1 Floating Cranes for Container Handling Ben-Jaap A. Pielage, Joan C. Rijsenbrij, Han Ligteringen Abstract Floating cranes could be used to increase the berth capacity for the largest container vessels, making it possible to reduce the vessel berth time. By adding floating cranes on the waterside of a berthed container vessel, the berth productivity could be increased without disturbing the landside operations. Containers would be loaded directly into barges, which could transport the containers to an inland barge terminal. This would not only reduce the pressure on the deep sea terminals and connecting road infrastructure, but could possibly also reduce the total handling costs for containers to and from the hinterland. This paper presents the findings of a study focusing on the feasibility of such a floating crane concept. The paper discusses the conceptual design of the crane itself, as well as its integration in the current logistic processes and its potential market. T I. INTRODUCTION HE container terminal of the future will have to service increasingly larger vessels within relatively short times at competitive costs. Furthermore, there are increasing service demands on the landside for handling the trucks, trains and barges. Earlier studies [1] suggest that by using floating cranes on the water-side of a berthed container vessel, the berth productivity could be increased without disturbing the shore-side operations (see Fig.1). Moreover, there would be no demand for storage or internal transport on the port terminal, as the containers would be transported directly to an inland barge terminal. Furthermore, it was expected that the total handling costs for container to and from the hinterland could be reduced. This paper presents the findings of a follow-up study Floating cranes for Container Handling [2]. The aim was to better assess the feasibility of this floating crane concept. The study focuses on the potential market for the floating crane, the possible integration of the floating crane in the current logistic processes, the conceptual design of the floating crane, and includes a first assessment of the dynamics(movements) and costs. Fig. 1. First sketch of the floating crane concept (Source: Jan van Beemen, Royal Haskoning) [1]. II. POTENTIAL MARKET To better assess the potential market for the floating crane, seven large ports in Europe are analyzed: Le Havre (France), Antwerp (Belgium), Rotterdam (the Netherlands), Amsterdam (the Netherlands), Bremen-Bremerhaven (Germany), Hamburg (Germany) and Constantza (Romania) [3]. These ports are considered based on their ability to service large container vessels and their inland waterway connections. For the deployment of floating cranes, space is required on the waterside of the vessel. Furthermore, the vessels should be able to navigate the basins. The selection criteria for suitable terminals were therefore: nautical access, water depth and basin width. Figure 2 shows the terminals analyzed for Maasvlakte 1 (right) and Maasvlakte 2 (left, currently in development) in the port of Rotterdam. Of the 6 terminals investigated, 5 would be suitable for floating crane deployment. Manuscript received March 27, 2008 Dr.ir. B.A. Pielage is with the department of Maritime and Transport Technology, Faculty 3ME, Delft University of Technology, the Netherlands (phone: ; fax: ; B.A.Pielage@tudelft.nl Prof.ir. J.C. Rijsenbrij is with the department of Maritime and Transport Technology, Faculty 3ME, Delft University of Technology, the Netherlands (J.C.Rijsenbrij@tudelft.nl). Prof.ir H. Ligteringen is with the department of Hydraulic Engineering, Faculty of Civil Engineering and Geosciences, Delft University of Technology, The Netherlands (H.Ligteringen@tudelft.nl) Fig. 2 Rotterdam Maasvlakte Terminals (Source: Rotterdam Port authority)
2 In the seven European ports, a total of 33 terminals were reviewed. Floating cranes could be deployed in 14 of the 33 terminals. Table I shows an overview of the results. TABLE I PORTS & TERMINALS FOR FLOATING CRANES Port Number of Terminals Number of terminals Investigated with potential Le Havre 6 1 Antwerp 4 3 Rotterdam 6 5 Amsterdam 4 1 Bremerhaven 2 0 Hamburg 6 3 Constantza 5 1 The current vessel stowage planning process does not easily include the option of grouping containers for direct barge transport in one bay. This limitation must be taken into account when considering possible implementation of floating cranes. B. Introducing the Floating Crane One of the main advantages of introducing floating cranes would be the increase in berth capacity. The number of quay cranes that can simultaneously work on a vessel is limited by their base dimensions. Two quay cranes working side by side will leave at least one 40 foot bay between them, as shown in Figure 4. This leaves potential for floating cranes to increase the berth capacity. Total III. LOGISTICS & OPERATIONAL ASPECTS One of the main concerns from an operational point of view was whether the floating crane could be integrated in the current logistic processes. This section first briefly discusses the current vessel stowage planning and introduces how the floating crane can be integrated in the current operations. Five cases are studied [4]. A. Current Vessel Stowage Planning A container vessel typically travels on so-called string routes, where at each port of call containers are discharged and additional containers destined for subsequent ports are loaded. Determining a viable arrangement of containers to facilitate this process in a cost effective way, makes up the vessel stowage problem [5]. Ideally all containers to be discharged at a certain port should be on top of containers that are destined for a subsequent port on the route. Whereas it is sensible to group cargo with the same destination in the same bay, a good distribution of this cargo between bays will permit multiple cranes to work on the vessel. The vessel stowage planner takes into account how many cranes will be made available at each port and aims to maximize their use. Furthermore the vessel stowage planner must take into account many other aspects, such as the size and weight of the container, and whether they are reefers or contain hazardous cargo. Figure 3 shows an example of a vessel stowage planning. Fig. 3. Example of vessel stowage planning (Modified from [2]) Fig. 4. Crane positions during loading/unloading (Modified from [6]) By introducing floating cranes, the total handling costs could also be reduced. The decrease in vessel mooring time and bypassing of the expensive deep sea terminal could reduce costs. However, there are also additional costs at the so called barge hub terminals further inland (see Figure 5). These and other costs are further analyzed in the case studies. Fig. 5. Container flow containers to and from the hinterland [4]. C. Five Case Studies To better assess whether floating cranes could indeed be integrated in the logistic processes, increase the berth capacity and reduce costs, five cases have been studied [4]. The focus was on possible implementation of the floating crane in current operations without changing the vessel stowage planning (only Case 5 involves changes in the vessel stowage planning). All cases were based on data from an actual vessel, with an existing vessel stowage planning. A 7 quay crane split (distribution) of containers on the vessel would be the point of departure. The crane planner would then integrate 2 additional floating cranes into the schedule, resulting in a combination of 7 quay cranes and 2 floating cranes working on the vessel. For the example vessel, the
