1 KEY ISSUES in Advanced Operations Management Timo Seppälä

2 Production as a value creation process Operations system forms the transformation process between the inputs and the outputs of a manufacturing company. Strategy Execution Value creation Operations system Performance Commodity Quality Precision Variety Novelty Efficiency Productivity Quality Speed Flexibility Variety Customization 2

3 Those were the days Digital Manufacturing seem to change everything?

4 Fit and the contingency view of operations There is no typical industrial firm Different companies have different strengths and weaknesses and may choose to compete in different ways also in the same industry Different ways of configuring, equipping and managing operations result in different operating characteristics Rather than adopting a one best way, the task is to seek congruence ( fit ) between the firm s approach to competition and the way operations is designed, organized and managed Source: Hayes et. al

5 Three tasks of Production Planning and Control (Design) Planning Scheduling Execution These tasks are generic to all production environments, but application is specific to the particular company conditions. 5

6 Product Life Cycle Management Capabilities Marketing Product Development Process Planning Concept Development System Level Design Detail Design Testing & Refinement Production Ramp-up Delivery Service

7 Bill of Everything (+Bill of Data) Product Mechanical BOM Formula Specification Production Process Production Line Part Syringe Ingredient NaOH Operation BULK Equipment Kärl 60L Part Needle Ingredient BODE Process Step NaOH Equipment Blender Part Cyclinder Ingredient HA Process Step Stabilize Equipment Mixer Operation Xxx Process Step yyy Mechanical BOM Formula BOM Production Process Production Line 7

8 Enterprise resource planning (ERP) Production Planning & Control System Resource planning Sales & Oper. planning Demand management Master production scheduling Front end : The planning task Detailed capacity planning Detailed material planning Material and capacity plans Engine : The scheduling task Shop-floor systems Supplier systems Back end : The execution task 8

9 Scope of Enterprise Resource Planning systems Production and logistics Production Planning and Control Front end Engine Back end Enterprise planning models Enterprise performance measures Data warehouses Report generation Human resource management Finance Sales and marketing Transaction processing

10 Demand management Determining, estimating and influencing demand from customers Starting point for balancing demand and supply Delivery time quotations and available-topromise (MTO, ATO) Demand forecasting for inventory levels of finished goods (MTS) Independent vs dependent demand Managing new product introductions and phasing out of old products 10

11 Independent and dependent demand When a customer decides to buy our product, that decision is independent of the actions of the company. Independent demand is defined as the demands of customers, while production decisions remain under company s control. If the company has plans to build e.g. valves at a forecasted rate during the year, then the demand for parts e.g. castings depends on that plan. Dependent demand can be derived from independent demand, Bill-Of-Materials (BOM) and plans 11

12 Categories of production environments Make-to-stock, MTS Serving customers from the finished goods inventories Assemble-to-order, ATO Assembling modules / options according to a customer order Make-to-order, MTO Making products from raw materials, parts and components to a customer order Engineer-to-order, ETO Working with the customer to design the product and then make it from purchased materials, parts and components

13 Customer Order Decoupling point or Order Penetration Point (OPP) Order penetration point is the point in the company material flow, where an item becomes earmarked to a specific, known customer. OPP is also the last point where unallocated inventory is held last point of forecasting. Upstream from OPP push control is used, downstream from OPP control is based on customer orders (pull control). Trade-off: upstream OPP means less risk (for the manufacturer), downstream OPP means shorter delivery times. 13

14 OPP and different production environments Production environment Engineerto-order (ETO) Make-toorder (MTO) Assembleto-order (ATO) Make-tostock (MTS) OPP location Suppliers IQI* Raw materials, suppliers Work-inprocess (WIP) parts, components and modules Finished goods Fixed *IQI = Internal Quotation Inquiry 14

15 Forecast and customer-order-driven parts of the production process Order-penetration point (OPP) Raw materials Forecast-driven Production time line Customer-driven End customer

16 Capacity Demand management and master production scheduling: orders consume the forecast Forecast orders MTS ATO MTO Current date Time into the future -> 16

17 Sales & operations planning top management s handle on the business q1 q2 q3 q4 q1 q2 q3 q4 q1 q2 q3 q4 q1 SOP is needed to match manufacturing and distribution capacity to nonlinear demand across quarters and months Process of determining aggregate levels of production Managerial objective is to develop an overall business plan integrating various functional planning efforts: marketing, finance, operations, human resource planning 17

