1 SSCP Evolving Technology & Planning Considerations Analysis Case Studies 14 March 2018 Regine Weston

2 Overview Security checkpoints (SSCPs) have evolved continuously over the last 20 years As each processing constraint has been identified, solutions to increase efficiency for that aspect have been implemented triggering a new constraint The idea of achieving balanced capacity has been elusive and the variables change too frequently day to day and sometimes hour to hour Simulation modelling allows us to understand the impact of changes before implementation and test mitigation measures as necessary Case study 1 is a US airport where the challenge is minimizing wait times within an existing footprint Case study 2 is a UK airport where changing regulations had a significant impact on operations 2

3 ASL & Matrix Screening The throughput for ASL and Matrix Screening systems is based on number of trays per machine and not on number of passengers Typical throughput rate is trays per hour. This includes 10% re-circulation rate for trays diverted for secondary screening Lanes with same equipment can have different throughput rates for passengers as the number of trays per passenger varies by: Airport location Type of airline (low cost, legacy, charter) Route (leisure vs business)

4 Case Study 1 10 double ASL lanes w/ current throughput Pre-Check Throughput: 275 passengers / hr Target Wait Time: 5 mins No Queue Balancing South 10 Lanes / SSCP Area Pre-Check (2) Pre-Check (3) North 80% 20% Pre- Check (8) (7) Throughput: 225 passengers / hr Target Wait Time: 10 mins Queue Balancing

5 10 Double Lanes (225/hr Reg; 275/hr Pre-check)

6 Case Study 1 Only 8 double ASL lanes staffed 80% 20% Throughput: 225 passengers / hr Target Wait Time: 10 mins Queue Balancing Pre-Check Throughput: 275 passengers / hr Target Wait Time: 5 mins No Queue Balancing Pre- Check Pre-Check North South North South Passengers Passengers Passengers in Queue Wait Time (mins) min LOS Wait Time (mins) min LOS Wait Time (mins)

7 Case Study 1 What throughput would be required to stay within the Maximum Wait Targets with only 8 double lanes open PRE-CHECK Target Wait Time: 5 mins Option A Queue Balancing Throughput: 275 passengers / hr Option B No Queue Balancing Throughput: 285 passengers / hr 80% 20% Pre- Check South 8 Lanes / SSCP Area North 260 pph 285 pph 10 +4% Pre-Check (2) Pre-Check (2) % (6) (6) REGULAR Throughput: 260 passengers / hr Target Wait Time: 10 mins Queue Balancing 225 Base 275 Base Lane PreCheck Lane

8 8 Double Lanes (260/hr Reg; 285/hr Pre-check)

9 SSCP Evolving Technology & Planning Considerations Case Study 2

10 Case Study 2 UK originally implemented Matrix screening for bags while using only WTMD for passengers. Government was considering implementing a minimum use of AIT (Body Scanners; 25% day & 20% of peak hour) Use a randomizer to select who uses lanes with AIT What percentage need to be sent to AIT lanes to ensure that the minima are met?

11 Case Study 2 Tray throughput rate varies by lane (length): Type Trays per hour Mid Parallel Load and Matrix Long Parallel Load and Matrix Family Long Parallel Load and Matrix Tray loading time/divestiture (survey based) is a random continuous distribution: Number of Trays :00 04:00 05:00-06:00 Trays per passenger varies by time of day 07:00-08:00 09:00-10:00 11:00-12:00 13:00-14:00 15:00-16:00 17:00-18:00 19:00-20:00 21:00-22:00 Time (seconds per tray) Cumulative % Magnetometer 720 passengers/hour (5 seconds / pax) Body-scanner 150 passengers/hour (24 seconds / pax) Number of Trays :00 04:00 05:00-06:00 Trays per passenger varies by season (20% higher in Winter) 07:00-08:00 09:00-10:00 11:00-12:00 Summer 13:00-14:00 Winter 15:00-16:00 17:00-18:00 19:00-20:00 21:00-22:00

12 Case Study 2 Impact of minimum target requirements for Full Body Scanner (AIT) Usage on security checkpoint lane operations Key Drivers: Avoid lane starvation Mini-queues Tray Throughput Lane Length Case 1: 0% AIT Usage..TO Case 10: 100% AIT Usage AIT installed in Lanes Number of Trays per Hour Maximum Simulated Tray Throughput per Lane Lane 6 Lane 7 Lane 8 Base Case 1 Case 2 Case 3 Case 4 Case 5 Case 6 Case 7 Lane 7 Lane 8 Lane 9 Lane 10 se 1 Case 2 Case 3 Case 4 Case 5 Case 6 Case 7 Case 8 Case 9 Case 10 Declared Throughput