3 vessel handling time could thus be reduced from 17 hours (with 7 quay cranes) to 15 hours (with 7 quay cranes and 2 floating cranes). The cost implications of adding the floating cranes are further discussed per case. In Case 1: Floating cranes are presumed to handle only those containers that are known to continue by barge, without changing the vessel stowage planning. This would however be practically impossible. Even if the final destination and mode of transport for all containers would be known (which is not the case), the vessel stowage planning does not take the final destination or mode into account. Therefore the so called barge containers are randomly scattered throughout the bays to be unloaded. Floating cranes that handle only barge containers with the current vessel stowage planning is therefore considered unfeasible. In Case 2: Floating cranes handle all containers in the bay it is working on, the barges remain at the terminal and the containers are second handled onto the terminal by the quay (barge) crane. In this case, all containers remain within the control of the terminal. The vessel mooring time will be reduced (2 hours), but the total costs will be higher, mainly due to the second handling of the containers. First cost calculations show that the total cost would increase from approx Euro with 7 quay cranes to Euro with 7 quay cranes and 2 floating cranes. This case could however still be of interest for terminals that want to increase their service (berth capacity) at a price. In Case 3: Floating cranes handle all containers in the bay it is working on, the barges transport all the containers to the barge hub terminal, where all containers are second handled. Although this could reduce the transport costs for the so called barge, rail and road containers, the so-called transshipment containers will need to return to the deep sea terminal. Again the vessel mooring time will be reduced, but the total costs are expected to be higher (645 k versus 641 k), amongst others due to the return of transshipment containers. In Case 4: Floating cranes handle all containers in the bay it is working on, the transshipment containers are put into one barge which remains at the terminal (similar to Case 2), and all other containers are transported by barge to the barge hub terminal (similar to Case 3). In this barge split case, the vessel mooring time will again be reduced. Furthermore, the first cost calculations show that the total costs could be reduced (from Euro with 7 quay cranes to Euro with 7 quay cranes and 2 floating cranes). Of the four cases without changes to the vessel stowage, this case is considered most promising from a total cost point of view. However, it should be noted that these are only preliminary cost estimates and based on one example vessel. In Case 5: Floating cranes handle only barge containers which have been grouped by the vessel stowage planners to allow for an efficient handling by floating cranes. In this case, it is assumed the vessel stowage planning will be adapted. Although this case shows the larges potential cost savings (from 641k tot 622k) the feasibility of changing the vessel stowage planning is still unclear. Aspects such as availability of information, last minute changes, possible decrease in transport and handling efficiency are still to be considered. IV. CONCEPTUAL DESIGN To better assess the technical feasibility and investment costs of the floating crane, a conceptual design was developed [7]. The philosophy was to develop a concept based on existing (proven) designs and standard (reliable) components, using the knowledge and experience of the partners involved in the research. The main requirements for the floating crane were that it would be able to reach across the whole width of the largest container vessels, work on a bay directly adjacent to a bay where a quay crane is working, be able to (re)position itself along the vessel, have a productivity of 25 moves per hour, be able to perform twin lifts, and service two barges simultaneously. The main parts of the floating crane are: the deep sea crane, the barge crane, the pontoons, and the foundation structure (connecting the pontoons and supporting the barge and deep sea cranes). Figure 6 shows the main parts of the floating crane. The machine room, with a buffer for containers, is positioned on the front pontoon. Fig. 6. Main parts of the floating crane [7]. The maximum outreach is 60 meters, and the maximum height under the spreader is 55 meters (to water level), making it possible to service the largest container vessels. The base of the crane is approximately 52 by 52 meters, and the distance between the pontoons is approx. 27 meters, making it possible to service 2 normal sized barges or one large (Class VI / 400 TEU) barge. Figure 7 shows the floating crane in its working environment. The floating crane is positioned between 2 quay cranes, unloads the containers from the vessel, and positions the containers in the buffer. The barge crane handles the containers between the buffer and the barges.
4 The mass and mass-distribution of the different crane parts were derived from the conceptual design. The total mass of the crane was calculated to be approx tons. For simulating a (maximum) load case, both the deep sea crane and barge crane are assumed to perform their load cycle simultaneously, both with maximum load (twin lift: two 30 Ton containers under the spreader). The maximum accelerations and velocities are shown in Figure 10. Fig. 7. Impression of the floating crane in its working environment [7]. The floating crane has two thrusters for propulsion, one on each pontoon, as shown in Figure 8. For loading/unloading operations, the crane is attached to the deep sea vessel using cables and winches. This secures the crane to the vessel, but also makes it possible to move the crane alongside the vessel. Winches are also used to secure and position the barges under the barge crane. Fig. 10. Maximum accelerations and velocities for crane cycles [8]. The resulting heave, surge and sway movements of the boom tip are presented in Figure 11. The maximum heave would be between approx and +1.8 meters, the maximum surge between -1.1 and +1.2 meters and the maximum sway between -0.6 and 0.7 meters. Heave Fig. 8. Top view of positioning and propulsion systems on the floating crane [7]. Surge V. DYNAMICS OF THE CRANE In order to assess the dynamic behavior of the crane under certain load conditions, a model was developed in a multi body dynamics program [8]. The first assessments focused on the dynamic movements of the tip of the boom. Figure 9 shows the defined movements: heave, surge and sway. Fig. 9. Heave, Surge and Sway movements of the boom tip [8]. Sway Fig. 11. Heave, Surge and Sway of the boom tip during a oad cycle [8].
