Size: px
Start display at page:

Download "Passenger/Freight Railroad Projects in Michigan"

Transcription

1 Passenger/Freight Railroad Projects in Michigan

2 Passenger/Freight Railroad Projects in Michigan Topics: Michigan Railroad Network State of Michigan Owned Railroad Corridors Michigan Accelerated Rail Program Dearborn to Ypsilanti Double Track Project Michigan Line Bridge Management Program Other Current Passenger/Freight Railroad Projects Chicago-Detroit/Pontiac Passenger Rail Corridor Program M-1 Rail (Light Rail Project in Detroit) Continental Rail Gateway (CRG) Detroit Intermodal Freight Terminal (DIFT) Amtrak Passenger Station Projects Questions and Answers 2

3 Michigan Railroad Network Michigan s freight & passenger rail system is part of a multi-modal transportation system with a diverse mix of facilities in both public & private ownership. Extensive system, ranking 12 th nationally in number of miles of track. 3,900 miles of freight railroad track 24 operators Carries 33% of state s freight tonnage 3

4 State of Michigan Owned Railroad Corridors 665 miles of rail line Operated by railroads under contract with MDOT and provide the only rail access to businesses in certain areas of the state Over 80 shippers 15,000 carloads (2010)* *excludes Michigan Line Provides access to national system to many companies with otherwise limited transportation options. 4

5 Michigan Accelerated Rail Program MDOT acquired 135 miles between Kalamazoo and Dearborn in December 2012 from Norfolk Southern Railway (NSR) The accelerated rail program will enhance this segment of the corridor for accelerated speeds up to 110 mph. Construction has begun and will be completed over the next three construction seasons Amtrak will operate and maintain the line NSR will continue freight service 5

6 Michigan Line History PRESENT 6

7 Michigan Accelerated Rail Program Segments SECTION 2 SECTION 1 SECTION 4 SECTION 3 7

8 Dearborn-Ypsilanti Double Track Project Background Challenges Project Status 8

9 Background Project Description 17.7 miles of capacity improvements on the Michigan Line Reconstruction of 18 at grade crossings Adds a second track between Dearborn and Wayne (Approximately 9 miles) 9

10 Background Purpose and Need Condition of the sale from Norfolk Southern to MDOT Provides separate tracks for freight and passenger service Helps achieve the service outcome (FRA Grant requirement) 10

11 Background Project Timeline Design Period: 2012 Spring of 2014 Project advertised for bids: Summer of 2014 Bids opened August 1, 2014 $19.56 Million Contract Awarded to RailWorks on September 10, 2014 Construction started: October 14, 2014 Contract Completion: November 1,

12 Background Project Team MDOT PM/PE/on-site soils engineering/ QA testing Federal Railroad Administration (FRA) Parsons Brinckerhoff Inspection, Office Tech and Office Engineering services Soils and Materials Engineers Testing Services-Rail items Somat Engineering Testing Services-Roadway Items Northwest Consultants Engineer s staking Quandel Design Support and Engineer of Record Amtrak Roadway Worker Protection and QA testing- field welding of rail RailWorks Prime Contractor 12

13 Background Major Items of Work 41,713 feet (1,894 tons) of continuously welded rail 25,670 ties 45,981 tons of ballast 18 roadway grade crossings reconstructed 440 stations of track bed grading Special Trackwork; 6 crossovers and 1 turnout 13

14 Challenges Merging MDOT, Amtrak, Norfolk Southern and AREMA specifications, standards and practices into contract documents that contractors could bid on Establishing the order of precedence between these specifications Preparing Special Provisions Mainline Track and Special Trackwork Railroad Earthwork At-Grade Crossings 14

15 Challenges Establishing procedures for Material Acceptance on rail items Rail, ballast, ties, tie plates, spikes, anchors, bolts, joint bars Merged MDOT, Amtrak and AREMA practices Acceptance procedures vary Full fabrication inspection (rail) Random sampling/testing ( ties) QA and QC testing (ballast) Test data certification (tie plates etc.) Approved suppliers (ballast and ties) 15

16 Challenges Buy America - Ballast Last minute negotiations between MDOT and the Federal Railroad Administration (FRA) Allowed material mined in Ontario, Canada to be a possible ballast source Material had to be manufactured (crushed to meet ballast gradation requirements) in the USA 16

17 Challenges Maintenance of Traffic at Roadway crossings Contract work requires complete roadway closing Roadways under multiple local jurisdictions Contract sets general parameters Contractor must design Work Zone Traffic Control Plan Detours and signage Schedule and closing duration Each crossing paid for as a lump sum 17

18 Project Status Work Accomplished To-Date 30 Percent of track bed graded Initial 8 of ballast layer being placed Rail strings fabricated and delivered 18

19 Project Status 2015 Construction Season Finish grading and pre-ballast Deliver/set ties Construct new track Special trackwork Reconstruct crossings Final track surfacing Coordination with Amtrak s signal contractor (GE) Signalize the new track Relocate crossing signals at 18 crossings 19

20 Background Inspection / Field Work Reports / Ratings Capital Planning Approach / Methodology Next Steps? Michigan Line Bridge Management Program 20

