1 Introduction: This leaflet Important Inspections on Loading Units ation is addressed to you as customers of TX Logistik as well as in the role of intermodal terminals who are handling loading units on behalf of TX Logistik. The present document shall serve as a descriptive help in providing for a frictionless terminal operation as well as a more secure and uninterrupted railway operation. In the initial inspection, loading units coming in via the terminals are inspected to verify whether they can be handled and transported. To avoid transportation failure or unnecessary waiting periods at the terminal from the outset, we recommend repairing obvious defects or damage on the loading units before they are delivered. The proper condition of the loading unit is within the responsibility of the supplier. The most frequently objected defaults that lead to the exclusion of transportation include: loose tarpaulins or open doors tarpaulins not properly fixed or damaged damaged or missing customs seals or custom ropes shifted cargo due to insufficient securing missing or inadmissible codification and designation as hazardous material strongly damaged grip edges or corner fittings damaged supporting legs As a matter of principle, the cargo in combined transportation should be secured in a way that the cargo can bear impact loads of 1 g in and against the direction of travel and 0.5 g transversely to the direction of travel during combined transportation. Cargo not secured may lead to the exclusion of transportation at any time. The inspection of the cargo securing is not within the terminal s responsibility. Please note that this leaflet does not replace the applicable rules and regulations of rail transport. The final inspection and the final decision on suitability for dispatch are effected by the wagon inspector. Version 1.1.5, by Philippus Nielsch

2 Important Inspection Steps on Trailers or Swap Bodies: At loading units with tarpaulins in curtainsider design, all lashing straps need to be closed and secured. (After makeshift securing, one damaged lashing strap on each side is tolerated. Such damaged strap may not be located directly next to the locking bar.) Corrugated canvas is not admissible. Example of a loose lashing strap. Lashing straps below the gripping edge are not admissible. Handling of the cargo is technically not possible. It is not admitted to fix strapping on the side plates or locking latches for tying down cargo. 2

3 Flexible straps must be pulled through all eyelets of the horizontal tarpaulin securing fixture. If an eyelet is missing, the strap must be secured with wire/plastic strips. It is not necessary to pull a safety rope through the eyelets of the lashing straps:... existing safety ropes must be either pulled through all eyelets or duly coiled up. For loading units with so-called Hamburg covering, a securing rope must be pulled through all eyelets. It is tolerable if up to three eyelets, not located in a row, are missing in the horizontal tarpaulin fixture. It is not tolerable if the first or last eyelet is missing. 3

4 Shirr is not admissible for securing. Shirr as a securing means is admissible in combination with a safety rope. In case of transportation via non- countries, the forwarder has to seal the doors. 4

5 At all loading units, the doors and front sides must be closed and secured! The upper latching also needs to be checked. On all loading units, the lateral panels must be closed and secured. 5

6 On all loading units, the side curtains must be closed and secured. The locking bar must be duly secured on the upper end and on the lower end. Terminal Operation Version: Insufficient securing of locking bars leads to open curtains during the train ride. Usually, wagons with open curtains have to be withdrawn. We recommend our customers to fix the locking bar by means of a lashing strap as an additional measure. 6

7 The locking bars must fit tightly to the guide with no play. Terminal Operation Version: Damage to the fixture of the locking bar is not tolerable. 7

8 In case of loading units with a tarpaulin body, the cargo must be duly secured (see page 1). The cargo may not be leaned against the tarpaulin. Units like this will be rejected by the wagon inspector or have to be left behind during the ride! If the tarpaulin is only pierced, this indicates that the cargo has shifted. Units like this have to be fixed before acceptance at the terminal. 8

9 On all loading units, the top sides must be closed and secured. On the top side of a loading unit, no more than one rivet may be missing per side. Such missing rivet must not be the first or last one. Example for missing rivet at the top side. Example for missing rivet at the last position at the top side. 9

10 The tarpaulins must be in a roadworthy condition without any holes. Holes or rips of a size of up to 30 mm may be fixed by the driver with sticky tape. Holes or rips that are larger than 30 mm must be welded. Rips in the tarpaulin, for example close to the locking bar, are also not admissible and must be repaired by a professional. 10