18 Sales and Operations Planning (S&OP) process in Unilever Nordic Sales: We might sell 200 units Finance: We have 300 units in the budget Marketing Finance Demand forecasting Purchasing One Plan Product management Production: We ll make 150 units Marketing: the campaign target is to sell 400 units Sales Production Customer service Source figure: Red Pepper. Modified E&Y 1999

19 Value of SOP The SOP process provides visibility of the interactions between sales, marketing, production, and finance Critical trade-off decisions are documented Manufacturing performance is controlled in a clear fashion This leads to better integration among functional areas and better response to the marketplace

20 SOP process key activities Update the sales forecast Review the impact of operations plan changes can current capacity and materials support the changes? Identify alternatives where problems exist Formulate recommendations for top management Communicate the information to top management

21 Master Production Schedule (MPS) Master Production Schedule answers, for an individual end item, e.g. on a weekly level, to the following questions: What product will be produced? How many should be completed? When these products are completed? 21

22 Master Production Schedule MPS is a planned production schedule MPS is stated in items (end item, sub-items and options) in order to figure out the materials and capacity needs Used as a vehicle for communication with sales sales can make accurate order promising against MPS MPS is updated as time goes on, this is called rolling through time 22

23 Time-Phased Record A means of gathering and displaying critical scheduling information (forecast, available stock, production schedule) Period On hand Forecast Projected available balance Master production schedule

24 Detailed material planning approaches MPS approach MTO ATO MTS Detailed material planning approach Timephased Ratebased Shop-floor system approach MRP based JIT (flow) based 24

25 Detailed material planning options Time-phased material planning Production process usually based on batch production Typically using MRP approaches Rate-based material planning Establishing rates of production for each part in the production process Repetitive manufacturing, assembly lines, JIT, TOC 25

26 Shop-floor system options MRP based systems Activities triggered by processes authorizing production quantities, routings, due dates continually recalculated through MRP planning Tracking of shop orders is done throughout the production JIT-based systems Produce in response to downstream use of the item, be it work center to work center or for the overall demand of the end item Tracking of individual orders is not necessary in the process Relatively constant demands are required for the JIT-based approach 26

27 Material Requirements Planning (MRP) Material Requirements Planning (MRP) has the managerial objective of providing the right part at the right time to meet the schedules for completed products MRP provides a formal plan for each part number raw materials, components, and finished products

28 Basic MRP Record Requirements from all sources On hand Period Gross requirements Scheduled receipts 50 A previously released order due in period 1 Projected available balance Planned order releases 50 Lead time = 1 period Lot size = 50 A unreleased order due in period 5

29 Theory of Constraints (TOC) Central tenant: An hour lost in a bottleneck resource is an hour lost of the entire factory s output, while an hour lost in a non-bottleneck resource is an illusion in other words, has no real cost So, you first need to establish your bottleneck resources (by using a rough-cut method), then make sure that they re never out of work 29

30 Theory of Constraints Production flow System capacity Bottleneck Drum-buffer-rope control Scheduling point = the Drum Buffer Bottleneck Pull = the Rope Excess capacity

31 The hidden factory Over time, the relative cost of the hidden factory has been growing compared to the first factory The hidden factory processes transactions Logistical transactions Balancing transactions Quality transactions Change transactions Beware the excess complexity created by letting the hidden factory grow too large

32 Two main managerial problems related to capacity planning and management 1. Matching capacity with the plans Either to provide sufficient capacity to execute the plans or to adjust plans to match capacity constraints 2. Trade-off between time and capacity utilization Fast throughput typically requires underutilization of some capacity in the system High priority scheduling results in fast throughput for the high priority jobs but with the expense of longer throughput times for lower priority jobs and underutilization of some capacity 32

33 Different capacity planning options Week number Capacity to match maximum demand Week number 34 Capacity to match average demand Week number Capacity is adjusted to demand Outsource Capacity Week number Week number Outsourcing of peaks OR Outsourcing the base load Complimentary products Capacity

34 Infinite capacity planning Capacity e.g. hours Feb 2-Mar 4-Mar 6-Mar Periodic No capacity constraints Does not consider any adjustment to plans because of planned capacity utilization 10-Mar 12-Mar Time (day or week) Other Order book Open orders Capacity 16-Mar 18-Mar 20-Mar 34

35 Finite scheduling/loading Schedules work through work centers only to the extent that there is capacity available to do so Capacity constraints will define order completion times 35

