Shippers Day LNG. 13 April Jean-Paul PINON Director Gas Market Commission for Electricity and Gas Regulation (CREG)

Size: px
Start display at page:

Download "Shippers Day LNG. 13 April Jean-Paul PINON Director Gas Market Commission for Electricity and Gas Regulation (CREG)"

Transcription

1 Shippers Day LNG 13 April 2005 Jean-Paul PINON Director Gas Market Commission for Electricity and Gas Regulation (CREG)

2 The CREG Belgian federal regulator for electricity and natural gas Autonomous organism having legal personality Missions : to advise the federal government to monitor the federal legislation organizing the electricity and natural gas markets (regulation, control, dispute settlement) Six directorates, the Board of Directors being supervised by the General Council 2

3 Code of Conduct (1) Importance Shaping the gas market Code of Conduct System Operator Service Contract System User 3

4 Code of Conduct (2) Legal status European Gas Directives 1998 and 2003 Belgian Gas Act 1999 Royal Decree, Code of Conduct 2003 Main conditions, proposed by TSO and approved by CREG in

5 Code of Conduct (3) Contents Roles and functions, rights and obligations of the system operator and the shippers: procedures: booking, nomination, etc information to the network users congestion management Chinese Walls Services to be offered: secondary market of capacities non firm capacity day ahead market 5 Comparable with the Guidelines for Good Practice as agreed in the Forum of Madrid

6 Code of Conduct (4) Subsequent publications (I) Code of Conduct Approval by CREG Proposal of Fluxys LNG Main Conditions (approved on 17 June 2004) Indicative Transport Programme Terminal code Compliance programme (related to impartiality, confidentiality,etc) 6

7 Code of Conduct (4) Subsequent publications (II) Main conditions of access (MC): Capacity derivation methodology and allocation rules Tradability Quality Congestion management Guarantees and liabilities Etc. All regulated service contracts must comply with the MC 7

8 Code of Conduct (4) Subsequent publications (III) Indicative Transport Programme (ITP): Quantitative derivation of capacities Commercial services offer Basic services vs. Complementary services Flexibility Bundled vs. unbundled services Contract types Contract duration Firm vs. non-firm contracts Services catalogue 8

9 Code of Conduct (4) Subsequent publications (IV) Terminal code Operational rules and procedures E.g. what happens when a ship arrives out of schedule? Particularly useful for spot Increases operating rules transparency Improves spot shippers ability to prepare their use of the Terminal Obligation to consult with signatories before submitting any modification to the CREG Standard general conditions 9

10 Code of Conduct (4) Subsequent publications (V) Timing Approval MC Approval TC ITP TC DAM 6/04 < 2 M < 4 M < 10 M < 8 M MC : Main conditions ITP : Indicative transport programme TC : Terminal code DAM : Day-ahead market (send-out capacity) 10

11 Gas Directive The owner of gas infrastructure has to grant TPA unless he got an exemption. LT contracts are allowed under certain conditions which safeguard competition on the gas market Some countries have imposed a quota of capacity reserved for short term bookings. CREG has allowed 100% LT booking under conditions related to the liquidity of the capacity market 11

12 TPA Principles Optimal use of infrastructure in a multi-shippers environment Obligation for the system operator to offer all available capacity on the primary market The secondary market should promote market liquidity and facilitate spot transactions Booking of slots (bundled basic capacities: unloading, storage, emission) additional capacity (flexibility, cf. Indicative Transport Programme) Consult publicly with system users 12

13 Spot access (1) According to Fluxys LNG, the terminal capacity is entirely sold on the primary market until September 2006 Spot access via the secondary market and/or the UIOLI process Importance of the calculation of the number of slots to be used (see comments on the ITP) 13

14 Spot access (2) Secondary market No obligation to allocate part of the terminal capacity for short term services Unused capacity must be offered on the secondary market by the shippers at a negotiated price (with publication by Fluxys LNG) Scheduling rules and timing allow spot access Priority to trading slots prior to unbundled services 14

15 Spot access (3) Anti-hoarding and use-it-or-lose-it Fluxys LNG offers on the primary market not nominated capacity If the shipper does not confirm 2 months in advance the use of a nominated slot, Fluxys LNG has automatically a mandate to offer it on the secondary market at a regulated price Registry of unused capacity and application of antihoarding provisions on ad hoc basis in the event of persistent congestion 15

Gas Natural Fenosa comments to ERGEG Public Consultation on Existing transparency requirements for natural gas

Gas Natural Fenosa comments to ERGEG Public Consultation on Existing transparency requirements for natural gas Gas Natural Fenosa comments to ERGEG Public Consultation on Existing transparency requirements for natural gas Gas Natural Fenosa welcomes the opportunity to respond to ERGEG Public consultation on existing

More information

LNG TERMINALLING PROGRAMME.

