1 Central Phoenix Transportation Framework Study Study Area 2013, All Rights Reserved. 1
2 Agenda Introductions Work Products Feedback on previous products Draft products for Planning Partner review SR-30 Corridor Extension Alternatives DHOV Locations and System Compatibility Park and Ride Connectivity Current Work Efforts Next Steps 2013, All Rights Reserved. 2
3 Project Work Products Draft Work Product Review Completed Draft Work Product Ready for Planning Partner Review Draft Work Product in Progress Future Work Product Phase II Work Products Phase I Summary Report Assessment of Improvement Strategies Technical Memorandum Interstate 10/Interstate 17 Spine Corridor Workshop Summary Freeway System Plan Working Paper SR-30 Corridor Extension Park-and-Ride Technical Memorandum DHOV Technical Memorandum & Concept Drawings ATM Deployment Technical Memorandum Roadway Maintenance Technical Memorandum DDI Technical Memorandum & Concept Drawings Indirect Left Turn Arterial Concepts Technical Memorandum Arterial Intersections Technical Memorandum Transit Improvement Strategies Summary Memorandum Pedestrian/Bicycle Improvement Strategies Summary Memorandum Executive Summary Poster 2013, All Rights Reserved. 3
4 Feedback on Previous Work Products Phase II Work Products Phase I Summary Report Assessment of Improvement Strategies Technical Memorandum Interstate 10/Interstate 17 Spine Corridor Workshop Summary Freeway System Plan Working Paper SR-30 Corridor Extension Park-and-Ride Technical Memorandum DHOV Technical Memorandum & Concept Drawings ATM Deployment Technical Memorandum Roadway Maintenance Technical Memorandum DDI Technical Memorandum & Concept Drawings Indirect Left Turn Arterial Concepts Technical Memorandum Arterial Intersections Technical Memorandum Transit Improvement Strategies Summary Memorandum Pedestrian/Bicycle Improvement Strategies Summary Memorandum Executive Summary Poster 2013, All Rights Reserved. 4
5 Overview of Review Comments Phase I Summary Report Address pedestrian/bicycle projects and Complete Streets. Public Transit not directly addressed. BIG IDEAS Advanced transportation management strategies Arizona parkways Commuter rail Complete streets Direct high occupancy vehicle (DHOV) ramps Freeway interchange efficiencies High capacity transit linkages High occupancy toll (HOT) lanes High volume intersection strategies Last mile strategies Managed lanes Multimodal connectivity of activity centers Pedestrian/bicycle connectivity between jurisdictions Road diets System maintenance Transit opportunities 2013, All Rights Reserved. 5
6 Overview of Review Comments Assessment of Improvement Strategies Potential improvement locations should be reviewed in the context of future projects, (i.e. South Mountain Freeway and I-10 west light rail extension). Strategies should address the benefits/impacts to transit and park-and-ride connectivity. DHOVs DDIs New Overcrossings 2013, All Rights Reserved. 6
7 Overview of Review Comments Interstate 10 and Interstate 17 Spine Summary Report Cap the footprint as a strategy must be further vetted with policymakers. Recommendations should be suggestions given no public process. Consider additional DHOV connectivity. Need continued coordination for integration of high-capacity transit corridors. Impacts of managed lanes on transit operations. 2013, All Rights Reserved. 7
8 Overview of Review Comments Freeway System Plan Additional analysis needed to determine ultimate right-of-way needs based on the movements of people and goods. Corridor strategies (transit, freight, personal vehicle focus) should be established before determining suggested lane widths. Need to further define the relationship of a cap the footprint policy to future environmental study efforts. Also consider bus-only travel lanes, that could be converted to GP lanes off-peak. 2013, All Rights Reserved. 8
9 Overview of Draft Work Products for Planning Partner Review Phase II Work Products Phase I Summary Report Assessment of Improvement Strategies Technical Memorandum Interstate 10/Interstate 17 Spine Corridor Workshop Summary Freeway System Plan Working Paper SR-30 Corridor Extension Park-and-Ride Technical Memorandum DHOV Technical Memorandum & Concept Drawings ATM Deployment Technical Memorandum Roadway Maintenance Technical Memorandum DDI Technical Memorandum & Concept Drawings Indirect Left Turn Arterial Concepts Technical Memorandum Arterial Intersections Technical Memorandum Transit Improvement Strategies Summary Memorandum Pedestrian/Bicycle Improvement Strategies Summary Memorandum Executive Summary Poster 2013, All Rights Reserved. 9
10 SR-30 Corridor Extension Alternatives Tier II Evaluation identified Alts 1A and 2A as most feasible. Technical Memorandum will be distributed for Planning Partner review. 2013, All Rights Reserved , All Rights Reserved.
