1 DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref.CRO 22 / FRBO 20 Jan 2014 Please find enclosed the following draft certification manual : PRODUCT MANUAL ON ROTATIONAL MOULDED POLYETHYLENE WATER STORAGE TANKS AS PER IS 12701:1996 Kindly examine the draft product certification manual and forward your comments on the draft manuals. Last date for comments: 5 Feb Comments, if any, may please be made in the format as given below and mailed to FRBO, Faridabad at the following id: fdo.bis Sl. No. Name of RO / BO Clause/ Sub-clause Paragraph / Figure / Table Type of comment (General / Technical / Editorial) Comments Proposed Change Note: Separate sheets may be attached incase comments are lengthy and cannot be incorporated in the S. K. Khanna Deputy Director General Central Region Bureau of Indian Standards, 9, B S Z Marg, New Delhi

2 PRODUCT MANUAL 1. PRODUCT MANUAL ON ROTATIONAL MOULDED POLYETHYLENE WATER STORAGE TANKS AS PER IS 12701: Amendment Sheet - Including Amendment No. 2, June Foreword The product certification scheme of the Bureau of Indian Standards, now under Bureau of Indian standards Act 1986, is in operation for more than four decades covering a wide variety of products. The wide experience in the area has brought a fair amount of rationalization in the certification process. This has resulted in the formulation of the Operation Manual for Product Certification (referred to as OMPC in this manual) prescribing rules and practices generally applicable to all products. Product related rules/guide lines are periodically issued to cover the specific requirements of different products. Still, in view of the wide spread of the certification operations, differences are found in the application of these guidelines in the BIS certification offices in different parts of the country. Therefore, it has been decided to bring out Sectoral manuals as guideline documents covering certification requirements of specific products/group of products. This Manual, one in the series, has been prepared to ensure uniformity in the certification practices in respect of s covered by IS This manual is strictly an internal document intended for use by the certification marks officers of BIS. 4. Table of Contents I: Product Description 5. Description of Products(s) - Rotational moulded polyethylene water storage tanks with nominal service temperature from +1 0 C to C. These tanks are not meant for underground applications. The standard is applicable only to Water storage tanks subjected to the following two conditions: a) Own hydrostatic head of water b) with uniform flat base support 6. Rotational moulded polyethylene water storage tanks, IS 12701:1996, Number of Amendments List of referred Indian Standards for raw materials/components and test methods IS No. Title IS No. Title 554: 1985 Dimensions for pipe threads 9845:1986 Methods of analysis for the where pressure-tight joints are determination of specific and/ are required on threads (third or overall migration of constituents revision). of plastic materials and articles

3 1879:1987 Malleable cast iron pipe fittings (second revision) intended to come into contact with foodstuffs (first revision) 2530:1963 Methods of test for polyethylene 10141:1982 Positive list of constituents of moulding materials and polyethylene in contact with poly-ethylene compounds foodstuffs, pharmaceuticals and drinking water 4905:1968 Methods for random sampling 7328:1992 High density polyethylene 10146:982 Polyethylene for its safe use in Materials for moulding and contact with foodstuffs, pharmaextrusion ceuticals and drinking water 8543 Methods of testing plastics Plastics Methods of testing: (Part 4/Sec 1): Part 4 Short term mechanical (Part 5/Sec 7) Part 5 Mechanical properties, Properties, I 8. Check list for submission of an application for grant of licence - Pl. see check list on BIS Intranet for applicants) II: Raw Material / Components 9. List of important Raw Materials / components, including those which are required to conform to the relevant Indian Standards Sl.No. Raw Material/Components 1. Polyethylene Resin stabalised with antioxidants 2. Master batch 3. Man-hole lids Relevant Indian Standard IS 7328:1992 III: Manufacturing Process and in-process Quality Controls 10. Description of Manufacturing Process Rotational moulded grade of Polyethylene resin duly stabilized with anti-oxidants is the main raw material used for the manufacture of Rotational Moulded Polyethylene Water Storage s. Polyethylene resin is first mixed with master batch manually to impart colour to tank. The mix is heated and is then send to extruder for making granules. The granules are then pulverized to convert the mix into a powder form.

4 The pulverized material is then fed to the rotational moulding die of required size where the final product takes shape. After the process of rotation the mould is cooled and the tank gets released from the mould. The tank is then finished manually with the help of knives and files. Infrastructure for production A list of the manufacturing machinery is given in Annexure 1 - Pl. see the proforma on BIS intranet) IV: Certification Criteria 11. Identification of critical requirements of the Indian Standard ( To be provided by CMD ) In simple terms, a critical requirement can be defined as one that affects the health and safety of the user and the performance of the product during the course of its use. Thus keeping in view the process of manufacture and application of the product the following requirements can be termed as critical:- a) Minimum wall and bottom thickness b) Resistance to impact c) Top Load resistance d) Tensile Strength 12. Scheme of Testing and Inspection (Please See the STI on BIS Intranet vide ref. STI/12701/3 dated ) 13. Marking Fee Rates : Minimum marking fee Rs /- 14. Grouping Guidelines Grouping guidelines (Pl. refer CMD circular No. CMD-III/16:12701 dated ). 15. Guidelines for writing Scope of Licence Following shall be mentioned while writing the scope of licence: a) Net capacity b) Type of - whether rectangular loft or cylindrical vertical tank c) Layer d) Whether tank is with lid or without lid

