Istokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project. May 23, 2012

Size: px
Start display at page:

Download "Istokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project. May 23, 2012"

Transcription

1 STORMWATER INFORMATION AND CALCULATIONS FOR ENVIRONMENTAL RESOURCE PERMIT Istokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project Prepared by Chastain-Skillman, Inc. Prepared for May 23, 2012 Certificate of Authorization No. CA US Highway 27 South (33870) Post Office Box 7036 Sebring, Florida [863] Highlands County Board of County Commissioners 4344 George Boulevard Sebring, Florida Submitted to South Florida Water Management District 205 North Parrott Avenue, Suite 201 Okeechobee, Florida ENGINEER: Wendy G. Contner, P.E. Fla. Reg. No CSI File No Copyright 2012

2 Minor Impoundment Project Stormwater Calculations Table of Contents Page No. STORMWATER CALCULATIONS REPORT List of Attachments Attachment No. ICPR MODEL INPUT/OUTPUT DATA...1 CSI File No i

3 Minor Impoundment Project Stormwater Calculations 1.0 PROJECT SUMMARY The attached ICPR model is provided to determine the maximum water depth of the proposed minor impoundment and to size an emergency overflow structure. The design is based upon the guidelines provided in Appendix 6, Section 2.2 of the Basis of Review for Environmental Resource Permits. 2.0 MODEL INPUT BASIN: The basin area of acres represents the top of bank area of the reservoir. It is conservatively assumed that this entire acreage is open water retention with a Curve Number equal to 100. NODE: The node represents the stage/storage areas of the impoundment. The initial stage elevation is set at the overflow weir elevation of A base flow of 78 cfs is presented here to account for the maximum amount of water being pumped into the reservoir when all pumps are operating. This pumpage amount of 78 cfs or 35,000 gpm was established by the modeling efforts of Del Bottcher. Del s report titled Operation Protocols is also provided under separate cover. WEIR: The weir represents a 300 ft wide structure with invert elevation equal to The height of opening is the difference between the structure invert and top of bank elevation of 36. TAILWATER: Per Appendix 6, Section , the tailwater elevation must be set assuming a 100-year downstream condition. Per Del s modelings (see attached supporting ), it is estimated that 100-year elevation of the receiving canal is 31.4, utilized elevation 32.0 in the model. ROUTING/HYDROLOGY: Per Appendix 6, Section , a three day 25-year storm event was routed to determine the maximum water depth also known as the design water depth for minor impoundments. A three day 25- year storm event produces 9 inches of rainfall per Figure C.10 of the Basis of Review Design Aids. CSI File No

4 Minor Impoundment Project MODEL RESULTS Stormwater Calculations The maximum water depth a.k.a. design water depth equals elevation This elevation is based upon all pumps running with a three day 25-year rainfall event on the impoundment area. The impoundment s top of bank elevation is 36.0, therefore a two foot freeboard is provided above the maximum water depth. FLOODPLAIN The site lies within a ZONE A floodplain. Per the guidelines of the Environmental Resource Permit Information Manual Volume IV 2011, the site is determined to be an Exporter. 1. Site pre-development 100-year, 3-day storm runoff volume: computed by using the SCS method of volume estimation given by: Runoff Depth Over Basin (Q) = (P- 0.2*S) 2 / (P+ 0.8*S) where P = Rainfall Depth (11.0") S = Potential Storage Abstraction = 1000/CN 10; CN = 84 Q = ac-ft 2. Site pre-development storage available to the basin during the 100-year flood. V = 9.48 ac-ft 3. Since the difference between (1) and (2) is positive ( = ), thus the runoff volume is larger than the available storage; the site is considered an exporter of basin runoff. In the post-development conditions, the site s contributing runoff downstream during the 100-year, 3-day storm event will be eliminated since the impoundment s overflow is set at 2.1 foot above the estimated 100-year elevation of the surrounding canal. CSI File No

5 Nodes A Stage/Area V Stage/Volume T Time/Stage M Manhole Basins O Overland Flow U SCS Unit CN S SBUH CN Y SCS Unit GA Z SBUH GA Links P Pipe W Weir C Channel D Drop Structure B Bridge R Rating Curve H Breach E Percolation F Filter X Exfil Trench T:TW-100 year W: OVERFLOW A: impoundment U:impound. basin Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc.

