1 SECTION 07 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA)

2 7.0 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER 7.1 GENERAL This section of the document includes the design, manufacture, testing & inspection of 11kV Outdoor Type Single Phase Metal Oxide (ZnO) Gapless Lightning Arrester. 7.2 CLIMATE DATA The equipments to be supplied against this tender shall be suitable for satisfactory use under the following climatic condition: Climate : Tropical, intense sunshine, heavy rain, humid. Maximum Humidity and Temperature sometimes occur simultaneously. Maximum Temperature : 40 0 C Minimum Temperature : 03 0 C Average daily Temperature : 30 0 C Average isokeraunic level : 80 days/ year Relative humidity : % Average annual rain fall : 3454 mm Maximum wind velocity : 200 km/ hour Altitude : Sea level to 300 metres Atmospherical, Mechanical and Chemical impurities : Moderately polluted Equipments as specified will be installed in tropical locations and in a hot humid environment with presence of the insects and vermin. The information is given as a guide for Tenders and no responsibility for its accuracy will be accepted, nor will any claim based on the above be entertained. 7.3 SYSTEM PARTICULARS SL. SYSTEM CHARACTERISTICS VOLTAGE LEVEL NO. 1. Normal System Voltage, KV (Voltage Class) 3. Maximum System Voltage, KV System Frequency, Hz Phase Rotation RST RST RST RST (Anti-Clock wise) 6. Type of System Grounding Solid Solid Solid Solid 7. Rated Fault Level (3-Phase Symmetrical), MVA 3 sec. 8. Basic Installation Level, KV LOW VOLTAGE 415/ 240V CHARACTERISTICS: 9. Normal System Voltage, V (Voltage Class) 415/ Type of System Grounding Solid

3 7.4 STANDARDS Performance, Design & Testing of Outdoor Type Single Phase Metal Oxide (ZnO) Gapless Lightning Arrester shall conform to the latest edition of the IEC / ANSI- C or equivalent international Standards unless otherwise specified herein. 7.5 SPECIFICATIONS 1 Application Distribution Transformer/ Line/ Cable protection of heavy duty class. 2 Type of Arrester Metal Oxide (ZnO), Gapless 3 Construction Single Unit, basically consisting of gapless hermetically sealed in with non-linear characteristics with high energy capacity, all enclosed in porcelain housing. 4 Installation Outdoor 5 Mounting Pole Mounted steel bracket 6 Nominal System Voltage 11 kv 7 Maximum System Voltage 12 kv to 15 kv 8 System Frequency 50 Hz 9 Number of Phase 3 10 Rated Arrester Voltage 10.5 kv (rms) 11 Maximum Continuous Operating Voltage 8.4 kv (rms) 12 Rated Arrester Current 5 KA 13 Power Frequency withstands voltage of 35 kv (Dry) & 30 kv (Wet) Lightning Arrester Housing, Dry & Wet. 14 Impulse Withstand Voltage of Lightning Arrester 75 kv (peak) Housing. 15 Lightning Impulse Residual Voltage (8/20 35 kv (peak) micro-second wave) 16 Steep Current Impulse Residual Voltage at 40 kv (peak) 10KA of 1 micro-second front time. 17 High Current Impulse Withstand Value (4/10 65 KA micro-second) 18 Creepage distance (minimum) 25 mm/ kv 19 Standard Performance, Design & Testing shall be in accordance to IEC-99-4/ ANSI- C or equivalent international Standards unless otherwise specified herein. 7.6 FEATURES & ACCESSORIES - The arresters shall be ZnO type, basically consisting of gap-less hermetically sealed in with non-linear volt-ampere characteristics with high energy capacity. ZnO arrester shall have excellent thermal stability for high energy surges, external pollution & temporary over voltage. - The Line lead & earthing terminal with clamps shall be provided, suitable to accommodate AAC/ ACSR/ Copper Conductor of diameter from 10.0mm to 15 mm.

4 - All ferrous parts exposed to atmosphere shall be Cadmium plated. The arrester shall be suitable for mounting vertically. The housing shall be of high quality porcelain containers of heavy construction sealed against the entry of moisture and oxygen and free from influence of moisture and weather condition. - Each Single pole arrester shall be furnished with a stainless steel rating plate mentioning manufacturer s name, client name, year of manufacturing & model of LA. - Mounting steel bracket and fixing bolts, nut, washer etc. shall be provided with the arrester for steel crossarm. The mounting steel bracket & necessary fittings shall be hot dip galvanized as per BS The Bidder shall indicate the methods need to provide pressure relief or to prevent explosive sheltering of the porcelain housing. No chemical action shall be take place nor shall the arrester material show deterioration as a result of the specified operating duty. No maintenance other than routine inspection shall be required under service conditions. 7.7 INFORMATION REQUIRED The Bidder/ Manufacturer as per tender requirements shall provide all information. Besides these, the following information/ Documents have to be submitted:- (a) Detail dimensional drawing of the offered type LA. (b) Manufacturer's ISO 9001 certificate. (c) Manufacturer's Printed catalogue describing specification, technical data, rated voltage, current, creepage distance, characteristics curve etc. of the offered type LA. 7.8 DOCUMENTATION 1) Type Test Reports (as stated in Clause 7.9) for offered type 11kV Single Phase Lightning Arrester from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per relevant Standards (unless other wise specified). 2) At least 2 (two) pieces of offered type 11kV Single Phase Lightning Arrester as sample along with the tender. The submitted sample should comply the technical requirements of the tender document. It is noted that the submitted sample of the responsive Tenderers will be tested as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at CERS, BPDB or BUET/ CUET/ KUET/ RUET. If the submitted sample failed in test to conform the technical specification, the tender of the Tenderer will be rejected. The cost of test will be borne by the Purchaser. 7.9 TEST REPORTS The following test reports including tests carried out for the offered type 11kV Single Phase Lightning Arrester in accordance with the latest version of IEC /ANSI-C Standard, which are issued by STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory by confirming design to the tender document shall be submitted with the offer:- a) Insulation Withstand tests on the Arrester housing; b) Step Current Impulse Residual Voltage test; c) Lightning Impulse Residual Voltage test; d) Long Duration Current Impulse withstand test; e) High Current Impulse operating duty test; f) Power Frequency voltage versus time curve; g) Partial Discharge test APPROVAL OF DRAWINGS & SPECIFICATIONS

