Proposed Changes to the Annual Gas Transmission DOT Report Concerning MAOP Verification. NGA Fall Operations Conference October 4, 2012 Mary Holzmann

Size: px
Start display at page:

Download "Proposed Changes to the Annual Gas Transmission DOT Report Concerning MAOP Verification. NGA Fall Operations Conference October 4, 2012 Mary Holzmann"

Transcription

1 Proposed Changes to the Annual Gas Transmission DOT Report Concerning MAOP Verification NGA Fall Operations Conference October 4, 2012 Mary Holzmann

2 National Grid In the US, we serve 3.4 million customers over a network of nearly 32,000 miles of pipe throughout New York, Massachusetts, Rhode Island. We have just recently sold our New Hampshire Assets. 2

3 Background Just in case anyone is not that closely involved in with the Annual Report for Gas Transmission and Gathering Systems, Operators went through some major Transmission report changes that PHMSA made to the 2010 Reports. PHMSA combined the Annual Reports with the Transmission Integrity Management Program Reports while also requiring Operators to include far greater detail in the combined report on pipe inventories by class location and %SMYS and additional Integrity inspection and repair details. PHMSA implemented a switch over to using their new Portal process which requires users to obtain Portal access in order to file reports. PHMSA had extended the 2010 Report deadline to August 2011 due to the extent of the changes and switching to their new computer system. The 2011 reports were due March 15, 2012 (as usual, but this resulted in a shortened time frame between the 2010 and 2011 reports. The changes to be discussed here are NEW CHANGES impacting the next Annual Reports which cover 2012 pipeline data and the MAOP verifications as well as pipeline piggability. Operators need to be aware of how this new data needs to be broken down so proper data is collected for submission to DOT/PHMSA. 3

4 Update on Annual DOT Report as of 9/21/2012 On April 13, 2012, (77 FR 22387) PHMSA proposed a number of revisions to the Annual Report for Gas Transmission and Gathering Systems (PHMSA F ) some minor, some quite significant. The initial comment period ended 6/12/2012 PHMSA received 12 comments in response to that notice. Operators: Alliance Pipeline, Energy Transfer, National Grid, Paiute, SCANA Corporation, and Southwest Gas Trade Associations: NGA, AGA, INGAA, API, AOPL and Texas Pipeline Association 1 Public commenter 4

5 Update on Annual DOT Report as of 9/21/2012 Just recently, on 9/21/2012 PHMSA published the 30- day Notice (77 FR 58616) in response to the comments, and provides the public with an additional 30 days to comment on their modified revisions to the forms and the instructions, and to announce that the revised Information Collections will be submitted to the Office of Management and Budget (OMB) for approval. PHMSA s current work on the annual report should be considered as complete. The comments from this thirty day notice go directly to the OMB. 5

6 Update on Annual DOT Report as of 9/21/2012 Operators should consider these forms to be final because OMB is unlikely to change the forms unless critical changes are deemed necessary. All prior comments and PHMSA s amended Annual Report form and instructions in response to those comments can be found on the docket at: Docket number PHMSA Operators should use the revised Report form and instructions to finalize their plans for submitting MAOP verification data (and in preparation for the 2012 Reports). 6

7 7

8 There are Other Changes, however. This presentation covers those areas involving the MAOP verifications only. I have provided NGA with the entire Annual Report changes and Instructions. These will be available through NGA after this conference. NGA will discuss if any further comments should be submitted before the deadline (October 19) regarding the new changes in an upcoming conference call. 8

9 Highlights of the DOT Report Changes and MAOP Verification PHMSA Administrator Quarterman looking on as President Obama signs the Pipeline Safety, Regulatory Certainty, and Job Creation Act in January 2012

10 Highlights of the DOT Report Changes and MAOP Verification PHMSA has determined that the most appropriate method to collect MAOP verification information is through the next Gas Transmission Annual Report. Owners or operators must submit the required MAOP verification information using the new Parts Q and R of the revised Annual Report. At this time, PHMSA has decided not to extend the Report deadline of March 15, 2013 regardless of the many comments received on the issue. PHMSA is taking this approach to ensure that owners or operators comply with the requirement to submit the data not later than 18 months as per the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011(before July 2013). 10

11 Highlights of the DOT Report Changes and MAOP Verification PHMSA has determined that mileage for records reviews that are not complete should be identified as mileage without records to avoid confusion and comply with the reporting requirements. Therefore, PHMSA has revised the instructions to specify that pipeline segments that have not been verified be reported under the appropriate w/out Recds column. After the March deadline, operators can submit Supplemental Reports if necessary to update their MAOP verification data previously submitted to PHMSA. 11

12 Major Changes to the Forms and Instructions involving MAOP are as Follows: PHMSA intends for operators to report mileage under the single code section heading used to establish the MAOP. In some scenarios, 49 CFR (a)(1) through (4) may all have been considered when establishing MAOP, PHMSA expects the mileage to be reported under the single heading for the final methodology that was used to determine the MAOP value. PHMSA has revised the instructions to include this clarification. 12

13 Where in the Annual Gas Transmission DOT Report do Operators Record the Miles by Method Used to Determine MAOP Verifications? What Changes Were Made or Amended Concerning the Report? Brand new Part Q Gas Transmission Miles by MAOP Determination Method

14 Part Q Gas Transmission Miles by MAOP Determination Method In the April 13, 2012 (77 FR 22387) Federal Register notice for this information collection revision, PHMSA expressed intent to collect Part Q data only for Class 1 and 2 HCAs and all Class 3 and 4 locations. All of the Class 1 and 2 not in HCA rows should have been blacked-out in the w/out Recds column. PHMSA has revised the report form and instructions to not collect the reporting of mileage without complete records in Class 1 and 2 locations which are not within HCAs. 14