5 Although the heave and surge have relatively large ranges, the time between peaks is also relatively large. These movements could be (partly) compensated by the crane driver. The sway movement is relatively low, but is difficult to control. Furthermore, the sway movements are most critical when considering possible collision between the boom of the floating crane and the booms of the quay cranes. If a floating crane is working on a bay directly adjacent to a quay crane, the distance between the booms is estimated at approx. 4 meters. The maximum sway displacement of 0.7 meters is well within this margin. However, the simulation does not take waves and wind into account. Further research is required. Similar analyses were performed for the movement of the deep sea spreader and barge spreader. From the analyses it could be concluded that the dynamic responses of the floating crane seem to be within allowable limits. However, special attention should be paid to the sway of the boom tip and the (corresponding) sway of the deep sea spreader. In any case, using a floating crane on a bay directly adjacent to a quay crane does require operational restrictions to avoid collisions between spreaders/containers. cost calculations should be regarded as first estimates. A more in depth business case is required to better assess the costs and possible cost savings. TABLE III ESTIMATED YEARLY OPERATIONAL COSTS Cost Type of costs (million Euro) Fixed costs Depreciation & interest (linear, 15 years, rest value 1 million Euro, Intr. 6%) 1.7 Maintenance cost (5% of investment) 0.9 Insurance (0,5% of investment) 0.09 Personnel costs Indirect (Admin. etc) 0.16 Variable costs (for 2600 hours) Personnel costs Direct (5 people at total 250 euro/hour*2600 hours) 0.65 Energy costs (2600 hours) 0.25 Miscellaneous 0.25 Total Yearly Costs (for 2600 hours (approx.30%) utilization) 4.0 VI. COST ESTIMATES The investment costs for the floating crane were estimated using the conceptual design and the experience of the participants (see Acknowledgements) in the project. Table II presents the cost breakdown. The total investment costs are estimated at 18 million euro. TABLE II ESTIMATED INVESTMENT COSTS Part Cost (million Euro) Deep sea crane 7.5 Barge crane 2.2 Structure connecting pontoons 1.2 Pontoons 3.6 Engine room & Thrusters 2.0 Winches 0.5 Miscellaneous 1.0 Total Investment Costs 18.0 The estimated yearly operational costs were calculated for 2600 hours (approx. 30%) utilization. Table III shows the results of the calculations, adding up to approx. 4 million euro per year for 2600 hours operation. Assuming an average production of 25 containers per hour, the costs per container can be calculated at 62 euro/container. Although the handling cost per container by floating crane can be lower than the handling costs per container by quay crane, the potential to reduce the total handling costs greatly depends on the type of operation, as discussed in the section on Logistics and Operational Aspects. In that section is was argued that Case 4, with the so called barge split, would be most promising from a total cost point of view. However, the VII. CONCLUSIONS The aim of this study was to better assess the feasibility of floating cranes for container handling. The following conclusions are drawn: The floating crane is considered technically feasible. The main parts of the crane are based on existing designs, and the conceptual design shows no technological show stoppers. The floating crane can be integrated in the current logistic operations without changing the current vessel stowage planning. However, using a floating crane on a bay directly adjacent to a quay crane does require operational restrictions in order to avoid collisions between spreaders/containers. The first assessment of the dynamics show that the distance between the booms of the cranes should be sufficient to avoid collisions between the booms themselves. A more in depth study on the operation and dynamics of the crane is however required. Using floating cranes can reduce the container vessel berth time and may reduce total handling costs. Without changing the vessel stowage planning, Case 4 seem most promising from a total cost point of view. In Case 4 the floating cranes handle all the containers in the bay they are working on; the transshipment containers are put into one barge which remains at the terminal to be second handled back onto the terminal; and all other containers are transported by barge to the inland Barge Hub Terminal, where they are second handled onto the Barge Hub Terminal. The first cost estimates show possible cost savings of approx euro for one vessel (from Euro with 7 quay cranes to Euro with 7 quay cranes and 2 floating cranes). However, it should be noted that these are only preliminary cost estimates, and based on one example vessel.
6 Furthermore, this case assumes a Barge Hub Terminal to be available approx 50 kilometers inland. A more in depth business case is required to better assess the total costs and benefits, as well as implementation issues. The floating crane concept greatly depends on the availability of an inland Barge Hub Terminal, at least as a possible cost saving alternative. In return, a Barge Hub Terminal can benefit from the floating crane concept as it will provide more containers. Combining the floating cranes with a direct barge connection to a Barge Hub Terminal will furthermore reduce the pressure on the deep sea terminals handling and storage capacity, as well as the connecting road infrastructure. So apart from possible cost reductions, floating cranes could also be of interest to terminals reaching their maximum capacity, and/or as a method to reduce road congestion in port areas. Floating cranes can be used at the Maasvlakte in Rotterdam, but also in many other ports. Of the 7 European ports and 33 terminals reviewed, 14 terminals appear to have the qualities required for deployment of floating cranes. 80% of the potential terminals are located in the three major container ports in Europe: Antwerp, Hamburg and Rotterdam. Although the study shows positive preliminary results with regard to the technical, operational and financial feasibility, there are several aspects to be considered in more detail. To better assess the costs and possible cost savings, a business case is required. The business case should not only focus on the cost and benefits themselves, but also on possible issues with regard to the distribution of the costs and benefits among the parties involved. The question who is going to invest, and who is going to operate should also be considered. To better assess the operational aspects and to ensure a safe working environment, a further analysis of the operation and dynamics is required, and should also be included in a next phase. Finally, it is recommended to investigate the possibilities for adapting the vessel stowage planning to allow for concentration of barge containers in specific bays. REFERENCES [1] H. Ligteringen, J.C. Rijsenbrij, B.A. Pielage, W.F. Molenaar, M. van Schuylenburg, A.M. Vaes-Van de Hulsbeek Container terminal of the future Port Research Centre Rotterdam-Delft, 2004 (in Dutch) [2] B.A. Pielage, J.C. Rijsenbrij, W. van den Bos, H. Ligteringen, J. van Beemen, Floating Cranes for Container Handling Port Research Centre Rotterdam-Delft, ISBN: , [3] R. Obrer Marco Logistical and Economical Aspects of the Floating Container Crane within a Netwok Terminal, Master of Science Thesis, Delft University of Technology, Faculty of Civil Engineering and Geosciences, Department of Hydraulics, Delft, [4] H.A. ter Horst, Vessel Stowage Planning for the Floating Crane Concept, Literature Assignment, Delft University of Technology, Faculty of Mechanical, Maritime and Materials Engineering, Department Marine and Transport Technology, Report Number 2006.TL.7086, Delft., [5] I.D. Wilson,, P.A. Roach, J.A. Ware. Container stowage pre-planning: using search to generate solutions, a case study, Knowledge-Based Systems 14, pp , [6] I.D.Wilson, P.A. Roach. Container stowage planning: a methodology for generating computerised solutions, Journal of the Operational Research Society 51, pp , [7] J.H. Reus, Structural design of the floating container crane concept, Design Assignment, Delft University of Technology, Faculty of Mechanical, Maritime and Materials Engineering, Department Marine and Transport Technology, Report Number 2007.TL.7121, Delft, [8] M. Barends, Dynamic behaviour of a floating container crane, s for container Handling, Master of Science Thesis, Delft University of Technology, Faculty of Mechanical, Maritime and Materials Engineering, Department Marine and Transport Technology, Report Number 2007.TEL.7207, Delft, ACKNOWLEDGMENT This paper presents the finding of the Port Research Centre project Floating Cranes for Container Handling. The Port Research Centre (PRC) is a cooperation between the Port of Rotterdam and the Delft University of Technology. It mission is to generate, coordinate and execute innovative, strategic research projects aimed at application in the Rotterdam port and industrial area. Participants in the project were Delft University of Technology, the Port of Rotterdam, APM Terminals, Kalmar Industries, Gottwald Port Technology, Ravestein, Siemens Netherlands, IDEA Heavy Equipment and Royal Haskoning.