5 The Bidder shall have to submit 3 sets of Design, Drawing, Technical Specification, Features & Accessories, Guaranteed Technical Particulars of offered type Lighting Arrester along with manufacturer's printed catalogue, to the Engineer, Director, Design & Inspection II, BPDB within 15 days from the date of signing the Contract for approval, prior to the manufacturing of the goods TESTS AT MANUFACTURERS WORKS General Functional electrical, material, mechanical and hydraulic tests shall be carried out at manufacturers premises. The extent and method of recording the results shall be agreed by the Purchaser in ample time to enable the tests to be satisfactorily witnessed or to make any changes to the proposed program of tests. Material Tests The supplier shall provide test pieces free of charge as required to enable the quality of the material to be determined at the supplier s expense. Purchaser may at its own discretion and by specific arrangement accept certified particulars of tests carried out in the absence of his authorized representative. Type Test Type tests are required to prove the general design of the offered equipments/ materials. The Tenderer shall submit the type test reports of the offered equipments/ materials from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender. Routine Tests All equipments/ materials shall be subjected to routine tests as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at the manufacturers works and shall include, but not be limited to an operational test TECHNICAL ORIENTATION AND QUALITY TEST WITNESS Witnessing of the manufacturing process and tests of the equipment at manufacturer s premises including transfer of technical know-how shall be required/held as detailed elsewhere in Particular Conditions of Contract (GCC 32.1) of tender document and other than this the following will be as follows: The Purchaser or its representative shall have the right to inspect, examine and test the workmanship and performance of the goods/materials to confirm their conformity to the specification. The Purchaser or its representative shall be entitled at all reasonable time during manufacture or after manufacture to inspect, examine and test of goods/materials at the manufacturers premises, workmanship and performance. The test shall be carried out as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the contract at the manufacturer premises. An inspection team will be formed by Purchaser or its representative immediate after signing of the contract to control the quality and monitoring the manufacturing process (where required). The manufacturer will allow inspection team to inspect the manufacturing process and quality control and progress of the work at any time need by BPDB s inspection team. This team will witness the Factory/Technical orientation & Quality test at the manufacturer's plant. The Manufacturer shall have facilities to carry out all tests at its premises and shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. The inspection team maximum 2 (two) times may inspect (if required) the goods during the manufacturing process or after manufacture of Goods as required and shall also request to supplier for the purchase/ import/ shipping documents of major/key materials of Goods and shall check in accordance with Guaranteed Technical Particulars (GTP) and guarantees of the contract. All expenses for such tests shall be borne by the supplier.

6 The manufacturer shall have all testing facilities at the manufacturer's premises to carry out the tests in accordance with the relevant IEC Standards. If, any test(s) pending due to lack of testing facilities at the manufacturer's premises, then the Inspection team shall select sample of Goods and sent the selected sample to any independent Testing Laboratory of the manufacturer's country to carry out the test(s). All cost of testing of the selected sample(s) including carrying, loading, un-loading etc. will be borne by the supplier. The Supplier shall, after consulting the purchaser, give notice to the Purchaser in writing of the date and the place where the material or equipment will be ready for quality witness testing. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that supplier can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. The supplier/ manufacturer shall submit (if required by inspection team) the testing procedure & list of testing/ measuring equipment, meters etc. used for Factory/Technical orientation & Quality test witness prior to carry out such witness test(s). The supplier/ manufacturer shall submit the valid Calibration Certificate from competent authority of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test and the following documents to inspection team prior to carry out such witness test(s).: I. Updated valid Calibration Certificates of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test. II. The factory test report (Routine test report) of Goods to be supplied under the contract. Failing to submit the above documents, the inspection team may not perform to carry out such witness test(s) and all the liabilities along with delay (if any) will be borne by the Bidder/Manufacturer. It is noted that at the time of Factory/Technical orientation & Quality Test witness BPDB's Inspection team will check the calibration seal/ certificate of the testing/ measuring equipment, meters etc. by the competent authority. If the calibration seal/ certificate of the testing/ measuring equipment, meters etc. are not found and the calibration not done within the due date then BPDB's Inspection team will not witness the test. In that case the Bidder/ Manufacturer shall complete the calibration of the testing/ measuring equipment, meters etc. from the competent authority within a reasonable period without any delay in delivery period. The Factory/Technical orientation & Quality Test witness shall be carried out as per latest version of relevant IEC/BS/ANSI/ASTM/BDS or equivalent international standards as mentioned in the contract at the manufacturer's premises or other places where the required test facilities are available and only routine tests as agreed upon inspection team will be performed. All expenses for such tests shall be borne by the supplier. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that he can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. Where the supplier provides for tests on the premises of the supplier or of any manufacturer of the supplier, except where otherwise specified, shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. These tests shall be performed as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender and only routine tests as agreed upon, will be performed. As and when the purchaser is satisfied that any materials/ equipments shall have passes the tests referred to in this clause, purchaser shall notify the contractor in writing to that effect. Should any inspected/ tested goods fail to conform to the specification, the Purchaser shall have the right to reject any of the items or complete batch if necessary. In that case Supplier has to replace the equipment and to make good of them and the supplier shall conduct similar pre-delivery Inspection and factory tests without any financial involvement to the purchaser. In case any of the Equipment found not conforming to the specification at the time of post landing Inspection, the supplier will in no way be relieved from the responsibility of replacing them on making them good at their own cost, despite the Equipment were found

7 good at the time of Factory Acceptance Test. Nothing in this clause shall in any way release the supplier from any warranty or other obligations under the tender. No goods shall be packed, prepared for shipment/delivery unless it has been approved including factory Test reports and written instructions have been issued by the Purchaser. On successful completion of Pre-shipment inspection/quality test witness, delivery of goods will be made to the designated stores under contractor s/supplier s responsibility until Post-Landing Inspection is successfully completed without any obligation on part of BPDB. Quality and quantity of the delivered goods will be determined at the time of post-landing inspection at the designated stores in presence of the authorized representative of the contractor/supplier. After approval of the satisfactory Post-Landing Inspection, R&I Report will be issued following the contractual obligations. The goods supplied under this Contract shall be fully insured in addition, All risks insurance, including war risks, riots, strikes and/or theft shall be acquired for 110% of the delivered cost of the goods on Warehouse to Warehouse basis until the issuance of the R & I after satisfactory completion of Post-Landing Inspection of the goods supplied. The Tenderer has mentioned the place of Technical Orientation and Quality Test Witness in the following table:- Sl. Period of Technical Orientation Place & Country of Technical Item No. and Quality Test Witness Orientation and Quality Test Witness 7.13 POST-LANDING INSPECTION AND TESTING : The Supplier shall inform the purchaser immediately after arrival of the goods at the designated store of BPDB (as per delivery schedule). An Inspection team of BPDB shall perform the post-landing inspection in presence of supplier's representative. The Supplier shall arrange the program of post-landing inspection. Any defect or damage have been found at post-landing inspection, the defective or damaged materials/ goods to be replaced by the supplier at his own cost within the stipulated time. The purchaser s right to inspect, test (where necessary) and reject the goods after delivery at the designated store of BPDB shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by the purchaser prior to the good's delivery. The Inspection team will check the physical conditions and quantity of the goods delivered. If necessary, the inspection team will select the sample of good(s) and sent the selected sample goods to CERS, BPDB or BUET/ CUET/ KUET /RUET (as selected by the inspection team) to carryout the test(s) as per contract to confirm the conformity to the approved Technical Specifications, Guaranteed Technical Particulars (GTP), drawings and relevant standards. If the tested sample(s) fail to confirm the specifications in tests, the full consignment will be rejected. All cost of testing of Materials/ Goods including carrying, loading, un-loading etc. will be borne by the supplier PACKAGING AND SHIPPING Packing of equipment has been detailed elsewhere in Particular Conditions of Contract of tender document. ----O----