21 Background Project Team URS & Bergmann Associates URS offices included Grand Rapids, Southfield, Chicago and Indianapolis Amtrak Amtrak held URS contract URS followed Amtrak s Detailed Bridge Inspection Standards (Format, Forms, Load Rating Requirements, etc.) MDOT Minor MDOT participation Field inspections & Correspondence 21

22 Background Scope 3 to 5 two-man teams in the field Amtrak staff onsite if on tracks Could work under structure without Amtrak staff Scope Required detailed inspection and load rating of approximately 83 bridges Approximately - Some bridges could not be located in field. Some were hard to find Due to line switching hands the inventory needing updating Team produced a total of 85 reports 22

23 Inspection / Field Work Safety Requirements Federal Railroad Agency Bridge Safety Standards Amtrak Contractor Training Amtrak Roadway Worker Protection Amtrak Qualified Flagging Personnel Safety briefings each day at inspection site prior to inspection 23

24 Inspection / Field Work Structure Locations and Inspection Methods 24

25 Inspection / Field Work Hi-Rail Snooper Vehicle Boat Waders Ladders 25

26 Inspection / Field Work Structure Types Deck Girder 26

27 Inspection / Field Work Structure Types Multi-Beam 27

28 Inspection / Field Work Structure Types Through Girder 28

29 Inspection / Field Work Structure Types Multiple Types of Culverts 29

30 Inspection / Field Work Structure Types Through Truss Swing Bridge * *located on Amtrak ownership 30

31 Inspection / Field Work Typical Findings Considering age of structures typically good condition Minor to moderate surface corrosion Failed paint system Failed/seized bearings Substructure deterioration 31

32 Inspection / Field Work Non-Destructive Testing Dye Penetrant Testing on E and E Fatigue Details 32

33 Inspection / Field Work Load Ratings AREMA Manual for Railway Engineering Cooper E-80 Loading, Amtrak P42 Diesel Locomotive Normal Rating: Expected service life load carrying level Maximum: Infrequent interval load carrying level Fatigue 33

34 Inspection / Field Work Report Bridge Description and Location Summary of Inspection Findings and Bridge Condition Load Rating Results Repair and Rehabilitation Recommendations Immediate, Priority, Routine, Maintenance, Increased Structure Capacity Cost Estimates 34

35 Capital Planning Approach/Methodology Priority Lists Capital & Maintenance (Ranked recommendations by priority and year) Maintenance by Amtrak staff Temporary bents, concrete patching, ballast retainers, debris removal Capital Major repairs by outside contractor Superstructure replacement, Pier replacements, structure replacement, etc. Methodology Rating / Condition / Cost / Time Replacement estimates included two or three track structures 35

36 Preliminary Capital Repair Summary No Repairs 37 44% Bridge Replacement 4 5% Superstruture Replacement 8 9% Substructure Replacement 1 1% Superstructure Repairs 14 17% Miscellaneous 20 24% 36

37 Lessons Learned Safety No MOT Steep slopes Insects / Poison Ivy Physical - Heat, waders, crawling through culverts Track Time Amtrak Staff & Snooper High Rail Snooper rental All affect production rates Condition / Load Capacity / Over Design 37

38 Next Steps Evaluate capital and maintenance repair summary Collaborate with Amtrak maintenance Secure funding for capital repair and replacement projects 38

39 Chicago-Detroit/Pontiac Passenger Corridor Program Overview Purpose is to improve intercity mobility by providing an improved passenger rail service that would be a competitive transportation alternative to automobile, bus and air service. Program is a partnership between Indiana DOT, Illinois DOT and Federal Railroad Administration. Program consists of: An evaluation of potential route and service alternatives for the corridor. A Tier 1 Environmental Impact Statement (EIS) that reviews the impacts and benefits of rail service. A Service Development Plan (SDP) that describes how rail service will be implemented. Goals that include increased daily service and speeds up to 110 mph. Project website at 39

40 Chicago-Detroit/Pontiac Passenger Corridor Program Current Status Public hearings were held on the Tier 1 Draft EIS on 10/28/14 in Dearborn, 10/29/14 in Chicago and 10/30/14 in Gary. Remaining work includes addressing the DEIS comments, alternative analysis, preparation of the Final EIS, completion of the Record of Decision and development of the Service Development Plan. Completion of the study expected in summer

41 M-1 Rail (Light Rail Project in Detroit) Overview A non-profit organization formed in 2007 Design, construction, and future operations 3.3 mile circulating streetcar along Woodward Avenue between Congress Street and West Grand Boulevard. 20 stations serving 12 locations Public-private partnership Groundbreaking on July 28, 2014 Construction expected to be complete late

42 M-1 Rail (Light Rail Project in Detroit) Current Status I-94 and I-75 Overpass Bridge Work Ongoing Utilities reconstruction and relocation Ongoing Track bed installation Ongoing. Progressing north 42

43 Continental Rail Gateway (CRG) Project Existing Rail Tunnel Completed in early 1900s 1.6 miles long Originally designed for electric trains Continuous operation for over 100 years Carries approximately 400,000 rail cars per year Vital link between Port of Montreal and America s heartland Too small for double-stacked 9 6 container rail cars 43