13

14 SSCP Analysis Questions?

Innovation Task Force

Innovation Task Force Innovation Task Force Innovation Task Force Briefing To ACI-NA / A4A March 28, 2017 1 2 Agenda Innovation Task Force Overview Current ITF Efforts ITF-Led vs. ITF-Enabled Automated Screening Lane Deployments

More information

Curbfront Case Studies

Curbfront Case Studies 1 A Sharper Saw? Using Advanced Planning Tools and Data to Improve Your Planning Efforts Finding the Right Saw, Curbfront Case Studies Jill Capelli, P.E. Associate Kimley-Horn and Associates, Inc. jill.capelli@kimley-horn.com

More information

BAGGAGE HANDLING SYSTEM RECAPITALIZATION & OPTIMIZATION

BAGGAGE HANDLING SYSTEM RECAPITALIZATION & OPTIMIZATION BAGGAGE HANDLING SYSTEM RECAPITALIZATION & OPTIMIZATION ACI North America Technical & Operations Committee Vancouver, British Columbia March 24, 2015 Emily Underhill, P.E., A.A.E. Division Director Development

More information

Transportation Security Administration. CHECKPOINT DESIGN GUIDE (CDG) Revision 6.1. June 01, Prepared for the

Transportation Security Administration. CHECKPOINT DESIGN GUIDE (CDG) Revision 6.1. June 01, Prepared for the Transportation Security Administration CHECKPOINT DESIGN GUIDE (CDG) Revision 6.1 June 01, 2016 Prepared for the Transportation Security Administration (TSA) Prepared by: Lockheed Martin System Integration

More information

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations Why use simulation? Accurate Depiction of Reality Anyone can perform a simple analysis manually. However, as the complexity of the analysis increases, so does the need to employ computer-based tools. While

More information

ISE480 Sequencing and Scheduling

ISE480 Sequencing and Scheduling ISE480 Sequencing and Scheduling INTRODUCTION ISE480 Sequencing and Scheduling 2012 2013 Spring term What is Scheduling About? Planning (deciding what to do) and scheduling (setting an order and time for

More information

Wake Mitigation in the Terminal Area

Wake Mitigation in the Terminal Area Center for Advanced Aviation System Development Wake Mitigation in the Terminal Area Marshall Koch November 18, 2014 Approved for Public Release; Distribution Unlimited. Case Number 14-3930 2014 The MITRE

More information

o&i consulting: at a glance

o&i consulting: at a glance s u p p l i e r o f a i r p o r t a r r i v a l & d e p a r t u r e o p e r a t i o n a l p l a n n i n g s e r v i c e s t o t h e L o n d o n 2 0 1 2 G a m e s aviation. logistics. services. o&i consulting:

More information

ITB 2017 Berlin Can we handle airport s future security challenges?

ITB 2017 Berlin Can we handle airport s future security challenges? ITB 2017 Berlin Can we handle airport s future security challenges? Bismarckstr. 61 52066 Aachen, Germany Tel.: +49 (0)241 16 843-0 Fax.: +49 (0)241 16 843-19 Email: mail@airport-consultants.com Internet:

More information

I-10 CONNECT. Public Meeting #1

I-10 CONNECT. Public Meeting #1 I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

Solicitation No Passenger Wait Time System, please be advised of the following clarifications to the above referenced Solicitation.

Solicitation No Passenger Wait Time System, please be advised of the following clarifications to the above referenced Solicitation. February 2, 2018 CLARIFICATION LETTER No. 1 Re: Solicitation No. 7006612 Passenger Wait Time System, please be advised of the following clarifications to the above referenced Solicitation. (Note: Other

More information

A Simulation-Evolutionary Approach for the allocation of Check-In Desks in Airport Terminals

A Simulation-Evolutionary Approach for the allocation of Check-In Desks in Airport Terminals A Simulation-Evolutionary Approach for the allocation of Check-In Desks in Airport Terminals Miguel MUJICA Mota a,b c and Catya ZUNIGA a Universitat Autonoma de Barcelona, Campus UAB,08193, Bellaterra,

More information

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper Niagara-Hamilton Trade Corridor Technical Paper 1. Purpose In the report to Council on the Regional Council Strategic Priorities Implementation Plan, pursuing Provincial commitment for the Niagara to Greater

More information

OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen

OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen Arne Thesen: Optimal allocation of work... /3/98 :5 PM Page OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen Department of Industrial Engineering, University

More information

Variable Speed Warnings on DMS

Variable Speed Warnings on DMS Variable Speed Warnings on DMS Evolving Tools for Better Safety and Service Jeanne Olubogun, P.E. District Traffic Engineer - St. Louis Region Jeanne.Olubogun@modot.mo.gov 314-275-1536 2014 Traffic and

