2 What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned
3 It s not about you, it s about the public
4
5
6
7
8 Developed by Access Utah County (AUC), I-15 CORE and the TOC Reviewed by UDOT Technical Committee For DDI feasibility on other projects
9
10 Main goal is to reduce delay: Accommodate the left turn movements Reduce the number of signal phases Only two signal phases are required, compared with 3 for a SPUI, or 4 with a diamond
11 Operational Failure when: A + B > 1900 vph
12 Operational Failure when: A + B > 1900 vph A + C > 1900 vph
13 Operational Failure when: A + B > 1900 vph A + C > 1900 vph B + C > 1900 vph
14 Operational Failure when: A + B > 1900 vph A + C > 1900 vph B + C > 1900 vph A + B + C > 2100 vph
15 Operational Failure when: A + B > 1900 vph A + C > 1900 vph B + C > 1900 vph A + B + C > 2100 vph Transition from LOS D to LOS F is very short. For this reason, UDOT defines LOS C as a minimum for acceptable operation.
16 Considerations: Weaving and merging Signal timing Driver behavior Intersection spacing Requires use of micro-simulation software UDOT requires use of VISSIM (PTV America) for analysis
17 Considerations: Traffic & Pedestrian Volumes Multi-Lane Turning Movements Merging & Weaving Operations within the Interchange Non-traditional Signal Warrant Analysis
18
19
20
21
22 Proximity of side streets, railroads, etc. Accommodation of pedestrians Existing geometric constraints in retrofit projects
23 Ramp terminal separation distance Crossover intersection layout and grading Signing and Striping Lane and Shoulder Widths Glare Reduction Roadway Cross-Section
24 To provide for queue storage and weaving space, crossover intersections should be spaced 850 apart, with adjacent signalized intersections 1000 from the crossover intersections. Right-in/Right-out access points may be placed according to the UDOT Access Management rules. Placement of accesses closer than 1000 should be analyzed using VISSIM to determine potential operational effects.
25
26 Design speed through the crossover is reduced at least 10 mph, with a minimum speed through the curves of 25 mph. Utilize reverse curves without tangents to minimize length of crossover zones.
27
28
29 Placement of glare screen is specific to each DDI design, and may affect horizontal alignments. Line-of-sight calculations should be used. Additional study required to identify appropriate design parameters.
30
31 Shoulder widths should NOT be reduced across structure Lane widths should be at least 12 feet Turning templates for side by side WB-67 or other appropriate design vehicle should be applied
32
33
34 500 East, American Fork Why a DDI Crossover geometry & glare reduction Side street & ramp terminal separation
35
36
37
38
39 SR-92, Lehi Why a DDI Crossover geometry & glare reduction Side street & ramp terminal separation
40
41
42
43
44
45 Access Justification Report (AJR) Used by FHWA for all modifications to the interstate system. The AJR is not a substitute for the NEPA process, and the NEPA process does not eliminate the need for a AJR document. Addresses the eight policy points defined by FHWA as a type of warrants process.
46 When compared with SPUI or Diamond interchanges: ADVANTAGES Higher left-turn capacity No exclusive left-turn lanes Smaller structures Two-phase signal provides flexibility in timing Smaller ROW footprint at the interchange DISADVANTAGES Contrary to driver expectation Operation sensitive to signal and street spacing Rapid transition from LOS D to LOS F ROW impacts at crossover intersections Integration of pedestrian traffic
47 Design/Build contractors may submit the DDI interchange type as an alternate concept; RFP should be written to address the possibility. Operational analysis of a DDI requires specific software and requires more review time. Retrofit of existing structures may extend the operational life of the interchange for much less than reconstruction.
48 Thank you for your time.
49
500 Interchange Design
500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1
More informationUNION CENTRE BLVD AND I-75 INTERCHANGE WEST CHESTER, OHIO
UNION CENTRE BLVD AND I-75 INTERCHANGE WEST CHESTER, OHIO New interchange Completed in 1997 Project coordinated by the Butler County TID Cooperation of local public and private sector entities Union
More information500 Interchange Design
500 Interchange Design Table of Contents 501 Interchange Design... 1 501.1 General... 1 501.2 Interchange Type... 1 501.2.1 General... 1 502 Interchange Design Considerations... 2 502.1 Determination of
More informationCHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES
CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting
More informationI-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge
I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge Client: AJR or IJR? This is a TO-MAY-TO This is a TO-MAH-TO Practical Design PRACTICAL
More informationExit 73 I-29 Interchange Modification Justification Study
xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.
More informationFOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310
INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006
More informationDRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0
SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive
More informationI-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013
I-64 Peninsula Shoulder Usage Evaluation Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 Briefing Purpose Evaluation Area / Existing Conditions Code and Policy Engineering Facts
More informationDiverging Diamond Interchanges in Michigan
2015 MDOT / ACEC Partnering Workshop Diverging Diamond Interchanges in Michigan Lori Swanson MDOT Oakland TSC John Katers OHM Advisors Chris Van Norwick MDOT Grand Region Rob Leppala TranSystems Topics
More informationINTERCHANGE MODIFICATION REPORT
INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange
More informationThe Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges
The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares
More informationCHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS
HPTER 5 PRLLEL PRKWY ORRIDOR IMPROVEMENTS nother key area within the Village West study area is the Parallel Parkway corridor. This chapter focuses on the segment of Parallel Parkway between 106 th Street
More informationMINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No TS-03 December 5, 2016
MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 16-07-TS-03 December 5, 2016 To: From: Subject: Electronic Distribution Recipients Nancy T. Daubenberger, P.E.
More informationCOMPARISON OF SPUI & TUDI INTERCHANGE ALTERNATIVES WITH COMPUTER SIMULATION MODELING
COMPARISO OF SPUI & TUDI ITERCHAGE ALTERATIVES WITH COMPUTER SIMULATIO MODELIG Matthew J. Selinger, PTOE William H. Sharp, PTOE ABSTRACT There are numerous technical papers and reports discussing the operations
More informationAPPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies
APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS
More informationTRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002
TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH
More informationWELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015
WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges
More informationInterchange Design. Nick Hoernke, Bill Roth and Eric Sorensen
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen Presentation Overview Interchange Characteristics Process for Interchange Type Selection Service Interchange System Interchange New Type of
More informationProject History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS
DIVERGING DIAMOND INTERCHANGE State Route 120/Union Road Diverging Diamond Retrofit Presented by: Mark Houghton Sam Sherman Matt Brogan Aaron Silva City of Manteca Caltrans, District 10 Mark Thomas Mark
More informationUS 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison
T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form
More informationBreaking the Diamond: DDIs, CFIs, and SPUIs
Breaking the Diamond: DDIs, CFIs, and SPUIs Smith Siromaskul, P.E. Abstract With a recent push towards innovative solutions in interchange design, the diverging diamond interchange has been the next big
More informationGEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects
GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway
More informationComparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design
Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design ABSTRACT Several analysis methods have been proposed to analyze the vehicular capacity of roundabouts.
More informationConceptual Design Report
Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE
More informationAppendix B Highway 407 Interchange Review - Cochrane Street Area
Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,
More informationThe New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM
The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM Tom Creasey, PE, PhD Principal, Stantec Consulting Services Inc. Chair, TRB Highway Capacity and Quality of Service Committee Presented
More informationPROJECT STUDY REPORT. Cal Poly Pomona Senior Project
06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval
More informationChapter GRADE SEPARATIONS & INTERCHANGES
Chapter 9 GRADE SEPARATIONS & INTERCHANGES 2012 ODOT Highway Design Manual Grade Separations And Interchanges 9.1 GENERAL INFORMATION There are three types of roadway intersections: intersections at-grade,
More informationBILLINGS BYPASS UPDATE
July 18, 2018 BILLINGS BYPASS UPDATE TEDD Steering Committee Monthly Meeting Project Update EIS and ROD Documents through Current Design Preliminary Design Completed preliminary design for full-build
More informationA Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange
A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts
More informationEnvironmental Consequences and Mitigation
Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives
More informationCommunity Advisory Committee Meeting No. 2. June 22, 2006
Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept
More informationPerformance Based Practical Design (PBPD)
Performance Based Practical Design (PBPD) 2016 ODOT D08 LPA Day John R. Kasich, Ohio Governor Jerry Wray, ODOT Director PBPD PBPD Presenter Katherine DeStefano, P. E. District 08 Design Engineer ODOT D08
More informationI 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS
TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION
More informationAPPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report
APPENDIX B Excerpts from the October 2002 Interstate 83 and PA Route 921 The objective for the SR 921 interchange site was to study alternatives for construction of a new interchange. There are no short-term
More informationI-10 CONNECT. Public Meeting #1
I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT
More informationWELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017
WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule
More informationPeterborough County Road Safety Audit Guideline Pilot
Peterborough County Pilot Table of Contents 1.0 Purpose... 3 2.0 Road Safety Audit Objectives... 3 3.0 Legal Issues... 3 4.0 Road Safety Audit Procedures... 4 4.1 Project Selection Criteria... 5 4.2 Scope...
