost Effective approach to qualifying standard products for enhanced reliability

More information

MIL-HDBK-512A 31 October 2001 SUPERSEDING MIL-HDBK October 2000 DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT

MIL-HDBK-512A 31 October 2001 SUPERSEDING MIL-HDBK October 2000 DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT NOT MEASUREMENT SENSITIVE MIL-HDBK-512A 31 October 2001 SUPERSEDING MIL-HDBK-512 04 October 2000 DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT This handbook is for guidance only. Do not cite this document

More information

MIL-STD October 2007 SUPERSEDING MIL-HDBK-512A 31 October 2001 DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT

MIL-STD October 2007 SUPERSEDING MIL-HDBK-512A 31 October 2001 DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT NOT SENSITIVE MEASUREMENT SENSITIVE 15 October 2007 SUPERSEDING MIL-HDBK-512A 31 October 2001 DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT AMSC 7730 AREA SDMP FOREWORD 1. This standard is approved

More information

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, PRECISION ±10 V VOLTAGE REFERENCE, MONOLITHIC SILICON

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, PRECISION ±10 V VOLTAGE REFERENCE, MONOLITHIC SILICON REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED A Drawing updated to reflect current requirements. -ro 02-01-11 R. MONNIN Five year review update. -rrp 09-07-15 C. SAFFLE REV REV REV STATUS REV OF S

More information

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT NOT MEASUREMENT SENSITIVE MIL-HDBK-512A 31 October 2001 SUPERSEDING MIL-HDBK-512 04 October 2000 DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT This handbook is for guidance only. Do not cite this document

More information

For MIL-STD-981 inductors or transformers, Class B lot control applies, see Para. 5.1 for requirements.

For MIL-STD-981 inductors or transformers, Class B lot control applies, see Para. 5.1 for requirements. 1026-1628 R 2 OF 7 NTS A 1.0 PURPOSE: The purpose of this document is to define the requirements for procurement of passive elements (resistors, resistor networks, thickfilm substrates, thinfilm substrates,

More information

DEPARTMENT OF DEFENSE STANDARD PRACTICE

DEPARTMENT OF DEFENSE STANDARD PRACTICE NOT MEASUREMENT SENSITIVE MIL-STD-790G 24 January 2013 SUPERSEDING MIL-STD-790G 13 September 2011 DEPARTMENT OF DEFENSE STANDARD PRACTICE ESTABLISHED RELIABILITY AND HIGH RELIABLITY QUALIFIED PRODUCTS

More information

PERFORMANCE SPECIFICATION INTEGRATED CIRCUITS (MICROCIRCUITS) MANUFACTURING, GENERAL SPECIFICATION FOR

PERFORMANCE SPECIFICATION INTEGRATED CIRCUITS (MICROCIRCUITS) MANUFACTURING, GENERAL SPECIFICATION FOR The documentation and process conversion measures necessary to comply with this revision shall be completed by June 30, 2014 INCH-POUND MIL-PRF-38535K 20 December 2013 SUPERSEDING MIL-PRF-38535J 28 December

More information

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100) Effective Date: 04/07/2014 AJR1: Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100) During the performance of this Contract/Purchase Order (C/PO), the seller

More information

TN0873 Technical note

TN0873 Technical note Technical note DIE2HR/D2HR manufacturing and quality specification Introduction This specification describes the manufacturing flow and quality insurance requirements to be fulfilled for STMicroelectronics

More information

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, PRECISION ±10 V VOLTAGE REFERENCE, MONOLITHIC SILICON

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, PRECISION ±10 V VOLTAGE REFERENCE, MONOLITHIC SILICON REVISIONS LTR DESRIPTION DATE (YR-MO-DA) APPROVED A Drawing updated to reflect current requirements. -ro 02-01-11 R. MONNIN B Five year review update. -rrp 09-07-15. SAFFLE Update drawing to current MIL-PRF-38535

