1 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017

2 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix This page intentionally left blank. PlaceWorks

3 = Storm Drain System The campus is served by a private on-site storm drainage system consisting of a series of pipes ranging between 4 and 36 in diameter that collect runoff from building roof drains and site area drains. The storm drainage system ultimately ties into an existing 36 storm drain main in La Piedra Road at the northeast end of the campus which drains to a lake northeast of the site, and ultimately to Salt Creek. The proposed on-site storm drainage system shall piggyback off the existing system, and shall be designed in accordance with the requirements of the City of Menifee as well as the Riverside County Flood Control and Water Conservation District s Hydrology Manual and Standard Drawings. The new storm drain pipes will gravity flow to bioretention basins (which will act as both detention basins and water quality BMPs), then ultimately to the existing storm drainage system. Proposed building roof drains and site area drains shall utilize PVC or HDPE pipe. As requested by the City of Menifee, a WQMP (Water Quality Management Plan) for Master Planning is being developed in conjunction with the DEIR. The purpose of the WQMP is to provide supporting studies and calculations indicating whether post-development flows might adversely impact existing receiving facilities, and if mitigation measures are required. The WQMP includes a drainage study analyzing the anticipated post-development flows and comparing to pre-development flows. Should post-development flows exceed pre-development flows, mitigation measures will be required on-site to restrict excess runoff. A summary of the Drainage Study is as follows: Sizing of storm drainage piping is based on post-development 100-year peak flows as determined using the Rational Method in accordance with Riverside County Flood Control and Water Conservation District s Hydrology Manual. The WinTR-55 hydrology modeling program is also used to compare postdevelopment vs. pre-development flows. The difference in runoff amount will be mitigated by the detention characteristics of the proposed bioretention basins. The WinTR-55 hydrology program, developed by the US Department of Agriculture, assumes the following storm data per NOAA Atlas 14, Volume 6, for the 24-hour storm in Menifee: NOAA Atlas 14, Volume 6 for the 24-hour storm Rainfall Return Period (years): Rainfall Amount (inches): The following Runoff Index Numbers were assumed for the following cover types: Runoff Index Numbers for Pervious Areas Cover Type: Soil Group: A B C D Commercial Landscaping (good quality): Field, Turf (good quality): Undeveloped Natural Grass, Annual (fair quality): Gravel: Developed Commercial (average 85% impervious): In all cases, soil group D is assumed. Since the project proposes to utilize the three existing off-site discharge points, the site is divided into three sheds (A, B and C). See attached shed maps.

4 The increase in storm water runoff is primarily due to the increase in impervious area. Table 1, below, presents the anticipated increase in impervious area at full-buildout of the campus for the three sheds as well as the overall site: Table 1: Summary of Anticipated Increase of Impervious Area Shed Pre-Development Shed Tributary Area Pre-Development Impervious Area (Percentage) Post-Development Shed Tributary Area at Full-Buildout Page 2 Post-Development Impervious Area (Percentage) at Full-Buildout Shed A 46.7 ac 27.0 ac (57.8%) 50.9 ac 36.3 ac (71.3%) Shed B 4.0 ac 0.2 ac (6.3%) 4.3 ac 3.3 ac (75.4%) Shed C 28.2 ac 4.1 ac (14.6%) 23.7 ac 14.7 ac (62.3%) Overall Site 78.9 ac 31.3 ac (39.7%) 78.9 ac 54.3 ac (68.8%) Table 2, below, summarizes the peak flows at the downstream outlet locations for sheds A, B, and C for the 100-year storm events: Table 2: Summary of Peak Storm Water Flows Shed Pre-Development Shed Tributary Area Pre-Development 100-Year Peak Flow Post-Development Shed Tributary Area at Full-Buildout Post-Development 100-Year Peak Flow Shed A 46.7 ac 42.2 cfs 50.9 ac 49.1 cfs Shed B 4.0 ac 3.5 cfs 4.3 ac 4.9 cfs Shed C 28.2 ac 20.5 cfs 23.7 ac 25.2 cfs Referring to the WinTR-55 program outputs on the following pages, the required detention volumes are estimated as follows: Shed A (Post-Dev Runoff Depth) (Pre-Dev Runoff Depth) x Shed Area = Detention Volume (4.204 inches inches) x acres = 0.11 acre-ft, or 4,800 cubic feet Shed B (Post-Dev Runoff Depth) (Pre-Dev Runoff Depth) x Shed Area = Detention Volume (4.299 inches inches) x 4.34 acres = 0.19 acre-ft, or 8,200 cubic feet Shed C (Post-Dev Runoff Depth) (Pre-Dev Runoff Depth) x Shed Area = Detention Volume (4.097 inches inches) x acres = 0.72 acre-ft, or 31,200 cubic feet Total Site 4, , ,200 = 44,200 cubic feet Referring to the section titled Water Quality, approximately 2.7 acres of bioretention basins are anticipated for the site. The basins will store water at select locations throughout the site at a depth of 6 inches each. This results in a total detention capacity of 2.7 ac x 43,560 sf/ac x 0.5 ft = 58,800 cubic feet which exceeds the required detention volume of 44, 200 cubic feet.

