AEMO TECHNICAL SPECIFICATION - VAR DISPATCH PARTICIPANT INTERFACES 2016

Size: px
Start display at page:

Download "AEMO TECHNICAL SPECIFICATION - VAR DISPATCH PARTICIPANT INTERFACES 2016"

Transcription

1 AEMO TECHNICAL SPECIFICATION - VAR DISPATCH PARTICIPANT INTERFACES FEBRUARY 2016 Version: 1.0 Version: 1.0 Change Notice Series N/A 2016 Australian Energy Market Operator Ltd (AEMO). All rights reserved.

2 Important Notice Important Notice AEMO has prepared this AEMO Technical Specification - VAR Dispatch participant interfaces 2016 (Technical Specification) to provide guidance on the use of the MVAR Dispatch, February 2016 under the National Gas or Electricity Rules (Rules), as at the date of publication. No Reliance or warranty This Technical Specification does not constitute legal or business advice, and should not be relied on as a substitute for obtaining detailed advice about the National Gas or Electricity Law, the Rules or any other applicable laws, procedures or policies. While AEMO has made every effort to ensure the quality of the information in this Technical Specification, neither AEMO, nor any of its employees, agents and consultants make any representation or warranty as to the accuracy, reliability, completeness, currency or suitability for particular purposes of that information. Limitation of liability To the maximum extent permitted by law, AEMO and its advisers, consultants and other contributors to this Technical Specification (or their respective associated companies, businesses, partners, directors, officers or employees) are not liable (whether by reason of negligence or otherwise) for any errors, omissions, defects or misrepresentations in this document, or for any loss or damage suffered by persons who use or rely on the information in it. Copyright Copyright Australian Energy Market Operator Limited. The material in this publication may be used in accordance with the copyright permissions on AEMO s website. Trademark notices Microsoft, Windows and SQL Server are either registered trademarks or trademarks of Microsoft Corporation in the United States and/or other countries. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Distribution Commercial-in-confidence with NEM participants Document identification Title: AEMO Technical Specification - VAR Dispatch participant interfaces 2016 Version: 1.0 Release: MVAR Dispatch, February 2016 Responsible Department: PMO Documentation Team Last Update: Monday, 15 February 2016 Notes: no notes. Documents made obsolete: The release of this document changes only the version of the AEMO Technical Specification MVAR Dispatch 2015 No documents are made obsolete by releasing this document version 1.0. Revision history Date Person Version Description 6-Jul-15 K. Rodrigues 0.10 Draft 9-Jul-15 K. Rodrigues 0.2 Updated screen shots of Web Portal. Added Revision History table. Other minor additions / corrections. 14-Jul-15 K. Rodrigues 0.3 Added option for Windfarms in AVR mode to receive Voltage setpoint targets. Also AVR mode status. 10-Oct-15 T. Butterworth Changed sample Instruction file references from 'VAR,INSTRUCTION' and 'VAR,INSTRUCTION_TRK' to 'VOLTAGE_INSTRUCTION_INSTRUCTION' and 'VOLTAGE_INSTRUCTION_TRACK' respectively 16-Oct-15 K. Rodrigues 0.4 Added Conformance flow diagram Added Web Portal screen behaviour and alarms table 22-Jan-16 K. Rodrigues 0.5 Switching instructions changed from digital multi-state to an analog type in SCADA AEMO i

3 Contents Date Person Version Description 25-Jan-16 M. Strong SCADA review 29-Jan-16 S. Hang Web Portal section 4.4 update Control types only sent from one SCADA production site at a time. Added table of default IDs for VDS SCADA. Changes in sections and Feb-16 K. Rodrigues 1.0 Edits reviewed. Links added for Dashboard website and Web Portal user guide doc. Reviewed by Chris Stewart. Further information For further information, please visit AEMO s website or contact: AEMO Information and Support Hub Phone: 1300 AEMO 00 ( ) and follow the prompts. supporthub@aemo.com.au 2016 AEMO ii

4 Contents Contents 1 Introduction Intended Audience Project Scope Systems list Definitions Summary of Device Types and Instruction Types Request for feedback Live website Project Schedule Proposed timeline Executive summary Project implications Summary Benefits Business Impact Risks associated with the change Common Components AEMO VAr dispatch system: AEMO to RPO communication interface Control instructions by Device Type VAr Dispatch Signal (cycle phases) Conformance Status RPO to AEMO communication interface Reactive Device Availability Status AVR Mode Status (optional) RPOs systems (basic functional requirements) Control NET (SCADA) Interface Control Instructions to NSPs using ICCP protocol Conversion of analogs to control types for forwarding to Generators and Windfarms VAR Dispatch Signal (cycle phases) Conformance Device Availability AVR Mode Status (optional) Redundant SCADA paths (duplication) Changes to be done by RPOs Intending to use SCADA Interface EMMS Data Interchange Interface MMS Data Model Control Instructions VAr Dispatch Signal (cycle phases) AEMO iii

5 Tables Conformance Device Availability Changes to be done by RPOs intending to use EMMS interface EMMS Web Portal MVAR Dispatch Web Interface Control Instructions VAr Dispatch Signal (cycle phases) Conformance Screen behaviour and Alarms Device Availability Changes to be done by RPOs intending to use Web Portal interface Network Outage Scheduler (NOS) NOS for RPOs equipment names NOS for equipment availability status References AEMO CSV data format standard AEMO s website asexml standards Consultations Information and Support Hub Appendix A: VAR MMS Data Model changes...25 A.1 New Package: VOLTAGE_INSTRUCTIONS Tables A.2 Participant interfaces changes A.3 File interface changes Table 1: VAr Dispatch definition of terms... 2 Table 2: Summary of Device Types and Instruction Types... 2 Table 3: VAr Project proposed timeline... 4 Table 4: Reactive Device Types under VDS control... 7 Table 5: Meaning of numbers sent as Switching Instructions... 8 Table 6: Default VDS SCADA IDs Table 7: Conformance Indicators sent via SCADA points Table 8: Reactive device availability status Table 9: EMMS MVar Web Screen Information Table 10: EMMS Web Portal Alarms Figures Figure 1: Example Signal for VDS in Auto Mode... 9 Figure 2: Flow diagram for Conformance Status Figure 3: SCADA flow and prototcols Figure 4. Example screen shot of webpage Figure 5: Example of webscreen cycle phases Figure 6: Example of webscreen conformance AEMO iv

6 Introduction 1 Introduction This document describes the technical requirements relevant to participant systems for the AEMO VAr Dispatch Project implementation. For background information about the project see: Executive summary VAr Dispatch project implications Notes: This document is written in plain language for easy reading. Wherever there is a discrepancy between the NEM Rules and a term in this document, the NEM Rules take precedence. Text in this format indicates a direct hyperlink. You may need to hold down the control key when clicking on the link. If this document is in pdf format all links may not work. Resources and supporting documentation are listed in the References section. 1.1 Intended Audience The intended audience include: Business representatives (management) in participant organisations for assessing business impact and choosing which communication options will be most suitable. See Executive Summary section. Technical (IT) staff in participant organisations for assessing the options for inbound and outbound communication requirements, suggesting solutions for RPO displays and interaction with the system, providing estimates (to their organisation s management) and implementing technical changes on the participant side. 1.2 Project Scope The scope of this project is for AEMO to automate the creation of VAr dispatch schedules and to send instructions electronically 1 to RPOs for them to view and execute the instructions. The scope also includes conformance monitoring. The project scope does not include the following: Communication arrangements between NSPs and other RPO s plant (e.g. generators and wind farms) who do not have direct SCADA or NOS communication with AEMO. The RPOs decision about how to apply instructions (e.g. operator manual action). 1.3 Systems list This project includes new functionality for the following AEMO systems: Control Net (SCADA) ICCP interfaces with NSPs EMMS Data Interchange (B2B) and Web Portal Network Outage Scheduler (NOS) 1 Refer to section 4 for information on the interface options available AEMO 1

7 Introduction 1.4 Definitions Table 1 explains some of the acronyms and terminology used in conjunction with this project. Table 1: VAr Dispatch definition of terms Definition Version Description VAr RPO VDS System ICCP NEM NOS EMS EMMS NSP PSO RTO Volt-Ampere reactive Reactive Plant Operator: A participant who accepts and responds to reactive plant instructions from AEMO VAr Dispatch Scheduling System. It implies the set of software components at AEMO that will provide the functionality included in the project scope Inter Control Centre Protocol (for SCADA communications) National Electricity Market AEMO s Network Outage Scheduler, used for the programming and scheduling of transmission equipment outages. Energy Management System Electricity Market Management System Network Service Provider (TNSP and DSNP for Transmission and Distribution respectively) AEMO Power System Operations AEMO Real Time Operations 1.5 Summary of Device Types and Instruction Types Table 2: Summary of Device Types and Instruction Types Device Type Shunt Capacitor Shunt Reactor Transformer Transformer Generator Synchronous Condenser Synchronous Condenser Generator or Synchronous Condenser Group Wind Farm SVC Instruction Type ON / OFF / Do Nothing ON / OFF / Do Nothing AVR Voltage Setpoint Delta in kv Delta Tap Position AVR Voltage Setpoint Delta in kv AVR Voltage Setpoint Delta in kv Commit/ Decommit / Do Nothing Reference Bus Voltage setpoint Delta in kv MVAr Setpoint Delta in MVAr AVR Voltage Setpoint Delta in kv AEMO has issued a list of all reactive devices to be included in the automated VAr Dispatch. To request copy please VarProject@aemo.com.au AEMO 2