More information

EEE COMPONENTS LONG TERM STORAGE Long Term Storage Workshop ESA / ESTEC (7 th June 2016)

EEE COMPONENTS LONG TERM STORAGE Long Term Storage Workshop ESA / ESTEC (7 th June 2016) EEE COMPONENTS LONG TERM STORAGE Long Term Storage Workshop ESA / ESTEC (7 th June 2016) Gonzalo Fernandez Romero TÜV NORD GROUP June 2016 AEROSPACE & ELECTRONIC BUSINESS UNIT ALTER TECHNOLOGY GROUP: with

More information

DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT

DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT NOT MEASUREMENT SENSITIVE MIL-STD-3018 2 June 2015 SUPERSEDING MIL-STD-3018 w/change 1 27 October 2011 DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT AMSC 9549 AREA STDZ FOREWORD 1. This standard

More information

JUL 14 Rev B All Paragraphs Revised

JUL 14 Rev B All Paragraphs Revised Quality Specification 102-32039 22 JUL 14 Rev B All Paragraphs Revised Counterfeit Electronic Parts Detection and Avoidance System 1. PURPOSE 1.1. Content The purpose of this document is to describe the

More information

DEFENSE LOGISTICS AGENCY LAND AND MARITIME POST OFFICE BOX 3990 COLUMBUS, OH

DEFENSE LOGISTICS AGENCY LAND AND MARITIME POST OFFICE BOX 3990 COLUMBUS, OH DEFENSE LOGISTICS AGENCY LAND AND MARITIME POST OFFICE BOX 3990 COLUMBUS, OH 43218-3990 Douglas Young President DPA Components International 2251 Ward Avenue Simi Valley, CA 93065 March 23, 2017 Dear Mr.

More information

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH Page 1 of 7 QUALITY CLAUSES Clause A - Quality System Requirements All references to the term "Government" in any of the documents referenced below shall be replaced with the term "Curtiss Wright Controls

More information

AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS

AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS Page 1. GENERAL REQUIREMENTS 4 2. QUALITY SYSTEM 2.1 MIL-STD-45208A 5 2.2 MIL-Q-9858A 5 2.3 ISO 9001 5 2.4 ISO9002 5 2.5 NHB5300.4 (1B) 5 2.6

More information

PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR EXPENDABLE LAUNCH VEHICLES

PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR EXPENDABLE LAUNCH VEHICLES SMC Standard SMC-S-011 31 July 2015 ------------------------ Supersedes: SMC-S-011 (2012) Air Force Space Command SPACE AND MISSILE SYSTEMS CENTER STANDARD PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM

More information

Standardization and NSN Data Cleansing: Land and Maritime Effort Streamlines Procurements

Standardization and NSN Data Cleansing: Land and Maritime Effort Streamlines Procurements Standardization and NSN Data Cleansing: Land and Maritime Effort Streamlines Procurements By Tom Hess and Gary Watson 12 The Defense Logistics Agency (DLA) Land and Maritime Document Standardization Division

More information

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR NOT MEASUREMENT SENSITIVE MIL-PRF-31032 1 November 1995 PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR This specification is approved for use by all Departments

More information

ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL PARTS PROGRAM STANDARD

ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL PARTS PROGRAM STANDARD ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL PARTS PROGRAM STANDARD Rev. A February 3, 2014 Japan Aerospace Exploration Agency This is an English translation of JMR-012A. If there is anything ambiguous

More information

PROCUREMENT DOCUMENT QUALITY ASSURANCE REQUIREMENTS

PROCUREMENT DOCUMENT QUALITY ASSURANCE REQUIREMENTS Document Title Document Number PROCUREMENT DOCUMENT QUALITY ASSURANCE REQUIREMENTS STO-QR-0310 Rev. Change Order Checked by: Date Approved by: Date Safety* Date C REVISED PER TR 0051-96 XXXX XX M. Devoe

More information

D. All distributors shall be reviewed and approved as per company procedure.

D. All distributors shall be reviewed and approved as per company procedure. PROCEDURE Number: QM-251 Purchase Order (QAP) Quality Assurance Provisions Department: Quality Assurance Revision: 5 Publish Date: 2015-11-18 Prepared by: Quality Manager Authorised by: Director of Operations

More information

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. B Changes in accordance with 5962-R M. A. FRYE

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. B Changes in accordance with 5962-R M. A. FRYE REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED A Add device type 03. Add one vendor, CAE 64155. Make changes to table I and throughout. 91-02-14 M. A. FRYE B Changes in accordance with 5962-R271-92.