LNG TERMINALLING PROGRAMME. LNG TERMINALLING PROGRAMME Based on Article 203 of the Royal Decree of 23 December 2010 on the Code of Conduct regarding access to natural gas transmission networks www.fluxys.com TABLE OF CONTENTS 1 INTRODUCTION...

More information

LNG TERMINALLING PROGRAMME

LNG TERMINALLING PROGRAMME LNG TERMINALLING PROGRAMME Based on Article 203 of the Royal Decree of 23 December 2010 on the Code of Conduct regarding access to natural gas transmission networks TABLE OF CONTENTS 1 INTRODUCTION...

More information

FLUXYS STORAGE SERVICES : ISP - SC

FLUXYS STORAGE SERVICES : ISP - SC FLUXYS STORAGE SERVICES : ISP - SC Shippers Day CREG (June 22 th 2005) Indicative Storage Program (ISP( ISP) ISP LOENHOUT & PSP : INTRODUCTION Indicative Storage Program : first introduction (time frame

More information

LNG TERMINALLING PROGRAMME.

LNG TERMINALLING PROGRAMME. LNG TERMINALLING PROGRAMME Based on Article 203 of the Royal Decree of 23 December 2010 on the Code of Conduct regarding access to natural gas transmission networks www.fluxys.com TABLE OF CONTENTS TABLE

More information

National Grid Grain LNG Ltd. Third Party Access Arrangements. Guide for prospective Secondary Capacity customers 2017/18

National Grid Grain LNG Ltd. Third Party Access Arrangements. Guide for prospective Secondary Capacity customers 2017/18 National Grid Grain LNG Ltd Guide for prospective Secondary Capacity customers 2017/18 Disclaimer This document is produced as a guide only. The full terms and conditions for Third Party Access to the

More information

Introduction of Entry Capacity to Northern Ireland Transitional Arrangements

Introduction of Entry Capacity to Northern Ireland Transitional Arrangements Introduction of Entry Capacity to Northern Ireland Transitional Arrangements Business Rules Revised Post-Consultation Version 1.1 13 th October 2014 Contents 1. Introduction: Background and Purpose...

More information

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007 ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL

More information

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Case Study on Grid Code Harmonization: Italy Arnaldo Orlandini MRC Consultants and Transaction Advisers Budapest, 08/12/2017

More information

LNG Truck Loading. Revised/proposed business model. Info session LNG Truck Loading 27/05/2013 Non-binding - for information purposes only

LNG Truck Loading. Revised/proposed business model. Info session LNG Truck Loading 27/05/2013 Non-binding - for information purposes only LNG Truck Loading Revised/proposed business model Overview Consultation process - Proposed business model - Contractual framework - Next steps 2 CONSULTATION PROCESS Scope & purpose Consultation: scope

More information

Removing LNG barriers on gas markets Preliminary findings

Removing LNG barriers on gas markets Preliminary findings Removing LNG barriers on gas markets Preliminary findings Rocío Prieto, CEER LNG TF co-chair Madrid Forum, 19 th October 2017 EU LNG TERMINALS Nº of EU terminals: 25 Regasification cap.: 6,91 TWh/day 51%

More information

THIRD PARTY ACCESS TO LNG TERMINALS. GIIGNL Commercial Study Group Topic 8

THIRD PARTY ACCESS TO LNG TERMINALS. GIIGNL Commercial Study Group Topic 8 THIRD PARTY ACCESS TO LNG TERMINALS GIIGNL Commercial Study Group Topic 8 November 2012 Disclaimer This document was drafted only for the purpose of serving as a reference and the user is required to use

More information

Entry Point Registrations

Entry Point Registrations Entry Point Registrations Business Rules Revised Post-Consultation Version 1.1 13 th October 2014 Contents 1. Introduction... 3 2. Relevant Context... 3 3. Entry Point Registrations - Principles... 4 4.

More information

Operations and user manual for the REMIT REGISTER

Operations and user manual for the REMIT REGISTER Operations and user manual for the REMIT REGISTER Version 1.1 of 4 August 2015 1 Contents 1. Introduction... 3 2. Who has to register?... 4 2.1 Reportable contracts... 4 2.2 Fundamental data to be reported...