15 Part Q The Amended Version 9/21/

16 PART Q Gas Transmission Miles by MAOP Determination Method Amended Instructions In the Total columns, operators report transmission pipeline miles by the subsection of serving as the limiting factor for establishing MAOP and by each combination of class location and HCA. A short explanation of each subsection for MAOP determination methodology [follows] 16

17 Methodology Description Given in Part Q Instructions 17

18 Review of Class Location and HCA definitions are Given in Part Q Instructions 18

19 Part Q - Instruction Detail Transmission miles may only be entered under a single subsection of In some scenarios, (a)(1) through (4) may all have been considered when establishing MAOP, but PHMSA expects that one value is lower than the others and was used to establish MAOP. In other scenarios, (c) could be used to set MAOP, regardless of the values in (a)(1) through (4). For each combination of class location and HCA shown on the form, report the miles in each MAOP category. The sum of all Total columns for subsections and Other for each class location must be consistent with the class location data reported in Part K. If miles are entered in the Other column, enter text describing the Other method(s) used to establish MAOP. 19

20 Part Q Instruction detail continued For each combination of class location and HCA, except Classes 1 and 2 outside HCAs, report the transmission miles for which the operator lacks complete records to verify the MAOP in the w/out Recds column. The value in the w/out Recds column must be less than or equal to the value in the Total column for each combination of class location and HCA. For the purpose of this part, verification records are records that can be used to validate the MAOP for the subject pipelines such as: as-built drawings, alignment sheets, specifications, and all design, construction, inspection, testing, maintenance, manufacturer, or other related documents. These records should be traceable, verifiable, and complete. For miles of transmission pipeline for which the operator has not completed the records review, include these miles in the w/out Recds column. See PHMSA Advisory Bulletin (ADB) for additional details: peline/regulations/advisorybulletins/ad pdf 20

21 Reporting of miles MAOP using (d) When reporting transmission miles for which (d) was used to establish MAOP, include miles of pipeline installed pursuant to a PHMSA special permit allowing operation up to 80% SMYS in Class 1 areas. From 2006 through 2010, PHMSA issued fifteen of these special permits with conditions equivalent to pipeline installed under (d). 21

22 Where in the Annual Gas Transmission DOT Report do Operators Record the Miles Pressure Tested? What Changes Were Made or Amended Concerning the Report? Brand new Part R - Gas Transmission Miles by Pressure Test (PT) Range & Ability to use Internal Inspection Tools

23 Part R - Gas Transmission Miles by Pressure Test (PT) Range and Internal Inspection PHMSA agrees with the commenters and has expanded Part R to collect data about the mileage of pipe in three bands of pressure tests; miles tested to more than 1.25 times the MAOP, miles tested to less than 1.25 times the MAOP but greater than or equal to 1.1 times the MAOP, and miles with a pressure test less than 1.1 times the MAOP or no pressure test. PHMSA also agrees that the test medium is irrelevant and has amended the form and instructions accordingly. 23

24 Part R continued Operators are required to report in each pressure test band the number of miles able to accommodate internal inspection and the number of miles not able to accommodate internal inspection. PHMSA has amended the form and instructions for Part R in response to comments to clarify the phrase not able to accommodate the passage of instrumented internal inspection devices. As a result, PHMSA has revised Part R to collect Miles Internal Inspection ABLE and Miles Internal Inspection NOT ABLE. The instructions include the following definition for Internal Inspection ABLE A length of pipeline through which commercially available devices can travel, inspect the entire circumference and wall thickness of the pipe, and record or transmit inspection data in sufficient detail for further evaluation of anomalies. 24

25 Part R - Amended version 9/21/

26 Part R Amended Instruction Details 9/21/2012 For Part R, enter miles of gas transmission pipe in each of the three pressure test ranges with each range divided into miles able to be internally inspected and miles unable to be internally inspected. All gas transmission miles must be reported in this part. The miles entered for each class location must be consistent with the class location data entered in Part K. If an operator is uncertain whether a gas transmission pipeline has been subjected to a post-construction pressure test, report the miles in the PT < 1.1 or No PT section. 26

27 Part R Amended Definition for Clarification Miles Internal Inspection ABLE means a length of pipeline through which commercially available devices can travel, inspect the entire circumference and wall thickness of the pipe, and record or transmit inspection data in sufficient detail for further evaluation of anomalies. If an operator is uncertain whether a gas transmission pipeline is able to be internally inspected, report the miles in the Miles Internal Inspection NOT ABLE column. 27

28 Older Versions of Sections Q & R as Proposed in June 2012 Notice have been Changed Be Sure to use the Revised Format and Amended Instructions to Ensure Proper Data is Collected for DOT Reports due March 2013

29 Part Q originally proposed - since revised. Be sure to use newest version 29

30 Part R originally proposed - since revised. Be sure to use newest version 30

31 Questions? Comments? Discussion? 31

Proactive Assessment on Vintage Pipelines 2013 OGA Technical Workshop

Proactive Assessment on Vintage Pipelines 2013 OGA Technical Workshop Proactive Assessment on Vintage Pipelines 2013 OGA Technical Workshop Brian Moidel Principal Engineer Dominion East Ohio Gas Outline Background MAOP Verification DEO Remediation Plan Proposed changes to

More information

PHMSA 2011 reporting requirements March 2012

PHMSA 2011 reporting requirements March 2012 PHMSA 2011 reporting requirements March 2012 Agenda 2011 Hazardous Liquid Annual Report Improvements Operator Validation Operator Notifications PHMSA Portal Improvements Questions - 2 - 2011 Hazardous