More information

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS A-1 QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS Prepared/Approved By: Director of Quality Assurance Sr. Production/Sr. Supply Chain Manager Micro

More information

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING 1.0 PURPOSE The purpose of this document is to define the requirements of Anaren Microwave, Anaren Ceramics and MS Kennedy (collectively Anaren)

More information

Qualified Products List Qualified Manufacturers List

Qualified Products List Qualified Manufacturers List DLA Land and Maritime Qualified Products List Qualified Manufacturers List General Qualification Information SOURCING AND QUALIFICATIONS DIVISION DLA LAND AND MARITIME COLUMBUS, OHIO 1 June 2018 Page 1

More information

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. B Drawing updated to reflect current requirements. - ro R. MONNIN

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. B Drawing updated to reflect current requirements. - ro R. MONNIN REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED A Add one vendor, CAE 01295. Make changes to 1.3, table I, and editorial changes throughout. 90-06-13 M. A. FRYE B Drawing updated to reflect current

More information

Special Purchase Order Clauses

Special Purchase Order Clauses SC-1 Quality System: The Supplier shall have a quality management system that conforms to: a) SAE AS9100 Quality Management Systems Aerospace Requirements b) SAE AS9110 Quality Management Systems Aerospace

More information

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, 5 VOLT VOLTAGE REFERENCE, MONOLITHIC SILICON

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, 5 VOLT VOLTAGE REFERENCE, MONOLITHIC SILICON REVISIONS LTR DESRIPTION DATE (YR-MO-DA) APPROVED A Drawing updated to reflect current requirements. - ro 00-07-17 R. MONNIN B Replace reference to MIL-STD-973 with reference to MIL-PRF-38535. -rrp 08-08-12

More information

Combating Counterfeiting Program

Combating Counterfeiting Program DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY Combating Counterfeiting i Program Christine Metz Chief, Technical & Quality Assurance Logistics Operations (J3) 1 Defense Logistics Agency

More information

This procedure shall apply to all microcircuit elements and semiconductors as follows:

This procedure shall apply to all microcircuit elements and semiconductors as follows: 1019-1618 V 2 OF 7 NTS A 1.0 PURPOSE: The purpose of this document is to define the supplier requirements of all procured microcircuit elements (Integrated Circuits) and semiconductor elements (diodes,

More information

SPACE AND LAUNCH REQUIREMENTS ADDENDUM TO AS9100D QUALITY MANAGEMENT SYSTEMS

SPACE AND LAUNCH REQUIREMENTS ADDENDUM TO AS9100D QUALITY MANAGEMENT SYSTEMS SMC Tailoring SMC-T-009 2 November 2018 ------------------------ Supersedes: SMC-S-003 (2015) Air Force Space Command SPACE AND MISSILE SYSTEMS CENTER TAILORING SPACE AND LAUNCH REQUIREMENTS ADDENDUM TO

More information

Teledyne QPR 001 Electronic Safety Products Rev F Page 1 of 9 QUALITY INSTRUCTION

Teledyne QPR 001 Electronic Safety Products Rev F Page 1 of 9 QUALITY INSTRUCTION Page 1 of 9 REV DESCRIPTION OF CHANGE APPROVAL NC Initial Release A Added 503 Counterfeit part prevention B C D E F Updated Quality provisions for all clauses Updated Quality provisions for all clauses.

