RFC 5 Annual Report 2015

Size: px
Start display at page:

Download "RFC 5 Annual Report 2015"

Transcription

1 RFC 5 Annual Report 2015 "The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained therein."

2 Table of Contents 1 Introduction RFC5 Corridor Governance Executive Board Mangement Board RFC 5 PMO Working Groups The Railway Undertaking Advisory Group (RAG) and Terminal Advisory Group (TAG) RFC 5 activities and offer Preparation for making the corridor operational on 10th November Elaboration of basic documents for RFC 5 ( CID Books) Presentation of Reserve Capacity Offer Preparation of PaPs offer for TT 2016/ IT tools (PCS; TIS and CIP) Train Performance Tools - KPIs Inauguration Event Cooperation with EU Institutions and Organisations RNE RFCs EC CNC Baltic - Adriatic

3 1. Introduction Regulation (EU) No 913/2010 of the European Parliament and of the Council of 22 September 2010 concerning a European rail network for competitive freight 1, further referred as the Regulation, provides for the implementation of corridors allowing freight trains to benefit from high quality routes, offering better services (in terms of punctuality and journey time) than at present. The principal guidelines specified by the Regulation focus on: establishing a Corridor One-Stop-Shop; closer cooperation and harmonization between Infrastructure Managers / Allocation Body and Member States both for the operational management of the infrastructure and for investments, in particular by putting in place a governance structure for each corridor; increased coordination between the network and terminals, providing the reliability of the infrastructure capacity allocated to international freight on these corridors; close cooperation with clients. Rail Freight Corridor Baltic Adriatic currently runs through 6 EU Member States: starting in the Baltic Sea ports of Świnoujście, Szczecin, Gdynia and Gdańsk in Poland going south to Czech Republic, Slovakia and Austria and ends in Adriatic Sea ports of Koper, Trieste, Venice and Ravenna respectively in Slovenia and Italy. RFC Baltic - Adriatic consists of: 4825 km of railway lines, 84 terminals, 8 sea ports. 1 Published in the Official Journal of the European Union on the 20 of October 2010 L 276/ page 22. 3

4 2. RFC5 Corridor Governance In 2015 the Organisation structure of corridor was as follows: 2.1 Executive Board The Executive Board is composed of representatives from the Ministries responsible for transport of Poland, Czech Republic, Slovakia, Austria, Slovenia and Italy. In 2015 Executive Board of RFC Baltic Adriatic consisted of representatives of 6 Member States. They were as follows: Boris Živec Ministry of Infrastructure - Slovenia; 4

5 Alessandro Violi Ministry of infrastructure and Transport - Italy; Reinhard Haller Austrian Ministry for Transport, Innovation and Technology Austria; Pavol Hartl Ministry of Transport, Construction and Regional Development Slovakia; Jan Ilik Ministy of Transport Czech Republic, Maciej Gładyga Ministry of Infrastructure and Construction Poland. The Executive Board has supervisory role and defines general goals for RFC 5 and framework of capacity allocation. In 2015 there were four meetings of the Executive Board. The general responsibility of the Executive Board is to implement the Regulation. There were a couple of areas of Executive Board activity in 2015, mainly: Adoption of Implementation Plan; Adoption of a Framework for Capacity Allocation for TT 2017; Inauguration and Launching event; Coordination with CNC; The Executive Board cooperated with the Management Board on preparing a common report for the European Commission on the experiences from the period of the implementation of 5

6 the Corridor. Even though RFC Baltic Adriatic was not required yet to present to the Commission the results of the Implementation Plan under Article 22 of the Regulation, the Boards wanted to share their experiences in implementing the Corridor since The Commission will take the content of this document into account while preparing a report for the Council and the European Parliament on the basis of art. 23 of the Regulation. Then, the Commission intends to prepare a possible revision of the Regulation when it comes to some aspects. The progresses realized by the Management Board in terms of developing the Implementation Plan has been monitored and the Implementation Plan has been adopted. The Executive Board adopted a Framework for Capacity Allocation for timetable The FCA is a common version for all other operational Rail Freight Corridors in the EU in order to streamline the processes of the Prearranged Paths construction and capacity allocation across the EU. In 2015 the Executive Board collaborated with the European Coordinator of the Core Network Corridor Baltic Adriatic and his staff. It is said that RFCs are to be a railway backbone of the CNCs, therefore investments on the Corridor are discussed by means of the RFCs-CNCs cooperation. 2.2 Management Board In 2015 Management Board of RFC 5 consisted of representatives of 7 different companies from 6 Member States. It consisted of representatives of the following companies: PKP Polskie Linie Kolejowe S.A. Edyta Jaszczuk Správa železniční dopravní cesty, státní organizace Anna Kodysová; Železnice Slovenskej republiky, ŽSR - Miroslav Matúšek; 6

7 ÖBB-Infrastruktur AG Diana Gasanova; RFI Rete Ferroviaria Italiana S.p.A. Stefano Castro; SŽ Infrastruktura d.o.o. Bojan Kekec, Javna agencija za železniški promet Republike Slovenije Benjamin Steinbacher Pušnjak In 2015 the Management Board met six times. The meetings were chaired by Mrs Diana Gasanova. The main activity of the Management Board was the establishment and making RFC5 operational on 10 November From the 1 st January 2016, Javna agencija za železniški promet Republike Slovenije does not participate in RFC5 activities due to transferring its task in this field to SŽ Infrastruktura d.o.o. 2.3 RFC 5 PMO RFC 5 Project Management Office is composed of Director and two Managers i.e. Railway Infrastructure Manager and C-OSS Manager. At the same time, within the PMO, the Corridor One Stop Shop (C-OSS) as dedicated model has been appointed. They were: 7

8 Jarosław Majchrzak PMO Director Małgorzata Boczek-Kwaczyńska Railway Infrastructure Manager Stefano Quaranta - C-OSS Manager Contract for functioning of C-OSS was signed by all RFC5 IMs. C-OSS started its activities on 10th November 2015 and is the single contact point for the customers wishing to reserve the corridor s capacity. Applicants are able to request PaPs and reserve capacity via PCS system. 2.4 Working Groups In 2015 the Working Groups met regularly, working on creation of organizational conditions to make corridor operational and contributed to the Implementation Plan. The Working groups experts took part in preparation of the most important documents necessary for starting up the RFC 5 : - Transport Market Study - the most essential document describing the commercial role of the RFC5 ; - Corridor Information Document the source of technical and commercial information about the RFC5 and its offer ; - Elaboration of essential document necessary for functioning of RFC5 (Statue, Internal Rules, C-OSS Contract. 2.5 The Railway Undertaking Advisory Group (RAG) and Terminal Advisory Group (TAG) Both Advisory Groups: Railway Undertaking (RAG) and Terminal Owners and Managers (TAG), established in 2013 are advisory group for RFC 5. 8