11 Bent supporting legs constitute a defect and must be recorded at gatein. Upon consultation with the wagon inspector, the trailers may be loaded. It must always be possible to retract the support legs. The yellow code plates must be mounted on each long side, where they are well legible. They provide information on the allocation of the loading units to the wagons and the admission of the units for route profiles. If a plate is missing on one side, it may be replaced by a provisional plate as long as there is an original plate on the other side. On all loading units with permanently installed steps or ladders, there must be a high voltage warning sign (lightning flash) close to such steps or ladder. 11

12 Foldable underride guard at the back and on the sides must be folded up and latched. This step has to be done by the driver. Semi-trailers must have a valid license plate. The roadworthy condition of the semi-trailers must be ensured. The air suspension system of the semi-trailers must be vented before the cargo is loaded (1). The brakes must be released before loading (2). After loading, the crank-handles must be secured. 12

13 Additional Inspection Steps on Swap Bodies: Terminal Operation Version: On all loading units, the side panels must be closed and secured! Supporting feet must be folded up and latched by means of a safety mechanism. The safety mechanism must work with two devices (inside and outside). 13

14 Important Inspection Steps on Containers: Terminal Operation Version: The doors must be locked. The fasteners must be closed each one by one. On the right side of the picture, one fastener is not closed. A sign indicating the height and width must be attached to the container. There must be a valid CSC plate on the container, indicating the next inspection date. If the CSC plate includes a complete ACEP admission code, the next inspection date is not required. If waste is forwarded to Italy, the loading units must be marked with a yellow sticker (25 x 25 cm) with a black R on it. 14

15 Due attention should be paid that each rod assembly is properly locked on top of the container and at the level of the container floor. The corner fittings must be in a functional condition. On open-top containers, the top must be duly closed. It is tolerable if up to three eyelets, not located in a row, are missing in the horizontal tarpaulin fixture. The same applies for strongly bent, ground reinforcement rings in eyelets. 15

16 Important Inspection Steps on Tank Containers: Terminal Operation Version: Blind flanges must be fastened. Both the fittings and the safety covers must be closed. The dome covers must be closed. There must be a valid date for the pressure inspection, to be found in several instances on the container, for example on the CSC plate. Railings on tank and silo containers must be folded in and secured. 16

17 Important Additional Inspection Steps for Truck Drivers on Loading Units with a Folding Top: On loading units with a folding top, the moving parts always have to be checked. For this purpose, the top tarpaulin must be closed entirely and the locks must be latched. The double-sided locking/securing appliance of the folding top must be inspected once again prior to transportation by train in order to avoid incidents during the ride. 17

Load security for. Sheeted paper Paper reels. Stand: Feb. 2012

Load security for. Sheeted paper Paper reels. Stand: Feb. 2012 Load security for Sheeted paper Paper reels Stand: Feb. 2012 Content: Table of contents General Part 1 Introduction and scope, STVO (German road traffic regulations) 22 Loading Part 2 Basic rules and principles

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information

Scaffolding and Raised Platforms

Scaffolding and Raised Platforms Standard Operating Procedures Scaffolding and Raised Platforms Last Modified: JAN 2013 1 of 7 Scaffolding and Raised Platforms I Purpose To provide a guideline for personnel who work around or on stationary

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

Ladders and scaffold systems

Ladders and scaffold systems Ladders and scaffold systems Customised-solutions for railway vehicles For each application the right solution! www.krause-systems.com Introduction Business Portrait KRAUSE-Werk GmbH & Co. KG For more

More information

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. RM140A-R3 RM140A-M-R3 RM145A-R3 RM145A-M-R3 Small Office/Home Office (SOHO) Cabinets Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. Fit under most desktops in the

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

Interunit Technical Committee

Interunit Technical Committee IU Interunit Technical Committee Unaccompanied Combined Transport Index Date Index Date A Published 18-6-08 G Amended 9-9-09 B Amended 25-2-09 H Amended 7-10-09 C Amended 31-3-09 I Amended 17-6-10 D Amended

More information

Scaffolding Procedures

Scaffolding Procedures Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This

More information

Ramps Vip Aldime WHAT DO VIP ALDIME RAMPS HAVE THAT OTHERS DO NOT?