More information

Market Consultation Session

Market Consultation Session Market Consultation Session February 19, 2013 Fluxys non-binding document for discussion & information purposes only (subject to managment approval) Objective of today s session Feedback on consultation

More information

NATURAL GAS TRANSPORTATION SERVICES PROVIDED BY IUK BETWEEN GB AND BELGIUM

NATURAL GAS TRANSPORTATION SERVICES PROVIDED BY IUK BETWEEN GB AND BELGIUM NATURAL GAS TRANSPORTATION SERVICES PROVIDED BY IUK BETWEEN GB AND BELGIUM Issue 5 March 2018 www.interconnector.com DISCLAIMER This IUK Access Agreement Summary ( IAAS ) has been prepared by Interconnector

More information

New Role and functions of independent energy regulatory authority in EU under the Third Energy Package

New Role and functions of independent energy regulatory authority in EU under the Third Energy Package 1 New Role and functions of independent energy regulatory authority in EU under the Third Energy Package E-Control, October 10, 2013 Alexandra Schwaiger-Faber, E-Control Austria Organisation Organisation

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 17.3.2017 L 72/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and

More information

IUK Access Agreement Summary. 10 Oct 2013

IUK Access Agreement Summary. 10 Oct 2013 IUK Access Agreement Summary 10 Oct 2013 Preface This document (the IUK Access Agreement Summary or IAAS ) describes the transportation model and the related services offered by Interconnector (UK) Limited

More information

The Revithoussa LNG Terminal:

The Revithoussa LNG Terminal: The Revithoussa LNG Terminal: An Entry Point to Greece and SEE Michael Thomadakis Katerina Sardi Gerasimos Avlonitis Setting the scene Entry Capacities Entry bcma Capacities 2012 2015 2017 North 4 4 4

More information

Exhibit G to the General Terms and Conditions Forward Flow as of 2018

Exhibit G to the General Terms and Conditions Forward Flow as of 2018 CAM and CMP implementation and general rules General provisions Terms defined in the Conditions shall have the same meaning when used herein. This Exhibit G shall form part of the Conditions as amended

More information

What are your main views of the proposed measures? Do you think Network codes

What are your main views of the proposed measures? Do you think Network codes EDP Gás and Naturgas Energia Comercializadora Response to ERGEG Pilot Framework Guidelines on Capacity Allocation on European gas Transmission Networks EDP has activities in the gas sector in transportation,

More information

THE ITALIAN REGULATORY AUTHORITY FOR ELECTRICITY GAS AND WATER

THE ITALIAN REGULATORY AUTHORITY FOR ELECTRICITY GAS AND WATER RESOLUTION OF 4 AUGUST 2016 464/2016/R/GAS COMPLETING THE IMPLEMENTATION OF EUROPEAN PROVISIONS RELATING TO THE RESOLUTION OF CONGESTIONS AT INTERCONNECTION POINTS WITH OTHER COUNTRIES OF THE NATIONAL

More information

Role of AERS in natural gas sector reform in Serbia

Role of AERS in natural gas sector reform in Serbia ENERGY AGENCY OF THE REPUBLIC OF SERBIA Role of AERS in natural gas sector reform in Serbia Petar Maksimović Secretary General 16 th MEETING OF THE UNECE GAS CENTRE TASK FORCE GROUP ON THE IMPLEMENTATION

More information

PIPED-GAS REGULATION FEBRUARY 2017

PIPED-GAS REGULATION FEBRUARY 2017 PIPED-GAS REGULATION FEBRUARY 2017 Disclaimer This frequently asked questions document (FAQ) is developed in the context of the liquefied natural gas (LNG) to Power IPP Procurement Programme currently

More information

CALL FOR MARKET INTEREST NOTICE

CALL FOR MARKET INTEREST NOTICE CALL FOR MARKET INTEREST NOTICE Dunkerque LNG SAS Terminal méthanier de Dunkerque 5100 Route de la Jetée du Clipon CS 20150 59792 Grande Synthe cedex SAS au capital de 1 263 374 000 euros 489 967 794 R.C.S.

More information

Fluxys natural gas transport services in Belgium Indicative Conditions & Tariffs

Fluxys natural gas transport services in Belgium Indicative Conditions & Tariffs Fluxys natural gas transport services in Belgium Indicative Conditions & Tariffs Page 1 of 51 Contents 1. Introduction 4 1.1 Natural gas transport services in Belgium: scope 4 1.2 Regulated tariffs 4 1.3

More information

ACCESS CODE FOR TRANSMISSION. Attachment B: Subscription & Allocation of Services

ACCESS CODE FOR TRANSMISSION. Attachment B: Subscription & Allocation of Services NON BINDING DOCUMENT FOR CONSULTATION PURPOSES ONLY ACCESS CODE FOR TRANSMISSION Attachment B: Subscription & Allocation of Services Based on version approved by CREG on 26 March 2015 1 of 72 Table of

More information

Interconnector (UK) Limited IUK Access Code

Interconnector (UK) Limited IUK Access Code Interconnector (UK) Limited IUK Access Code Issue 2 May 2015 subject to NRA approval Contents SECTION A INTRODUCTION... 1 1. IUK Access Code... 1 2. Capacity... 1 3. Nominations and Matching Procedures...