9 In 2015 there was one meeting of RAG and TAG - on 10 th November 2015, during Inauguration Event of RFC 5, when the following essential issues were discussed: 1. Limited capacity of some infrastructure parameters. 2. Not discriminatory access to information/data provided by IMs. 3. Regular update of the TAG and RAG Advisory Group Members on RFC5 Website. 4. Flexible access to Path Coordination System (PCS ). 5. The need of the railway infrastructure last mile upgrade. 6. TAG and RAG Advisory Group Members internal communication. 7. To increase number of TAG and RAG Advisory Group Members. Common wish of TAG and RAG Advisory Group Members is to achieve better performance and harmonization of terms. 9

10 3. RFC 5 activities and offer 3.1 Preparation to make RFC 5 operational on 10th November 2015 In 2015 activities of the Management Board focused first of all on preparing the Corridor to go live on 10 th November and preparing the first offer Reserve Capacity for Timetable Among other issues this means that the Corridor Information Document for TT 2016 was elaborated and so that from the 10 November 2015 the Corridor One-Stop Shop was operational. Our aim is to boost rail freight by providing a seamless and good quality path offer along the Corridor as well as to raise the attractiveness and efficiency of rail freight compared to other modes of transport. Together with eight other Rail Freight Corridors, RFC Baltic - Adriatic is part of the European rail freight network for competitive freight created on the basis of the Regulation. The following map shows the Baltic - Adriatic at the start on November 10 th

11 The Management Board was also involved, inter alia, in: developing position towards the possible revision of the Regulation 913, establishing the Customer Information Platform, delivering the Final Report for TEN-T Funding Action 2011-EU S, the application for CEF Funding, cooperation between RFCs and between RFCs and CNCs, elaboration of the EEIG Statutes. Together with the Executive Board, the Management Board was also involved in the elaboration of the new Framework for Capacity Allocation. During the year Working Groups continued providing inputs to the Corridor activities e.g. to elaborate the Corridor Information Document. In July 2015, under the decision of European Commission, RFC5 received a grant from the Connecting Europe Facility Fund. On the Grant Agreement was signed for the action entitled "Studies and activities regarding enhancement of Baltic-Adriatic Rail Freight Corridor 5 offer", action number 2014-EU-TM-0335-S. The action is provided to last until Elaboration of basic documents for RFC 5 ( CID Books) In 2015 Implementation Plan of the RFC 5 was elaborated by PMO staff with great support of Working Groups. On 13 April 2015 the Implementation Plan was sent for consultation to Ministries, IMs and RAG and TAG members. During the process of consultation 128 remarks were received. Majority of remarks and suggestions have been incorporated in the final version of the Implementation Plan. Some of remarks will be taken into consideration during next Transport Market Study updating process. The final version of Implementation Plan approved by the Executive Board has been placed on RFC5 web site on 10 th November 2015 as the Corridor Information Document Book 5 in the file CID. During 2015 the other 4 Books, creating Corridor Information Documents have been elaborated: Book 1 Generalities Book 2 Network Statement Excerpts Book 3 Terminal Description Book 4 Procedures for Capacity and Traffic Management 11

12 On 10 th November 2015 all CID Books were uploaded on RFC 5 website. Additionally Planned Temporary Capacity Restrictions for 2016 were placed on RFC5 website, when the RFC 5 started to be operational. 3.3 Presentation of Reserve Capacity Offer On November 6th, 2015 the Corridor published its first capacity offer catalogue according to Regulation (EU) 913/2010, displaying reserve capacity (RC) for timetable The RC is provided in form of PaPs that are kept available during the running timetable period for adhoc market needs, as it can be requested by Applicants up to 30 days before the train run. Being the Corridor just launched, the IMs involved in the RFC developed brand-new PaPs, each made by several sections in order to grant Applicants the highest flexibility with their capacity request. The RC offer consists of 104 PaPs sections. The offer has been developed by WG Capacity/TT/COSS under the lead of the C-OSS taking into account the TMS, the historical traffic flows along the corridor, the inputs from RAG/TAG. The RC offer has been published both in the PCS system ( and on the Corridor website by means of a Catalogue downloadable as PDF-file. In line with Art. 14 of the Regulation these pre-arranged path products are dedicated to the corridor and protected from cancellation risk in the last 60 days before the running day. 12

13 3.4 Preparation of PaPs offer for TT 2016/2017 At the end of December 2015, IMs members of the RFC delivered to C-OSS the first Corridor PaPs offer for the annual timetable 2017 to be approved by MB and published in January The offer has been developed by WG Capacity/TT/COSS under the lead of the C-OSS taking into account the TMS, the historical traffic flows along the corridor, the inputs from RAG/TAG. A total of 36 daily PaPs have been provided by IMs to the C-OSS. To allow the highest degree of flexibility: - every PaP is made by several geographical sections, for a total of 396 PaPs sections; - flex PaPs have been provided by PLK, SZDC, ZSR, SZ-Infra and RFI. # PaP Sections Fix Flex Concerning overlapping sections with Mediterranean Corridor, 4 PaPs sections have been developed by SZ-Infra with a common approach. To manage the dual governance, the General Assembly and Manager Board of the two Corridors have agreed that the common sections will be published in PCS and allocated by the COSS of Mediterranean Corridor. The Baltic-Adriatic Corridor will publish those sections for information only in the Catalogue made available on the website as a PDF file. 13

14 3.5 IT Tools (PCS; TIS; and CIP) PCS Path Coordination System (PCS) is a web-based application provided by RNE for the coordination of the international path requests. It is the only tool that Applicants shall use to apply for the capacity offered by the RFC. TIS The Train Information System (TIS) is a web-based application provided by RNE that supports international train management by delivering real-time train data concerning punctuality of international trains. The relevant data is obtained directly from the Infrastructure Managers systems. 14

15 CIP Customer Information Platform (CIP) - Intention Letter was signed by RFC 5. Basing on the Management Board decision RFC 5 joined CIP platform and started to create its geographical and information part for RFC 5. In the second half of 2015 Infrastructure Managers experts supplied specification of nodes and segments and topology data of their sections of RFC 5. The data have been uploaded into working area of CIP platform. In close cooperation with RNE the data are being adjusted and also a process of collection of information about terminals and properties has started. First of all a common approach between corridors needed to be agreed. CIP in scope of RFC5 data system will be available for customers in Train Performance Tools - KPIs By means of a reporting tool (Oracle Business Inteligence) that queries the TIS database, RNE can provide the RFC a set of reports useful for monitoring punctuality of international freight trains along the Corridor. The WG Performance Management and Operations (PM&O) was defining the monthly reports to require and the relative train lists along with the monitoring criteria. The MB has approved under proposal of WG PM&O - 4 KPIs that shall be measured by the RFC in order to assess the operational performance of trains running over the Corridor. Namely: - Punctuality at destination - Punctuality at intermediate points as well as at origin - Undocumented delays - Total amount of minutes per delay reason Furthermore RNE WG KPIs has added a further operational KPI for internal use: - Number of trains MB set a punctuality target at destination of 70%. 15