5 ALBION LANE ANTELOPE ROAD LA PIEDRA ROAD STORM OUTLET 'A' (N) PERFORMING ARTS STORM OUTLET 'B' STORM OUTLET 'C' LEGEND 1" = 200' STORM DRAIN EXHIBIT - PHASE 1 Menifee Valley Campus June 2017 Mt. San Jacinto Community College District La Piedra Road Menifee, CA 92584

6 ALBION LANE ANTELOPE ROAD LA PIEDRA ROAD STORM OUTLET 'A' (N) PERFORMING ARTS STORM OUTLET 'B' STORM OUTLET 'C' LEGEND 1" = 200' STORM DRAIN EXHIBIT - FULL BUILDOUT Menifee Valley Campus June 2017 Mt. San Jacinto Community College District La Piedra Road Menifee, CA 92584

7 ANTELOPE ROAD LEGEND LA PIEDRA ROAD STORM OUTLET 'A' STORM OUTLET 'B' SHED A1.1 STORM OUTLET 'C' SHED A1.3 SHED AREA = ac LANDSCAPE = 2.61 ac SHED A1.6 SHED AREA = 9.76 ac LANDSCAPE = 1.69 ac SHED A1.2 SHED AREA = 3.61 ac LANDSCAPE = 1.28 ac SHED A1.4 SHED AREA = 1.56 ac LANDSCAPE = 0.58 ac SHED A1.5 SHED AREA = 5.84 ac LANDSCAPE = 1.24 ac SHED AREA =2.73 ac LANDSCAPE =0.73 ac SHED B1.1 SHED AREA = 4.02 ac LANDSCAPE = 0.01 ac UNDEVELOPED = 3.54 ac GRAVEL = 0.22 ac SHED C1.2 SHED AREA = ac UNDEVELOPED = ac ATHLETIC FIELD = 3.70 ac SHED C1.1 SHED AREA = 7.16 ac LANDSCAPE = 1.24 ac UNDEVELOPED = 1.71 ac FIELD = 0.05 GRAVEL = 0.19 ac DRAINAGE STUDY SHED MAP - PRE DEVELOPMENT Menifee Valley Campus Mt. San Jacinto Community College District La Piedra Road Menifee, CA June 2017 SHED A1.7 SHED AREA = ac UNDEVELOPED = ac 1" = 200' ALBION LANE

8 LA PIEDRA ROAD REACH 0-1 REACH 2-3 REACH 1-2 SHED A1.1 STORM OUTLET 'A' STORM OUTLET 'B' REACH 0-1 STORM OUTLET 'C' ANTELOPE ROAD SHED A1.3 SHED AREA = ac LANDSCAPE = 2.61 ac SHED A1.6 SHED AREA = 9.76 ac LANDSCAPE = 1.69 ac REACH 6-7 SHED A1.2 SHED AREA = 3.61 ac LANDSCAPE = 1.28 ac SHED A1.4 SHED AREA = 1.56 ac LANDSCAPE = 0.58 ac REACH 5-6 SHED A1.5 SHED AREA = 5.84 ac LANDSCAPE = 1.24 ac SHED AREA =2.73 ac LANDSCAPE =0.73 ac REACH 4-5 REACH 1-4 SHED B1.1 SHED AREA = 4.02 ac LANDSCAPE = 0.01 ac UNDEVELOPED = 3.54 ac GRAVEL = 0.22 ac SHED C1.2 SHED AREA = ac UNDEVELOPED = ac ATHLETIC FIELD = 3.70 ac SHED C1.1 REACH 0-1 REACH 1-2 SHED AREA = 7.16 ac LANDSCAPE = 1.24 ac UNDEVELOPED = 1.71 ac FIELD = 0.05 GRAVEL = 0.19 ac TR-55 MODEL - PRE DEVELOPMENT Menifee Valley Campus Mt. San Jacinto Community College District La Piedra Road Menifee, CA June 2017 SHED A1.7 SHED AREA = ac UNDEVELOPED = ac 1" = 200' ALBION LANE