Port Feeder Barge: Innovative green waterborne logistics for container ports. PORT FEEDER BARGE GmbH Hamburg PORT FEEDER BARGE
Port Feeder Barge: Innovative green waterborne logistics for container ports GmbH Hamburg The " Port Feeder Barge" Main Data (preliminary): length: 64 m beam: 21 m capacity (3 Layers): 168 TEU reefer plugs:
More informationIntermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS
Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS Intelligent intermodal solutions ensure safe and sustainable transport of goods International trade is constantly changing its ways and requirements
More informationAPM Terminals Announces Innovative, more Sustainable Terminal Design
Press Release 19 March 2012 APM Terminals Announces Innovative, more Sustainable Terminal Design Maasvlakte II equipment order launches new era in automation, productivity, safety Rotterdam, The Netherlands
More informationImproved Inland Rail Transport Through New Concepts for Intermodal Hubs
Improved Inland Rail Transport Through New Concepts for Intermodal Hubs Dr. Robert Wassmer, Chief Executive Officer Gottwald Port Technology GmbH TOC Europe Bremen, 17 June 2009 Economic Drivers for Improved
More informationPort of Hamburg: Heading into the future with smartport
Port of Hamburg: Heading into the future with smartport The strategy for intelligent port development The Port of Hamburg is the most eastern port of the North Range. The strategy for intelligent port
More informationThe impact of a B-to-B container transferium on the sojourn time of inland container vessels
The impact of a B-to-B container transferium on the sojourn time of inland container vessels Transport Infrastructure and Logistics The impact of a B-to-B container transferium on the sojourn time of
More informationMaritime Container Transport
Chapter 2 Maritime Container Transport This chapter provides an introduction to the maritime container transport industry. Section 2.1 briefly describes the development of maritime container transport
More informationCapacity Planning System
Institute of Shipping Economics and Logistics Capacity planning for container terminals 1 Introduction Important parameters for container terminal capacity technical features operation time (technical)
More informationReport of the Port Authority
Report of the Port Authority REPORT OF THE PORT AUTHORITY 1 Foreword by executive board 2 The port in brief 3 About the Port Authority 4 Customer 5 Area and space 6 Traffic and accessibility 7 Environment
More informationNew Container Terminal Development for a Proposed Area
New Container Terminal Development for a Proposed Area Hasini A, Papa Rao G haasini.a@gmail.com, gprao_74@yahoo.co.in ABSTRACT: Container traffic has grown exponentially since 1980 and has become a reliable
More informationNVV - Journée Schadee Matthijs van Doorn Director Logistics Rotterdam, 2018
NVV - Journée Schadee 2018 Matthijs van Doorn Director Logistics Rotterdam, 2018 Port of Rotterdam, engine of the economy Total port area 12,500 ha (net 6,000 ha) Total employment 180,000 people Total
More informationPort Feeder Barge. Floating infrastructure for container ports.
Port Feeder Barge Floating infrastructure for container ports Page 2 Floating infrastructure for container ports Although tremendous efforts have been made in worldwide port development following issues
More informationAlthough tremendous efforts have been made in worldwide port development following issues are still on the agenda in many (container) ports:
Page 1 Port Feeder Barge: Floating infrastructure for congested (container) ports Although tremendous efforts have been made in worldwide port development following issues are still on the agenda in many
More informationDCT Gdansk Presentation January 2017
DCT Gdansk Presentation January 2017 2 Company Profile DCT Gdansk: Resources and Technical Specifications Terminal description: The largest and the fastest-growing container terminal in the Baltic Sea
More informationOpportunities for inland container terminals. FITAC Conference Bogotà October Marc Pirenne
Opportunities for inland container terminals FITAC Conference Bogotà October 2-3 2014 Marc Pirenne Presentation outline 1. Inland container terminal: the concept 2. European best practices in inland container
More informationA SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS
A SIMULATION MODEL FOR INTEGRATING QUAY TRANSPORT AND STACKING POLICIES ON AUTOMATED CONTAINER TERMINALS Mark B. Duinkerken, Joseph J.M. Evers and Jaap A. Ottjes Faculty of OCP, department of Mechanical
More informationEUROGATE WIND ENERGY SIZE IS OUR DAILY BUSINESS
Issued 09 /2016 EUROGATE WIND ENERGY SIZE IS OUR DAILY BUSINESS MOVING THE GLOBAL ECONOMY EUROGATE WIND ENERGY ONSHORE AND OFFSHORE WIND ENERGY IN EUROPE A BIG CHALLENGE FOR LOGISTICS According to the
More informationThe Operating Concept Peter Beamish, MA MICE Technical Director, Royal HaskoningDHV
TEN-T Project 2011-IT-94006-S Implementation study to prepare a Public Private Partnership (PPP) to improve the capacity of the port of Venice and related logistics system Venice Offshore Onshore Port
More informationCase Study. Transportation of healthcare products by inland navigation. European Commission