6 ==== Basins ============================================================================== Name: impound. basin Node: impoundment Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh256 Peaking Factor: Rainfall File: Sfwmd72 Storm Duration(hrs): Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): 0.00 ==== Nodes =============================================================================== Name: impoundment Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Stage/Area BASE FLOW REPRESENTS THE INFLOW FROM ALL PUMPS RUNNING Stage(ft) Area(ac) Name: TW-100 year Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Time/Stage 100-year elevation in canal per Del Bottcher's study Time(hrs) Stage(ft) ==== Weirs =============================================================================== Name: OVERFLOW From Node: impoundment Group: BASE To Node: TW-100 year Flow: Both Count: 1 Type: Vertical: Mavis Geometry: Rectangular Span(in): Rise(in): Invert(ft): Control Elevation(ft): Bottom Clip(in): Top Clip(in): Weir Discharge Coef: Orifice Discharge Coef: TABLE ==== Hydrology Simulations =============================================================== Name: 25-yr, 3-day Filename: I:\LKDCIV\PUBLIC\Sebring\Istokpoga\sfwmd.R32 Override Defaults: Yes Storm Duration(hrs): Rainfall File: Sfwmd72 Rainfall Amount(in): 9.00 Time(hrs) Print Inc(min) ==== Routing Simulations ================================================================= Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 2

7 Name: 25-yr, 3-day Hydrology Sim: 25-yr, 3-day Filename: I:\LKDCIV\PUBLIC\Sebring\Istokpoga\sfwmd.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Delta Z Factor: Time Step Optimizer: Start Time(hrs): End Time(hrs): Min Calc Time(sec): Max Calc Time(sec): Boundary Stages: Boundary Flows: Time(hrs) Print Inc(min) Group Run BASE Yes Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 2 of 2

8 Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs ft ft ft ft2 hrs cfs hrs cfs impoundment BASE 25-yr, 3-day TW-100 year BASE 25-yr, 3-day Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 1

9 about:blank Page 1 of 1 5/23/2012 Wendy Contner - Fwd: RE: Istokpoga Above Ground Impoundment From: Wendy Contner Subject: Fwd: RE: Istokpoga Above Ground Impoundment >>> "Del Bottcher" <dbottcher@swet.com> 4/17/2012 7:25 PM >>> Wendy and Ron, I have completed a number of simulations and it s clear we can go even lower with the pump sizes. My current recommend is for a two 15,000 gpm pumps and one 5,000 gpm duty pump. These pumps will work with or without the neighboring farmer pumping in, so I suggest you design using a total of 35,000 gpm for your outlet. As far as the 100-yr tailwater elevation, my results show a maximum stage of 31.4 feet over the 43-year simulation for the reach receiving the impoundment s outflow. Therefore, it would be safe to assume that the 100-yr stage would be a little less than 32 feet. Del Del Bottcher, Ph.D. P.E. Soil and Water Engineering Technology, Inc NW 12 th Ave Gainesville, FL Office PH: (352) Cell PH: (352)

DRAINAGE REPORT FOR. Creeks Crossing

DRAINAGE REPORT FOR. Creeks Crossing DRAINAGE REPORT FOR Creeks Crossing LOCATED AT: Galloway Road North Lakeland, Florida 33810 PREPARED FOR: Southern Homes/LM Properties OWNER: Heritage Investments of Polk, LLC PREPARED BY: SUBMITTED TO:

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2

Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2 Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2 PRESENTED AT THE SFWMD WORKSHOP PRE-DEVELOPMENT VERSUS POST DEVELOPMENT RUNOFF VOLUME ANALYSIS

More information

SAN GORGONIO PASS CAMPUS - PHASE I

SAN GORGONIO PASS CAMPUS - PHASE I SAN GORGONIO PASS CAMPUS - PHASE I Banning, CA DRAINAGE STUDY June 16, 2010 Reference 106-195 PREPARED BY: Encompass Associates, Inc. 5699 Cousins Place Rancho Cucamonga, CA 91737 909-684-0093 Fax-909-586-6979

More information

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes

More information

ENVIRONMENTAL ENGINEERING LAND SURVEYING

ENVIRONMENTAL ENGINEERING LAND SURVEYING ENVIRONMENTAL ENGINEERING LAND SURVEYING Inflow Design Flood Control System Plan Bottom Ash Pond Sherburne County Generating Plant Introduction This report presents documentation and certification of the

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Valmont Station - CCR Surface Impoundments Public Service Company of Colorado Denver, Colorado

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

Index. Page numbers followed by f indicate figures.