5 16. Guidelines for Inclusion of new Varieties For the purpose of inclusion of additional varieties in the existing licence, one sample from each group and type as given in grouping guidelines shall be tested for all the requirements of the specification. As far as possible, sample of higher capacity shall be drawn for testing. 17. Sample size, including guidelines for drawal of separate samples are required to be sent to different labs for testing. One sample from each group and type as given in grouping guidelines shall be tested for all the requirements of the specification. 18. Manner of Sealing of Sample (s) The sample drawn shall be labeled and wax sealed. 19. Whether remnants of sample(s) are returnable / non-returnable, to be scrapped / used, to be deshaped before disposal in case of safety items), any other precaution required for dealing with remnants The remnants of the samples tested shall be scrapped after the testing. 20. Procedure to be followed for destroying / deshaping / recycling the product that does not meet the quality parameters during regular production. The product that does not meet the quality parameters during regular production may be recycled/reworked. The addition of not more than 10% of the manufacturers own reworked material resulting from the manufacture of tanks only according to IS is permissible. V : Inspection and Testing 21. Packing Material requirement (to be available in factory at all times) for Packing / Dispatch of Samples. There is no requirement of packing material for this product. 22. List of required Test Equipment / Facilities with requirement and frequency of Calibration Enclosed in Annexure Status of Test Facilities in BIS Labs and OSLs with Testing Charges, and approximate time required for testing by BIS labs / OSLs. 24. Whether Grant of Licence will be based on:

6 Both factory testing and independent testing shall be covered for this product. 25. Details of Tests to be carried out in the Factory in case of GOL and Surveillance Visit a) Net Capacity b) Gross Capacity c) Overall Height d) Effective Height e) Overall Diameter f) Internal Diameter of Manhole g) Density (At 23c Without Carbon) h) Carbon black content i) Carbon black dispersion j) Weight of (without Lid) k) Visual Appearance for Flat Area WALL THICKNESS a) Resistance to deformation b) Resistance to Impact c) Tensile Strength at Yield d) Flexural Modulus LID TEST a) Wall thickness b) Carbon black content c) Carbon black dispersion d) Material of lid e) Visual Appearance

7 Annexure 1 LIST OF MACHINERY Sl.No. Machinery 1. Bi-axial M/c(Straight Arm with Turret & its accessories) 2. Rock N Roll M/c 3. Extruder with cooling tower 4. Pulveriser M/c 5. Scrap Cutter with Motor 6. Scrap grinder with Motor 7. Genset 8. Moulds (as per required sizes)

8 Process flow chart Raw Material LLDPE Granules Master Batch To make Coloured granules on EXTRUDER M/c. ToMake Coloured Powder on PULVERISER M/c. Roto Moulding Machine for making s Than goes Fitting for lid Visual Examination & Control Checks Through,Tape,scale vernier,micrometer Etc. Testing Marking Stock Despatch

STI /15392 /1 April, 2009

STI /15392 /1 April, 2009 CENTRAL MARKS DEPARTMENT-III Our Ref : CMD-III/16:15392 30 04 2009 Subject : Finalized STI as per IS 15392 : 2003 Aluminium and Aluminium Alloy Bare Foil Food Packaging The Scheme of Testing and Inspection

More information

ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES

ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES DRAFT Doc No.: SM/IS 398 (Pt.1) PRODUCT MANUAL FOR ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES PART 1 ALUMINIUM STRANDED CONDUCTORS ACCORDING TO IS 398 (Part 1):1996 (with Amendment No.01 APR

More information

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF CARBON STEEL BILLETS, BLOOMS, SLABS AND BARS FOR FORGINGS ACCORDING TO IS:1875-1992 (Fifth Revision) 1. LABORATORY: A laboratory shall be maintained

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS : 1999 (Incorporating Amendment No.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS : 1999 (Incorporating Amendment No. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS 14625 : 1999 (Incorporating Amendment No. 1,2 3 & 4).Doc: STI/14625/3 1.0 LABORATORY- A laboratory shall be

More information

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-III/16:814 31 January 2006 Subject: Implementation of Amendment No 1 to IS 814:2004 for Covered Electrodes For Manual Metal Arc Welding

More information

STEEL TUBES FOR STRUCTURAL PURPOSES

STEEL TUBES FOR STRUCTURAL PURPOSES Steel Tubes for Structural Purpose IS Number IS 1161 Page No: 1 of 20 BUREAU OF INDIAN STANDARDS (Eastern Region Office, Kolkata) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref: DDGE/22/IS 1161