More information

Introduction to Transportation Systems

Introduction to Transportation Systems Introduction to Transportation Systems 1 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATION 2 Chapter 7: Transportation Systems: Key Points 11-17 3 Direct Elevator Service 60 59 58 3 2 1 0 Figure 71 4 Another

More information

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN

More information

The RIDE Access Center (TRAC) Update June 26, 2017

The RIDE Access Center (TRAC) Update June 26, 2017 The RIDE Access Center (TRAC) Update June 26, 2017 Overview The consolidation of RIDE call centers is designed to improve the experience of RIDE customers by improving accountability and enabling the MBTA

More information

About us. We specialize in designing, production, assembly, commissioning and service of the airport dedicated

About us. We specialize in designing, production, assembly, commissioning and service of the airport dedicated About us We specialize in designing, production, assembly, commissioning and service of the airport dedicated transport systems. We have all the essential qualifications and experience to execute professional

More information

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03 OPERATING SYSTEMS CS 3502 Spring 2018 Systems and Models Chapter 03 Systems and Models A system is the part of the real world under study. It is composed of a set of entities interacting among themselves

More information

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES 1 st Edition City of San Luis Obispo 2035 Circulation Element 1 Table of Contents Introduction... 2 Process... 2 When Impact Studies Are Required... 3

More information

Disruptive Innovation in

Disruptive Innovation in INNO-Grips Workshop on Disruptive Innovation 24 th January 2012, Brussels Disruptive Innovation in European Tourism Dr. Markus Lassnig Salzburg Research GmbH Agenda 1. The tourism sector in Europe 2. Main

More information

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES 6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES The projected activity levels at Sacramento International Airport as described in Chapter 3 are the basis for determining the terminal facilities that will be

More information

Simulation. Supplement B. Simulation 1. Simulation. Supplement B. Specialty Steel Products Co. Example B.1. Specialty Steel Products Co. Example B.

Simulation. Supplement B. Simulation 1. Simulation. Supplement B. Specialty Steel Products Co. Example B.1. Specialty Steel Products Co. Example B. Supplement B Simulation Simulation Simulation: The act of reproducing the behavior of a system using a model that describes the processes of the system. Time Compression: The feature of simulations that

More information

Perception of Waiting Time in Queues and Effects on Service Quality Perception and Satisfaction: A Research on Airline Check-in Services

Perception of Waiting Time in Queues and Effects on Service Quality Perception and Satisfaction: A Research on Airline Check-in Services Perception of Waiting Time in Queues and Effects on Service Quality Perception and Satisfaction: A Research on Airline Check-in Services Ozlem Atalik (Anadolu University, Turkey) Emircan Ozdemir (Anadolu

More information

LECTURE 41: SCHEDULING

LECTURE 41: SCHEDULING LECTURE 41: SCHEDULING Learning Objectives After completing the introductory discussion on Scheduling, the students would be able to understand what scheduling is and how important it is to high volume

More information

Sorting out your sortation options

Sorting out your sortation options Sorting out your sortation options Guiding you through the process of evaluating and selecting the right mission-critical sortation solution automation 1 Sorting that out your delivers sortation options

More information

Airline Management Solutions. ProfitLine. The integrated solution for revenue management and pricing

Airline Management Solutions. ProfitLine. The integrated solution for revenue management and pricing Airline Management Solutions ProfitLine The integrated solution for revenue and pricing Contents Airline network planning and control 2 Revenue and pricing 4 ProfitLine 5 ProfitLine Services 6 Pricing

More information

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016 City of Kansas City AIRPORT COMMITTEE BRIEFING New Terminal Evaluation for Kansas City International Airport March 15, 2016 1 Agenda Process Overview Establishing Requirements & Identifying Issues Forecast

More information

PSTA PROCEDURE 4.03 CHARTER SERVICE

PSTA PROCEDURE 4.03 CHARTER SERVICE PSTA PROCEDURE 4.03 CHARTER SERVICE A. PURPOSE To ensure Pinellas Suncoast Transit Authority compliance with the new Charter Service regulations contained in 49 CFR Part 604, Final Rule, effective April

More information

Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016

Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016 Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016 The Memorandum of Agreement (MOA) for the Transform 66: Inside the Beltway Project directs NVTC to

More information

IT STRATEGIC PLANNING A VIEW FROM THE TRENCHES

IT STRATEGIC PLANNING A VIEW FROM THE TRENCHES IT STRATEGIC PLANNING A VIEW FROM THE TRENCHES Moderator: John Payne, Principal Consultant, Pueblo Technology Group, Inc. Speakers: Jim Miller, Senior Consultant, Barich, Inc Royce Holden, Director of