44 Continental Rail Gateway (CRG) Project Why We Need to Replace the Existing Rail Tunnel 44

45 Continental Rail Gateway (CRG) Project Proposed Rail Tunnel A new high-capacity replacement rail tunnel Will handle trains carrying double-stacked 9 6 containers Will help Detroit-Windsor to further its vision of becoming an international logistics hub Currently working to secure all funding for project 45

46 Detroit Intermodal Freight Terminal (DIFT) Overview Purpose is to support economic competitiveness of southeast Michigan and the state. Program is a public-private partnership between Government, Canadian Pacific (CP) Railroad, Canadian National (CN) Railroad, Norfolk Southern (NS) Railroad and CSX Railroad. April, 2010 Federal Highway Administration issued Record of Decision. Program consists of: Eliminating the major choke points at the Livernois-Junction Yard in southwest Detroit. Terminal improvements External rail line improvements Roadway improvement Real estate Community enhancements Intermodal Terminal Locations 46

47 Detroit Intermodal Freight Terminal (DIFT) Current Status DIFT Five Year Plan DIFT Project Agreement Delray Interlocking West Detroit Connection Project Economic Development Plan Milwaukee/Beaubien Interlocking West Detroit Connection Project Existing railroad structure has been demolished CN and Conrail track work is ongoing Bridge substructure under construction Structural steel is being fabricated Bridge completion proposed May,

48 Amtrak Passenger Station Projects Completed Troy Transit Center, Troy Project cost: $6.4-million Opened October 14, 2014 Vernon J. Ehlers Amtrak Station, Grand Rapids Project cost: $6.1-million Opened October 27, 2014 John D Dingell Transit Center, Dearborn Project cost: $28.2-million Opened December 10,

49 Amtrak Passenger Station Projects Ongoing Capital Area Multi Modal Gateway, East Lansing New Build Construction anticipated to be completed fall 2015 Jackson Renovation Ann Arbor Design/New Build Port Huron NEPA/Design/New Build Detroit Design/New Build Flint Renovation 49

50 Questions? 3 rd Annual Michigan Rail Conference Location: Grand Rapids, MI Time: August 2015 Specifics location to be announced soon 50

1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan.

1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan. Rail Rail plays a significant role in transportation planning, especially when considering economic development, safety, freight, and intermodal connectivity. Jackson has two rail lines serving the area,

More information

Tier 1 Environmental Impact Statement for the Chicago, Illinois, to Detroit-Pontiac,

Tier 1 Environmental Impact Statement for the Chicago, Illinois, to Detroit-Pontiac, This document is scheduled to be published in the Federal Register on 08/31/2012 and available online at http://federalregister.gov/a/2012-21587, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Michigan DOT: Design Challenges of Dearborn to Ypsilanti Double Track Project

Michigan DOT: Design Challenges of Dearborn to Ypsilanti Double Track Project Michigan DOT: Design Challenges of Dearborn to Ypsilanti Double Track Project Daniel Schulte, P.E. Quandel Consultants, LLC 161 N. Clark St., Suite 2060 Chicago, IL 60601 312-634-6219 dschulte@quandelconsultants.com

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR0013844 & BR0013129 COLUMBIA, CHEROKEE COUNTY, SOUTH CAROLINA I-85 UNDERPASS PROJECT (1) REPLACEMENT OF EXISTING I-85 UNDERPASS BRIDGE MILEPOST SB-141.35 DOT/AAR

More information

2.0 Purpose. 3.0 Work Plan. Page 1 of 7

2.0 Purpose. 3.0 Work Plan. Page 1 of 7 2.0 Purpose The purpose of this document is to present the findings of the field investigation and concept design study, as well as recommend appropriate track relocation and bridge modifications to provide

More information

Appendix C Presentation Slides with Script

Appendix C Presentation Slides with Script Appendix C Presentation Slides with Script 32 Grand Crossing Rail Project 10 S. Riverside Plaza, Suite 400 Chicago, IL 60606 www.grandcrossingrail.com info@grandcrossingrail.com [title slide no narration]

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan NEW JERSEY DEPARTMENT OF TRANSPORTATION New Jersey Statewide Strategic Freight Rail Plan OVER-ARCHING PROJECT PURPOSE In short, the plan is intended to: Identify Issues That Constrain Freight Rail Operations

More information

2.0 ALTERNATIVES. 2.1 Introduction. 2.2 No Build Alternative

2.0 ALTERNATIVES. 2.1 Introduction. 2.2 No Build Alternative 2.0 ALTERNATIVES 2.1 Introduction The alternatives selected for evaluation in this Environmental Assessment (EA) include the No Build Alternative and a Build Alternative that provides for increased HSR

More information

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,

More information

Long Bridge - Present & Future: A Multimodal Analysis

Long Bridge - Present & Future: A Multimodal Analysis Long Bridge - Present & Future: A Multimodal Analysis Edward La Guardia P.E. American Public Transportation Association (APTA); American Railway Engineering and Maintenance-of- Way Association (AREMA);

More information

1.0 INTRODUCTION Federal Mandate for State Rail Plans Stakeholder Consultation Ongoing Planning Process...

1.0 INTRODUCTION Federal Mandate for State Rail Plans Stakeholder Consultation Ongoing Planning Process... TABLE OF CONTENTS 1.0 INTRODUCTION... 1-1 1.1 Federal Mandate for State Rail Plans......1-2 1.2 Stakeholder Consultation... 1-3 1.3 Ongoing Planning Process... 1-3 2.0 STATE RAIL ACTIVITY IN OHIO... 2-1

More information

LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS

LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS Review of the Potomac River Crossing a Rail Resource for the Washington, DC Region and Beyond Presenter: Edward La Guardia P.E. Michael Baker International

More information

Rail Division. Riding the Rails

Rail Division. Riding the Rails Rail Division Riding the Rails Amtrak Ridership within Texas Remains Strong The annual ridership within Texas on all three services (Heartland Flyer, Texas Eagle and Sunset Limited) continues to soar.