8 SECTION - 8 A) GUARANTEED TECHNICAL PARTICULARS OF 11KV SINGLE PHASE LIGHTNING ARRESTER

9 8.01GUARANTEED TECHNICAL PARTICULARS OF 11KV SINGLE PHASE LIGHTNING ARRESTER (To be filled up by the Manufacturer in Manufacturer Letterhead Pad, otherwise the bid shall be rejected) Sl. No. Description Unit BPDB's Requirement 01 Manufacturer s Name and Country - To be mentioned 02 Manufacturer s model No. - To be mentioned 03 Type of the Arrester & Construction - Metal Oxide (ZnO), Gapless- Outdoor(Single Unit, basically consisting of gapless hermetically sealed in with non-linear characteristics with high energy capacity, all enclosed in porcelain housing.) 04 Rated Arrester Voltage kv Rated Arrester Current KA 5 06 Max. Continuous Operating Voltage kv rms Power Frequency withstand voltage of the Arrester Housing, Dry & Wet kv rms 35 (Dry) & 30 (Wet) 08 Impulse withstand Voltage of the Arrester Housing. kv (peak) Lightning Impulse Residual Voltage (8/20 microsecond kv (peak) 35 wave) 10 Steep Current Impulse Residual Voltage at 10 KA kv (peak) 40 of 1 micro second front time. 11 High Current Impulse Withstand Value (4/10 micro KA 65 second) 12 Temporary Over voltage capability: a) 0.1 Second kv (peak) To be mentioned b) 1.0 Second kv (peak) To be mentioned c) 10 Second kv (peak) To be mentioned d) 100 Second kv (peak) To be mentioned 13 Leakage Current at rated voltage ma < 1 ma 14 Total Creepage distance (minimum) mm/ kv Overall dimension : a) Height mm To be mentioned b) Diameter mm To be mentioned 16 Total weight of Arrester Kg. To be mentioned 17 Outline dimensional drawing of offered LA and mounting Bracket. 18 Printed catalogue describing specification, technical data of LA - To be Submitted - To be Submitted 19. Manufacturer's ISO 9001 certificate. - To be Submitted 20. Standard - IEC / ANSI- C Manufacturer's Guaranteed Particulars Seal & Signature of the Manufacturer Seal & Signature of the Bidder

10 8.02 SCHEDULE OF MANUFACTURERS NAME AND PLACES OF MANUFACTURE & TESTING Item No Description Manufacture's name Place of Manufacture 01 11KV Single Phase Lightning Arrester Place of Testing & Inspection Seal and Signature of the Bidder

11 SECTION 9 DRAWINGS

12 SECTION 07 B) TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT (DOFC) WITH FUSE LINK

13 7.1 GENERAL 7.0 TECHNICAL SPECIFICATION OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT WITH FUSE LINK This section of the document includes the design, manufacture, testing & inspection of 11KV Outdoor Drop Out Fuse Cut-out (DOFC) with Fuse Link. 7.2 CLIMATE DATA The equipments to be supplied against this tender shall be suitable for satisfactory use under the following climatic condition: Climate : Tropical, intense sunshine, heavy rain, humid. Maximum Humidity and Temperature sometimes occur simultaneously. Maximum Temperature : 40 0 C Minimum Temperature : 03 0 C Average daily Temperature : 30 0 C Average isokeraunic level : 80 days/ year Relative humidity : % Average annual rain fall : 3454 mm Maximum wind velocity : 200 km/ hour Altitude : Sea level to 300 metres Atmospherical, Mechanical and Chemical impurities : Moderately polluted Equipments as specified will be installed in tropical locations and in a hot humid environment with presence of the insects and vermin. The information is given as a guide for Tenders and no responsibility for its accuracy will be accepted, nor will any claim based on the above be entertained. 7.3 SYSTEM PARTICULARS SL. SYSTEM CHARACTERISTICS VOLTAGE LEVEL NO. 1. Normal System Voltage, KV (Voltage Class) 3. Maximum System Voltage, KV System Frequency, Hz Phase Rotation RST RST RST RST (Anti-Clock wise) 6. Type of System Grounding Solid Solid Solid Solid 7. Rated Fault Level (3-Phase Symmetrical), MVA 3 sec. 8. Basic Installation Level, KV LOW VOLTAGE 415/ 240V CHARACTERISTICS: 9. Normal System Voltage, V (Voltage Class) 415/ Type of System Grounding Solid

14 7.4 STANDARDS Performance, Design & Testing of Outdoor Drop Out Fuse Cut-out (DOFC) and Fuse Link shall conform to the latest edition of the IEC 282-2/ BS 729/ ANSI-C 37.40, & and NEMA Standard or equivalent international Standards unless otherwise specified herein. 7.5 SPECIFICATIONS 1 Installation Outdoor mounted on cross-arm angle/ channel structure. 2 Application Protection of 11/0.415KV, 250/200/100KVA Distribution Transformer. 3 Type Open drop out expulsion. 4 Nominal rated voltage (3 phase) 11 kv 5 Maximum System voltage (3 phase) 12 kv 6 Frequency 50 Hz. 7 Continuous Current Rating 100 A 8 Basic Insulation Level (Impulse Voltage) 75kV (To earth and between poles) 9 Power Frequency withstand Voltage, Dry & Wet 35kV (To earth and between poles) 10 Creepage Distance 25mm/kV (Minimum) 11 Fuse holder type Heavy duty, sealed cap with eye at upper end of the fuse holder. 12 Fuse link continuous ratings 16 amps for 100KVA Transformer 25 amps for 200KVA Transformer 40 amps for 250KVA Transformer 13 Fuse link type K-type as per NEMA standard, medium melting high surge. 14 Rated interrupting capacity, 8 KA (RMS) 15 Standard Design, manufacture, testing and performance shall be in accordance with the latest revision of relevant IEC 282-2/ BS 729/ ANSI-C 37.40, & and NEMA Standard. 7.6 FEATURES & ACCESSORIES (a) DOFC shall be with Guide. (b) Each cut-out shall be completed including fuse holder and fuse link. (c) The design shall provide reasonable protection against earthing by animals or birds. (d) The terminal shall be Tin-plated and shall be suitable to accommodate for ACSR Merlin/ Grosbeak/ Hawk or suitable conductor as required. (e) All moveable current-carrying contacts shall be silver plated. (f) Bracket shall be provided for steel cross-arm mounting with nuts bolts etc. (g) All hardware shall be non-ferrous metal or if ferrous should be hot dip galvanized after fabrication in accordance to latest revision of relevant IEC 282-2/ BS 729/ ANSI-C 37.40, & and NEMA Standard. (h) Fused cut-out units to latest revision of relevant IEC 282-2/ ANSI-C 37.40, & Standard are required to protect and provide insulator for distribution transformer. The unit shall be supplied complete with galvanized steel brackets bolt nuts and washers for mounting. They shall be provided with a latch