More information

The Future of Airport Information Technology (IT) Presentation to, ACI-NA Airport Board Members and Commissioners Conference April 28, 2009

The Future of Airport Information Technology (IT) Presentation to, ACI-NA Airport Board Members and Commissioners Conference April 28, 2009 The Future of Airport Information Technology (IT) Presentation to, ACI-NA Airport Board Members and Commissioners Conference April 28, 2009 Initiatives Dictating IT Trends Technology Standards Driving

More information

Ms. Ada Tse. 5th Meeting of CAPSCA Asia Pacific (CAPSCA AP) Project. Senior Manager Communications and Marketing

Ms. Ada Tse. 5th Meeting of CAPSCA Asia Pacific (CAPSCA AP) Project. Senior Manager Communications and Marketing 5th Meeting of CAPSCA Asia Pacific (CAPSCA AP) Project Updates on Public Health Preparedness Guidelines 20 April 2012 Ms. Ada Tse Senior Manager Communications and Marketing ACI Asia-Pacific 1 Contents

More information

SR 99 Incident Response After- Action Plan

SR 99 Incident Response After- Action Plan SR 99 Incident Response After- Action Plan Background On June 10, 2014 at 1:52 PM, a pickup truck and a passenger car collided on southbound SR 99 (E Marginal Way S), just south of S Spokane St. The SDOT

More information

The impact of intelligent routing on traffic congestion. Nick Cohn

The impact of intelligent routing on traffic congestion. Nick Cohn The impact of intelligent routing on traffic congestion Nick Cohn Contents CONGESTION INDEX DYNAMIC NAVIGATION EFFECTS COOPERATIVE TRAFFIC MANAGEMENT (NEAR) FUTURE Congestion Index 3 4 Goals of Congestion

More information

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond Transportation Metrolinx US & USRC Track Capacity Study Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga, ON, Canada L4W 4P2 905 238 0038 fax www.aecom.com AECOM Project Number:

More information

Material Handling Solutions Worldwide

Material Handling Solutions Worldwide Material Handling Solutions Worldwide material handling solutions worldwide A global supplier of integrated equipment and systems enjoys global partnerships with some of the best-known companies in the

More information

Ask, Learn, Act. Jeff Emerson Accenture CTO, Transportation San Francisco, CA

Ask, Learn, Act. Jeff Emerson Accenture CTO, Transportation San Francisco, CA Ask, Learn, Act Jeff Emerson Accenture CTO, Transportation San Francisco, CA 2 Competitive Advantage Analytics Defined Analytics Defined Analytic Challenges Optimization Predictive Modeling Forecasting/extrapolation

More information

1 Introduction. 2 Mobility in Palermo. 164 Urban Transport XIX

1 Introduction. 2 Mobility in Palermo. 164 Urban Transport XIX Urban Transport XIX 163 Modelling the accessibility to public local transport to increase the efficiency and effectiveness of the service: the case study of the Roccella area in Palermo M. Migliore, A.

More information

TRACK: RESILIENCY WORKSHOP: 4 Title: Technology Resiliency Part 1 Moderator: Chris Norton, VTC Date: February 22, 2017

TRACK: RESILIENCY WORKSHOP: 4 Title: Technology Resiliency Part 1 Moderator: Chris Norton, VTC Date: February 22, 2017 TRACK: RESILIENCY WORKSHOP: 4 Title: Technology Resiliency Part 1 Moderator: Chris Norton, VTC Date: February 22, 2017 Airport Focused Technologies Faster processing Better customer service Safer operations

More information

A+ ACADEMY HIGH SCHOOL

A+ ACADEMY HIGH SCHOOL TRAFFIC MANAGEMENT PLAN FOR A+ ACADEMY HIGH SCHOOL IN DALLAS, TEXAS Prepared for: A+ Charter Schools, Inc. 8225 Bruton Road Dallas, Texas 75217 Prepared by: Texas Registered Engineering Firm F-3199 400

More information

Advanced Analytics Meets Pulp and Paper Planning and optimizing your Supply Chain from A to Z. June 22, 2016

Advanced Analytics Meets Pulp and Paper Planning and optimizing your Supply Chain from A to Z. June 22, 2016 Advanced Analytics Meets Pulp and Paper Planning and optimizing your Supply Chain from A to Z June 22, 2016 Meet the Presenters Gertjan de Lange Connecting Business & Optimization SVP, AIMMS Gertjan has