More information

Ann Arbor Station Environmental Review. Public Information Meetings April 2, 2014

Ann Arbor Station Environmental Review. Public Information Meetings April 2, 2014 Ann Arbor Station Environmental Review Public Information Meetings April 2, 2014 Welcome Eli Cooper, AICP Transportation Program Manager City of Ann Arbor ecooper@a2gov.org 734-794-6430 x.43710 Robert

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Rail Freight and Passenger

Rail Freight and Passenger Take Care of the System Critical Investments in the areas of: Rail Freight rehabilitate rail bridges o Rail Bridge Inventory Database... $0.5 - $1.0 million (one time) Rail Freight rail replacement and

More information

CHAPTER 13 MICHIGAN DESIGN MANUAL BRIDGE DESIGN RAILROAD CROSSINGS RAILROAD CROSSINGS IDENTIFICATION OF GRADE SEPARATIONS

CHAPTER 13 MICHIGAN DESIGN MANUAL BRIDGE DESIGN RAILROAD CROSSINGS RAILROAD CROSSINGS IDENTIFICATION OF GRADE SEPARATIONS CHAPTER 13 RAILROAD CROSSINGS 13.00 RAILROAD CROSSINGS 13.01 IDENTIFICATION OF GRADE SEPARATIONS 13.02 AGREEMENT PREPARATION 13.02.01 Railroad Contacts 13.02.02 Agreement Plans 13.02.03 Force Accounts

More information

CREATE Program Overview

CREATE Program Overview CREATE Program Overview April 2016 CREATE Partners 2 What is CREATE? A $4.4 billion Public-Private Partnership (PPP) designed to improve transportation flow through Chicago focusing on: Increased capacity,

More information

1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project

1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project 1.0 INTRODUCTION 1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project Connecticut is centrally located in a part of

More information

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant Quick Facts PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S. making

More information

Sandpoint Junction Connector

Sandpoint Junction Connector Sandpoint Junction Connector BNSF Railway MAY 23, 2018 BNSF is a Leading Railroad A Berkshire Hathaway, Inc. company 32,500 route miles in 28 states and 3 Canadian provinces 42,000 employees Approximately

More information

North Carolina Railroad Company Engineering Department. Design and Construction Guidelines

North Carolina Railroad Company Engineering Department. Design and Construction Guidelines North Carolina Railroad Company Engineering Department Design and Construction Guidelines January 2019 Version 2.0 PREFACE These Design and Construcion Guidelines are provided as information only to assist

More information

Record of Professional Development Hours

Record of Professional Development Hours Record of Professional Development Hours Please enter the amount of PDH credits earned for each session in the PDH Earned column. The total PDH credits earned for the 2018 Annual Conference will be shown

More information

GKC CONSULTING COMPANY

GKC CONSULTING COMPANY GKC CONSULTING COMPANY George K. Clem, President 501 Graham Drive Chesterton, Indiana 46304-1615 phone/fax: 219-926-1378 www.gkcconsulting.com george.clem@comcast.net A career of 40 years in the railway

More information

Class I Railroad Statistics

Class I Railroad Statistics Class I Railroad Statistics Class I Railroads Class I Railroads are U.S. line haul freight railroads with operating revenue in excess of $266.7 million. Two Canadian railroads, Canadian National Railway

More information

ESTIMATING MAINTENANCE COSTS FOR MIXED HIGHER SPEED PASSENGER AND FREIGHT RAIL CORRIDORS

ESTIMATING MAINTENANCE COSTS FOR MIXED HIGHER SPEED PASSENGER AND FREIGHT RAIL CORRIDORS Proceedings of the 2010 Joint Rail Conference JRC20104 April April 27-29, 27-29, 2010, 2010, Urbana, Urbana, Illinois, IL, USA JRC2010-36036 JRC2010- ESTIMATING MAINTENANCE COSTS FOR MIXED HIGHER SPEED

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 Final EIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need

More information

CREATE Program Overview. October 2015

CREATE Program Overview. October 2015 CREATE Program Overview October 2015 CREATE Partners 2 What is CREATE? A $4.4 billion Public-Private Partnership (PPP) designed to improve transportation flow through Chicago focusing on: Increased capacity,

More information

Cross Border Rail Transportation: A Canadian Perspective. Canada-United States Cross-Border Rail Peer Exchange May 25, 2011 Burlington, Vermont

Cross Border Rail Transportation: A Canadian Perspective. Canada-United States Cross-Border Rail Peer Exchange May 25, 2011 Burlington, Vermont Cross Border Rail Transportation: A Canadian Perspective Canada-United States Cross-Border Rail Peer Exchange May 25, 2011 Burlington, Vermont 2 Purpose To discuss: National Context Current State of Cross

More information

Project Purpose and Need Statements

Project Purpose and Need Statements Norfolk Southern Railway Company Pittsburgh Vertical Clearance Projects Purpose and Need Summary: Project Purpose and Need Statements August 2018 The principal purpose of the Pittsburgh Vertical Clearance

More information

Northeast Bridge Preservation Partnership Meeting

Northeast Bridge Preservation Partnership Meeting Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.