Case Study Transportation of healthcare products by inland navigation European Commission 1 THE PLATFORM If transport continues to grow at the same rate as the economy, this will become both an economic
More informationSmart port logistics: lessons from the experience of Port of Rotterdam and Port of Hamburg
Smart port logistics: lessons from the experience of Port of Rotterdam and Port of Hamburg Dr. Behzad Behdani Wageningen University, Logistics and Operations Research Department Delft University of Technology,
More informationTHE PORT OF MARSEILLE FOS : Le FRENCH SMART PORT in Med
THE PORT OF MARSEILLE FOS : Le FRENCH SMART PORT in Med Mediterranean sea : an essential crossroad area for two of the three biggest world container trades : Asia / Europe and Europe / Americas Med ports
More informationAMSbarge: Daily service between your company and the deepsea, shortsea and hinterland services in the Amsterdam seaport and airport region
AMSbarge: Daily service between your company and the deepsea, shortsea and hinterland services in the Amsterdam seaport and airport region AMSbarge Logistic Concept for Goods transport in Congested Regions
More informationIntermodal technology implementation: the key for the functioning of port a system
Maritime Heritage and Modern Ports 333 Intermodal technology implementation: the key for the functioning of port a system D. Badanjak & N. Brnjac Faculty of Transport and Traffic Engineering, University
More informationContainer Terminal Modelling in Simul8 Environment
Acta Technica Jaurinensis Series Logistica Vol. 6. No. 4. 2013 Container Terminal Modelling in Simul8 Environment G. Bohács, B. Kulcsár, D. Gáspár Budapest University of Technology and Economics 1111 Budapest,
More informationGlobal standards in Maritime and Ports: improving the customer experience
Global standards in Maritime and Ports: improving the customer experience For shipping to become integrated partners in the value chain, it will need to use global standards and definitions. Capt. Andreas
More informationTwin hub. Intermodal rail freight Twin hub Network North West Europe
Twin hub Intermodal rail freight Twin hub Network North West Europe Ekki Kreutzberger and Rob Konings Twin hub network: an innovative concept to boost competitiveness of intermodal rail transport to the
More informationSlade Shipping Pipe Management Services. Amsterdam Storage Facility
Amsterdam Storage Facility The Slade Group Established in 1991under the guidance of Mr. Robert J. Peska, Slade Shipping is a full service transportation company accomplished in providing premium services
More informationOperations Systems of Container Terminals: A Compendious Overview
Chapter 2 Operations Systems of Container Terminals: A Compendious Overview Birgitt Brinkmann Abstract This section contains an overview of the different functional areas of a marine container terminal
More informationGreen corridors: policy and regulatory issues
Green corridors: policy and regulatory issues Raimonds Aronietis, Paresa Markianidou, Hilde Meersman, Tom Pauwels, Eddy Van de Voorde, Thierry Vanelslander and Ann Verhetsel University of Antwerp Department
More informationUnderground Freight Transportation. A new development for automated freight transportation systems in the Netherlands.
Underground Freight Transportation. A new development for automated freight transportation systems in the Netherlands. By Ben-Jaap Pielage Abstract Underground freight transportation (UFT) is introduced
More informationYOUR GATEWAY TO MOLDOVA AND SOUTHEASTERN EUROPE
YOUR GATEWAY TO MOLDOVA AND SOUTHEASTERN EUROPE Location and Regional Profile Giurgiulesti International Free Port (GIFP) is situated at 133.8 km / 72.2 nautical miles from the Black Sea on the maritime
More informationCTB3300WCx Introduction to Water and Climate
CTB3300WCx Introduction to Water and Climate IN3 Delta and Estuary intervention Mark Voorendt Hello my name is Mark Voorendt. I am researcher and lecturer on hydraulics structures at the Delft University
More informationModal shift to inland navigation facts and figures
Modal shift to inland navigation facts and figures Stockholm, 23 May 2018 Sources: Häfen und Güterverkehr Köln AG, Neuss-Düsseldorfer Häfen, Hafen Hamburg Marketing e.v. 1 Agenda About PLANCO Inland waterway
More informationDynamic Port Planning under Competition
Dynamic Port Planning under Competition Development of a tool for strategic investment planning W.A. Gerrits BSc June 2007 Delft University of Technology Faculty of Civil Engineering and Geosciences Section
More informationBARGE BAR. Connecting the Waterway Community
BARGE BAR Connecting the Waterway Community Agenda 1. APCS (Antwerp Port Community System) 2. Barge Traffic System 3. Rheinport Information System 1 1 APCS Antwerp Port Community System John Kerkhof Director
More informationProcess for Port Master Planning
Process for Port Master Planning Presented by Kerry Simpson, P.E. Vice President, Marine Terminals AAPA Port Executive Management Seminar Merida, Mexico December 2014 Moffatt & Nichol Founded in 1945 in
More informationContainer Transferium An innovative logistic concept. Maurits van Schuylenburg Port Infrastructure Seminar Delft 22th of June 2010
Container Transferium An innovative logistic concept Maurits van Schuylenburg Port Infrastructure Seminar Delft 22th of June 2010 Sense of urgency - 1 Congestion along A-15 Chance of incidents 2x greater