More information

BIT WORKSHOP AIRPORT ROUNDTABLE

BIT WORKSHOP AIRPORT ROUNDTABLE BIT WORKSHOP AIRPORT ROUNDTABLE Facilitator: Rick Belliotti, Director, Innovation and Small Business Development, San Diego County Regional Airport Authority 2017 ACI-NA Annual Conference & Exhibition

More information

Chapter 9 Balancing Demand and Productive Capacity

Chapter 9 Balancing Demand and Productive Capacity GENERAL CONTENT Multiple Choice Questions Chapter 9 Balancing Demand and Productive Capacity 1. Which of the following is NOT one of the productive capacity forms in a service context? a. Physical facilities

More information

Service Operations Management

Service Operations Management Service Operations Management Shin Ming Guo NKFUST Department of Logistics Management office: C415, phone: 6011000 ext. 3216 e mail: smguo@nkfust.edu.tw web: www2.nkfust.edu.tw/~smguo/teaching/service.htm

More information

Sortation Directing Product Traffic

Sortation Directing Product Traffic Sortation Directing Product Traffic Presented by: Boyce Bonham, Chief Engineer Satyen Pathak, Senior Product Manager PRESENTATION TITLE 2017 MHI Copyright claimed for audiovisual works and sound recordings

More information

Customer-centric transportation network modelling

Customer-centric transportation network modelling www.pwc.com.au Customer-centric transportation network modelling Agent-based modelling in (Australia) Insight Analytics Introduction Public Transportation Services across Australia are undergoing transformation

More information

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka Roser, Christoph, Masaru Nakano, and Minoru Tanaka. Comparison of Bottleneck Detection Methods for AGV Systems. In Winter Simulation Conference, edited by S. Chick, Paul J Sanchez, David Ferrin, and Douglas

More information

Logistics Insight Corporation Romulus ODC Version 3.2 Procedure Manual Subject: Material Flow July 31, 2014

Logistics Insight Corporation Romulus ODC Version 3.2 Procedure Manual Subject: Material Flow July 31, 2014 2.2 Cross Dock SCOPE This process describes the actions taken when unloading inbound loads, checking freight, and loading to a specified outbound trailer. RESPONSIBILITY The ODC Manager is responsible

More information

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009 Dallas/Fort Worth International Airport ASCE Presentation Terminal Development Program November, 2009 ASCE PRESENTATION, NOVEMBER 2009 Background Objective The objective of today s presentation 1. Review

More information

Utilization vs. Throughput: Bottleneck Detection in AGV Systems

Utilization vs. Throughput: Bottleneck Detection in AGV Systems Utilization vs. Throughput: Bottleneck Detection in AGV Systems Christoph Roser Masaru Nakano Minoru Tanaka Toyota Central Research and Development Laboratories Nagakute, Aichi 480-1192, JAPAN ABSTRACT

More information

HOME OUR SERVICES COMPANY POLICIES PROGRAMS TECHNOLOGY LICENSING & SAFETY PROCEDURES

HOME OUR SERVICES COMPANY POLICIES PROGRAMS TECHNOLOGY LICENSING & SAFETY PROCEDURES WCTLC 01-00114 US DOT Compliant Fully Licensed & Insured Golden Knight Limousine II 914.245.8718 800.381.5333 2 Barger Street, Putnam Valley, NY 10579-3405 www.goldenknightlimo.com Company Profile/ Our

More information

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers Appendix H Millennium Hollywood Project Trip Cap and Mitigation Triggers MILLENNIUM HOLLYWOOD PROJECT TRIP CAP AND MITIGATION TRIGGERS Crain and Associates Introduction The Millennium Hollywood Project

More information

Intelligrated sortation systems

Intelligrated sortation systems Sortation systems Intelligrated sortation systems Intelligrated, now part of Honeywell, draws on more than 100 years of sortation experience and thousands of installations to provide sortation systems

More information

Renewables, Smart Grids

Renewables, Smart Grids Renewables, Smart Grids New perspective on system integration enabling CO2 reduction and efficient energy usage paolo.gaggero@ge.com Segment Leader GE P&C 1 Introduction UN Climate Change Conference Dec

More information

Report Reference Guide for TASKE Contact

Report Reference Guide for TASKE Contact Report Reference Guide for TASKE Contact For Avaya Communication Manager Telephone Systems Version: 8.9 Date: 2011-06 This document is provided to you for informational purposes only. The information is

More information

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION Dr. Arun Chatterjee Professor Emeritus Dept of Civil & Environmental Engineering The University of Tennessee Knoxville,

More information

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts

More information

CITY OF CLOVIS Traffic Impact Study Guidelines

CITY OF CLOVIS Traffic Impact Study Guidelines CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer

More information

Service Operations Management

Service Operations Management Aalto Introduction to Services TU-E2000 23.9.2015 Service Operations Management Paul Lillrank What is Operations Management Production in Open Systems Managing capacity and demand 1 THE WORLD OF SCIENCE

More information

Project Evaluation Criteria

Project Evaluation Criteria Project Evaluation Criteria Goals and Objectives were developed to guide Envision 35 Long Range Transportation Plan (LRTP) Update. These guiding principles were based on the requirements included in the

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

Chapter III TRANSPORTATION SYSTEM. Tewodros N.