More information

Tier 2 Environmental Impact Statement for the High-Speed Rail Project from Granite

Tier 2 Environmental Impact Statement for the High-Speed Rail Project from Granite This document is scheduled to be published in the Federal Register on 02/18/2014 and available online at http://federalregister.gov/a/2014-03324, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida By: Bryan K. Haye, Senior Project Manager; Michael J. Shostak, P.E., Vice President; and Clinton C. Lalla,

More information

2010 Indiana Logistics Summit

2010 Indiana Logistics Summit 2010 Indiana Logistics Summit Michael B. Cline Commissioner, INDOT October 26, 2010 INDOT 3,912 INDOT employees 1,702 Highway Technicians 594 Managers/Supervisors 325 Engineers 805 District CO 3,106 State

More information

Massachusetts Rail Plan. September 16, 2010

Massachusetts Rail Plan. September 16, 2010 Massachusetts Rail Plan September 16, 2010 State Freight and Rail Plans State Rail Plan The plan describes state policy for freight and passenger rail transportation, including commuter rail Provides priorities

More information

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD September 18, 2013 District Department of Transportation Federal Railroad Administration AGENDA Vision History & Background Study Area Purpose & Need

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 DEIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need of the

More information

CSX Montreal Expansion Ohio Conference on Freight September 2013

CSX Montreal Expansion Ohio Conference on Freight September 2013 CSX Montreal Expansion Ohio Conference on Freight September 2013 CSX has a 125 year history in Québec Company Overview America s first railroad Founded 1827, headquartered in Jacksonville, FL CSX in Québec

More information

Commercial Ties. Cost Effective Solutions for Mainline Track Applications

Commercial Ties. Cost Effective Solutions for Mainline Track Applications Commercial Ties Cost Effective Solutions for Mainline Track Applications Cost Effective Solutions for Mainline Track From the Leader in Pre-stressed Concrete Crossties The Rocla Concrete Tie Advantage

More information

Trends in the U.S. Rail Network. Mike McClellan Vice President Industrial Products Midwest Association of Rail Shippers July 15, 2014 Lake Geneva, WI

Trends in the U.S. Rail Network. Mike McClellan Vice President Industrial Products Midwest Association of Rail Shippers July 15, 2014 Lake Geneva, WI Trends in the U.S. Rail Network Mike McClellan Vice President Industrial Products Midwest Association of Rail Shippers July 15, 2014 Lake Geneva, WI 1 The Dynamics in US Rail Freight Traffic The (Growing)

More information

Appendix D Presentation Slides with Script

Appendix D Presentation Slides with Script Appendix D Presentation Slides with Script 18 Grand Crossing Rail Project 10 S. Riverside Plaza, Suite 400 Chicago, IL 60606 www.grandcrossingrail.com info@grandcrossingrail.com [title slide no narration]

More information

Norfolk Southern: Creating Options for Ohio Shippers. Ohio Conference on Freight 15 September 2010

Norfolk Southern: Creating Options for Ohio Shippers. Ohio Conference on Freight 15 September 2010 Norfolk Southern: Creating Options for Ohio Shippers Ohio Conference on Freight 15 September 2010 Norfolk Southern s Intermodal Network Chicago 47th Street 63 rd Street Landers Calumet Ashland Ave Detroit

More information

New England Railroads The Next Generation. New England Railroad Club Presentation to UMass Amherst November 29, 2018

New England Railroads The Next Generation. New England Railroad Club Presentation to UMass Amherst November 29, 2018 New England Railroads The Next Generation New England Railroad Club Presentation to UMass Amherst November 29, 2018 Introduction What we are going to cover: New England Railroad Club and Railroading Megaregions

More information

W. W. HAY SEMINAR SERIES. Tower 55 Multimodal Improvements NATIONAL UNIVERSITY RAIL CENTER UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN

W. W. HAY SEMINAR SERIES. Tower 55 Multimodal Improvements NATIONAL UNIVERSITY RAIL CENTER UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN W. W. HAY SEMINAR SERIES NATIONAL UNIVERSITY RAIL CENTER UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN Tower 55 Multimodal Improvements 2015 HDR, Inc., all rights reserved. W. W. HAY SEMINAR SERIES TOWER

More information

Replacing the Aging US 52 Mississippi River Bridge

Replacing the Aging US 52 Mississippi River Bridge 2019 TRANSPORTATION & HIGHWAY ENGINEERING CONFERENCE F. Duncan, PE, G. Hasbrouck, PE and A. Dour, PE Replacing the Aging US 52 Mississippi River Bridge February 26, 2019 Project Overview US 52 / IL 64

More information

PURPOSE AND NEED FOR ACTION

PURPOSE AND NEED FOR ACTION Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to

More information

LONG BRIDGE CAPACITY NEEDS. Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA

LONG BRIDGE CAPACITY NEEDS. Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA LONG BRIDGE CAPACITY NEEDS Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA 1 TODAY S PRESENTATION VRE Overview Project Location and Partners Challenges and Opportunities Funding

More information

CREATE: Benefits to U.S. Seaports. American Association of Port Authorities Maritime Economic Development Workshop

CREATE: Benefits to U.S. Seaports. American Association of Port Authorities Maritime Economic Development Workshop CREATE: Benefits to U.S. Seaports American Association of Port Authorities Maritime Economic Development Workshop June 27, 2013 CREATE Partners Chicago Terminal Operation and Railroad Daily Activity: 1,300

More information

Sieve Size 2" 1" 3/8" No. 10 No. 40 No. 200 % Passing Size

Sieve Size 2 1 3/8 No. 10 No. 40 No. 200 % Passing Size VII. MATERIALS 7.01 SUBBALLAST Subballast shall be crusher-run stone (dense graded aggregate), preferably limestone or granite material and shall meet the requirements as set out in Chapter 1, Part 2,

More information

Rail Freight Service Review. Submission of the New Brunswick Department of Transportation

Rail Freight Service Review. Submission of the New Brunswick Department of Transportation Rail Freight Service Review Submission of the New Brunswick Department of Transportation Department of Transportation March 25, 2010 Rail Freight Service Review Submission of the New Brunswick Department

More information

PLEASE NOTE. NATS MPO Suzann Flowers x 17 TwinCATS MPO Gautam Mani (269) x24

PLEASE NOTE. NATS MPO Suzann Flowers x 17 TwinCATS MPO Gautam Mani (269) x24 PLEASE NOTE In an effort to gather additional comments and suggestions during the 24 Long Range Transportation Planning process the Southwest Michigan Planning Commission is making the working draft sections

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

University of Illinois at Urbana-Champaign April 2, 2010

University of Illinois at Urbana-Champaign April 2, 2010 1 1 CSXT Network Planning: The View in 2010 University of Illinois at Urbana-Champaign April 2, 2010 1 CSX connects the nation and the globe CSX facts: 30,000000 employees 21,000 route miles Chicago Buffalo

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

Rail Division 2012 Annual Summary

Rail Division 2012 Annual Summary Rail Division 2012 Annual Summary Overview The Rail Division oversees rail planning and inspection, highway rail crossings, management of stateowned lines (such as the South Orient Rail line (SORR) and

More information

State of Ohio Rail Plan. MORPC Community Advisory Committee June 4, 2018 Meeting

State of Ohio Rail Plan. MORPC Community Advisory Committee June 4, 2018 Meeting State of Ohio Rail Plan MORPC Community Advisory Committee June 4, 2018 Meeting Federal Mandate to Complete State Rail Plans The federal Passenger Rail Investment and Improvement Act (PRIIA) of 2008 required

More information

Freight Public Private Partnerships Today. by Bill Habig, P.E., AICP Transportation Matters

Freight Public Private Partnerships Today. by Bill Habig, P.E., AICP Transportation Matters Freight Public Private Partnerships Today by Bill Habig, P.E., AICP Transportation Matters Overview of Transportation Matters Founded October 2008 Seeks full funding of Ohio transportation Advocates statewide

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

CSX BRIDGE OVER TENNESSEE RIVER SLOUGH NEAR BRIDGEPORT, ALABAMA BRIDGE REPLACEMENT AND TRACK IMPROVEMENTS. Introduction

CSX BRIDGE OVER TENNESSEE RIVER SLOUGH NEAR BRIDGEPORT, ALABAMA BRIDGE REPLACEMENT AND TRACK IMPROVEMENTS. Introduction CSX BRIDGE 122.6 OVER TENNESSEE RIVER SLOUGH NEAR BRIDGEPORT, ALABAMA BRIDGE REPLACEMENT AND TRACK IMPROVEMENTS AREMA PRESENTATION September 13, 1999 Presented by: Rick Garro, P.E. Assistant Chief Engineer

More information

CTA Capital Construction Update August 8, 2007

CTA Capital Construction Update August 8, 2007 Block 37 Signals Project Brown Line Howard CTA Capital Construction Update August 8, 2007 1 Capital Construction Update Agenda Howard Station Reconstruction Brown Line Capacity Expansion Project Block

More information

Wisconsin s Passenger Rail Development Program

Wisconsin s Passenger Rail Development Program Wisconsin s Passenger Rail Development Program Existing Service Milwaukee-Chicago Hiawatha Service Hiawatha Service Chicago-Milwaukee Hiawatha service supported since 1989 by Wisconsin and Illinois Hiawatha

More information

Carolina Connector Intermodal Terminal (CCX)

Carolina Connector Intermodal Terminal (CCX) Joint Legislative Oversight Committee January 6, 2017 Carolina Connector Intermodal Terminal (CCX) Paul C. Worley, CPM, Rail Division Director CCX is a three legged stool: State, Community and Railroad

More information

The National Gateway Preparing for Tomorrow Lisa Mancini, VP Strategic Infrastructure Initiatives

The National Gateway Preparing for Tomorrow Lisa Mancini, VP Strategic Infrastructure Initiatives 1 The National Gateway Preparing for Tomorrow Lisa Mancini, VP Strategic Infrastructure Initiatives 2 CSX moves what matters to America... Transportation demand is on the rise Industrial Production Population