15 mechanism, which will open the fuse element when the fuse has operated. The latch mechanism shall be constructed as to operate easily from the ground with the aid of an operating stick. (i) Insulators shall be of the post type made of porcelain to withstand a mechanical force of 1600N. Current carrying equipment shall be made of copper or copper alloy. The nominal rating of the unit shall be 100A. In addition the units shall be capable of being opened under normal transformer magnetizing currents of transformers up to 250KVA to permit transformer isolation. (j) Termination shall be suitable for connection of compression terminal lugs. (k) The fuse element shall be totally enclosed by a fuse holder to protect it from the atmosphere specified electrical characteristics of the fuse units shall be to latest revision of relevant IEC standard. (l) Fuse links for the fuse cut-out units shall be of the disconnecting type suitable for opening closing and removal by an operating stick. (m) Each fuse link shall be suitable for a common fuse base. (n) Each DOFC shall be furnished with a stainless steel rating plate mentioning manufacturer s name, client name, year of manufacturing, Contract No & model no. in English. 7.7 INFORMATION REQUIRED The Bidder/ Manufacturer as per tender requirements shall provide all information. Besides these, the following information/ Documents have to be submitted: (a) Detail Outline and General Arrangement drawings. (b) Manufacturer s printed catalogue describing specification and technical data of the offered type DOFC and Fuse Link (c) Maximum clearing time and minimum melting time curve characteristics for Fuse Link. (d) Manufacturer's ISO 9001 certificate. 7.8 DOCUMENTATION 1) Type Test Reports (as stated in Clause 7.9) for offered type DOFC & Fuse Link from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per relevant Standards (unless otherwise specified). 2) Bidder shall submit at least 2 (two) pieces of offered type DOFC and 3 (three) pieces of each type of offered Fuse Links as samples along with the bid. The submitted sample(s) should comply the technical requirements of the tender document. It is noted that the submitted sample(s) of the responsive Tenderer s will be tested as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at CERS, BPDB or BUET/ CUET/ KUET/ RUET. If the submitted sample failed in test to conform the technical specification, the tender of the Tenderer will be rejected. The cost of test will be borne by the Purchaser. 7.9 TYPE TESTS REPORT The following Type Test report for offered type DOFC & Fuse Link from by STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per latest revision of relevant IEC/ BS/ ANSI and NEMA Standard of design confirming to the tender document shall submit with the offer. a) Impulse voltage withstand tests. b) Power frequency withstand tests. c) Temperature rise tests. d) Time/ Current Characteristics tests APPROVAL OF DRAWINGS & SPECIFICATIONS The Bidder shall have to submit 3 sets of Design, Drawing, Technical Specification, Features & Accessories, Guaranteed Technical Particulars of offered type Lighting Arrester along with manufacturer's printed

16 catalogue, to the Engineer, Director, Design & Inspection II, BPDB within 15 days from the date of signing the Contract for approval, prior to the manufacturing of the goods TESTS AT MANUFACTURERS WORKS General Functional electrical, material, mechanical and hydraulic tests shall be carried out at manufacturers premises. The extent and method of recording the results shall be agreed by the Purchaser in ample time to enable the tests to be satisfactorily witnessed or to make any changes to the proposed program of tests. Material Tests The supplier shall provide test pieces free of charge as required to enable the quality of the material to be determined at the supplier s expense. Purchaser may at its own discretion and by specific arrangement accept certified particulars of tests carried out in the absence of his authorized representative. Type Test Type tests are required to prove the general design of the offered equipments/ materials. The Tenderer shall submit the type test reports of the offered equipments/ materials from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender. Routine Tests All equipments/ materials shall be subjected to routine tests as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at the manufacturers works and shall include, but not be limited to an operational test TECHNICAL ORIENTATION AND QUALITY TEST WITNESS Witnessing of the manufacturing process and tests of the equipment at manufacturer s premises including transfer of technical know-how shall be required/held as detailed elsewhere in Particular Conditions of Contract (GCC 32.1) of tender document and other than this the following will be as follows: The Purchaser or its representative shall have the right to inspect, examine and test the workmanship and performance of the goods/materials to confirm their conformity to the specification. The Purchaser or its representative shall be entitled at all reasonable time during manufacture or after manufacture to inspect, examine and test of goods/materials at the manufacturers premises, workmanship and performance. The test shall be carried out as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the contract at the manufacturer premises. An inspection team will be formed by Purchaser or its representative immediate after signing of the contract to control the quality and monitoring the manufacturing process (where required). The manufacturer will allow inspection team to inspect the manufacturing process and quality control and progress of the work at any time need by BPDB s inspection team. This team will witness the Factory/Technical orientation & Quality test at the manufacturer's plant. The Manufacturer shall have facilities to carry out all tests at its premises and shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. The inspection team maximum 2 (two) times may inspect (if required) the goods during the manufacturing process or after manufacture of Goods as required and shall also request to supplier for the purchase/ import/ shipping documents of major/key materials of Goods and shall check in accordance with Guaranteed Technical Particulars (GTP) and guarantees of the contract. All expenses for such tests shall be borne by the supplier.

17 The manufacturer shall have all testing facilities at the manufacturer's premises to carry out the tests in accordance with the relevant IEC Standards. If, any test(s) pending due to lack of testing facilities at the manufacturer's premises, then the Inspection team shall select sample of Goods and sent the selected sample to any independent Testing Laboratory of the manufacturer's country to carry out the test(s). All cost of testing of the selected sample(s) including carrying, loading, un-loading etc. will be borne by the supplier. The Supplier shall, after consulting the purchaser, give notice to the Purchaser in writing of the date and the place where the material or equipment will be ready for quality witness testing. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that supplier can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. The supplier/ manufacturer shall submit (if required by inspection team) the testing procedure & list of testing/ measuring equipment, meters etc. used for Factory/Technical orientation & Quality test witness prior to carry out such witness test(s). The supplier/ manufacturer shall submit the valid Calibration Certificate from competent authority of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test and the following documents to inspection team prior to carry out such witness test(s).: I. Updated valid Calibration Certificates of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test. II. The factory test report (Routine test report) of Goods to be supplied under the contract. Failing to submit the above documents, the inspection team may not perform to carry out such witness test(s) and all the liabilities along with delay (if any) will be borne by the Bidder/Manufacturer. It is noted that at the time of Factory/Technical orientation & Quality Test witness BPDB's Inspection team will check the calibration seal/ certificate of the testing/ measuring equipment, meters etc. by the competent authority. If the calibration seal/ certificate of the testing/ measuring equipment, meters etc. are not found and the calibration not done within the due date then BPDB's Inspection team will not witness the test. In that case the Bidder/ Manufacturer shall complete the calibration of the testing/ measuring equipment, meters etc. from the competent authority within a reasonable period without any delay in delivery period. The Factory/Technical orientation & Quality Test witness shall be carried out as per latest version of relevant IEC/BS/ANSI/ASTM/BDS or equivalent international standards as mentioned in the contract at the manufacturer's premises or other places where the required test facilities are available and only routine tests as agreed upon inspection team will be performed. All expenses for such tests shall be borne by the supplier. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that he can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. Where the supplier provides for tests on the premises of the supplier or of any manufacturer of the supplier, except where otherwise specified, shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. These tests shall be performed as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender and only routine tests as agreed upon, will be performed. As and when the purchaser is satisfied that any materials/ equipments shall have passes the tests referred to in this clause, purchaser shall notify the contractor in writing to that effect. Should any inspected/ tested goods fail to conform to the specification, the Purchaser shall have the right to reject any of the items or complete batch if necessary. In that case Supplier has to replace the equipment and to make good of them and the supplier shall conduct similar pre-delivery Inspection and factory tests without any financial involvement to the purchaser. In case any of the Equipment found not conforming to the specification at the time of post landing Inspection, the supplier will in no way be relieved from the responsibility of replacing them on making them good at their own cost, despite the Equipment were found