11 Direct High-Occupancy Vehicle (DHOV) Locations and System Compatibility Over 35 potential DHOV locations were identified in the Planning Partners Charette and subsequent Assessment of Improvement Strategies technical memorandum. List was narrowed to best candidate locations based on system and land use compatibility. Concept drawings developed to illustrate potential connectivity with P&Rs and arterial road system. No prioritization or implementation strategies discussed. 2013, All Rights Reserved. 11
12 Candidate DHOV Locations RTP Existing and Proposed DHOV System Connections RTP Existing and Proposed DHOV Arterial Connections CPHX Candidate DHOV Arterial Connections 2013, All Rights Reserved. 12
13 Focus of Research: P&R w/dhovs RANCHO BERNARDODIRECT ACCESS RAMPS Transit Station 15 Case studies of Best Practices were conducted for San Diego, Denver, and Washington State to: Establish background for development of DHOVs. Identify key points of interest characterizing DHOVs. Define integration with freeway system. Identify physical features. Characterize operational conditions. Identify benefits. Safety Traffic Flow Efficiency P&R Lot Travel Time Savings Revenue Potential Source: Bing Maps, 2012 Microsoft Corporation 2013, All Rights Reserved. 13
14 Findings: P&R Connectivity w/dhovs MOUNTLAKE TERRACE TRANSIT CENTER DHOVs especially suited to support Express Bus and Bus Rapid Transit (BRT) services. DHOVs are a desirable element of HOT or TEL facilities. DHOVs generally result from cooperative effort by DOT and regional transit provider. Transit involvement boosts passenger throughput and brings transit funding sources to the table. Site selection typically integrated with corridor-level planning to evaluate capacity improvements, transit service options, and managed lanes concepts. Source: Bing Maps, 2013 Microsoft Corporation 2013, All Rights Reserved. 14
15 Current Work Efforts Phase II Work Products Phase I Summary Report Assessment of Improvement Strategies Technical Memorandum Interstate 10/Interstate 17 Spine Corridor Workshop Summary Freeway System Plan Working Paper SR-30 Corridor Extension Park-and-Ride Technical Memorandum DHOV Technical Memorandum & Concept Drawings ATM Deployment Technical Memorandum Roadway Maintenance Technical Memorandum DDI Technical Memorandum & Concept Drawings Indirect Left Turn Arterial Concepts Technical Memorandum Arterial Intersections Technical Memorandum Transit Improvement Strategies Summary Memorandum Pedestrian/Bicycle Improvement Strategies Summary Memorandum Executive Summary Poster 2013, All Rights Reserved. 15
16 Diverging Diamond Interchange Conversions Assessment of Alternative Improvement Strategies identified 26 candidate locations for potential conversion to Diverging Diamond Interchanges (DDI). List narrowed to 18 locations through removal of existing Single Point Urban Interchanges (SPUI). Screening process to identify 10 best candidate locations. Traffic volumes Intersection spacing Level of Service Compatibility with system plans 2013, All Rights Reserved. 16
17 Candidate DDI Conversion Locations CPHX Candidate DDI Conversion Locations Other Potential DDI Conversion 2013, All Rights Reserved. 17
18 Future Work Efforts Phase II Work Products Phase I Summary Report Assessment of Improvement Strategies Technical Memorandum Interstate 10/Interstate 17 Spine Corridor Workshop Summary Freeway System Plan Working Paper SR-30 Corridor Extension Park-and-Ride Technical Memorandum DHOV Technical Memorandum & Concept Drawings ATM Deployment Technical Memorandum Roadway Maintenance Technical Memorandum DDI Technical Memorandum & Concept Drawings Indirect Left Turn Arterial Concepts Technical Memorandum Arterial Intersections Technical Memorandum Transit Improvement Strategies Summary Memorandum Pedestrian/Bicycle Improvement Strategies Summary Memorandum Executive Summary Poster 2013, All Rights Reserved. 18