8 Introduction 1.6 Request for feedback completed and closed AEMO seeks feedback from RPOs regarding any questions or concerns with the interface implementations. In particular, we wish RPOs to inform us of their preferred communication interface(s) and their contact people for operations, technical and testing. Please also include information regarding RPOs estimated timelines for implementation where possible. AEMO also requires a station ID and equipment ID as named at RPO side (mostly already in NOS for TNSP equipment but outstanding for generators). Response required by close of business: closed Please send your response by to VarProject@aemo.com.au with the following details: Reference ( subject): VAr Dispatch Project: feedback on draft Technical Specification for Participant Interfaces Name Organisation Contact details for nominated project liaisons in areas of operations, technical and testing Preferred communication option for inbound instructions Preferred communication option for providing device availability status Estimated timeline for RPO technical implementation and testing Comments / Questions Station ID and equipment ID for generators and wind farms as named at RPO side. You may also include a human readable description for each. Please see this section for details: NOS for RPOs equipment names AVR mode (yes, no or switchable) for transformers and wind farms For other general enquiries please mailto:supporthub@aemo.com.au 1.7 Live website AEMO posts updates about the status of live data feeds and other project information to the following Participant Dashboard website: AEMO 3

9 Project Schedule 2 Project Schedule 2.1 Proposed timeline Systems scheduled for implementation and available (indicative dates only): EMMS Pre-production: Thursday 10 September 2015 EMMS Production: Thursday 15 October 2015 System Acceptance of Alstom VAr Dispatch Scheduling System Friday 4 March 2016 The dates and times for the user group meetings are tentative only. AEMO will provide definite schedules closer to the meeting day. Table 3: VAr Project proposed timeline Milestone Date Description 2pm 30 June 2015 Reactive Plant Operator s Focus Group Meeting No. 8 2pm 14 July 2015 Technical Q & A session No. 1 2pm 21 July 2015 Technical Q & A session No. 2 2pm 28 July 2015 Technical Q & A session No. 3 2pm 4 August 2015 Technical Q & A session No. 4 Complete Preliminary Factory Acceptance Testing Commence installation in AEMO s Dispatch Training Simulator.. August 2015 September 2015 Conduct tuning and site acceptance testing Participants prepare for testing. September 2015 Commence AEMO operator training October 2015 Publication of change notice for necessary changes to market systems AEMO EMMS data interchange and web interface available for testing AEMO SCADA available for point to point testing Commence sessions with Reactive Plant Operators October 2015 October 2015 October 2015 October 2015 The aim of these sessions is to develop familiarity with the new system Complete Final Factory Acceptance Testing November 2015 Testing on pre-production systems with Reactive plant operators Testing on production systems with reactive plant operators and open loop trial October November 2015 November December 2015 Commence operational trial in open-loop mode 14 December 2015 The operational trial in open-loop mode will be conducted in parallel with current manual processes over Summer 2015/16 Transition to closed-loop mode 15 February 2016 RPOs act on Var electronic instructions Go Live 04 April 2016 VAr Dispatch Scheduling System in production and system fully operational Commence AEMO new shift staffing arrangements in control room April AEMO 4

10 Executive summary Project implications 3 Executive summary Project implications 3.1 Summary VAr dispatch is a term used for issuing instructions to achieve stable voltage control of the electricity grid. These instructions typically request changes to reactive plant, which are able to increase or decrease the VAr contribution to the grid. Capacitors, reactors and generating units are typical examples of devices with VAr capability. The intended recipients of VAr dispatch instructions relating to reactive power devices will be Generator Control Rooms and Network Operators who control the reactive power devices (i.e. RPOs). Generator Traders may also be interested in viewing VAr instructions. Currently RPOs receive voltage control instructions from AEMO via telephone. The scope of this project is to automate the creation of VAr dispatch schedules and to send instructions electronically 2 to RPOs, as well as to monitor conformance. This automated process would aim to achieve the same level of automation that currently exists for MW dispatch except that AEMO will not send control signals directly to plant, but rather send instructions that an RPO (person) can read on screen. AEMO requires reactive plant availability status from RPOs Benefits The VAr Dispatch Scheduling System Implementation Project is an initiative to improve NEM real time operations processes by automating the production of VAr dispatch schedules and transmission of instructions electronically. The objective is to reduce the number of AEMO control room operator positions from 5 down to 4 without materially increasing operational risk. The benefits are improved processes and reduced cost. 3.3 Business Impact The business impact on AEMO includes the following (resources, cost and scheduling): Project implementation and rollout. Roster and role/responsibility changes for NEM control room staff (1 PSO controller to manage voltage control for the entire NEM). The timing of these changes is driven by the retirement of certain RTO staff. The impact on staff is also a consideration. Update procedures Training requirements for PSO controller as well as technical support staff. Implement VAr Dispatch in EMS Dispatch Training Simulator environment for training and tuning purposes. 2 Refer to section 4 for information on the interface options available. 3 Refer to the relevant section on Device Availability for each of the interface options AEMO 5

11 Executive summary Project implications The business impact on RPOs includes the following (resources, cost and scheduling): Inform AEMO of the availability of their reactive power devices (3 options). Receive VAr dispatch instructions electronically (3 options). May require development of a custom interface and display for RPO. Each RPO is responsible for their own interface and display arrangements. Respond to non-conformance. Investigate any potential impact on own automated control systems Update procedures Training requirements for control room and technical support staff. 3.4 Risks associated with the change R1. There is a risk that the vendor software or interfaces may not meet the technical and operational requirements. R2. There is a risk that the AEMO software or interfaces may not meet the technical and operational requirements. R3. There is a risk that reactive plant operators do not cooperate with or accept the changes R4. There is a project delivery risk that software development and implementation project suffers either significant delays or a significant increase in costs. R5. There is a risk that the automated process does not deliver the reduction in control room workload to reduce shift staffing AEMO 6

12 4 Technical information: VAr Dispatch Project Implementation 4.1 Common Components AEMO VAr dispatch system: Determination of VAr dispatch schedule for voltage control Var Dispatch Instructions for reactive plant sent electronically to RPOs. Monitoring of Conformance. This process will compare actual state of the system (state estimated) with the current instruction. A status flag for conformance (per device) will also be sent electronically. Resolving Non- Conformance will be o an automated notification process to alert RPOs when they are not conforming to instructions, o automated adjustment of the schedule if non-conformance is not addressed (i.e. the nonconforming device is flagged as such at AEMO s end and therefore excluded from subsequent schedules and will require operator intervention to return it to being available). Full integration with the AEMO simulator environment for training and tuning purposes AEMO to RPO communication interface AEMO is making 3 interface options available to participants for receiving VAr instructions: ControlNET (SCADA) interface EMMS Data Interchange interface EMMS Web Portal It is important to note that it is at the participants discretion to choose the preferred interface for the receipt of VAr Dispatch instructions. Any one of these interface methods is available for the participant to use. The current EMMS release includes the data model changes (structures) required for the MVar Dispatch project release. The data content was available prior to the commencement of the trial in December Simulated data was available from October The sections below provide the details of each of these options Control instructions by Device Type Table 4 explains the different types of reactive devices that can receive targets from the VDS. Table 4: Reactive Device Types under VDS control Device Type Instruction Type SCADA Type Instruction Description Shunt Capacitor OFF / ON / NO CHANGE Analog *See Table 5: Meaning of numbers sent as Switching Instructions Shunt Reactor OFF / ON / NO CHANGE Analog *See Table 5: Meaning of numbers sent as Switching Instructions Transformer AVR Voltage Setpoint Analog An analog representing the requested change in the voltage setpoint of a transformer (delta kv). For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. If the RPO intends 2016 AEMO 7

13 Device Type Instruction Type SCADA Type Instruction Description to be able to swap between receiving voltage setpoints or tap change instruction then we also recommend a SCADA status to be sent to AEMO to indicate AVR mode. See AVR Mode Status (optional) Transformer Tap Position Analog An analog representing the requested change (delta position) of tap position of a transformer. A negative value implies step down and a positive value implies step up. For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. Generator AVR Voltage Setpoint Analog An analog representing the requested change in the voltage setpoint of a generating unit (delta kv). For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. Synchronous Condenser AVR Voltage setpoint Analog An analog representing the requested change in the voltage setpoint of a synchronous condenser (delta kv). For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. Synchronous Condenser De-commit / Commit / NO CHANGE Analog *See Table 5: Meaning of numbers sent as Switching Instructions. A Commit instruction will be issued together with an AVR Voltage setpoint instruction within the same instruction set. Generator or Synchronous Condenser Group Reference bus Voltage Setpoint Analog An analog representing the requested change in voltage of the nominated reference bus (delta kv). For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. Wind Farm MVAr Setpoint Analog An analog representing the requested change in the MVAr output of a wind farm as measured at the KV level where the generator is modelled in AEMOs EMS. A positive MVAr value is in the sense that the device exports MVAr s to the power system. The delta MVAr value will indicate by how much more the device will export MVAr to the power system to raise its voltage. For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. Wind Farm AVR Voltage Setpoint Analog An analog representing the requested change in the voltage setpoint of a wind farm (delta kv). For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. If the wind farm intends to be able to swap between receiving voltage or MVAr setpoints then we also require a SCADA status to be sent to AEMO which indicates AVR mode. See AVR Mode Status (optional) SVC AVR Voltage Setpoint Analog An analog representing the requested change in the voltage setpoint of a static VAr compensator (delta kv). For SCADA a zero will be transmitted if no change is required in this cycle. For EMMS the field will be null if no change is required in this cycle. Table 5: Meaning of numbers sent as Switching Instructions Target/Change NEMReport and WebPortal SCADA (ICCP) Analog / Control Meaning OFF [De-commit] De-energise the device (e.g. take capacitor Out of Service) ON [Commit] Energise the device (e.g. put capacitor In Service) NO CHANGE <blank> 1.00 Don t take any action Analog instructions (e.g. tap changes or voltage and MVAr setpoints) will be issued as Delta values. AEMO has chosen to maintain the issuance of all analog instructions as delta rather than absolute value instructions for the following reasons: 1. It is in line with current practice of verbally giving instructions in terms of changes. 2. The application computes target values based on state estimated values. The state estimator values may be slightly different to the SCADA telemetry AEMO receives. 3. The SCADA telemetry AEMO receives on a device could potentially be sourced from a different transducer than the SCADA point the RPO is monitoring. There will most likely be differences AEMO 8

