Bijwasan: A World Class Station

Size: px
Start display at page:

Download "Bijwasan: A World Class Station"

Transcription

1 Bijwasan: A World Class Station Presentation to Governing Body, UTTIPEC 19 th December, 2014

2 INDEX 1. AIMS & OBJECTIVE OF THE PROJECT 2. EXISTING CONDITIONS 3. MASTER PLAN - GENERAL LAYOUT 4. TRAFFIC STUDY 5. ACCESSIBILITY OF MASTER PLAN 6. INTERNAL CIRCUALTION 7. CONCLUSIONS 8. FABLE 2

3 1. AIMS & OBJECTIVES OF THE PROJECT WORLD CLASS STATION SEGREGATION OF ARRIVAL/DEPARTURE SAFE AND COMFORTABLE SUPERIOR ROAD CONNECTIVITY SUPERIOR TRAIN OPERATION AND MAINTENANCE FAC USER-FRIENDLY FACILITIES AND PASSENGER SERVICES SMOOTH ARRIVAL/DEPARTURE AND MOVE 3

4 2. EXISTING CONDITIONS 4

5 2. EXISTING CONDITIONS. SITE LOCATION INDIA LOCATION OF BIJWASAN SITE DETAILS Location of the proposed Bijwasan station : Land adjoining the IGI airport, Dwarka sector km from the New Delhi railway station Area of the land : Ha Landmarks : IGI airport, sector 21 metro station THE STUDY AREA 5

6 3. EXISTING CONDITIONS. SITE LOCATION.ZONAL MAP (MPD 2021) ZONAL DEVELOPMENT PLAN - ZONE K-II INCLUDES SECTOR 21, IN WHICH BWSN PASSENGER TERMINAL IS TO BE BUILT AND ESTABLISHES THE INFRASTRUCTURES AND FACILITIES FOR ENHANCE AN EFFICIENT MULTI MODE TRANSPORT TERMINAL IN DWARKA SUB-CITY: MASTER PLAN OF DELHI, MPD 2021 PROPOSES THE DEVELOPMENT OF THE NEW BIJWASAN WORLD CLASS STATION AS A PASSENGER & FREIGHT TERMINAL TO DECONGEST THE CENTRAL AREA OF DELHI. S.NO 1 RAIL TERMINAL/INTEGRAT USE PREMISES ED PASSENGER TERMINAL ALL FACILITIES RELATED TO RAILWAY PASSENGERS, OPERATIONS, GOODS ACTIVITIES HANDLING, PERMITTED PASSENGERS CHANGE OVER FACILITIES, INCLUDING WATCH AND WARD, HOTEL. AREA UNDER 70% OPERATION AREA UNDER DEVELOPMENT CONTROLS 30% BUILDING FAR 100 FLOOR AREA THAT CAN BE UTILISED FOR PASSENGER ACCOMODATION 15% 6

7 3. EXISTING CONDITIONS. SITE LOCATION. PROJECT LOCATION AND SURROUNDINGS DWARKA SUB-CITY / SECTOR 21 THE LAND IS OWNED BY THE NORTHERN RAILWAY. THE LOCATION IS STRATEGIC GIVEN THE PRESENCE OF THE OTHER MASS TRANSIT SYSTEMS IN THE VICINITY. METRO BLUE LINE & AIRPORT EXPRESS LINE:UNDERGROUND CUT & COVER TUNNELS STARTING FROM SHAHBAD MOHAMMADPUR METRO STATION AND HEADING NORTH INTO NEW DELHI CITY AND EAST TO THE AIRPORT. THE FEASIBILITY OF A FUTURE EXPANSION TO THE SOUTH HAS TO BE ENSURED URBAN EXTENSION ROAD UER II DIVIDES THE SITE IN TWO. NEW INTERNAL DISTRIBUTION CONNECTED TO THE SURROUNDING ROAD NETWORK, EITHER EXISTING OR PLANNED ROADS, SHALL FACILITATE THE ACCESS TO THE SECTOR. ISBT STATION IS PLANNED TO BE DEVELOPED ADJOINING THE RAILWAY LAND ON ITS WEST AND TO CATER OVER THAN 1.5 LAKH COMMUTERS DAILY. INDIRA GANDHI AIRPORT LOCATION AT THE EAST SIDE OF THE DWARKA SECTOR 21 PLOT. NORTHERN PERIPHERIC ROAD EXTENSION. TO GURGAON UER II ANUP NARANG FARM METRO STATION JAIN FARM METRO STATION CHAWALA FARM METRO BLUE LINE GIRLS SCHOOL METRO EXPRESS LINE BOYS SCHOOL ISBT SAHBAD VILLAGE AIRPORT POND TO CONVENTION DRAIN CENTER SHAHBAD MOHAMMADPUR CREMATION GROUND VILLAGE 7

8 3. MASTER PLAN. GENERAL LAYOUT

9 3. MASTER PLAN.PROJECT DEVELOPMENT INITIAL PHASE PROJECT SHALL BE DEVELOPED IN 2 PHASES OWING TO LAND ACQUISITION ISSUES PHASE 1 SHALL INCLUDE RAILWAY STATION WITH ESSENTIAL PASSENGER FACILITES, PASSENGER ACCOMODATION, COMMERICAL AND RETAILS AS PER NORMS FINAL PHASE PHASE 2 SHALL BE CONSTRUCTED IN THE FUTURE WITH THE ACQUISITION OF LAND AS PER REQUIREMENTS OF RAILWAYS. 9