16 3.7 Inauguration Event Inuaguration Event of RFC Baltic Adriatic took place in Warsaw on 10th of November Therepresenative of RFC Baltic Adriatic: Member States, Infrastructure Managers, Railway Uderatkings and Terminal owner took part in this meeting. Occasional speeches was given by PKP Polskie Linie Kolejowe S.A., European Commision, Eecutive Board, Management Board and RAG Spokesman. After official part all guests were invited to listen to jazz concert. 16

17 4. Cooperation with EU Institutions and Organisations 4.1 RNE In 2015 the cooperation of all RFCs with RailNetEurope in a form of recurring meetings of RNE/RFC High Level Group was continued. As in previous years, this effort was aimed to develop common procedures and IT tools in order to bring closer the creation of a genuine single European railway market. A cooperation between RFCs and RNE is oriented to create an offer of a network of RFCs (see map below). At the request of RFCs RNE has developed several guidelines and projects aiming at harmonization among RFCs. At the end of 2015 also a joint motivation letter of RNE, RFCs and UIRR (International Union for Road-Rail Combined Transport) concerning the Train Information System (TIS) data exchange was signed and distributed. With this letter its signatories wanted to encourage railway undertakings to allow the sharing of information gathered in TIS with terminals. 17

18 In 2015 there were four RNE/RFC High Level Meetings organized (attended by RNE representatives, chairpersons of Management Board and managing directors of all RFCs). 4.2 RFCs The meetings of RFC Talks (platform for cooperation of all Rail Freight Corridors) are organized in the same days as the RNE/RFC High Level Meetings. In 2015 this forum discussed among others: review of the Regulation, questions concerning CEF applications, 2015 User Satisfaction Survey, reports required from ExBo on the basis of the Regulation, cross-border interoperability challenges, the draft of Framework for Capacity Allocation, traffic management issues (which functions if any to be transferred to the RFCs), opinions about definition of a corridor train, procedure to monitor PaPs usage after the publication of a TT etc., development of CIP. The RFC Talks served also to exchange experiences e.g. on harmonization among the different C- OSSs for cross corridor dossiers (harmonization in CID Book 4 regarding overlapping sections with a discussion on usage of Network PaP), on Flex PaPs and differences of definition of the concept, on time limit for reserving RC. An important part of every RFC Talks meeting is taken by discussion held to reach a common position in relation with other bodies: the EC, CNCs (there was a discussion on cooperation model between CNCs and RFCs), Independent Regulators' Group Rail, ECCO. On 1 July for the first time a special strategic RFC Talks meeting was held in Stockholm. Participants discussed how to meet market demand and what tools should be used to offer awaited flexibility for applicants. In the second part of the meeting representatives of RFCs planned their work on a paper concerning the revision of the Regulation. 4.3 European Commission The main platform for the EC to communicate with RFCs is the SERAC Working Group on Rail Freight Corridors. In 2015 the meetings of the WG were held on 8 May and 10 December. The discussions focused on: the Implementing act of the EC on framework agreements, publication of the revised Handbook, the evaluation and revision of the Regulation, 18

19 the EC policy document on reduction of railway noise, short distance interoperability & language requirement, RFCs CNCs coordination model, report to the EC: structure and timeline, feedback on the allocation process for TT 2016 and use of reserve capacity for TT 2015 (in particular application of the Network PaP rule and flex PaPs), ERTMS & operational rules, results of the User Satisfaction Survey. During the first meeting of the Corridor Group in 2015 on 26 January the discussion focused on the ERTMS breakthrough initiative proposed by the European Commission. The second meeting on 23 March was used by RFCs to draw the Commission attention to RUs problems resulting from EU law (safety certificates and language requirements). The third meeting took place during TEN-T Days and in October it was announced that the Corridor Group will not continue its activities. The group leader Mr Karel Vinck noticed that a comprehensive monitoring of ERTMS deployment shall be carried out by the Core Network Corridors when the Rail Freight Corridor issues can be discussed in the meetings of the SERAC Working Group on RFCs. In 2015 RFC North Sea-Baltic took active part in two promotional events organized by the European Commission: 2015 TEN-T Days and the 2nd EU Rail Freight Day. The TEN-T Days were arranged by the EC and Latvia which held the presidency of the EU Council. In 2015 for the first time the EU Rail Freight Day was organized by the EU and RNE together. 4.4 CNC Baltic Adriatic The representatives of Baltic Adriatic RFC participated in the Forum Meetings of Core Network Corridor Baltic - Adriatic under the lead of the European Coordinator Mr. Kurt Bodewig. There were two Baltic - Adriatic Core Network Corridor Forum in During the last meeting on December 11th the forum was informed about the state of development of this Core Network Corridor and RFC Baltic - Adriatic. 19

Corridor Information Document Book 1 Generalities

Corridor Information Document Book 1 Generalities Corridor Information Document Book 1 Generalities Content 1 Introduction... 3 2 Structure of the Corridor Information Document... 4 3 Corridor Description... 5 4 Corridor Organisation... 8 5 Contacts...

More information

Chapter changed. V1 all layout X

Chapter changed. V1 all layout X RFC North Sea Baltic Corridor Information Document Book 1 Generalities Timetable 2019 Version control Version Chapter changed Changes compared to the previously published version X marks which part in

More information

Rail Freight Corridor North Sea - Baltic. Corridor Information Document. Book 1

Rail Freight Corridor North Sea - Baltic. Corridor Information Document. Book 1 Rail Freight Corridor North Sea - Baltic Corridor Information Document Book 1 Generalities Timetable 2018 Version Control Version number Chapter changed Changes 05.01.2017 Final version Version for publication

More information

CID Book 1. Generalities

CID Book 1. Generalities CID Book 1 Generalities Harmonised text proposal 2019 timetable year Version control Version Chapter changed Changes compared to the previously published version X marks which part in the chapter concerned

More information

CID Book 1. Generalities

CID Book 1. Generalities CID Book 1 Generalities Harmonised text proposal applicable as of timetable year 2020 Version control Version Chapter changed Changes compared to the previously published version X marks which part in

More information

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors Boosting International Rail Freight Sector Statement on Rail Freight Corridors Brussels, 20 May 2016 1 Sector Statement on Rail Freight Corridors: Boosting International Rail Freight 20 May 2016 - final

More information

RAIL FREIGHT CORRIDOR 9 CZECH-SLOVAK RAIL FREIGHT CORRIDOR CORRIDOR INFORMATION DOCUMENT BOOK 2 NETWORK STATEMENT EXCERPTS TIMETABLE 2019

RAIL FREIGHT CORRIDOR 9 CZECH-SLOVAK RAIL FREIGHT CORRIDOR CORRIDOR INFORMATION DOCUMENT BOOK 2 NETWORK STATEMENT EXCERPTS TIMETABLE 2019 RAIL FREIGHT CORRIDOR 9 CZECH-SLOVAK RAIL FREIGHT CORRIDOR CORRIDOR INFORMATION DOCUMENT BOOK 2 NETWORK STATEMENT EXCERPTS TIMETABLE 2019 Version control Version Chapter changed Changes compared to the