Index. Page numbers followed by f indicate figures. Index Aerodynamic method, 103, 110 111 Algae, 131, 173, 175 Alternate depth, 88 Alternating block method, 132, 140 141 Attenuation, 106, 107f, 118, 120 Page numbers followed by f indicate figures. Baseflow

More information

Software Applications for Runoff Hydrological Assessment

Software Applications for Runoff Hydrological Assessment Bulletin UASVM Horticulture, 67(2)/2010 Print ISSN 1843-5254; Electronic ISSN 1843-5394 Software Applications for Runoff Hydrological Assessment Severin CAZANESCU 1), Sorin CIMPEANU 1), Oana GUI 2), Dana

More information

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to

More information

4.1 General Methodology and Data Base Development

4.1 General Methodology and Data Base Development Chapter 4 METHODOLOGY 4.1 General and Data Base Development This report project utilized several computer software models and analysis techniques to create the numeric data on which decisions for this

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

Climate Sensitivity Runs (DRAFT)

Climate Sensitivity Runs (DRAFT) Climate Sensitivity Runs (DRAFT) South Florida Water Management Model SOUTH FLORIDA WATER MANAGEMENT DISTRICT February 13, 2013 Authored by: Hydrologic & Environmental Systems Modeling (HESM) Contributors:

More information

Stormwater as an Alternative Source of Water Supply: Feasibility and Implications for Watershed Management 1

Stormwater as an Alternative Source of Water Supply: Feasibility and Implications for Watershed Management 1 CIR1493 Stormwater as an Alternative Source of Water Supply: Feasibility and Implications for Watershed Management 1 Sanjay Shukla and Fouad H. Jaber 2 Introduction: Florida s Water Supply Florida is projected

More information

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview WinTR-55 for Plan Reviews Small Watershed Hydrology Overview 1 Overview Course Outline Historical Background Program Description Model Capabilities and Limitations This is the Overview portion of the training.

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia

Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia September 2015 Terracon Project Number: N4155129 Prepared for: American Electric Power 1 Riverside

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

Rhode Island Stormwater Design and Installations Standards Manual

Rhode Island Stormwater Design and Installations Standards Manual Rhode Island Stormwater Design and Installations Standards Manual Public Workshop Required Management Volume Calculations and Redevelopment Considerations March 22, 2011 Presentation Outline Recap of How

More information

Appendix B. Storm Drain System Data

Appendix B. Storm Drain System Data MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO

More information

PUNTA GORDA AIRPORT CONSTRUCT TAXIWAY A EXTENSION DRAINAGE REPORT

PUNTA GORDA AIRPORT CONSTRUCT TAXIWAY A EXTENSION DRAINAGE REPORT PUNTA GORDA AIRPORT CONSTRUCT TAIWAY A ETENSION DRAINAGE REPORT Prepared for the Charlotte County Airport Authority Prepared By: 7650 West Courtney Campbell Causeway Tampa, Florida 33607-1462 May 2015

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis San Antonio Water System enhancement. This recommendation was based on limited water quality data provided by SAWS and using a free-water surface constructed wetland with approximately 112 acres of wetted

More information

DRAINAGE DESIGN DOCUMENTATION

DRAINAGE DESIGN DOCUMENTATION June, 2017 DRAINAGE DESIGN DOCUMENTATION (An expansion of the Stormwater Management Design Report) Note: This report outline is not all-inclusive. There may be situations when information not included

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

Gwinnett County Stormwater System Assessment Program

Gwinnett County Stormwater System Assessment Program Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What

More information

Runoff Hydrographs. The Unit Hydrograph Approach

Runoff Hydrographs. The Unit Hydrograph Approach Runoff Hydrographs The Unit Hydrograph Approach Announcements HW#6 assigned Storm Water Hydrographs Graphically represent runoff rates vs. time Peak runoff rates Volume of runoff Measured hydrographs are