More information

Change Summary of MIL-PRF Revision K

Change Summary of MIL-PRF Revision K Throughout the document Add class Y. Add class Y non-hermetic for space application QML products to the MIL-PRF-38535., Class Y task group and Space community. Throughout the document Update Non-government

More information

PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR SPACE VEHICLES

PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR SPACE VEHICLES SMC Standard SMC-S-009 12 April 2013 ------------------------ Supersedes: SMC-S-009 (2009) Air Force Space Command SPACE AND MISSILE SYSTEMS CENTER STANDARD PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM

More information

DAICO Industries. DAICO Industries, Inc E. 233rd. Street Carson, CA Tel: 310/ Fax: 310/

DAICO Industries. DAICO Industries, Inc E. 233rd. Street Carson, CA Tel: 310/ Fax: 310/ DAICO Industries, Inc. 1070 E. 233rd. Street Carson, CA 90745 Tel: 310/507-3242 Fax: 310/507-5701 www.daico.com Founded in 1965, DAICO Industries, Inc. has been the leader in IF/RF Microwave Control Products

More information

Supplier Quality Clauses

Supplier Quality Clauses Reviewed: Reviewed: Date: Supplier Quality Clauses 1 TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 SCOPE... 3 3.0 APPLICABLE DOCUMENTS... 3 4.0 PROCEDURE... 3 5.0 RECORDS... 4 Q1 GENERAL QUALITY ASSURANCE REQUIREMENTS...

More information

PCB IPC-A 600 PCB IPC- 6012, 6018

PCB IPC-A 600 PCB IPC- 6012, 6018 APPENDIX 1: QOP-47 Procurement Quality Requirements Rev. E: QA Clauses/Codes The requirements listed in Table 1 are minimum requirements per IPC, Mil & J-standard. Details of each requirement follows Table

More information

Design and AIV for New Space New Rules (components for nano/micro satellite)

Design and AIV for New Space New Rules (components for nano/micro satellite) Design and AIV for New Space New Rules (components for nano/micro satellite) Stephan Roemer Head of Space Project Development and Space Sales Astro- und Feinwerktechnik Adlershof GmbH 1 Berlin, Germany

More information

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses Quality Requirements The following requirements apply at minimum, additional requirements may be incorporated with the company purchase order. Material and Hardware Providers - Q1, Q2, Q3, Q4, Q5, Q8,

More information

AC Incorporated Quality Clauses

AC Incorporated Quality Clauses AC Incorporated Quality Clauses 001. Quality System: The supplier shall maintain a Quality System that is in compliance with ISO 9001:2000, AS9100, MIL-Q-9858A or NADCAP AC7004 Inspection & test Quality

More information

PURCHASE ORDER QUALITY SYSTEM REQUIREMENTS

PURCHASE ORDER QUALITY SYSTEM REQUIREMENTS 1 2 3 4 5 Quality System Requirements General location and, where required, obtain approval. Right of access by Microphase, their customer, and regulatory authorities to the applicable areas of all facilities

More information

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton. Curtiss-Wright Defense Solutions-Dayton (CW-DSD) Quality Procedure QP 8.4.1 Title: Supplier Quality Requirements QP 8.4.1 Revision: 0 Issue Date: 8/1/18 QUALITY CLAUSES Clause A Quality System Requirements

More information

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. B Drawing updated to reflect current requirements. - gt R. MONNIN

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. B Drawing updated to reflect current requirements. - gt R. MONNIN REVISIONS LTR ESCRIPTION ATE (YR-MO-A) APPROVE A Add device type 02. Technical changes to table 1. Editorial changes throughout. 93-01-07 Michael A. Frye B rawing updated to reflect current requirements.

More information

SAE s New Standard for Manufacturing Management

SAE s New Standard for Manufacturing Management SAE s New Standard for Manufacturing Management By David Karr dsp.dla.mil 33 SAE International recently published AS6500, Manufacturing Management Program, a commercial standard governing the implementation

More information

Understanding and Complying with EEE Parts and Assembly Management Requirements

Understanding and Complying with EEE Parts and Assembly Management Requirements Understanding and Complying with EEE Parts and Assembly Management Requirements Parts Standardization and Management Committee April 26, 2017 DfR Solutions Avionics Market Segments (Long Term Average)

More information

This specification is approved for use by all Departments and Agencies of the Department of Defense.