10 3. MASTER PLAN.IMPROVEMENTS PROVISION OF 2 ND ENTRY (FROM AIRPORT SIDE), IT REQUIRES APPOX. 10 ACRES OF LAND TO BE ACQUIRED FROM AAI. PROPOSED WIDENING OF 2ND ENTRY CONNECTING ROAD TO 4 LANES (24 M) INLCUSION OF BUS TERMINAL (16 BAYS) AND PARKING (30 SPACES) INCLUSION OF NIGHT SHELTERS INCLUSION OF DISASTER MANAGEMENT (WILL BE EXPANDED IN THE 2ND PHASE.) GARBAGE COLLECTION POINTS SHOWN AT THE STRATEGIC PLACES. PUBLIC TOILETS PROVIDED AT STRATEGIC PLACES SEPARATE LANES FOR NMT TRAFFIC PARKING FOR CARS, M/C, CYCLES HOLDING AREA FOR TSR AND TAXI NEW ROAD CONNECTING THE COMMERCIAL AREA NEW EXTENSION OF THE BUILDING OVER THE MAIN ACCESS ROAD INCLUSION OF KIOSKS/RETAIL AREA AT DROP OFF/PICK UP POINTS TO INCREASE THE ACTIVITIES AND MAKE IT SAFE FOR WOMEN 10

11 3. MASTER PLAN IMPROVEMENTS. COMMERCIAL STALLS: THE MASTER PLAN PROPOSES TO INCLUDE COMMERCIAL STALLS IN ORDER TO INCREASE THE ACTIVITIES AROUND THE STATION TO MAKE IT SAFE FOR THE PASSENGERS PARTICULARLY WOMEN DURING ODD HOURS.. 37

12 3. MASTER PLAN.STATION LAYOUT-BASEMENT ARRIVALS UNDERPASSES ARRIVALS HALL ARRIVALS UNDERPASSES BASEMENT PARKING BASEMENT FLOOR ARRIVALS HALL: THIS ZONE WILL ACCOMMODATE THE MAIN EXIT AND THE VERTICAL COMMUNICATION ELEMENTS TO CONNECT THIS LEVEL WITH THE FIRST LEVEL IN WHICH THEY WILL HAVE THE OPTION TO MAKE THE CONNECTION WITH THE METRO STATION. IT WILL ALSO HOST TRAVELATORS TO ENSURE A COMFORTABLE MOVEMENT. THIS ZONE WILL INCLUDE SERVICE & SUPPORT AREAS TO GUARANTEE AN EFFICIENT PERFORMANCE OF THE ZONE. ARRIVALS HALL ENTRANCE CONTROL AREA CONCOURSES VERTICAL COMMUNICATION ELEMENTS PLATFORM AREAS PUBLIC SUPPORT AREAS PARCEL STORAGE AND PARCEL MOVEMENT SUPPORT SERVICE AREAS 12

13 3. MASTER PLAN. STATION LAYOUT-BASEMENT. PASSENGER CIRCULATION 13

14 3. MASTER PLAN.STATION LAYOUT-BASEMENT. TRAFFIC CIRCULATION BUS TERMINAL (16 BAYS) 14

15 3. MASTER PLAN.STATION LAYOUT-GROUND FLOOR. TRAFFIC CIRCULATION SEPARATE LANES FOR VARIOUS TRAFFIC MODES 15

16 3. MASTER PLAN.STATION LAYOUT. FUTURE SECOND ENTRY TRAFFIC CIRCULATION 15

17 3. MASTER PLAN.STATION LAYOUT-FIRST FLOOR. INNER CIRCULATION COMMERCIAL ZONE CONTROL GATES CONCOURSE ZONE ENTRANCE CONTROL AREA CONCOURSES VERTICAL COMMUNICATION ELEMENTS PLATFORM AREAS PUBLIC SUPPORT AREAS PARCEL STORAGE AND PARCEL MOVEMENT SUPPORT SERVICE AREAS CONNECTION WITH METRO STATION 17

18 18 INDIA, SEPTEMBER 30H 2013

19 4. TRAFFIC STUDY AND ANALYSIS 19 19

20 4. TRAFFIC STUDY AND ANALYSIS. STATION DEMAND Pairs of Trains proposed Passengers per day 88,000 1,38,000 THIS WOULD ATTRACT & GENERATE A TOTAL OF 1200 PCU S IN THE PEAK HOUR 20

21 4. TRAFFIC STUDY AND ANALYSIS. DEMAND PROJECT DEVELOPMENT FOR MIXED USE SQ M OF LAND HAS BEEN ALLOCATED FOR THE MIXED USE DEVELOPMENT IN THE MASTER PLAN. PHASE 1 THE OFFICE AND THE COMMERCIAL DEVELOPMENTS ANTICIPATED TO GENERTE FOOTFALLS FOOTFALLS ARE EXPECTED TO BE GENERATED PER DAY, I.E PCU S IN PEAK HOUR PHASE 2 21

22 4. TRAFFIC STUDY AND ANALYSIS. OTHER DEVELOPMENT THE ISBT IS PROJECTED TO HANDLE PASSENGERS PER DAY IN THE YEAR THIS TRANSLATES TO 1400 PCUS PER HOUR DURING PEAK HOURS. IFC ISBT THE DEVELOPMENT OF INTEGRATED FREIGHT COMPLEX WOULD GENERATE ADDITIONAL TRAFFIC DEMAND. THIS TRANSLATES TO 1200 PCUS PER HOUR DURING PEAK HOURS 22

23 4. TRAFFIC STUDY AND ANALYSIS. COMPREHENSIVE MOBITITY PLAN-2021 THE COMPREHENSIVE MOBILITY PLAN(CMP) PREPARED FOR THE DELHI REGION CONSTRUCTED A TRANSPORTATION MODEL FROM WHICH TRAFFIC WAS FORECASTED FOR THE YEAR THE MODEL HAS BEEN DEVELOPED IN CUBE VOYAGER. 380 ZONES WITH VEHICLES AND PUBLIC TRANSPORT MODELED SEPARATELY. WE HAVE EXTRACTED THE DATA FOR THE BIJWASAN AREA FROM THE MODEL. TRAFFIC ESTIMATES FROM THIS MODEL HAVE BEEN TAKEN IN AS PRELOADS TO A LOCAL MODEL CONSTRUCTED OVER 18 ZONES WITH THE LOCAL NETWORK FULLY REPRESENTED IN THE SAME. THE MODEL HAS BEEN USED TO ESTIMATE THE TRAFFIC LOADING ON ADJOINING ROADS. The Comprehensive Mobility Plan, Network extract for Dwarka and its surrounding area 23