9 LEGEND STORM OUTLET 'A' LA PIEDRA ROAD STORM OUTLET 'B' STORM OUTLET 'C' SHED B2.1 SHED AREA = 3.38 ac LANDSCAPE = 0.84 ac SHED AREA = 4.35 ac LANDSCAPE = 1.07 ac SHED C2.2 SHED A2.3 SHED A2.4 SHED AREA = ac LANDSCAPE = 1.91 ac SHED AREA = 1.85 ac LANDSCAPE = 1.02 ac SHED AREA = 1.57 ac LANDSCAPE = 0.49 ac SHED A2.6 SHED AREA = 2.92 ac LANDSCAPE = 0.55 ac SHED A2.5 ANTELOPE ROAD DRAINAGE STUDY SHED MAP - POST DEVELOPMENT Menifee Valley Campus SHED A2.2 SHED AREA =2.64 ac LANDSCAPE =1.18 ac SHED C2.1 SHED AREA = 2.38 ac LANDSCAPE = 0.40 ac SHED AREA = 6.00 ac LANDSCAPE = 1.67 ac SHED A2.8 SHED AREA = 8.41 ac LANDSCAPE = 2.38 ac SHED A2.7 SHED AREA = 3.16 ac LANDSCAPE = 1.10 ac SHED C2.3 SHED AREA = 6.94 ac LANDSCAPE = 1.42 ac ATHLETIC FIELD = 1.32 ac SHED A2.9 SHED AREA = 2.03 ac LANDSCAPE = 0.88 ac SHED C2.5 (N) PERFORMING ARTS SHED AREA = 1.26 ac LANDSCAPE = 0.31 ac Mt. San Jacinto Community College District La Piedra Road Menifee, CA SHED A2.1 June 2017 SHED C2.4 SHED A2.10 SHED AREA = ac LANDSCAPE = 3.63 ac ALBION LANE SHED C2.6 SHED AREA = 5.19 ac LANDSCAPE = 1.49 ac SHED AREA = 6.03 ac LANDSCAPE = 1.09 ac ATHLETIC FIELD = 1.86 ac 1" = 200'

10 REACH 6-7 REACH 4-6 ANTELOPE ROAD SHED A2.3 SHED AREA = ac LANDSCAPE = 1.91 ac LA PIEDRA ROAD SHED A2.8 SHED AREA = 8.41 ac LANDSCAPE = 2.38 ac SHED A2.4 REACH 0-1 REACH 2-3 REACH 1-2 SHED A2.2 SHED AREA = 3.38 ac LANDSCAPE = 0.84 ac SHED AREA = 1.57 ac LANDSCAPE = 0.49 ac SHED A2.5 SHED A2.9 SHED A2.1 SHED AREA =2.64 ac LANDSCAPE =1.18 ac REACH 4-5 SHED AREA = 6.00 ac LANDSCAPE = 1.67 ac SHED AREA = 2.03 ac LANDSCAPE = 0.88 ac REACH 7-8 REACH 1-4 SHED C2.5 SHED B2.1 SHED AREA = 4.35 ac LANDSCAPE = 1.07 ac SHED A2.7 SHED AREA = 3.16 ac LANDSCAPE = 1.10 ac SHED AREA = 1.26 ac LANDSCAPE = 0.31 ac STORM OUTLET 'A' STORM OUTLET 'B' SHED A2.6 REACH 0-1 SHED AREA = 2.92 ac LANDSCAPE = 0.55 ac SHED C2.2 SHED AREA = 1.85 ac LANDSCAPE = 1.02 ac SHED C2.3 SHED C2.1 SHED AREA = 2.38 ac LANDSCAPE = 0.40 ac SHED AREA = 6.94 ac LANDSCAPE = 1.42 ac ATHLETIC FIELD = 1.32 ac REACH 4-5 REACH 0-2 STORM OUTLET 'C' REACH 0-1 REACH 1-3 REACH 3-4 TR-55 MODEL - POST DEVELOPMENT Menifee Valley Campus Mt. San Jacinto Community College District La Piedra Road Menifee, CA June 2017 SHED C2.4 SHED A2.10 SHED C2.6 SHED AREA = 6.03 ac LANDSCAPE = 1.09 ac ATHLETIC FIELD = 1.86 ac SHED AREA = ac LANDSCAPE = 3.63 ac SHED AREA = 5.19 ac LANDSCAPE = 1.49 ac 1" = 200' ALBION LANE