Ramps Vip Aldime WHAT DO VIP ALDIME RAMPS HAVE THAT OTHERS DO NOT? Ramps Vip Aldime Vip Vip Aldime, established in 2005, is presently a business project within the field of aluminum. Its professional team proudly bears more than 20 years of experience in this sector.

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

Hydraulic Dock Levelers

Hydraulic Dock Levelers Hydraulic Dock Levelers Serco hydraulic dock levelers are installed in thousands of high-volume loading docks worldwide, delivering outstanding performance for strength, safety and durability. Serco Hydraulic

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

Installation Instructions

Installation Instructions Installation Instructions RainTight Decks www.raintightdecks.com Underdeck Installation Instructions Table of Contents Page 3 Page 4 Page 5 Page 6 Page 7 Tools Required Introduction and How the system

More information

Institute of International Container Lessors IICL

Institute of International Container Lessors IICL Institute of International Container Lessors IICL International Maritime Organization Convention for Safe Containers CSC Introduction With the development of specialized container ship, The International

More information

Railway Freight Car Inspection and Safety Rules

Railway Freight Car Inspection and Safety Rules Railway Freight Car Inspection and Safety Rules December 9, 2014 PART I GENERAL... 3 1. SHORT TITLE... 3 2. SCOPE... 3 3. DEFINITIONS... 3 4. SAFETY INSPECTIONS... 5 5. PRE-DEPARTURE INSPECTION... 6 6.

More information

Scaffolding Safety. Scaffolding

Scaffolding Safety. Scaffolding Scaffolding Safety Scaffolding 1926.450 - Scope, Application Covers all scaffolds used in workplaces Does not apply to crane or derrick suspended personnel platforms, which are covered by 1926.550(g) Aerial

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 22 13 (August 2016) --------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 22 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders

More information

NSN WEAPON STORAGE CATALOG CAGE: 3BSY8 DUNS:

NSN WEAPON STORAGE CATALOG CAGE: 3BSY8 DUNS: CAGE: 3BSY8 DUNS: 021533653 NSN WEAPON STORAGE 1-866-601-1671 www.seksolutions.com sales@seksolutions. CAGE: 3BSY8 DUNS: 021533653 1-866-601-1671 www.seksolutions.com sales@seksolutions.com FEATURES Welded

More information

Cargotec improves the efficiency of cargo flows on land and at sea

Cargotec improves the efficiency of cargo flows on land and at sea Cargotec improves the efficiency of cargo flows on land and at sea Cargotec s daughter brands Hiab, Kalmar and MacGregor are recognised leaders in cargo and load handling Cargotec s sales totalled EUR

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

TRAPEZOIDAL SHEET METAL RAIL

TRAPEZOIDAL SHEET METAL RAIL Photovoltaic Mounting Systems Assembly Instructions TRAPEZOIDAL SHEET METAL RAIL Mounting system for roofing with trapezoidal sheet metal S:FLEX GmbH 09/2017 / design and engineering is subject to change

More information

TENT / SHELTER / TARPS, GLOBAL DEFECT LIST

TENT / SHELTER / TARPS, GLOBAL DEFECT LIST Date Rev. N Modifications tracking 2009/09/08 1 Initial release 2016/07/14 2 Major changes 9/19/2016 3 Defects A13, B23 and D39 were added. Defect D9 was modified. 2017/1/23 4 Revision per Coleman design

More information

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK A. 1. Using curb ribs as a guide, layout and mark roof openings on completed roof deck as outside curb

More information

RHE3 Dock Leveler Installation Manual

RHE3 Dock Leveler Installation Manual RHE3 Dock Leveler Installation Manual MADE IN U.S.A. This Manual Covers Dock Levelers Built After Serial Numbers: 07FE160001M and up PRINTED IN U.S.A. RITE-HITE PRINT SHOP PUBLICATION NO. 1222 MAY 2007

More information

DIVISION 10 SPECIALTIES SECTION OPERABLE PARTITIONS

DIVISION 10 SPECIALTIES SECTION OPERABLE PARTITIONS DIVISION 10 SPECIALTIES SECTION 10 22 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

NORDSTROM factories are required to perform a seven-point inspection process designed to verify the physical integrity of the container.