More information

Improving LNG logistics in Spain

Improving LNG logistics in Spain Improving LNG logistics in Spain EFET Iberian Gas Group Discussion paper 27 September 2018 INTRODUCTION Uniquely among European gas markets, Spain has successfully introduced an entry-exit transportation

More information

on the conditions for the application of FDA UIOLI pursuant to paragraph a) - d) of the CMP Guidelines

on the conditions for the application of FDA UIOLI pursuant to paragraph a) - d) of the CMP Guidelines Case Id: c8d4ee05-ccfc-464f-a253-4c5fad681ae0 Date: 13/09/2016 11:53:22 ACER Call for Evidence on the conditions for the application of FDA UIOLI pursuant to paragraph 2.2.3.1 a) - d) of the CMP Guidelines

More information

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011 Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G-001 3 August 2011 Agency for the Cooperation of Energy Regulators Trg Republike 3 1000 Ljubljana

More information

ANNEX X REFERRED TO IN ARTICLE 3.20 TELECOMMUNICATIONS SERVICES

ANNEX X REFERRED TO IN ARTICLE 3.20 TELECOMMUNICATIONS SERVICES ANNEX X REFERRED TO IN ARTICLE 3.20 TELECOMMUNICATIONS SERVICES ANNEX X REFERRED TO IN ARTICLE 3.20 TELECOMMUNICATIONS SERVICES Article 1 Scope and Definitions 1. This Annex applies to measures by Parties

More information

on the conditions for the application of FDA UIOLI pursuant to paragraph a) - d) of the CMP Guidelines

on the conditions for the application of FDA UIOLI pursuant to paragraph a) - d) of the CMP Guidelines Case Id: 3a123382-8301-48f8-a8f7-a674b1c3a961 Date: 19/09/2016 11:44:04 ACER Call for Evidence on the conditions for the application of FDA UIOLI pursuant to paragraph 2.2.3.1 a) - d) of the CMP Guidelines

More information

Towards efficient and effective congestion management of the European gas transmission network:

Towards efficient and effective congestion management of the European gas transmission network: Amstelveenseweg 998 1081 JS Amsterdam Phone: + 31 20 520 7970 Email: secretariat@efet.org Website: www.efet.org Towards efficient and effective congestion management of the European gas transmission network:

More information

ANNEX XII REFERRED TO IN ARTICLE 3.21 TELECOMMUNICATIONS SERVICES

ANNEX XII REFERRED TO IN ARTICLE 3.21 TELECOMMUNICATIONS SERVICES ANNEX XII REFERRED TO IN ARTICLE 3.21 TELECOMMUNICATIONS SERVICES ANNEX XII REFERRED TO IN ARTICLE 3.21 TELECOMMUNICATIONS SERVICES Article 1 Scope and Definitions 1. This Annex applies to measures by

More information

LNG ACCESS CODE FOR THE ZEEBRUGGE LNG TERMINAL. Based on version approved by CREG on December 14 th 2017 Applicable as of December 20 th /193

LNG ACCESS CODE FOR THE ZEEBRUGGE LNG TERMINAL. Based on version approved by CREG on December 14 th 2017 Applicable as of December 20 th /193 LNG ACCESS CODE FOR THE ZEEBRUGGE LNG TERMINAL Applicable as of December 20 th 2017 1/193 Contents 1 PURPOSE AND SCOPE 5 1.1 Purpose 5 1.2 Scope 5 1.3 Definitions 5 1.4 Interpretation 5 1.5 Amendments

More information

ENTSOG s Capacity conversion model

ENTSOG s Capacity conversion model 2017-07-24 ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894 5101; info@entsog.eu, www.entsog.eu, VAT No. BE0822 653 040 Background On October 13 th, 2016 the amendment

More information

How to buy, what to buy

How to buy, what to buy the voice of the NHS in Europe consultation March 2011 How to buy, what to buy Revising the EU public procurement rules Key points The European Commission Green Paper investigates ways in which the current

More information

IOGP response to the DG Energy "Consultation on an EU strategy for. for liquefied natural gas and gas storage.

IOGP response to the DG Energy Consultation on an EU strategy for. for liquefied natural gas and gas storage. IOGP response to the DG Energy "Consultation on an EU strategy for liquefied natural gas and gas storage" IOGP welcomes the opportunity to respond to DG Energy's public consultation on an EU strategy for

More information

Exhibit G to the General Terms and Conditions Forward Flow as of 2018

Exhibit G to the General Terms and Conditions Forward Flow as of 2018 CAM and CMP implementation and general rules General provisions Terms defined in the Conditions shall have the same meaning when used herein. This Exhibit G shall form part of the Conditions as amended

More information

APPENDIX E.1: PROCEDURE FOR THE MARKETING OF CAPACITIES AT THE PIRINEOS VIRTUAL INTERCONNECTION POINT

APPENDIX E.1: PROCEDURE FOR THE MARKETING OF CAPACITIES AT THE PIRINEOS VIRTUAL INTERCONNECTION POINT APPENDIX E.1: PROCEDURE FOR THE MARKETING OF CAPACITIES AT THE PIRINEOS VIRTUAL INTERCONNECTION POINT Version dated [01/04/2017] NOTICE The purpose of this document is to describe in detail the procedures