24 4. TRAFFIC STUDY AND ANALYSIS. SURROUNDING ROAD NETWORK 24

25 4. TRAFFIC STUDY AND ANALYSIS. MODEL DEVELOPMENT THE MODEL WAS TESTED FOR THREE SCENARIOS FLOWS FROM MODEL Without proposed developments With IFC and ISBT With the Master Plan. IFC and ISBT The traffic generated by the development of Bijwasan station and other developments (IFC, ISBT) were assigned on to the network. The traffic loadings after the inclusion of the Master Plan are not significantly higher than with the IFC and ISBT The detail volume are shown in further slides 25

26 4. TRAFFIC STUDY AND ANALYSIS. TRAFFIC DEMAND ESTIMATION AT JUNCTIONS WITHOUT DEVELOPMENTS - FLOWS IN PCU WITH DEVELOPMENTS - FLOWS IN PCU Sl # Junction Road Sector 21 Junction Samalka Junction DDA Water Supply Junction Volume (Current) Volume (2021) Without Developments Volume (2021) With Developments Capacity (IRC) V/C Ratio (Current) V/C Ratio 2021 Without Developments V/C Ratio 2021 With Developments UER II North Arm Road towards Sector UER II South Arm UER II East Arm UER II West Arm Old Delhi Gurgaon Road Road towards Sector 19 & 20 Junction Road towards Pochanpur Road towards Janki Chowk

27 4. TRAFFIC STUDY AND ANALYSIS. PROPOSED IMPROVEMENT PLAN TRAFFIC DEMAND FROM THE STATION DEVELOPMENT & OTHER PROPOSED DEVELOPMENTS (IFC, ISBT) IS ANTICIPATED TO CREATE SIGNIFICANT VOLUMES OF TRAFFIC. THIS COULD POTENTIALLY AFFECT THE LOCAL ACCESSIBILITY TO THE STATION AS PER THE TRAFFIC FORECASTS. HENCE, CORRIDOR IMPROVEMENTS VIA GRADE SEPARATORS ARE PROPOSED ALONG THE NPR AND UER 2 AXIS 27

28 5. ACCESIBILITY TO THE MASTER PLAN. MULTIPLE VEHICULAR ACCESS. ACCESS FROM/TO UER-II MAIN ACCESS NORTHERN ACCESS 1 STATION ACCESS 2 NORTHERN ACCESS 2 28

29 5. ACCESIBILITY TO THE MASTER PLAN. IMPROVEMENTS PROPOSED FLYOVER PROPOSED ON UER-2 PROPOSED CONNECTION FOR BOTH SIDES OF SITE PEDESTRIAN+CYCLE PROPOSED PEDESTRIAN WALKWAY BETWEEN RAILWAY STATION & PROPOSED ISBT MAIN ACCESS UNDERPASS PROPOSED DIRECT ACCESS TO THE COMMERCIAL AREA (18 meters) PROPOSED WIDENING TO 4 LANE ROAD TO IMPROVE NORTHERN ACCESS (18 meters) PROPOSED NMT Crossing PROPOSED UNDERPASS SOUTHERN ACCESS FROM UER II PROPOSED WIDENING OF ACCESS ROAD TO 4 LANES (24 MTRS) SECOND ENTRY PROPOSED RAILWAY STATION-METRO PEDESTRIAN CONNECTION 29

30 5. ACCESIBILITY TO THE MASTER PLAN. DETAILS OF PROPOSED IMPROVEMENTS 30

31 6. INTERNAL CIRCULATION. BUS ACCESS AND ROUTE Mode Parking Drop & Ride Bus SECTOR-21 METRO STATION ISBT BUS STOP BUS ROUTES RAILWAY STATION 31

32 6. INTERNAL CIRCULATION. CAR ACCESS ROUTE Mode Parking Drop & Ride Car Two Wheeler SECTOR-21 METRO STATION ISBT DROP POINT FOR THE PASSENGERS PICK UP POINT FOR PASSENGERS RAILWAY STATION 32

33 6. INTERNAL CIRCULATION. TAXI/ AUTORICKSHAWS ACCESS AND ROUTE Mode Parking Drop & Ride Taxi TSR DROP POINT FOR THE PASSENGERS SECTOR-21 METRO STATION ISBT PICK UP POINT FOR PASSENGERS RAILWAY STATION AUTO TAXI HOLDING AREA 33

34 6. INTERNAL CIRCULATION. NON MOTORIZED TRAFFIC ROUTE Mode Parking Drop & Ride Cycle Rickshaw SEPARATE LANES FOR NMT TRAFFIC RICKSHAW DROP OFF AND PICK UP POINT PLANNED ON THE GROUND FLOOR 34

35 6. INTERNAL CIRCULATION. PEDESTRIAN ACCESS AND ROUTE Pedestrian paths across UER II including a cycle track SECTOR-21 METRO STATION The pedestrian walkway can be extended by connecting the Metro Station to the ISBT ISBT Proposed pedestrian walkway between the railway station and S21 metro. RAILWAY STATION Proposed pedestrian paths 35

36 7. CONCLUSIONS The proposed Master Plan is in line with the Master Plan of Delhi 2021 (MPD 2021) The proposed Master Plan has been designed to fully integrate with local road network. Bijwasan Station and the proposed development do not change the capacity traffic ratios significantly, but some improvements at main entry and on UER2 have been suggested. The pedestrian movement is totally integrated with Metro station and can be extended in the future to the proposed ISBT The new Station help to develop this area as a Transportation Hub connecting all modes of transport New facilities have been incorporated as disaster management, night shelters, kiosk, waste management... New Iconic and sustainable Railway Station is proposed. The Master designed for sustainable features i.e. renewable energy, water management and energy efficient buildings. 36 BIJWASAN : A WORLD 36 CLASS STATION