More informationContainer terminal planning Experiences & lessons learnt
Container terminal planning Experiences & lessons learnt Port Finance International TBA 2015 / Remmelt Thijs Contents 1. Terminal Master planning Reasons why terminal master planning Typical approach for
More informationNetwork Analysis of Container Barge Transport in the Port of Antwerp by means of Simulation
Network Analysis of Container Barge Transport in the Port of Antwerp by means of Simulation An Caris and Gerrit K. Janssens Transportation Research Institute Hasselt University - campus Diepenbeek Wetenschapspark
More informationPorts and their Connection within the TEN-T
Ports and their Connection within the TEN-T July 7, 2010 (Centre Albert Borschette) Peter Wolters, Deputy Secretary General European Intermodal Association 1 Port-Hinterland Policies, Networks, Players
More informationWaterborne will Win. Waterborne Saves Energy
Waterborne will Win Cost of Transport to Environment and Society Factors taken into consideration*: Noise Pollutants Climate costs Accidents Infrastructure Congestion * Source: EU Energy Commission Waterborne
More informationContainer Terminal Robotization
Container Terminal Robotization Next Challenge: Brown-field?! Coeveld TBA2017 About TBA Outline Presentation Trends in Automation Case Study: Maasvlakte 2 Next Challenge: Brown-field Q&A TBA 2017 / Container
More informationPORT COOPERATION BETWEEN EUROPEAN SEAPORTS FUNDAMENTALS, CHALLENGES AND GOOD PRACTICES
PORT COOPERATION BETWEEN EUROPEAN SEAPORTS FUNDAMENTALS, CHALLENGES AND GOOD PRACTICES Presentation of the study carried out on behalf of the GUE/NGL in the European Parliament, 19th October 2016, Brussels
More informationCoordination in hinterland transport chains:
Coordination in hinterland transport chains: a major challenge for the seaport community Presented by: Peter de Langen & Martijn van der Horst Port of Rotterdam Erasmus University Rotterdam Erasmus University
More informationSmart Ports and smart infrastructure Big data and simulations. Jan Egbertsen, , Delft
Smart Ports and smart infrastructure Big data and simulations Jan Egbertsen, 18.11.2016, Delft Game changers in logistics 2 The world of logistics is changing Internationals hubs Individual transports
More informationSafety of LNG-Shipping around Ports and Terminals
Safety of LNG-Shipping around Ports and Terminals Jos T.M. van Doorn and Johan H. de Jong, MARIN Introduction The design of port lay-outs and terminals suitable for LNG-carriers has to meet exceptionally
More informationEindhoven University of Technology MASTER. Simulating a hub network for container barging. de Vries, S.W. Award date: Link to publication
Eindhoven University of Technology MASTER Simulating a hub network for container barging de Vries, S.W. Award date: 2015 Link to publication Disclaimer This document contains a student thesis (bachelor's
More informationA Framework for Integrating Planning Activities in Container Terminals
A Framework for Integrating Planning Activities in Container Terminals August 30th, 2007 S. H. Won and K. H. Kim Dept. of Industrial Engineering, Pusan National University, South Korea Contents 1 Introduction
More informationALWAYS A STEP AHEAD. INLAND CONTAINER SHIPPING CHAIN OPTIMIZATION
ALWAYS A STEP AHEAD. INLAND CONTAINER SHIPPING CHAIN OPTIMIZATION nextlogic.nl Breakthrough in efficiency and reliability. INTEGRATED PLANNING Nextlogic offers integrated planning in handling inland container
More informationAbstract. 1 Introduction
Developments in shipping and their consequences on port planning and design H. Ligteringen Faculty of Civil Engineering and Geosciences, TecWca/ (7mWrj;Yy D#, f.o. Box The Netherlands E-mail: H.Lizteringen(a).ct.
More informationOFFSHORE TARIFF Valid as per June 1, 2018
OFFSHORE TARIFF Valid as per June 1, 2018 TABLE OF CONTENTS I. General Provisions 2 II. Port Dues 2 III. Demurrage 3 IV. Quay Dues 3 V. Floating Storage 4 VI. Mooring Fees 4 VII. Security Surcharge 5 VIII.
More informationA SIMULATION MODEL OF A SAILING CONTAINER TERMINAL SERVICE IN THE PORT OF ROTTERDAM
Proceedings of the Conference on Modeling and Simulation 1994 (ESM 1994). June 1994. Barcelona [SCS]. ISBN 1-5655-028-5 A SIMULAION MODEL OF A SAILING CONAINER ERMINAL SERVICE IN HE POR OF ROERDAM J.A.
More informationGlobal Ports and Urban Development: Creative use of space
Global Ports and Urban Development: Creative use of space Jan Egbertsen Port of Amsterdam Paris, OECD Headquarters, December 9, 2011 Port of Amsterdam is a company of the city of Amsterdam Port of Amsterdam,
More informationOVET_omslag_Brochure_nov14_sn :11 Pagina 3 Quality in Bulk
Quality in Bulk Terminal Terneuzen Vessel size - Panamax up to: 90,000 dwt - Maximum loa: 265 m - Maximum beam: 37 m - Maximum draught: 12.50 meter freshwater Added value - Screening - Crushing - Blending
More informationInformation Exchange between Deep Sea Container Terminals and Hinterland Parties
Information Exchange between Deep Sea Container Terminals and Hinterland Parties The information needs of hinterland parties and the impact of information exchange Ilse Menger April 2016 I Information
More informationCALL FOR PROPOSALS FOR MAKING AREAS AVAILABLE AT THE TRADING PORT OF SÈTE WITH A VIEW TO OPERATING A CONTAINER AND GENERAL CARGO YARD.