More information

Exhibit G to the General Terms and Conditions Forward Flow November 2015

Exhibit G to the General Terms and Conditions Forward Flow November 2015 CAM and CMP implementation and general rules Introduction In this Exhibit G BBL Company sets out the conditions following from the implementation of CAM and CMP. This exhibit G is not exhaustive because

More information

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz (Natural Gas Act) 2011, BGBl. (Federal

More information

COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS

COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS EN EN EN EUROPEAN COMMISSION Brussels, 22 January 2010 COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS THIRD-PARTY

More information

where implicit capacity allocation methods are applied, national regulatory authorities may decide not to apply Articles 8 to 37.

where implicit capacity allocation methods are applied, national regulatory authorities may decide not to apply Articles 8 to 37. System Operator's METHODOLOGY OF GAS TRANSMISSION CAPACITY ALLOCATION AND CONGESTION MANAGEMENT PROCEDURE AND STANDARD TERMS FOR ACCESSING THE CROSS-BORDER INFRASTRUCTURE 30 th June 2017 1. General provisions...

More information

OPEN SEASON second capacity enhancement. 03 february 2011

OPEN SEASON second capacity enhancement. 03 february 2011 OPEN SEASON second capacity enhancement of the Zeebrugge LNG terminal BINDING PHAse: OFFER DESCRIPTION 03 february 2011 Contents 1. The Project 7 2. Services offer 13 3. REGULATION AND TARIFF 16 4. Allocation

More information

Deliberation. I - The Context. 1. The European regulatory framework: Directive 2003/55/CE

Deliberation. I - The Context. 1. The European regulatory framework: Directive 2003/55/CE Deliberation Deliberation of July 23 2009 regarding French Energy Regulatory Commission s opinion on the request filed by Dunkerque LNG Company for an exemption from regulated third party access to its

More information

Intra-Belgian division of competences and EU influence

Intra-Belgian division of competences and EU influence Transfer of Energy 26 October 2017 Intra-Belgian division of competences and EU influence Cedric Degreef & Thierry D hoore Table of Contents Intra-Belgian division of competences 3 Difference between commercial

More information

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM TRANSMISSION SYSTEM OPERATOR AB AMBER GRID AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM Version 3.0 Vilnius, 2015 TABLE OF CONTENTS 1. GENERAL PROVISIONS... 3 2. DEFINITIONS AND

More information

ACER and the Transparency Platform

ACER and the Transparency Platform ACER and the Transparency Platform Csilla Bartók Team Leader Network Codes, Gas Department ENTSOG 11 th Transparency Workshop Vienna, 6 December 2017 ACER s transparency assessment - Background The legal

More information

12-16 June Prisma reporting section Design sprint

12-16 June Prisma reporting section Design sprint 12-16 June 2017 Prisma reporting section Design sprint Welcome Coffee, internet, toilets, smoking Namahn 4 Human-centred design, digital, product-service systems An experienced, international, multidisciplinary

More information

Content. Introduction. Amendments. Amendment to Article 5.1 on pre-coupling arrangements for single dayahead

Content. Introduction. Amendments. Amendment to Article 5.1 on pre-coupling arrangements for single dayahead Explanatory document concerning the Nordic TSOs request for amendments in accordance with Article 9(13) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity

More information

Association of Mediterranean Energy Regulators ACTION PLAN

Association of Mediterranean Energy Regulators ACTION PLAN Association of Mediterranean Energy Regulators ACTION PLAN 2014-2015-2016 1 INDEX I. MEDREG MISSION AND OBJECTIVES... 3 II. MEDREG APPROACH TO MEDITERRANEAN COOPERATION... 4 III. MEDREG S STRUCTURE AND

More information

CEER Vision for a European Gas Target Model Conclusions Paper Ref: C11-GWG December 2011

CEER Vision for a European Gas Target Model Conclusions Paper Ref: C11-GWG December 2011 CEER Vision for a European Gas Target Model Conclusions Paper Ref: C11-GWG-82-03 1 December 2011 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL 28

More information

Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG

Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG Contents 1 Background... 2 2 Regasification services... 2 2.1 Core service... 2 2.2 Uniform option... 3 2.3 Spot service... 4 2.4 Management

More information

ACCESS CODE FOR TRANSMISSION. Attachment F: Plan for Incident Management

ACCESS CODE FOR TRANSMISSION. Attachment F: Plan for Incident Management ACCESS CODE FOR TRANSMISSION Attachment F: Plan for Incident Management Based on version approved by CREG on 20 October 2016 1 of 15 Table of contents Table of contents... 2 1. Introduction... 3 2. Definitions...