14 Switching instructions will be issued as a three state status. This will allow for instructions that request the device to be switched ON, the device to be switched OFF as well as the device to remain in its current state (i.e. no instruction). AEMO has issued a spreadsheet containing all reactive devices that are to be included in the VAr dispatch schedule (for another copy please VarProject@aemo.com.au) VAr Dispatch Signal (cycle phases) In addition to the set of device instructions, AEMO will also send a global VAr Dispatch signal (binary status point for SCADA or a signal file for EMMS interface). The purpose is to provide the RPO systems with a mechanism to synchronise with the timing of the AEMO VAr Dispatch cycle, typically one run every 15 minutes while in Auto Mode 4. In essence, the signal indicates when instructions are valid and should be acted upon vs. a waiting period of no instruction execution. Figure 1: Example Signal for VDS in Auto Mode The no instructions period starts at the beginning of a VDS cycle, at which point the state estimator takes a snapshot of the current power system state (based on incoming SCADA). At this point the RPO should abandon any unimplemented instructions from the previous cycle. The VDS instruction set will be based on the power system state at that start time, so any subsequent execution of control actions by an RPO (while the VDS algorithms are being solved) will not be taken into account and hence could result in an undesired outcome. The no instructions period ends when VDS has come up with a new schedule of instructions and dispatches it. Now RPOs may execute the requested actions until the next no instruction period starts again for the next VDS cycle. See sections below for details of signal implementation for each of the communication options Conformance Status For the benefit of both RPO s and AEMO, AEMO will be monitoring the performance of each device, by confirming the device does follow the instructions when issued. AEMO s conformance monitor will determine conformance by comparing the current cycle s State Estimator snapshot of the power system state against the instructions from the previous VDS cycle. For each device that will participate in the VAr Dispatch, AEMO will send a conformance status electronically (binary conforming / not conforming). 4 Any timing of the VDS cycle specified here is subject to fine-tuning. The description of other VDS modes is outside the scope of this document. Relevant to RPOs is that cycle time may be less than 15 minutes and may be ad-hoc when triggered by AEMO PSO controller. The system will allow the RPO a minimum time (e.g. 5 minutes) and maximum time to execute instructions AEMO 9

15 For example, if a generator was instructed to increase voltage in the previous cycle by Delta_kV, then conformance is measured by comparing the generator bus voltage in the current snapshot with the same point in the previous snapshot and seeing if the difference matches the delta kv instruction (within a tolerance range) i.e. Before_kV + Delta_kV ~ Present_kV If the same device does not follow its instructions for a number of consecutive VDS cycles, it will be marked as non-conforming (CONFORMING field set to N). The conformance parameters (viz. conformance size threshold and count thresholds) for each device type will be determined by AEMO during the fine-tuning in the trial phase. When a device is first flagged as non-conforming, there may still be a pending instruction that was issued within that same cycle 5. Subsequent cycles will not issue instructions for as long as the CONFORMING flag remains false. Non-conformance status can be reset by the RPO through setting the device as not available for at least one VDS cycle. Figure 2: Flow diagram for Conformance Status 5 This is due to the fact that the dispatch schedule is determined prior to the conformance calculations AEMO 10

16 4.1.3 RPO to AEMO communication interface Reactive Device Availability Status Each RPO is required to indicate to AEMO whether a reactive device is available for control. The default assumption is that plant is available unless otherwise indicated. AEMO is making 3 options available to participants for submitting plant availability information: 1. SCADA status indicating availability of the device for reactive control in real time. See section: Device Availability 2. Entry in AEMO s Network Outage Scheduler (NOS) 6 for periods when plant will be unavailable (excluding generators). See section: Network Outage Scheduler (NOS) for Device Availability 3. Verbal advice to AEMO control room. 7 The sections below provide the details of each of these options. Note that the EMMS interfaces are not two-way communication mechanisms and cannot be used by participants to inform AEMO of device availability AVR Mode Status (optional) AEMO s model contains a status to indicate if devices such as transformers and wind farms are operating in AVR mode or not. For the majority of devices that will permanently operate in one mode, it is acceptable to set these up as part of the model. AEMO requests the RPO s to verify the correct settings for all reactive plant taking part in VAr dispatch. In other cases, where the RPO may wish to change the AVR mode of particular devices in real time (e.g. some wind farms that are operated in more than one control mode), AEMO requests that the real-time AVR status be telemetered to AEMO via SCADA. If a wind farm is in AVR mode, then VDS will send a voltage setpoint (delta kv) instruction. If it is not in AVR mode, it will receive a MVAr setpoint (delta MVAr) instruction. If a transformer is in AVR mode it will receive a voltage setpoint (delta kv). If it is not in AVR mode it will receive a tap change instruction (delta tap position). For those devices that may switch their operating mode, two different instructions will appear in the dispatch to represent either operating mode, but only one instruction will request a change at any one time that is appropriate to the mode of operation RPOs systems (basic functional requirements) The RPO will need (as a minimum): One or more displays to show the instructions and conformance status sent by AEMO. The ability to change the availability status of plant (which should subsequently be communicated to AEMO) [Assumed existing functionality] The ability to implement the instructions, i.e. execute required changes to reactive plant (e.g. switching, setpoint control or tap changes) 6 This option is only available to TNSP s who use the Network Outage Scheduler. 7 This option will be only be for devices that rarely require communication that they are unavailable and will be at AEMO s discretion AEMO 11

17 The sections following below provide the details of each option depending on the chosen method of communication (see subheadings starting with Changes to be done by RPOs ) 4.2 Control NET (SCADA) Interface This section deals with the transmission of VAr Dispatch instructions over the ControlNet (SCADA) interface. This is one of the three methods available for the receipt of instructions from AEMO. It is also one of three options for sending device availability to AEMO. If a RPO chooses to utilise the SCADA option for communication with AEMO, analog and status points will be sent /received via the ICCP method across existing links to Network Service Providers (TNSPs or DNSPs). This document does not specify the mode of communication between the NSP and the RPO in the case where the NSP is acting as a 3 rd party gateway Control Instructions to NSPs using ICCP protocol For a definition of all instructions see: Control instructions by Device Type Conformance and Timing signal will be standard ICCP status point type (binary). Delta setpoints and tap changes will be standard ICCP analog type. All switching instructions will be issued as three-state analog values to indicate OFF / ON / DO Nothing. See Table 5: Meaning of numbers sent as Switching Instructions. The GENGRP device type for aggregated generators will require SCADA points to be associated with the regulated bus, which is common to all the generators, i.e. device type bus / node. If there are cases where the choice of bus is not obvious please contact AEMO for advice. The following table provides the standard 4-character IDs that can be appended to the device composite ID for defining the new VDS SCADA items. The text marked with orange colour relates to special requirements for generators and windfarms. Table 6: Default VDS SCADA IDs VDS Input / Output Instruction Type ICCP Type Proposed IDs Proposed IDs when converted to Control Types Source Destination Unit Voltage Delta change Analog / [Setpoint] VV_D VVDC AEMO NSP / [ GEN CO] Unit MVAr (Wind Farm only) Delta change Analog / [Setpoint] VQ_D VQDC AEMO NSP / [ GEN CO] SVC Voltage (AVR On) Delta change Analog / [Setpoint] VV_D VVDC AEMO NSP / [ GEN CO] Trans Voltage (AVR On) Delta change Analog / [Setpoint] VV_D VVDC AEMO NSP / [ GEN CO] Trans Tap (AVR off) Delta change Analog / [Setpoint] VT_D VTDC AEMO NSP / [ GEN CO] Shunt On/Off/Do nothing Analog / [Setpoint] VSWT VSWC AEMO NSP / [ GEN CO] Bus Voltage (unit Group control) Delta change Analog / [Setpoint] VV_D VVDC AEMO NSP / [ GEN CO] 2016 AEMO 12

18 VDS Input / Output Instruction Type ICCP Type Proposed IDs Proposed IDs when converted to Control Types Source Destination Device Conformance On/Off (2 State) Status / [ON-OFF] VCNF VCFC AEMO NSP / [ GEN CO] VDS Timing signal On/Off (2 State) Status / [ON-OFF] VTIM VDSC AEMO NSP / [ GEN CO] Device Availability On/Off (2 State) Status VAVL [GEN CO ] / NSP AEMO Mode Voltage (Wind Farm, SVC, transformer) On/Off (2 State) Status AVR [GEN CO ] / NSP AEMO Mode VAr (Wind Farm only) On/Off (2 State) Status QMD [GEN CO ] / NSP AEMO Mode Power Factor (Wind Farm only) On/Off (2 State) Status PF [GEN CO ] / NSP AEMO Conversion of analogs to control types for forwarding to Generators and Windfarms. Many generators and windfarms use protocols such as DNP3 and Conitel for SCADA communication to NSPs. These protocols typically require that anything sent from the NSP to the RTU must be a control type rather than, for example, a standard analog value. In these cases, AEMO will convert the analogs (for delta and switching instructions) to control types in ICCP protocol before sending them out. AEMO do not have direct communication links to generators and windfarms. Typically, these SCADA items are passed to AEMO via the TNSPs. Generator / Windfarm DNP3, CONITEL etc. TNSP ICCP AEMO VAR Dispatch Signal (cycle phases) Refer to section: VAr Dispatch Signal This single SCADA status is optional and will have a number of purposes: 1. At the falling edge transition (1 to 0), AEMO will send No Instructions to RPO s. This will signal the point at which the state estimator starts the estimation of the power system that will feed into the Var Dispatch System for the computation of dispatch instructions. 2. Whilst this signal remains at 0, it indicates that the VDS is still analysing the state of the power system to determine a new set of instructions. During this time, any unimplemented instructions from the previous cycle should be terminated in preparation for a new set of instructions. This period will nominally be about 5 minutes duration AEMO 13