36 Capacity planning and management in the MPC System Long range Resource planning Rough-cut capacity planning Sales & Oper. planning Master production scheduling Demand management Medium range Capacity requirement planning Detailed material planning Short range Finite loading Input/output analysis Shop-floor and purchasing systems 36

37 Hierarchy of capacity planning decisions 1. Resource planning matching with the sales and operations planning (SOP) 2. Rough-cut capacity planning matching with the master production scheduling (MPS) 3. Capacity requirements planning (CRP) matching with the detailed material planning (MRP) 4. Finite loading matching with the detailed material planning and shop floor scheduling 5. Evaluation of particular capacity plans using input / output analysis Long range Medium range Short range Decision-making among these levels is hierarchical: long-range planning sets constraints on medium-range planning, which in turn constrains detailed scheduling and execution on the shop floor. 37

38 Production environments and capacity planning techniques Rate-based planning Time-phased planning Stable material flows Simple product structures Simple accounting systems Recognizes product mix changes Different capacity requirements for different products Recognizes product mix changes Different lead-times for different products Time-phased MRP records used for detailed materials planning Capacity planning using overall factors (CPOF) Capacity bills Resource profiles Capacity requirements planning (CRP) Increasing: requirements for input data volume and quality computational capability and capacity difficulties in making changes to the plans

39 Capacity monitoring with input/output control Planned inputs are determined by the capacity planning process Planned outputs depend upon the nature of the work center Capacity-constrained planned output is determined by the processing rate of the work center Non-capacity-constrained planned outputs match planned inputs Differences between plan and actual must be addressed (management by exception)

40 Summarizing principles Production systems need to be analysed from the perspective of the value that they create The logic of the production process design and the PPC system design need to match with the market and business requirements but it also needs to accept the restictions set by the existing systems Production process improvement is never ending therefor there will always be work available for those who are interested in complex analytical and practical problems

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning TU-E2020 ADVANCED OPERATIONS MANAGEMENT Master Production Scheduling Material Requirements Planning Schedule for classes 26.10 Introduction to the Course / TS 27.10 Different models of Planning for Production

More information

TU-C2020 Operations Management. Timo Seppälä

TU-C2020 Operations Management. Timo Seppälä TU-C2020 Operations Management Timo Seppälä Operations management Operations management is an activity of managing the resources which create and deliver services and products Slack et al., 2012 Inputs

More information

Bill of material. A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials

Bill of material. A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials Bill of material A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials FP A B C x y z 1 Manufacturing cycle Manufacturing

More information

Strategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance

Strategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance Strategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance Jan Olhager and Erik Selldin Linkoping University, Department of Management and Engineering,

More information

Material Requirements Planning (MRP) and ERP 14. Outline

Material Requirements Planning (MRP) and ERP 14. Outline Material Requirements Planning (MRP) and ERP 14 1 Outline Global Company Profile: Wheeled Coach Dependent Demand Dependent Inventory Model Requirements MRP Structure MRP Management 2 1 Outline - Continued

More information

What is ERP? Source: Wikipedia

What is ERP? Source: Wikipedia Brad Staats What is ERP? Enterprise resource planning (ERP) systems integrate internal and external management information across an entire organization. The purpose of ERP is to facilitate the flow of

More information

Hybrid Manufacturing Methods

Hybrid Manufacturing Methods Hybrid Manufacturing Methods The following manufacturing execution and costing methods are supported in SyteLine. These methods can be combined in a single environment so that the optimal method is used

More information

TU-C2020 OPERATIONS MANAGEMENT (5 cr)

TU-C2020 OPERATIONS MANAGEMENT (5 cr) TU-C2020 OPERATIONS MANAGEMENT (5 cr) Product and Service Life Cycles and Operations Management 20.09.2017 Timo Seppälä What is Product and Service Lifecycle Management P(S)LM? PLM is the business activity

More information

Chapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD

Chapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD Chapter 6 RESOURCE PLANNING SYSTEMS Prepared by Mark A. Jacobs, PhD LEARNING OBJECTIVES You should be able to: Describe the hierarchical operations planning process in terms of materials planning (APP,

More information

Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management

Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management Arrangements for lectures 9 and 10 In class Studying outside

More information

10 SECRETS EVERY SOFTWARE BUYER SHOULD KNOW

10 SECRETS EVERY SOFTWARE BUYER SHOULD KNOW WHITEPAPER 10 SECRETS EVERY SOFTWARE BUYER SHOULD KNOW A Guide for Engineer-to-Order and Project-Based Manufacturers WHITEPAPER 10 SECRETS EVERY SOFTWARE BUYER SHOULD KNOW 2 INTRODUCTION In today s challenging