More information

PHMSA Proposed Rulemaking Safety of Gas Transmission & Gathering Lines Rule. October 2016

PHMSA Proposed Rulemaking Safety of Gas Transmission & Gathering Lines Rule. October 2016 PHMSA Proposed Rulemaking Safety of Gas Transmission & Gathering Lines Rule October 2016 1 Safety of Gas Transmission & Gathering Lines Rule Significant Rule ANPRM published: 8/25/2011 NPRM : 4/8/2016

More information

Pipeline Records - - Lessons Learned. The Changing Industry Landscape and Transmission Records Implications NGA Operations Conference April 3, 2012

Pipeline Records - - Lessons Learned. The Changing Industry Landscape and Transmission Records Implications NGA Operations Conference April 3, 2012 Pipeline Records - - Lessons Learned The Changing Industry Landscape and Transmission Records Implications NGA Operations Conference April 3, 2012 Who Are We? CHA Consulting, Inc. CHA is a highly diversified,

More information

Maximum Allowable Operating Pressure (MAOP) & Integrity Verification Process (IVP)

Maximum Allowable Operating Pressure (MAOP) & Integrity Verification Process (IVP) Maximum Allowable Operating Pressure (MAOP) & Integrity Verification Process (IVP) 2013 NGA Fall Operations Conference Pipeline Integrity/Corrosion October 3, 2013 Lauren Toczylowski Pipeline Integrity

More information

June 2009 Portland, Oregon Wayne St. Germain U.S. DOT/PHMSA T&Q

June 2009 Portland, Oregon Wayne St. Germain U.S. DOT/PHMSA T&Q Oregon Pipeline Safety Seminar June 2009 Portland, Oregon Wayne St. Germain U.S. DOT/PHMSA T&Q Wayne F. St. Germain YOUR INSTRUCTOR WELCOME WELCOME PHMSA Training & Qualifications 6500 South MacArthur

More information

Regulatory Update - 1 -

Regulatory Update - 1 - Regulatory Update - 1 - Leticia Santos Hernández Pipeline Safety Specialist PHMSA Training & Qualifications Leticia.santos@dot.gov - 2 - ANPRM Advance Notice of Proposed Rulemaking Used to gather information

More information

Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region

Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region Rulemaking Process Topics Safety of Hazardous Liquid Pipelines (PHMSA- 2010-0229) Safety of Gas Transmission Pipelines (PHMSA- 2011-0023)

More information

PHMSA Update: Aging Infrastructure and Integrity Verification Process

PHMSA Update: Aging Infrastructure and Integrity Verification Process PHMSA Update: Aging Infrastructure and Integrity Verification Process NAPCA Workshop August 15, 2013 Houston, Texas Safety Administration (PHMSA) Steve Nanney 1 PHMSA Safety Update - Topics Performance

More information

ASSET INTEGRITY Project Case Studies

ASSET INTEGRITY Project Case Studies Project Case Studies Development of Corrosion Under Insulation (CUI) Protocol and Inspection Procedure Multi-National Natural Gas Pipeline Operator Texas Contacts Background A large multi-national energy

More information

BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION UNITED STATES DEPARTMENT OF TRANSPORTATION WASHINGTON, D.C.

BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION UNITED STATES DEPARTMENT OF TRANSPORTATION WASHINGTON, D.C. BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION UNITED STATES DEPARTMENT OF TRANSPORTATION WASHINGTON, D.C. Pipeline Safety: Public Workshop on the Integrity Verification Process Docket

More information

API Pipeline Conference San Antonio, Texas

API Pipeline Conference San Antonio, Texas Page 1 of 15 API Pipeline Conference San Antonio, Texas The Best Regulations Don t Happen By Accident April 8, 2014 Alan Mayberry -1- Page 2 of 15 External Drivers Current PHMSA major rulemaking activity

More information

Regulatory Review PHMSA Regulatory Update. Tom Finch Western Region CATS Manager

Regulatory Review PHMSA Regulatory Update. Tom Finch Western Region CATS Manager Regulatory Review PHMSA Regulatory Update Tom Finch Western Region CATS Manager Rulemaking Process ANPRM Advance Notice of Proposed Rulemaking Used to gather information (non-mandatory) NPRM Notice of

More information

SUMMARY OF TRANSMISSION INTEGRITY MANAGEMENT PROGRAM

SUMMARY OF TRANSMISSION INTEGRITY MANAGEMENT PROGRAM Page 1 of 6 SUMMARY OF TRANSMISSION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Company s Transmission Integrity Management Program ( TIMP ) was established to comply with federal TIMP regulations

More information

PHMSA Rule Update. David Johnson November 14, 2018

PHMSA Rule Update. David Johnson November 14, 2018 PHMSA Rule Update David Johnson November 14, 2018 PHMSA Active Rulemakings Gas Transmission (Mega Rule) now 3 parts o o o MAOP, Assessment requirements Repair criteria, IM improvements, CP, MOC Gas gathering

More information

Delmont Line 27 Incident Update

Delmont Line 27 Incident Update Pennsylvania Public Utility Commission Delmont Line 27 Incident Update July 21, 2016 Agenda Introductions Penn-Jersey system overview Incident and preliminary cause Texas Eastern actions and commitments

More information

Pipeline Safety Compliance

Pipeline Safety Compliance Wyoming Pipeline Authority Public Meeting Casper, Wyoming February 17, 2009 Presenter: John Beets - Principle GIS Technologist, Kansas City Operations Objectives: Who is the regulator? Brief review of