CALL FOR PROPOSALS FOR MAKING AREAS AVAILABLE AT THE TRADING PORT OF SÈTE WITH A VIEW TO OPERATING A CONTAINER AND GENERAL CARGO YARD Specifications Preamble Ownership of the ports of Sète and Frontignan
More informationPORT AUTONOME DE PARIS. Yves MORIN
PORT AUTONOME DE PARIS Yves MORIN Louisville September 18 th 2007 31 st PIANC CONGRESS Estoril May 2006 Working Group n 31 ***** Mission, Organization and Management of River Ports 31 ème CONGRES DE L
More informationLinking modes of transportation makes modal shift possible
Press release 2016 financial year: cargo handling by inland waterway and rail up 4.7% to over 630,000 tonnes; Container traffic +12.3 %; new pier for hotel ships Linking modes of transportation makes modal
More informationMarket Place Seminar Rail Crossroads
Market Place Seminar Rail Crossroads 24-25 September 2015 Tom Paeshuys, General Manager IFB Key facts & figures (2014) Over 520,000 TEUs handled Operated 11,107 trains Door-to-door solutions in over 15
More informationECT - European Gateway Services. 24 June 2013
ECT - European Gateway Services 24 June 2013 Agenda 1. Introduction 2. Supply Chain Trends 3. Synchromodality 4. European Gateway Services 5. COMCIS-project 1. Introduction Europe Container Terminals (ECT)
More informationINTEGRATING RAILWAY SERVICES INTO THE SUPPLY CHAIN AT THE LAST MILE OF THE TRANSSHIPMENT INTERFACE SEAPORT-RAIL
René Schönemann Berlin Institute of Technology Chair of Track and Railway Operations INTEGRATING RAILWAY SERVICES INTO THE SUPPLY CHAIN AT THE LAST MILE OF THE TRANSSHIPMENT INTERFACE SEAPORT-RAIL Abstract:
More informationRealisierungskonzept zur Etablierung eines Offshore-Shuttles SH 1. Feasibility study: Establishment of an offshore-shuttle Schleswig-Holstein
Realisierungskonzept zur Etablierung eines Offshore-Shuttles SH 1 Brunsbüttel Ports GmbH Feasibility study: Establishment of an offshore-shuttle Schleswig-Holstein Executive Summary The study is within
More informationPRÄSENTATION. Windpower Offshore Base Mukran
PRÄSENTATION Windpower Offshore Base Mukran Folie 1 Windpower Offshore Base Mukran Part I Location Port of Sassnitz General Information Folie 2 Location Sassnitz / Mukran (I) Uncomplicated navigational
More informationUNMANNED CONTAINER HANDLING MEETING THE FUTURE CHALLENGES
UNMANNED CONTAINER HANDLING MEETING THE FUTURE CHALLENGES When to Automate Main Reasons In market areas with high labor costs, labor accounts for more than 50 % of overall costs in a terminal. Therefore
More informationShort Sea Shipping Yesterday, today and tomorrow. Shortsea 14 European Conference Gare Maritime de Alcântara Lisboa 12 th & 13 th May 2014
Short Sea Shipping Yesterday, today and tomorrow. Shortsea 14 European Conference Gare Maritime de Alcântara Lisboa 12 th & 13 th May 2014 V.22 APR 2014 MacAndrews Facts Established in 1770 220 employees
More informationThe best solution for new build as well as for reconstruction of existing terminals DEEPSEA
THE NEW CONCEPT FOR CONTAINER TERMINALS The best solution for new build as well as for reconstruction of existing terminals DEEPSEA higher performance lower investments reduction operational costs higher
More informationBS 6349:Part 1.1: 1: General Code of practice for planning and design for operations. David Veale
: 1: Principal Technical Expert for Marine Facilities Engineering Shell Projects and Technology OCIMF Representative on CB502 OCIMF The Oil Companies OCIMF mission is to be the International Marine Forum
More informationJakov Karmelić, PhD Association of Ship Agents and Brokers of Croatia
Jakov Karmelić, PhD Association of Ship Agents and Brokers of Croatia Strengthening the corridor`s competitiveness through the cooperation between the ports in the North Adriatic Opatija, 22nd November
More informationA Lot is Going on at the Elbe: Our Industrial Port With Multi-Functional. The Seaport of Stade
A Lot is Going on at the Elbe: Our Industrial Port With Multi-Functional Terminal The Seaport of Stade The Seaport of Stade The seaport of Stade has long been transformed into much more than just a productive
More informationCONSTANTA PORT (a river maritime port)
Location Black Sea Port, connected to the Danube via the Danube Black Sea Canal Authorities National Company Maritime Ports Administration SA Constanta General Manager: Andrei Aurelian POPA Address: Incinta
More informationMechanical support linkspans
Linkspans The function of linkspans is to level the height difference between the quay and the cargo deck of the vessel in order to provide smoother, safer and faster access for loading and unloading.
More informationOUR COMPANY YOUR MARITIME AND OFFSHORE PARTNER OUR MISSION AND VISION GROWTH AND COOPERATION MISSION SHE-Q SAFETY, HEALTH, ENVIRONMENT AND QUALITY
OUR COMPANY YOUR MARITIME AND OFFSHORE PARTNER Dutch Offshore provides equipment and services (24/7) to the maritime and offshore industry. Dutch Offshore offers offshore crawler cranes, special offshore
More informationSIMULATION STUDIES OF ROBOTIZED MULTI TERMINAL SYSTEMS
SIMULATION STUDIES OF ROBOTIZED MULTI TERMINAL SYSTEMS International congress on Freight Transport Automation and Multimodality, Delft, 23 & 24 May 2002 ISBN 90-5584-048-3 Authors Jaap A. Ottjes, Hans
More informationTheo Notteboom ITMMA - University of Antwerp and Antwerp Maritime Academy
THE RELATIONSHIP BETWEEN SEAPORTS AND THE INTERMODAL HINTERLAND IN LIGHT OF GLOBAL SUPPLY CHAINS: EUROPEAN CHALLENGES Theo Notteboom ITMMA - University of Antwerp and Antwerp Maritime Academy Research
More informationNorth Adriatic vs. North Europe myths, facts and truth
Regional Conference Development of Sustainable Intermodal Transport Jakov Karmelić North Adriatic vs. North Europe myths, facts and truth Rijeka, 4th March 2014. The Vision of NAPA (North Adriatic Ports
More informationThe EU funding emphasises the importance of bayernhafen Regensburg as a logistics hub in Europe
Press release 2016 financial year: goods moved by inland waterway and rail 3.06 M t; container traffic 130,205 TEU The EU funding emphasises the importance of bayernhafen Regensburg as a logistics hub
More informationNicole Brouwer, Business Unit Manager Container Terminal Doesburg & Nieuw Amsterdam
Nicole Brouwer, Business Unit Manager Container Terminal Doesburg & Nieuw Amsterdam History The Rotra brand is stronger than ever Family owned company 4 generations of family ownership 860 employees More
More informationAutomated Container Handling
Automated Container Handling Control of Automated Container Terminals A Literature review on automated container handling equipment June 11, 2014 source: www.abb.com Student Student Number Supervisor J.
