1 Technical Cooperation Project INT/4/142 Interregional Workshop on Advanced Nuclear Reactor Technology for Near Term Deployment IAEA Headquarters, Vienna, Austria, 4-8 July 2011 Design, Safety Technology and Operability Features of Advanced VVERs Presented by Nikolay Fil OKB GIDROPRESS Russian Federation
2 2 Introduction OKB GIDROPRESS has been established in 1946 to develop designs of nuclear steam supply system (NSSS) and separate equipment for nuclear installations. Some milestones: 1947 Research heavy water reactor 1954 Steam generator for 1st NPP 1963 Lead-bismuth NSSS for submarine First VVER Boiling water reactor VK Fast sodium reactor BOR First VVER First VVER-1000 Now VVER-440 and VVER-1000 are in operation in Russia, Ukraine, Armenia, Finland, Bulgaria, Hungary, Czech Rep., Slovakia, China. Now VVERs of MWe, VVER-SCP, sodium BN-800/1200 steam generator, lead-bismuth SVBR-100 are under development. Visit for details.
3 Introduction What is VVER ВВЭР: водо-водяной энергетический реактор WWER: water-cooled water-moderated energy reactor Pressurized light water reactor. Loop-type reactor plant. Horizontal steam generators. Hexagonal fuel assemblies. High level of inherent safety. About 1500 reactor-years of operating time 3
4 VVER evolution Low and medium power designs ( ) RP design RP type Site (units) Status V-1 VVER-210 NVNPP (1) DCOM V-2 VVER-70 NPP «Rheinesberg» (1) DCOM V-3М VVER-365 NVNPP (2) DCOM V-179 VVER-440 NVNPP (3,4) SLE V-230 VVER-440 Kola NPP (1,2), NPP «Kozloduy» (1-4), NPP «Nord» (1-4), NPP «Bohunice» (1,2) SLE DCOM V-270 VVER-440 Armenian NPP UO V-213 VVER-440 Kola NPP (3,4), Rovno NPP (1,2), UO NPP «Loviisa» (1,2), NPP «Paks» (1-4), NPP «Bohunice» (3,4), NPP «Mochovce» (1,2), NPP «Dukovany» (1-4), NPP «Nord» (5) DCOM 4
5 VVER evolution High power designs ( ) RP design RP type Site (units) Status V-187 VVER-1000 NVNPP (5) SLE V-302 VVER-1000 South Ukraine NPP (1) UO V-338 VVER-1000 South Ukraine NPP (2), Kalinin NPP UO (1,2) V-320 VVER-1000 Balakovo NPP (1-4), Zaporozhe NPP UO (1-6), Rovno NPP (3,4), Khmelnitsk NPP (1,2), South Ukraine NPP (3), Rostov NPP (1,2), NPP «Temelin» (1,2), Kalinin NPP (3), NPP «Kozloduy» (5,6) V-392 VVER D V-446 VVER-1000 NPP «Bushehr» (1) COM 5
6 VVER evolution Current designs ( ) RP RP type Site (units) Status design V-392B VVER-1000 Balakovo NPP (5) D V-412 VVER-1000 NPP «Kudankulam» (1,2) UC V-428 VVER-1000 Tianwan NPP (1,2) UO V-407 VVER D V-466B VVER-1000 NPP «Belene» (1,2) D V-392М VVER-1200 NVNPP-2 (1,2) UC V-491 VVER-1200 LNPP-2 (1-4), BaltNPP (1,2) UC D V-448 VVER D VVER-1200 is also a starting point for future VVER designs of MWe power. 6
7 VVER evolution VVER-1200 Basic design VVER-1200A 300 MWe per loop 600 MWe per loop VVER-600 VVER
8 VVER evolution Future designs RP design RP type Site (units) Status V-498 VVER CtP V-501 VVER-1200А - CtP VVER CtP V-393 VVER-SCP - CtP 8 Abbreviations used: SLE service life extended; COM commissioning; CtP concept proposal; D design is developed; DCOM decommissioned; UC NPP under construction; UO under operation.
9 NPP-2006 basis Now VVER-1200 (also known as NPP-2006) is the main design for near term nuclear power program in Russia and for bidding at international market. NPP-2006 is the evolution of VVER-1000s by improving plant performance and increasing plant safety. Plant performance Rated power 1170 (1000) MWe Primary pressure 16.2 (15.7) MPa Secondary pressure 7.0 (6.3) MPa Coolant temperature 329 (320) C Refueling period 24 (12) months Burn-up in FA 70 (50) MWD/kgU Plant safety Passive reactor scram system Passive core flooding system Passive decay heat removal system Passive containment cooling system Passive hydrogen removal system Passive corium catcher 9
10 NPP-2006 basis Reference plants for NPP-2006 design: Operating standard VVER-1000 with V-320 AES-91 with V-428 Tianwan NPP AES-92 with V-392 Kudankulam NPP (V-412) LNPP-2 (VVER-1200/V-491) NVNPP-2 (VVER-1200/V-392M) EUR organization has certified in 2007 that AES-92 design has passed all the steps of the analysis of compliance vs. EUR. Following this analysis, a specific subset of the EUR volume 3 dedicated to AES-92 project has been published by EUR organization. 10
11 NPP-2006 performance Parameter Value NSSS equipment lifetime, years 60 Load factor, % 92 NSSS availability factor 99 Efficiency factor, net % 35.7 Length of fuel cycle, years 4-5 Frequency of refueling, months 12 (18-24) FA maximum burn-up, MW day/kgu 70 Inter-repair period length, years 4-8 Refueling length, days 16 Number of unplanned reactor shutdowns per year 1 11 For more details
12 Reactor NPP-2006 equipment 7 1 In-core instrumentation detectors 2 Top head unit 3 Protective tube unit 4 Core barrel 5 Core baffle 6 Core 7 Reactor pressure vessel 12 No welds in core region No joints below cold leg
13 NPP-2006 equipment Core Fuel assembly Top nozzle Spacer grid Fuel rods fuel assemblies of to 5% enrichment. To 121 control rods. Bottom nozzle 312 fuel rods. 18 guide channels. 13 spacer grids.