11 WinTR-55 Current Data Description --- Identification Data --- User: P. Herzer, LPA Date: 5/30/2017 Project: Menifee Master Planning Units: English SubTitle: Shed A, Pre Development Areal Units: Acres State: California County: Riverside Filename: C:\Users\pherzer\AppData\Roaming\WinTR-55\Menifee Shed A Pre.w Sub-Area Data --- Name Description Reach Area (ac) RCN Tc (hr) 10-Yr (cfs) 100-Yr (cfs) Shed A1.1 Reach Shed A1.2 Reach Shed A1.3 Reach Shed A1.4 Reach Shed A1.5 Reach Shed A1.6 Reach Shed A1.7 Reach Total area: (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 200-Yr (in) (in) (in) (in) (in) (in) (in) Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate 10-Yr Rate 100-Yr Identifier (sq mi) Location (in) (ft) (min) (cfs) (cfs) OUTLET WinTR-20 Version 1.10 Page 1 5/30/ :38

12 WinTR-55 Current Data Description --- Identification Data --- User: P. Herzer, LPA Date: 5/30/2017 Project: Menifee Master Planning Units: English SubTitle: Shed A, Post Development Areal Units: Acres State: California County: Riverside Filename: C:\Users\pherzer\AppData\Roaming\WinTR-55\Menifee Shed A Post.w Sub-Area Data --- Name Description Reach Area (ac) RCN Tc (hr) 10-Yr (cfs) 100-Yr (cfs) Shed A2.1 Reach Shed A2.2 Reach Shed A2.3 Reach Shed A2.4 Reach Shed A2.5 Reach Shed A2.6 Reach Shed A2.7 Reach Shed A2.8 Reach Shed A2.9 Reach Shed A2.10 Reach Total area: (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 200-Yr (in) (in) (in) (in) (in) (in) (in) Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate 10-Yr Rate 100-Yr Identifier (sq mi) Location (in) (ft) (min) (cfs) (cfs) OUTLET WinTR-20 Version 1.10 Page 1 5/30/ :36

13 WinTR-55 Current Data Description --- Identification Data --- User: P. Herzer, LPA Date: 5/30/2017 Project: Menifee Master Planning Units: English SubTitle: Shed B, Pre Development Areal Units: Acres State: California County: Riverside Filename: C:\Users\pherzer\AppData\Roaming\WinTR-55\Menifee Shed B Pre.w Sub-Area Data --- Name Description Reach Area (ac) RCN Tc (hr) 10-Yr (cfs) 100-Yr (cfs) Shed B1.1 Reach Total area: 4.02 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 200-Yr (in) (in) (in) (in) (in) (in) (in) Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate 10-Yr Rate 100-Yr Identifier (sq mi) Location (in) (ft) (min) (cfs) (cfs) OUTLET WinTR-20 Version 1.10 Page 1 5/30/ :59

14 WinTR-55 Current Data Description --- Identification Data --- User: P. Herzer, LPA Date: 5/30/2017 Project: Menifee Master Planning Units: English SubTitle: Shed B, Post Development Areal Units: Acres State: California County: Riverside Filename: C:\Users\pherzer\AppData\Roaming\WinTR-55\Menifee Shed B Post.w Sub-Area Data --- Name Description Reach Area (ac) RCN Tc (hr) 10-Yr (cfs) 100-Yr (cfs) Shed B2.1 Reach Total area: 4.34 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 200-Yr (in) (in) (in) (in) (in) (in) (in) Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate 10-Yr Rate 100-Yr Identifier (sq mi) Location (in) (ft) (min) (cfs) (cfs) OUTLET WinTR-20 Version 1.10 Page 1 5/30/ :17