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

Materials and Resource Requirements Planning

Materials and Resource Requirements Planning CHAPTER FIFTEEN Materials and Resource Requirements Planning McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Where We Are Now Relationships Sustainability Globalization

More information

APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies

APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies It's an integrated and modular software that provides management tools to the operational areas of a manufacturing

More information

Engineer to Order In Microsoft Dynamics NAV

Engineer to Order In Microsoft Dynamics NAV Microsoft Dynamics NAV is a robust ERP system which is designed to handle a broad spectrum of manufacturing requirements. It includes several unique features which support engineering-to-order (ETO) manufacturing

More information

There are three options available for coping with variations in demand:

There are three options available for coping with variations in demand: Module 3E10 Operations management for Engineers - Crib 1 (a) Define the theoretical capacity of a manufacturing line. Explain why the actual capacity of a manufacturing line is often different from its

More information

Enterprise Information Systems

Enterprise Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Enterprise Information Systems Lecture Outline 6 ACS-1803 Introduction to Information Systems Learning Objectives 1. Explain how

More information

12/02/2018. Enterprise Information Systems. Learning Objectives. System Category Enterprise Systems. ACS-1803 Introduction to Information Systems

12/02/2018. Enterprise Information Systems. Learning Objectives. System Category Enterprise Systems. ACS-1803 Introduction to Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Enterprise Information Systems Lecture Outline 6 ACS-1803 Introduction to Information Systems Learning Objectives 1. Explain how

More information

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston Subbu Ramakrishnan Manufacturing Finance with SAP ERP Financials Bonn Boston Contents at a Glance 1 Overview of Manufacturing Scenarios Supported by SAP... 25 2 Overview of Finance Activities in a Make-to-Stock

More information

9. What are the activities within the scope of production planning? 1. Aggregate production planning

9. What are the activities within the scope of production planning? 1. Aggregate production planning UNIT-II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 1. Define Process Planning Process planning involves determining the sequence of processing and assembly steps that must be accomplished

More information

Enterprise Information Systems

Enterprise Information Systems Instructor: Kevin Robertson Enterprise Information Systems Lecture Outline 6/7 Learning Objectives 1. Explain how organizations support business activities by using information technologies across the

More information

Functional Area Systems Production / Operation Systems

Functional Area Systems Production / Operation Systems Functional Area Systems Production / Operation Systems Lecture Outline 5 Part 4 Instructor: Trevor Nadeau Examples: Functional Area Info Systems 2 Functional Area Information Systems 3 Computers in Manufacturing

More information

THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP)

THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP) THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP) Richard E. Crandall, Appalachian State University, CIS Department, Raley Hall, Boone, NC 28608,

More information

Breakdown. Learn the implications of the breakdown field in Item Master Data

Breakdown. Learn the implications of the breakdown field in Item Master Data Breakdown Learn the implications of the breakdown field in Item Master Data Boyum Solution IT A/S beas tutorial TABLE OF CONTENTS 1. INTRODUCTION... 2 2. Process... 2 2.1. Mode of procurement in beas...

More information

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders. Manufacturing Functionlity in Microsoft Dynamics GP Gain complete control over your inventory, production and orders. Control your Inventory Costing and Inventory Control Are you confident and in control

More information

AVANTUS TRAINING PTE LTD

AVANTUS TRAINING PTE LTD Manufacturing II in Microsoft Dynamics NAV 2009 Course 80261A: 3 Days; Instructor-Led About this Course This three-day course explores the advanced manufacturing functionality of Microsoft Dynamics NAV

More information

02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 4 ACS-1803 Introduction to Information Systems Examples:

More information

MASTER PRODUCTION SCHEDULE (MPS)

MASTER PRODUCTION SCHEDULE (MPS) MASTER PRODUCTION SCHEDULE (MPS) Anticipated build schedule for manufacturing end products (or product options) A statement of production, not a statement of market demand MPS takes into account capacity

More information

INSTRUCTORS GUIDE FOR USING THE THE ENCYCLOPEDIA OF OPERATIONS MANAGEMENT by Professor Arthur V. Hill Revised November 21, 2018

INSTRUCTORS GUIDE FOR USING THE THE ENCYCLOPEDIA OF OPERATIONS MANAGEMENT by Professor Arthur V. Hill Revised November 21, 2018 INSTRUCTORS GUIDE FOR USING THE THE ENCYCLOPEDIA OF OPERATIONS MANAGEMENT by Professor Arthur V. Hill Revised November 21, 2018 Introduction Many instructors have found the Encyclopedia of Operations Management

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

Business Systems Operations Management

Business Systems Operations Management Business Systems Operations Management Session 7 - Enterprise Resource Planning Facilitator: Dr. Jonathan Farrell 1 This Evening s s Program Enterprise Resources Planning (ERP) The origins of ERP (MRP,

More information

TRANSFORM EXPERIENCE. TRANSFORM BUSINESS.