More information

BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006

BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006 BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16:8156 18 Oct 2006 Subject : SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FASTENERS FOR CONSUMER GOODS SYNTHETIC

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO IS 278:2009 (Fourth Revision)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO IS 278:2009 (Fourth Revision) SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO (Fourth Revision) DOC: STI/278/, 1 LABORATORY - A laboratory shall be maintained which

More information

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SINGLE PHASE a.c. INDUCTION MOTORS FOR GENERAL PURPOSE ACCORDING TO IS 996:2009 (Including Amendment No.1) 1. LABORATORY A laboratory shall be maintained

More information

2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards. Doc. STI 1848/6 January 1995 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF WRITING AND PRINTING PAPERS ACCORDING TO IS : 1848-1991 (Third Revision) (Amendment No.1 OF September 1993) 1. Laboratory

More information

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained. DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO IS/IEC:2003 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests

More information

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SALT AND REFINED IODIZED SALT, VACUUM EVAPORATED IODIZED ACCORDING TO IS 7224:2006 (Second Revision) Doc: STI/7224/5 1. Laboratory - A laboratory shall

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994 1.0 Laboratory A laboratory shall be maintained, which shall be suitably

More information

Paragraph/ Figure/Table

Paragraph/ Figure/Table Date Document No. 22-07-2014 Doc: ET 15(6749) Sl. No. Name of the Organization Clause/ Subclause Paragraph/ Figure/Table Type of Comment (General/ Technical/ Editorial Comments Proposed Change BUREAU OF

More information

BUREAU OF INDIAN STANDARD (Faridabad Branch Office)

BUREAU OF INDIAN STANDARD (Faridabad Branch Office) BUREAU OF INDIAN STANDARD (Faridabad Branch Office) Our ref: FRBO/9798:2013 Date- 31-12-2014 Subject: Implementation of IS 9798:2013, Low Pressure Regulators for Use With Liquefied Petroleum Gas (LPG)

More information

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING क द र ह व भ ग 3 द भ- क द र ह व भ ग -3/ 16: आई ए 13714 06.09. 2016 ग ह- आई ए 13714 : 1993 क ल ए ए ट आई आई ए 13714 : 1993 ल भ र (ड ज) प ट भ ड र ग़ क ल ए पर षण और ल ररषण य ज क य वय क ल ए ष ल य क य य एश ष ख

More information

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION PTFE BELLOWS TECHNICAL SPECIFICATION 1. MATERIALS 1.1 PTFE Only virgin (not reprocessed) PTFE conforming to ASTM D 1457, type III, IV or V shall be used for the production of bellows; the PTFE raw material

More information

FABRICATED PVC-U FITTINGS (SOCKETS) FOR POTABLE WATER SUPPLIES.

FABRICATED PVC-U FITTINGS (SOCKETS) FOR POTABLE WATER SUPPLIES. BUREAU OF INDIAN STANDARDS (Eastern Region Office, Kolkata) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref: DDGE/22/IS 10124(pt-2) Dated: 20 Feb 2014 Sub: Draft manual for IS 10124(pt-2) This

More information

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT- I. Our Ref: CMD I/

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT- I. Our Ref: CMD I/ BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT- I Our Ref: CMD I/31 01 11 2011 Subject: Amendment No. 17 to Operating Manual for Product Certification, 2004 The procedure for Stop Marking and Resumption

More information

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992 1. LABORATORY: A laboratory shall be maintained which

More information

DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref.: NRO/PRBO 13 Jan 2014

DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref.: NRO/PRBO 13 Jan 2014 DRAFT MANUAL FOR COMMENTS Our Ref.: NRO/PRBO 13 Jan 2014 Please find enclosed the following draft certification manual: Product manual on Electric Iron as per IS 366: 1991 Kindly examine the draft product

More information

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 2nd September, 1999 1 [S. 0.705 (E-).-Whereas draft rules in exercise of the powers

More information

BUREAU OF INDIAN STANDARDS (Central Regional Office) EXPRESSION OF INTEREST

BUREAU OF INDIAN STANDARDS (Central Regional Office) EXPRESSION OF INTEREST BUREAU OF INDIAN STANDARDS (Central Regional Office) EXPRESSION OF INTEREST Expression of Interest for Undertaking Factory Assessment/Surveillance audits under Product Certification Scheme of Bureau of

More information

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श "मल)

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श मल) क य म हर वभ ग 2 हम र स दभ: स एमड 2/16:7123 16 12 2015 वषय : परण और नरण क# य जन, एसटआई Doc:STI/7123/4 *दस बर 2015 क श त ल क 0लए आई एस 7123:1993 क 2प म3 क पय स लन प ए, परण और नरण क# य जन, एसटआई Doc:STI/7123/4