14 NPP-2006 equipment Steam generator Cylindrical vessel of 4200 mm internal diameter, mm long with welded elliptical bottoms HX U-tubes of 16x1.5 mm. 14
15 NPP-2006 equipment Pressurizer Parameter Value Total volume, m 3 79 Water volume, m 3 55 Pressure, MPa 16,1 Temperature, C
16 NPP-2006 equipment Main coolant pump Head 0.59 Mpa Flow rate m 3 /h Speed 1000/750 rot/min Current 50 Hz Massive flywheel ensures smooth reduction of flow rate in case of loss of power. No coolant leakage in case of loss of power min 24 (72) hours. 16
17 NPP-2006 safety Parameter Frequency of severe core damage, 1/year Frequency of the limiting emergency release, 1/year Autonomy time of passive safety systems, hour Design basis earthquake, MSK-64 scale Safe shutdown earthquake, MSK-64 scale Value < 10-6 < (72) 6 7(8) 17
18 NPP-2006 safety Novovoronezh NPP-2 Leningrad NPP-2 ECCS active part Emergency boron injection system High and low pressure combined twochannel system with ejector pumps with internal redundancy of main safety functions Two-channel system with channel redundancy 2 х 100 % and internal channel redundancy 2 х 50 % High and low pressure separate four-channel systems with channel redundancy 4 х 100 %, each Four-channel system with channel redundancy 4 х 50 % Emergency feedwater system SG emergency cooldown system Core passive flooding system (HA- 2) Passive heat removal system (PHRS) Closed two-channel system with redundancy 2 х 100 % Passive four-channel system with channel redundancy 4 х 33 % with two accumulators in each channel Passive four-channel system with channel redundancy 4 х 25 % with two heat exchangers, cooled by air, in each channel Not available Four-channel system with channel redundancy 4 х 100 % with emergency feedwater storage tanks Not available Not available Passive four-channel system with channel redundancy 4 х 33 % with 18 heat exchangers, cooled by water, in each channel 18 Passive systems are provided to back-up the active systems for all main safety functions (reactivity control, fuel cooling and confinement of radioactivity) during min 24 (72) hours.
19 NPP-2006 safety Emergency boron injection system ГЕ ГЕ ГЕ ГЕ - injection into PRZ in case of primary-to-secondary leak for fast decrease of primary pressure - injection into primary circuit to shutdown reactor in case of failure of reactor scram (ATWS) - pumps of 24.5 Mpa shut-off head are connected to tanks with 40 g/kg boric acid concentration 150 m 3 each
20 NPP-2006 safety Active ECCS in NVNPP-2 High and low pressure combined system with ejector pumps is intended for boric acid solution supply into reactor coolant system within the whole spectrum of design basis LOCAs up to DEGB of 850 mm main coolant pipeline. 4 3 ГЕ ГЕ ГЕ ГЕ Parameters Value P HPIS max. head MPa 8 P LPIS max. head MPa 2,5 G LPIS max. supply, m 3 /h 900 C Н 3 ВО 3 concentration,g/kg 16
21 NPP-2006 safety Active ECCS in LNPP-2 Separate 4-trains high and low pressure injection systems are intended for boric acid solution supply into reactor coolant system within the whole spectrum of design basis LOCAs up to DEGB of 850 mm main coolant pipeline. channel channel 3 ГЕ ГЕ ГЕ ГЕ channel channel 2 21 Parameter Value P HPIS max. head, MPa 7,9 G HPIS max. supply, m 3 /h 260 P LPIS max. head, MPa 2,5 G LPIS max. supply, m 3 /h 900 C Н 3 ВО 3 concentration, g/kg 16
22 NPP-2006 safety Passive part of ECCS Passive part of emergency core cooling system is intended for boric acid solution supply into the reactor at the primary pressure less than 5,9 MPa under LOCA till start of active ECCS. 4 3 HA ГЕ HA ГЕ HA ГЕ HA ГЕ Parameters Value P Nominal pressure, MPa 5,9 C Н 3 ВО 3 concentration, g/kg 16 V Accumulator/solution volume, m 3 60 / 50
23 NPP-2006 safety Additional passive ECCS in NVNPP-2 design prevents progression of a LOCA to severe core damage in case of failure of active ECCS during min 24 hours. Flow rate law verified by scaled Experiments. ГЕ ГЕ ГЕ ГЕ Time, s Flow, kg/s To 5430 To To To ,0 5,0 3,3 1, Water inventory 120x8 m 3 Design pressure 3.0 MPa Pressure of connection 1.5 MPa
24 NPP-2006 safety Emergency cool down system via steam generators in NVNPP-2 design is intended for removal of decay heat and RP cool down in case of loss of normal and auxiliary feed water supply. 4 3 канал Parameter Value Channel power, MW 80 Temperature of condensate, С Max. flow rate to one SG, t/h 200 Control of cool down rate Available
25 NPP-2006 safety Emergency cool down system via steam generators in LNPP-2 design is intended for removal of decay heat and RP cool down in case of loss of normal and auxiliary feed water supply. 4 3 канал 3 канал 4 канал 1 канал Parameter Value G Flow rate from one EFWP, t/h 150 T Emergency feed water temperature, С 5-40 N Number of storage tanks V Tank volume, m D Control cool down rate via BRU-A Available