19 3. At the rising edge transition (0 to 1), a new set of dispatch instruction will be determined and sent to the RPO. This event could be used to trigger calculations on the RPO s SCADA system if desired. 4. Whilst this signal remains at 1, it indicates that a valid set of instructions are available and should be implemented as instructed. It will nominally be 10 minutes duration in this state before the next cycle commences Conformance Refer to common section: Conformance Status Table 7: Conformance Indicators sent via SCADA points Conformance Status Value 1 (TRUE) 0 (FALSE) Description Indicates that the device is following the instructions being sent to it, i.e. it is CONFORMING Indicates that the device is not following instructions for a set time-period, i.e. it is NOT CONFORMING. The device will be marked as unavailable until operator action is taken to restore its status Device Availability Refer to common section above: Reactive Device Availability Status One SCADA status point per reactive device indicating availability of the device for reactive control in real time. Table 8: Reactive device availability status Availability Status Value 1 (TRUE) 0 (FALSE) Description Indicates that the device is available for use in the schedule Indicates that the device is not available (e.g. planned maintenance) Note that the above is in addition to AEMO s minimum SCADA requirements, which is assumed to already be in place for existing plant AVR Mode Status (optional) Also refer to common section above: AVR Mode Status (optional) Table 8: AVR mode status AVR Mode Status Value Description 1 (TRUE) Indicates that the device is in Voltage Control mode 0 (FALSE) Indicates that the device is not in Voltage Control mode Note that Windfarms usually also send individual status points for other modes such as VAr or Power Factor control modes AEMO 14

20 4.2.6 Redundant SCADA paths (duplication) To ensure high availability of SCADA there are two redundant communication paths to AEMO s control centres in Brisbane and Sydney. Data sent from the two sites will be identical. The RPO will need to determine how they wish to accommodate the duplicate sources of data. For generators, this may involve liaising with a TNSP to combine the two sources into one before passing this on to the power station (e.g. if an item from one site is marked as suspect the good value from the other site should be used). Alternatively, the Reactive Plant Operator may choose to receive both sources of each point and combine them at their site. In the case of SCADA items being converted to control types for the sake of accommodating protocols other than ICCP, these controls will only be sent from one AEMO site at a time. This will always be the same site as where the existing Automatic Generation Control instructions are being sent from, i.e. Brisbane or Sydney Changes to be done by RPOs Intending to use SCADA Interface AEMO has issued a spreadsheet containing all reactive devices that are to be included in the VAr dispatch schedule (for another copy please VarProject@aemo.com.au). A reactive plant operator, receiving VAr Dispatch instructions will need to do the following: 1. Configure local SCADA interface and communication channels to receive the SCADA points identified in above sections for each item of plant that can potentially receive VAr instructions from AEMO. Generators may have to initiate negotiations with their NSP to allow for their SCADA to be linked to AEMO. a. For generators, this would include generator transformer tap positions changes and generator AVR setpoint changes. b. For TNSP s, this would include reactive shunt devices status, system transformer AVR setpoint changes or tap position changes, and SVC voltage setpoint changes. c. For wind farms, this would include MVAr setpoint changes. 2. Configure SCADA points to send availability information to AEMO for each of their reactive devices that normally receive verbal instructions. 3. Determine how they wish to accommodate the duplicate sources of SCADA data. For generators, not receiving converted control instructions this may involve liaising with a TNSP to combine the two sources into one before passing this on to the power station. Alternatively, the Reactive Plant Operator may choose to receive both sources of each point and select best quality at their site (either). For generators receiving SCADA that has converted into controls, these will only be sent from one link at a time and no combination is required. 4. Determine if and how they may want to use the VAr Dispatch Signal to indicate that a new set of VAr Dispatch instructions is about to arrive or has been received. 5. Provide a means by which instructions sent via SCADA can be viewed by their local operator in order to initiate the requested action. It may also be necessary to alert the local operator that there are pending instructions to be implemented. 6. Provide a means by which the local operator can set or reset availability of their own reactive equipment, when being communicated via SCADA AEMO 15

21 7. Provide a mechanism by which their local operator is alerted to and can view non-conformance issues (identified by the non-conformance status sent by AEMO), and take appropriate action. 8. Develop procedures that will; a. Enable the RPO to implement the requested instructions when it arrives. b. Prevent unapplied instructions from being implemented when the VAr Dispatch Signal is reset to the waiting period. Note that all pending instructions in SCADA are also reset when the VAr Dispatch Signal resets. 9. Create a test plan for verifying the above changes before the commencement of the trial period (started in December 2015). Wind farms can receive voltage setpoint changes (if the AVR status is true), or they can receive MVAr setpoint target changes. If the wind farm is operating in constant power factor mode or similar, the MVAr setpoint will need to be converted to the equivalent in its current operating mode and applied at the time the instruction is issued. 4.3 EMMS Data Interchange Interface This section discusses details relating to the market systems file interchange method of communication MMS Data Model 4.24 The MMS Data Model released with the EMMS May 2015 release includes changes to support the MVAR Dispatch project. The data model changes are included in the EMMS May 2015 Technical Specification document, which was previously issued. Please refer to Appendix for a copy of the relevant tables as well as a copy of the full pdf file: Appendix A: VAR MMS Data Model changes Change Notice EMMS Technical Specification - May 2015 issued on 16 March This project adds one new package with two new tables to the MMS Data Model: Package VOLTAGE_INSTRUCTIONS voltage instructions Table VOLTAGE_INSTRUCTION_TRK tracking for voltage instructions (parent records) Table VOLTAGE_INSTRUCTION data for voltage instructions (child records) Data Interchange software and associated documentation is available for current and new participants, as follows: Current participants can use FTP to the participant file server in the Releases directory to download all supported Data Interchange software. EMMS PreProduction participant file share (FTP): Directory: /Releases/MMS Data Model/Production/v4.24/ Filename: Change Notice EMMS Technical Specification - May 2015.pdf New participants who do not yet have their access to the web portal can obtain the latest versions of Data Interchange bundles on AEMO s website: Systems/Data-Interchange AEMO 16

22 The data definitions for the voltage tables can be found in the EMMS May 2015 Technical Specification. See References for the EMMS May 2015 Technical Specification for the data definitions. For your convenience a full copy of this document is in Appendix A, as well as a copy of the tables relevant to VAr Dispatch only. The EMMS CSV file format is defined in section Control Instructions For a definition of all instructions, see section: Control instructions by Device Type The following is an example of the market data interchange file for control instructions. Please note that this is a mock-up of potential instructions in order to explain the file structure and the actual contents should not be interpreted as examples of real instructions to be expected. C,NEMP.WORLD,VAR_EXTERNAL,AEMO,PUBLIC,2015/03/15,10:30:00, ,VAR_EXTERNAL, I,VOLTAGE_INSTRUCTION,TRACK,1,RUN_DATETIME,FILE_TYPE D,VOLTAGE_INSTRUCTION,TRACK,1, 2015/03/15 10:30:00,INSTRUCTION I,VOLTAGE_INSTRUCTION,INSTRUCTION,1,RUN_DATETIME,EMS_ID,Participant_ID,Station_ID,Device_ID,Device_T ype,control_type,target,conforming,instruction_summary D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,MURRAY.BUS.B1.KV,Transgrid, Murray 330kV Switching Station, 330kV B1 Bus,GENGRP,VOLTAGE,10,Y,Raise the voltage of 330kV B1 Bus at Murray 330kV Switching Station by 1.0 kv D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.R1.Switch,Transgrid,"Peakhurst 132kV Substation ea","132kv No.1 Capacitor",CAPACITOR,SWITCH,1,Y,"Switch 132kV No.1 Capacitor at Peakhurst 132kV Substation ea in service" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.R1.Switch,Transgrid,"Armidale 330kV Substation","No.1 capacitor",capacitor,switch,1,n,"switch No.1 capacitor at Armidale 330kV Substation in service" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.UN1.Voltage,Powerlink,"Alligator Creek 132kV","132kV 1 Bus T65",GENGRP,VOLTAGE,,Y,"NO INSTRUCTION" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,CBTS.BUS.1B_500.KV,AusNet,CBTS, NO 1 500kV,GENGRP,VOLTAGE,10,Y,Raise the voltage of NO 1 500kV Bus at CBTS by 10.0 kv D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.R1.Switch,Powerlink,"Chalumbin 275kV","857 Reactor 275kV",REACTOR,SWITCH,,Y,"NO INSTRUCTION" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.R1.Switch,Transgrid,"Sydney South 330kV Substation","No.2 Reactor",REACTOR,SWITCH,,Y,"NO INSTRUCTION" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.UN1.Voltage,ElectraNet,"PORT PIRIE 132/33/6.6/11kV SUBSTATION","132/33 TF 2",TRANS,VOLTAGE,-4.0,Y,"Lower the voltage setpoint of Transformer 132/33 TF 2 at PORT PIRIE 132/33/6.6/11kV SUBSTATION by 4.0 kv" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.UN1.Voltage,Powerlink,"Gladstone North (T074) 132kV","1 Tfmr T074",TRANS,VOLTAGE,,N,"NON CONFORMING" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.UN1.Voltage,AusNet,HOTS,Svc,SVC,VOLTAGE,10.0,Y,"Raise the voltage setpoint of Svc at HOTS by 10.0 kv" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.UN1.Voltage,Powerlink,"Swanbank B PS","2 Generator SBK_PS",GEN,VOLTAGE,-10.0,N,"Lower the voltage setpoint of 2 Generator SBK_PS at Swanbank B PS by 10.0 kv" D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.UN1.Voltage,Transgrid,"Capital Windfarm","1",GEN,MVAR,10.0,Y,"Change MVAr of Unit 1 at Capital Wind Farm by 10 MVAr to raise voltage" C,"END OF REPORT", VAr Dispatch Signal (cycle phases) For general description and purpose refer to section: VAr Dispatch Signal For EMMS implementation of the signal refer to previously issued MMS documentation listed in section MMS Data Model The following represents a mock-up example of a signal file. C,NEMP.WORLD,VAR_EXTERNAL,AEMO,PUBLIC,2015/03/15,10:30:00, ,VAR_EXTERNAL, I,VOLTAGE_INSTRUCTION,TRACK,1,RUN_DATETIME,FILE_TYPE D,VOLTAGE_INSTRUCTION,TRACK,1, 2015/03/15 10:30:00,SIGNAL C,END OF REPORT, AEMO 17