18 good at the time of Factory Acceptance Test. Nothing in this clause shall in any way release the supplier from any warranty or other obligations under the tender. No goods shall be packed, prepared for shipment/delivery unless it has been approved including factory Test reports and written instructions have been issued by the Purchaser. On successful completion of Pre-shipment inspection/quality test witness, delivery of goods will be made to the designated stores under contractor s/supplier s responsibility until Post-Landing Inspection is successfully completed without any obligation on part of BPDB. Quality and quantity of the delivered goods will be determined at the time of post-landing inspection at the designated stores in presence of the authorized representative of the contractor/supplier. After approval of the satisfactory Post-Landing Inspection, R&I Report will be issued following the contractual obligations. The goods supplied under this Contract shall be fully insured in addition, All risks insurance, including war risks, riots, strikes and/or theft shall be acquired for 110% of the delivered cost of the goods on Warehouse to Warehouse basis until the issuance of the R & I after satisfactory completion of Post-Landing Inspection of the goods supplied. The Tenderer has mentioned the place of Technical Orientation and Quality Test Witness in the following table:- Sl. Period of Technical Orientation Place & Country of Technical Item No. and Quality Test Witness Orientation and Quality Test Witness 7.13 POST-LANDING INSPECTION AND TESTING : The Supplier shall inform the purchaser immediately after arrival of the goods at the designated store of BPDB (as per delivery schedule). An Inspection team of BPDB shall perform the post-landing inspection in presence of supplier's representative. The Supplier shall arrange the program of post-landing inspection. Any defect or damage have been found at post-landing inspection, the defective or damaged materials/ goods to be replaced by the supplier at his own cost within the stipulated time. The purchaser s right to inspect, test (where necessary) and reject the goods after delivery at the designated store of BPDB shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by the purchaser prior to the good's delivery. The Inspection team will check the physical conditions and quantity of the goods delivered. If necessary, the inspection team will select the sample of good(s) and sent the selected sample goods to CERS, BPDB or BUET/ CUET/ KUET /RUET (as selected by the inspection team) to carryout the test(s) as per tender to confirm the conformity to the approved Technical Specifications, Guaranteed Technical Particulars (GTP), drawings and relevant standards. If the tested sample(s) fail to confirm the specifications in tests, the full consignment will be rejected. All cost of testing of Materials/ Goods including carrying, loading, un-loading etc. will be borne by the supplier

19 SECTION - 8 B) GUARANTEED TECHNICAL PARTICULARS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT WITH FUSE LINK

20 8.01 GUARANTEED TECHNICAL PARTICULARS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT AND FUSE LINK (To be filled up by the Manufacturer in Manufacturer Letterhead Pad, otherwise the bid shall be rejected.) KV OUTDOOR DOFC Sl. No. Description Unit BPDB's Requirement 1. Manufacturer s Name and Country - To be mentioned 2. Manufacturer s Model no. - To be mentioned 3. Frequency Hz System Nominal Voltage kv System Maximum Voltage kv Continuous current rating of cut-out. A Basic Insulation Level (BIL) (To earth and between Poles) kv Creepage Distance mm 25mm/kV 9. Power Frequency withstands Voltage, Dry & Wet (To earth and between Poles) kv Fuse Type A Fuse Link 11. Installation - Outdoor 12. Operating Mechanism - Manual 13. Mounting Position - Vertical 14. Type of contact - Silver plated 15. Maximum Switching Voltage kv To be mentioned 16. Insulator material strength KN Safety clearance between the terminals mm To be mentioned 18. Dimensions (L x W x H) mm To be mentioned 19. Total weight of unit Kg To be mentioned 20. Outline and General arrangement drawings. - To be submitted 21. Manufacturer's ISO 9001 certificate. - To be submitted 22. Printed Catalogue describing specification and technical data 23. Standard (IEC 282-2/ BS 729/ ANSI-C 37.40, & and NEMA Standard) - To be submitted - To be mentioned Manufacturer's Guaranteed Particulars Manufacturer s Seal & Signature Bidder Seal & Signature

21 8.02 GUARANTEED TECHNICAL PARTICULARS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT AND FUSE LINK (To be filled up by the Manufacturer in Manufacturer Letterhead Pad, otherwise the bid shall be rejected.) KV FUSE LINK Sl. No. Description Unit BPDB's Requirement 1 Manufacturer s Name & Country - To be mentioned Manufacturer's Guaranteed Particulars 2 Manufacturer s Model no. - To be mentioned 3 Type - K-Type (NEMA Standard) 4 Rated Voltage kv 11 5 Frequency Hz Rated Current Amps. a) 16 amps b) 25 amps b) 40 amps 7 Rated interrupting capacity KA (rms) 8 8 Time/ Current Characteristics - To be furnished 9 Material of fuse Link - To be mentioned 10 Material of fuse cartridge - To be mentioned 11. Standard (IEC 282-2/ BS 729/ ANSI-C 37.40, & and NEMA Standard) - To be mentioned Manufacturer s Seal & Signature Bidder's Seal & Signature

22 8.3 SCHEDULE OF MANUFACTURERS NAME AND PLACES OF MANUFACTURE & TESTING Item No Description Manufacture's name Place of Manufacture 01 11kV Outdoor Drop Out Fuse Cut-out and Fuse Link Place of Testing & Inspection Seal and Signature of the Bidder

23 SECTION 9 DRAWINGS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 66 kv LIGHTNING ARRESTORS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 66 kv LIGHTNING ARRESTORS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 66 kv LIGHTNING ARRESTORS GETCO/ENGG/TECH SPECI.- 66 KV LA/R4/Jan11 Sign

More information

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132/220/400 KV SUB-STATION

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132/220/400 KV SUB-STATION GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132/220/400 KV SUB-STATION GETCO/E/TS-C&C

More information

Technical Specification for LV ABC Fuse Switch Disconnectors

Technical Specification for LV ABC Fuse Switch Disconnectors Ergon Energy Corporation Limited Technical Specification for LV ABC Fuse ETS-06-02-02 Check this is the latest Process Zone version before use. Specification ETS 06-02-02 Ver 3 Contents 1. Purpose and

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA TECHNICAL SPECIFICATIONS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA TECHNICAL SPECIFICATIONS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 400 kv, 220 kv & 132 kv LIGHTNING ARRESTORS (SURGE ARRESTORS) GETCO/ENGG/TECH

More information

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132 KV SUB-STATION

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132 KV SUB-STATION GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132 KV SUB-STATION GETCO/E/TS C&C057/R0 DT.