TRANSPORT SYSTEM IN URBAN INDIA

TRANSPORT SYSTEM IN URBAN INDIA MULTI MODAL TRANSPORT SYSTEM IN URBAN INDIA Pawan Kumar, Asstt TCP, Town & Country Planning Organization,, MoUD, New Delhi 1 Urban India(2001) Total Urban Population = 286.11 million = 27.78 % of total

More information

Transit Oriented Development Strategic Plan for Bhopal

Transit Oriented Development Strategic Plan for Bhopal Transit Oriented Development Strategic Plan for Bhopal 26 th February, 2015 IBI GROUP INTRODUCING BHOPAL Transport Urban Form Policy Framework Bhopal Curitiba Bhopal Curitiba Ottawa Population 1.79 million

More information

7 Infrastructure Development Plan

7 Infrastructure Development Plan 7 Infrastructure Development Plan 7.1 Roads and Public Transport 7.1.1 Sector Overview Major industrial linkage to/from Krishnapatnam node will be developed with Bengaluru, Chennai, Vijaywada, Guntur,

More information

FUTURE BUS RAPID TRANSIT PLANS

FUTURE BUS RAPID TRANSIT PLANS ATTACHMENT 1 Preferred Configuration Saskatoon Bus Rapid Transit - Preferred Configuration FUTURE BUS RAPID TRANSIT PLANS Plan For Growth Transportation Plan BRT Plan October 2017 saskatoon.ca/engage 1

More information

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP)

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP) Workshop on enabling Inclusive Cities ADB 29 October 2013 PAKISTAN: Karachi Mass-Transit Project (KMTP) Agenda 1. Karachi - Context 2. Rapid Project Description 3. Urban Transport and Inclusiveness: Different

More information

Transit Service Guidelines

Transit Service Guidelines G R E AT E R VA N CO U V E R T R A N S P O RTAT I O N A U T H O R I T Y Transit Service Guidelines PUBLIC SUMMARY REPORT JUNE 2004 Greater Vancouver Transportation Authority TRANSIT SERVICE GUIDELINES

More information

North Side Transfer Zone. Public Open House April 16, 2014

North Side Transfer Zone. Public Open House April 16, 2014 North Side Transfer Zone Public Open House Agenda Introductions Project Background and Purpose Transit Zone Components Site Identification Concepts Open Discussion 2 Project Purpose To determine the feasibility

More information

TRANSPORT DEMAND AND SUPPLY MODELING FOR CHENNAI CITY-A SYSTEMS APPROACH

TRANSPORT DEMAND AND SUPPLY MODELING FOR CHENNAI CITY-A SYSTEMS APPROACH TRANSPORT DEMAND AND SUPPLY MODELING FOR CHENNAI CITY-A SYSTEMS APPROACH S.Gayathri* #M.E Transportation Engineering, Anna University, College of Engineering, Abstract- Urban transportation system is a

More information

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis

More information

CE 452 Traffic Impact Assessment

CE 452 Traffic Impact Assessment CE 452 Traffic Impact Assessment 1 Why Required? New developments Produce/ attract new traffic Production: Residences Attraction: Shops, Offices, Schools, Hospitals etc. etc. Changes in traffic pattern

More information

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress IPSWICH NORTHERN ROUTES STUDY Stage 1 Progress 17 th January 2017 STUDY CONTEXT 2 The study is being funded in partnership with the Suffolk district and borough councils. Work forms part of the Suffolk

More information

Introduction to Transportation Systems Analysis

Introduction to Transportation Systems Analysis Introduction to Transportation Systems Analysis Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Goal of Transportation System Analysis 1 1.1 Characteristics...................................

More information

VICE MINISTER FOR TRANSPORTATION REPUBLIC OF INDONESIA

VICE MINISTER FOR TRANSPORTATION REPUBLIC OF INDONESIA VICE MINISTER FOR TRANSPORTATION REPUBLIC OF INDONESIA Opening Remarks ASEAN IN 2050: THE TRANSPORT SYSTEM AND ITS IMPLICATIONS ON ENERGY, ENVIRONMENT, AND CLIMATE CHANGE BALI, 23 FEBRUARY 2012 Assalamu

More information

Transportation demand management: a case study of Ahmedabad city

Transportation demand management: a case study of Ahmedabad city Urban Transport 641 Transportation demand management: a case study of Ahmedabad city S. Mistry India Abstract The city is one of the most important centers of 4500 years of Indus valley civilization. This

More information

Travel Delay and Modal Split Analysis A Case Study

Travel Delay and Modal Split Analysis A Case Study IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684 Volume 5, Issue 2 (Jan. - Feb. 213), PP 4-45 H.S.Sathish 1, Dr. H.S.Jagadeesh 2, Skanda Kumar 3 1, 2 (Department of Civil

More information

Appendix B5 PT Model Validation

Appendix B5 PT Model Validation Appendix B5 PT Model Validation PT Model Validation Report Sheffield and Rotherham Public Transport Model Report for Sheffield City Council August 2009 Document Control Project Title: MVA Project Number:

More information

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10 ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10 Section 7-10.1 Off Street Parking. Off-street parking spaces, with proper access from a street, alley or driveway shall be provided in all districts

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers Appendix H Millennium Hollywood Project Trip Cap and Mitigation Triggers MILLENNIUM HOLLYWOOD PROJECT TRIP CAP AND MITIGATION TRIGGERS Crain and Associates Introduction The Millennium Hollywood Project

More information

THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS PART ONE

THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS PART ONE Journal of KONES Powertrain and Transport, Vol. 22, No. 1 2015 ISSN: 1231-4005 e-issn: 2354-0133 DOI: 10.5604/12314005.1161598 THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS PART ONE Maciej Bilski