23 4.3.4 Conformance Refer to section: Conformance Status The CONFORMING flag (see yellow marker in the example below) will be set to Y if the device followed the target from the previous interval. Conversely, the CONFORMING flag will be set to N only after a number of cycles of not following the target. The conformance parameters (viz. conformance size threshold and count thresholds) for each device type will be determined by AEMO during the fine-tuning in the trial phase. D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.R1.Switch,Transgrid,"Peakhurst 132kV Substation ea","132kv No.1 Capacitor",CAPACITOR,SWITCH,1,Y,"Switch 132kV No.1 Capacitor at Peakhurst 132kV Substation ea in service" The NON CONFORMING text will appear in the Instruction_Summary field (see yellow marker in the example below) after one more VDS cycle, from which point onwards VDS will treat it as unavailable. At this point the operator will need to take action in order to restore the device availability for VDS again. D,VOLTAGE_INSTRUCTION,INSTRUCTION,1, 2015/03/15 10:30:00,ST1.UN1.Voltage,Powerlink,"Gladstone North (T074) 132kV","1 Tfmr T074",TRANS,VOLTAGE,,N,"NON CONFORMING" Device Availability Note that the EMMS interface is not a two-way communication mechanism and cannot be used by participants to inform AEMO of device availability. Refer to section: Reactive Device Availability Status Changes to be done by RPOs intending to use EMMS interface Implement MMS Data Model v4.24 to gain access to the new data tables. Subscribe to MMS Participant Data Model file VAR_DISPATCH Develop functionality to retrieve and interpret the new VAr Dispatch datasets, including dispatch instructions, synchronising signal and conformance flags. Provide the RPO control room with one or more displays for viewing instructions and conformance. Also refer to: RPOs systems (basic functional requirements) 4.4 EMMS Web Portal MVAR Dispatch Web Interface For the most up to date user guide please download the following document from the Participant Dashboard: Guide to VAR Dispatch Web Interface V0.3 The user guide describes the meaning of options, web browser compatibility and similar usage parameters. If you have difficulty navigating to the above link, please visit the website: Control Instructions For a definition of all instructions, see section: Control instructions by Device Type A new web screen will be provided on the EMMS Web Portal allowing participants to view the latest current instructions. Note that the Web Portal does not currently have the ability to show a history of previous instructions AEMO 18

24 The EMMS Web Portal is simply a method to display the same information that is captured in the files that will be sent out via the EMMS Data Interchange. Therefore, the information contained in the section above is also relevant to the Web Portal. By default all reactive devices taking part in VAr Dispatch will be displayed in the list, even if they have no instruction (the Target field will be blank). Below is an example screen shot of the web page (indicative only, the production version may vary slightly). Please also note that the sample contents are not indicative of real instructions. Figure 4. Example screen shot of webpage The following information will be included on the web page: Will show only the latest instructions Will allow filtering on one or more Participant ID by clicking inside the text box Will allow filtering on stations based on what Participant IDs are selected Will allow filtering on only those devices that have received a target Will allow automatic refresh (10 second intervals) Highlights non-conforming devices (entire row will be coloured red) Shows the issued date/time (top right corner of the page). The date box will be green for normal operation and red when no new instruction set has been issued for more than 15 minutes. This indicates to the RPO that there may be VDS system or communication issues in which case AEMO control room will revert to telephonic instructions. Will alarm when receives new instructions for filtered on device Will alarm when VDS has been inactive for more than 30 minutes Will alarm when unable to contact AEMO web servers Table 9: EMMS MVar Web Screen Information The information fields (in top right corner of the page): Information Field Description Instruction/Signal Indicates whether instructions are currently active or a signal has been issued to clear instructions AEMO 19

25 Information Field Run Date/Time Description MVAr Interval a timestamp of when instructions issued The filter fields are: Filter Field Participant Station Show only devices with Targets Description The NEM id of the participant who owns the equipment The station names grouped under Participant ID Only displays devices that have been issued a target Description of fields in the table Field Name EMS ID Participant ID Station ID Device ID Device Type Control Type Target Instruction Description The unique identifier for reference within AEMO matches equipment names between NOS and EMS The NEM id of the participant who owns the equipment The company/participant preferred name of the substation the equipment is located at The company/participant preferred name of an equipment One of REACTOR, CAPACITOR, GEN, SVC, TRANS or GENGRP but may be extended to other types The type of issued control Instruction for the device for this interval null denotes no instruction. Verbose summary of instruction VAr Dispatch Signal (cycle phases) For general description and purpose refer to section: VAr Dispatch Signal When a VAr dispatch signal is issued to signify the start of the no instructions period, the web screen will appear as follows (blank table): Figure 5: Example of webscreen cycle phases Conformance Refer to common section: Conformance Status Also refer to the EMMS section above for details about when the CONFORMANCE field will be set to Y/N, and when the text in the INSTRUCTION_SUMMARY field will be updated for NON CONFORMANCE: Conformance data A non-conforming device row will be highlighted in red AEMO 20

26 Figure 6: Example of webscreen conformance Screen behaviour and Alarms The following table describes the screen behaviour according to the main scenarios: Table 10: EMMS Web Portal Alarms Device Availability Note that the EMMS interface is not a two-way communication mechanism and cannot be used by participants to inform AEMO of device availability. Refer to section: Reactive Device Availability Status Changes to be done by RPOs intending to use Web Portal interface No changes necessary to participant systems. The operator just needs access to the web portal. Also refer to: RPOs systems (basic functional requirements) 4.5 Network Outage Scheduler (NOS) NOS is the primary means for TNSPs to provide outage information to AEMO and to receive approval to proceed with outages. The term outage implies the unavailability of any electrical equipment that forms part of the electricity grid and is in AEMO s direct oversight. NOS plays two roles in relation to VDS: Source of the RPOs equipment names. Source of equipment availability status for reactive devices 2016 AEMO 21

COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED TRANSMISSION SERVICES

COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED TRANSMISSION SERVICES COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED PREPARED BY: Network Development VERSION: 2.0 RELEASE DATE: 30 May 2012 Version Release History Version Date By Changes 1.0 6 Oct 11 Transmission

More information

International ejournals

International ejournals ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER

More information

POWER SYSTEM STABILITY GUIDELINES

POWER SYSTEM STABILITY GUIDELINES PREPARED BY: DOCUMENT REF: Planning PSSG-02 VERSION: 1.0 DATE: 25 May 2012 FINAL Final Matt Zema CEO Date 25/ 5 /2012 Version Release History VERSION DATE AUTHOR PEER REVIEW APPROVED COMMENTS 1.0 25/5/12

More information

Invoice Manager Admin Guide Basware P2P 17.3

Invoice Manager Admin Guide Basware P2P 17.3 Invoice Manager Admin Guide Basware P2P 17.3 Copyright 1999-2017 Basware Corporation. All rights reserved.. 1 Invoice Management Overview The Invoicing tab is a centralized location to manage all types

More information

WIND AND SOLAR ENERGY CONVERSION MODEL GUIDELINES CONSULTATION DRAFT REPORT AND DETERMINATION

WIND AND SOLAR ENERGY CONVERSION MODEL GUIDELINES CONSULTATION DRAFT REPORT AND DETERMINATION WIND AND SOLAR ENERGY CONVERSION MODEL GUIDELINES CONSULTATION DRAFT REPORT AND DETERMINATION Published: AUGUST 2016 DRAFT REPORT CONSULTATION ON AMENDMENTS TO THE WIND ENERGY CONVERSION MODEL (ECM) GUIDELINES

More information

B2B PROCEDURE CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS

B2B PROCEDURE CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS B2B PROCEDURE CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS ENERGY TYPE: Electricity PREPARED BY: Retail Markets and Metering DOCUMENT NO: Not Applicable VERSION NO: 2.2 EFFECTIVE DATE: 13 May 2015 FINAL

More information

TABLE OF CONTENTS DOCUMENT HISTORY

TABLE OF CONTENTS DOCUMENT HISTORY TABLE OF CONTENTS DOCUMENT HISTORY 4 UPDATE 17D 4 Revision History 4 Overview 4 Optional Uptake of New Features (Opt In) 5 Update Tasks 5 Feature Summary 6 Supply Chain Collaboration 7 Streamline Collaboration

More information

PJM Roadmap for edart

PJM Roadmap for edart PJM Roadmap for edart As of March 15, 2017 Background edart (electronic Dispatcher Application and Reporting Tool) is suite of electronic applications used to facilitate dispatcher-todispatcher communications,

More information

Power Potential webinar

Power Potential webinar Power Potential webinar Thank you for joining our webinar. Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a

More information

Oracle Landed Cost Management

Oracle Landed Cost Management Oracle Landed Cost Management Process Guide Release 12.1 Part No. E14299-01 April 2009 Oracle Landed Cost Management Process Guide, Release 12.1 Part No. E14299-01 Copyright 2009, Oracle and/or its affiliates.