Chapter III TRANSPORTATION SYSTEM. Tewodros N. Chapter III TRANSPORTATION SYSTEM ANALYSIS www.tnigatu.wordpress.com tedynihe@gmail.com Lecture Overview Traffic engineering studies Spot speed studies Volume studies Travel time and delay studies Parking

More information

Multi-Channel Distribution Align Your Fulfillment Operations With Your Changing Channel Mix

Multi-Channel Distribution Align Your Fulfillment Operations With Your Changing Channel Mix Multi-Channel Distribution Align Your Fulfillment Operations With Your Changing Channel Mix Sponsored by: Presented by: Jason Denmon Account Executive Adam Mullen Retail Industry Leader 2013 MHI Copyright

More information

Simulation of an Interdependent Metro-Bus Transit System to Analyze Bus Schedules from Passenger Perspective

Simulation of an Interdependent Metro-Bus Transit System to Analyze Bus Schedules from Passenger Perspective Proceedings of the 21 International Conference on Industrial Engineering and Operations Management Dhaka, Bangladesh, January 9 1, 21 Simulation of an Interdependent Metro-Bus Transit System to Analyze

More information

Abdulla Al-Dhaheri. A thesis submitted in partial fulfilment of the requirement of De Montfort University for the Degree of Doctor of Philosophy

Abdulla Al-Dhaheri. A thesis submitted in partial fulfilment of the requirement of De Montfort University for the Degree of Doctor of Philosophy Developing an Integrated Method of Controlling the Flow of Departing Passengers: A study of passenger departure processes at Abu Dhabi International Airport Abdulla Al-Dhaheri A thesis submitted in partial

More information

I-710 Project Committee Meeting

I-710 Project Committee Meeting Los Angeles County Metropolitan Transportation Authority I-710 Project Committee Meeting January 29, 2009 Meeting Expectations Review I-710 planning context Concur on a port cargo forecast scenario to

More information

The lead-time gap. Planning Demand and Supply

The lead-time gap. Planning Demand and Supply Planning Demand and Supply The lead-time gap Reducing the gap by shortening the logistics lead time while simultaneously trying to move the order cycle closer through improved visibility of demand. Copyright

More information

SLA-Driven Planning and Optimization of Enterprise Applications

SLA-Driven Planning and Optimization of Enterprise Applications SLA-Driven Planning and Optimization of Enterprise Applications H. Li 1, G. Casale 2, T. Ellahi 2 1 SAP Research, Karlsruhe, Germany 2 SAP Research, Belfast, UK Presenter: Giuliano Casale WOSP/SIPEW Conference

More information

CE 452 Traffic Impact Assessment

CE 452 Traffic Impact Assessment CE 452 Traffic Impact Assessment 1 Why Required? New developments Produce/ attract new traffic Production: Residences Attraction: Shops, Offices, Schools, Hospitals etc. etc. Changes in traffic pattern

More information

Optimized travel options with a Flexible Mobility on Demand System FMOD

Optimized travel options with a Flexible Mobility on Demand System FMOD Optimized travel options with a Flexible Mobility on Demand System FMOD Bilge Atasoy, Takuro Ikeda, Moshe Ben-Akiva October 30, 2014 Shaping the New Future of Paratransit: An International Conference on

More information

Capacity Planning and Assessment Additional considerations

Capacity Planning and Assessment Additional considerations Capacity Planning and Assessment Additional considerations Air Traffic Services System Capacity Seminar/Workshop Nairobi, Kenya, 8 10 June 2016 Raffaele Russo EUROCONTROL Operations Planning Summary Winter

More information

Analytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014

Analytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014 Analytical Tools and Decision Support Systems SANDAG I-15 ICM ITS PA January 30 th, 2014 Project Partners/Stakeholders National ICM Evaluator National AMS Contractor 2 San Diego I-15 Corridor 21 mile corridor

More information

Autonomous Shop Floor Control Considering Set-up Times

Autonomous Shop Floor Control Considering Set-up Times Autonomous Shop Floor Control Considering Set-up Times B. Scholz-Reiter, T. Jagalski, C. de Beer, M. Freitag Department of Planning and Control of Production Systems, University of Bremen, Germany Abstract