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 400/220 KV SUB-STATION

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 400/220 KV SUB-STATION GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 400/220 KV SUB-STATION GETCO/E/TS C&C057/R0 DT.

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

SEAL & SIGNATURE OF THE TENDERER

SEAL & SIGNATURE OF THE TENDERER MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. SCHEDULE - `A' TECHNICAL SPECIFICATION FOR 11 kv & 22 kv A.B. SWITCH. SPECIFICATION NO:RE/II/A.B.SWITCH/2005 INDEX -----------------------------------------------------------------------------------------------------------------------

More information

SPECIFICATION: LINE TAPS FOR ALUMINIUM/ACSR AND COPPER CONDUCTORS

SPECIFICATION: LINE TAPS FOR ALUMINIUM/ACSR AND COPPER CONDUCTORS Page no. :1 of 11 SPECIFICATION: LINE TAPS FOR ALUMINIUM/ACSR AND COPPER CONDUCTORS Prepared by: Eng. T. Lev (-חתום-) Checked by: I. Bester (-חתום (- Approved by: Eng. Y. Samoocha (-חתום (- 1 Page no.

More information

Notes Changed note Date. 1 (A) Changed template 09 / 07 / 2008

Notes Changed note Date. 1 (A) Changed template 09 / 07 / 2008 Revisions Notes Changed note Date 1 (A) Changed template 09 / 07 / 2008 2 Changed template. Clause 12.5.4.1 hot-rolled steel added. Clause 12.5.4.2, 12.5.2.4, 12.5.3.4, 12.5.4.4, 12.5.5.4, 12.5.6.4, 12.5.7.4

More information

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0 REVISION NO. 0 NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0 PAGE NO. 1 OF 24 DATE OF ISSUE (MONTH/YEAR) TOTAL NO. OF PAGES (Including cover

More information

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEB SPECIFICATION 005-1: 2012 P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 0953 Fax: +94 11 232 3935 CONTENTS PAGE 1. Scope 03

More information

P.V.C. INSULATED UNARMOURED COPPER CABLES

P.V.C. INSULATED UNARMOURED COPPER CABLES 083 : 2007 CEB SPECIFICATION P.V.C. INSULATED UNARMOURED COPPER CABLES CEYLON ELECTRICITY BOARD SRI LANKA Specification for P.V.C. INSULATED UNARMOURED COPPER CABLES CEB Specification 083 : 2007 CEYLON

More information

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: -

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: - SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: - 1. SCOPE: - This specification covers 11KV Disc Type & 11KV/ 22KV Pin Type Insulators for 11/22KV H.T. over head power lines. 2. APPLICABLE

More information

SPECIFICATION FOR ALL ALUMINIUM ALLOY STRANDED CONDUCTOR

SPECIFICATION FOR ALL ALUMINIUM ALLOY STRANDED CONDUCTOR 003: 2008 CEB SPECIFICATION SPECIFICATION FOR ALL ALUMINIUM ALLOY STRANDED CONDUCTOR CEYLON ELECTRICITY BOARD SRI LANKA Specification for Specification For All Aluminium Alloy Stranded Conductor CEB Specification

More information

THE KENYA POWER AND LIGHTING CO. LTD

THE KENYA POWER AND LIGHTING CO. LTD THE KENYA POWER AND LIGHTING CO. LTD SPECIFICATION for SINGLE PHASE STATIC METERS FOR ACTIVE ENERGY Compiled by NAME DESIGNATION SIGNATURE DATE Ephantus Nyagah Ag. Senior Engineer Checked by Approved by

More information

Technical Specification for Live Line Tap Connectors

Technical Specification for Live Line Tap Connectors Ergon Energy Corporation Limited Technical Specification for Live Line Tap ETS-06-01-01 Check this is the latest Process Zone version before use. Specification ETS 06-01-01 Ver 1 Contents 1. Purpose and

More information

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 70mm 2 FLEXIBLE TINNED COPPER CONDUCTOR 3.3kV EPR INSULATED WITHOUT METALLIC SCREEN

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 70mm 2 FLEXIBLE TINNED COPPER CONDUCTOR 3.3kV EPR INSULATED WITHOUT METALLIC SCREEN Engineering Specification Electrical Networks MESP 030000-04 TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 70mm 2 FLEXIBLE TINNED COPPER CONDUCTOR 3.3kV EPR INSULATED WITHOUT METALLIC SCREEN Version: 1 Issued:

More information

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED WITH METALLIC SCREEN

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED WITH METALLIC SCREEN Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED Version: 1 Issued: March 2014 Owner: Electrical Networks Asset

More information

An Insight into Design, Development & Testing of Insulation Piercing Connectors for LV Application

An Insight into Design, Development & Testing of Insulation Piercing Connectors for LV Application An Insight into Design, Development & Testing of Insulation Piercing Connectors for LV Application Introduction Designed for Indoor and outdoor applications Non-tension tap and splice applications Used

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

General Requirements. Technical Specifications for Insulators of Transmission Lines

General Requirements. Technical Specifications for Insulators of Transmission Lines Islamic Republic of Iran Vice Presidency for Strategic Planning and Supervision General Technical Specification and Execution Procedures for Transmission and Subtransmission Networks Insulators of Transmission

More information

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2013) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION MEDIUM VOLTAGE TRANSFORMERS

SECTION MEDIUM VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION OF ELECTRICAL MATERIALS DEVKON KIT AND HAND GLOVES GROUP F Tender Notice No. NESCO Utility / O&M Materials/58 / 8267, dtd.17.7.15 1 Group-F Sl no. Material Description Unit Quantity

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES Sub-System Completion Certificate: Scope: In the case of new installations or modifications to existing installations, where part of the installation traverses hazardous areas, this Sub-system Completion

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC. PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS SPEC.NO. MSEDCL/ DIST:MSC-III/SPRING LOADED CONNECTOR BOX/05/10/R0/ 200510 TECHNICAL SPECIFICATIONS FOR TAMPER PROOF SERVICE CONNECTION BOX FOR L.T. LINES / CONSUMER MAINS (20.05.2010) Page 1 of 14 Clause

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

SECTION HIGH EFFICIENCY DISTRIBUTION TRANSFORMERS

SECTION HIGH EFFICIENCY DISTRIBUTION TRANSFORMERS SECTION 26 22 13 HIGH EFFICIENCY DISTRIBUTION TRANSFORMERS PART 1 GENERAL 1.1 WORK INCLUDED A. Dry-type, low-voltage, distribution transformers meeting US Department of Energy proposed Candidate Standard

More information

SUPPLY AND DELIVERY OF 200KVA EARTHING TRANSFORMER TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. PLS PART I TENDER PROCEDURES

SUPPLY AND DELIVERY OF 200KVA EARTHING TRANSFORMER TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. PLS PART I TENDER PROCEDURES SUPPLY AND DELIVERY OF 200KVA EARTHING TRANSFORMER TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. PLS-160091 PART I TENDER PROCEDURES SECTION 1 INTRODUCTION This Introduction should be read in conjunction with

More information

Technical Specifications and General Guidelines for Mass Flow Meters at Petroleum Oil Installations. Note:

Technical Specifications and General Guidelines for Mass Flow Meters at Petroleum Oil Installations. Note: Technical Specifications and General Guidelines for Mass Flow Meters at Petroleum Oil Installations Note: These are general specifications and guidelines for Mass Flow Meters for Petroleum Oil Installations.