19 Next Steps Presentation of potential strategies to Transportation Policy Committee Follow up with more detailed assessment for NexGen RTP Additional assignments for Focused Downtown Assessments (McDowell Road-Buckeye Road and 7 th Avenue - 7 th Street) Next Planning Partners Meeting August 2013 (date TBD) 2013, All Rights Reserved. 19
Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis
Contra Costa Transportation Authority STAFF REPORT Meeting Date: February 15, 2017 Subject Summary of Issues Regional Measure 3 (RM3) Candidate Projects for Submittal to the Metropolitan Transportation
More information6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS
6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple
More informationCOFFEE WITH THE MAYOR. September 10, 2010
COFFEE WITH THE MAYOR September 10, 2010 JBLM LOCATION TACOMA 163 road miles Part of Seattle-Tacoma-Olympia metropolitan region Bisected by Interstate 5 JBLM - 86, 176 Acres Yakima Training Center - 323,651
More informationACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015
ACTIVE TRANSPORTATION ADVISORY COMMITTEE Memphis MPO March 30, 2015 Agenda Welcome & Introductions Announcements and Briefings Livability 2040: Regional Transportation Plan Congestion Management Process
More informationProgress Report Regional Express & Bus Rapid Transit Program
Progress Report Regional Express & Bus Rapid Transit Program ST Express Bus routes serve urban centers in Snohomish, King, and Pierce. March 2018 Prepared by Project Control & VE l Design, Engineering
More informationAPPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017
APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017 DENVERMOVES Transit Denver Moves: Transit APPENDIX A PLANS AND POLICY REVIEW 2035 Metro Vision Regional Transportation Plan (MVRTP) (2011) 2040 Fiscally
More informationPresented to : I 710 Project Committee June 30, 2011
Presented to : I 710 Project Committee June 30, 2011 Overview Metro s Public Private Partnership (PPP) program Traffic Effects of Tolling Trucks on I 710 Statutory Authority for Tolling Interstate Highways
More informationSouth Bay Corridor Study and Evaluation for Dynamic Corridor Congestion Management (DCCM) Metro Streets and Freeways Subcommittee Meeting
South Bay Corridor Study and Evaluation for Dynamic Corridor Congestion Management (DCCM) Metro Streets and Freeways Subcommittee Meeting October 17, 2013 Agenda 1. DCCM Background 2. Project Overview
More informationGDOT-Office of Planning Update
GDOT-Office of Planning Update GAMPO Conference Athens, Georgia Matthew Fowler, PTP Assistant Planning Administrator November 30, 2010 AGENDA Atlanta Region Managed Lane System Plan I-85 HOV to HOT Conversion
More informationCurrent Trends in Traffic Congestion Mitigation
Current Trends in Traffic Congestion Mitigation April 24, 2009 NCSL Spring Forum Washington, DC Jeff Lindley Associate Administrator, Office of Operations Federal Highway Administration U.S. Department
More informationI-880 Integrated Corridor Management: Building on Existing Planning Efforts
Integrated Corridor Management (ICM) I-880 Integrated Corridor Management: Building on Existing Planning Efforts Presentation to Arterial Operations Committee July 13, 2010 1 Integrated Corridor Management
More informationFinal Recommendations Identification of Improvements, Strategies, and Solutions
Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...