15 WinTR-55 Current Data Description --- Identification Data --- User: P. Herzer, LPA Date: 5/30/2017 Project: Menifee Master Planning Units: English SubTitle: Shed C, Pre Development Areal Units: Acres State: California County: Riverside Filename: C:\Users\pherzer\AppData\Roaming\WinTR-55\Menifee Shed C Pre.w Sub-Area Data --- Name Description Reach Area (ac) RCN Tc (hr) 10-Yr (cfs) 100-Yr (cfs) Shed C1.1 Reach Shed C1.2 Reach Total area: (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 200-Yr (in) (in) (in) (in) (in) (in) (in) Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate 10-Yr Rate 100-Yr Identifier (sq mi) Location (in) (ft) (min) (cfs) (cfs) OUTLET WinTR-20 Version 1.10 Page 1 5/30/ :36

16 WinTR-55 Current Data Description --- Identification Data --- User: P. Herzer, LPA Date: 5/30/2017 Project: Menifee Master Planning Units: English SubTitle: Shed C, Post Development Areal Units: Acres State: California County: Riverside Filename: C:\Users\pherzer\AppData\Roaming\WinTR-55\Menifee Shed C Post.w Sub-Area Data --- Name Description Reach Area (ac) RCN Tc (hr) 10-Yr (cfs) 100-Yr (cfs) Shed C2.1 Reach Shed C2.2 Reach Shed C2.3 Reach Shed C2.4 Reach Shed C2.5 Reach Shed C2.6 Reach Total area: (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 200-Yr (in) (in) (in) (in) (in) (in) (in) Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate 10-Yr Rate 100-Yr Identifier (sq mi) Location (in) (ft) (min) (cfs) (cfs) OUTLET WinTR-20 Version 1.10 Page 1 5/30/ :48

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT: HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA 90731 (310) 241-2992 FOR THE PROJECT: PERRIS VALLEY COMMERCE CENTER BUILDING PERRIS, CALIFORNIA PROJECT NUMBER:

More information

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data February 2017 MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

Design Handbook. Low Impact Development Best Management Practices

Design Handbook. Low Impact Development Best Management Practices Design Handbook for Low Impact Development Best Management Practices Prepared by: 9/2011 Riverside County Flood Control and Water Conservation District 1995 Market Street Riverside, CA 92501 TABLE OF CONTENTS

More information

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E. Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1 Geoffrey A. Cerrelli 1, P.E. 1 Hydraulic Engineer USDA/NRCS, One Credit Union Place,

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

SAN GORGONIO PASS CAMPUS - PHASE I

SAN GORGONIO PASS CAMPUS - PHASE I SAN GORGONIO PASS CAMPUS - PHASE I Banning, CA DRAINAGE STUDY June 16, 2010 Reference 106-195 PREPARED BY: Encompass Associates, Inc. 5699 Cousins Place Rancho Cucamonga, CA 91737 909-684-0093 Fax-909-586-6979

More information

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Module 3 and Module 4 Watershed Analysis and RUSLE Calculation by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

Subject: Mt. San Antonio College- Measure RR Updated Hydrology Study

Subject: Mt. San Antonio College- Measure RR Updated Hydrology Study To: Cc: Mike Klein Mt. San Antonio College Sidney Lindmark, AICP Mt SAC Environmental Consultant From: Alysen Weiland, PE - Psomas Date: May 6, 2016 Subject: Mt. San Antonio College- Measure RR Updated

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

Applying the Water Quality Volume

Applying the Water Quality Volume Applying the Water Quality Volume Justin Reinhart, PE Division of Surface Water Northeast Ohio Stormwater Training Council Cleveland, Ohio & Richfield, Ohio July 12, 2018 July 25, 2018 Post-Construction

More information

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report

More information

Sizing Calculations and Design Considerations for LID Treatment Measures

Sizing Calculations and Design Considerations for LID Treatment Measures SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