More information

U.S. DOT Pipeline and Hazardous Materials Safety Administration

U.S. DOT Pipeline and Hazardous Materials Safety Administration U.S. DOT Pipeline and Hazardous Materials Safety Administration Priority Issues for 2017+ - -2 2 - - Organizational Updates Leveraging Lessons from Prior Years Congressional Mandates and Recommendations

More information

Natural Gas Pipelines The State of Pipeline Safety

Natural Gas Pipelines The State of Pipeline Safety Natural Gas Pipelines The State of Pipeline Safety Chris Helms, NiSource Gas Transmission & Storage Marcellus Advisory Commission Infrastructure Subcommittee April 11, 2011 0 Gas is Good Shale reserves

More information

Pipeline Safety Update

Pipeline Safety Update Pipeline Safety Update NAPCA Workshop August 16, 2012 Houston, Texas Safety Administration (PHMSA) Steve Nanney - 1 - PHMSA Safety Update - Topics PHMSA Overview Perspective on Past Performance Agency

More information

Pipeline Safety Update

Pipeline Safety Update Jul y 2012 Pipeline Safety Update B r i e f S u m m a r y o f 2 0 1 1 It was a blur! San Bruno facts were still unknown NTSB immediate safety recommendations Cast iron failures in Pennsylvania US DOT Secretary

More information

PHMSA rule update. David Johnson November 1, 2017

PHMSA rule update. David Johnson November 1, 2017 PHMSA rule update David Johnson November 1, 2017 No, it s not still Halloween. These are all real. 2 PHMSA Active Rulemakings Safety of Hazardous Liquid Pipelines Gas Transmission (Mega Rule) Underground

More information

Integrity Program Evaluation Using Meaningful Performance Metrics

Integrity Program Evaluation Using Meaningful Performance Metrics Integrity Program Evaluation Using Meaningful Performance Metrics 1 Objective Pipeline Safety Management Systems (API 1173), the recent PHMSA guidance presented in ADB 14-05 and Asset Management (ISO 55001),

More information

Industry Guidance on Records Review for Re-affirming Transmission Pipeline MAOPs

Industry Guidance on Records Review for Re-affirming Transmission Pipeline MAOPs October 2011 Industry Guidance on Records Review for Re-affirming Transmission Pipeline MAOPs The intent of this document is to provide general guidance to pipeline operators who are undertaking a process

More information

Public Workshop on Integrity Verification Process (IVP)

Public Workshop on Integrity Verification Process (IVP) Public Workshop on Integrity Verification Process (IVP) Arlington, Virginia 8/7/2013 Presenting on behalf of INGAA Dwayne Burton Kinder Morgan INGAA s Integrity Management Continuous Improvement (IMCI)

More information

Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference

Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference U.S. DOT / PHMSA Steve Nanney November 19, 2014 1 Integrity Verification Process Drivers Overview

More information

American Petroleum Institute th St, NW Suite L St, NW Washington, DC Washington, DC December 1, 2017

American Petroleum Institute th St, NW Suite L St, NW Washington, DC Washington, DC December 1, 2017 David Murk Andrew Black Pipeline Manager, President & CEO Midstream & Industry Operations Association of Oil Pipe Lines American Petroleum Institute 900 17 th St, NW Suite 600 1220 L St, NW Washington,

More information

Natural Gas Gathering Lines. John Williams Director Service Monitoring and Enforcement Department

Natural Gas Gathering Lines. John Williams Director Service Monitoring and Enforcement Department Natural Gas Gathering Lines John Williams Director Service Monitoring and Enforcement Department Gas Pipeline Safety Staff Program Manager Office Support Staff 11 Inspectors The Federal/State Partnership

More information

Liquid Petroleum Pipelines Safe, Efficient and Improving

Liquid Petroleum Pipelines Safe, Efficient and Improving Liquid Petroleum Pipelines Safe, Efficient and Improving Peter Lidiak Pipeline Director March 15, 2012 U.S. Oil Pipelines & Refineries Pipelines: Safe and Getting Safer Safest and most efficient mode for

More information

Smart Modernization: Infrastructure Replacement & Expansion Update. NARUC Staff Subcommittee on Accounting and Finance, 2016 Fall Conference

Smart Modernization: Infrastructure Replacement & Expansion Update. NARUC Staff Subcommittee on Accounting and Finance, 2016 Fall Conference Smart Modernization: Infrastructure Replacement & Expansion Update NARUC Staff Subcommittee on Accounting and Finance, 2016 Fall Conference Natural Gas Records in 2015 Domestic Annual Production 27.1 Tcf

More information

Interstate Natural Gas Association of America. INGAA Action Plan. INGAA Integrity Management Continuous Improvement

Interstate Natural Gas Association of America. INGAA Action Plan. INGAA Integrity Management Continuous Improvement Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement November, 2011 INGAA Guiding Principles of Pipeline

More information

Transmission Integrity Planning Best Practices

Transmission Integrity Planning Best Practices Transmission Integrity Planning Best Practices Paul Amato V.P. of Engineering, Operation, Environmental, Health and Safety Matthew Bell Engineering Specialist, Cathodic Protection Company Profile Commenced

More information

Before the Pipeline and Hazardous Materials Safety Administration United States Department of Transportation Washington, D.C.