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

Jamestown Public Schools Bush Elementary Addition and Alterations

Jamestown Public Schools Bush Elementary Addition and Alterations ADDENDUM TO THE STORMWATER POLLUTION PREVENTION PLAN For the Jamestown Public Schools Bush Elementary Addition and Alterations Jamestown, New York Chautauqua County February, 2014 Clark Patterson Lee DESIGN

More information

Florida s Deranged Hydrology and the National Water Model Challenges and Opportunities

Florida s Deranged Hydrology and the National Water Model Challenges and Opportunities Florida s Deranged Hydrology and the National Water Model Challenges and Opportunities Peter J. Singhofen, P.E. Streamline Technologies, Inc. psinghofen@icpr4.com Part 1 Florida is Different 2 2016, Streamline

More information

CONVEYANCE ANALYSIS OF THE MAINLINE TUNNEL USING ICAP

CONVEYANCE ANALYSIS OF THE MAINLINE TUNNEL USING ICAP VEN TE CHOW HYDROSYSTEMS LAB Technical Memorandum CONVEYANCE ANALYSIS OF THE MAINLINE TUNNEL USING ICAP David S. Ancalle Nils Oberg Marcelo H. García Ven Te Chow Hydrosystems Laboratory Dept. of Civil

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

Constructed Wetland Pond T-8

Constructed Wetland Pond T-8 Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands

More information

Chapter 12 Storage. Contents. Overview... 1

Chapter 12 Storage. Contents. Overview... 1 Chapter 12 Storage Contents Overview... 1 Implementation of Regional, Sub-regional, and On-site Detention Facilities... 2 Regional Detention... 2 Subregional Detention... 5 Onsite Detention... 6 Detention

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA FEBRUARY 1996 CITY OF LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA TABLE OF CONTENTS Pg 1.0 GENERAL 1.1 Introduction... 1 1.2 Applicability... 1 1.3 General

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria)

ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria) ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria) FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Volume II (including Appendices

More information

Detention Pond Design and Analysis. CE 378 Water Resources Engineering. Contents

Detention Pond Design and Analysis. CE 378 Water Resources Engineering. Contents R. Pitt April 12, 2004 Detention Pond Design and Analysis CE 378 Water Resources Engineering Contents Introduction...1 Expected Detention Pond Performance...2 Potential Detention Pond Problems...3 Wet

More information

OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK WATER PRESERVE AREA

OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK WATER PRESERVE AREA Revised 9 12 2011 to revise PE Certification page on Operation Plan and add PE Certification page to Performance Plan SOUTH FLORIDA WATER MANAGEMENT DISTRICT OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

2C-12 Detention Basin Outlet Structures

2C-12 Detention Basin Outlet Structures Iowa Stormwater Management Manual 2C-12 2C-12 Detention Basin Outlet Structures A. Introduction The methods described in Section 2C-9 are used to estimate the volume of the detention storage. The second

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall SWM MD-378 Pond Checklist Training 10/17/07 Ken Wolfe Warren Johnson USDA, NRCS Frederick, Maryland ROLES AND RESPONSIBILITIES Small Pond Approval MDE, WMA, Dam Safety Division Authority (COMAR 26.17.04.03)

More information

Modelling and Analysis of EES Systems Using SWMM

Modelling and Analysis of EES Systems Using SWMM Planning and Design of a Right-of-Way LID (Etobicoke Exfiltration System) July 24 th 2015 Toronto, Ontario, Canada ling and Analysis of EES Systems Using SWMM Darko Joksimovic Department of Civil Engineering,

More information

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate...

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate... Chapter 5 Table of Contents 5-1 Introduction... 1 5-1-1 Stormwater Quality Considerations... 1 5-1-2 Stormwater Volume Considerations... 2 5-1-3 Downstream Impacts... 2 5-2 Requirements... 2 5-2-1 General

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

2

2 1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.