More information

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

TRANSPORTATION IMPACT ANALYSIS GUIDELINES TRANSPORTATION IMPACT ANALYSIS GUIDELINES SANTA CLARA COUNTY TRANSPORTATION AUTHORITY CONGESTION MANAGEMENT PROGRAM ADOPTED MARCH 2009 TABLE OF CONTENTS PART I - STATUTE AND AUTHORITY...1 CHAPTER 1. CMP

More information

Dynamic Lane Merge Systems

Dynamic Lane Merge Systems Dynamic Lane Merge Systems Acknowledgements Maryland State Highway Administration University of Maryland, College Park Michigan Department of Transportation Wayne State University Lane Merging Issues Merging

More information

Material Handling Automation and Warehouse Execution Systems

Material Handling Automation and Warehouse Execution Systems Material Handling Automation and Warehouse Execution Systems The Connected Distribution Center The pace of change in modern commerce is putting tremendous pressure on fulfillment operations. To stay competitive

More information

Capacity Accreditation and External Resource Zones 06/30/2016

Capacity Accreditation and External Resource Zones 06/30/2016 Capacity Accreditation and External Resource Zones 06/30/2016 Overview MISO requested guidance on areas that require additional discussion and resolution in the seasonal / locational proposal In the last

More information

Use the following headings

Use the following headings Q 1 Furgon Van Hire rents out trucks and vans. One service they offer is a sameday rental deal under which account customers can call in the morning to hire a van for the day. Five vehicles are available

More information

The Secrets to HCM Consistency Using Simulation Models

The Secrets to HCM Consistency Using Simulation Models The Secrets to HCM Consistency Using Simulation Models Ronald T. Milam, AICP David Stanek, PE Chris Breiland Fehr & Peers 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 r.milam@fehrandpeers.com (916)

More information

Dependency-aware and Resourceefficient Scheduling for Heterogeneous Jobs in Clouds

Dependency-aware and Resourceefficient Scheduling for Heterogeneous Jobs in Clouds Dependency-aware and Resourceefficient Scheduling for Heterogeneous Jobs in Clouds Jinwei Liu* and Haiying Shen *Dept. of Electrical and Computer Engineering, Clemson University, SC, USA Dept. of Computer

More information

Passenger transport. Operational review / Diversified logistics revenue-earning vehicles. Revenue increased by 7% employees

Passenger transport. Operational review / Diversified logistics revenue-earning vehicles. Revenue increased by 7% employees Operational review / Diversified logistics Passenger transport 1 350 revenue-earning vehicles Revenue increased by 7% 4 095 employees 10.4 million passengers per annum 72 KAP Integrated Report 2017 A complete

More information

Six Sigma Project - KPI Process Improvement Project Kickoff Meeting. Maximizing and Advancing Performance ( MAAP) Office May 21, 2015 May 22, 2015

Six Sigma Project - KPI Process Improvement Project Kickoff Meeting. Maximizing and Advancing Performance ( MAAP) Office May 21, 2015 May 22, 2015 Six Sigma Project - KPI Process Improvement Project Kickoff Meeting Maximizing and Advancing Performance ( MAAP) Office May 21, 2015 May 22, 2015 About Six Sigma Lean/Six Sigma Set of techniques and tools

More information

City of Palo Alto (ID # 7047) City Council Staff Report

City of Palo Alto (ID # 7047) City Council Staff Report City of Palo Alto (ID # 7047) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/13/2016 Summary Title: East Palo Alto Comment Letter Title: Approval and Authorization for the City

More information

Mod-TWO. Transaction Processing System (TPS) Office Automation System (OAS)

Mod-TWO. Transaction Processing System (TPS) Office Automation System (OAS) Mod-TWO Transaction Processing System (TPS) Office Automation System (OAS) TPS, MIS, DSS, and AI/ES Hierarchy: Information AI/ES Less More Less More DSS MIS Routine Decision support Input & output Sophistication

More information

TABLE OF CONTENTS. 2 Eurowings Advertising Media Table of Contents. Portrait & Route Network 3. Eurowings Customer Profile 4

TABLE OF CONTENTS. 2 Eurowings Advertising Media Table of Contents. Portrait & Route Network 3. Eurowings Customer Profile 4 Effective March 15, 2017 TABLE OF CONTENTS Portrait & Route Network 3 Eurowings Customer Profile 4 Online 5 Completion of Booking 6 Web Check-in 7 Other Websites 8 Newsletter Price Campaign 9 Boomerang