Before the Pipeline and Hazardous Materials Safety Administration United States Department of Transportation Washington, D.C. Before the Pipeline and Hazardous Materials Safety Administration United States Department of Transportation Washington, D.C. Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines; Proposed

More information

PHMSA = Pipelines and Hazardous. RITA = Research and Innovative Technologies Administration

PHMSA = Pipelines and Hazardous. RITA = Research and Innovative Technologies Administration Arkansas Gas Pipeline Safety Seminar June 20-21, 21, 2007 Arkansas Public Service Commission PHMSA T&Q Wayne St. Germain Pipeline Safety Specialist Phone (405) 954-7219 Live Person (405) 954-8575 Direct

More information

National Academy of Sciences

National Academy of Sciences National Academy of Sciences Transportation Research Board Study of Pipeline Transportation of Diluted Bitumen PHMSA Regulatory Authority and Keystone XL Pipeline October 23, 2012-1 - Topics for Briefing

More information

Control Information: (copy and fill-in for each Operator)

Control Information: (copy and fill-in for each Operator) PUBLIC AWARENESS PROGRAM EFFECTIVE INSPECTION SPECIFIC INFORMATION Control Information: (copy and fill-in for each Operator) Inspection Date(s): Operator ID: OpID: State/Other ID: Unit ID No. Activity

More information

Gas Pipeline Safety March 2012

Gas Pipeline Safety March 2012 Gas Pipeline Safety March 2012 Contact: edbaker@scottmadden.com jgdavis@scottmadden.com Introduction Pipeline safety has become a top priority for the gas industry. Several drivers have increased scrutiny

More information

The INGAA Foundation

The INGAA Foundation Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable companies in Canada. Its members transport the nation's

More information

INGAA Foundation, Inc. Construction Safety and Construction QA/QC Workshop Houston, Texas. PHMSA Update on Construction and Inspection March 21, 2012

INGAA Foundation, Inc. Construction Safety and Construction QA/QC Workshop Houston, Texas. PHMSA Update on Construction and Inspection March 21, 2012 INGAA Foundation, Inc. Construction Safety and Construction QA/QC Workshop Houston, Texas PHMSA Update on Construction and Inspection March 21, 2012 Alan Mayberry - 1 - Today s Agenda Updates on the past

More information

ILI: An Improvement Over Pressure Testing for Pipeline Integrity Management

ILI: An Improvement Over Pressure Testing for Pipeline Integrity Management Bruce L. Paskett, PE Dr. Pete Riccardella June, 2018 ILI: An Improvement Over Pressure Testing for Pipeline Integrity Management Gas MegaRule MAOP Verification Requirements - Advantages from Using ILI

More information

PPTS OPERATOR ADVISORY: REPORTING INTEGRITY MANAGEMENT PROGRAM ACTIVITY

PPTS OPERATOR ADVISORY: REPORTING INTEGRITY MANAGEMENT PROGRAM ACTIVITY The petroleum pipeline industry has undertaken a voluntary environmental performance tracking initiative, recording detailed information about spills and releases, their causes and consequences. PPTS ADVISORY

More information

Pipeline safety regulations apply to all pipelines that transport either flammable gas or hazardous liquids where the product affects interstate

Pipeline safety regulations apply to all pipelines that transport either flammable gas or hazardous liquids where the product affects interstate 1 Pipeline safety regulations apply to all pipelines that transport either flammable gas or hazardous liquids where the product affects interstate commerce. For example, the piping within a refinery or

More information

With New Regulations Coming (Maybe), Will You Adopt or Adapt? Matthew Thomas, Novara GeoSolutions Jacob Parakadan, Enbridge

With New Regulations Coming (Maybe), Will You Adopt or Adapt? Matthew Thomas, Novara GeoSolutions Jacob Parakadan, Enbridge With New Regulations Coming (Maybe), Will You Adopt or Adapt? Matthew Thomas, Novara GeoSolutions Jacob Parakadan, Enbridge adopt /əˈdäpt/ verb 1. start to use or follow 2. formally accept (a report or

More information

Preliminary Regulatory Impact Assessment. Notice of Proposed Rulemaking - Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines

Preliminary Regulatory Impact Assessment. Notice of Proposed Rulemaking - Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines Preliminary Regulatory Impact Assessment Notice of Proposed Rulemaking - Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines Office of Pipeline Safety Pipeline and Hazardous Materials Safety

More information

An Update on the Gas Industry

An Update on the Gas Industry An Update on the Gas Industry Kyle Rogers, American Gas Association September 21-22, 2015 OMNI Austin Hotel Downtown Austin, Texas Smart Modernization Pipeline Safety & Natural Gas Infrastructure Replacement

More information

From the desk of G. A. Aaker, Jr., PE.

From the desk of G. A. Aaker, Jr., PE. SAMPLE CALCULATIONS TO DETERMINE THE REQUIRED MINIMUM WALL THICKNESS PER DOT 192 / ASME B31.8 FOR GAS TRANSMISSION AND DISTRIBUTION PIPING SYSTEMS 192.103 GENERAL Pipe must be designed with sufficient

More information

Pipeline Safety: Clarification of Terms Relating to Pipeline Operational Status.

Pipeline Safety: Clarification of Terms Relating to Pipeline Operational Status. This document is scheduled to be published in the Federal Register on 08/16/2016 and available online at http://federalregister.gov/a/2016-19494, and on FDsys.gov Billing Code: 4910-60-W DEPARTMENT OF

More information

Pipeline Safety Trust Annual Conference New Orleans, Louisiana October 20, 2016

Pipeline Safety Trust Annual Conference New Orleans, Louisiana October 20, 2016 Pipeline Safety Trust Annual Conference New Orleans, Louisiana October 20, 2016 PHMSA Pipeline Safety Program Updates Alan Mayberry Acting Associate Administrator Who is PHMSA - DOT/PHMSA? Pipeline and

More information

Hazardous Liquid Pipeline Integrity Verification Process (HL IVP) Overview

Hazardous Liquid Pipeline Integrity Verification Process (HL IVP) Overview Hazardous Liquid Pipeline Integrity Verification Process (HL IVP) Overview Industry (API/AOPL) Briefing November 18, 2014 1 HL IVP What is HL IVP Where would HL IVP be applicable Drivers - GT Statutory