More informationCHAPTER 4. Existing Roadway Conditions. Highway Element. Kanawha County Putnam County
CHAPTER 4 Highway Element Existing Roadway Conditions The challenges facing the future of the transportation network in the Kanawha Valley are a collective result of reliance on passenger vehicles for
More informationPLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014
PLAN 2040 Regional Transportation Plan Update Final Recommendations Transportation and Air Quality Committee March 13, 2014 TIP/RTP Update Milestones Official public comment period closed February 21 Final
More informationAlternatives Evaluation Report. Appendix C. Alternatives Evaluation Report
s Evaluation Report Appendix C s Evaluation Report I-35W North Corridor Project EA Minnesota Department of Transportation Final Project s Report I-35W North Corridor Preliminary Design Project Report Version
More informationRegional Transit Framework Study
MARICOPA ASSOCIATION OF GOVERNMENTS Regional Transit Framework Study Regional Stakeholders Group Meeting #1 February 29, 2008 Copyright 2008 AGENDA Welcome and Introductions Project Process Regional Transit
More informationRegional Transportation Studies Management Committee
Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Management Committee March 8, 2017 North-South Corridor Study (Pinal County) Staff
More informationBILLINGS BYPASS UPDATE
July 18, 2018 BILLINGS BYPASS UPDATE TEDD Steering Committee Monthly Meeting Project Update EIS and ROD Documents through Current Design Preliminary Design Completed preliminary design for full-build
More informationChapter 5. Congestion Management Program. Chapter 5
Chapter 5 Congestion Management Program Chapter 5 67 Chapter 5 Congestion Management Program Enacted in the early 1990s, California s Congestion Management Program (CMP) statutes encourage local jurisdictions
More informationRegional Transportation Studies Regional Council
Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement
More information3. STATION SPACING AND SITING GUIDELINES
3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as
More information3.0 REVIEW OF PREVIOUS STUDIES
3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the
More informationSan Francisco Freeway Corridor Management Study (SF FCMS)
Item 6 Enclosure B Plans and Programs Committee March 17, 2015 San Francisco Freeway Corridor Management Study (SF FCMS) Phase 1 Findings and Recommendations Agenda Item 6 SAN FRANCISCO COUNTY TRANSPORTATION
More informationTRANSFORM66: OUTSIDE THE BELTWAY
TRANSFORM66: OUTSIDE THE BELTWAY Concession Fee Project Eligibility *Required Entry PARTI GENERAL INFORMATION 1.1 Applicant Information Please indicate the jurisdiction or agency that is submitting this
More informationAppendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance
APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation
More informationPlanning Group. Alternative Screening Presentations October/November Bow-Concord Interstate 93 Transportation Planning Study
Planning Group Alternative Screening Presentations October/November 2006 Part A Schedule Planning Group 1 February 1, 2006 Planning Group 2 March 7, 2006 Introduction CSS Overview Brainstorm Problem Statement
More informationDeveloping New Revenue Streams For Transit
Developing New Revenue Streams For Transit Jennifer Mitchell Agency Director Rail~Volution October 23, 2018 DRPT Role in Transportation DRPT focuses on moving people and goods: Rail Public transportation
More informationPhase 1, SR 509 Completion Project NEPA Re evaluation
Economics COPY TO: PREPARED BY: Project File DATE: November, 2017 SUBJECT 1. Introduction Puget Sound Gateway Program Team Phase 1, SR 509 Completion Project NEPA Re evaluation This memorandum was prepared
More informationDRAFT TECHNICAL MEMORANDUM: DIVERGING DIAMOND INTERCHANGES
PHX C DRAFT TECHNICAL MEMORANDUM: DIVERGING DIAMOND INTERCHANGES Note: This document presents a planning level assessment of the feasibility of various improvement strategies for consideration when developing