More informationPerformance Based Practical Design. An FHWA Perspective
Performance Based Practical Design An FHWA Perspective Early Adopters Research on PBPD and Background Materials http://www.fhwa.dot.gov/design/pbpd/ FAST Act Changes that Encourage PBPD On the NHS, design
More informationA three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.
MEMORANDUM TO: FROM: Highway 36/Rice Street PMT Mark Benson DATE: March 23, 2009 RE: Selection of a Preferred Alternative SEH No. 105803 The purpose of this memorandum is to document the process for selecting
More informationThe Secrets to HCM Consistency Using Simulation Models
The Secrets to HCM Consistency Using Simulation Models Ronald T. Milam, AICP David Stanek, PE Chris Breiland Fehr & Peers 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 r.milam@fehrandpeers.com (916)
More informationDEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)
2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima
More informationSouth Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)
South Dakota Department of Transportation Interchange Modification Justification Report Interstate 90 Exit 44 (Bethlehem Road - Piedmont) February 28, 2014 Prepared By: SDDOT Office of Project Development
More informationFINAL REPORT GUIDELINES FOR PRELIMINARY SELECTION OF THE OPTIMUM INTERCHANGE TYPE FOR A SPECIFIC LOCATION
FINAL REPORT GUIDELINES FOR PRELIMINARY SELECTION OF THE OPTIMUM INTERCHANGE TYPE FOR A SPECIFIC LOCATION Nicholas J. Garber, Ph.D. Faculty Research Scientist and Professor of Civil Engineering Michael
More informationINTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)
INTERCHANGE SAFETY Steve Allen Director, Strategic Transportation Investments Division (TDOT) Houston Daugherty Director of Transportation & Traffic (Cannon & Cannon Inc.) 2014 TSITE Summer Meeting August
More informationTRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception
TRAFFIC SAFETY EVALUATION Using the Highway Safety Manual and the Interactive Highway Safety Design Model I 15 Dry Lakes Design Exception Prepared for: Nevada Department of Transportation Safety Engineering
More informationCHAPTER 3 SCOPE SUMMARY
CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the
More informationMEMORANDUM: INITIAL CONCEPTS SUMMARY
MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations
More informationIH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5
MEMO TO: Timothy Nesbitt, P.E. DATE: August 26, 2002 FROM: SUBJECT: Sandy Wesch-Schulze, P.E., AICP IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives
More informationPROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS
PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS June 2011 PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS June 2011 Prepared by: Arkansas State Highway and Transportation Department
More informationSteve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,
PLACEMENT OF PRECAST PRESTRESSED CONCRETE GIRDER BRIDGE SPANS WITH SELF PROPELLED MODULAR TRANSPORTERS PIONEER CROSSING DESIGN/BUILD PROJECT, AMERICAN FORK, UT Steve Haines, P.E., Parsons, (303) 831-8100,
More informationRapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD
To: Steve Gramm, SDDOT Memo From: HDR Project: SDDOT I-190 Silver Street Interchange Study Rapid City, SD HDR Project No. 000000000137390 Date: December 27, 2011 RE: Replacement of Existing I-190 Twin
More informationHighway Construction Program
Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,
More informationAppendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance
APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation
More informationCITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES
CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES June 1, 2012 Draper City Traffic Impact Study Guidelines Table of Contents Introduction... 1 Traffic Impact Classification Levels... 1 Analysis Approach
More informationAPPENDIX D ACCESS MANAGEMENT GUIDELINES
APPENDIX D ACCESS MANAGEMENT GUIDELINES Access management has become an important tool in transportation planning. Access management guidelines are intended to preserve the integrity of roadways by balancing
More informationGeometric Design: Past, Present, and Future
A2A02: Committee on Geometric Design Chairman: Daniel B. Fambro Geometric Design: Past, Present, and Future DANIEL B. FAMBRO, Texas A&M University JOHN C. COLLINGS, Delcan Corporation ROBERT DELLA VEDOVA,
More information5.0 PRELIMINARY ENVIRONMENTAL REVIEW
5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors
More informationI-17 and Happy Valley Road Diverging Diamond Interchange (DDI)
I-17 and Happy Valley Road Diverging Diamond Interchange (DDI) Bharat Kandel (ADOT) and Jeremy Neuman (HDR) February 28, 2018 Project Purpose and Overview New interchange will accommodate current and future
More informationCHAPTER 2: MODELING METHODOLOGY
CHAPTER 2: MODELING METHODOLOGY 2.1 PROCESS OVERVIEW The methodology used to forecast future conditions consisted of traditional traffic engineering practices and tools with enhancements to more accurately
More informationAppendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance
Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Functional classification identifies the role a highway or street plays in the transportation system. Some highways
More informationProject Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018
Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource
More information2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement
2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at
More informationExisting vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange
I-290 Phase I Study West of US 45 (Mannheim Road) to Racine Avenue Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange Technical Memorandum Prepared By: Huff & Huff, Inc.