More information

PIPE GRADE DETERMINATION AND MAOP VALIDATION USING SOPHISTICATED SCRAPER TECHNOLOGY

PIPE GRADE DETERMINATION AND MAOP VALIDATION USING SOPHISTICATED SCRAPER TECHNOLOGY PIPE GRADE DETERMINATION AND MAOP VALIDATION USING SOPHISTICATED SCRAPER TECHNOLOGY Thomas Eiken, Werner Thale, Mohammed Jaarah 7 th MENDT Conference Bahrain 09/15/2015 CONTENT 1. Pipe Grade in the Context

More information

NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety

NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety Pipeline Construction Challenges NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety PHMSA Mission To ensure the operation of the Nation s pipeline transportation system

More information

Pipeline Safety: Plastic Pipe

Pipeline Safety: Plastic Pipe U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Plastic Pipe Draft Environmental Assessment Docket No. PHMSA-2014-0098 May 1, 2015 Prepared for:

More information

DEPARTMENT OF TRANSPORTATION BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION DEPARTMENT OF TRANSPORTATION BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION Pipeline Safety: Request for Revision of a ) Previously Approved Information ) Docket No. PHMSA 2014 0092

More information

Gas Transmission NPRM. David Johnson November 10, 2016

Gas Transmission NPRM. David Johnson November 10, 2016 Gas Transmission NPRM David Johnson November 10, 2016 Friday the 13 th came 5 days early! 2 A few statistical facts As published in the FR: 136 pages like this 103 pages of intro & preamble 33 pages of

More information

Russ Davis, Jim Redmon, Nestor S. Makarigakis and Adam Reale, MISTRAS Group, Inc., USA,

Russ Davis, Jim Redmon, Nestor S. Makarigakis and Adam Reale, MISTRAS Group, Inc., USA, Russ Davis, Jim Redmon, Nestor S. Makarigakis and Adam Reale, MISTRAS Group, Inc., USA, explore the shift towards risk-based integrity: centralising data management to enhance pipeline risk analysis. I

More information

Request for Proposal. Pipeline Safety Management System LDC Development and Implementation Northeast Gas Association

Request for Proposal. Pipeline Safety Management System LDC Development and Implementation Northeast Gas Association Request for Proposal Pipeline Safety Management System LDC Development and Implementation 2018 Northeast Gas Association 75 Second Ave. Suite 510 Needham, MA 02494 Prepared by: Document : Final 1.0 NGA

More information

PHMSA Update on Public Awareness

PHMSA Update on Public Awareness PHMSA Update on Public Awareness 2010 Western Regional Gas Conference August 24, 2010 Tom Finch PHMSA - Western Region CATS Manager Overview PHMSA Mission and Scope Why Public Awareness Public Awareness

More information

What s Coming Down the Pipe? Pipeline Safety & Natural Gas Utility Efforts M a y 21, 2 0to 15 Upgrade Aging Infrastructure

What s Coming Down the Pipe? Pipeline Safety & Natural Gas Utility Efforts M a y 21, 2 0to 15 Upgrade Aging Infrastructure What s Coming Down the Pipe? Pipeline Safety & Natural Gas Utility Efforts M a y 21, 2 0to 15 Upgrade Aging Infrastructure 2 Pipeline Safety & Infrastructure Replacement Commitment to Safety Safest Energy

More information

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF TRANSPORTATION This document is scheduled to be published in the Federal Register on 02/22/2018 and available online at https://federalregister.gov/d/2018-03618, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-22-P]

More information

NCSL Natural Gas Policy Institute

NCSL Natural Gas Policy Institute - 1 - Pipeline Infrastructure: Replacement and Expansion Needs NCSL Natural Gas Policy Institute PHMSA Pipeline Safety Program Updates September 9, 2015 - 2 - Topics for Today Introductions Who We are

More information

Cost of Compliance Challenges with Materials Verification

Cost of Compliance Challenges with Materials Verification Cost of Compliance Challenges with Materials Verification Andy Lutz Senior Engineer, Integrity Solutions 1 SAFER, SMARTER, GREENER Overview Regulatory Background Material Testing Records Review 2 Regulatory

More information

Gas Gathering Lines - Managing Risk

Gas Gathering Lines - Managing Risk Gas Gathering Lines - Managing Risk Gathering Lines are a Long-Term Capital Investment in Assets and Infrastructure Pipeline Safety Trust November 21, 2013 Shale Energy = National Opportunity And New Neighbors

More information

PIPELINE INSPECTOR TRAINING PROGRAMS

PIPELINE INSPECTOR TRAINING PROGRAMS ABSTRACT As our pipeline industry grows and changes, regulations and standards are developed to help facilitate and drive these changes. New amendments concerning pipeline inspectors will require both

More information

Underground Natural Gas Storage Safety Regulation. Mary L. McDaniel, P.E. Baker Engineering and Risk Consultants, Inc Oakwell Court Suite 100

Underground Natural Gas Storage Safety Regulation. Mary L. McDaniel, P.E. Baker Engineering and Risk Consultants, Inc Oakwell Court Suite 100 Underground Natural Gas Storage Underground Natural Gas Storage Safety Regulation Mary L. McDaniel, P.E. Baker Engineering and Risk Consultants, Inc. 3330 Oakwell Court Suite 100 San Antonio, Texas 78218

More information

This Part prescribes requirements for the REPORTING of:

This Part prescribes requirements for the REPORTING of: This Part prescribes requirements for the REPORTING of: Incidents Safety Related Conditions Annual Pipeline Summary Data Other Reporting Requirements 191.1 (b) Offshore Gathering of Gas Upstream from the

More information

DOT Proposes Tougher Safety Regulations For Hazardous Liquids Pipelines

DOT Proposes Tougher Safety Regulations For Hazardous Liquids Pipelines RESEARCH North America Fossil Fuels Oil DOT Proposes Tougher Safety Regulations For Hazardous Liquids Pipelines New Rule Would Expand Reach Of DOT Reporting Requirements; Cost Operators Upwards Of $22.4

More information

1155 North State Street, Suite 609, Bellingham, WA Phone Fax

1155 North State Street, Suite 609, Bellingham, WA Phone Fax 1155 North State Street, Suite 609, Bellingham, WA 98225 Phone 360-543-5686 Fax 360-543-0978 http://pipelinesafetytrust.org Dockets Operations U.S. Department of Transportation M-30, West Building Ground

More information

STANDARDIZED PIPELINE RISK COMPARISON AND PREDICTION

STANDARDIZED PIPELINE RISK COMPARISON AND PREDICTION ASSET INTEGRITY INTELLIGENCE STANDARDIZED PIPELINE RISK COMPARISON AND PREDICTION CRAIG SWIFT, Project Manager at Bureau Veritas CONTRIBUTING AUTHORS: Bibek Das, Gustavo Rocha, Nicolaus Williams, Karen

More information

PHMSA Pipeline Safety Program Update

PHMSA Pipeline Safety Program Update PHMSA Pipeline Safety Program Update NACE Central Area Conference August 28, 2013 William Lowry, PE Community Assistance and Technical Services Mgr, Southwest Region USDOT/PHMSA 1 Today s Agenda Underlying

More information

PRELIMINARY STATEMENT

PRELIMINARY STATEMENT PRELIMINARY STATEMENT 1. These responses and objections are made without prejudice to, and are not a waiver of, SDG&E and SoCalGas right to rely on other facts or documents in these proceedings. 2. By

More information

Testimony of Ronald W. Jibson Vice President of Operations Questar Gas Company

Testimony of Ronald W. Jibson Vice President of Operations Questar Gas Company Testimony of Ronald W. Jibson Vice President of Operations Questar Gas Company On Behalf of the American Gas Association and The American Public Gas Association Before the U.S. House Energy and Commerce

More information

Re: NARA Incorporation by Reference

Re: NARA Incorporation by Reference May 30, 2012 Director Office of the Federal Register 800 N. Capital St. NW Suite 700 Washington DC 20001 Re: NARA 12-0002 Incorporation by Reference National Tank Truck Carriers Inc.(NTTC) is the national

More information

PHMSA DIMP AUDIT FORM 24

PHMSA DIMP AUDIT FORM 24 PHMSA DIMP AUDIT FORM 24 OCTOBER 13, 2017 NORTHEAST GAS ASSOCIATION 2017 FALL CONFERENCE AUTHORS Diana Camaiani, Distribution Engineer Vermont Gas Systems, Inc. 85 Swift Street, South Burlington, VT 05403

More information

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Organization and Regulatory Overview Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Main: (405) 954-7219 My Office:

More information

BEFORE THE UNITED STATES DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION WASHINGTON, D.C.

BEFORE THE UNITED STATES DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION WASHINGTON, D.C. BEFORE THE UNITED STATES DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION WASHINGTON, D.C. Pipeline Safety: Gas and Hazardous Liquid Pipeline Risk Models Docket No. PHMSA-2018-0050

More information

Kevin C. Connors Pipeline Program Supervisor

Kevin C. Connors Pipeline Program Supervisor Underground Gathering Pipelines: Building a Regulatory Program Kevin C. Connors Pipeline Program Supervisor kcconnors@nd.gov 600 East Boulevard Ave. Dept 405 Bismarck, ND 58505-0840 (701)328-8020 Focused

More information

Natural Gas Infrastructure Replacement and Expansion Efforts

Natural Gas Infrastructure Replacement and Expansion Efforts Natural Gas Infrastructure Replacement and Expansion Efforts National Association of State Energy Officials 2014 Energy Outlook Conference February 5, 2014 Washington, D.C. 2 Trillion cubic Feet Future

More information

David Spangler CATS Coordinator Office of Pipeline Safety (202)

David Spangler CATS Coordinator Office of Pipeline Safety (202) Damage Prevention PHMSA s Perspective David Spangler CATS Coordinator Office of Pipeline Safety (202) 366-5064 David.spangler@dot.gov Presentation Overview PHMSA s perspective on damage prevention Variability

More information

1220 L St., NW Washington, DC Washington, DC January 8, 2016

1220 L St., NW Washington, DC Washington, DC January 8, 2016 Robin Rorick Andrew J. Black Group Director, Midstream President & CEO & Industry Operations Association of Oil Pipe Lines American Petroleum Institute 1808 Eye St., NW 1220 L St., NW Washington, DC 20006

More information

PIPELINE SAFETY MANAGEMENT SYSTEM Annual Report

PIPELINE SAFETY MANAGEMENT SYSTEM Annual Report PIPELINE SAFETY MANAGEMENT SYSTEM 2017 Annual Report 2 2017 Pipeline SMS Annual Report ONE INDUSTRY, ONE GOAL A crucial development for the Pipeline SMS program in 2017 was the creation of the joint industry

More information

Agency Request for Regular Processing of Collection of Information by the Office of Management and Budget

Agency Request for Regular Processing of Collection of Information by the Office of Management and Budget This document is scheduled to be published in the Federal Register on 05/09/2016 and available online at http://federalregister.gov/a/2016-10831, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