More information1.1 Purpose of the Project
Chapter 1 Purpose and Need for East Link Project 1.1 Purpose of the Project The purpose of the East Link Project is to expand the Sound Transit Link light rail system from Seattle to Mercer Island, Bellevue
More informationFunding Intelligent Transportation Systems in the Los Angeles Region
Funding Intelligent Transportation Systems in the Los Angeles Region 2017 ITS California Annual Meeting Ed Alegre, PTP Los Angeles County Metropolitan Transportation Authority (Metro) Los Angeles Region
More informationCharlotte Region HOV/HOT/Managed Lanes Analysis. Technical Memorandum Task 1.3 EVALUATION CRITERIA
Charlotte Region HOV/HOT/Managed Lanes Analysis Technical Memorandum Task 1.3 EVALUATION CRITERIA October 23, 2007 TABLE OF CONTENTS 1.0 EVALUATION PROCESS -------------------------------------------------------------------------------------------
More informationFreeway Management/Managed Lanes - New Publications/Resources:
FHWA Update on Managed Lanes/HOV/Congestion Pricing Greg Jones, FHWA Resource Center Presented at the Managed Lanes Committee Meeting, 2018 TRB Annual Meeting January 10, 2018 Freeway Management/Managed
More information10.0 Congestion Management Process
Livability 2040 Regional Transportation Plan 10-1 10.0 Congestion Management Process 10.1 CMP Summary The identification and evaluation of projects for the Livability 2040 Regional Transportation Plan
More informationChapter 1: Overview. page 1. Figure 2-1: Road congestion is expected to continue to grow
Chapter 1: Overview Figure 2-1: Road congestion is expected to continue to grow The region s mobility so fundamental to its economic vitality and quality of life is challenged by mounting congestion, rising
More informationAppendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance
Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Functional classification identifies the role a highway or street plays in the transportation system. Some highways
More informationLivability 2050 Regional Transportation Plan Update. RTPAC #4 October 16, 2018
Livability 2050 Regional Transportation Plan Update RTPAC #4 October 16, 2018 1 Meeting Agenda Timeline Financial Plan Update o Adopted Funding Scenario o Revenue Projections Prioritization Process Round
More informationCongestion Management Process in the US A Federal Requirement
Congestion Management Process in the US A Federal Requirement ITS Argentina November 6, 2013 U.S. Department of Transportation Federal Highway Administration Outline of Seminar Discussion of Congestion
More informationThe Metropolitan Transportation Plan. Public Meetings February 2016
The Metropolitan Transportation Plan for North Central Texas Public Meetings February 2016 Presentation Agenda Mobility 2040 Draft Recommendations RTC Policy Bundle Concept Transportation Improvement Program
More informationIntelligent Transportation Systems
Intelligent Transportation Systems TABLE OF CONTENTS Introduction... 3 Background... 3 Existing Conditions... 4 Traffic Signals... 4 Transit... 6 Parking... 6 Staffing... 7 Best Practices... 8 Recommendations...
More informationRichard Clarke Executive Director Program Management. Capital Program Management
Richard Clarke Executive Director Program Management Capital Program Management Department Overview > Transit, Highway Programs, and Regional Rail o Transit Deliver construction projects on-time and within
More informationATTACHMENT 3. Background:
Colorado Tolling Enterprise (CTE) or High Performance Transportation Enterprise Additional Information Requirements for Amendment Submittals for the DRCOG Fiscally Constrained RTP Adopted by DRCOG Board
More informationSouth Fulton Parkway Transit Feasibility Study Stakeholder Committee Meeting #2
South Fulton Parkway Transit Feasibility Study Stakeholder Committee Meeting #2 June 8, 2009 Meeting Agenda I. Study Purpose and Schedule II. III. Review of Previous Plans and Studies Transit Propensity
More informationStrategic Transportation Plan. Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc.