More information

BILL NO. 23. (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, Government Bill

BILL NO. 23. (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, Government Bill BILL NO. 23 (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, 2011 Government Bill Public Procurement Act CHAPTER 12 OF THE ACTS OF 2011 The Honourable Percy

More information

Network Code. on Capacity Allocation Mechanisms

Network Code. on Capacity Allocation Mechanisms 6 March 2012 Network Code on Capacity Allocation Mechanisms An ENTSOG Network Code for ACER review and Comitology Procedure This document constitutes the Capacity Allocation Mechanisms Network Code developed

More information

European Network Code Workshop

European Network Code Workshop European Network Code Workshop Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Gas European

More information

EU Gas Balancing Code - Daily Nominations at Interconnection Points (IP)

EU Gas Balancing Code - Daily Nominations at Interconnection Points (IP) UNC MODIFICATION PROPOSAL 0493 EU Gas Balancing Code - Daily Nominations at Interconnection Points (IP) COMMERCIAL BUSINESS RULES Text in red [BC 12(3)] [INT 12(3)] Key to format convention is reference

More information

Energie-Control Austria Interpretative Note on Transparency Requirements and Third-Party Access Services Concerning Storage Facilities

Energie-Control Austria Interpretative Note on Transparency Requirements and Third-Party Access Services Concerning Storage Facilities Energie-Control Austria Interpretative Note on Transparency Requirements and Third-Party Access Services Concerning Storage Facilities As of 2012-02-24 Page 1 / 12 Contents 1. Aim of the interpretative

More information

Proposal for a common set of requirements used for the continuous trading matching algorithm

Proposal for a common set of requirements used for the continuous trading matching algorithm Proposal for a common set of requirements used for the continuous trading matching algorithm 13 November 2017 1. Background 1. This document is a common proposal developed by all Transmission System Operators

More information

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Practices for Grid Code Harmonization Examining Capacity Allocation and Congestion Management Fotis Thomaidis Partner,

More information

RECEIVING, STORAGE AND REGASIFICATION OF THE LNG

RECEIVING, STORAGE AND REGASIFICATION OF THE LNG RECEIVING, STORAGE AND REGASIFICATION OF THE LNG 1) MANAGEMENT OF NON-COMPLIANCE WITH THE MONTHLY LNG DELIVERY SCHEDULE OR OF SPOT BERTHINGS... 2 1.1) FAILURE TO PERFORM AN UNLOADING OPERATION... 2 1.1.1)

More information

Consultation on the ZIGMA Model and Implementation of the Capacity Allocation Mechanism and Balancing EU Network Codes

Consultation on the ZIGMA Model and Implementation of the Capacity Allocation Mechanism and Balancing EU Network Codes 8 April 2014 Dear Stakeholder, Consultation on the ZIGMA Model and Implementation of the Capacity Allocation Mechanism and Balancing EU Network Codes Interconnector (UK) Ltd (IUK), Fluxys Belgium and National

More information

Exhibit G to the General Terms and Conditions Forward Flow as of 2018November 2015

Exhibit G to the General Terms and Conditions Forward Flow as of 2018November 2015 CAM and CMP implementation and general rules General provisions Terms defined in the Conditions shall have the same meaning when used herein. This Exhibit G shall form part of the Conditions as amended

More information

PUBLIC VERSION WORKING LANGUAGE This document is made available for information purposes only. Brussels, 22-V-2007 SG-Greffe(2007) D/203046

PUBLIC VERSION WORKING LANGUAGE This document is made available for information purposes only. Brussels, 22-V-2007 SG-Greffe(2007) D/203046 ANDRIS PIEBALGS MEMBER OF THE EUROPEAN COMMISSION PUBLIC VERSION WORKING LANGUAGE This document is made available for information purposes only. Brussels, 22-V-2007 SG-Greffe(2007) D/203046 Your Excellency,

More information

Target Model for a Standardized German Balancing Gas Market

Target Model for a Standardized German Balancing Gas Market Target Model for a Standardized German Balancing Gas 1. Fundamentals The design of this target model and the definition of the balancing to be used are based on the Framework Guidelines Balancing as adopted

More information

TRANSMISSION CONTRACT ON THE NATURAL GAS TRANSMISSION SYSTEM

TRANSMISSION CONTRACT ON THE NATURAL GAS TRANSMISSION SYSTEM TRANSMISSION CONTRACT ON THE NATURAL GAS TRANSMISSION SYSTEM Appendix 1 GENERAL TERMS AND CONDITIONS Version of June 1, 2010 NON BINDING The English translation of the General Terms and Conditions of the

More information

WORLD TRADE GATS/SC/31/Suppl.3 11 April 1997 ORGANIZATION

WORLD TRADE GATS/SC/31/Suppl.3 11 April 1997 ORGANIZATION WORLD TRADE GATS/SC/31/Suppl.3 11 April 1997 ORGANIZATION (97-1526) Trade in Services EUROPEAN COMMUNITIES AND THEIR MEMBER STATES Schedule of Specific Commitments Supplement 3 (This is authentic in English,

More information

Interconnector (UK) Limited. IUK Access Code

Interconnector (UK) Limited. IUK Access Code Interconnector (UK) Limited IUK Access Code Issue 5 March 2018 Contents SECTION A INTRODUCTION... 1 1. IUK Access Code... 1 2. Transportation Services... 1 3. Nominations and Matching Procedures... 1 4.