More information

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF HAND-OPERATED CHAIN PULLEY BLOCKS ACCORDING TO IS 3832:2005 (Third Revision) (Incorporating Amendment No. 1) DOC:STI:3832/3 1. LABORATORY A laboratory

More information

BUREAU OF INDIAN STANDARDS OFFICE ORDER. Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs

BUREAU OF INDIAN STANDARDS OFFICE ORDER. Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs BIS/DGO( 428 )/2015 15 January 2015 BUREAU OF INDIAN STANDARDS OFFICE ORDER Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs Attention of RO/BOs is drawn towards Cl.10.1 of DGO(404) whereupon

More information

(अन भ ग अध क र ) (स ए ड -3)

(अन भ ग अध क र ) (स ए ड -3) क द र ह व भ ग 3 स द भ- क द र ह व भ ग -3/16: आई एस 15511 17 भ 2016 ग षह- आई एस 15511:2004 स ईककल ज ज भ एस.ट.आई क क ह भद ह सषम अध क र व र स लगन एस.ट.आई क अन म दन कर ददय गय ह यह सभ क रय ग ह त ह आई एस 15511:2004

More information

Quality Standard for ACR Copper Tubes in LWC

Quality Standard for ACR Copper Tubes in LWC Quality Standard for ACR Copper Tubes in LWC Foreword cuproclima is a protected tradename for high-quality seamless copper tubes in levelwound coils (LWC) supplied to manufacturers of heat exchangers for

More information

INTERNATIONAL STANDARD ISO 4427-2 First edition 2007-08-01 Plastics piping systems Polyethylene (PE) pipes and fittings for water supply Part 2: Pipes Systèmes de canalisations en plastique Tubes et raccords

More information

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61) PART 1-GENERAL INTEGRALLY MOLDED FLANGED OUTLET (IMFO ) - COMPLETE DRAIN HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61) 1.01 Requirements 1. The

More information

AS/NZS 2280:2012 AS/NZS

AS/NZS 2280:2012 AS/NZS AS/NZS 2280:2014 Incorporating Amendment No. 1 and 2 Australian/New Zealand Standard Ductile iron pipes and fittings Superseding AS/NZS 2280:2012 AS/NZS 2280:2014 AS/NZS 2280:2014 This joint Australian/New

More information

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0 REVISION NO. 0 NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0 PAGE NO. 1 OF 24 DATE OF ISSUE (MONTH/YEAR) TOTAL NO. OF PAGES (Including cover

More information

IN THE FIELD PIPE INSTALLATION INSTRUCTIONS

IN THE FIELD PIPE INSTALLATION INSTRUCTIONS The Company With Connections MT THE NEXT LEVEL OF FLEXIBLE CONNECTORS A-LOK PREMIUM ASTM C-923 APPLICATION A LOK PREMIUM Designed to produce a guaranteed watertight seal between pipe and concrete, the

More information

Evaluation of Profile Wall Polyvinyl Chloride Drainage Pipe Manufacturers

Evaluation of Profile Wall Polyvinyl Chloride Drainage Pipe Manufacturers NTPEP Committee Work Plan for Evaluation of Profile Wall Polyvinyl Chloride Drainage Pipe Manufacturers NTPEP Designation: PVC-17-01 National Transportation Product Evaluation Program 444 North Capitol

More information

DRAFT UGANDA STANDARD

DRAFT UGANDA STANDARD DRAFT UGANDA STANDARD DUS 1659 First Edition 2016-11-09 Materials in Contact with Food Requirements for Packaging materials Reference number DUS 1659: 2016 UNBS 2016 DUS 1659: 2016 Compliance with this

More information

EXTRUSION MACHINE OPERATOR (PLASTICS)

EXTRUSION MACHINE OPERATOR (PLASTICS) Syllabus for the trade of EXTRUSION MACHINE OPERATOR (PLASTICS) Under APPRENTICESHIP TRAINING SCHEME Government of India Ministry of Labour & Employment (D.G.E.&T.) CENTRAL STAFF TRAINING AND RESEARCH

More information

BIS or used as Amendment to STANDARD comments is 15 Nov. 2008

BIS or used as Amendment to STANDARD comments is 15 Nov. 2008 Doc: MTD 4 (4730) For comments only BUREAU OF INDIAN STANDARDS Modified draft Indian Standard HOT ROLLED CARBON STEEL SHEET AND STRIP (Sixth Revision of IS 1079) ICS 77.140.50 Not to be reproduced without

More information

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney

More information

Module 3 Selection of Manufacturing Processes. IIT Bombay

Module 3 Selection of Manufacturing Processes. IIT Bombay Module 3 Selection of Manufacturing Processes Lecture 3 Design for Bulk Deformation Processes Instructional objectives By the end of this lecture, the students are expected to learn the working principle