More informationYOUR EFFICIENT CONTAINER GATEWAY FOR EUROPE
YOUR EFFICIENT CONTAINER GATEWAY FOR EUROPE C O N TA I N E R TERMINAL Capability highlights 17.5 m alongside berth 3 berths, 1.200 meters total 7 STS cranes - 23+1 rows outreach On dock rail operations
More informationThe Future of Port Solutions. Building on a strong tradition
The Future of Port Solutions Building on a strong tradition Terex milestones in port business 1824 1960 1968 Launch of Straddle Carrier 1993 1995 China 2000 2009 1933 1966 1986 Launch of Lift Trucks Launch
More informationClimate change from a ports perspective
Climate change from a ports perspective Marc Eisma Port of Rotterdam Authority March 4-5, 2013 Workshop on Sea Ports and Climate Change Content Delta Programme: climate change on a national perspective
More informationDCT: Poland's Maritime Window on the World
DCT: Poland's Maritime Window on the World November 27th, 2013 Adam Żołnowski Chief Financial Officer Company Profile Ownership Structure DCT Gdansk is an infrastructure asset majority owned and managed
More informationContaining. the future
Containing the future Antwerp, the fastest route to Europe Of the 190 million tonnes handled at the Port of Antwerp in 2008, some 100 million tonnes was containerized cargo, representing 8.7 million TEU.
More informationBroadening our horizons
Broadening our horizons November 2009 Reaching new heights of excellence On many levels, the past years have been of paramount importance for Malta Freeport which witnessed the realisation of various investments
More informationBig Data and Logistics Views of a port authority. 05 April 2013 Groningen, Jan Egbertsen
Big Data and Logistics Views of a port authority 05 April 2013 Groningen, Jan Egbertsen Some questions to start with? How do you book a trip from Groningen to New York? How do you book a container from
More informationThe Ports of Flanders KEY FACTS & FIGURES
The Ports of Flanders KEY FACTS & FIGURES BERLIN LONDON The Ports of Flanders PORT OF PORT OF PORT OF PORT OF ROTTERDAM RUHR AREA 269 MILLION TONS GOODS TURNOVER NORDRHEIN WESTFALEN Antwerp 199mil. Ghent
More informationTowards truly multimodal EU corridors ERTICO- ITS EUROPE
Towards truly multimodal EU corridors ERTICO- ITS EUROPE Table of Contents The ERTICO Partnership Freight Transport and Logistics programme Connectivity for freight and Logistics Interfaces for an integrated
More informationSmall scale LNG developments from the perspective of an infrastructure player
Small scale LNG developments from the perspective of an infrastructure player The Hague, 22 April 2016 Jan van Esch Scherm_2 Gasunie, introduction Independent gas infrastructure company High pressure gas
More informationThe Next Mode of Transportation. Presented By: Ronald J. Silva CEO-Westar Transport
The Next Mode of Transportation Presented By: Ronald J. Silva CEO-Westar Transport - Short Sea Shipping is the diversion of domestic and international cargos that move by highway from major metropolitan
More informationSYRIA CRISIS BEIRUT PORT ASSESSMENT (LEBANON) (29 AUG 2013)
PORT OVERVIEW: Location: Country Province and District Town or City (Closest) Distance Port Name (km) Latitude Longitude Closest Airport Lebanon Beirut Beirut Port of Beirut, code: LBBEY 33 54' 18" N 35
More informationPORT OF SILLAMÄE, ESTONIA THE MOST EASTERN PORT OF THE EU
PORT OF SILLAMÄE, ESTONIA THE MOST EASTERN PORT OF THE EU LOCATION port location Global: 2060 km from Hamburg 2246 km from Rotterdam 2000 km from Bremerhaven 2424 km from Antwerp 2598 km from Le Havre
More informationSimulation and Logistics
Simulation and Logistics Rommert Dekker Professor of Operations Research Introduction Many Cases: Port, container stacking Elevator control Inventory control (optional) Conclusions 1 Logistics and transportation
More informationInland shipping in the Netherlands
Inland shipping in the Netherlands General overview and cases Paul van de Lande Amsterdam Consultants, The Netherlands Contents The position of inland shipping The container case The orange juice case
More informationSamskip Multimodal. Short Sea and Multimodal Business.
Samskip Multimodal Short Sea and Multimodal Business 1 Samskip Group Profile Samskip is a globally active company offering transport and related services by land, sea, rail, inland waterways and air. Dutch
More informationLOADING OF BULK LIMESTONE AT MUSANDAM ANCHORAGE
LOADING OF BULK LIMESTONE AT MUSANDAM ANCHORAGE NAVIGATION TO MUSANDAM ANCHORAGE The Bulk Carrier will approach the Musandam Peninsula while respecting the split navigation channels at the Strait of Hormuz.
More information10 th June 2010 Mr. Abdulla Bin Damithan
Role of Ports in Supply Chain 10 th June 2010 Mr. Abdulla Bin Damithan 1 Objectives Over a year, laid end to end, the boxes we handle would circle the world more than six times Role of Ports in Supply
More informationPort of Antwerp A Reliable Link in your Supply Chain
Port of Antwerp A Reliable Link in your Supply Chain 19 March 2013 Chris Hoornaert Port Ambassador Movie 2 Overview 1. Port of Antwerp in figures 2. A multifunctional port in the heart of Europe 3. Excellent
More informationJF (Bangladesh) Limited Topic: Project Cargo and/or Unique/Unusual Task
JF (Bangladesh) Limited Topic: Project Cargo and/or Unique/Unusual Task Presented by Sudatta Barua Lloyd s s Agency Department JF ( Bangladesh) Limited Finlay House Chittagong, Bangladesh at Lloyd s s
More informationMarine Tech SHIP OPERATIONS. Dr. Alok K. Verma Lean Institute - ODU
SHIP OPERATIONS 1 Module Description and Goals This module is intended to introduce participants to basic concepts in ship loading operations and ship stability. 2 CONTENTS Types of Ships 5 min Ship Organization
More informationSpace-Sharing Strategy for Building Dynamic Container Yard Storage Considering Uncertainty on Number of Incoming Containers
Jurnal Teknik Industri, Vol. 19, No. 2, December 2017, 67-74 ISSN 1411-2485 print / ISSN 2087-7439 online DOI: 10.9744/jti.19.2.67-74 Space-Sharing Strategy for Building Dynamic Container Yard Storage
More information