Strategic Transportation Plan Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc. June 11, 2014 1 Local Solutions for all Gateway Cities Communities
More informationINTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)
INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) TSITE 2016 Winter Meeting Nashville, TN February 25, 2016 AGENDA Project History IHSDM: Background & Overview IHSDM: Interstate 24 Model IHSDM: Interstate
More informationUS 75 Integrated Corridor Management
US 75 Integrated Corridor Management Koorosh Olyai,, P.E. Assistant Vice President Dallas Area Rapid Transit ITS Texas September 5, 2008 Why ICM is needed in the US 75 Corridor DFW 5 th most congested
More informationTransform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016
Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016 The Memorandum of Agreement (MOA) for the Transform 66: Inside the Beltway Project directs NVTC to
More informationFEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION
FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1
More informationSAN DIEGO SITE: I-15 ICM DEMONSTRATION PROJECT. TRB Joint Operations Committees Midyear Meeting Integrated Corridor Management July 18-21, 2011
SAN DIEGO SITE: I-15 ICM DEMONSTRATION PROJECT TRB Joint Operations Committees Midyear Meeting Integrated Corridor Management July 18-21, 2011 San Diego 2 Investments To Meet Growth Manage Lanes System
More informationThird AASHTO SSOM Webinar on Integrated Corridor Management. March 27, 2014
Third AASHTO SSOM Webinar on Integrated Corridor Management March 27, 2014 Agenda 1. Introduction/Kickoff Patrick Zelinski 2. Webinar Software Patrick Zelinski 3. Overview Bob Sheehan, Federal Highway
More informationCORE MPO Freight Transportation Plan. Project Advisory Committee December 3, 2014
CORE MPO Freight Transportation Plan Project Advisory Committee December 3, 2014 Agenda 9:30-9:40 Welcome-Introductions 9:40-10:10 Recap of Previous FAC Meetings 10:10 10:50 Land Use Analysis Update Review
More information2035 LRTP Transportation Options Introduction
2035 LRTP Transportation Options Introduction What is the 2035 LRTP? The 2035 Long-Range Transportation Plan (LRTP) is the guide for major transportation investments in the Durham-Chapel Hill-Carrboro
More informationAppendix O Level of Service Standard and Measurements
July 8, 2016 Appendix O. Appendix O Standard and Measurements Definition Level of service (LOS) is a mechanism used to determine how well a transportation facility is operating from a traveler s perspective.
More informationINTERCHANGE MODIFICATION REPORT
INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange
More informationFHWA Tolling and Pricing Programs. Angela Jacobs
FHWA Tolling and Pricing Programs Angela Jacobs February 17, 2011 Six Programs Express Lanes Demonstration Program: wayne.berman@dot.gov High Occupancy Vehicle Facilities: neil.spiller@dot.gov Value Pricing
More information12 Evaluation of Alternatives
12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information
More informationCritical Issues for Transportation Policy And Finance The Second William O. Lipinski Symposium on Transportation Policy
Critical Issues for Transportation Policy And Finance The Second William O. Lipinski Symposium on Transportation Policy Martin Wachs, Director Transportation, Space & Technology The RAND Corporation Many
More informationPreliminary Assessment of Interchange Concepts. Seven Corners Task Force March 11, 2014
Preliminary Assessment of Interchange Concepts Seven Corners Task Force March 11, 2014 Presentation overview Introduction Concept selection and refinement Future volume development and assignment Preliminary
More informationDeveloping a Successful ICM Project. Christopher Poe, Ph.D., P.E. Assistant Director Texas A&M Transportation Institute
Developing a Successful ICM Project Christopher Poe, Ph.D., P.E. Assistant Director Texas A&M Transportation Institute What is ICM? What is ICM? The integrated management of freeway, arterial, transit,
More informationCongestion Management Process (CMP)
Congestion Management Process (CMP) Introduction The Congestion Management Process (CMP) is a systematic, data-driven, and regionally accepted approach that aims to improve the performance of the transportation
More informationI-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012
I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation
More informationAlternatives Identification and Evaluation
I-290 Environmental Impact Statement West of Mannheim Road to East of Cicero Avenue Alternatives Identification and Evaluation May 2012 Draft Interim Report: Initial Alternatives Identification and Round
More informationChapter 6 Freight Plan
Chapter 6 Freight Plan Overview This chapter presents a review and assessment of needs, deficiencies, policies and improvement options affecting the freight transportation system within the Medford Urban
More informationAPPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level Alternatives
Sound Transit Regional Transit Long-Range Plan Draft Supplemental Environmental Impact Statement APPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level
More informationSCS Scenario Planning
E SCS Scenario Planning Introduction As part of the 2035 MTP/SCS process, AMBAG developed a series of land use and transportation alternative scenarios for evaluation and testing to demonstrate how the
More informationThe Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges
The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares
More informationAppendix L Greenhouse Gas 4-part Strategy
Appendix L Greenhouse Gas 4-part Strategy Supplementary information regarding options for further reducing greenhouse gas emissions in the Puget Sound region State and Federal Greenhouse Gas Emissions
More informationMEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates
MEMORANDUM #4 DATE: November 4, 2015 TO: FROM: SUBJECT: Warrenton TSP Project Management Team Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates Warrenton Transportation System Plan Update
More informationPROJECT SUBMISSION FORM
PROJECT SUBMISSION FORM Basic Project Information CEID 1182 1. Submitting Agency: MDOT/State Highway Administration 2. Secondary Agency: 3. Agency Project ID: 4. Project Type: Interstate Primary Secondary
More informationSection 11: Transportation Strategies Toolbox
Section 11: Transportation Strategies Toolbox A transportation strategies toolbox was developed to provide a systematic approach to identify potential strategies that address corridor transportation needs.