NORDSTROM factories are required to perform a seven-point inspection process designed to verify the physical integrity of the container. 1. Container Security Container integrity must be maintained to protect against the introduction of unauthorized material and/or persons. Factory-loaded full containers must have written and verifiable

More information

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of

More information

1.1 RELATED DOCUMENTS

1.1 RELATED DOCUMENTS Desert Academy Phase 2B Mathey and Associates Specification - Section 08 35 13 Accordion Folding Doors PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Rationale Behind the Provisions of ASTM F 2200 & Illustration Guidelines Based on the Provisions of ASTM F 2200

Rationale Behind the Provisions of ASTM F 2200 & Illustration Guidelines Based on the Provisions of ASTM F 2200 Rationale Behind the Provisions of ASTM F 2200 & Illustration Guidelines Based on the Provisions of ASTM F 2200 (AFA Reference #G-125A) (NOMMA Reference #325-003-2000) DASMA, in cooperation with the American

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

CMA CGM CONTAINERS. Choosing the right equipment to ship your cargo

CMA CGM CONTAINERS. Choosing the right equipment to ship your cargo CMA CGM CONTAINERS Choosing the right equipment to ship your cargo Selecting a container NEEDS CONTAINER TYPE GENERAL PURPOSE CONTAINERS Boxes, cartons, cases, sacks, bales, pallets, drums 7 REEFER CONTAINERS

More information

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August Double Slide Rail August 2015 1 DOUBLE SLIDE RAIL INSTALLATION METHOD Introduction Slide rail shoring systems can be used for trenches up to 12m wide and 6m deep. Module length is determined by panels

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from

More information

CAMON C500 STUMP GRINDER IMPORTANT PLEASE READ CAREFULLY

CAMON C500 STUMP GRINDER IMPORTANT PLEASE READ CAREFULLY CAMON C500 STUMP GRINDER IMPORTANT PLEASE READ CAREFULLY OPERATOR MANUAL Teknol House, Victoria Road, Burgess Hill RH15 9LH T: 01444 247689 F: 01444 871612 I: www.tracmaster.co.uk OPERATION Operation Before

More information

METHOD STATEMENT FOR PIPE WELDING WORKS

METHOD STATEMENT FOR PIPE WELDING WORKS METHOD STATEMENT FOR PIPE WELDING WORKS Introduction This Method statement describes in detail the welding process for pipe work and the welder s qualification test procedures. This includes addressing

More information

PARIS 12 October 2011

PARIS 12 October 2011 Rail/road combined transport How to fasten a load 1. Current prescriptions for fastening ( safe loading in accordance with regulations) 2. Fastenings in the field PARIS 12 October 2011 ( non-compliant

More information

Section 1 OBC FADS /13 Access to Parking Areas

Section 1 OBC FADS /13 Access to Parking Areas Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator

More information

KENNECOTT UTAH COPPER

KENNECOTT UTAH COPPER 14.5.1 INTRODUCTION 14.51.1 This standard specifies the safety controls associated with freight / cargo loading operations at KUC properties and presents working references supporting KUC standards and

More information

ACCIDENT INTERVETION SYSTEMS

ACCIDENT INTERVETION SYSTEMS Protection for structural platforms, in-plant offices, conveyors, water mains, valuable equipment & personnel Easy installation with all hardware included 10,000 lb. Load at 4 mph rating Columns are 4

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7 Safety Manual Page 1 of 7 Scaffolds 1. Purpose This policy establishes the basic safety requirements and safe work practices for the erection, use, inspection, movement, and dismantling of scaffolding.

More information

A-0312 ASSEMBLY GUIDE

A-0312 ASSEMBLY GUIDE 760265-A-0312 ASSEMBLY GUIDE 1 Contents Section Contents Introduction Know Your MiTOWER Know Your MiTOWER s Components Know Your Kit List and Specifications Know Your Storage and Transport Pack Safety

More information

New consumer units. Design and functionality in plain sight.