More information

RAIL FREIGHT CORRIDOR 9 CZECH-SLOVAK RAIL FREIGHT CORRIDOR

RAIL FREIGHT CORRIDOR 9 CZECH-SLOVAK RAIL FREIGHT CORRIDOR RAIL FREIGHT CORRIDOR 9 CZECH-SLOVAK RAIL FREIGHT CORRIDOR CORRIDOR INFORMATION DOCUMENT BOOK 2 NETWORK STATEMENT EXCERPTS TIMETABLE 2020 Version control Version Chapter changed Changes compared to the

More information

Europaudvalget 2018 KOM (2018) 0189 Offentligt

Europaudvalget 2018 KOM (2018) 0189 Offentligt Europaudvalget 2018 KOM (2018) 0189 Offentligt EUROPEAN COMMISSION Brussels, 16.4.2018 SWD(2018) 101 final COMMISSION STAFF WORKING DOCUMENT Accompanying the document REPORT FROM THE COMMISSION TO THE

More information

RNE Process Handbook for International Path Allocation

RNE Process Handbook for International Path Allocation RNE Process Handbook for Infrastructure Managers RailNetEurope Oelzeltgasse 3/9 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu www.rne.eu Content 1 Introduction and scope

More information

Corridor Information Document

Corridor Information Document Corridor Information Document Book 4 Procedures for Capacity and Traffic Management for timetable 2017 Table of Contents TABLE OF CONTENTS... 2 1. INTRODUCTION... 4 2. CORRIDOR ONE STOP SHOP... 5 3. CAPACITY

More information

Action Plan RFC North Sea - Mediterranean

Action Plan RFC North Sea - Mediterranean Action Plan RFC North Sea - Mediterranean G Confais Morieux 16 April 2018 Agenda 1. Reminder The 10 priorities of the Sector 2. Action Plan RFC North Sea - Med 2/20 2/23 Opening RFC Strategy Sessions -

More information

RFC North Sea Med 2016 customer satisfaction survey results & action plan

RFC North Sea Med 2016 customer satisfaction survey results & action plan RFC North Sea Med 2016 customer satisfaction survey results & action plan Matthieu Maeselle RAG Meeting, Paris, 25th of January 2017 Survey design Actions mentioned in this presentation are referring to

More information

MEDITERRANEAN CORRIDOR

MEDITERRANEAN CORRIDOR MEDITERRANEAN CORRIDOR Annual Report 16 TABLE OF CONTENTS I Glossary 1 I INTRODUCTION 2 I CORRIDOR MAIN CHARACTERISTICS 3 I DOCUMENTS 4 I CORRIDOR ACTIVITIES 2016 5 I ERTMS 6 I ADVISORY GROUPS 7 I QUALITY

More information

Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018

Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018 Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018 RFC North Sea Med is co-financed by the European Union's CEF. The sole responsibility

More information

Vienna Declaration Progress on boosting rail freight

Vienna Declaration Progress on boosting rail freight Vienna Declaration Progress on boosting rail freight Statement of the Austrian Presidency as follow-up of the Ministerial Rotterdam Declaration 6 December 2018 Seizing the opportunity of the Presidency

More information

Rail freight corridors in Central Europe

Rail freight corridors in Central Europe TER Workshop Rail freight corridors in Central Europe Radek Cech, Ph.D. Head of infrastructure conceptual planning unit Scheme of the railway sector in CZ Czech Republic shareholder Ministry of Transport

More information

Price for the Allocation of Railway Infrastructure Capacity as a Tool for the Improvement of Train Transport Planning

Price for the Allocation of Railway Infrastructure Capacity as a Tool for the Improvement of Train Transport Planning Price for the Allocation of Railway Infrastructure Capacity as a Tool for the Improvement of Train Transport Planning Jaromír Široký 1,* 1 University of Pardubice, Faculty of Transport Engineering, 532

More information

International Corridor Rhine-Alpine Conference

International Corridor Rhine-Alpine Conference A cooperation between Supported by International Corridor Rhine-Alpine Conference 2014 2014 18. September 2014 Guus de Mol PMO International Corridor Rhine-Alpine Conference (Genoa, 18/09/2014) Chairman

More information

Rail Freight Corridor 3 Stockholm Malmö Copenhagen Hamburg Innsbruck Verona Palermo

Rail Freight Corridor 3 Stockholm Malmö Copenhagen Hamburg Innsbruck Verona Palermo Rail Freight Corridor 3 Stockholm Malmö Copenhagen Hamburg Innsbruck Verona Palermo State of play Kick-Off SWIFTLY Green 28 th November 2013 Gothenburg RFC 3 is a component of a broader European Corridor

More information

Guidelines concerning Non-RU Applicants. Version 1.0

Guidelines concerning Non-RU Applicants. Version 1.0 Guidelines concerning Non-RU Applicants Version 1.0 Version control VERSION AUTHOR DATE CHANGES 0.1 RNE Project Group 2014-11-12 Creation 0.2 RNE Project Group 2015-01-20 Addition of Section 8 0.3 RNE

More information

Update on Corridor KPI s and Train Performance Management

Update on Corridor KPI s and Train Performance Management Update on Corridor KPI s and Train Performance Management RAG September 2017 Content 1. Update on Corridor KPI s 2. Update on Train Performance Management 2/23 2/20 Ecco KPI 1. CAPACITY MANAGEMENT 1.1

More information

RFC North Sea Med 2017 Customer Satisfaction Survey Results

RFC North Sea Med 2017 Customer Satisfaction Survey Results RFC North Sea Med 2017 Customer Satisfaction Survey Results Matthieu Maeselle RAG meeting Basel, 31 of January 2018 Survey design Survey organised by RNE and supplier MarketMind Common for all 8 participating

More information

4.3.2 DG Mobility and Transport Organization for Cooperation between Railways (OSJD) Activities planned for the future

4.3.2 DG Mobility and Transport Organization for Cooperation between Railways (OSJD) Activities planned for the future Table of Contents List of Abbreviations... 4 Foreword... 5 Introduction... 6 1. Governance... 7 1.1 Executive Board... 7 1.1.1 Extension and change of routing of RFC North Sea - Baltic... 8 1.1.2 Ministerial

More information

Rail Freight Corridor North Sea - Baltic Corridor Information Document. Procedures for Capacity and Traffic Management. Book IV

Rail Freight Corridor North Sea - Baltic Corridor Information Document. Procedures for Capacity and Traffic Management. Book IV Rail Freight Corridor North Sea - Baltic Corridor Information Document Book IV Procedures for Capacity and Traffic Management valid for process of timetable 2017, starting in January 2016, ending in December

More information

TM P Report of the project, including Guidelines for the cooperation and communication between Traffic control centres