26 NPP-2006 safety Passive decay heat removal system via steam generators in NVNPP-2 design is intended for reactor core decay heat removal to ultimate heat sink (atmosphere) through the secondary side during beyond design basis accidents (e.g., station blackout) 4 3 канал 3 канал Parameter Value System power, MW 64(at +38 С) Number of HX in each channel 2 Control of cooling medium flow rate Available Air temperature range, С
27 NPP-2006 safety Passive decay heat removal system via steam generators in LNPP-2 design is intended for decay heat removal through the secondary side during beyond design basis accidents (e.g., station blackout) Parameters Value Q System power, MW 200 V Water inventory, m 3 4 х 540 τ Time of operation, hour 24 27
28 NPP-2006 safety Passive containment cooling system in LNPP-2 design is intended for long-term condensation of steam from containment atmosphere. 1 This system shares the offcontainment water storage tanks with passive decay heat removal system via steam generators tank; 2 steam line; 3 condensate line; 4 SG PHRS valve; 5 HX of containment PHRS; 6 steam generator; 7 cut-off valve
29 NPP-2006 safety The core catcher in NPP-2006 design provides corium confinement and exclude corium discharge outside the containment in any scenario. - Protects the reactor cavity against thermal and mechanical impact of corium -Takes in and accommodates solid and liquid corium constituents -Ensures formation of optimal structure and properties of the melt pool and subsequent solidification of corium. - Provides heat sink from corium to cooling water passively supplied min 24 h without any coolant makeup. - Provides corium retention - Minimises hydrogen and radionuclide release into containment on ex-vessel phase of a core melt scenario. 29
30 NPP-2006 safety Core catcher long term cooling provisions 1 - reactor; 2 core catcher; 3 fuel pool; 4 inspection vault for in-vessel components; 5 sump tanks; 6 pipeline supplying water onto corium surface; 7 pipeline supplying water to core catcher heat exchanger 30
31 NPP-2006 safety Passive catalytic recombiners are provided in NPP-2006 design to remove hydrogen from containment atmosphere 31
32 Conclusion VVER-1200 is developed as the main design for near term nuclear power program in Russia and for bidding at international market. VVER-1200 is the evolution of operating VVER-1000s by improving plant performance and increasing plant safety. VVER-1200 design is a basis for future VVER designs of wide power range. Passive systems are designed for VVER-1200 to back-up fulfillment of all main safety functions. These systems are capable to prevent typical BDBA progression to Fukushima-like scenarios. The viability of new passive systems implemented in VVER-1200 design is confirmed by extensive R&D works. A few nuclear power plants are already in operation and under construction with these systems implemented. 32
Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors)
Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors) 1.3.2016 Prof.Dr. Böck Technical University Vienna Atominstitut Stadionallee 2, 1020 Vienna, Austria ph: ++43-1-58801 141368 boeck@ati.ac.at
More informationUp-to-date issues of VVER Technology Development
Up-to-date issues of VVER Technology Development 10 th International Scientific and Technical Conference Safety, Efficiency and Economics of Nuclear Power industry JSC Concern Rosenergoatom May 25-27,
More informationImprovement of economic efficiency of the fuel usage in NPP. The new types of nuclear fuel and the fuel cycles
STATE ATOMIC ENERGY CORPORATION ROSATOM Improvement of economic efficiency of the fuel usage in NPP. The new types of nuclear fuel and the fuel cycles Petr Lavrenyuk (JSC «TVEL») Eighth International Forum
More informationRELAP5/MOD3.2 INVESTIGATION OF A VVER-440 STEAM GENERATOR HEADER COVER LIFTING
Science and Technology Journal of BgNS, Vol. 8, 1, September 2003, ISSN 1310-8727 RELAP5/MOD3.2 INVESTIGATION OF A VVER-440 STEAM GENERATOR HEADER COVER LIFTING Pavlin P. Groudev, Rositsa V. Gencheva,
More informationNuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level
Nuclear Power Plant Safety Basics Construction Principles and Safety Features on the Nuclear Power Plant Level Safety of Nuclear Power Plants Overview of the Nuclear Safety Features on the Power Plant
More informationINVESTIGATION OF CRITICAL SAFETY FUNCTION INTEGRITY IN CASE OF STEAM LINE BREAK ACCIDENT FOR VVER 1000/V320
International Conference 12th Symposium of AER, Sunny Beach, pp.99-105, 22-28 September, 2002. INVESTIGATION OF CRITICAL SAFETY FUNCTION INTEGRITY IN CASE OF STEAM LINE BREAK ACCIDENT FOR VVER 1000/V320
More informationRESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP
RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP P. Krupa Ingeneer, e-mail: Krupa_Peter@ebo.seas.sk Bohunice NPPs Introduction The centre of upgrading activities in VVER NPP is clearly in
More informationBN-1200 Reactor Power Unit Design Development
International Conference on Fast Reactors and Related Fuel Cycles: Safe Technologies and Sustainable Scenarios (FR13) BN-1200 Reactor Power Unit Design Development B.A. Vasilyev a, S.F. Shepelev a, M.R.
More informationPreliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development
Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development A. Introduction The IAEA Report on Reactor and Spent Fuel Safety in the Light of
More informationProject AES
Project AES-2006 Project AES-2006 2014 Contents I. Introduction...................................................................... 4 II. AES-2006 design concept (described by the example of Leningrad
More informationProvision of containment integrity at Russian VVER NPPs under BDBA conditions
Provision of containment integrity at Russian VVER NPPs under BDBA conditions IAEA Technical Meeting Severe Accident Mitigation through Improvements in Filtered Containment Venting for Water Cooled Reactors
More informationHPR1000: ADVANCED PWR WITH ACTIVE AND PASSIVE SAFETY FEATURES
HPR1000: ADVANCED PWR WITH ACTIVE AND PASSIVE SAFETY FEATURES D. SONG China Nuclear Power Engineering Co., Ltd. Beijing, China Email: songdy@cnpe.cc J. XING China Nuclear Power Engineering Co., Ltd. Beijing,
More informationSignificant Events in Rostechnadzor Activity Regarding WWER-type NPPs Operation within the Period from September 2015 up to July 2016
FEDERAL ENVIRONMENTAL, INDUSTRIAL AND NUCLEAR SUPERVISION SERVICE OF RUSSIA Significant Events in Rostechnadzor Activity Regarding WWER-type NPPs Operation within the Period from September 2015 up to July
More informationEUR volume 3 AES 92 subset
European Utility Requirements for LWR nuclear power plants EUR volume 3 AES 92 subset Yury ERMAKOV, RosEnergoAtom Olivier ROUSSELOT, EDF EUR seminar 2005 13/12/2005 key points of the presentation ❽ Presentation
More informationDESIGN AND SAFETY PRINCIPLES LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION
DESIGN AND SAFETY PRINCIPLES LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION VIENNA OKTOBER 3-6, 2016 1 ANPP * ANPP is located in the western part of Ararat valley 30 km west of Yerevan close to
More informationConcepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant
8 Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant KOZO TABUCHI *1 MASAYUKI TAKEDA *2 KAZUO TANAKA *2 JUNICHI IMAIZUMI *2 TAKASHI KANAGAWA *3 ATMEA1 TM is a 3-loop 1100
More informationCzech Industry Cooperation with Rosatom CZECH INDUSTRY CAPABILITIES FOR ROSATOM NUCLEAR POWER PLANTS UNDER CONSTRUCTION
Czech Industry Cooperation with Rosatom CZECH INDUSTRY CAPABILITIES FOR ROSATOM NUCLEAR POWER PLANTS UNDER CONSTRUCTION DEEP HISTORY OF COOPERATION NPP Number and type of reactors Present state Bohunice
More informationNPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview
NPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview Wilson Lam (wilson@cti-simulation.com) CTI Simulation International Corp. www.cti-simulation.com Sponsored by IAEA Modified
More informationWestinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events
Westinghouse Small Modular Reactor Passive Safety System Response to Postulated Events Matthew C. Smith Dr. Richard F. Wright Westinghouse Electric Company Westinghouse Electric Company 600 Cranberry Woods
More informationRELAP 5 ANALYSIS OF PACTEL PRIMARY-TO-SECONDARY LEAKAGE EXPERIMENT PSL-07
Fifth International Seminar on Horizontal Steam Generators 22 March 21, Lappeenranta, Finland. 5 ANALYSIS OF PACTEL PRIMARY-TO-SECONDARY LEAKAGE EXPERIMENT PSL-7 József Bánáti Lappeenranta University of
More informationSYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC
SYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC 3.10.2016 ČEZ, a. s. Meeting at IAEA Vienna Overview of topics ČEZ nuclear fleet (basic features) Systematic measures targeted to improve
More informationDesign of Traditional and Advanced CANDU Plants. Artur J. Faya Systems Engineering Division November 2003
Design of Traditional and Advanced CANDU Plants Artur J. Faya Systems Engineering Division November 2003 Overview Canadian Plants The CANDU Reactor CANDU 600 and ACR-700 Nuclear Steam Supply Systems Fuel
More informationOperatiOn and safety report Of MOchOvce and BOhunice v2 nuclear power plants
2016 OperatiOn and safety report Of MOchOvce and BOhunice v2 nuclear power plants The company is certified according to three management systems: Certificate stn en iso 9001:2008 Quality management system
More informationSEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND
SEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND Risto Sairanen Radiation and Nuclear Safety Authority (STUK) Nuclear Reactor Regulation P.O.Box 14, FI-00881
More informationImplementation of Lessons Learned from Fukushima Accident in CANDU Technology
e-doc 4395709 Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General, Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU
More informationRosatom offer in the field of operation, maintenance and modernization of NNP
Rosatom offer in the field of operation, maintenance and modernization of NNP Daria Voronkova www.rosenergoatom.ru ROSATOM OFFERS COMPLETE SOLUTION FROM URANIUM SUPPLIES TO NPP CONSTRUCTION, OPERATION
More informationPLUTONIUM UTILIZATION IN REACTOR FUEL
Second Moscow International Nonproliferation Conference PLUTONIUM UTILIZATION IN REACTOR FUEL A. Zrodnikov Director General State Scientific Center of the Russian Federation Institute for Physics and Power
More informationCAREM: AN INNOVATIVE-INTEGRATED PWR