More information

Bulk Deformation Processes

Bulk Deformation Processes Bulk Deformation Processes Bachelor of Industrial Technology Management with Honours Semester I Session 2013/2014 TOPIC OUTLINE What is Bulk Deformation? Classification of Bulk Deformation Processes Types

More information

DRAFT UGANDA STANDARD

DRAFT UGANDA STANDARD DRAFT UGANDA STANDARD DUS 1674 First Edition 2017-mm-dd Surface polish specification Reference number DUS 1674: 2017 UNBS 2017 DUS1674: 2017 Compliance with this standard does not, of itself confer immunity

More information

TECHNICAL SPECIFICATION FOR 11mtr. LONG STEEL TUBULAR POLE

TECHNICAL SPECIFICATION FOR 11mtr. LONG STEEL TUBULAR POLE Annexure-A TECHNICAL SPECIFICATION FOR 11mtr. LONG STEEL TUBULAR POLE 1.0 SCOPE 1.1 This specification covers the design, manufacture, testing at works, supply / delivery & transportation of 11 mtr long

More information

AS/NZS 1477:2017. Australian/New Zealand Standard. PVC pipes and fittings for pressure applications. Superseding AS/NZS 1477:2006 AS/NZS 1477:2017

AS/NZS 1477:2017. Australian/New Zealand Standard. PVC pipes and fittings for pressure applications. Superseding AS/NZS 1477:2006 AS/NZS 1477:2017 AS/NZS 1477:2017 Australian/New Zealand Standard PVC pipes and fittings for pressure applications Superseding AS/NZS 1477:2006 AS/NZS 1477:2017 AS/NZS 1477:2017 This joint Australian/New Zealand standard

More information

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT TF N 548 Rev1 2012-03-29 CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT How to draft clauses on Assessment and Verification of the Constancy of Performance (AVCP) in harmonized standards for construction

More information

Sir, We hereby place an order on you for the services as described below: Collector Area (m²) No. of samples

Sir, We hereby place an order on you for the services as described below: Collector Area (m²) No. of samples APPLICATION FORM SOLAR FLAT PLATE COLLECTOR (FPC) From: - Company (Please write complete Postal address) Sir, We hereby place an order on you for the services as described below: Sr. No. Description Collector

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

Evaluation of HDPE (High Density. Drainage Pipe Manufacturers. Polyethylene) Thermoplastic. NTPEP Committee Work Plan for

Evaluation of HDPE (High Density. Drainage Pipe Manufacturers. Polyethylene) Thermoplastic. NTPEP Committee Work Plan for NTPEP Committee Work Plan for Evaluation of HDPE (High Density Polyethylene) Thermoplastic Drainage Pipe Manufacturers NTPEP Designation: [HDPE-01-16] National Transportation Product Evaluation Program

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 11357-6 Second edition 2008-06-15 Corrected version 2008-11-15 Plastics Differential scanning calorimetry (DSC) Part 6: Determination of oxidation induction time (isothermal

More information

VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED

VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED POST BOX NO. 125, A-14, SECTOR -1, NOIDA - 201301, DIST - GAUTAM BUDH NAGAR, UP, INDIA PHONE: 91-120-2529842, 843, 854 FAX: 91-120-2529801/2541493

More information

Metal Forming Process. Prof.A.Chandrashekhar

Metal Forming Process. Prof.A.Chandrashekhar Metal Forming Process Prof.A.Chandrashekhar Introduction Shaping of a component by the application of external forces is known as the metal forming. Metal forming can be described as a process in which

More information

HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986)

HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986) For Comments Only Draft Indian Standard Doc: MTD 4(4939) HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986) ICS 77.140.50 Not to be reproduced

More information

SEWER FORCE MAIN HDPE PIPE

SEWER FORCE MAIN HDPE PIPE SECTION 15150 SEWER FORCE MAIN HDPE PIPE PART 1: GENERAL 1-1 DESCRIPTION: This specification governs the material, pipe, fittings, joining methods and general construction practice for High Density Polyethylene

More information

MANUFACTURING PROCESSES

MANUFACTURING PROCESSES 1 MANUFACTURING PROCESSES - AMEM 201 Lecture 8: Forming Processes (Rolling, Extrusion, Forging, Drawing) DR. SOTIRIS L. OMIROU Forming Processes - Definition & Types - Forming processes are those in which

More information

TENDER ENQUIRY FOR PURCHASE OF COLD ROLLED CLOSED ANNEALED (CRCA) STEEL COILS

TENDER ENQUIRY FOR PURCHASE OF COLD ROLLED CLOSED ANNEALED (CRCA) STEEL COILS TENDER ENQUIRY NO.OI00LM0022 DATED 30.10.13 DUE ON : 11.11.13 AT 14.00 HRS. TENDER ENQUIRY FOR PURCHASE OF COLD ROLLED CLOSED ANNEALED (CRCA) STEEL COILS Balmer Lawrie & Co. Ltd. is a leading manufacturer