More information

Monolithic Isolation Fittings

Monolithic Isolation Fittings Monolithic Isolation Fittings The Industry s Dual O Ring Seal Standard Tests Include: 100% Hydrostatic Pressure & Electrical Tests 100% Ultrasonic of Welds 100% Magnetic Particle of Welds 100% Dye Penetrant

More information

NPS/002/020 Technical Specification for 11 & 20kV Power Cables

NPS/002/020 Technical Specification for 11 & 20kV Power Cables Version:- 3.1 of Issue:- Nov - 09 Page 1 of 11 NPS/002/020 Technical Specification for 11 & 20kV Power Cables 1. Purpose The purpose of this document is to detail Northern Powergrid (the Company) requirements

More information

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-BIPV-SM-P125-36

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-BIPV-SM-P125-36 Solar Innova uses the latest materials to manufacture photovoltaic modules. Our modules are ideal for any application that uses the photoelectric effect as a clean energy source because of its minimal

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

Wash Down Duty Non-Contact Sensor

Wash Down Duty Non-Contact Sensor Wash Down Duty Non-Contact Sensor Instruction Manual Models WDDC1-020/040/060/080/100 WDDC2-020/040/060/080/100 WDDV1-020/040/060/080/100 WDDV2-020/040/060/080/100 Table of Contents 1. General Description.....................................

More information

TESTING PTE EARTHING

TESTING PTE EARTHING 1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole

More information

City of Ottawa Street Lighting. Streetlight Brackets and Adapters

City of Ottawa Street Lighting. Streetlight Brackets and Adapters TITLE: Engineering Specification RECOMMENDED: S. Edey, NO: 1 REV: APPROVED: D. O Keefe LBS0001 OF REV. DATE: 2010-01-07 6 5 City of Ottawa Street Lighting Streetlight Brackets and Adapters For City of

More information

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained. DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO IS/IEC:2003 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS 1.0 MANUFACTURER'S RESPONSIBILITIES: The manufacturer's responsibilities include, but are not limited to: 1.1 Control of UL Mark - Restrict

More information

TECHNICAL SPECIFICATION FOR CONDUCTORS

TECHNICAL SPECIFICATION FOR CONDUCTORS TECHNICAL SPECIFICATION FOR CONDUCTORS SEAL & SIGNATURE OF THE TENDERER PAGE 1 OF 9 TECHNICAL SPECIFICATION FOR CONDUCTORS SPECIFYING TECHNICAL PARAMETERS OF THE CONDUCTOR SPECIFICATION NO. RE/ II/ ACSR

More information

SUGGESTED SPECIFICATIONS Pump Frames through 64132

SUGGESTED SPECIFICATIONS Pump Frames through 64132 TYPE HBB - HORIZONTAL SOLIDS-HANDLING WASTEWATER PUMPS Pump Frames 44081 through 64132 GENERAL Furnish and install Horizontal Flexible Coupled Dry Pit Pumping Units complete with all accessories and appurtenances

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P156-60

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P156-60 Solar Innova uses the latest materials to manufacture photovoltaic modules. Our modules are ideal for any application that uses the photoelectric effect as a clean energy source because of its minimal

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

Energy Division Insulators

Energy Division  Insulators Energy Division http://energy.tycoelectronics.com Insulators R Insulators Tyco Electronics Energy Division covers a wide range of polymeric, hybrid and porcelain insulators. For decades all these products

More information

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SINGLE PHASE a.c. INDUCTION MOTORS FOR GENERAL PURPOSE ACCORDING TO IS 996:2009 (Including Amendment No.1) 1. LABORATORY A laboratory shall be maintained

More information

DETAIL SPECIFICATION. MICROPHONE, CARBON (MICROPHONE M-29( )/U and M-52( )/U) INACTIVE FOR NEW DESIGN AS OF 30 MARCH 1999

DETAIL SPECIFICATION. MICROPHONE, CARBON (MICROPHONE M-29( )/U and M-52( )/U) INACTIVE FOR NEW DESIGN AS OF 30 MARCH 1999 INCH-POUND MIL-DTL-11193E 20 August 2009 SUPERSEDING MIL-M-11193D(SigC) 31 July 1960 DETAIL SPECIFICATION MICROPHONE, CARBON (MICROPHONE M-29( )/U and M-52( )/U) INACTIVE FOR NEW DESIGN AS OF 30 MARCH

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design. Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment

More information

Specification for 11 KV outdoor GOD Air Break Isolator along with earth switch,post insulators, CT, PT and the Double pole Structure.

Specification for 11 KV outdoor GOD Air Break Isolator along with earth switch,post insulators, CT, PT and the Double pole Structure. Page 1 of Specification for 11 KV outdoor GOD Air Break Isolator along with earth switch,post insulators, CT, PT and the Double pole Structure. Hindustan Petroleum Corporation Ltd 8 S.V. Marg, Ballard

More information

Technical Specification for Aluminium Castings, Pole Caps and Pressed Symbols

Technical Specification for Aluminium Castings, Pole Caps and Pressed Symbols Ergon Energy Corporation Limited Technical Specification for Aluminium Castings, Pole Caps and Pressed Symbols ETS-01-05-01 Check this is the latest Process Zone version before use. Specification ETS 01-05-01

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE

More information

Not Applicable DD/MM/YY Completed Forms to be submitted by 30/08/2013 : Hrs IST. Date of Opening for Technical Bids 30/08/2013 : 14.