TM P Report of the project, including Guidelines for the cooperation and communication between Traffic control centres TM P1 2014 Report of the project, including Guidelines for the cooperation and communication between Traffic control centres RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax:

More information

Proposal for RFC Network Cost-Benefit Analysis. Czech-Slovak Corridor Management Board SŽDC (Praha) / ŽSR (Bratislava), November 2017

Proposal for RFC Network Cost-Benefit Analysis. Czech-Slovak Corridor Management Board SŽDC (Praha) / ŽSR (Bratislava), November 2017 Proposal for RFC Network Cost-Benefit Analysis Czech-Slovak Corridor Management Board SŽDC (Praha) / ŽSR (Bratislava), November 2017 Czech-Slovak Corridor Executive Board Czech Republic / Slovakia, November

More information

Redesign of the International Timetabling Process (TTR) Project results

Redesign of the International Timetabling Process (TTR) Project results Redesign of the International Timetabling Process (TTR) Project results (Version 0.6) RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu www.rne.eu

More information

Corridor Information Document Common Texts and Structure Version 10 6 December 2017

Corridor Information Document Common Texts and Structure Version 10 6 December 2017 and Structure - Version 10 Corridor Information Document Common Texts and Structure Version 10 6 December RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90

More information

Performance of the corridor

Performance of the corridor Performance of the corridor RAG 27 May 2015 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Total Corridor Traffic KPI 02: Ton KMs KPI 03: Punctuality OM 01: Cross

More information

TimeTableRedesign Pilot Brenner

TimeTableRedesign Pilot Brenner Pilot Information Document TimeTableRedesign Pilot Brenner (on RFC-Routing ScanMed) Report for Phase 1 Preparations for Phase 2 DRAFT - Version V001 Frankfurt, Vienna, Roma 19-12-2018 1 P a g e Table of

More information

User Satisfaction Survey 2018 Report Summary

User Satisfaction Survey 2018 Report Summary User Satisfaction Survey 2018 Report Summary Czech-Slovak Corridor Management Board Praha/Bratislava, October 18 th 2018 1 Czech-Slovak Corridor Prague Horní Lideč / Ostrava Žilina Košice Čierna nad Tisou

More information

YEARLY ACTIVITY AND PERFORMANCE REPORT 2017

YEARLY ACTIVITY AND PERFORMANCE REPORT 2017 YEARLY ACTIVITY AND PERFORMANCE REPORT 2017 Table of Contents Foreword by the Chairman... 3 The Driving FORCE in our Mission... 4 1. Introduction... 5 1.1 Who are we?... 5 1.2 Special characteristics of

More information

***I POSITION OF THE EUROPEAN PARLIAMENT

***I POSITION OF THE EUROPEAN PARLIAMENT EUROPEAN PARLIAMENT 2004 2009 Consolidated legislative document 23.4.2009 EP-PE_TC1-COD(2008)0247 ***I POSITION OF THE EUROPEAN PARLIAMENT adopted at first reading on 23 April 2009 with a view to the adoption

More information

Mediterranean Corridor - RFC 6 connections to OSJD corridors from China Odessa, 2 June 2017

Mediterranean Corridor - RFC 6 connections to OSJD corridors from China Odessa, 2 June 2017 Mediterranean Corridor - RFC 6 connections to OSJD corridors from China Odessa, 2 June 2017 EU Regulation 913/2010 Regulation concerning the European Rail Network for Competitive Freight (913/2010) Regulation

More information

Scandinavian Mediterranean Rail Freight Corridor

Scandinavian Mediterranean Rail Freight Corridor Scandinavian Mediterranean Rail Freight Corridor What are we talking about? 26.06.2017 ScanMed RFC a Rail Freight Corridor Our product: Coordinated Capacity Our medium-term objectives: Reliability and

More information

Update 1st Semester 2018 easier, faster, safer

Update 1st Semester 2018 easier, faster, safer Annual Performance Report Update 1st Semester 2018 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Traffic Volume (Total) KPI 02: Corridor Punctuality OM 01: Traffic

More information

European Rail Infrastructure Managers Handbook for International Contingency Management

European Rail Infrastructure Managers Handbook for International Contingency Management European Rail Infrastructure Managers Handbook for International RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu www.rne.eu Version 1.5, 23.03.2018

More information

Abstract This study represents the technical basis for the first and second update of the Baltic-Adriatic corridor work plan by the European

Abstract This study represents the technical basis for the first and second update of the Baltic-Adriatic corridor work plan by the European Abstract This study represents the technical basis for the first and second update of the Baltic-Adriatic corridor work plan by the European Coordinator, Prof. Kurt Bodewig, together with Poland, Czech

More information

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member

More information

Guidelines for Coordination / Publication of Planned Temporary Capacity Restrictions for the European Railway Network Version 2.00

Guidelines for Coordination / Publication of Planned Temporary Capacity Restrictions for the European Railway Network Version 2.00 Guidelines for Coordination / Publication of Planned Temporary Capacity Restrictions for the European Railway Network Version 2.00 RailNetEurope Oelzeltgasse 3/9 AT-1030 Vienna Phone: +43 1 907 62 72 00

More information

GENERAL INFORMATION FOR TIMETABLE 2019 C-OSS NEWSLETTER. 23 January

GENERAL INFORMATION FOR TIMETABLE 2019 C-OSS NEWSLETTER. 23 January GENERAL INFORMATION FOR TIMETABLE 2019 C-OSS NEWSLETTER 23 January 2018 www.rfc7.com coss@rfc7.com Content November 2018 Extension of the Corridor 3 General basic information 4 Corridor Information Document

More information

Kopitarjeva 5, 2000 Maribor (Slovenia) Sex Male Date of birth 19/9/1957 Nationality Slovenian

Kopitarjeva 5, 2000 Maribor (Slovenia) Sex Male Date of birth 19/9/1957 Nationality Slovenian Curriculum vitae PERSONAL INFORMATION Zivec Boris Kopitarjeva 5, 2000 Maribor (Slovenia) + 386 2 234 14 57 + 386 51 687 385 boris.zivec@azp.si Sex Male Date of birth 19/9/1957 Nationality Slovenian WORK

More information

RAIL DELIVERY GROUP Rail Freight Corridors Consultation Submission Laura Wright, Head of European Policy RDG

RAIL DELIVERY GROUP Rail Freight Corridors Consultation Submission Laura Wright, Head of European Policy RDG RAIL DELIVERY GROUP Rail Freight Corridors Consultation Submission Laura Wright, Head of European Policy RDG 1. Introduction European Rail Freight Corridors (RFCs) were established under Regulation 913/2010

More information

CORRIDOR A/1 ROTTERDAM - GENOA

CORRIDOR A/1 ROTTERDAM - GENOA CORRIDOR A/1 ROTTERDAM - GENOA Annual Progress Report 2013 (Final Version) www.corridor1.eu Table of Contents 0 Executive Summary... 5 0.1 Management Dashboard... 7 0.2 Management Summary... 9 0.3 Work