New consumer units. Design and functionality in plain sight. New consumer units. Design and functionality in plain sight. CONSUMER UNITS A wide range of stylish solutions for any type of masonry or plasterboard wall. Consumer unit with white blind cover Consumer

More information

Universal-Fit LIFT HOOK - Model 1371B

Universal-Fit LIFT HOOK - Model 1371B 4101 GARLAND DR, FORT WORTH, TX 76117 Ph 817-485-6073 Fax 817-428-6008 www.starindustries.com Bulletin LH- OM0510B Universal-Fit LIFT HOOK - Model 1371B Installation, Use & Safety Precautions SPECIFICATIONS:

More information

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following: SECTION 10501 PERSONNEL DUTY LOCKERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

BESTMOVE STANDING TRANSFER AID

BESTMOVE STANDING TRANSFER AID BESTMOVE STANDING TRANSFER AID MODELS BestMove 400 BestMove 450 PRODUCT FEATURES *BestMove 450 shown Ensure the product has been assembled according to the instructions in this manual. OPERATING ASSEMBLY

More information

Key Features. Glass Locker Series GL5000. ¼ inch tempered glass doors with soft closing hinges. Back-painted glass can be matched to any Pantone color

Key Features. Glass Locker Series GL5000. ¼ inch tempered glass doors with soft closing hinges. Back-painted glass can be matched to any Pantone color Glass Locker Series GL5000 Key Features ¼ inch tempered glass doors with soft closing hinges Back-painted glass can be matched to any Pantone color Low iron glass for ultra-clear, pure colors Wood locker

More information

Planning and installation instructions

Planning and installation instructions Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...

More information

2

2 Quality Control Manual 2008 1 2 Table of Contents Introduction... 5 Major Factors in Quality Control... 6 General Requirements... 7 Plant Quality Control Procedures... 7 Steps to integrating a full quality

More information

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535 Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR 1910.22, 23, 66 App.C; 29 CFR 1926.502) ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9½ Street Rochester, MN

More information

High Piled Combustible Storage Guideline

High Piled Combustible Storage Guideline Moreno Valley High Piled Combustible Storage Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 5, 2017 Rev: 7-28-16 City of Moreno Valley Fire Department Page 1 of 19 High Piled Storage

More information

Proactive Approaches. To Minimize. Supply Chain Security. Breaches in the Rail, Air, Ocean and Land Environment

Proactive Approaches. To Minimize. Supply Chain Security. Breaches in the Rail, Air, Ocean and Land Environment Proactive Approaches To Minimize Supply Chain Security Breaches in the Rail, Air, Ocean and Land Environment Top Eight Rail Principles Track and monitor pulls on a 24 hour basis to determine location and

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

Hazards Outside The Laboratory: Loading Dock Safety

Hazards Outside The Laboratory: Loading Dock Safety Hazards Outside The Laboratory: Loading Dock Safety Levi Harmon, CSP Safety Engineer Occupational Health, Safety And Injury Prevention ljh252@cornell.edu 607-220-9532 Introduction The University s Loading

More information

CAL/OSHA ELECTRICAL HIGH VOLTAGE

CAL/OSHA ELECTRICAL HIGH VOLTAGE Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to electrical exposure to high voltage for employees and contractors

More information

SECTION 1043 FENCE MATERIAL

SECTION 1043 FENCE MATERIAL SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance

More information

1.15 Chemical Tanker Longitudinal corrugated bulkhead (vertical type).

1.15 Chemical Tanker Longitudinal corrugated bulkhead (vertical type). Table A.1 corrugated bulkhead s Case Ship Type Damage Location 1.1 Chemical Tanker Longitudinal corrugated bulkheads (horizontal type) in way of mid cargo area. 1.2 Product Tanker Transverse corrugated

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 2 EMPLOYEE TRAINING AND DOCUMENTATION 3-4 PERIODIC PROGRAM EVALUATION 4 GENERAL SCAFFOLD ERECTING/DISASSEMBLING REQUIREMENTS 5-7 SCAFFOLDING

More information

ROK HCS slab support Design instructions

ROK HCS slab support Design instructions ROK HCS slab support Design instructions Design according to Eurocodes 1 Table of contents 1. DESCRIPTION OF THE SYSTEM... 3 2. MATERIALS AND DIMENSIONS... 3 3. 4. 5. 6. 2.1 Dimensions and tolerances 2.2

More information

ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS

ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS UNLOADING HANDLING ASSEMBLING Preface This instruction book is for your crews. Distribute it to help them safely unload and handle

More information

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE SECTION 112429.18 - HORIZONTAL FALL PROTECTION - OVERHEAD CABLE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Provide overhead horizontal cable fall protection system, including end anchors, energy absorbers,

More information

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols. VIGO INDUSTRIES INSTALLATION GUIDE FOR STANDING SHOWER CABIN (MODEL VG06062) SAFETY PRECAUTIONS This Installation Guide uses the following symbols to indicate important information. Always observe the

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:

More information

BEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC.

BEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC. BEST PRACTICE GUIDANCE THE SAFE OFF-LOADING OF REINFORCEMENT FABRIC www.uk-bar.org CONTENTS Introduction.... 3 Hazards.... 4 Accidents... 5 Working at Height... 6 Dunnage.... 7 Planning for a Safe Delivery....

More information

2009 IBC Section 1024 Approved Luminous Egress Path Markings

2009 IBC Section 1024 Approved Luminous Egress Path Markings 2009 IBC Section 1024 Approved Luminous Egress Path Markings Where Required Buildings of Groups A (Assembly), B (Business), E (Education), I (Institutional), M (Mercantile) and R-1 (Residential transient

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

QUALITY STANDARDS for Temporary Traffic Control Devices

QUALITY STANDARDS for Temporary Traffic Control Devices QUALITY STANDARDS for Temporary Traffic Control Devices Contents Introduction 1 Quality Requirements 2 Quality Standards 2 General 2 Barricades, Channelizing Devices, and Signs 3 Warning Lights 3 Flashing

More information

53.20 PAINTED ROADWAY LINES

53.20 PAINTED ROADWAY LINES 53.20 PAINTED ROADWAY LINES 53.20.1 GENERAL The Work consists of supplying paint and painting roadway lines on pavement surfaces. The various configurations of roadway lines are shown in the Department

More information

PORTA-FAB Cleanroom Wall Systems

PORTA-FAB Cleanroom Wall Systems PORTA-FAB Cleanroom Wall Systems FABLINE FURRING 500 INSTALLATION INSTRUCTIONS IMPORTANT Porta-Fab Advises A Thorough Reading of These Instructions Before Beginning Installation. INTRODUCTION Porta-Fab

More information

NARROW-CORRUGATION FARM GRAIN BINS

NARROW-CORRUGATION FARM GRAIN BINS NARROW-CORRUGATION FARM GRAIN BINS STORAGE HANDLING CONDITIONING STRUCTURES GRAIN MANAGEMENT SYSTEMS Brock Grain Systems has a world-wide reputation for providing reliable on-farm storage that allows farmers

More information

Kelley HULK Dock Lifts and Ergonomic Lift Tables

Kelley HULK Dock Lifts and Ergonomic Lift Tables Kelley HULK Dock Lifts and Ergonomic Lift Tables Kelley HULK Lift Products help increase productivity and employee safety with innovative, cost effective solutions to the unique challenges associated with

More information

SECTION Summit Phenolic Lockers (Solid Phenolic Lockers)

SECTION Summit Phenolic Lockers (Solid Phenolic Lockers) SECTION 10 51 00 Summit Phenolic Lockers (Solid Phenolic Lockers) Part 1-General 1.01 Summary A. Section includes: solid phenolic lockers solid phenolic benches 1.02 Submittals A. Submittals: Comply with

More information

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored. Newfoundland & Labrador - Terre-Neuve-et-Labrador Ladder Safety - Sécurité des échelles This material has been extracted from the Acts and Regulations of the Province to help students understand the subject.

More information

Car and Counterweight Frames

Car and Counterweight Frames Car and Counterweight Frames CAR FRAME (SLING) AND PLATFORM COUNTERWEIGHT FRAME Every attempt has been made to ensure that this documentation is as accurate and up-to-date as possible. However, Vertical

More information

OSHA Rules for Scaffolding

OSHA Rules for Scaffolding OSHA Rules for Scaffolding A) Objectives: 1. 2. 3. Don t let the scaffold fall. Don t fall off the scaffold. Don t let the material fall off the scaffold. Name of Competent Person: Name of Qualified Person:

More information

CONVENTIONAL TG-150 LM TG-20 LM OPERATOR S MANUAL GATE SERIES Slauson Avenue. Santa Fe Springs, CA (800)