TRANSFORM EXPERIENCE. TRANSFORM BUSINESS. www.hcltech.com TRANSFORM EXPERIENCE. TRANSFORM BUSINESS. SAP S/4HANA Segmentation for Life Sciences DEMAND AND SUPPLY SEGMENTATION Separate stock based on attributes such as ingredient s country of origin,

More information

WHITE PAPER. Control Manufacturing Costs with Odoo Open ERP

WHITE PAPER. Control Manufacturing Costs with Odoo Open ERP WHITE PAPER Control Manufacturing Costs with Odoo Open ERP USA ODOO WHITE PAPER 1 The challenge of controlling costs looms large in many manufacturing sectors but clearing this hurdle is not insurmountable.

More information

Operation Management (OM) Introduction

Operation Management (OM) Introduction Operation Management (OM) Introduction Ing.J.Skorkovský, CSc, Department of Corporate Economy FACULTY OF ECONOMICS AND ADMINISTRATION Masaryk University Brno Czech Republic What is going on? Use of Operations

More information

7/14/2010. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall.

7/14/2010. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall. 15 Resource Planning PowerPoint Slides by Jeff Heyl For Operations Management, 9e by Krajewski/Ritzman/Malhotra 21 Pearson Education 15 1 Resource Planning At the heart of any organization Starts t with

More information

Lesson 1: Introduction to Production, Planning, and Control (PPC) Systems

Lesson 1: Introduction to Production, Planning, and Control (PPC) Systems 1. Production, Planning and Control (PPC). This module covers: An introduction to Production, Planning and Control. Guidelines on Sales and Operations Planning (S&OP) and Aggregate Planning. Definition

More information

Principles of Operations Management: Concepts and Applications Topic Outline Principles of Operations Planning (POP)

Principles of Operations Management: Concepts and Applications Topic Outline Principles of Operations Planning (POP) Principles of Operations Management: Concepts and Applications Topic Outline Principles of Operations Planning (POP) Session 1: Operation Management Foundations Describe how today s business trends are

More information

FEATURES IN TRIMIT FURNITURE 2017

FEATURES IN TRIMIT FURNITURE 2017 FEATURES IN TRIMIT FURNITURE 2017 This document provides an overview of the most important features available in TRIMIT Furniture, as they are available in version 2017 of December 2016. The purpose of

More information

Foreword 7. 1 Production planning Planning approaches Planning strategies Definition of the example 17

Foreword 7. 1 Production planning Planning approaches Planning strategies Definition of the example 17 TABLE OF CONTENTS Table of Contents Foreword 7 1 Production planning 11 1.1 Planning approaches 11 1.2 Planning strategies 14 1.3 Definition of the example 17 2 Design and work scheduling 19 2.1 Material

More information

The Future of ERP and Manufacturing Management

The Future of ERP and Manufacturing Management The Future of ERP and Manufacturing Management J. E. Boyer Company, Inc. John E. Boyer, Jr., President Copyright 2009 by J. E. Boyer Company, Inc. No portion of this article may be reproduced in whole

More information

FEATURES IN TRIMIT FURNITURE BASED ON BUSINESS CENTRAL

FEATURES IN TRIMIT FURNITURE BASED ON BUSINESS CENTRAL FEATURES IN TRIMIT FURNITURE BASED ON BUSINESS CENTRAL Date: 14-12-2018 This document provides an overview of the most important features available in TRIMIT Furniture based on Microsoft Dynamics 365 Business

More information

Does MRP Have a Role in a Volatile Marketplace?

Does MRP Have a Role in a Volatile Marketplace? Does MRP Have a Role in a Volatile Marketplace? Peter Milroy, CMA CMS Montera Inc. Cambridge, ON Innovation February 17-19, 2011 Cambridge, Ontario Who is CMS Montera? CMS Montera provides management solutions

More information

One Software to manage your entire bakery business.