More information

Mental Health Awareness & Trespass Prevention Strategies

Mental Health Awareness & Trespass Prevention Strategies Mental Health Awareness & Trespass Prevention Strategies Metra System Overview 83 million passenger trips in 2016 288,000 average weekday ridership 11 rail lines 487 route miles 686 weekday trains, plus

More information

Challenges and Opportunities for Canada s Freight Railways

Challenges and Opportunities for Canada s Freight Railways Challenges and Opportunities for Canada s Freight Railways Ninth Annual CILTNA Transportation Outlook Conference Cliff Mackay, President & CEO The Railway Association of Canada May 10, 2010 Ottawa, Ontario

More information

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP Presented By Ken Galt, Caltrans Division of Rail John Fleming, Burlington Northern Santa Fe Railway William Brewster, Hanson-Wilson

More information

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015 NCDOT Overview Nick Tennyson, Chief Deputy Secretary March 4, 2015 Overview Major Functions of DOT Board of Transportation Highway System Overview Construction- Road Building Process Operations and Maintenance

More information

Creating Capacity. Mike Franczak Vice President Transportation Canadian Pacific Railway. American Association of Port Authorities - June 6, 2006

Creating Capacity. Mike Franczak Vice President Transportation Canadian Pacific Railway. American Association of Port Authorities - June 6, 2006 Creating Capacity Mike Franczak Vice President Transportation Canadian Pacific Railway American Association of Port Authorities - June 6, 2006 Outline 1. Overview: The Challenge 2 Capacity: A Rail Perspective

More information

TECHNICAL MEMORANDUM #1. The Vision, Goals and Objectives for Rail Transportation in Missouri

TECHNICAL MEMORANDUM #1. The Vision, Goals and Objectives for Rail Transportation in Missouri TECHNICAL MEMORANDUM #1 The Vision, Goals and Objectives for Rail Transportation in Missouri April 2012 1 The Vision, Goals and Objectives for Rail Transportation in Missouri Role of Railroads in Missouri

More information

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017 Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives December 14, 2017 Today s Agenda Project Overview Project Schedule Purpose and Need Concept Screening Process Level

More information

Public Meeting. Draft Environmental Impact Statement (EIS) and Section 106 Consultation. Preferred Alternative Selection November 29, 2018

Public Meeting. Draft Environmental Impact Statement (EIS) and Section 106 Consultation. Preferred Alternative Selection November 29, 2018 Public Meeting Draft Environmental Impact Statement (EIS) and Section 106 Consultation Preferred Alternative Selection November 29, 2018 Agenda Project Overview No Action Alternative and Action Alternatives

More information

PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE

PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE Overview 1. Project Objectives 2. Bridge Data 3. Timeline 4. Existing Condition 5. Sequence of Coating and Repair Operations 6. Major

More information

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9 January 2011 Table of Contents Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9 Table of Figures and Tables Figure 1 Florida Rail System Map... 2 Figure

More information

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION Common Name: Camp Ripley Bridge Bridge Number: 4969 Identification Number: Location: Feature Carried: TH 115 Feature

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

Major Capital Improvements

Major Capital Improvements Major Capital ments Completed Description Wayne, Lenoir, Craven, and Carteret Counties: Upgrade track condition between Goldsboro and Morehead City Upgraded the track condition between Goldsboro and Morehead

More information

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities PCL Definitions for the Local Program Projects that are administered by the Central Bureau of Local Roads. Engineering, utilities and land acquisition are coded with the PCL for the type of construction

More information

Fixing America s Surface Transportation Act: Safety Provisions Affecting Rail Operations. Presented by Justin J. Marks FEBRUARY 22, 2016

Fixing America s Surface Transportation Act: Safety Provisions Affecting Rail Operations. Presented by Justin J. Marks FEBRUARY 22, 2016 Fixing America s Surface Transportation Act: Safety Provisions Affecting Rail Operations Presented by Justin J. Marks FEBRUARY 22, 2016 Presentation Summary Overview of the FAST Act Historical background

More information

Intermodal Port Strategy AAPA Vancouver Conference November 6, 2013

Intermodal Port Strategy AAPA Vancouver Conference November 6, 2013 Intermodal Port Strategy AAPA Vancouver Conference November 6, 2013 Intermodal industry volume has steadily grown North American Intermodal Volume (1980 2012) Units in Millions Volume has increased more

More information

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE Gusset Plates 2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE (50 Responses) Page 1 of 11 1) How many trusses are in your state? 2302 trusses owned by the state 8202 trusses owned by local agencies 2) What percentage

More information

Optimal Scheduling of Railroad Track Inspection Activities and Production Teams

Optimal Scheduling of Railroad Track Inspection Activities and Production Teams Optimal of Railroad Track Inspection Activities and Production Teams Fan Peng The William W. Hay Railroad Engineering Seminar Series 11 February 2011 1 Importance of Track Maintenance U.S. Class I railroads

More information

Freight Railroads: Linking Pennsylvania to the World. Rudy Husband Lehigh Valley Planning Commission April 4, 2018 Allentown, Pennsylvania