CONVENTIONAL TG-150 LM TG-20 LM OPERATOR S MANUAL GATE SERIES Slauson Avenue. Santa Fe Springs, CA (800) M-91-16 REV. 2 AUG. 1997 OPERATOR S MANUAL CONVENTIONAL LIFTGA GATE SERIES TG-150 LM TG-20 LM 11921 Slauson Avenue. Santa Fe Springs, CA. 90670 (800) 227-4116 C MAXON Lift Corp. 1997 LIFT CORP. 11921 Slauson

More information

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Model # 800SM-PS3. 8/3/2016 Page 1 of 8 Model # 800SM-PS3 8/3/2016 Page 1 of 8 /3/2016 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

REVISED RECOMMENDATIONS ON HARMONIZED INTERPRETATION AND IMPLEMENTATION OF THE INTERNATIONAL CONVENTION FOR SAFE CONTAINERS, 1972, AS AMENDED

REVISED RECOMMENDATIONS ON HARMONIZED INTERPRETATION AND IMPLEMENTATION OF THE INTERNATIONAL CONVENTION FOR SAFE CONTAINERS, 1972, AS AMENDED E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 Ref. T3/1.01 CSC.1/Circ.138 30 June 2010 REVISED RECOMMENDATIONS ON HARMONIZED INTERPRETATION AND IMPLEMENTATION

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

User Instruction Manual

User Instruction Manual Vestibule Connector VC-GK20-1935 User Instruction Manual March, 2006 Shelter Component Specifications Frame Specifications All-aluminum frame constructed of 6063-T5 and 6061-T6 alloys with clear industrial

More information

On-roof system Tau Installation manual

On-roof system Tau Installation manual On-roof system Tau Installation manual 810-0052 Table of Contents 1 Introduction 1 1.1 Short description 1 1.2 Intended use 1 1.3 Standards and guidelines 1 1.4 About these instructions 1 Tau The innovative

More information

Management Instruction

Management Instruction Management Instruction Date March 15, 2006 Internal Use and Transport of Pallets Effective March 15, 2006 Number PO-570-2006-1 Obsoletes N/A Unit Logistics Policy This management instruction (MI) establishes

More information

SALOG Aerospace & Aviation Logistics

SALOG Aerospace & Aviation Logistics Helicopter Transportation and Aircraft Parts require specialised care of freight Forwarders. At SALOG, we offer you best transit times, excellent cargo care, state-of-the art equipment, and a partnership

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Start by removing the ash-pit door. Remove from frame by removing two rivet pins. Remove the frame by unscrewing the 4 bolts. (Fig 1.

1. Start by removing the ash-pit door. Remove from frame by removing two rivet pins. Remove the frame by unscrewing the 4 bolts. (Fig 1. Page 1 INTRODUCTION This instruction shows how to replace ceramic bricks in the Solo Plus and Excel solid fuel boiler. Please read carefully before replacement. Follow the instruction point by point. Fig

More information

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS Model # 349S-P6 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic coated elements. Ultra Play guarantees all

More information

CONTAINER INSPECTION JOB AID

CONTAINER INSPECTION JOB AID CONTAINER INSPECTION JOB AID Container Inspection List of Acronyms ACS CBP COTP CSC DCM IAW IICL IMDG ISO PIH SWP Automated Commercial System Customs and Border Protection Captain of the Port Convention

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

THE USE OF THERMOGRAPHY TO AID DESIGN OF REFRIGERATED ROAD VEHICLES

THE USE OF THERMOGRAPHY TO AID DESIGN OF REFRIGERATED ROAD VEHICLES THE USE OF THERMOGRAPHY TO AID DESIGN OF REFRIGERATED ROAD VEHICLES S. ESTRADA-FLORES and A. EDDY Supply Chain Innovation, Fax: +61 02 94908530; Email: S. Estrada-Flores@csiro.au; Food Science Australia

More information

Light Duty Ramps. Loadingdocksupply.com PHONE:

Light Duty Ramps. Loadingdocksupply.com PHONE: Light Duty Ramps Light Duty Aluminum Dockplates Designed for use by pallet trucks, carts, and foot traffic the A & B model Aluminum Dockplate is lightweight and portable. Accomodates differentials up to

More information

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information