One Software to manage your entire bakery business. One Software to manage your entire bakery business. Why choose ibake ERP : ibake ERP is an enterprise-class ERP solution for bakeries that manages POS, front office, manufacturing, warehouse, inventory

More information

Oman College of Management and Technology

Oman College of Management and Technology Oman College of Management and Technology Course 803303 PIS Chapter 1 Manufacturing, Planning and Control CS/MIS Department Definition Manufacturing Planning and Control system is a methodology designed

More information

Resources Planning. Introduction

Resources Planning. Introduction Operations Management - II PGDM 2017-19 Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management Survey No. 38, Cherlaguda Village, Shamshabad Mandal, RR District, Hyderabad-

More information

Production Management and Scheduling

Production Management and Scheduling Production Management and Scheduling Meet Your Due Dates Your production process can be simple or complex, time consuming or quick, but one thing remains constant the drive to meet your customer s delivery

More information

Microsoft Business Solutions-Axapta Production enables you to flexibly manage your manufacturing processes for increased profitability.

Microsoft Business Solutions-Axapta Production enables you to flexibly manage your manufacturing processes for increased profitability. Microsoft Business Solutions Axapta Production gives you real-time insight into your manufacturing processes to help you increase production efficiency and reduce costs. Key Benefits: Minimize lead times

More information

Mechanical Engineering 101

Mechanical Engineering 101 Mechanical Engineering 101 University of alifornia, Berkeley Lecture #17 1 Today s lecture apacity planning Kanban intro 2 MRP Last lecture: MRP scheduling Materials Requirements Planning: MRP This lecture:

More information

Drum-Buffer-Rope in PlanetTogether Galaxy

Drum-Buffer-Rope in PlanetTogether Galaxy Drum-Buffer-Rope in PlanetTogether Galaxy This document provides background on Theory of Constraints and Drum-Buffer-Rope scheduling. It describes how to assess whether the DBR approach is appropriate

More information

CRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business

CRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business Basics of Supply Chain Management Jayanta Kumar Bandyopadhyay CRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business Contents

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Microsoft Dynamics AX. Microsoft Dynamics AX. Factsheet. Microsoft. 1 Microsoft

Microsoft Dynamics AX. Microsoft Dynamics AX. Factsheet. Microsoft. 1 Microsoft Factsheet Microsoft 1 Microsoft Better manufacturing through connected operations Competition is greater than ever before. To succeed, manufacturers have to show a higher value proposition to market. Whether

More information

Profit Center Planning & Analysis

Profit Center Planning & Analysis Profit Center Planning & Analysis Theory of constraints, maximizing profitability, and capacity utilization Hierarchy of Resource Consumption Unit-level resources resources consumed on activities proportionally

More information

GBI - Introductory Course 6/11/2015

GBI - Introductory Course 6/11/2015 SAP University Alliances Version 2.11 Authors Bret Wagner Stefan Weidner Production Planning and Execution (PP) Product 6.0 EhP4 Global Bike Inc. Level Beginner Focus Cross-functional integration Production

More information

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS About this Topic Outline This outline details the concepts and applications coved in all five of the APICS Principles of

More information

Material Resources Planning

Material Resources Planning Operations and Supply Planning PGDM 2018-20 Material Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management 170 Introduction Computerised information system Aids in planning

More information

Reading Sample. Introduction Organizational Structures in SAP ERP. Contents. Index. The Author. First-hand knowledge.

Reading Sample. Introduction Organizational Structures in SAP ERP. Contents. Index. The Author.  First-hand knowledge. First-hand knowledge. Reading Sample Chapter 1 provides an introduction to the book as a whole, from the goals of the book to its structure and content. Chapter 2 discuss the organizational structures

More information

Course Outline TO TRAIN

Course Outline TO TRAIN 1300 86 87246 1300 TO TRAIN 80309 - Microsoft Dynamics AX 2012 Process Manufacturing Production and Logistics General Description This three-day instructor-led course provides learners with knowledge about

More information

Introduction to Production Planning

Introduction to Production Planning Introduction to Production Planning Production Planning: what does it deal with? 2 The Production Manager question is: WHAT ( which product ), WHEN ( considered some time horizon ), HOW ( with which materials

More information

Planning. Dr. Richard Jerz rjerz.com

Planning. Dr. Richard Jerz rjerz.com Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Lecture - 44 Supply Chain

Lecture - 44 Supply Chain Economics, Management and Entrepreneurship Prof. Pratap. K. J. Mohapatra Department of Industrial Engineering and Management Indian Institute of Technology Kharagpur Lecture - 44 Supply Chain Good morning.