18th International Conference on Structural Mechanics in Reactor Technology (SMiRT 18) Beijing, China, August 7-12, 2005 SMiRT18-S01-2 CAREM: AN INNOVATIVE-INTEGRATED PWR Rubén MAZZI INVAP Nuclear Projects
More informationCURRENT NUCLEAR POWER ISSUES IN RUSSIA
CURRENT NUCLEAR POWER ISSUES IN RUSSIA Valerii Korobeinikov State Scientific Center Institute of Physics and Power Engineering Technical Meeting on the Country Nuclear Power Profiles 10 to 13 May 2016
More informationNuclear Power Development in Europe: Rosatom perspective
ROSATOM Nuclear Power Development in Europe: Rosatom perspective Alexey Kalinin Head, International Business, Rosatom CEO, Rusatom Overseas Platts 7 th Annual European Nuclear Conference June 25-26, 2012
More informationJoint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015
Joint ICTP- Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety Trieste,12-23 October 2015 Safety classification of structures, systems and components
More informationCAREM Prototype Construction and Licensing Status
IAEA-CN-164-5S01 CAREM Prototype Construction and Licensing Status H. Boado Magan a, D. F. Delmastro b, M. Markiewicz b, E. Lopasso b, F. Diez, M. Giménez b, A. Rauschert b, S. Halpert a, M. Chocrón c,
More informationMonitoring of the EU Stress test improvement actions in neighbouring countries
Monitoring of the EU Stress test improvement actions in neighbouring countries Public Workshop: Five Years Fukushima, Thirty Years Chernobyl 26 th February 2016 Approach Review & monitoring of post Fukushima
More informationNuclear Desalination Complex with VK-300 Boiling-Type Reactor Facility
World Nuclear Association Annual Symposium 8-10 September 2004 - London Nuclear Desalination Complex with VK-300 Boiling-Type Reactor Facility B.A. Gabaraev, Yu.N. Kuznetzov, A.A. Romenkov, Yu.A. Mishanina
More informationModule 06 Boiling Water Reactors (BWR)
Module 06 Boiling Water Reactors (BWR) 1.10.2015 Prof.Dr. Böck Vienna University oftechnology Atominstitute Stadionallee 2 A-1020 Vienna, Austria ph: ++43-1-58801 141368 boeck@ati.ac.at Contents BWR Basics
More informationMAJOR FINDINGS OF PMK-2 TEST RESULTS AND VALIDATION OF THERMOHYDRAULIC SYSTEM CODES FOR VVER SAFETY STUDIES
FINAL REPORT ON THE PMK-2 PROJECTS VOLUME II. MAJOR FINDINGS OF PMK-2 TEST RESULTS AND VALIDATION OF THERMOHYDRAULIC SYSTEM CODES FOR VVER SAFETY STUDIES By L. Szabados, Gy. Ézsöl, L. Perneczky, I. Tóth,
More informationNUCLEAR ENERGY MATERIALS AND REACTORS Vol. I - Pressurized Water Reactors - J. Pongpuak
PRESSURIZED WATER REACTORS J. Pongpuak Department of Chemical Engineering, University of New Brunswick, Canada Keywords: Pressurized Water Reactors, Reactor Core, Fuel Elements, Control Rods, Steam Generators
More informationIn April 1986, unit 4 of the Chernobyl nuclear
Safety of RBMK reactors: Setting the technical framework The IAEA's co-operative programme is consolidating the technical basis for further upgrading the safety of Chernobyl-type reactors by Luis Lederman
More informationWWER-440 CONTROL ASSEMBLY LOCAL POWER PEAKING INVESTIGATION ON LR-0 REACTOR
International Conference Nuclear Energy for New Europe 2002 Kranjska Gora, Slovenia, September 9-12, 2002 www.drustvo-js.si/gora2002 WWER-440 CONTROL ASSEMBLY LOCAL POWER PEAKING INVESTIGATION ON LR-0
More informationAssessing and Managing Severe Accidents in Nuclear Power Plant
Assessing and Managing Severe Accidents in Nuclear Power Plant Harri Tuomisto Fortum, Finland IAEA Technical Meeting on Managing the Unexpected - From the Perspective of the Interaction between Individuals,
More informationSmall Modular Reactors: A Call for Action
Small Modular Reactors: A Call for Action Overview of Five SMR Designs by Dr. Regis A. Matzie Executive Consultant Adapted May 2015 for the Hoover Institution's Reinventing Nuclear Power project from a
More informationRosatom Integrated Offer for Africa
STATE ATOMIC ENERGY CORPORATION ROSATOM Rosatom Integrated Offer for Africa JSC Rusatom Overseas March, 2016 WORLD TOWARDS CO 2 REDUCTIONS «Can you actually get the amount of CO 2 put out per each unit
More informationPost-Fukushima Assessment of the AP1000 Plant
ABSTRACT Post-Fukushima Assessment of the AP1000 Plant Ernesto Boronat de Ferrater Westinghouse Electric Company, LLC Padilla 17-3 Planta 28006, Madrid, Spain boronae@westinghouse.com Bryan N. Friedman,
More informationSafety enhancement of NPPs in China after Fukushima Accident
Safety enhancement of NPPs in China after Fukushima Accident CHAI Guohan 29 June 2015, Brussels National Nuclear Safety Administration, P. R. China Current Development of Nuclear Power Mid of year 2015
More informationRosatom Global Development, International Cooperation Perspective
ROSATOM STATE ATOMIC ENERGY CORPORATION ROSATOM Rosatom Global Development, International Cooperation Perspective Atomex-Europe 013 Forum Nikolay Drozdov Director, International Business State Corporation
More informationModule 06 Boiling Water Reactors (BWR) Vienna University of Technology /Austria Atominstitute Stadionallee 2, 1020 Vienna, Austria
Module 06 Boiling Water Reactors (BWR) Prof.Dr. H. Böck Vienna University of Technology /Austria Atominstitute Stadionallee 2, 1020 Vienna, Austria Contents BWR Basics Technical Data Safety Features Reactivity
More informationVerification of the MELCOR Code Against SCDAP/RELAP5 for Severe Accident Analysis