More informationMEMORANDUM EXAMPLES FOR ILLUSTRATIVE PURPOSES NEXT STEPS. Item 3 Long-Range Plan Task Force May 17, 2017
Item 3 Long-Range Plan Task Force May 17, 2017 MEMORANDUM TO: TPB Long-Range Plan Task Force FROM: Kanti Srikanth, TPB Staff Director SUBJECT: Sample list of improvement initiatives for illustrative purposes
More informationChapter 9: Vision Plan. Chapter 9. Vision Plan. Lake Loveland. Image 179 Credit: City of Loveland
Chapter 9 Vision Plan Lake Loveland. Image 179 Credit: City of Loveland Chapter 9: Vision Plan A. Regionally Significant Corridor and Regional Bike Corridor Visions Corridor visioning seeks to develop
More informationThe Metropolitan Transportation Plan. Public Meetings January 2016
The Metropolitan Transportation Plan for North Central Texas Public Meetings January 2016 Presentation Agenda Mobility 2040 Draft Recommendations 2016 Transportation Conformity RTC Policy Bundle Concept
More informationComparison of I-210 and I-710 as Potential ICM Corridors
Comparison of I-210 and I-710 as Potential ICM Corridors Positive Aspects Traffic sensors Very good PeMS coverage of freeway mainline, HOV lanes, and ramps Many intersections within Pasadena already equipped
More informationFederal Highway Administration Cooperative Automated Vehicle (CAV) Update
Federal Highway Administration Cooperative Automated Vehicle (CAV) Update AASHTO Committee on Traffic Engineering Kevin Sylvester Office of Transportation Operations Office of Operations Federal Highway
More informationExecutive Summary November 2018
2 018 LON G - R A N G E T R A N S P ORTAT I O N P L A N Executive Summary November 2018 2 This page intentionally left blank. Executive Summary 2018 Long-Range Transportation Plan 3 Executive Summary The
More informationLivability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018
Livability 2050 Regional Transportation Plan Update Transportation Policy Board (TPB) August 23, 2018 1 Oct. 2017 Plan Kick-Off Sept. 2019 Plan Adoption Timeline Livability 2050 Regional Transportation
More informationEXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050
EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 Introduction Goals Policies, and Performance Measures Growth Forecast and Planned Land Use Development Key Recommendations i Executive Summary April
More informationTransportation A Conversation on Regional Transportation. Tacoma City Manager April 15, Update to the Regional Transportation Plan
Transportation 2040 Update to the Regional Transportation Plan A Conversation on Regional Transportation Tacoma City Manager April 15, 2009 1 Puget Sound Regional Council The Region: 4 counties 82 cities
More informationExecutive Summary. What is the Regional Transportation Commission of Southern Nevada?