More information

UNC 0616: Capacity Conversion Mechanism for Interconnection Points. UNC Modification. 01 Modification. 02 Workgroup Report

UNC 0616: Capacity Conversion Mechanism for Interconnection Points. UNC Modification. 01 Modification. 02 Workgroup Report UNC Modification UNC 0616: Capacity Conversion Mechanism for Interconnection Points At what stage is this document in the process? 01 Modification 02 Workgroup Report 03 04 Draft Modification Report Final

More information

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas Two Years of TPA in Italy: Snam Rete Gas experience Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas Carlo Malacarne Managing Director Operations - Snam Rete Gas

More information

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Commission decision

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Commission decision EUROPEAN COMMISSION Brussels, XXX [ ](2012) XXX draft COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT Accompanying the document Commission decision amending Annex I to Regulation

More information

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5 CAPACITY BOOKING CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE... 5 1) REQUIREMENTS... 5 1.1) REQUIREMENTS IN ACCORDANCE WITH RESOLUTION NO. 137/02... 5 1.1.1) Possession

More information

EU Gas Market Reform what does it mean in practice?

EU Gas Market Reform what does it mean in practice? EU Gas Market Reform what does it mean in practice? Alex Barnes, Head of Regulatory Affairs Energy Forum 2012 Vilnius 18 th December 2012 European gas markets are facing major changes... DG ENERGY / ACER

More information

Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld Bonn

Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld Bonn Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld 4 53113 Bonn Consultation documents: Application for use of a reservation quotas at the Vierow

More information

REPORT OF THE HELLENIC GAS TRANSMISSION SYSTEM OPERATOR (DESFA S.A.) ON THE IMPLEMENTATION OF INTERIM MEASURES

REPORT OF THE HELLENIC GAS TRANSMISSION SYSTEM OPERATOR (DESFA S.A.) ON THE IMPLEMENTATION OF INTERIM MEASURES REPORT OF THE HELLENIC GAS TRANSMISSION SYSTEM OPERATOR (DESFA S.A.) ON THE IMPLEMENTATION OF INTERIM MEASURES UNDER REGULATION (EU) 312/214 "ESTABLISHING A NETWORK CODE ON GAS BALANCING OF TRANSMISSION

More information

European Commission, Competition DG. Sector Inquiry under Art 17 Regulation 1/2003 on the gas and electricity markets. Preliminary Report

European Commission, Competition DG. Sector Inquiry under Art 17 Regulation 1/2003 on the gas and electricity markets. Preliminary Report European Commission, Competition DG Sector Inquiry under Art 17 Regulation 1/2003 on the gas and electricity markets Preliminary Report Under the aegis of the French Regulatory Authority (CRE), for almost

More information

Financing Energy and Climate PPP based Infrastructures: Experiences and Emerging Trends. Venice, May 9th,2014

Financing Energy and Climate PPP based Infrastructures: Experiences and Emerging Trends. Venice, May 9th,2014 Financing Energy and Climate PPP based Infrastructures: Experiences and Emerging Trends Venice, May 9th,2014 PPPs are no silver bullet solution... Potential challenges Misaligned incentives Imperfect regulation,

More information

The Spanish Energy Regulator: The National Energy Commission (CNE)

The Spanish Energy Regulator: The National Energy Commission (CNE) The Spanish Energy Regulator: The National Energy Commission (CNE) STRENGTHENING THE BULGARIAN ENERGY REGULATOR Rafael Durban Romero Director of External Affairs & Information services Spanish National

More information

8.1. GENERAL RULES OF CAPACITY BOOKING

8.1. GENERAL RULES OF CAPACITY BOOKING 8.1. GENERAL RULES OF CAPACITY BOOKING (a) Pursuant to the provisions of the Gas Supply Act and the Implementation Decree the free capacities of the natural gas network may and shall be offered to network

More information

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS Energy Week, Vaasa, Finland, 16.03.2016 Ioanna Mersinia, Attorney in Law (LL.M.) Contents EU Energy Law / 3 rd Energy Package (2009):

More information

Coordinated implementation of the Network Code on Capacity Allocation Mechanisms. Information Memorandum

Coordinated implementation of the Network Code on Capacity Allocation Mechanisms. Information Memorandum Coordinated implementation of the Network Code on Capacity Allocation Information Memorandum February 2014 INDEX Disclaimer... 4 1 Background... 5 2 Auctions... 6 2.1 2014 auctions... 6 2.2 2015 auctions

More information

GRTGAZ NETWORK TRANSMISSION CONTRACT

GRTGAZ NETWORK TRANSMISSION CONTRACT GRTGAZ NETWORK TRANSMISSION CONTRACT SECTION B UPSTREAM NETWORK VERSION APPLICABLE AS OF 1ST APRIL 2016 English translation for information. Disclaimer The present translation is not binding and is provided

More information

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for a common set of requirements, in accordance with Article

More information

Study on Underground Gas Storage in Europe and Central Asia. Working Party on Gas Geneva, January 22, 2013 G.-H. Joffre (Storengy) et al.