More information

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) 525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan R.M. SCHAHFER GENERATING STATION CCR SURFACE IMPOUNDMENT INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Wheatfield, Indiana Pursuant to 40 CFR 257.82 Submitted To: Northern

More information

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

STORMWATER MANAGEMENT CRITERIA

STORMWATER MANAGEMENT CRITERIA JOPLIN, MISSOURI STORMWATER MANAGEMENT CRITERIA AM ALLGEIER, MARTIN and ASSOCIATES, INC. Consulting Engineers and Surveyors 1.0 GENERAL 1.1 Introduction: This document provides uniform procedures

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). 1. Stream Network The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). First Order Streams streams with no tributaries. Second Order Streams begin at

More information

BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES

BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES MICHAEL ZYGNERSKI ENVIRONMENTAL PLANNING AND COMMUNITY RESILIENCY DIV. ASCE 2/8/2017 Overview Purpose/Application Current Maps

More information

NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD

NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD Dec, 2015 NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD NRCS - Natural Resource Conservation Service (formerly known as SCS Soil Conservation

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Section CONTENTS Page RO- 1.0 OVERVIEW... 1 2.0 RATIONAL METHOD... 3 2.1 Rational Formula... 3 2.2 Assumptions... 4 2.3 Limitations... 4 2.4 Time of Concentration... 5 2.4.1 Initial Flow Time... 5 2.4.2

More information

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr.

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr. 32 Urban Drainage A.Ramachandra Rao Purdue University C.B. Burke Christopher B. Burke Engineering, Ltd. T.T. Burke, Jr. Christopher B. Burke Engineering, Ltd. 32.1 Introduction 32.2 The Rational Method

More information

CRITERIA FOR STORMWATER DESIGN

CRITERIA FOR STORMWATER DESIGN ..CHAPTER.. CRITERIA FOR STORMWATER DESIGN 2.1 Integrated Site Design Approach 2.1.1 Introduction This chapter represents the requirements, policies and other guidance for stormwater management design

More information

Sediment Basin. Fe= (Depends on soil type)

Sediment Basin. Fe= (Depends on soil type) 3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment

More information

STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION. TFMA Spring Conference 2013

STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION. TFMA Spring Conference 2013 STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION TFMA Spring Conference May 23, 2013T F M A Spring Conference 2013 INTRODUCTIONS ALYSHA GIRARD, P.E., CFM Storm Water Program Manager City

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity 9th International Conference on Urban Drainage Modelling, Belgrade 2012 C4. Climate change impacts, pp.287-288 Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

More information

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS Coldstream Park Stream Corridor Restoration and Preservation Consent Decree SEP Prepared for Lexington-Fayette Urban County Government Division of Water

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

BMPTRAINS MODEL: A TRAINING WORKSHOP B Y : M AR T Y W AN I E L I S T A, H AR V E Y H AR P E R AN D M I K E H AR D I N.

BMPTRAINS MODEL: A TRAINING WORKSHOP B Y : M AR T Y W AN I E L I S T A, H AR V E Y H AR P E R AN D M I K E H AR D I N. BMPTRAINS MODEL: A TRAINING WORKSHOP B Y : M AR T Y W AN I E L I S T A, H AR V E Y H AR P E R AN D M I K E H AR D I N. PURPOSE OF TRAINING IS TO: Understand the theory essential for estimating annual nutrient

More information

Appendix B HYDROLOGIC AND HYDRAULIC MODELING

Appendix B HYDROLOGIC AND HYDRAULIC MODELING Appendix B HYDROLOGIC AND HYDRAULIC MODELING Memo To: George Hudson, PE and Jeff Robinson, PE, GEC, Inc. From: Stephen Sanborn, PE, Dynamic Solutions, LLC Date: 4/25/ /2014 CC: Chris Wallen, Vice President,

More information

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION SBSA PROJECT TITLE: KRSM095002, wo54127 Construct Clubhouse near Bldg 720; KRSM150043, wo54127 Replace Piping Utilities near Bldg 720, KRSM130012, wo54127 Demo Golf Clubhouse Bldg 720. General: DATE: 31

More information

Hydraulic Design of Highway Culverts HDS 5 September 1985

Hydraulic Design of Highway Culverts HDS 5 September 1985 Hydraulic Design of Highway Culverts HDS 5 September 1985 Welcome to HDS 5 - Hydraulic Design of Highway Culverts Table of Contents Preface Tech Doc U.S. - SI Conversions DISCLAIMER: During the editing

More information

Infiltration Stormwater Control Measures. Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer

Infiltration Stormwater Control Measures. Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer Infiltration Stormwater Control Measures Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer Overview of Presentation NCDENR Infiltration Devices Infiltration and the SHWT Innovative infiltration