More information

IMPLEMENTATION OF TERMINAL MANAGEMENT SYSTEM (TMS) AT ISBT-43,CHANDIGARH

IMPLEMENTATION OF TERMINAL MANAGEMENT SYSTEM (TMS) AT ISBT-43,CHANDIGARH Leaders-5 Mid Term Review IMPLEMENTATION OF TERMINAL MANAGEMENT SYSTEM (TMS) AT ISBT-43,CHANDIGARH Project Report prepared by Amit Talwar, Additional Secretary cum-director (Transport), Chd.UT Scenario

More information

Land at Penny Pot Lane, Killinghall

Land at Penny Pot Lane, Killinghall NORTH YORKSHIRE COUNTY COUNCIL BUSINESS and ENVIRONMENTAL SERVICES LOCAL HIGHWAY AUTHORITY Proposed Development: Location: Applicant: Outline Application for erection of 600 dwellings, primary school,

More information

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS 2016 1 PROJECT OUTLINE The Union Pearson Express is a significant urban transportation project that

More information

ARCHIVED. Identification and Suitability Assessment of Sites for Primary Schools. Technical Guidance Document TGD-025

ARCHIVED. Identification and Suitability Assessment of Sites for Primary Schools. Technical Guidance Document TGD-025 DEPARTMENT OF EDUCATION & SCIENCE Planning & Building Unit Technical Guidance Document TGD-025 Identification and Suitability Assessment of Sites for Primary Schools 1 st Edition, September 2007 Planning

More information

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal May 2012 Draft Report: Alternatives Screening Version 1.0 1.0 Introduction This document outlines the alternatives screening process used

More information

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Hamilton Rapid Transit Preliminary Design and Feasibility Study Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT DESIGN BRIEF Version:1.0 Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT

More information

GARE DO ORIENTE: LISBON, PORTUGAL

GARE DO ORIENTE: LISBON, PORTUGAL GARE DO ORIENTE: LISBON, PORTUGAL TASK 2: TECHNOLOGY // 11516 COMPUTATIONAL ENVIRONMENTS TENEIL VAN DYCK 10449736 TRISTAN DAVISON 10448898 TASK 02 // TENEIL VAN DYCK + TRISTAN DAVISON // TECHNOLOGY 1.CP

More information

A+ ACADEMY HIGH SCHOOL

A+ ACADEMY HIGH SCHOOL TRAFFIC MANAGEMENT PLAN FOR A+ ACADEMY HIGH SCHOOL IN DALLAS, TEXAS Prepared for: A+ Charter Schools, Inc. 8225 Bruton Road Dallas, Texas 75217 Prepared by: Texas Registered Engineering Firm F-3199 400

More information

BAREILLY Smart City ROUND II

BAREILLY Smart City ROUND II BAREILLY Smart City ROUND II VISION, STRATRGIC FOCUS & CITIZEN CONSULTATION Vision - To be an economically alive city by strengthening traditional handicrafts in Zari-Zardosi, Cane furniture, Kite-Manjha

More information

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018 Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018 Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel 1 FREIGHT TERMINAL AND DEPOTS Helsinki Helsinki-Vantaa

More information

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT For ease of local identification this Environmental Impact Statement

More information

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE Draft Regional Climate Action Plan Sustainable Communities & Transportation Planning SP-1 Develop criteria in collaboration with municipal and county planning

More information

South Sounder Capital Improvements Program

South Sounder Capital Improvements Program South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Version Draft ST3 Plan Date Last Modified March 28, 2016

More information

Stockton Freight & Passenger Rail Mobility Enhancement

Stockton Freight & Passenger Rail Mobility Enhancement Stockton Freight & Passenger Rail Mobility Enhancement 2017 $10.34 million in 2017 FASTLANE Grant funding to complete engineering design, permitting, and construction of the Stockton Track Extension and

More information

RER New Stations Initial Business Case BRESLAU STATION. Kitchener Corridor. July Draft

RER New Stations Initial Business Case BRESLAU STATION. Kitchener Corridor. July Draft RER New Stations Initial Business Case BRESLAU STATION Kitchener Corridor July 2016 Draft Draft: v1.2 Metrolinx RER New Stations Initial Business Case BRESLAU Draft Prepared by: IBI Group 55 St. Clair

More information

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements Section Five Section 5: Subarea Mobility Enhancements 5.1 Transit and Pedestrian Improvements From the outset of the master planning process, one of the primary goals was to integrate transit and pedestrian-oriented

More information

GPS Devices to Increase Efficiency of Indian Auto-Rickshaw Segment

GPS Devices to Increase Efficiency of Indian Auto-Rickshaw Segment GPS Devices to Increase Efficiency of Indian Auto-Rickshaw Segment Sanchay Vaidya, Sourabh Gupta, Gouresh Singhal International Science Index, Economics and Management Engineering waset.org/publication/9997647

More information

Road Transport Upgrade through Kapiti. Transportation Review for Kapiti Coast District Council

Road Transport Upgrade through Kapiti. Transportation Review for Kapiti Coast District Council Transportation Review for Kapiti Coast District Council September 2009 Project: Title: Document Reference: Prepared by: Reviewed by: Revisions: Road Transport Upgrade through Kapiti Transportation Review

More information

Kennedy Station Online Consultation

Kennedy Station Online Consultation Kennedy Station Online Consultation 1 Surface Light Rail Transit 2 Metrolinx LRV 4 doors per car (2 single, 2 double) Up to 3 cars per consist 3 Light Rail Vehicles (LRVs) New LRVs will feature: 100% low

More information

AIRPORT ADVERTISING TXL BERLIN-TEGEL

AIRPORT ADVERTISING TXL BERLIN-TEGEL BERLIN S MOST FREQUENTED AIRPORT The airport Tegel is the most frequented airport in Berlin with 14.5 million passengers every year. 49,5% of the visitors are business travellers a significantly higher

More information

Mobility on Demand for Improving Business Profits and User Satisfaction

Mobility on Demand for Improving Business Profits and User Satisfaction Mobility on Demand for Improving Business Profits and User Satisfaction Takuro Ikeda Takushi Fujita Moshe E. Ben-Akiva For a sustainable society, we need to design a mobility management system that does