More information

SAMPLE DRAINAGE STATEMENT

SAMPLE DRAINAGE STATEMENT Firm Name & Logo Hidalgo County Drainage District No. 1 Drainage Statement Subdivision Name Hidalgo County, Texas Prepared By: Firm's Name Address City, State, Zip Telephone Fax Email Date SAMPLE DRAINAGE

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Jill Bicknell, P.E., EOA, Inc. Presentation Overview Sizing/Design of Self Treating and Self Retaining Areas

More information

Engineering Bulletin 11-02

Engineering Bulletin 11-02 ENGINEERING, SURVEYING & PERMIT SERVICES DEPARTMENT CHARLES LACKEY, P.E., DIRECTOR 2700 M STREET, SUITE 570 BAKERSFIELD, CA 93301-2370 Phone: (661) 862-8603 Fax: (661) 862-5149 E-mail: esps@co.kern.ca.us

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN)

DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN) DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN ( PLAN) ALAMITOS BEACH CONCESSION BUILDING 780 E. SHORELINE DRIVE LONG BEACH, CALIFORNIA Prepared For: Long Beach Public Works 333 W. Ocean

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,

More information

IBS Site Drainage: Senior Design Project

IBS Site Drainage: Senior Design Project IBS Site Drainage: Senior Design Project Len Wright, Ph.D., PE Lecturer, CEAE Wright.Len@gmail.com September 11, 2008 mwsw204i1.ppt/1 OUTLINE Motivation for Stormwater Management Quantity (both onsite,

More information

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM June 2017 C.3 Workshop Sizing Example Section II. Sizing for Volume-Based Treatment Measures Section II.B Sizing Volume-Based Treatment Measures

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan Scrubber Ponds Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.14 17:54:29-05'00' 234 West Century Avenue

More information

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado. November 4, Project No.

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado. November 4, Project No. DRAINAGE STUDY 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado November 4, 2014 Project No. 14-2953 Prepared for Mr. Robert Myers Caribbean Group P.O. Box N 1968

More information

A Hydrologic Study of the. Ryerson Creek Watershed

A Hydrologic Study of the. Ryerson Creek Watershed A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2

More information

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental

More information

SITE HYDROLOGY. Created by PRE-CONSTRUCTION S>30% 10<S<30 5<S<10 0<S<5 .35>C>.28.28>C>.20.20>C>.14.14>C>.08 NO SOIL CLAY WELL DRAINED SAND

SITE HYDROLOGY. Created by PRE-CONSTRUCTION S>30% 10<S<30 5<S<10 0<S<5 .35>C>.28.28>C>.20.20>C>.14.14>C>.08 NO SOIL CLAY WELL DRAINED SAND AYS ENGINEERING GROUP, Inc Client job no location Date Created by PRE- & POST-CONSTRUCTION RUNOFF ANALYSIS PRE-CONSTRUCTION Area 112,364 SF 2.58 ACRES TOTAL AREA OF ENTIRE PROPERTY. C FACTOR ADDITIVE METHOD=

More information

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green

More information

SIZING. MWS Linear. Hybrid Stormwater Filtration System. P.O. Box 869 P Oceanside, CA F

SIZING. MWS Linear. Hybrid Stormwater Filtration System. P.O. Box 869 P Oceanside, CA F SIZING MWS Linear Hybrid Stormwater Filtration System Modular Wetland Systems, Inc. www.modularwetlands.com P.O. Box 869 P 760-433-7640 Oceanside, CA 92049 F 760-433-3179 SIZING Many municipal stormwater

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural

More information

SEWRPC Staff Memorandum

SEWRPC Staff Memorandum SEWRPC Staff Memorandum EVALUATION OF PROPOSED STORMWATER QUANTITY MANAGEMENT FOR THE DES PLAINES RIVER WATERSHED PORTION OF THE PROPOSED FOXCONN DEVELOPMENT IN THE VILLAGE OF MOUNT PLEASANT June, 2018

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood

Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood WATER RESOURCES Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood Charles Crowell, PE Stormwater Section Manager October 2016 WATER RESOURCES The Old Traditional Stormwater

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data August 2017 I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE by James C.Y. Guo. Professor, Civil Engineering, U. Of Colorado at Denver, James.Guo@cudenver.edu.. And Eric Hsu, Project Engineer, Parson

More information

Appendix H Amanda Estates Drainage Study

Appendix H Amanda Estates Drainage Study Appendix H Amanda Estates Drainage Study Hunsaker & Associates 2015 Contents 1 Scope... 1 2 Existing Conditions... 1 3 Project Description... 3 4 Methodology... 5 4.1 Hydrology... 5 4.2 Hydraulics...