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Connecting S&OP to the Shop Floor: Here s How!

Connecting S&OP to the Shop Floor: Here s How! Connecting S&OP to the Shop Floor: Here s How! J. E. Boyer Company, Inc. John E. Boyer, President Copyright 2004 by J. E. Boyer Company, Inc. No portion of this article may be reproduced in whole or in

More information

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS About this Topic Outline This outline details the concepts and applications coved in all five of the APICS Principles of

More information

Factory Modeling. The Priority Enterprise Management System. Contents

Factory Modeling. The Priority Enterprise Management System. Contents The Priority Enterprise Management System Factory Modeling Contents Introduction...2 Parts...3 Bills of Materials and Revisions...3 Engineering Change Orders (ECO)...4 Part Routings...4 s...5 Work Cells...5

More information

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM 4.1 Introduction Synchronous manufacturing is an all-encompassing manufacturing management philosophy that includes a consistent set of principles, procedures

More information

Manufacturing Resource Planning

Manufacturing Resource Planning Outline Manufacturing Resource Planning MRP The Strategic Importance of Short- Term Scheduling Scheduling Issues Forward and Backward Scheduling Scheduling Criteria Outline Continued Scheduling Process-Focused

More information

EnterpriseIQ Intelligent ERP & MES Software

EnterpriseIQ Intelligent ERP & MES Software EnterpriseIQ Intelligent ERP & MES Software By Your Side, Every Step of the Way, From Start to Finish About IQMS Knowledge, Experience, and Excellence For more than 20 years, IQMS has been providing powerful

More information

HS-OWL UniTS Operations management Process design

HS-OWL UniTS Operations management Process design Process design Introduction Products, services and the processes which produce them all have to be designed. Design is an activity (mainly conceptual) which must produce a solution that will achieve a

More information

Principles of Operations Management Concepts and Applications Topic Outline

Principles of Operations Management Concepts and Applications Topic Outline Avvertenza: ogni corso é da intendersi frequentabile singolarmente e potete, quindi, scegliere il più adatto ai vostri obiettivi; inoltre, potete anche creare insieme a noi un corso su misura strutturato

More information

THE MRP CHALLENGE IN THE 21 ST CENTURY. All material and content copyright 2016 Demand Driven Institute. All rights reserved.

THE MRP CHALLENGE IN THE 21 ST CENTURY. All material and content copyright 2016 Demand Driven Institute. All rights reserved. THE MRP CHALLENGE IN THE 21 ST CENTURY The MRP Revolution Joe Orlicky Features: Time Phased Planning Level by level BOM explosion Dependent demand planning Benefits: Component synchronization Reduction

More information

Glossary for Sales and Operations Planning, Sales Forecasting and Master Scheduling

Glossary for Sales and Operations Planning, Sales Forecasting and Master Scheduling Glossary for Sales and Operations Planning, Sales Forecasting and Master Scheduling Definitions are from books on these subjects by Tom Wallace and Bob Stahl ABC Classification The grouping of items based

More information

Test-king.C_TSCM42_65.80 Questions

Test-king.C_TSCM42_65.80 Questions Test-king.C_TSCM42_65.80 Questions Number: C_TSCM42_65 Passing Score: 800 Time Limit: 120 min File Version: 4.9 http://www.gratisexam.com/ C_TSCM42_65 SAP Certified Application Associate - Production -

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

Best Practices in Demand and Inventory Planning

Best Practices in Demand and Inventory Planning W H I T E P A P E R Best Practices in Demand and Inventory Planning for Chemical Companies Executive Summary In support of its present and future customers, CDC Software sponsored this white paper to help

More information

Objectives of Chapters1, 2, 3

Objectives of Chapters1, 2, 3 Objectives of Chapters1, 2, 3 Building a Strategic Framework to Analyze a SC: (Ch1,2,3) Ch1 Define SC, expresses correlation between SC decisions and a firms performance. Ch2 Relationship between SC strategy

More information

2 Production Planning

2 Production Planning 1 2 Production Planning "The wise man must be wise before, not after, the event." (Epicharmus, approx. 550 BC 460 BC) In this chapter I will present the basic planning approaches used in the SAP system.