More information

Amman Transportation Strategy

Amman Transportation Strategy Amman Transportation Strategy from Planning to Implementation Ayman Smadi Regional Conference on Sustainable Urban Transport Damascus (Syria), April 11-13, 2010 Outline Background and introduction Current

More information

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016 Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016 Presentation Outline Project Background Demographic and Economic Data Review Competitive Market Analysis Feasibility Assessment

More information

S-09: Auburn Station Access Improvements

S-09: Auburn Station Access Improvements Project Number S-09 Subarea South King Primary Mode Commuter Rail Facility Type Infrastructure Improvements Length Version Number ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE

More information

News Release TRANSPORT MINISTER ANNOUNCES WINNING PROPOSAL FOR TORONTO AIR-RAIL LINK. No. H132/03 For release November 13, 2003

News Release TRANSPORT MINISTER ANNOUNCES WINNING PROPOSAL FOR TORONTO AIR-RAIL LINK. No. H132/03 For release November 13, 2003 News Release No. H132/03 For release November 13, 2003 TRANSPORT MINISTER ANNOUNCES WINNING PROPOSAL FOR TORONTO AIR-RAIL LINK TORONTO -- Transport Minister David Collenette today announced that Union

More information

Liverpool City Region Candidate Major Schemes April 2013

Liverpool City Region Candidate Major Schemes April 2013 Region Candidate April 2013 Sponsoring Halton Borough Halton Borough Halton Borough Scheme Name: Detail: Estimated Silver Jubilee Bridge Major Maintenance M56 J11A Daresbury Enterprise Zone / East Runcorn

More information

SEARs project justification and conclusion

SEARs project justification and conclusion 31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need

More information

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF ANN ARBOR AND THE REGENTS OF THE UNIVERSITY OF MICHIGAN FOR THE DEVELOPMENT OF THE FULLER ROAD STATION

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF ANN ARBOR AND THE REGENTS OF THE UNIVERSITY OF MICHIGAN FOR THE DEVELOPMENT OF THE FULLER ROAD STATION MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF ANN ARBOR AND THE REGENTS OF THE UNIVERSITY OF MICHIGAN FOR THE DEVELOPMENT OF THE FULLER ROAD STATION This memorandum of understanding is entered into on

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

Presentation On Vehicle Telematics 2017

Presentation On Vehicle Telematics 2017 DGM IT,Transportation Technology Solutions Presentation On ITS @ Vehicle Telematics 2017 Presented By. Alok Sethi Company Overview Delhi Integrated Multi-Modal Transit System Ltd. (DIMTS) is an urban transport

More information

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009 Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009 FINAL 1 Table of Contents Slide Number Executive Summary 3 Understanding the Outcomes Report 5 Measuring results

More information

Developing Low Carbon Vision for Indian Cities: A Case of Bhopal, India

Developing Low Carbon Vision for Indian Cities: A Case of Bhopal, India Developing Low Carbon Vision for Indian Cities: A Case of Bhopal, India Manmohan Kapshe Responding to Climate Change: UK-Indian Perspectives Queens University, Belfast 20th - 21st June 2012 Presentation

More information

Project: Study on Integrated Public Transit System for the City of Surat Sheet 1 of 8 Document: /TT/Rep-05 March 2007 CONTENTS

Project: Study on Integrated Public Transit System for the City of Surat Sheet 1 of 8 Document: /TT/Rep-05 March 2007 CONTENTS Project: Study on Integrated Public Transit System for the City of Surat Sheet 1 of 8 Contents Revision: R0 CONTENTS Chapter 1 Introduction 1.1 Preamble 1.2 Need for the Study 1.3 Study Objectives 1.4

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

Delhi Mumbai Industrial Corridor (DMIC) Project

Delhi Mumbai Industrial Corridor (DMIC) Project Delhi Mumbai Industrial Corridor (DMIC) Project 1. Delhi Mumbai Industrial Corridor (DMIC) project is a flagship programme of Government of India with the aim to create futuristic industrial cities by

More information

INFRASTRUCTURE PROJECTS IN PIPELINE

INFRASTRUCTURE PROJECTS IN PIPELINE Now Available INFRASTRUCTURE PROJECTS IN PIPELINE Sector Analysis and Outlook; Opportunities and Projections Report (PDF) Data-set (Excel) 3 Quarterly Updates India Infrastructure Research Table of Contents

More information

20. Travel per vehicle (freight)

20. Travel per vehicle (freight) 20. Travel per vehicle (freight) Overview Target The view is intended to calculate the annual travel per vehicle over time for the freight transport service. Light-freight and large-freight vehicles are

More information

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe: November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,

More information

Regional Overview of Sustainable Urban Transport Systems in Asia

Regional Overview of Sustainable Urban Transport Systems in Asia Capacity Building Workshop on Sustainable Urban Transport Index 30-31 October 2017, Colombo Regional Overview of Sustainable Urban Transport Systems in Asia Madan B. Regmi, DEng Transport Division UNESCAP,

More information

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012 Hong Kong International Airport Medium & Long Term Development Plans The British Chamber of Commerce 18 July 2012 Connecting HK with the World More than 100 airlines serving 160 destinations worldwide

More information

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL Approval Name Position Signature/Date Document Author Adam Graves Network Program Planning Manager Document Endorsers Approving Manager Scott Short Karen Wilson Robb van Toledo Manager, Network Scheduling

More information

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration Scope of Work Route 116/Hinesburg Growth Center Corridor Study Town of Hinesburg and CCRPC Project Approach and Understanding Route 116 through Hinesburg had seen substantial changes in the past 15 years,

More information

Urban Corridor Noise Pollution: A case study of Surat city, India

Urban Corridor Noise Pollution: A case study of Surat city, India ISBN 978-1-84626 Proceedings of 2011 International Conference on Environment and Industrial Innovation (ICEII 2011) Malaysia, 17-19 June, 2011, pp. 144-148 Urban Corridor Noise Pollution: A case study

More information

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES 6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES The projected activity levels at Sacramento International Airport as described in Chapter 3 are the basis for determining the terminal facilities that will be

More information

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns OUR CUSTOMERS: Travel Patterns TRANSPORTATION FACTS The more than 6.5 million people in the Commonwealth have many reasons to travel and several ways to get to their destinations. A recent statewide survey

More information

Section 1 OBC FADS /13 Access to Parking Areas

Section 1 OBC FADS /13 Access to Parking Areas Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

MASTER PLAN. Urban Rail Development. Plan. Bus Transformation Plan. Taxi Transformation. Plan. Interchange and Integration Plan.