More information

National technical approval Coupler

National technical approval Coupler National technical approval Coupler Z-1.5-100 12.02.2015 english Mechanical connection of B500B reinforcing steel bars with screw couplers Nominal diameter: 12 to 32 mm Tested by: DIBt, Berlin Max Frank

More information

BUREAU OF INDIAN STANDARDS Draft Indian Standard

BUREAU OF INDIAN STANDARDS Draft Indian Standard Doc:MTD 15(5106) For Comments Only BUREAU OF INDIAN STANDARDS Draft Indian Standard METHOD FOR DETERMINATION OF THERMAL CONDUCTIVITY OF DENSE AS WELL AS INSULATING FIRED REFRACTORIES, REFRACTORY MONOLITHICS

More information

GRI - GM17 Standard Specification*

GRI - GM17 Standard Specification* Geosynthetic Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII Revision 12: November 4, 2015 Revision schedule on pg. 12 GRI - GM17 Standard

More information

(SIGNATURE OF THE APPLICANT)

(SIGNATURE OF THE APPLICANT) APPLICATION FOR REGISTRATION OF IMPORTERS Under Rule 35 of the Standards of Weights & Measures (Packaged Commodities) Rules,1977 1. Name of the applicant (Firm/Company) 2. Complete address (including district)

More information

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE. (f) The minimum requirements for construction, materials and foundations of grease traps shall be the same as those required for septic tanks, as prescribed in N.J.A.C. 7:9A-8.2. (g) The inlet and outlet

More information

Casting. Forming. Sheet metal processing. Powder- and Ceramics Processing. Plastics processing. Cutting. Joining.

Casting. Forming. Sheet metal processing. Powder- and Ceramics Processing. Plastics processing. Cutting. Joining. Traditional Manufacturing Processes Casting Forming Sheet metal processing Powder- and Ceramics Processing Plastics processing Cutting Joining Surface treatment FUNDAMENTALS OF METAL FORMING Overview of

More information

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE SUGGESTED STANDARD SPECIFICATION January, 2012 Prepared by International Pipe Bursting Association Thanks to the following participants for the development

More information

DRAFT UGANDA STANDARD

DRAFT UGANDA STANDARD DRAFT UGANDA STANDARD DUS1910-2 First Edition 2017-10-20 Metal Chairs for 0ffice Purposes Part. 2: Revolving and Tilting- Specification Reference number DUS 1910-2:2017 UNBS 2017 DUS 1910-2:2017 Compliance

More information

INDIAN REGISTER OF SHIPPING CLASSIFICATION NOTES. Type Approval of Mechanical Joints used in Piping

INDIAN REGISTER OF SHIPPING CLASSIFICATION NOTES. Type Approval of Mechanical Joints used in Piping INDIAN REGISTER OF SHIPPING CLASSIFICATION NOTES Type Approval of Mechanical Joints used in Piping January 2017 Page 2 of 16 Changes in JANUARY 2017 Version Type Approval of Mechanical Joints used in Piping

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 21138-2 First edition 2007-10-15 Plastics piping systems for non-pressure underground drainage and sewerage Structured-wall piping systems of unplasticized poly(vinyl chloride)

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 21138-3 First edition 2007-10-15 Plastics piping systems for non-pressure underground drainage and sewerage Structured-wall piping systems of unplasticized poly(vinyl chloride)

More information

Calcium Carbonate in Blown HDPE Film

Calcium Carbonate in Blown HDPE Film Calcium Carbonate in Blown HDPE Film New Developments to Increase Productivity and Profitability by Gil Morieras - Marketing Manager Polyolefines (Omya) and Dr. Gerard Schaeffer (GS Technology) Many interesting

More information

BUREAU OF INDIAN STANDARDS (Southern Regional Office) This has reference to CMD-I s circular CMD-1/31 dated 11 Nov 2013 on the above subject.

BUREAU OF INDIAN STANDARDS (Southern Regional Office) This has reference to CMD-I s circular CMD-1/31 dated 11 Nov 2013 on the above subject. BUREAU OF INDIAN STANDARDS (Southern Regional Office) Our Ref: 60/CM 1 23 Dec 2013 Subject: Preparation & Review of Product Manuals for Product Certification This has reference to CMD-I s circular CMD-1/31

More information

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS - June 2013 Addendum GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS SUBSECTION "A" : GENERAL RULES SUBSECTION "B" : CLASS 1 COMPONENTS SUBSECTION "C" : CLASS 2 COMPONENTS SUBSECTION "D" : CLASS

More information

COMPARISON OF CAST FILM AND BLOWN FILM 9 - LAYER BARRIER FILM

COMPARISON OF CAST FILM AND BLOWN FILM 9 - LAYER BARRIER FILM COMPARISON OF CAST FILM AND BLOWN FILM 9 - LAYER BARRIER FILM Gerhard Winkler Windmöller & Hölscher / Germany ABSTRACT Above-average growth rates in the field of cast film production and stretch film,