More informationIntroductions. ASHE Technical Session June 11, Chesterfield County Transportation Department. McCormick Taylor, Inc.
ASHE Technical Session June 11, 2015 Introductions Chesterfield County Transportation Department Jesse Smith, P.E. Stan Newcomb McCormick Taylor, Inc. Rick DeLong, P.E. Craig Krupp, P.E. 1 Chesterfield
More informationCLA /10.54, PID Project Description:
Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway
More informationI-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR
: Douglas Avenue to NW 86 th Street FOR Iowa Department of Transportation City of Urbandale City of Grimes February 7, 2013 FINAL Prepared by: HR Green, Inc. HR Green Project Number: 40110031 TABLE OF
More information1000 Performance Based Project Development (PBPD)
Table of Contents 1000 Introduction... 1 1001 Application to the PDP... 1 1001.1 Planning... 2 1001.2 Preliminary Engineering... 3 1001.3 Design... 3 1002 Evaluation of PBPD Options... 4 1002.1 General...
More informationSPAGHETTI BOWL. RTC Workshop April 20, 2018
SPAGHETTI BOWL RTC Workshop April 20, 2018 EIS TIMELINE PLANNING NEPA FINAL DESIGN & ROW CONSTRUCTION ALTERNATIVES UPDATES We will review changes to the Alternatives Alternative 1 Alternative 2 Alternative
More informationWELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016
WELCOME IL 47 Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Range of Alternatives
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Interstate, NHS Non-Interstate and Non-NHS (IJR / IMR Guidance) SPECIFIC SUBJECT:
More informationNCHRP 3-88 Guidelines for Ramp and Interchange Spacing
Session 312 Updates on NCHRP-Funded Geometric Design Research Projects NCHRP 3-88 Guidelines for Ramp and Interchange Spacing Brian L. Ray, PE Kittelson & Associates, Inc Portland, Oregon bray@ kittelson.com
More informationAir Quality Analysis Technical Memorandum
Air Quality Analysis Technical Memorandum Segment 4: State Road 400 (SR 400)/Interstate 4 (I-4) from East of SR 15-600/US 17-92 (Seminole/Volusia County Line) to ½ Mile East of SR 472 Volusia County (79110),
More informationBetween existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL
American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Illinois for: Elimination of a U.S. (Interstate) Route Establishment
More informationSouth Dakota Interstate Corridor Study. Phase I Summary Report
South Dakota Interstate Corridor Study Phase I Summary Report December 2000 Prepared for: South Dakota Department of Transportation 700 East Broadway Avenue Pierre, South Dakota 57501-2586 Prepared by:
More informationI 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT
I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT February 2016 INTERSTATE 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION PROJECT Commonwealth of Virginia Virginia
More informationAir Quality Analysis Technical Memorandum
Air Quality Analysis Technical Memorandum Segment 2: State Road 400 (SR 400) / Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road) Orange County (75280), Florida
More informationAPPENDIX A TIER 1 ANALYSIS
SPN H.004100 FEASIBILITY STUDY APPENDIX A TIER 1 ANALYSIS 040-012-042AH Appendices Lead Sheets PROVIDENCE STATE PROJECT. H.004100 The following worksheets analyze various project alternatives at various
More informationOperational and Safety Attributes of an Alternative Design, Space-Efficient One-Sided Interchange
Operational and Safety Attributes of an Alternative Design, Space-Efficient One-Sided Interchange Christopher L. Melson Civil Engineer (PDP) Federal Highway Administration Turner Fairbank Highway Research
More informationDIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS
CITY OF ALBANY DEPARTMENT OF PUBLIC WORKS DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS Prepared By PUBLIC WORKS DEPARTMENT ALBANY, OREGON 97321 Telephone: (541) 917-7676 TABLE OF CONTENTS
More informationRIDOT S Statewide Roadway and Asset Data Collection Project