Verification of the Code Against SCDAP/RELAP5 for Severe Accident Analysis Jennifer Johnson COLBERT 1* and Karen VIEROW 2 1 School of Nuclear Engineering, Purdue University, West Lafayette, Indiana 47907-2017,
More informationStatus report Chinese Supercritical Water-Cooled Reactor (CSR1000)
Status report Chinese Supercritical Water-Cooled Reactor (CSR1000) Overview Full name Chinese Supercritical Water-Cooled Reactor Acronym CSR1000 Reactor type Pressurized Water Reactor (PWR) Coolant Supercritical
More informationACR-1000: ENHANCED RESPONSE TO SEVERE ACCIDENTS
ACR-1000: ENHANCED RESPONSE TO SEVERE ACCIDENTS Popov, N.K., Santamaura, P., Shapiro, H. and Snell, V.G Atomic Energy of Canada Limited 2251 Speakman Drive, Mississauga, Ontario, Canada L5K 1B2 1. INTRODUCTION
More informationTHREE MILE ISLAND ACCIDENT
THREE MILE ISLAND ACCIDENT M. Ragheb 12/4/2015 1. INTRODUCTION The Three Mile Island (TMI) Accident at Harrisburg, Pennsylvania in the USA is a severe and expensive incident that has seriously affected,
More informationWWER Fuel Performance and Modelling Activities in Bulgaria
WWER Fuel Performance and Modelling Activities in Bulgaria Maria Manolova INRNEBAS, Sofia, Bulgaria manolova@inrne.bas.bg TWGFTP Meeting Vienna, IAEA, 2729 29 April 2010 Intermediate Meeting of the TWGFTP,
More informationAPR1400 Safe, Reliable Technology
APR1400 Safe, Reliable Technology OECD/NEA Workshop on Innovations in Water-cooled Reactor Technology Paris, Feb 11 12, 2015 Presented by Shin Whan Kim Contents 1. Introduction 2. Major Safety Design Characteristics
More informationNuclear Power A Journey of Continuous Improvement
Nuclear Power A Journey of Continuous Improvement Westinghouse Non Proprietary Class 3 Our Place in Nuclear History Innovation 1886 and forever Implementation & Improvement 1957 through Today Renaissance
More informationGreen Cross Russia Nuclear and Radiation Safety Programme. V. M. Kuznetsov Contemporary state of safety at Russian nuclear installations
Green Cross Russia Nuclear and Radiation Safety Programme V. M. Kuznetsov Contemporary state of safety at Russian nuclear installations The Russian nuclear complex (1) 213 nuclear installations (industrial
More informationSafety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency
Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident Ryodai NAKAI Japan Atomic Energy Agency Contents Introduction Japanese Government Report to the IAEA
More informationRELAP5/MOD3.2 ASSESSMENT STUDIES BASED ON THE PACTEL AND PMK-2 LOSS OF FEED WATER TESTS
Proceedings of the 3rd ASME/JSME Joint Fluids Engineering Conference July 18-23, 1999, San Francisco, California FEDSM99-7009 RELAP5/MOD3.2 ASSESSMENT STUDIES BASED ON THE PACTEL AND PMK-2 LOSS OF FEED
More informationNPP Personnel Training Center
NPP Personnel Training Center Juraj Marec, Ivana Maixnerova TM on Developing Systematic Education and Training Approach Using PC Based Simulators for Nuclear Power Programmes, IAEA, Vienna, May 2017 Power
More informationExperiments Carried-out, in Progress and Planned at the HTR-10 Reactor
Experiments Carried-out, in Progress and Planned at the HTR-10 Reactor Yuliang SUN Institute of Nuclear and New Energy Technology, Tsinghua University Beijing 100084, PR China 1 st Workshop on PBMR Coupled
More informationNuScale SMR Technology
NuScale SMR Technology UK IN SMR; SMR IN UK Conference - Manchester, UK Tom Mundy, EVP Program Development September 25, 2014 Acknowledgement & Disclaimer This material is based upon work supported by
More informationPresent Status of Kyoto University Research Reactor, KUR
18th IGORR conference/iaea Technical Meeting 3-7 Dec. 2017, Sydney, Australia Present Status of Kyoto University Research Reactor, KUR Ken NAKAJIMA Research Reactor Institute, Kyoto University 1 Accident
More informationPakistan s Experience in Operating CNP-300s and Near Term Deployment Scheme
Pakistan s Experience in Operating CNP-300s and Near Term Deployment Scheme Presented by: M. Kamran Chughtai Directorate of Nuclear Power Engineering Reactor PAKISTAN ATOMIC ENERGY COMMISSION IAEA Work
More informationDesign Safety Considerations for Water-cooled Small Modular Reactors As reported in IAEA-TECDOC-1785, published in March 2016
International Conference on Topical Issues in Nuclear Installation Safety, Safety Demonstration of Advanced Water Cooled Nuclear Power Plants 6 9 June 2017 Design Safety Considerations for Water-cooled
More informationNON-ELECTRICITY APPLICATION OF NUCLEAR ENERGY: SOME GENERAL ISSUES AND PROSPECTS
NON-ELECTRICITY APPLICATION OF NUCLEAR ENERGY: SOME GENERAL ISSUES AND PROSPECTS Yu.N.Kuznetsov, B.A.Gabaraev Research and Development Institute of Power Engineering Moscow, Russia IAEA Conference Oarai,2007
More informationAPPROACH TO PRACTICAL ELIMINATION IN FINLAND
M-L. JÄRVINEN et al. APPROACH TO PRACTICAL ELIMINATION IN FINLAND M-L. JÄRVINEN Radiation and Nuclear Safety Authority (STUK) Helsinki, Finland Email: marja-leena.jarvinen@stuk.fi N. Lahtinen Radiation
More informationEvolution of Nuclear Energy Systems
ALLEGRO Project 2 Evolution of Nuclear Energy Systems 3 General objectives Gas cooled fast reactors (GFR) represent one of the three European candidate fast reactor types. Allegro Gas Fast Reactor (GFR)
More informationEuropean level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.