More information

ADM920 SAP Identity Management

ADM920 SAP Identity Management ADM920 SAP Identity Management. COURSE OUTLINE Course Version: 17 Course Duration: 5 Day(s) SAP Copyrights and Trademarks 2016 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication

More information

SAP SuccessFactors Foundation

SAP SuccessFactors Foundation SAP SuccessFactors Foundation Technical and Functional Specifications CUSTOMER TABLE OF CONTENTS KEY FEATURES AND FUNCTIONALITIES... 3 INTELLIGENT SERVICES... 4 Activities... 4 Administration... 4 INTEGRATION

More information

Expedient User Manual Container Management

Expedient User Manual Container Management f Volume Expedient User Manual Container Management 13 Gavin Millman & Associates (Aust) Pty Ltd 281 Buckley Street Essendon VIC 3040 Phone 03 9331 3944 Web www.expedientsoftware.com.au Table of Contents

More information

NEM EVENT - DIRECTION TO SOUTH AUSTRALIA GENERATOR - 9 FEBRUARY 2017

NEM EVENT - DIRECTION TO SOUTH AUSTRALIA GENERATOR - 9 FEBRUARY 2017 NEM EVENT - DIRECTION TO SOUTH AUSTRALIA GENERATOR - 9 FEBRUARY 2017 Published: July 2017 IMPORTANT NOTICE Purpose AEMO has prepared this report in accordance with clause 3.13.6A(a) of the National Electricity

More information

Frequently Asked Questions on Secure Usage of Remote Support Platform for SAP Business One (RSP)

Frequently Asked Questions on Secure Usage of Remote Support Platform for SAP Business One (RSP) FAQs Remote Support Platform for SAP Business One 3.2 Document Version: 2.0 2017-04-20 Frequently Asked Questions on Secure Usage of Remote Support Platform for SAP Business One (RSP) All Countries Typographic

More information

MOD Data for Power System Modeling and Analysis

MOD Data for Power System Modeling and Analysis MOD-032-1 Data for Power System Modeling and Analysis A. Introduction 1. Title: Data for Power System Modeling and Analysis 2. Number: MOD-032-1 3. Purpose: To establish consistent modeling data requirements

More information

Oracle In-Memory Cost Management Cloud. Release What s New

Oracle In-Memory Cost Management Cloud. Release What s New Oracle In-Memory Cost Management Cloud Release 17.3 What s New TABLE OF CONTENTS REVISION HISTORY... 3 OVERVIEW... 4 UPDATE TASKS... 5 RELEASE FEATURE SUMMARY... 6 ORACLE IN-MEMORY COST MANAGEMENT CLOUD

More information

IBM TRIRIGA Version 10 Release 5.2. Inventory Management User Guide IBM

IBM TRIRIGA Version 10 Release 5.2. Inventory Management User Guide IBM IBM TRIRIGA Version 10 Release 5.2 Inventory Management User Guide IBM Note Before using this information and the product it supports, read the information in Notices on page 19. This edition applies to

More information

Employee Central Imports

Employee Central Imports SuccessFactors HCM Suite August 2014 Release Document Version: 1.0 2014-08-27 Administration Guide Typographic Conventions Type Style Example Example EXAMPLE Example Example EXAMPLE Description

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

CBPG01. Certification Bodies. Reference Guide

CBPG01. Certification Bodies. Reference Guide CBPG01 Certification Bodies Reference Guide Version: 1.0 Date: October 2014 Table of Contents 1 Module Overview... 3 1.1 Course Objectives... 3 1.2 Understanding This Reference Guide... 3 1.3 Legend...

More information

NetSuite OpenAir Mobile for iphone User Guide Version 2.2

NetSuite OpenAir Mobile for iphone User Guide Version 2.2 NetSuite OpenAir Mobile for iphone User Guide Version 2 General Notices Attributions NetSuite OpenAir includes functionality provided by HighCharts JS software, which is owned by and licensed through Highsoft

More information

SAP Consolidated Payables Link

SAP Consolidated Payables Link SAP Custom Development SAP Consolidated Payables Link CUSTOMER Document Version: 100 SAP Consolidated Payables Link 100 1 Copyright Copyright 2013 SAP AG. All rights reserved. SAP Library

More information

R2 TESTING GUIDELINE. PREPARED BY: Network Models Systems Capability VERSION: Final RELEASE DATE: 28 June 2013

R2 TESTING GUIDELINE. PREPARED BY: Network Models Systems Capability VERSION: Final RELEASE DATE: 28 June 2013 PREPARED BY: Network Models Systems Capability VERSION: Final RELEASE DATE: 28 June 2013 Version Release History Version Date By Approved By Changes 0.1 June 2013 BB MS This document has been created by

More information

Project and Portfolio Management Center

Project and Portfolio Management Center Project and Portfolio Management Center Software Version: 9.42 Resource Management User Guide Go to HELP CENTER ONLINE http://admhelp.microfocus.com/ppm/ Document Release Date: September 2017 Software

More information

PJM Technical Guidelines for. Installation of Synchrophasor Measurements at. Generation Facilities

PJM Technical Guidelines for. Installation of Synchrophasor Measurements at. Generation Facilities PJM Technical Guidelines for Installation of Synchrophasor Measurements at Generation Facilities Introduction The technical requirements and guidelines presented here are for reference to aid new generation

More information

Ariba Network Invoice Guide

Ariba Network Invoice Guide Ariba Network Invoice Guide Content 1. Introduction 2. Invoice Practices 3. Before you Begin Invoicing I. Viewing Customer Invoice Rules II. Electronic Invoice Routing and notifications III. Account Configuration

More information

Sage What s New. December 2017

Sage What s New. December 2017 Sage 100 2018 What s New December 2017 2017 The Sage Group plc or its licensors. All rights reserved. Sage, Sage logos, and Sage product and service names mentioned herein are the trademarks of The Sage

More information

Solutions Implementation Guide

Solutions Implementation Guide Solutions Implementation Guide Salesforce, Winter 18 @salesforcedocs Last updated: November 30, 2017 Copyright 2000 2017 salesforce.com, inc. All rights reserved. Salesforce is a registered trademark of

More information

The content can be provided to ORACLE iprocurement in basically 3 ways:

The content can be provided to ORACLE iprocurement in basically 3 ways: BT Procurement and Supply Chain 3 Catalogues and Content Options 3.1 Introduction The default method of ordering on ORACLE iprocurement is non-catalogue ordering or Special Requirements. This is a basic

More information

DELTA MARITIME ASSET MANAGEMENT SYSTEM

DELTA MARITIME ASSET MANAGEMENT SYSTEM Airport Business Centre Thornbury Road PLYMOUTH PL6 7PP tel: 0203 286 5836 email: info@deltasys.co.uk Last Update 16 th July 2014 DELTA MARITIME ASSET MANAGEMENT SYSTEM This document defines the overall

More information

An Introduction to SupplyPro

An Introduction to SupplyPro Hyphen Solutions, Ltd. An Introduction to SupplyPro 2004 Hyphen Solutions, Ltd. All rights reserved. Product and Company Information Product and Company Information The information in this document is

More information

WIND AND SOLAR ENERGY CONVERSION MODEL GUIDELINES CONSULTATION - ISSUES PAPER

WIND AND SOLAR ENERGY CONVERSION MODEL GUIDELINES CONSULTATION - ISSUES PAPER WIND AND SOLAR ENERGY CONVERSION MODEL GUIDELINES CONSULTATION - PREPARED BY: Forecasting VERSION: 1.0 DATE: 18 March 2016 FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES

UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES Guideline 1 (11) Contents 1 INTRODUCTION... 2 2 PRINCIPLES OF THE SUPPLY OF REACTIVE POWER... 2 2.1 Supply point

More information

I-SEM Testing Tariff High Level Options Consultation

I-SEM Testing Tariff High Level Options Consultation I-SEM Testing Tariff High Level Options Consultation 02 June 2017 Version 1.0 EXECUTIVE SUMMARY Testing Tariffs are currently applied to Units Under Test (UUT) in the Single Electricity Market (SEM) on

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Sage What s New. March 2018

Sage What s New. March 2018 Sage 100 2018 What s New March 2018 2018 The Sage Group plc or its licensors. All rights reserved. Sage, Sage logos, and Sage product and service names mentioned herein are the trademarks of The Sage Group

More information

safe reliable affordable GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS 1 21 September 2015 TITLE: PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS

safe reliable affordable GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS 1 21 September 2015 TITLE: PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS TITLE: GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS DOCUMENT STATUS: FINAL REVISION: DATE: 1 21 September 2015 2015 Electricity Networks Corporation trading

More information

SAP SuccessFactors Onboarding

SAP SuccessFactors Onboarding SAP SuccessFactors Onboarding Technical and Functional Specifications CUSTOMER TABLE OF CONTENTS KEY FEATURES AND FUNCTIONALITIES... 3 FORMS MANAGEMENT... 3 TASK AND PROCESS MANAGEMENT... 4 NEW HIRE PORTAL...