MASTER PLAN. Urban Rail Development. Plan. Bus Transformation Plan. Taxi Transformation. Plan. Interchange and Integration Plan. Taxi Transformation Plan Interchange and Integration Plan Urban Rail Development Plan MASTER PLAN Travel Demand Management Plan Bus Transformation Plan Land Use Plan Establishing city-bus service within

More information

Kosovo s PPP Policy, Legal, & Institutional Framework

Kosovo s PPP Policy, Legal, & Institutional Framework MODULI 1 Kosovo s PPP Policy, Legal, & Institutional Framework Case study PIA concesssion 02, November 2016 Arton Ahmeti Central Public-Private Partnership Department Ministry of Finance 2 Overview Investment

More information

China, PR: Metro in Guangzhou. OECD sector Railway sector / BMZ project ID

China, PR: Metro in Guangzhou. OECD sector Railway sector / BMZ project ID China, PR: Metro in Guangzhou Ex-post evaluation OECD sector Railway sector / 21030 BMZ project ID 1993 65 883 Project-executing agency Consultant Guangzhou Metro Corporation (GMC) Hamburg Consult (HC)

More information

Sounder Extension to DuPont

Sounder Extension to DuPont Subarea Pierce Primary Mode Commuter Rail Facility Type Station Length 7.8 miles Version Draft ST3 Plan Date Last Modified March 28, 2016 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

TRANSIT SERVICE GUIDELINES

TRANSIT SERVICE GUIDELINES CHATHAM AREA TRANSIT AUTHORITY FEBRUARY 2014 Table of Contents 1. PURPOSE... 3 2. CAT SERVICE GUIDELINES... 3 3. TRAVEL MARKETS... 4 4. TRANSIT COVERAGE... 4 5. TRANSIT ACCESS... 4 6. BUS STOP SPACING

More information

What is the Future of the Chinese Railways?

What is the Future of the Chinese Railways? What is the Future of the Chinese Railways? By David Burns 2/19/09 Not a definitive presentation! Railways are Railways the World Over Possible to predict future of Chinese railway by observation of those

More information

THE REGION S PLAN POLICY FRAMEWORK. August 2015

THE REGION S PLAN POLICY FRAMEWORK. August 2015 THE REGION S PLAN POLICY FRAMEWORK August 2015 2 What is The Policy Framework? Cover photo credit: Sinan Sinharoy for Atlanta BeltLine, Inc. Atlanta is one of the world s most dynamic metropolitan areas,

More information

International Seminar on PRIORITISATION OF MULTIMODAL TRANSPORT INFRASTRUCTURE Noordwijk aan Zee, The Netherlands -- May 12-15, 1996

International Seminar on PRIORITISATION OF MULTIMODAL TRANSPORT INFRASTRUCTURE Noordwijk aan Zee, The Netherlands -- May 12-15, 1996 International Seminar on PRIORITISATION OF MULTIMODAL TRANSPORT INFRASTRUCTURE Noordwijk aan Zee, The Netherlands -- May 12-15, 1996 PRESENT STATUS AND POLICIES ON MULTIMODAL TRANSPORT IN JAPAN R. YOSHIMOTO

More information

Master Plan. Summary

Master Plan. Summary R e g i o n a l Tr a n s p ortat i o n Master Plan Summary Executive Summary With an increasing population and changing demographics, Waterloo Region must ensure that growth is both sustainable and affordable.

More information

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW October 2002 The Planning Department City and County of San Francisco TABLE OF CONTENTS I. Introduction 1 II. Overview of Process and

More information

Project Evaluation Criteria

Project Evaluation Criteria Project Evaluation Criteria Goals and Objectives were developed to guide Envision 35 Long Range Transportation Plan (LRTP) Update. These guiding principles were based on the requirements included in the

More information

STAFF REPORT. Project Description. Proposal. Snyderville Basin Planning Commission From:

STAFF REPORT. Project Description. Proposal. Snyderville Basin Planning Commission From: STAFF REPORT To: Snyderville Basin Planning Commission From: Ray Milliner, County Planner Date of Meeting: May 12, 2015 Type of Item: Public Hearing, No Action Process: Administrative Review RECOMMENDATION:

More information

Transit Oriented Development Study

Transit Oriented Development Study Federal Way Link Extension Transit Oriented Development Study Table of Contents Executive Summary ES 1 Chapter 1: Introduction.. 1-1 Chapter 2: Methodology. 2-1 Chapter 3: Project Overview 3-1 Chapter

More information

GO RAIL NIAGARA SERVICE EXTENSION

GO RAIL NIAGARA SERVICE EXTENSION Business Case: Finch Avenue West Rapid Transit GO RAIL NIAGARA SERVICE EXTENSION INITIAL BUSINESS CASE Date: November, 2014 NOVEMBER 2015 Page 1 TABLE OF CONTENTS 1.0 Executive Summary...p.5 2.0 Introduction....p.6

More information

Bonnie Doon Grade Separation

Bonnie Doon Grade Separation 6. 2 Bonnie Doon Grade Separation Recommendation: That the April 18, 2017, Integrated Infrastructure Services report CR_4461, be received for information. Report Summary This report provides information