Not Applicable DD/MM/YY Completed Forms to be submitted by 30/08/2013 : Hrs IST. Date of Opening for Technical Bids 30/08/2013 : 14. DETAIL INFORMATION Contact Person and Address M.NALLATHAMBI SENIOR MANAGER / CCDP PURCHASE DEPARTMENT/R&D and CR UNIT HPBP BHEL, TIRUCHY, INDIA PIN : 620 014 Email mnthambi@bheltry.co.in Telephone 0091

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

SPECIFICATION SHEET JUNCTION BOXES

SPECIFICATION SHEET JUNCTION BOXES SPECIFICATION SHEET JUNCTION BOXES 8484-SS8201-8010 0 DOCUMENT NO REV SHEET 1 OF 1 CLIENT : HPCL, MUMBAI PROJECT : LPG BOTTLING PLANT, ANANTAPUR PLANT : - LPG BOTTLING PLANT ISSUED FOR : PROPOSAL ENQUIRY

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

PART MATERIAL REMARK Metal Case with Pig-tail. Brass (Metal Case) Copper (Pig-tail) Star Contact Copper Silver Plated

PART MATERIAL REMARK Metal Case with Pig-tail. Brass (Metal Case) Copper (Pig-tail) Star Contact Copper Silver Plated 1. SCOPE This specification defines the technical requirements of TZ-D series thermal-link with PROFFUSE brand that are produced according to IEC 60691, UL 60691,GB 9816. 2. APPLICABLE STANDARDS IEC 60691,

More information

Field Economy Unit Instruction Manual

Field Economy Unit Instruction Manual Field Economy Unit Instruction Manual Models CDC3FE-001 CDC3FE-002 CDC3FE-003 Table of Contents 1. General Description............................................................ 2 2. Specifications &

More information

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1 GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials, and services to furnish and install VERSA SHIELD Window

More information

SCHEDULE-III TECHNICAL SPECIFICATION OF 11 KV CTPT METERING SETS AGAINST TN-2134

SCHEDULE-III TECHNICAL SPECIFICATION OF 11 KV CTPT METERING SETS AGAINST TN-2134 Common Spec-2134.doc - 1-3.01 SCOPE: SCHEDULE-III TECHNICAL SPECIFICATION OF 11 KV CTPT METERING SETS AGAINST TN-2134 This specification covers the design, manufacture, assembly, testing and delivery of

More information

METERING GUIDE PART 1 METERING GENERAL

METERING GUIDE PART 1 METERING GENERAL 1 METERING GUIDE PART 1 METERING GENERAL 2 METERING GUIDE 1 INTRODUCTION 3 PURPOSE OF THIS GUIDE 3 METERING GENERAL 4 ELECTRICITY SUPPLY - INDUSTRY PLAYERS 4 1.1.2 Generators 4 1.1.3 Networks 4 1.1.4 Retailers

More information

SECTION SLUDGE HOLDING TANK DECANTER PUMP

SECTION SLUDGE HOLDING TANK DECANTER PUMP PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Sludge Holding Tank Decanter Pumping System in accordance with the

More information

MATERIAL AND EQUIPMENT STANDARD FOR PIG LAUNCHING AND RECEIVING TRAPS

MATERIAL AND EQUIPMENT STANDARD FOR PIG LAUNCHING AND RECEIVING TRAPS MATERIAL AND EQUIPMENT STANDARD FOR PIG LAUNCHING AND RECEIVING TRAPS CONTENTS : PAGE No. 1. SCOPE... 3 2. SOURCES AND REFERENCES... 3 2.1 Sources... 3 2.2 References... 4 3. UNITS... 5 4. SERVICE CONDITIONS...

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

Jet Tunnel Fans.

Jet Tunnel Fans. Jet Tunnel Fans www.systemair.de by Division AJ (T) Tunnel Jet Fans Standard features: Thrust efficiency in excess of 40 N/kW Adjustable aluminium impellers for maximum efficiency Terminal box on the casing

More information

The complete guide to transformers and packaged substations

The complete guide to transformers and packaged substations LAND LOGICAL POWER The complete guide to transformers and packaged substations Contents Land Logical Power transformers An introduction to the complete range of Land Logical Power transformers and package

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

SOMFY SPECIFICATION March 2012 SECTION... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE. Disclaimer for advice given to architects and engineers

SOMFY SPECIFICATION March 2012 SECTION... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE. Disclaimer for advice given to architects and engineers V1 SECTION......... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE * NOTE TO SPECIFIER * [LS40 is a range of motors, only take the appropriate reference within this range for your project specification.]

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

Power Zone Center. Your solution for power distribution and control systems

Power Zone Center. Your solution for power distribution and control systems Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest

More information

Agilent 16047D Test Fixture

Agilent 16047D Test Fixture Agilent 16047D Test Fixture Operation and Service Manual Third Edition Agilent Technologies Japan, Ltd. Agilent PN 16047-90300 May 2000 Printed in Japan Notices The information contained in this document

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11931 - Horizontal Centrifugal Water Pumps C O N T E N T S PART 1 - GENERAL... 1 1.01 PUMP - GENERAL... 1 1.02 CERTIFIED PUMP CURVES... 1 1.03 NPSH REQUIREMENTS...

More information

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications 1. FENCE REQUIREMENTS Hazard Trees All hazard trees, which are within tree length of the fence, must be felled

More information

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 1040 O Street, P.O. Box 80869 p: 402.475.4211 Lincoln, NE 68501-0869 www.les.com

More information

Surge arrester 3EB4. with polymeric composite housing for operating aboard traction units

Surge arrester 3EB4. with polymeric composite housing for operating aboard traction units Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and communication thereof to others without express authorization are prohibited. Offenders

More information

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220550 - VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. It is the intent of this specification to provide vibration isolation supports for Plumbing

More information

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN A DETAILS OF THE CLIENT Client / Address: C PURPOSE OF THE REPORT Purpose for which this report is required: E PARTICULARS OF THE CONTRACTOR Trading Title: Address: DOMESTIC ELECTRICAL INSTALLATION PERIODIC

More information

Section - III Evaluation and Qualification Criteria

Section - III Evaluation and Qualification Criteria Section - III Evaluation and Qualification Criteria 1-2 Table of Clauses TABLE OF CLAUSES... 2 1. EVALUATION... 4 1.1 TECHNICAL EVALUATION... 4 1.2 ECONOMIC EVALUATION... 5 2. QUALIFICATION... 6 2.1 ELIGIBILITY...

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14

More information

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved. For more information, visit www.247technology.com/on-line-ups/c60-standby-ups C60 Standby UPS 800VA Models User & Installation Manual 2015. All rights reserved. (Rev 6/23/15) Table of Contents Package

More information

Pioneer Forced Draft Cooling Tower Specifications

Pioneer Forced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com Pioneer Forced Draft Cooling Tower

More information

IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS

IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Ref. No. CNCA-01C-011: 2007 IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Low-voltage Electrical Apparatus---switch and control Equipment Announced on Aug. 1,

More information

NATIONAL INSTITUTE OF SOLAR ENERGY (An Autonomous Institute, Ministry of New & Renewable Energy, Government of India)

NATIONAL INSTITUTE OF SOLAR ENERGY (An Autonomous Institute, Ministry of New & Renewable Energy, Government of India) NATIONAL INSTITUTE OF SOLAR ENERGY (An Autonomous Institute, Ministry of New & Renewable Energy, Government of India) REQUEST FOR QUOTATION For Procurement of Fifteen (15 Nos.) High efficiency Passivated

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

3M Cold Shrink Silicone Rubber Connector Insulators 8440 Series

3M Cold Shrink Silicone Rubber Connector Insulators 8440 Series 3M Cold Shrink Silicone Rubber Connector Insulators 8440 Series Data Sheet May 2014 Product Description 3M Cold Shrink Connector Insulators 8440 Series are open-ended, silicone rubber, tubular sleeves.

More information