Freight Railroads: Linking Pennsylvania to the World. Rudy Husband Lehigh Valley Planning Commission April 4, 2018 Allentown, Pennsylvania Freight Railroads: Linking Pennsylvania to the World Rudy Husband Lehigh Valley Planning Commission April 4, 2018 Allentown, Pennsylvania How Freight Moves in the U.S. The U.S. Rail Network is made up

More information

Steel Railway Bridge Fatigue and the Evolution of Railway Car Loadings

Steel Railway Bridge Fatigue and the Evolution of Railway Car Loadings 1 Steel Railway Bridge Fatigue and the Evolution of Railway Car Loadings The Current State and Future Challenges of Railway Bridges Stephen M. Dick, PE, SE, Ph.D. Hanson Professional Services 2 Discussion

More information

Leveraging Intermodal Transportation. Georgia Environmental Conference August 21, 2014

Leveraging Intermodal Transportation. Georgia Environmental Conference August 21, 2014 1 Leveraging Intermodal Transportation Georgia Environmental Conference August 21, 2014 CSX is providing substantial value for shippers Company Overview Intermodal at CSX America s first railroad Far-reaching,

More information

Great Lakes Basin Transportation, Inc. Railroad Proposal

Great Lakes Basin Transportation, Inc. Railroad Proposal Great Lakes Basin Transportation, Inc. Railroad Proposal A Kankakee County Perspective June 15, 2016 Kankakee County Planning Department 189 E. Court St, Room 201 Kankakee, IL 60901 815-937-2940 Delbert

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Texas Pacifico Transportation South Orient Rail-line Infrastructure Assessment

Texas Pacifico Transportation South Orient Rail-line Infrastructure Assessment Texas Pacifico Transportation South Orient Rail-line Infrastructure Assessment January 2015 Contents Executive Summary i 1. Project Description and Purpose... 1 1.1 Purpose of Project... 1 1.2 Project

More information

Transportation Update

Transportation Update Transportation Update Projects Underway Norview Avenue About the Project: The Norview Avenue Interchange Improvement Project will eliminate the existing weave movement associated with the on- and off-ramps

More information

Record of Professional Development Hours

Record of Professional Development Hours Record of Professional Development Hours Please enter the amount of PDH credits earned for each session in the PDH Earned column. The total PDH credits earned for the 2017 Annual Conference will be shown

More information

Safe, innovative, quality construction since Riding on the Strength

Safe, innovative, quality construction since Riding on the Strength Safe, innovative, quality construction since 1880 Riding on the Strength of EXPERIENCE The Expertise The Experience The People The Equipment The Work Ethic The quality To get your job done safely, on time

More information

Joint Legislative Transportation Oversight Committee January 8, NCDOT Rail Division. Paul Worley, NCDOT Rail Division Director

Joint Legislative Transportation Oversight Committee January 8, NCDOT Rail Division. Paul Worley, NCDOT Rail Division Director Joint Legislative Oversight Committee January 8, 2015 NCDOT Rail Division Paul Worley, NCDOT Rail Division Director Rail Division Rail Division Director Administrative Business Office Planning & Development

More information

Metro Blue Line Improvements & Project Update

Metro Blue Line Improvements & Project Update Metro Blue Line Improvements & Project Update February 9, 2018 MBL Operational Improvements - External Metro & LADOT coordination to identify traffic signal and intersection treatments aimed at increasing

More information

Supports Item No. 3 T&T Committee Agenda February 17, 2009

Supports Item No. 3 T&T Committee Agenda February 17, 2009 Supports Item No. 3 T&T Committee Agenda February 17, 2009 ADMINISTRATIVE REPORT Report Date: February 6, 2009 Contact: Jerry Dobrovolny Contact No.: 604.873.7331 RTS No.: 07712 VanRIMS No.: 08-2000-20

More information

Midwestern Logistics Recent Changes Bradley Hull PhD John Carroll University Cleveland, Ohio March 17, 2012

Midwestern Logistics Recent Changes Bradley Hull PhD John Carroll University Cleveland, Ohio March 17, 2012 Midwestern Logistics Recent Changes Bradley Hull PhD John Carroll University Cleveland, Ohio March 17, 2012 Midwestern Logistics Recent Changes 1. Description of Chicago East Coast Corridor 2. Exogenous

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

Milton and CN A Partnership

Milton and CN A Partnership DID-5-15 APPENDIX A Milton and CN A Partnership Milton and CN A Partnership March 2014 0 Milton and CN CN has been in Milton for more than 100 years Our rail line runs through the community, carrying a

More information

Automated Condition Assessment as an Aid to Complying With the FTA State of Good Repair Regulations

Automated Condition Assessment as an Aid to Complying With the FTA State of Good Repair Regulations Automated Condition Assessment as an Aid to Complying With the FTA State of Good Repair Regulations 1 Metrolink Overview Commuter Railroad with Mixed Passenger and Freight Traffic 1. Most lines are former

More information

Moving Washington Forward: State and Ports working together for freight mobility in reauthorization

Moving Washington Forward: State and Ports working together for freight mobility in reauthorization Moving Washington Forward: State and Ports working together for freight mobility in reauthorization Andrew Wood Deputy Director - State Rail and Marine Association of Port Authorities Tacoma, Washington

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information