More information

Advert pages 24/3/03 12:25 pm Page METROSUR 2

Advert pages 24/3/03 12:25 pm Page METROSUR 2 Advert pages 24/3/03 12:25 pm Page 56 56 METROSUR 2 pp57-60 Line 10 From Colonia 24/3/03 12:38 pm Page 57 Line 10, Section 1A Contractor: From Colonia Jardín to Cuatro Vientos Line 10 Extension to Metrosur,

More information

FAST FIT TEMPORARY HOARDING SY COMBINED BASE & PANEL SYSTEM FAST FIT TEMPORARY HOARDING SY

FAST FIT TEMPORARY HOARDING SY COMBINED BASE & PANEL SYSTEM FAST FIT TEMPORARY HOARDING SY SHOWCASE BIRMINGHAM NEW STREET STATION FAST FIT TEMPORARY HOARDING SY Ultrahord on a mainline platform in 2009 A footbridge is removed. Hoardings on bottom left. FAST FIT TEMPORARY HOARDING SY ultrahord

More information

INDEPENDENT PUBLIC INQUIRY SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN

INDEPENDENT PUBLIC INQUIRY SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN INDEPENDENT PUBLIC INQUIRY PO Box 484 North Sydney NSW 2059 SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN T: 02 8904 1011 F: 02 8904 1133 E: nswmanager@planning.org.au About PIA The Planning Institute of Australia

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

1.1 Purpose of the Project

1.1 Purpose of the Project Chapter 1 Purpose and Need for East Link Project 1.1 Purpose of the Project The purpose of the East Link Project is to expand the Sound Transit Link light rail system from Seattle to Mercer Island, Bellevue

More information

MEMORANDUM EXAMPLES FOR ILLUSTRATIVE PURPOSES NEXT STEPS. Item 3 Long-Range Plan Task Force May 17, 2017

MEMORANDUM EXAMPLES FOR ILLUSTRATIVE PURPOSES NEXT STEPS. Item 3 Long-Range Plan Task Force May 17, 2017 Item 3 Long-Range Plan Task Force May 17, 2017 MEMORANDUM TO: TPB Long-Range Plan Task Force FROM: Kanti Srikanth, TPB Staff Director SUBJECT: Sample list of improvement initiatives for illustrative purposes

More information

THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS. PART TWO

THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS. PART TWO Journal of KONES Powertrain and Transport, Vol. 22, No. 1 2015 ISSN: 1231-4005 e-issn: 2354-0133 DOI: 10.5604/12314005.1161601 THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS. PART TWO Maciej Bilski

More information

2007 Title 24 Accessibility Code Updates and ADA Issues

2007 Title 24 Accessibility Code Updates and ADA Issues 2007 Title 24 Accessibility Code Updates and ADA Issues C.A.S.H. Workshop June 2007 Introduction Update on ADA Certification of the California Building Code Overview of significant changes to accessibility

More information

Stationsomgeving Diksmuide

Stationsomgeving Diksmuide Stationsomgeving Diksmuide Introduction Dynamic seamless interchange in Diksmuide: introduction Diksmuide: small sized medieval town - 16 000 inhabitants including the inhabitants of the 15 small villages

More information

PRICING STRATEGIES PRESENTED BY JEFFREY D. ENSOR MALAYSIA TRANSPORT RESEARCH GROUP TO THE NOVEMBER 25, 2003

PRICING STRATEGIES PRESENTED BY JEFFREY D. ENSOR MALAYSIA TRANSPORT RESEARCH GROUP TO THE NOVEMBER 25, 2003 PRICING STRATEGIES PRESENTED BY JEFFREY D. ENSOR TO THE MALAYSIA TRANSPORT RESEARCH GROUP NOVEMBER 25, 2003 Outline Motivations Distance-based pricing Congestion pricing Overview Scheme types Technology

More information

Transportation Cost Estimation

Transportation Cost Estimation Transportation Decision-making Principles of Project Evaluation and Programming Transportation Cost Estimation Kumares C. Sinha and Samuel Labi 1 Transportation Costs Classification of Costs Agency Costs

More information

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999

More information

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation Draft - Smart City Proposal Kalyan Dombivli Municipal Corporation 1 1. Kalyan-Dombivli Introduction 2 Kalyan Dombivli Kalyan Dombivli and Titwala cities form KDMC jurisdiction; Population increased from

More information

Introduction to Transportation Systems

Introduction to Transportation Systems Introduction to Transportation Systems 1 PART III: TRAVELER TRANSPORTATION 2 Chapter 28: Urban Public Transportation 3 Urban Public Transportation Introduction LOS Services History Costs Temporal Peaking

More information

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan. 8.4-1 REPORT Meeting Date: 2014-06-26 Regional Council For Information DATE: June 17, 2014 REPORT TITLE: PEEL GOODS MOVEMENT STRATEGIC PLAN UPDATE 2014 FROM: Dan Labrecque, Commissioner of Public Works

More information

24.1 Residential Buildings on plots (other than flatted group housing)

24.1 Residential Buildings on plots (other than flatted group housing) 24.1 Residential Buildings on plots (other than flatted group housing) (1) Ground coverage, Floor Area Ratio, height and setbacks shall be as per Table-I appended to these regulations. However, the set

More information

Introduction to the Roads and Road Transport

Introduction to the Roads and Road Transport Chapter 1 Introduction to the Roads and Road Transport 1.1 The Problem. 1.2 The Need for Integrated Transport System. 1.3 Importance of Road Transport for Indian Economy. 1.4 Classification of Indian Roads.

More information

siemens.com/mobility Traffic simulation with PTV Vissim Leading-edge software fully integrated in the Sitraffic landscape

siemens.com/mobility Traffic simulation with PTV Vissim Leading-edge software fully integrated in the Sitraffic landscape siemens.com/mobility Traffic simulation with PTV Vissim Leading-edge software fully integrated in the Sitraffic landscape For urban or interurban traffic, rail transport or private travel: To all kinds

More information