More information

Produkter för och kundkrav på kapacitet i de europeiska järnvägskorridorerna

Produkter för och kundkrav på kapacitet i de europeiska järnvägskorridorerna Produkter för och kundkrav på kapacitet i de europeiska järnvägskorridorerna KAJT Dagarna Borlänge, 26+27 april 2016 Dr. Gerhard Troche Senior Expert Rail Freight and European Issues / EU Rail Freight

More information

Atelier : Découvrir l offre de service internationale

Atelier : Découvrir l offre de service internationale Atelier : Découvrir l offre de service internationale 26 juin 2014 L EQUIPE DE l ATELIER Harald REISINGER CIO RailNetEurope Michel DUPUIS Directeur adjoint RailNetEurope Philippe GALLEY Chef du service

More information

The Baltic-Adriatic Corridor. Stefan Ebner Division for Transport and Logistics, director dep. Austrian Federal Economic Chamber

The Baltic-Adriatic Corridor. Stefan Ebner Division for Transport and Logistics, director dep. Austrian Federal Economic Chamber The Baltic-Adriatic Corridor Stefan Ebner Division for Transport and Logistics, director dep. Austrian Federal Economic Chamber 14 November 2016 Austrian Transport Sector - Performance Passenger transport:

More information

Trans-European Transport Network

Trans-European Transport Network Trans-European Transport Network Republic of Slovenia Ministry of Transport Ljubljana, October 22 nd 2010 THE NORTH-ADRIATIC MULTIPORT February 6 th 2009 - Letter of Intent April 17 th 2009 Memorandum

More information

EasyWay Project An overview

EasyWay Project An overview EasyWay Project An overview Andreas Arnaoutis 26-06-09, Thessaloniki www.easyway-its.eu EasyWay : from systems to services 2 Background EasyWay follows on from the success of the TEMPO programme (MIP I),

More information

C-Roads Platform Terms of Reference

C-Roads Platform Terms of Reference C-Roads Platform Terms of Reference Dissemination level: C-Roads Platform internal Author: AustriaTech Status: Final Index 1 Purpose... 3 2 Governance Structure... 4 3 C-Roads Steering... 6 3.1 Tasks and

More information

ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT. Brussels. August 2008

ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT. Brussels. August 2008 ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT Brussels August 2008 This report only represents the opinion of the European coordinator and does not prejudge the official position of the

More information

C-Roads Platform Terms of Reference

C-Roads Platform Terms of Reference C-Roads Platform Terms of Reference Dissemination level: C-Roads Platform internal Author: AustriaTech Status: Final C-Roads Platform Coordinator AustriaTech www.austriatech.at Index 1 Purpose... 3 2 Governance

More information

The Baltic-Adriatic Corridor (BAC)

The Baltic-Adriatic Corridor (BAC) The Baltic-Adriatic Corridor (BAC) Alliance of 14 regions to support the consequent and immediate realization of the Baltic-Adriatic Railway Corridor, Gdansk/Gdynia Warszawa Brno Wien / Bratislava Venezia

More information

WELCOME TO THE ERFA STRATEGY DAY

WELCOME TO THE ERFA STRATEGY DAY WELCOME TO THE ERFA STRATEGY DAY Brussels, 21st November 2018 www.erfarail.eu ERFA main message: WE WANT TO CREATE THE RIGHT CONDITIONS TO BOOST RAIL GROWTH WE NEED AN ATTRACTIVE ENVIRONMENT FOR RAIL

More information

Rail Freight Corridor North Sea Baltic (RFC NS-B)

Rail Freight Corridor North Sea Baltic (RFC NS-B) Annex No. 1 to the Tender Rules TERMS OF REFERENCE TRANSPORT MARKET STUDY Rail Freight Corridor North Sea Baltic (RFC NS-B) TABLE OF CONTENTS Glossary of abbreviations 1. General overview 1.1. Introduction

More information

Potential of regional railway cooperation and infrastructure investment View of Slovenian Railways

Potential of regional railway cooperation and infrastructure investment View of Slovenian Railways Potential of regional railway cooperation and infrastructure investment View of Slovenian Railways Dr. Peter Verlič Transport & Logistics Conference 2018 Brussels, 22 March 2018 1 Slovenian Railways At

More information

TAF/TAP workshop Brussels, September 2017

TAF/TAP workshop Brussels, September 2017 TAF/TAP workshop Brussels, September 2017 1 TAF TSI Business Process & Path Coordination System 2 TAF TSI Functions Grouped Joint IM-RU Functions Reference Files Common Interface Short Term Path Request

More information

Gateway to European Rail Infrastructure. UIC ebusiness Conference. October 12 th 2006

Gateway to European Rail Infrastructure. UIC ebusiness Conference. October 12 th 2006 Gateway to European Rail Infrastructure UIC ebusiness Conference October 12 th 2006 1 The Association RailNetEurope is an Association of European Infrastructure Managers to promote international railway

More information

Summary Report. 1st meeting of the Single European Railway Area Committee (SERAC) Brussels,

Summary Report. 1st meeting of the Single European Railway Area Committee (SERAC) Brussels, EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Directorate B - European mobility network Summary Report 1st meeting of the Single European Railway Area Committee (SERAC) Brussels, 31.1.2013

More information

North Adriatic Intelligent Transport System Technical seminar

North Adriatic Intelligent Transport System Technical seminar TEN-T Italian Transport Programme North Adriatic Intelligent Transport System Technical seminar Friday, June 24th 2011 Venice, Santa Marta, Spazio Porto Italian Ministry of Infrastructures and Transport

More information

Gateway to European Rail Infrastructure. Klicken Sie, um das Format des Untertitel-Masters zu. UIRR Conference Brussels June 11 th, 2009

Gateway to European Rail Infrastructure. Klicken Sie, um das Format des Untertitel-Masters zu. UIRR Conference Brussels June 11 th, 2009 Gateway to European Rail Infrastructure Klicken Sie, um das Format des Untertitel-Masters zu bearbeiten. UIRR Conference Brussels June 11 th, 2009 October 200513.05.2003 RailNetEuropeDB Netz AG, NM (EB)

More information

ANNEX Removing bottlenecks and bridging missing links; Ensuring sustainable and efficient transport in the long run;

ANNEX Removing bottlenecks and bridging missing links; Ensuring sustainable and efficient transport in the long run; ANNEX 1. BUDGET 1.1. Budget heading 06020101 - Removing bottlenecks and bridging missing links; 06020102 - Ensuring sustainable and efficient transport in the long run; 06020103 - Optimising the integration

More information

Network Statement NETWORK STATEMENT. Annex A.1 Glossary. 1. Definitions. Applicant (article 3, 11 of the Rail Code)