More information

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017 STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project

More information

RATIONAL METHOD INPUT PARAMETERS

RATIONAL METHOD INPUT PARAMETERS RATIONAL METHOD INPUT PARAMETERS TIME OF CONCENTRATION Study Area Rational Method Nodes Upper Elevation, ft Lower Elevation, ft Flow Length, mi Tc, min Quarry Phase 1 10 12 352.2 221 0.014 0.17 Quarry

More information

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc.

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. STORMWATER CONTROL PLAN 23 LOT SUBDIVISION ON PROCTOR ROAD CASTRO VALLEY, CALIFORNIA Owner/Developer: Hue Tran 4584 Ewing

More information

Warner Robins Stormwater Local Design Manual

Warner Robins Stormwater Local Design Manual Warner Robins Stormwater Local Design Manual Prepared for Houston County City of Warner Robins City of Perry City of Centerville May 17, 2005 Version 4 (As presented with adopted Stormwater Ordinance)

More information

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR:

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: APPENDIX H GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: NORTHERN NEW ENGLAND PASSENGER RAIL AUTHORITY (NNEPRA) 75 WEST COMMERCIAL STREET, SUITE 104

More information

HOMELAND / ROMOLAND AREA DRAINAGE PLAN

HOMELAND / ROMOLAND AREA DRAINAGE PLAN RIVERSIDE COUNTY CALIFORNIA HOMELAND / ROMOLAND AREA DRAINAGE PLAN Amendment No. 3 JULY 2014 By the Riverside County Board of Supervisors Prepared and Adopted Pursuant to Government Code Section 66483,

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

LIST OF TABLES... ii LIST OF FIGURES... iii LIST OF APPENDICES... iv. Section 1 - Introduction Purpose of Study... 1

LIST OF TABLES... ii LIST OF FIGURES... iii LIST OF APPENDICES... iv. Section 1 - Introduction Purpose of Study... 1 Preliminary Hydrologic Analysis for Alberhill Villages April 2015 TABLE OF CONTENTS Section Name Page Number LIST OF TABLES... ii LIST OF FIGURES... iii LIST OF APPENDICES... iv Section 1 - Introduction...

More information

UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS

UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS Burlington Summit The Gutierrez Company One Wall Street, Burlington, MA July, Prepared by, Symmes Maini & McKee Associates Cambridge, MA SMMA No. PROJECT

More information

Rhode Island Stormwater Design and Installations Standards Manual

Rhode Island Stormwater Design and Installations Standards Manual Rhode Island Stormwater Design and Installations Standards Manual Public Workshop Required Management Volume Calculations and Redevelopment Considerations March 22, 2011 Presentation Outline Recap of How

More information

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado. November 25, Project No.

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado. November 25, Project No. DRAINAGE STUDY 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado November 25, 2014 Project No. 14-2953 Prepared for Mr. Robert Myers Caribbean Group P.O. Box N 1968

More information

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

Stormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019

Stormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019 Stormwater Review Part 2 Rainfall and Runoff Tom Seybert, PE and Andy Bennett, PE Pennsylvania Surveyors Conference 2019 1 Topics Covered 1. Rainfall characteristics and sources 2. Watershed characteristics

More information

Modeling Infiltration BMPs

Modeling Infiltration BMPs Modeling Infiltration BMPs CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Design Goals for Calculations 1. Mitigate Peak Rates 2-Year to 100-Year 2. No Volume

More information

Appendix C.1. Design Example 1 Shallow Wetland (W-1)

Appendix C.1. Design Example 1 Shallow Wetland (W-1) Appendix C.1 Design Example 1 Shallow Wetland (W-1) Design Example 1 Shallow Wetland (W-1) The following example demonstrates the process for the design of a shallow wetland (W-1) BMP. Site Specific Data

More information

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers DRAINAGE REPORT Project Name: PG&E Gas Operations Technical Training Center Winters, CA Date: February 4, 2015 Prepared by: BKF Engineers Client: Pacific Gas & Electric Company This report has been prepared