More information

SAP Innovation And Optimization Pathfinder How-To-Guide

SAP Innovation And Optimization Pathfinder How-To-Guide SAP Innovation And Optimization Pathfinder How-To-Guide How to extract all necessary information and request a Pathfinder report? SAP Innovation and Optimization Pathfinder A tailor-made report highlighting

More information

Reactive Reserve Checks (RRCs)

Reactive Reserve Checks (RRCs) (RRCs) PJM State & Member Training Dept. PJM 2016 1 Reactive Reserve Check (RRC) RRC generally called for during capacity deficient conditions or when a Heavy Load Voltage Schedule is expected Gives PJM

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

Oracle Utilities Network Management System

Oracle Utilities Network Management System Oracle Utilities Network Management System Release Notes Release 1.11.0.4 E36991-01 March 2013 Oracle Utilities Network Management System Release Notes E36991-01 Copyright 2013, Oracle and/or its affiliates.

More information

Market Trial Working Group I-SEM Project

Market Trial Working Group I-SEM Project Market Trial Working Group I-SEM Project Dublin, 31 August 2017 1 Overview of the Session Meeting Details Meeting Purpose Chair Secretariat I-SEM Market Trial Working Group Mark Needham Louise Dalton Amy

More information

Supply Chain EDI Supplier Accreditation Guide. EDI Supplier Accreditation Guide Page 1 of 25 July 2017 Myer Pty Ltd

Supply Chain EDI Supplier Accreditation Guide. EDI Supplier Accreditation Guide Page 1 of 25 July 2017 Myer Pty Ltd Supply Chain EDI Supplier Accreditation Guide EDI Supplier Accreditation Guide Page 1 of 25 Accreditation Guide This guide provides Suppliers with the necessary information to complete their Accreditation

More information

BRP Web EDI Suppliers Portal Version 3.2 Quick Reference Guide. Revision 3.0

BRP Web EDI Suppliers Portal Version 3.2 Quick Reference Guide. Revision 3.0 BRP Web EDI Suppliers Portal Version 3.2 Quick Reference Guide Revision 3.0 Table of Contents 1 Overview... 6 2 Supported EDI Transactions on the BRP Web EDI Portal... 7 2.1 Purchase Order (EDI transaction

More information

DEMAND TERMS IN EMMS DATA MODEL

DEMAND TERMS IN EMMS DATA MODEL DEMAND TERMS IN EMMS DATA MODEL Published: September 2016 IMPORTANT NOTICE Purpose AEMO has prepared this document to provide information about regional demand definitions, as at the date of publication.

More information

Non Registered Embedded Generation Information Pack

Non Registered Embedded Generation Information Pack Non Registered Embedded Generation Information Pack > 30 KW to 5 MW Ergon Energy Network Embedded Generator Information Pack With a focus on energising our diverse QLD communities, we are committed to

More information

Sage ERP Accpac Online 5.6

Sage ERP Accpac Online 5.6 Sage ERP Accpac Online 5.6 Integration Resource Guide for Sage ERP Accpac And Sage CRM (Updated: December 1, 2010) Thank you for choosing Sage ERP Accpac Online. This Resource Guide will provide important

More information

PeopleSoft Enterprise Collaborative Supply Management 9.1 PeopleBook

PeopleSoft Enterprise Collaborative Supply Management 9.1 PeopleBook PeopleSoft Enterprise Collaborative Supply Management 9.1 PeopleBook November 2009 PeopleSoft Enterprise Collaborative Supply Management 9.1 PeopleBook SKU fscm91pbr0 Copyright 1992, 2009, Oracle and/or

More information

Requirements for the Provision of Load Shedding Service for Import Version 4.0

Requirements for the Provision of Load Shedding Service for Import Version 4.0 LOAD SHED SERVICE for IMPORT (LSSi) Requirements Requirements for the Provision of Load Shedding Service for Import Version 4.0 This document outlines the eligibility criteria and requirements that an

More information

Oracle. SCM Cloud Using Supply Chain Collaboration. Release 13 (update 17D)

Oracle. SCM Cloud Using Supply Chain Collaboration. Release 13 (update 17D) Oracle SCM Cloud Release 13 (update 17D) Release 13 (update 17D) Part Number E89232-01 Copyright 2011-2017, Oracle and/or its affiliates. All rights reserved. Author: Venkat Dharmapuri This software and

More information

Oracle Network Logistics

Oracle Network Logistics Oracle Network Logistics Concepts and Procedures Release 11i August, 2000 Part No. A86278-01 Oracle Network Logistics Concepts and Procedures, Release 11i Part No. A86278-01 Copyright 1996, 2000, Oracle

More information

IMPLEMENTATION OF THE ELECTRONIC TIMESHEET WEBSITE FOR IN-HOME SUPPORTIVE SERVICES AND WAIVER PERSONAL CARE SERVICES PROVIDERS AND RECIPIENTS

IMPLEMENTATION OF THE ELECTRONIC TIMESHEET WEBSITE FOR IN-HOME SUPPORTIVE SERVICES AND WAIVER PERSONAL CARE SERVICES PROVIDERS AND RECIPIENTS REASON FOR THIS TRANSMITTAL June XX, 2017 ALL-COUNTY LETTER NO.: 17-XX [ ] State Law Change [ ] Federal Law or Regulation Change [ ] Court Order [ ] Clarification Requested by One or More Counties [X]

More information

Crowe Project Management

Crowe Project Management Smart decisions. Lasting value. Crowe Project Management For Microsoft Dynamics CRM Crowe Project Management for Microsoft Dynamics CRM Table of Contents Overview... 1 Main Menu End User Navigation...

More information

How To Create and Use an SAP ME Process Workflow

How To Create and Use an SAP ME Process Workflow SAP Manufacturing Execution How-To Guide How To Create and Use an SAP ME Process Workflow Applicable Release: ME 15.0 Version 1.0 May 15, 2014 Copyright 2014 SAP AG. All rights reserved. No part of this

More information

Telecom expense management platform CAAB Enterprise

Telecom expense management platform CAAB Enterprise Telecom expense management platform CAAB Enterprise NEC Australia au.nec.com Introduction CAAB Enterprise is a market leading Telecom Expense Management platform that enables organisations to manage and

More information

User s Manual. esims Web. Synthes Information Management Suite.

User s Manual. esims Web. Synthes Information Management Suite. User s Manual esims Web. Synthes Information Management Suite. Table of Contents Navigation and Interface Structure of the User Interface 1 Getting Around 2 Search and Edit Search 3 Cycle Count Recording

More information

HP Service Manager. Software Version: 9.40 For the supported Windows and Unix operating systems. Processes and Best Practices Guide (Classic Mode)

HP Service Manager. Software Version: 9.40 For the supported Windows and Unix operating systems. Processes and Best Practices Guide (Classic Mode) HP Service Manager Software Version: 9.40 For the supported Windows and Unix operating systems Processes and Best Practices Guide (Classic Mode) Document Release Date: January 2015 Software Release Date:

More information

Integrating SAP Hybris Cloud for Customer with SAP Hybris Marketing Cloud using HANA Cloud Integration Integration Guide

Integrating SAP Hybris Cloud for Customer with SAP Hybris Marketing Cloud using HANA Cloud Integration Integration Guide SAP Cloud for Customer Integrating SAP Hybris Cloud for Customer with SAP Hybris Marketing Cloud using HANA Cloud Integration Integration Guide February 2017 Table of Contents Integrating SAP Cloud for

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

HansaWorld Enterprise

HansaWorld Enterprise HansaWorld Enterprise Integrated Accounting, CRM and ERP System for Macintosh, Windows, Linux, PocketPC 2002 and AIX Consolidation Program version: 4.2 2004-12-20 2004 HansaWorld Ireland Limited, Dublin,

More information

TC10. Piecework for Payroll & TimeCard TC-1010

TC10. Piecework for Payroll & TimeCard TC-1010 DSD Business Systems Sage 100 Enhancements TC10 Piecework for Payroll & TimeCard TC-1010 Version 5.40 2 Piecework for Payroll & TimeCard Information in this document is subject to change without notice.