Network Statement NETWORK STATEMENT. Annex A.1 Glossary. 1. Definitions. Applicant (article 3, 11 of the Rail Code) NETWORK STATEMENT Annex A.1 Glossary 1. Definitions Applicant (article 3, 11 of the Rail Code) Area Asset Management -Infrabel Area Traffic Management & Services - Infrabel Auxiliary company of a railway

More information

Challenges and solutions for transport in the Danube region

Challenges and solutions for transport in the Danube region Challenges and solutions for transport in the Danube region Business models and solutions for the Adriatic Danube multimodal platform Ljubljana, November 2012 Rail transport Does it matter? CNT Modal split

More information

Hit Rail: Support to Interoperability

Hit Rail: Support to Interoperability Hit Rail: Support to Interoperability 6 th Regional 12 th - 13 th September 2017 Urząd Transportu Kolejowego (UTK) Aleje Jerozolimskie 134, 02-305 Warsaw Eurocentrum Office Complex Ugo Dell Arciprete Commercial

More information

Capacity Allocation. Railway Advisory Group October 1, 2014 Rotterdam. Thomas Vanbeveren

Capacity Allocation. Railway Advisory Group October 1, 2014 Rotterdam. Thomas Vanbeveren Capacity Allocation Railway Advisory Group October 1, 2014 Rotterdam Thomas Vanbeveren Agenda 1. Results 2015 timetable allocation 2. Forecast 2016 timetable PaP supply 3. Evolution of priority rule for

More information

Rail Interoperability

Rail Interoperability Rail Interoperability Gerhard Troche DG MOVE B2 Single European Rail Area 2014 CEF Transport Calls Info Days Brussels, 10 October 2014 Indicative budget and specific objectives 50 million (general envelope)

More information

The Trans European Transport Network TEN-T and its role for Austria. Workshop Vienna

The Trans European Transport Network TEN-T and its role for Austria. Workshop Vienna 1 TEN-V für Oberösterreich Spiegel / Infra 5 The Trans European Transport Network TEN-T and its role for Austria Dipl.-Ing. Dr. Thomas Spiegel Workshop Vienna 6.11.2013 2 TEN-T Spiegel, Infra 5 - Importance

More information

2. Therefore the Presidency has decided to develop Council conclusions on the potential of this mode of transport.

2. Therefore the Presidency has decided to develop Council conclusions on the potential of this mode of transport. REPORT From: To: General Secretariat of the Council Permanent Representatives Committee/Council No. prev. doc.: ST 12987/18 TRANS 442 MAR 142 Subject: Council conclusions on Inland Waterway Transport see

More information

Good Practice N 11. Gateway Slovenia. Slovenske železnice - Tovorni promet, d.o.o. (SŽ), 04/2013

Good Practice N 11. Gateway Slovenia. Slovenske železnice - Tovorni promet, d.o.o. (SŽ), 04/2013 Good Practice N 11 Slovenske železnice - Tovorni promet, d.o.o. (SŽ), 04/2013 Contents Good practice form Introduction (summary) Starting position (gaps and challenges) Concept and components Application

More information

Draft AGREEMENT 7th version

Draft AGREEMENT 7th version , Draft AGREEMENT 7th version 18.04.2018 Interregional Agreement on Establishing Scandria Alliance for Territorial Cooperation along the Scandria Corridor Founding Members: 1. Region Örebro County 2. Region

More information

European Economic Interest Grouping (EEIG) corridor D TECHNICAL TERMS OF REFERENCE FOR THE TRANSPORT MARKET STUDY ON THE EUROPEAN FREIGHT CORRIDOR 6

European Economic Interest Grouping (EEIG) corridor D TECHNICAL TERMS OF REFERENCE FOR THE TRANSPORT MARKET STUDY ON THE EUROPEAN FREIGHT CORRIDOR 6 TECHNICAL TERMS OF REFERENCE FOR THE TRANSPORT MARKET STUDY ON THE EUROPEAN FREIGHT CORRIDOR 6 1 Table of Contents Introduction... 3 1 Objectives of the Transport Market Study... 3 2 Scope of the Transport

More information

11th PRIME Plenary Meeting, Brussels, 16 November 2017 State of Play: Review of Rastatt disruption and first ideas for contingency plans

11th PRIME Plenary Meeting, Brussels, 16 November 2017 State of Play: Review of Rastatt disruption and first ideas for contingency plans 11th PRIME Plenary Meeting, Brussels, 16 November 2017 State of Play: Review of Rastatt disruption and first ideas for contingency plans 2017-11-16 Agenda 1. 2. 3. Rastatt incident Rerouting of rail freight

More information

RFC2 Transport Market Study

RFC2 Transport Market Study RFC2 Transport Market Study End of task 3 and task 4 Eric Guenther 9 October 2013 Strength Handling large and regular volumes, More access points than IWW (Inland Waterways), Less hampered by driving bans

More information

PRIME Meeting no 8 24 th October 2014 Madrid (E)

PRIME Meeting no 8 24 th October 2014 Madrid (E) PRIME Meeting no 8 24 th October 2014 Madrid (E) Annex 8 Future challenges for infrastructure management - For Discussion and Decision - Context: According to the Declaration of Intent (DoI) signed between

More information

Telematic Applications for Freight (TAF TSI)

Telematic Applications for Freight (TAF TSI) Telematic Applications for Freight (TAF TSI) OSJD UNESCAP Regional Meeting on Harmonization of Rules and Regulations for Facilitation of International Railway Transport Astana (Kazakhstan), 20 21 December

More information

INTEROPERABILITY UNIT

INTEROPERABILITY UNIT INTEROPERABILITY UNIT TAF TSI - ANNEX A.5 :FIGURES AND SEQUENCE DIAGRAMS OF THE TAF TSI REFERENCE: ERA-TD-100 DOCUMENT TYPE: TECHNICAL DOCUMENT VERSION: 2.1 TAF TSI DATE: 10.02.2015 ERA_TECHNICAL_DOCUMENT_TAF_A_INDEX5_20130515_V2_1.DOC

More information

Procedures for Capacity Requests

Procedures for Capacity Requests Pilot Information Document Procedures for Capacity Requests valid for process of timetable 2020, starting in 15 Dec 2019, ending on 12 Dec 2020 2020 timetable year TTR Pilot Rotterdam-Antwerp PID version

More information

Baltic-Adriatic Core Network Corridor

Baltic-Adriatic Core Network Corridor Baltic-Adriatic Core Network Corridor Fourth Corridor Forum Meeting Prepared by LeighFisher Jacobs Polska NDCON Paradigma Astra-project University of Maribor Fourth Corridor Forum Meeting Brussels, 21

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT M I N U T E S

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT M I N U T E S EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Directorate B Investment, Innovative & Sustainable transport B.4 Sustainable & Intelligent transport M I N U T E S 5 T H M E E T I N G

More information

Memorandum of Understanding (MoU)

Memorandum of Understanding (MoU) EUROPEAN COMMISSION Memorandum of Understanding (MoU) Between the European Commission and the European Railway Associations (CER UIC UNIFE EIM GSM-R Industry Group ERFA) concerning the strengthening of

More information

Technical barriers: overview, impact on quality and sustainable solutions (RFCs) Karen Davies ERA. IRG Rail Forum 27 th September

Technical barriers: overview, impact on quality and sustainable solutions (RFCs) Karen Davies ERA. IRG Rail Forum 27 th September Technical barriers: overview, impact on quality and sustainable solutions (RFCs) Karen Davies ERA IRG Rail Forum 27 th September Introduction Background: Technical barriers = operational barriers requirements

More information

Version 1.0. JSG Pilot Programme Governance Document

Version 1.0. JSG Pilot Programme Governance Document JSG Pilot Programme Governance Document 04/05/2017 04/05/2017 Table of Contents 1. General Statement... 4 2. Scope Statement... 6 3. Defining the Governance... 7 3.1. Organisational structure... 7 3.2.