Executive Summary What is the Regional Transportation Commission of Southern Nevada? With more than 2 million people living in Southern Nevada and another 39 million tourists visiting our community annually,
More informationAppendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project
Appendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project Purpose of White Paper White Paper on Transit and the Tappan Zee Hudson River Crossing
More informationRESOLUTION NO
RESOLUTION NO. 2018-12 RESOLUTION OF THE SOUTHEASTERN WISCONSIN REGIONAL PLANNING COMMISSION AMENDING THE TRANSPORTATION IMPROVEMENT PROGRAM FOR SOUTHEASTERN WISCONSIN: 2017-2020 WHEREAS, the Southeastern
More information2016 Arizona Pavement/Materials Conference. Dennis Smith MAG Executive Director (602)
2016 Arizona Pavement/Materials Conference Dennis Smith MAG Executive Director (602) 254-6300 www.azmag.gov MAG Committee Structure MAG Membership Regional Planning Districts Councils of Governments (COGs)
More informationNW La Center Road/I-5 Interchange Improvement Project (MP 16.80)
FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,
More informationATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope
ATTACHMENT A Detailed Study Scope I-66 (Inside) Multi-modal Study Scope EXECUTIVE SUMMARY The Virginia Department of Transportation (VDOT) seeks consultant assistance in identifying and evaluating a range
More informationSR 710 Environmental Study
SR 710 Environmental Study Alternatives Analysis s Technical Advisory Committee Meeting No. 5 May 9, 2012 1 1 Agenda > Recap of TAC Meeting No. 4 > Recommended alternative concepts for conceptual engineering
More information41 st & Fox Station Area Property Owner Meeting August 16, 2018
Parking Maximum Overlay 41 st & Fox Station Area Property Owner Meeting August 16, 2018 1 Agenda What is this all about? Background 41 st & Fox Station Area Plan Vision Major Implementation Steps What
More informationConclusions & Lessons Learned
What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County
More informationLos Angeles County Congestion Reduction Demonstration Project
Los Angeles County Congestion Reduction Demonstration Project frequently asked questions update #1 /august 2008 Los Angeles County Metropolitan Transportation Authority (Metro), California Department of
More informationA three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.
MEMORANDUM TO: FROM: Highway 36/Rice Street PMT Mark Benson DATE: March 23, 2009 RE: Selection of a Preferred Alternative SEH No. 105803 The purpose of this memorandum is to document the process for selecting
More informationTRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7
TRANSPORTATION Like many growing western counties, Douglas County focuses on one of the most integral elements in land-use planning: transportation. The primary purpose of a transportation network is to
More informationInterstate 66 Tier 1 Environmental Impact Statement Public Hearing
Interstate 66 Tier 1 Environmental Impact Statement Public Hearing 1 Project Corridor Study Process / Tiering Approach Tier 1 EIS focuses on broad issues - Purpose and need - Mode / Technology choice -
More informationAppendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY
Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY 2014 REGIONAL CONGESTION MANAGEMENT PROGRAM 2014 RTP/SCS APPENDIX O SAN JOAQUIN COUNCIL OF GOVERNMENTS
More informationOperations in the 21st Century DOT Meeting Customers Needs and Expectations
Operations in the 21st Century DOT Meeting Customers Needs and Expectations 1 Purpose of this Meeting: Share Thoughts & Discuss Challenges brought about by the changing transportation environment and public
More informationP4.0 Highway Quantitative Scoring Workgroup Recommendations
P4.0 Highway Quantitative Scoring Workgroup Recommendations May 18, 2015 Highway Project Scoring Overview Insert Table of Eligibility Statewide Mobility Regional Impact Division Needs Eligible Projects:
More informationy Significant Regionall FINAL REPORT
R E G I O N A L LY CO gi on RR a ID l ly O Sig RS n i ST f i c a UD n t Y think Re PI A S MA G SO O C V E IA R N TIO M N EN O TS F FINAL REPORT January 2014 Final Report January 2014 Table of Contents
More informationCHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS
HPTER 5 PRLLEL PRKWY ORRIDOR IMPROVEMENTS nother key area within the Village West study area is the Parallel Parkway corridor. This chapter focuses on the segment of Parallel Parkway between 106 th Street
More informationSouth Bay Metro Green Line Extension
Meeting Agenda Project overview and update Recap of the Scoping Meetings Progress on the project alternative and proposed station locations Meeting Schedule 6:00 Open House 6:30 Presentation 7:15 Public
More informationI-95 Corridor Study Phase II Highway Element
I-95 Corridor Study Phase II Highway Element FAMPO Policy Committee July 16, 2018 1 I-95 Phase 2 Study Final Report A final report is being created to document the findings of the I-95 Phase 2 Study and
More informationAssessment of Current Status, Plans, and Preliminary Alternatives for High Capacity Transportation in the I-5 Corridor
CONNECTING THURSTON COUNTY AND THE CENTRAL PUGET SOUND Alternatives to Meet Transportation Needs in the I-5 Corridor Working Paper #1 June 2011 Assessment of Current Status, Plans, and Preliminary Alternatives
More information