More information

Draft Indian Standard Galvanized Steel Sheets (Plain and Corrugated)- Specification (Seventh Revision of IS 277) ICS

Draft Indian Standard Galvanized Steel Sheets (Plain and Corrugated)- Specification (Seventh Revision of IS 277) ICS FOR BIS Use Only Doc: No. MTD 4 (5207) Draft Indian Standard Galvanized Steel Sheets (Plain and Corrugated)- Specification (Seventh Revision of IS 277) ICS 77.140.50 Not be reproduced without the permission

More information

Bharat Petroleum Corporation Limited Supply Chain (Lubricants) Mumbai. Vendor Data For Registration

Bharat Petroleum Corporation Limited Supply Chain (Lubricants) Mumbai. Vendor Data For Registration Bharat Petroleum Corporation Limited Supply Chain (Lubricants) Mumbai Vendor Data For Registration 1 Registered Name of the Firm 2 Legal Status of the firm - Proprietor / Partnership / Public / Private.

More information

Session 10: The UNFPA Prequalification Site Inspection

Session 10: The UNFPA Prequalification Site Inspection Session 10: The UNFPA Prequalification Site Inspection Group Brainstorm: Site Inspection In your experience, in what areas have you disagreed with the inspectors? Objectives Provide overview of what inspectors

More information

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE No. : IIT/WW/2017-18/ 35 Dt. : 19.01.2018 The Sr. Executive Engineer (Water Works), IIT Kharagpur

More information

Sika KAB combination joint waterbars waterstopping systems

Sika KAB combination joint waterbars waterstopping systems PRODUCT DATA SHEET Sika KAB combination joint waterbars Waterbars for waterproofing construction and crack induced shrinkage joints in new reinforced concrete structures PRODUCT- DESCRIPTION KAB 125/KAB

More information

NATIONAL CODES ON PUMPSETS. By D K Das Bureau of Indian Standards, New Delhi

NATIONAL CODES ON PUMPSETS. By D K Das Bureau of Indian Standards, New Delhi NATIONAL CODES ON PUMPSETS By D K Das Bureau of Indian Standards, New Delhi BIS is National Standard body engaged in formulation of Indian Standards. Standard formulation activity of Bureau is functioning

More information

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5 How to perform PPAP The process of completing a PPAP submission is complex. This detailed process is a collection of key elements that must be completed to verify that the production process will produce

More information

Study of GFRG Panel and Its Strengthening

Study of GFRG Panel and Its Strengthening Study of GFRG Panel and Its Strengthening Eldhose M Manjummekudiyil 1, Basil P Alias 2, Biji K Eldhose 3, Sarath Rajan 4, Thasneem Hussain 5 1 Assistant Professor, 2, 3, 4, 5 Under Graduate Students 1,

More information

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED ELASTOMERIC BRIDGE BEARING TO LATEST IRC: 83-015 (PART - II) Kanta System of Elastomeric bridge bearing is made out of Poly chloroprene rubber having low crystallization rates and adequate shelf life,

More information

Pig s Tail. protective wrapping. use pig s Tail for:

Pig s Tail. protective wrapping. use pig s Tail for: igs Pig s Tail use pig s Tail for: protective wrapping hydraulic, gas and air hoses/pipes Welding leads electrical leads sapling/plant protection Protect your investment with Pig s Tail Protective Wrapping.

More information

Steel Making. Modern Long Product Manufacturing. Process Flow Chart

Steel Making. Modern Long Product Manufacturing. Process Flow Chart Rolling Process Metallurgical Aspects Material Specifications and Chemistries Standard Mill Practices Miscellaneous Tables & Data Elastic Section Modulus Plastic Section Modulus Moment of Inertia SI Conversion

More information

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Master version approved by the QUALIDECO Committee on 14 December 2011 Effective from 1 January

More information

MASTERBATCHES. Masterbatch Application and Selection Guide for Irrigation Pipes

MASTERBATCHES. Masterbatch Application and Selection Guide for Irrigation Pipes MASTERBATCHES Masterbatch Application and Selection Guide for Irrigation Pipes Table of contents Page Nr Introduction 2 Definitions 3 Key Performance Requirements of Irrigation Pipes 3 Drip Irrigation

More information

NPS/002/020 Technical Specification for 11 & 20kV Power Cables

NPS/002/020 Technical Specification for 11 & 20kV Power Cables Version:- 3.1 of Issue:- Nov - 09 Page 1 of 11 NPS/002/020 Technical Specification for 11 & 20kV Power Cables 1. Purpose The purpose of this document is to detail Northern Powergrid (the Company) requirements

More information

MOTHER DAIRY. A Unit of Gujarat Co-operative Milk Marketing Federation Limited. MDG:PUR:PFP:CORE:13:03 December 16, 2013