RIDOT S Statewide Roadway and Asset Data Collection Project ESRI User Conference 2017 Rafiq Basaria, DTS; Daniel Behnke DTS, Shane White, RIDOT Accent image here Primary Image here What is MIRE? Recommended
More informationHALDIMAND COUNTY DESIGN CRITERIA SECTION T TRAFFIC IMPACT STUDY GUIDELINES
HALDIMAND COUNTY DESIGN CRITERIA SECTION T TRAFFIC IMPACT STUDY GUIDELINES Revised 2015 TRAFFIC IMPACT STUDIES PAGE 1 T 1.00 T 1.01 INTRODUCTION TRAFFIC IMPACT STUDY One of Haldimand County s key objectives
More informationNCHRP Report 687 Guidelines for Ramp and Interchange Spacing
Updates on NCHRP-Funded Geometric Design Research Projects NCHRP Report 687 Guidelines for Ramp and Interchange Spacing Brian L. Ray, PE Kittelson & Associates, Inc Portland, Oregon bray@ kittelson.com
More informationFLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT
FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR
More informationDRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis
Draft Carbon Monoxide (CO) Traffic Air Quality Analysis North Houston Highway Improvement Project From US 59/I-69 at Spur 527 To I-45 at Beltway 8 North Harris County TxDOT Houston District CSJ: 0912-00-146
More informationImpacts of Replacing a Tight Diamond Interchange with a SPUI A Wilsonville Interchange Study
Portland State University PDXScholar Civil and Environmental Engineering Master's Project Reports Civil and Environmental Engineering 3-2015 Impacts of Replacing a Tight Interchange with a SPUI A Wilsonville
More information2017 Highway Safety Improvement Program Call
2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public
More informationChapter URBAN & RURAL FREEWAY DESIGN
Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides
More informationNW La Center Road/I-5 Interchange Improvement Project (MP 16.80)
FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,
More informationDRAFT AIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida
More informationInterchange Justification Report (IJR) I-75 at Bethlehem Road Henry County
Interchange Justification Report (IJR) I-75 at Bethlehem Road Henry County IJR Study/Analysis Area Exit 216: SR 155 Bethlehem Road Exit 212: Bill Gardner Pkwy Planning Background ARC 2040 Regional Transportation
More informationM D 355 [FR E D E R IC K R O A D] OVER
M D 355 [FR E D E R IC K R O A D] OVER LITTLE BENNETT CREEK MAINTENANCE OF TRAFFIC ALTERNATIVE ANA LYSIS Prepared by: INTRODUCTION The purpose of this report is to present the results of traffic analyses
More informationBCEO TRAFFIC IMPACT STUDY GUIDELINES
BCEO TRAFFIC IMPACT STUDY GUIDELINES February 2006 TABLE OF CONTENTS INTRODUCTION..... i TRAFFIC IMPACT STUDY STRUCTURE... 1 WHEN IS A TRAFFIC IMPACT STUDY NEEDED?..... 1 STUDY AREA, SITE PLAN & HORIZON
More informationOperational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013
Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County Department of Transportation 1 Agenda Overview & Assumptions
More informationMULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES
MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES 1 st Edition City of San Luis Obispo 2035 Circulation Element 1 Table of Contents Introduction... 2 Process... 2 When Impact Studies Are Required... 3
More informationReadily Implementable Signal Phasing Schemes for Diverging Diamond Interchanges
Tian, Xu, de-camp, Kyte, and Wang Readily Implementable Signal Phasing Schemes for Diverging Diamond Interchanges Zong Tian*, Ph.D., P.E. Hao Xu, Ph.D Center for dvanced Transportation Education and Research
More informationEngineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida
Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South
More informationS.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award
S.R. 0070, Section T20 Engineering District 12-0 ASHE National Project of the Year Award AMERICAN SOCIETY OF HIGHWAY ENGINEERS National Project of the Year Award OFFICIAL ENTRY FORM AWARD CATEGORY (Check