This specification is approved for use by all Departments and Agencies of the Department of Defense. This document and process conversion measures necessary to comply with this revision shall be completed by 1 May 2003. INCH-POUND MIL-PRF-38535F 1 December 2002 SUPERSEDING MIL-PRF-38535E 1 December 1997

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements Supplier Quality Assurance Requirements This document replaces the contractual Quality Requirements (Exhibit-C) as communicated on December 18, 2015 Fokker Elmo Procurement Department Issue 07, November

More information

Previous Meeting Summary. Parts Standardization & Management Committee Meeting

Previous Meeting Summary. Parts Standardization & Management Committee Meeting Previous Meeting Summary Fall 2011 Parts Standardization & Management Committee Meeting Held November 2011 Boeing Seattle, WA LMI Spring PSMC, DC Area April 24, 2012 DSPO Perspective on Parts Management

More information

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, 10.0 VOLT, VOLTAGE REFERENCE, MONOLITHIC SILICON

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, 10.0 VOLT, VOLTAGE REFERENCE, MONOLITHIC SILICON REVISIONS LTR DESCRIPTION DTE (YR-MO-D) PPROVED Replaced reference to MIL-STD-973 with reference to MIL-PRF-38535. -rrp 03-10-24 R. MONNIN REV REV REV STTUS REV OF S 1 2 3 4 5 6 7 8 PMIC N/ STNDRD MICROCIRCUIT

More information

QPL Verification - a Key Element in Parylene Coating Specification

QPL Verification - a Key Element in Parylene Coating Specification QPL Verification - a Key Element in Parylene Coating Specification William Gleason, General Manager Para Tech Coating, Inc. (Para Tech) Copyright 2012, Para Tech Coating, Inc. CAPTION: Thin, transparent

More information

SUPPLIER PRODUCT ASSURANCE REQUIREMENTS

SUPPLIER PRODUCT ASSURANCE REQUIREMENTS I. PURPOSE This document establishes specifically tailored Supplier Product Assurance Requirements for vendors of products and services. The Section III General Requirements form a part of the order, without

More information

QUALITY SPACE AND LAUNCH REQUIREMENTS ADDENDUM TO AS9100C

QUALITY SPACE AND LAUNCH REQUIREMENTS ADDENDUM TO AS9100C SMC Standard SMC-S-003 8 May 2015 ------------------------ Supersedes: SMC-S-003 (2008) Air Force Space Command SPACE AND MISSILE SYSTEMS CENTER STANDARD QUALITY SPACE AND LAUNCH REQUIREMENTS ADDENDUM

More information

DSPO PSMC Briefing Parts, Materials, and Process Mission Assurance Plan (PMAP) MDA/QSA

DSPO PSMC Briefing Parts, Materials, and Process Mission Assurance Plan (PMAP) MDA/QSA DSPO PSMC Briefing Parts, Materials, and Process Mission Assurance Plan (PMAP) MDA/QSA 1 Integrated Ballistic Missile Defense System Sensors Boost Defense Segment Defense Support Program Space Tracking

More information

QUALITY ASSURANCE FOR SPACE AND LAUNCH VEHICLES

QUALITY ASSURANCE FOR SPACE AND LAUNCH VEHICLES BY ORDER OF THE COMMANDER SMC Standard SMC-S-003 13 June 2008 ------------------------ Supersedes: New issue Air Force Space Command SPACE AND MISSILE SYSTEMS CENTER STANDARD QUALITY ASSURANCE FOR SPACE

More information

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS 1. GOVERNMENT/CUSTOMER SOURCE INSPECTION: a. Government/Customer inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government/Customer representative

More information