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Environmental Design Group

Environmental Design Group SEDIMENT CONTROL DURING CONSTRUCTION, STORMWATER MANAGEMENT AND POST CONSTRUCTION BMP REPORT for Hudson Salt Storage and Bus Garage 5810 Hudson Drive HUDSON, OHIO SUMMIT COUNTY Prepared by Environmental

More information

Activity Calculating Property Drainage

Activity Calculating Property Drainage Page 1 of 5 Activity 2.3.11 Calculating Property Drainage Introduction When a property is developed, it is important to understand that changes to watershed characteristics (i.e., land use, slope, soil

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

Appendix E.2 Preliminary Hydrology Report

Appendix E.2 Preliminary Hydrology Report Appendix E.2 Preliminary Hydrology Report PRELIMINARY HYDROLOGY STUDY HARVARD WESTLAKE SCHOOL PARKING STRUCTURE 3700 Coldwater Canyon North Hollywood, CA 91604 KPFF Job # 109046 August 12, 2013 CLIENT:

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report November 21, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR 257.81) Pawnee Station CCR Landfill Public Service Company of Colorado Denver, Colorado October 17,

More information

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014 Decatur, Georgia Stormwater Management Policy Guidelines Stormwater Management Policy Guidelines Decatur, Georgia STORMWATER MANAGEMENT POLICY GUIDELINES 1.0 Introduction... 3 2.0 Determining Predevelopment

More information

Water Quality Management Plan

Water Quality Management Plan Water Quality Management Plan For El Centro Aquatic Center Park Avenue between 4 th Street and 6 th Street August 5, 216 Prepared by Arsalan Dadkhah, Ph.D., PE (RCE 4156) D-MAX Engineering, Inc. 722 Trade

More information

Local Stormwater Design Manual. City of Fairburn

Local Stormwater Design Manual. City of Fairburn APPENDIX D LOCAL STORMWATER DESIGN MANUAL Local Stormwater Design Manual City of Fairburn May 2008 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS...

More information

Results shown on 'Detailed Summary' tab

Results shown on 'Detailed Summary' tab Fill in site's Pre Development parameters on 'Pre' tab (Site Area, Drainage Area, Impervious Area, CNpre, tc) Prior to using BSD or BMP practices, fill in site's Post Development parameters on 'Post' tab

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

4.16 UTILITIES AND SERVICE SYSTEMS

4.16 UTILITIES AND SERVICE SYSTEMS 4.16 UTILITIES AND SERVICE SYSTEMS This section evaluates the effects of the proposed project with regard to utilities and service systems by identifying anticipated demand and existing and planned utility

More information

Culvert Sizing procedures for the 100-Year Peak Flow

Culvert Sizing procedures for the 100-Year Peak Flow CULVERT SIZING PROCEDURES FOR THE 100-YEAR PEAK FLOW 343 APPENDIX A: Culvert Sizing procedures for the 100-Year Peak Flow A. INTRODUCTION Several methods have been developed for estimating the peak flood

More information

DRAINAGE BASICS Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements

DRAINAGE BASICS Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements DRAINAGE BASICS 1 Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements 2 Common Terminology & Useful Tools CFS= Cubic Feet per Second-

More information

DRAINAGE PLAN AND REPORT OLD DENVER ROAD

DRAINAGE PLAN AND REPORT OLD DENVER ROAD DRAINAGE PLAN AND REPORT 16140 OLD DENVER ROAD PART OF THE NW1/4 SEC. 28, T.11S., R.67W., 6 th P.M. EL PASO COUNTY February 3, 2017 Revised January 5, 2018 Prepared for All About Outdoor Storage Oliver

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

Santa Margarita Region of Riverside County

Santa Margarita Region of Riverside County Santa Margarita Region of Riverside County Water Quality Management Plan (WQMP), Hydromodification Management Plan (HMP) Program Training Presented by: Daniel Apt, CPSWQ, CPESC Vice President Kevin Villarama

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011

More information

Water Resources Management Plan

Water Resources Management Plan B u r n s v i l l e M i n n e s o t a Water Resources Management Plan - Volume Control / Infiltration Worksheet This Appendix contains a worksheet and related information that can be used for evaluating

More information