More information

RED RIVER FLOODWAY OPERATION REPORT SPRING Manitoba Infrastructure

RED RIVER FLOODWAY OPERATION REPORT SPRING Manitoba Infrastructure RED RIVER FLOODWAY OPERATION REPORT SPRING 2017 Manitoba Infrastructure RED RIVER FLOODWAY OPERATION REPORT SPRING 2017 June 29, 2017 Manitoba Infrastructure Hydrologic Forecasting and Water Management

More information

Phase 2 CSO Control Plan/Wellington Avenue CSO Facility

Phase 2 CSO Control Plan/Wellington Avenue CSO Facility 4.0 Hydrologic and Hydraulic Modeling 4.1 Overview and Modeling Approach In accordance with AECOM s scope of services for Phase 2, a hydrologic and hydraulic model was prepared for the Wellington Avenue

More information

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Stormwater Volume and Treatment Methods Simplifying the Numbers IAFSM March 10, 2011 Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Introduction GOALS: Improve understanding of Rate and Volume (Quantity)

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

Chatham Park Stormwater Manual

Chatham Park Stormwater Manual Chatham Park Stormwater Manual Table of Contents A. Introduction... 2 B. Calculation Methods... 2 C. BMP Design Standards... 3 D. Compliance Points... 3 E. Critical Environmental Resources... 3 F. Submittal

More information

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF CHAPTER 3 STORMWATER HYDROLOGY Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF 3.1.1 Introduction to Hydrologic Methods...3.1-1 3.1.2 Symbols and Definitions...3.1-3 3.1.3 Rainfall

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

VOLUME 1 TABLE OF CONTENTS

VOLUME 1 TABLE OF CONTENTS Santiago Hills Phase II Planned Community and East Orange Planned Community Area 1 Issue Date: 2, May 20055 VOLUME 1 TABLE OF CONTENTS SECTION 1: INTRODUCTION... 1-1 1.1 PROJECT DESCRIPTION... 1-1 1.2

More information

City of Oakland. Public Works Agency Standards STORM DRAINAGE DESIGN GUIDELINES. Engineering Design & ROW Management Division

City of Oakland. Public Works Agency Standards STORM DRAINAGE DESIGN GUIDELINES. Engineering Design & ROW Management Division City of Oakland PUBLIC WORKS AGENCY 250 FRANK H. OGAWA PLAZA 4 TH FLOOR OAKLAND, CALIFORNIA 94612 (510) 238-3437 FAX (510) 238-7227 TTD (510) 238-3254 Public Works Agency Standards STORM DRAINAGE DESIGN

More information

PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY

PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY Department of Public Works Division of Environmental Management Updated October 2016 This page intentionally left blank.

More information

Chapter 3 Calculating the WQCV and Volume Reduction

Chapter 3 Calculating the WQCV and Volume Reduction Contents 1.0 Introduction... 1 2.0 Hydrologic Basis of the WQCV... 1 2.1 Development of the WQCV... 1 2.2 Optimizing the Capture Volume... 3 2.3 Attenuation of the WQCV (BMP Drain Time)... 4 2.4 Excess

More information

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE by James C.Y. Guo. Professor, Civil Engineering, U. Of Colorado at Denver, James.Guo@cudenver.edu.. And Eric Hsu, Project Engineer, Parson

More information

URBAN FLOODING: HEC-HMS

URBAN FLOODING: HEC-HMS 1.0 Introduction URBAN FLOODING: HEC-HMS -Sunil Kumar, Director, NWA All major ancient civilisations were developed in the river valleys because river served as source of water, food, transportation and

More information

iswm TM Technical Manual Hydrology:

iswm TM Technical Manual Hydrology: : 1.0 2.0 Downstream Assessment 3.0 Streambank Protection 4.0 Water Balance 5.0 Rainfall Tables 6.0 Hydrologic Soils Data Table of Contents 1.0... HO-1 1.1 Estimating Runoff... HO-1 1.1.1 Introduction

More information

City of Tulsa. Stormwater Design Criteria Manual

City of Tulsa. Stormwater Design Criteria Manual City of Tulsa Stormwater Design Criteria Manual 2014 Table of Contents Chapter 100 EXECUTIVE SUMMARY... 101 101 INTRODUCTION... 101 101.1 Manual Organization... 101 101.2 Manual Contents... 101 101.2.1

More information