More information

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast)

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast) 02012L0034 EN 24.12.2016 001.001 1 This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions

More information

Report on CLECAT activities on EU RAIL FREIGHT CORRIDORS

Report on CLECAT activities on EU RAIL FREIGHT CORRIDORS Report on CLECAT activities on EU RAIL FREIGHT CORRIDORS Ivan Petrov, Chairman of the Clecat Rail Transport Institute Ivan Petrov, Chairman of the Clecat Rail Transport Institute for the Debate on European

More information

2016 Connecting Europe Facility (CEF) Transport Calls for Proposals COUNTRY FACTSHEET. Belgium

2016 Connecting Europe Facility (CEF) Transport Calls for Proposals COUNTRY FACTSHEET. Belgium 26 Connecting Europe Facility (CEF) Transport Calls for Proposals COUNTRY FACTSHEET Belgium Key facts and figures Evaluation results Eligible vs Recommended proposals by call proposals were selected for

More information

RFC North Sea - Mediterranean ERTMS State of play

RFC North Sea - Mediterranean ERTMS State of play RFC North Sea - Mediterranean ERTMS State of play Railway advisory group November 26th, 2015 Agenda 1. Key lessons from MoT BE meeting 2. Technical Aspects 3. ERTMS implementation state of play 4. CEF

More information

R&D in Railway Transport under Horizon Massimo Marianeschi General Manager, UNIFE TRAKO International Railway Fair Gdansk, 25 September 2013

R&D in Railway Transport under Horizon Massimo Marianeschi General Manager, UNIFE TRAKO International Railway Fair Gdansk, 25 September 2013 R&D in Railway Transport under Horizon 2020 Massimo Marianeschi General Manager, UNIFE TRAKO International Railway Fair Gdansk, 25 September 2013 Full members: Over 80 of the largest and mediumsized companies

More information

Implementation of Sector Statement Update on Sector Statement Group

Implementation of Sector Statement Update on Sector Statement Group Implementation of Sector Statement Update on Sector Statement Group PRIME Plenary Meeting 16 November 2017, Brussels Libor Lochman, Executive Director CER SSG Secretary libor.lochman@cer.be 1 Rotterdam

More information

INEA Corridor report: state of play of CEF funding for Rhine-Alpine CNC. Peter Van Bockland Rhine-Alpine Corridor Technical Advisor, INEA

INEA Corridor report: state of play of CEF funding for Rhine-Alpine CNC. Peter Van Bockland Rhine-Alpine Corridor Technical Advisor, INEA INEA Corridor report: state of play of CEF funding for Rhine-Alpine CNC Peter Van Bockland Rhine-Alpine Corridor Technical Advisor, INEA Outline CEF support to the Coordinator's Work Plan CEF Action Portfolio:

More information

Smart Supply Chain Oriented Rail Freight Services. GA No Deliverable No. D8.3 Information exchange for necessary level of transparency

Smart Supply Chain Oriented Rail Freight Services. GA No Deliverable No. D8.3 Information exchange for necessary level of transparency Smart Supply Chain Oriented Rail Freight Services GA No. 636071 Deliverable No. D8.3 Deliverable Title Information exchange for necessary level of transparency Document ID Dissemination level Main Author

More information

Timetabling on European Corridors

Timetabling on European Corridors Timetabling on European Corridors Dipl. Ing. Andreas Lischke 1 Ing. Bernard Führer 2 Dott. Giampiero Garavagno 3 Summary The Path Allocation Re-engineering of Timetable Networks for European Railways (PARTNER)

More information

The EU Transport Policy Leo Huberts, European Commission

The EU Transport Policy Leo Huberts, European Commission The EU Transport Policy Leo Huberts, European Commission Advisor to Mr Pat Cox, European Coordinator Scandinavian-Mediterranean Core Network Corridor Brussels (BE), Alpeuregio Summer School, 04 July 2016

More information

Technical Session Connecting Europe Facility Projects: a tool for the infrastructure financing. Federica Montaresi

Technical Session Connecting Europe Facility Projects: a tool for the infrastructure financing. Federica Montaresi Technical Session Connecting Europe Facility Projects: a tool for the infrastructure financing Federica Montaresi Autorità di Sistema Portuale del Mar Ligure Orientale The European context where WiderMOS

More information

Szczecin-Świnoujście as a point infrastructure of the Baltic-Adriatic Corridor. Opatija, Nov. 2017

Szczecin-Świnoujście as a point infrastructure of the Baltic-Adriatic Corridor. Opatija, Nov. 2017 Szczecin-Świnoujście as a point infrastructure of the Baltic-Adriatic Corridor Opatija, 20-22 Nov. 2017 Baltic-Adriatic Corridor Alignment of the Baltic-Adriatic core network corridor Length of 2,400 km

More information

from other domains than the usual actors from the rail business e.g. start-ups or small or medium companies

from other domains than the usual actors from the rail business e.g. start-ups or small or medium companies SHIFT²RAIL: The Future Advanced Traffic Management And Control Systems For All Rail Applications Jacques Poré, HonFIRSE, IRSE Past President 2005-2006, Alstom SUMMARY Shift²Rail is a European Commission

More information

Logistical and environmental considerations for the Far East to Europe corridor

Logistical and environmental considerations for the Far East to Europe corridor Logistical and environmental considerations for the Far East to Europe corridor Harilaos N. Psaraftis Technical University of Denmark Department of Management Engineering Overview EU SuperGreen project

More information

Best Practices of Slovenian Railways in intermodal transportation

Best Practices of Slovenian Railways in intermodal transportation Best Practices of Slovenian Railways in intermodal transportation Tomaž Schara, Director General Slovenske železnice, d.o.o. UIRR Conference Portorož, 6 June 2008 Key facts of SŽ-Cargo At a glance SŽ-Cargo

More information

Procedures for International. Late Path Request Management

Procedures for International. Late Path Request Management Appendix to the RNE Process Handbook for International Path Allocation for Infrastructure Managers RailNetEurope Oelzeltgasse 3/9 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu

More information