More information

Airport Ground Access Planning Reading the Crystal Ball

Airport Ground Access Planning Reading the Crystal Ball ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Airport Ground Access Planning Reading the Crystal Ball Gavin Duncan Associate Director LeighFisher gavin.duncan@leighfisher.com Why Should We Care? Ground access

More information

SIMULATING BIOTECH MANUFACTURING OPERATIONS: ISSUES AND COMPLEXITIES. Prasad V. Saraph

SIMULATING BIOTECH MANUFACTURING OPERATIONS: ISSUES AND COMPLEXITIES. Prasad V. Saraph Proceedings of the 2001 Winter Simulation Conference B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, eds. SIMULATING BIOTECH MANUFACTURING OPERATIONS: ISSUES AND COMPLEXITIES Prasad V. Saraph

More information

FTA Ireland Membership 2015 DELIVERING SAFE, EFFICIENT, SUSTAINABLE LOGISTICS

FTA Ireland Membership 2015 DELIVERING SAFE, EFFICIENT, SUSTAINABLE LOGISTICS FTA Ireland Membership 2015 DELIVERING SAFE, EFFICIENT, SUSTAINABLE LOGISTICS FTA Ireland is a trade association representing the transport interests of members and works to ensure the safest, most efficient

More information

Fred. Olsen Windbase. Presenter: David Matthews, Fred. Olsen Windcarrier UK General Manager Contact:

Fred. Olsen Windbase. Presenter: David Matthews, Fred. Olsen Windcarrier UK General Manager Contact: Fred. Olsen Windbase Presenter: David Matthews, Fred. Olsen Windcarrier UK General Manager Contact: David.Matthews@fredolsen.com Background for Fred. Olsen Windbase Offshore wind must increase health and

More information

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY? WHAT IS AN INTERMODAL TRANSIT FACILITY? An intermodal transit facility gathers many modes of transportation together and is strategically located to increase destination alternatives. Intermodal facilities

More information

Phase II: Vendor Landscape Analyze BPM Requirements and Shortlist Vendors

Phase II: Vendor Landscape Analyze BPM Requirements and Shortlist Vendors V4 Phase II: Vendor Landscape Analyze BPM Requirements and Shortlist Vendors Determine how your process automation needs align with the scenarios and solutions in the market. Info-Tech Research Group,

More information

ADDITIONAL FUNDING AND AGREEMENTS (5)

ADDITIONAL FUNDING AND AGREEMENTS (5) Date of Meeting: August 1, 2017 Item No.: 5C_Supp Terminal 5 PROJECT Berth Modernization AUTHORIZATION Project FOR ADDITIONAL FUNDING AND AGREEMENTS (5) 8/1/2017 1 Power Upgrades Berth Deepening Dock Strengthening

More information

Understanding Operations

Understanding Operations Understanding Operations Operations in an Organization Section 1, Sub-section 1.2 Operations Management Definition An operations system is defined as one in which: several activities are performed to transform

More information

Proposed Overnight Service Pilot

Proposed Overnight Service Pilot Proposed Overnight Service Pilot Service Pilot Evaluation Presented by MBTA Fiscal Management and Control Board July 31, 2017 1 Presentation Overview Service Pilot Proposal Evaluation Proposal for Early

More information

PLUS VALUE STREAM MAPPING

PLUS VALUE STREAM MAPPING LEAN PRINCIPLES PLUS VALUE STREAM MAPPING Lean Principles for the Job Shop (v. Aug 06) 1 Lean Principles for the Job Shop (v. Aug 06) 2 Lean Principles for the Job Shop (v. Aug 06) 3 Lean Principles for

More information

SIX MONTHS TO A STRONGER OPERATION SORTATION SYSTEMS EDITION

SIX MONTHS TO A STRONGER OPERATION SORTATION SYSTEMS EDITION SIX MONTHS TO A STRONGER OPERATION SORTATION SYSTEMS EDITION YOUR SYSTEM, ONLY BETTER. WELCOME www.dlneu.com (616) 538-0638 This month s topic in D.L. Neu s six month series focuses on sortation systems.

More information

Case Study Aer Lingus HRO. M. Oke, R. Hodge, P. Davies

Case Study Aer Lingus HRO. M. Oke, R. Hodge, P. Davies Case Study Aer Lingus HRO M. Oke, R. Hodge, P. Davies Case Study Aer Lingus HRO Background Aer Lingus, a national airline of just under 4,000 employees turning over 1.2 Billion, was striving to stay ahead

More information

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY April 2013 Alignments Alignments Magnolia Ave Northeast corridor Knoxville Transit Center Hall of Fame Dr Magnolia Ave Prosser Rd. Corridor contains commercial,

More information