More information

Volatility Prediction and Management by Active Network Management & Future Generation Management. Siemens, Sept 8 th 2017

Volatility Prediction and Management by Active Network Management & Future Generation Management. Siemens, Sept 8 th 2017 Volatility Prediction and Management by Active Network Management & Future Generation Management Siemens, Sept 8 th 2017 Table of contents To follow Current scenario and upcoming challenges in distribution

More information

Business Portal for Microsoft Dynamics GP. Requisition Management Administrator s Guide Release 10.0

Business Portal for Microsoft Dynamics GP. Requisition Management Administrator s Guide Release 10.0 Business Portal for Microsoft Dynamics GP Requisition Management Administrator s Guide Release 10.0 Copyright Copyright 2007 Microsoft Corporation. All rights reserved. Complying with all applicable copyright

More information

Infor LN Warehousing User Guide for Inbound Goods Flow

Infor LN Warehousing User Guide for Inbound Goods Flow Infor LN Warehousing User Guide for Inbound Goods Flow Copyright 2017 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and contains

More information

Information Document Service Proposals and Cost Estimating ID # R

Information Document Service Proposals and Cost Estimating ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

UltiPro 2016 Fall Release Payroll Processing, Tax Compliance, and Time Management

UltiPro 2016 Fall Release Payroll Processing, Tax Compliance, and Time Management To listen to a recording of this webcast, click here. UltiPro 2016 Fall Release Payroll Processing, Tax Compliance, and Time Management Version: 12.1.2 Presenter: Christopher Pacini Susan Grier Phone:

More information

Oracle Production Scheduling

Oracle Production Scheduling Oracle Production Scheduling Installation Guide Release 12.2 Part No. E48798-02 August 2014 Oracle Production Scheduling Installation Guide, Release 12.2 Part No. E48798-02 Copyright 2008, 2014, Oracle

More information

Fundamentals of Transmission Operations

Fundamentals of Transmission Operations Fundamentals of Transmission Operations Equipment Outages PJM State & Member Training Dept. Objectives At the end of this presentation the Learner will be able to: Identify how weather may influence outage

More information

8/28/2017 Readiness Criteria PGE EIM Readiness

8/28/2017 Readiness Criteria PGE EIM Readiness 8/28/2017 Criteria EIM 1 2 3 Generation, Interchange and Load comparison Comparison of SCADA measurement State Estimator solution Load, EIM Internal Intertie and EIM External Interties, and Generating

More information

Oracle Fusion Applications Supply Chain Planning, Order Promising Guide. 11g Release 1 (11.1.4) Part Number E

Oracle Fusion Applications Supply Chain Planning, Order Promising Guide. 11g Release 1 (11.1.4) Part Number E Oracle Fusion Applications Supply Chain Planning, Order Promising Guide 11g Release 1 (11.1.4) Part Number E22704-04 March 2012 Oracle Fusion Applications Supply Chain Planning, Order Promising Guide Part

More information

This topic focuses on how to prepare a customer for support, and how to use the SAP support processes to solve your customer s problems.

This topic focuses on how to prepare a customer for support, and how to use the SAP support processes to solve your customer s problems. This topic focuses on how to prepare a customer for support, and how to use the SAP support processes to solve your customer s problems. 1 On completion of this topic, you will be able to: Explain the

More information

Oracle Utilities Analytics Dasboards for Distribution Analytics, Outage Analytics

Oracle Utilities Analytics Dasboards for Distribution Analytics, Outage Analytics Oracle Utilities Analytics Dasboards for Distribution Analytics, Outage Analytics Metric Reference Guide Release 2.5.2 E49006-06 August 2015 Oracle Utilities Analytics Dasboards for Distribution Analytics,

More information

B2B Configuration & Setup

B2B Configuration & Setup B2B Configuration & Setup MICROS 2012 Page 1 of 22 MICROS retains the right to update or change the contents of this document without prior notice. MICROS assumes no responsibility by the contents of this

More information

Taleo Enterprise. Taleo Compensation Manager Guide

Taleo Enterprise. Taleo Compensation Manager Guide Taleo Enterprise Taleo Compensation Feature Pack 12B August 31, 2012 Confidential Information and Notices Confidential Information The recipient of this document (hereafter referred to as "the recipient")

More information

SMART GRID SCENARIO. Marina Egea,

SMART GRID SCENARIO. Marina Egea, SMART GRID SCENARIO Marina Egea, What is Smart Grid is an electricity network that can integrate in a costefficient manner the behaviour and actions of all users connected to it - generators, consumers

More information

Oracle Talent Management Cloud

Oracle Talent Management Cloud Oracle Talent Management Cloud Release 11 Release Content Document December 2015 Revised: April 2017 TABLE OF CONTENTS REVISION HISTORY... 4 OVERVIEW... 6 PERFORMANCE MANAGEMENT... 7 PERFORMANCE MANAGEMENT...

More information

SAS. Activity-Based Management Adapter 6.1 for SAP R/3 User s Guide

SAS. Activity-Based Management Adapter 6.1 for SAP R/3 User s Guide SAS Activity-Based Management Adapter 6.1 for SAP R/3 User s Guide The correct bibliographic citation for this manual is as follows: SAS Institute Inc. 2004. SAS Activity-Based Management Adapter 6.1 for

More information

Section 3: Issues Management Process

Section 3: Issues Management Process Oakland County Department of Information Technology Section 3 s Management Process Section 3: s Management Process Overview The s Management Process was developed as part of the on-going effort to improve

More information

George Washington University Workforce Timekeeper 6.0 Upgrade Training

George Washington University Workforce Timekeeper 6.0 Upgrade Training Workforce Timekeeper 6.0 Upgrade Training Table of Contents Topic 1: Workforce Timekeeper 6.0 New Features...4 Topic 2: Logging On and Off...5 Topic 3: Navigating in Workforce Timekeeper...7 Topic 4: Reviewing

More information

SAP Product Road Map SAP Identity Management

SAP Product Road Map SAP Identity Management SAP Product Road Map SAP Identity Management Road Map Revision: 2016.09.15 Customer Template Revision: 20160104 v4.1 Legal disclaimer The information in this presentation is confidential and proprietary

More information

Eclipse Interface for Use with StarShip. Release (Eterm)

Eclipse Interface for Use with StarShip. Release (Eterm) Eclipse Interface for Use with StarShip Release 8.6.2 (Eterm) Legal Notices 2007 Activant Solutions Inc. All rights reserved. Unauthorized reproduction is a violation of applicable laws. Activant and the

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Notice This FAQ document is published and copyrighted by NexTraq. Information and specifications contained in this document are subject to change without notice and do not represent

More information

CAS2Net for Employees and Supervisors New AcqDemo Organizations

CAS2Net for Employees and Supervisors New AcqDemo Organizations DoD Civilian Acquisition Workforce Personnel Demonstration Project (AcqDemo) CAS2Net for Employees and Supervisors New AcqDemo Organizations Fall 2015 Intended Audience and Expected Outcomes Intended Audience

More information

AppExchange Packaging Guide

AppExchange Packaging Guide Salesforce.com: Salesforce Summer '09 AppExchange Packaging Guide Last updated: July 6, 2009 Copyright 2000-2009 salesforce.com, inc. All rights reserved. Salesforce.com is a registered trademark of salesforce.com,

More information

Outage Types and Entering Tickets PJM State & Member Training Dept.

Outage Types and Entering Tickets PJM State & Member Training Dept. Outage Types and Entering Tickets PJM State & Member Training Dept. Objectives Students will be able to: Describe the outage reporting process and requirements 2 edart edart stands for Dispatcher Applications

More information

SAP Live Access General User Guide

SAP Live Access General User Guide 1. Before You Start SAP Live Access General User Guide July 2017 2. Get to Know SAP Live Access 3. Manage Your Training System 4. Support 1. Before You Start 2. Get to Know SAP Live Access 3. Manage Your

More information

Distribution Information Exchange Code

Distribution Information Exchange Code Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission

More information

Fairsail Collaboration Portal: Guide for Users

Fairsail Collaboration Portal: Guide for Users Fairsail Collaboration Portal: Guide for Users Version 11 FS-HCM-CP-UG-201504--R011.00 Fairsail 2015. All rights reserved. This document contains information proprietary to Fairsail and may not be reproduced,

More information

Demand Management User Guide. Release

Demand Management User Guide. Release Demand Management User Guide Release 14.2.00 This Documentation, which includes embedded help systems and electronically distributed materials (hereinafter referred to as the Documentation ), is for your

More information

PJM InSchedule User Guide

PJM InSchedule User Guide PJM InSchedule User Guide Revision: 01 Effective Date: June 1, 2015 Prepared by Markets Applications PJM 2015 PJM 2015 Revision 7, Effective Date: 6/1/2015 i PJM eschedules User Guide Approval and Revision

More information

TENDER AND EVALUATION PROCESS FOR CONTESTABLE AUGMENTATIONS IN VICTORIA

TENDER AND EVALUATION PROCESS FOR CONTESTABLE AUGMENTATIONS IN VICTORIA TENDER AND EVALUATION PROCESS FOR CONTESTABLE AUGMENTATIONS IN VICTORIA PREPARED BY: TRANSMISSION PROCUREMENT VERSION: 3.0 DATE: 13/06/2014 Am,ttolion l:nergy 1\_.n,ketOperctor Ltd AeN 94 on Ol'J 327 Wv'IW.oemo.oom.ou

More information

BI Workspaces User Guide SAP BusinessObjects Business Intelligence platform 4.0

BI Workspaces User Guide SAP BusinessObjects Business Intelligence platform 4.0 BI Workspaces User Guide SAP BusinessObjects Business Intelligence platform 4.0 Copyright 2011 SAP AG. All rights reserved.sap, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and

More information

SAP Transportation Management 9.1, Support Package 2 Enterprise Services

SAP Transportation Management 9.1, Support Package 2 Enterprise Services SAP Transportation Management 9.1, Support Package 2 Enterprise Services CUSTOMER Document Version: 1.0 May 2014 SAP TM 9.1 SP02 Enterprise Services 1 Copyright Copyright 2014 SAP AG. All rights reserved.

More information

Mobile for Android User Guide

Mobile for Android User Guide Version 1.7 Copyright 2013, 2017, Oracle and/or its affiliates. All rights reserved. This software and related documentation are provided under a license agreement containing restrictions on use and disclosure

More information

Gas Market Analysis Tool January 2017

Gas Market Analysis Tool January 2017 Gas Market Analysis Tool January 2017 Cover Note: This document is provided to you or your company ( You ) by Energy Edge Pty Ltd in accordance with the Consultancy Agreement between You and Energy Edge

More information

ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017

ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017 ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017 TABLE OF CONTENTS Service Offerings CONSULTING SERVICE OFFERINGS Part Number ORACLE HOSPITALITY FOOD AND BEVERAGE POINT OF SALE

More information

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS Reliability Coordinator Processes and Tools Objectives Describe how the FRCC Security Process addresses planning/coordination of the Bulk Electric System Describe

More information