Cross reference table of ENSREG and Extraordinary CNS recommendations and national actions 1(16) 2.1 European guidance on assessment of natural hazards and margins The peer review Board recommends that
More informationExpert Statement on the
Expert Statement on the NATIONAL REPORT OF THE REPUBLIC OF BELARUS ON THE BELARUSIAN NPP OBJECTIVE SAFETY REASSESSMENT (STRESS TESTS) Commissioned by Greenpeace Central and Eastern Europe Dipl.Phys. Oda
More informationDEVELOPMENT AND APPLICATION OF PROBABILISTIC SAFETY ASSESSMENT PSA IN DAYA BAY NUCLEAR POWER STATION
18th International Conference on Structural Mechanics in Reactor Technology (SMiRT 18) Beijing, China, August 7-12, 2005 SMiRT18-A01-2 DEVELOPMENT AND APPLICATION OF PROBABILISTIC SAFETY ASSESSMENT PSA
More informationRisks Associated with Shutdown in PWRs
International Conference Nuclear Option in Countries with Small and Mi Opatija, Croatia, 1996 Risks Associated with Shutdown in PWRs Igor Grlicarev Slovenian Nuclear Safety Administration Vojkova 59, 1113
More informationAnalysis of Unprotected Transients in the Lead-Cooled ALFRED Reactor
Analysis of Unprotected Transients in the Lead-Cooled ALFRED Reactor G. Bandini (ENEA/Bologna) E. Bubelis, M. Schikorr (KIT/Karlsruhe) A. Alemberti, L. Mansani (Ansaldo Nucleare/Genova) Consultants Meeting:
More informationIsolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)
Loss of Ultimate Heat Sink ANS AESJ AESJ Fukushima Symposium, March h4, 2012 Hisashi Ninokata, Tokyo Institute of Technology Available ultimate heat sinks at 1F1~3 1F1 (Fukushima Dai ichi Unit 1) Sea water
More informationThe Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services
The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM Roger Schène Director,Engineering Services 1 Background Late 80: USA Utilities under direction of EPRI and endorsed by NRC : Advanced
More informationStatus of the FRM-II Project at Garching. Hans-Jürgen Didier, Gunter Wierheim Siemens AG, Power Generation (KWU), D Erlangen
IGORR7 7 th Meeting of the International Group on Research Reactors October 26-29, 1999 Bariloche, Argentina Status of the FRM-II Project at Garching Hans-Jürgen Didier, Gunter Wierheim Siemens AG, Power
More informationThe Evolution of System Safety in the Canadian Nuclear Industry
Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire The Evolution of System Safety in the Canadian Nuclear Industry System Safety Society, Eastern Canada Chapter, June 18, 2009
More informationGerman contribution on the safety assessment of research reactors
German contribution on the safety assessment of research reactors S. Langenbuch J. Rodríguez Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) mh. Schwertnergasse 1, D-50667 Köln, Federal Republic
More informationOKBM AFRIKANTOV SMALL MODULAR REACTORS ENGINEERING SOLUTIONS FOR SAFETY PROVISION
OECD/NEA Workshop on Innovations in Water-cooled Reactor Technologies OKBM AFRIKANTOV SMALL MODULAR REACTORS ENGINEERING SOLUTIONS FOR SAFETY PROVISION Alexander M. Bakhmetyev, Igor A. Bylov,Andrey N.
More informationIntroduction to Level 2 PSA
Introduction to Level 2 PSA Dr Charles Shepherd Chief Consultant, Corporate Risk Associates CRA PSA/HFA FORUM 13-14 September 2012, Bristol Accident sequences modelled by the PSA INITIATING EVENTS SAFETY
More informationControlled management of a severe accident
July 2015 Considerations concerning the strategy of corium retention in the reactor vessel Foreword Third-generation nuclear reactors are characterised by consideration during design of core meltdown accidents.
More informationSUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD
МИНИСТЕРСТВО ЭНЕРГЕТИКИ И УГОЛЬНОЙ ПРОМЫШЛЕННОСТИ УКРАИНЫ НАЦИОНАЛЬНАЯ АТОМНАЯ ЭНЕРГОГЕНЕРИРУЮЩАЯ КОМПАНИЯ SUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD D.V. Biley Inspector General
More information2017 Water Reactor Fuel Performance Meeting September 10 (Sun) ~ 14 (Thu), 2017 Ramada Plaza Jeju Jeju Island, Korea
NUCLEAR DESIGN AND SAFETY ANALYSIS OF ACCIDENT TOLERANT FUEL CANDIDATES IN OPR1000 Wang-Kee In 1, Ser-Gi Hong 2, Tae-Wan Kim 3, Tae-Hyun Chun 1, Chang-Hwan Shin 1 1 Korea Atomic Energy Research Institute:
More informationSummary. LOCA incidents: Gas and liquid metal cooled reactors. List of LOCA incidents: 3-4
Summary NTEC Module: Water Reactor Performance and Safety Lecture 13: Severe Accidents II Examples of Severe Accidents G. F. Hewitt Imperial college London List of LOCA incidents: 3-4 Water cooled reactors
More informationLEAD-COOLED FAST-NEUTRON REACTOR BREST. Yu.G. Dragunov, V.V. Lemekhov, A.V. Moiseyev, V.S. Smirnov (NIKIET, Moscow, Russia)
LEAD-COOLED FAST-NEUTRON REACTOR BREST Yu.G. Dragunov, V.V. Lemekhov, A.V. Moiseyev, V.S. Smirnov (NIKIET, Moscow, Russia) Large-scale nuclear power based on fast-neutron reactors operating in a closed
More informationCOLD NEUTRON SOURCE AT CMRR