Study on Underground Gas Storage in Europe and Central Asia. Working Party on Gas Geneva, January 22, 2013 G.-H. Joffre (Storengy) et al. Study on Underground Gas Storage in Europe and Central Asia Working Party on Gas Geneva, January 22, 2013 G.-H. Joffre (Storengy) et al. United Nations Economic Commission for Europe Committee on Sustainable

More information

Corporate Governance Statement

Corporate Governance Statement Corporate Governance Statement The Board of Directors is committed to maintaining the highest standards of Corporate Governance. Corporate Governance is about having a set of core values and behaviours

More information

THE REGULATORY AUTHORITIES

THE REGULATORY AUTHORITIES EN EN EN EUROPEAN COMMISSION Brussels, 22 January 2010 COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/72/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN ELECTRICITY AND DIRECTIVE

More information

Replies to: Questions for the Hearing on the completion of the internal energy market

Replies to: Questions for the Hearing on the completion of the internal energy market /HLJK+$1&+(5 Catholic University Brabant, Tilburg Replies to: Questions for the Hearing on the completion of the internal energy market 1.) Questions concerning both the directive on common rules for the

More information

About Corporate Goals Corporate Values Top Management Obligations... 6

About Corporate Goals Corporate Values Top Management Obligations... 6 Jan 5, 2018 Table of Contents About... 3 Corporate Goals... 4 Corporate Values... 5 Top Management Obligations... 6 2 About Itransition Group (Company) is a leading provider of digital solutions and IT

More information

UNOFFICIAL TRANSLATION

UNOFFICIAL TRANSLATION UNOFFICIAL TRANSLATION REPUBLIC OF LATVIA PUBLIC UTILITIES COMMISSION COUNCIL RESOLUTION Riga, 13.04.2017 No. 1/16 (Minutes No. 15, para. 4) Rules of Use of the Natural Gas Transmission System 1. The regulations

More information

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Contextualizing Transmission Grid Codes in the Natural Gas System - The Intersection of Transmission and Distribution

More information

Table of Contents. Page 2 of 6

Table of Contents. Page 2 of 6 Annex I Harmonised maximum and minimum clearing prices for single intraday coupling in accordance with Article 54(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on

More information

Influences on LNG in Europe and EU LNG Policy

Influences on LNG in Europe and EU LNG Policy CEER workshop on Access to European LNG terminals 6 th September, 2011 Madrid Influences on LNG in Europe and EU LNG Policy European Federation of Energy Traders Carmen Vindel Sanchez cvindel@gasnatural.com

More information

REMIT. Manual of Procedures on transaction data, fundamental data and inside information reporting. (MoP on data reporting)

REMIT. Manual of Procedures on transaction data, fundamental data and inside information reporting. (MoP on data reporting) REMIT Manual of Procedures on transaction data, fundamental data and inside information reporting (MoP on data reporting) 18 May 2017 Agency for the Cooperation of Energy Regulators Trg Republike 3 1000

More information

Shippers Meeting. Hoofddorp, 27 May 2015

Shippers Meeting. Hoofddorp, 27 May 2015 Shippers Meeting Hoofddorp, 27 May 2015 Programme 11:00 13:00 13:00 14:00 14:00 19:00 Plenary session Lunch including individual consults Social event Agenda plenary session The Evolution of European Gas

More information

The conclusions from the 20 th Madrid Forum (September 2011) form an important input for ACER. In this matter, the forum stressed that both ACER and t

The conclusions from the 20 th Madrid Forum (September 2011) form an important input for ACER. In this matter, the forum stressed that both ACER and t North West IG meeting 8 March 2012 EK offices, The Hague DRAFT MINUTES Participants Menno van Liere NMa/EK (Chair) Gijsbert Lybaart NMa/EK Marie-Claire Aoun CRE Pitt Wangen ILR Bjorn ter Bruggen EI Sigrún

More information

Cambridge David Newbery Richard Green Karsten Neuhoff Paul Twomey

Cambridge David Newbery Richard Green Karsten Neuhoff Paul Twomey The Cambridge-MIT Institute A Review of the Monitoring of Market Power Cambridge 6.11.2004 David Newbery Richard Green Karsten Neuhoff Paul Twomey Outline Defining, Detecting and Mitigating Market Power

More information