40 CFR Parts 1500, 1501, 1502, 1503, 1504, 1505, 1506, 1507, and Update to the Regulations for Implementing the Procedural Provisions of the

40 CFR Parts 1500, 1501, 1502, 1503, 1504, 1505, 1506, 1507, and Update to the Regulations for Implementing the Procedural Provisions of the This document is scheduled to be published in the Federal Register on 06/20/2018 and available online at https://federalregister.gov/d/2018-13246, and on FDsys.gov [3225-F8] COUNCIL ON ENVIRONMENTAL QUALITY

More information

API Recommended Practice for Rural Onshore Gas Gathering Lines Forward

API Recommended Practice for Rural Onshore Gas Gathering Lines Forward API Recommended Practice for Rural Onshore Gas Gathering Lines Forward [INSERT API LANGUAGE] Introduction This recommended practice contains safety standards for the design, construction, testing, corrosion

More information

Pipeline Surveyor Certification 102

Pipeline Surveyor Certification 102 Pipeline Surveyor Certification 102 Pipeline & Hazardous Materials Safety Administration (PHMSA) Regulations plotting experience. charting the future. Learning Objectives Upon Completion of this class,

More information

Pipeline Operational Status. API Recommended Practice 1181 First Edition

Pipeline Operational Status. API Recommended Practice 1181 First Edition Pipeline Operational Status API Recommended Practice 1181 First Edition Special Notes Classified areas may vary depending on the location, conditions, equipment, and substances involved in any given situation.

More information

STATE OF NEW JERSEY Board of Public Utilities Two Gateway Center Newark, NJ

STATE OF NEW JERSEY Board of Public Utilities Two Gateway Center Newark, NJ Agenda Date: 11/7/08 Agenda Item: 68 STATE OF NEW JERSEY Board of Public Utilities Newark, NJ 07102 www.ni.~ov/bpul RELIABILITY & SECURITY IN THE MATTER OF THE PETITION OF PUBLIC SERVICE ELECTRIC AND GAS

More information

Plastic Pipe Timeline

Plastic Pipe Timeline Copyright Plastic Pipe Data Collection Committee 2015All Rights Reserved Administered by American Gas Association 400 North Capitol Street, N.W., 4 th Floor Washington, DC 20001 U.S.A. NOTICE AND COPYRIGHT

More information

2012 Distribution Best Practices Benchmarking Company Profile Data Packet

2012 Distribution Best Practices Benchmarking Company Profile Data Packet American Gas Association January 2012 Company Name: DOT Operating ID(s): Person Completing Form: Phone Number: Email Address: Required Fields Deadline for data submittal in BESS, http://www.aga.org/research/bess/

More information

Introduction. Background

Introduction. Background Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.

More information

Recent & Proposed Rulemakings

Recent & Proposed Rulemakings U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA'S S Recent & Proposed Rulemakings and Initiatives Byron Coy Region Director, Eastern USDOT/PHMSA PENNSYLVANIA

More information

Regulatory Agenda and Notices RSPA / OPS

Regulatory Agenda and Notices RSPA / OPS Regulatory Agenda and Notices RSPA / OPS Download the Regulations http://www.tsi.dot.gov Click on Pipeline Safety (Valve Setting), Publications & Follow Links Advisory Bulletins Advisory Bulletins http://ops.dot.gov

More information

SAN DIEGO GAS & ELECTRIC COMPANY SOUTHERN CALIFORNIA GAS COMPANY

SAN DIEGO GAS & ELECTRIC COMPANY SOUTHERN CALIFORNIA GAS COMPANY PRELIMINARY STATEMENT 1. These responses and objections are made without prejudice to, and are not a waiver of, SDG&E and SoCalGas right to rely on other facts or documents in these proceedings. 2. By

More information

Colonial Pipeline Company - Managing Operational Risk

Colonial Pipeline Company - Managing Operational Risk Colonial Pipeline Company - Managing Operational Risk Topics Background information on Colonial Pipeline Departmental versus Enterprise GIS ArcGIS Pipeline Data Model (APDM) + Geodatabase as foundation

More information

22 January Division of Dockets Management (HFA 305) Food and Drug Administration 5630 Fishers Lane, rm Rockville, MD 20852

22 January Division of Dockets Management (HFA 305) Food and Drug Administration 5630 Fishers Lane, rm Rockville, MD 20852 22 January 2009 Division of Dockets Management (HFA 305) Food and Drug Administration 5630 Fishers Lane, rm. 1061 Rockville, MD 20852 SUBMISSION OF COMMENTS, DOCKET NO. FDA-2008-D-0559 Dear Sir or Madam:

More information

PPTS OPERATOR ADVISORY:

PPTS OPERATOR ADVISORY: The petroleum pipeline industry has undertaken a voluntary environmental performance tracking initiative, recording detailed information about spills and releases, their causes and consequences. The pipeline

More information

March 6, Docket No. PHMSA : Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations

March 6, Docket No. PHMSA : Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations DOT Docket Management System U.S. Department of Transportation Docket Operations, M-30 Room W12-140 1200 New Jersey Avenue, S.E. Washington, D.C. 20590-0001 VIA E-GOV WEB SITE (http://www.regulations.gov)

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

U.S. DOT Pipeline and Hazardous Materials Safety Administration

U.S. DOT Pipeline and Hazardous Materials Safety Administration U.S. DOT Pipeline and Hazardous Materials Safety Administration Today s Agenda PHMSA Update PHMSA Rulemaking PHMSA Advisory Bulletins 2017: What is happening Rulemaking action continues Covering all Congressional

More information