COLD NEUTRON SOURCE AT CMRR Hu Chunming Shen Wende, Dai Junlong, Liu Xiankun ( 1 ) Vadim Kouzminov, Victor Mityukhlyaev / 2 /, Anatoli Serebrov, Arcady Zakharov ( 3 ) ABSTRACT As an effective means to
More informationEXPERIMENTS ON THE PERFORMANCE SENSITIVITY OF THE PASSIVE RESIDUAL HEAT REMOVAL SYSTEM OF AN ADVANCED INTEGRAL TYPE REACTOR
EXPERIMENTS ON THE PERFORMANCE SENSITIVITY OF THE PASSIVE RESIDUAL HEAT REMOVAL SYSTEM OF AN ADVANCED INTEGRAL TYPE REACTOR HYUN-SIK PARK *, KI-YONG CHOI, SEOK CHO, SUNG-JAE YI, CHOON-KYUNG PARK and MOON-KI
More informationThe ESBWR an advanced Passive LWR
1 IAEA PC-Based Simulators Workshop Politecnico di Milano, 3-14 October 2011 The ES an advanced Passive LWR Prof. George Yadigaroglu, em. ETH-Zurich and ASCOMP yadi@ethz.ch 2 Removal of decay heat from
More informationNUCLEAR POWER NEW NUCLEAR POWER PLANTS IN 2012
NUCLEAR POWER NEW NUCLEAR POWER PLANTS IN 2012 AP1000 IN FEBRUARY 2012, THE FIRST NUCLEAR POWER PLANTS IN THE US IN 35 YEARS WERE LICENSCED TO BEGIN CONSTRUCTION. TWO WESTINGHOUSE AP1000 NUCEAR REACTOR
More informationCNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements
CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements Sorin Holostencu IAEA Technical Meeting on Operational Experience with Implementation of Post-Fukushima Actions in Nuclear Power Plants,
More informationPreparedness at PFBR Kalpakkam to meet the challenges due to Natural events Prabhat Kumar, Project Director, PFBR, Director construction BHAVINI
BHARATIYA NABHIKIYA VIDYUT NIGAM LIMITED (A Government of India Enterprise) Preparedness at PFBR Kalpakkam to meet the challenges due to Natural events Prabhat Kumar, Project Director, PFBR, Director construction
More informationASTEC Model Development for the Severe Accident Progression in a Generic AP1000-Like
ASTEC Model Development for the Severe Accident Progression in a Generic AP1000-Like Lucas Albright a,b, Dr. Polina Wilhelm b, Dr. Tatjana Jevremovic a,c a Nuclear Engineering Program b Helmholtz-ZentrumDresden-Rossendorf
More informationA Research Reactor Simulator for Operators Training and Teaching. Abstract
Organized and hosted by the Canadian Nuclear Society. Vancouver, BC, Canada. 2006 September 10-14 A Research Reactor Simulator for Operators Training and Teaching Ricardo Pinto de Carvalho and José Rubens
More informationNUCLEAR SMALL MODULAR REACTOR
NUCLEAR SMALL MODULAR REACTOR DESCRIPTION A Small Modular Reactors (SMR) is a nuclear power plant that is smaller in size (300 MW or less) than current generation base load plants (1,000 MW or higher).
More informationEPR: Steam Generator Tube Rupture analysis in Finland and in France
EPR: Steam Generator Tube Rupture analysis in Finland and in France S. ISRAEL Institut de Radioprotection et de Sureté Nucléaire BP 17 92262 Fontenay-aux-Roses Cedex, France Abstract: Different requirements
More informationHigh Temperature Gas-Cooled Reactors Now More Than Ever!
High Temperature Gas-Cooled Reactors Now More Than Ever! Dr. Finis SOUTHWORTH Chief Technology Officer AREVA Inc. On behalf of the NGNP Industrial Alliance, LLC Washington DC Section ANS Rockville, MD
More informationCAREM-25: a Low-Risk Nuclear Option. Rivera, S.S. and Barón, J.H.
CAREM-25: a Low-Risk Nuclear Option Rivera, S.S. and Barón, J.H. Presentado en: VI General Congress on Nuclear Energy VII CGEN Minascentro-Bello Horizonte, Brasil, 31 agosto al 3 setiembre 1999 CAREM-25:
More informationNext and Last Generation of Nuclear Power Plants Paul Howarth
Next and Last Generation of Nuclear Power Plants Paul Howarth Exec Director, Dalton Nuclear Institute IMechE Branch Meeting Jan 2009 Order of Service Introduction to status of advanced systems The 3 contending
More informationGT-MHR OVERVIEW. Presented to IEEE Subcommittee on Qualification
GT-MHR OVERVIEW Presented to IEEE Subcommittee on Qualification Arkal Shenoy, Ph.D Director, Modular Helium Reactors General Atomics, San Diego April 2005 Shenoy@gat.com GT-MHR/LWR COMPARISON Item GT-MHR
More informationThis description was taken from the Advances in Small Modular Reactor Technology Developments 2016 Edition booklet.
Status Report LFTR Overview Full name Liquid-Fluoride Thorium Reactor Acronym LFTR Reactor type Molten Salt Reactor Purpose Commercial Coolant Molten fluoride Moderator Graphite Neutron Thermal Spectrum
More informationBulatom Conference June 2017 Ludek Urban & Vit Sousek. ŠKODA JS Casks for SNF & HAW
Bulatom Conference June 2017 Ludek Urban & Vit Sousek ŠKODA JS Casks for SNF & HAW Company profile ŠKODA JS a.s. is more than 60 years a longtime reliable supplier of technologies for nuclear power industry.
More informationDESIGN, SAFETY FEATURES & PROGRESS OF HTR-PM. Yujie DONG INET, Tsinghua University, China January 24, 2018
DESIGN, SAFETY FEATURES & PROGRESS OF HTR-PM Yujie DONG INET, Tsinghua University, China January 24, 2018 Meet the Presenter Dr. Dong is a Professor in Nuclear Engineering at the Tsinghua University, Beijing,
More information