MOTHER DAIRY. A Unit of Gujarat Co-operative Milk Marketing Federation Limited. MDG:PUR:PFP:CORE:13:03 December 16, 2013 MDG:PUR:PFP:CORE:13:03 December 16, 2013 TENDER FOR SUPPLY OF PAPER / POY CORES Subject: - Tender enquiry for Paper core and POY Tubes for PFP unit, Mother Dairy, Gandhinagar. We invite your most competitive

More information

Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015

Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015 Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015 Introduction This Self-Lay Policy applies when a developer decides to self-lay water mains and services (ie. construct water

More information

SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE

SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE SECTION 15000 MECHANICAL 1. GENERAL 1.1 This specification shall govern the materials and installation of polyethylene dual contained system of pipe, structures

More information

No. AUD/1-18/ / 3rd Convocation/ 2014

No. AUD/1-18/ / 3rd Convocation/ 2014 No. AUD/-8/04-5/ 3rd Convocation/ 04 6 October To, ------------------------------------------------- -------------------------------------------------- --------------------------------------------------

More information

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: -

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: - SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: - 1. SCOPE: - This specification covers 11KV Disc Type & 11KV/ 22KV Pin Type Insulators for 11/22KV H.T. over head power lines. 2. APPLICABLE

More information

ISO Steels for the reinforcement of concrete Reinforcement couplers for mechanical splices of bars Requirements

ISO Steels for the reinforcement of concrete Reinforcement couplers for mechanical splices of bars Requirements INTERNATIONAL STANDARD ISO 15835-1 First edition 2009-04-01 Steels for the reinforcement of concrete Reinforcement couplers for mechanical splices of bars Part 1: Requirements Aciers pour l'armature du

More information

Contents. 1. Making a Blue Tank 2. Material Production Options 3. Methods for Adding Color 4. Grinding the Pellets 5. Benefits of Using Micros

Contents. 1. Making a Blue Tank 2. Material Production Options 3. Methods for Adding Color 4. Grinding the Pellets 5. Benefits of Using Micros Contents 1. Making a Blue Tank 2. Material Production Options 3. Methods for Adding Color 4. Grinding the Pellets 5. Benefits of Using Micros Making a Blue Tank Additives Process Stabilizers (Phosphates)

More information

ISO/TC 238. Secretariat: SIS Solid biofuels Determination of particle size distribution for uncompressed fuels

ISO/TC 238. Secretariat: SIS Solid biofuels Determination of particle size distribution for uncompressed fuels DRAFT INTERNATIONAL STANDARD ISO/DIS 17827-2 Solid biofuels Determination of particle size distribution for uncompressed fuels Part 2: Vibrating screen method using sieves with aperture of 3,15 mm and

More information

Evaluation of Polypropylene Drainage Pipe Manufacturers

Evaluation of Polypropylene Drainage Pipe Manufacturers NTPEP Committee Work Plan for Evaluation of Polypropylene Drainage Pipe Manufacturers NTPEP Designation: PPP-17-01 National Transportation Product Evaluation Program 444 North Capitol Street N.W., Suite

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY. (Not to be reproduced without the permission of BIS or used as an Amendment)

BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY. (Not to be reproduced without the permission of BIS or used as an Amendment) Doc No. CED 50 (7780) BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY (Not to be reproduced without the permission of BIS or used as an Amendment) Draft AMENDMENT NO. 1 TO IS 12235 (Part 17):2004 THERMOPLASTICS

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

TECHNICAL GRADE MOLYBDENUM OXIDE

TECHNICAL GRADE MOLYBDENUM OXIDE Procedure for the Weighing and Sampling of TECHNICAL GRADE MOLYBDENUM OXIDE 1997 Published by the International Molybdenum Association (IMOA) Unit 7 Hackford Walk, 119-123 Hackford Road, London SW9 0QT,

More information

Introduction. 1. Outline of fan case ring

Introduction. 1. Outline of fan case ring A near-net-shape (NNS) ring-rolling process was developed to reduce the forging weight of a rolled, fan case front, ring made of Ti-6Al-4V. This was achieved by optimizing the ring-rolling process in which

More information

PHOTO 1: Separation in the center of a 2.0 mm thick HDPE sheet

PHOTO 1: Separation in the center of a 2.0 mm thick HDPE sheet SIP in Geomembrane Liners: An Acceptable Condition? by Mark E. Smith, PE, GE Separation in Plane, or SIP, is a phenomenon where a material (a geomembrane in this article) shears parallel or sub parallel

More information

INTERNATIONAL STANDARD ISO 13479 Second edition 2009-09-15 Polyolefin pipes for the conveyance of fluids Determination of resistance to crack propagation Test method for slow crack growth on notched pipes

More information

DNVGL-CP-0248 Edition May 2016

DNVGL-CP-0248 Edition May 2016 CLASS PROGRAMME Approval of manufacturers DNVGL-CP-0248 Edition May 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that

More information