More information

Take Back Manufacturing

Take Back Manufacturing Take Back Manufacturing Computer Integrated Manufacturing ( CIM ) ERP the long journey where we have been and where are we going? Genius Solutions: the Company In business for over 20 years Origins - Industrial

More information

WHITEPAPER. Roadblocks To Profitable ETO/MTO Manufacturing Sales: How Configure-Price-Quote (CPQ) Software Can Help

WHITEPAPER. Roadblocks To Profitable ETO/MTO Manufacturing Sales: How Configure-Price-Quote (CPQ) Software Can Help WHITEPAPER Roadblocks To Profitable ETO/MTO Manufacturing Sales: How Configure-Price-Quote (CPQ) Software Can Help INDEX What Is Configure-Price-Quote (CPQ)? 3 Expected benefits of CPQ software 5 The Three

More information

A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies

A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies Pavan Kumar Sriram, Erlend Alfnes, and Emrah Arica Norwegian University of Science and Technology, Trondheim, Norway

More information

MODULE CAPABILITY GUIDE

MODULE CAPABILITY GUIDE MODULE CAPABILITY GUIDE powered by AX Foundation & Supply Chain Produce Dimensions Manage product through utilisation of produce dimensions for different produce types and dimension groups, such as, produce

More information

History IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning

History IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning IE PRODUCTION INFORMATION SYSTEMS Course Notes Lecture #.A Material Requirements Planning IE Bilkent University Manufacturing Planning and Control System Routing file Resource planning Bills of material

More information

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 -

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 - CPIM(Certified In Production & Inventory Management) MPR Sample Test. 1. Which of the following would NOT be a key operating objective? A. Inventory dollars. B. Shipment dollars. C. Factory location selection.

More information

Best practices in demand and inventory planning

Best practices in demand and inventory planning whitepaper Best practices in demand and inventory planning WHITEPAPER Best Practices in Demand and Inventory Planning 2 about In support of its present and future customers, Aptean sponsored this white

More information

ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner

ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk E2-201 Information Systems September 27, 2006 2 Sales Finished and packaged

More information

TU-C2020 OPERATIONS MANAGEMENT (5 cr) Inbound Logistics Planning and Materials Management 25 Sept, 2015

TU-C2020 OPERATIONS MANAGEMENT (5 cr) Inbound Logistics Planning and Materials Management 25 Sept, 2015 TU-C2020 OPERATIONS MANAGEMENT (5 cr) Inbound Logistics Planning and Materials Management 25 Sept, 2015 Doctoral candidate, researcher Jari Laine Department of Industrial Engineering and Management A Fast

More information

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION INTRODUCTION Have you implemented kanban yet? Have you been unable to roll it out or just abandoned it? Most companies who begin kanban implementation struggle to finish the job. In too many cases, the

More information

DIGITAL INDUSTRY INNOVATION MAPS INDUSTRIAL MACHINERY & COMPONENTS. Digital Transformation Posters. Digital Industry Innovation Maps

DIGITAL INDUSTRY INNOVATION MAPS INDUSTRIAL MACHINERY & COMPONENTS. Digital Transformation Posters. Digital Industry Innovation Maps SAP LEONARDO INNOVATON SERVICE SHOWROOM DIGITAL INDUSTRY INNOVATION MAPS INDUSTRIAL MACHINERY & COMPONENTS Digital Transformation Posters Summarize your digital transformation with S/4HANA on one page

More information

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer May 2017 CloudSuite Industrial Where Did APS Come From? APS grew out of the convergence of two movements.

More information

Master Production Scheduling - Is it still relevant?

Master Production Scheduling - Is it still relevant? Master Production Scheduling - Is it still relevant? In the 1980s and 1990s Master Production Scheduling was a big thing. Practically all serious manufacturing companies has a Master Production Scheduler,

More information

<Insert Picture Here> Project Manufacturing Overview

<Insert Picture Here> Project Manufacturing Overview Project Manufacturing Overview The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any

More information

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems Outline Pull Manufacturing Why Pull Manufacturing? The Problem of Inventory Just In Time Kanban One Piece Flow Demand / Pull Standard Work & Takt Time Production Smoothing 1 2 Why Pull Manufacturing? Push

More information

Principles of Production & Inventory Management PPIM

Principles of Production & Inventory Management PPIM Principles of Production & Inventory Management PPIM PPIM course sessions. 1. Manufacturing Strategies & Resource Management 2. Product Development Cycle 3. Forecasting and Forecasting Techniques 4. Production

More information

UniSource Software Services UniSource Corporate Brochure

UniSource Software Services UniSource Corporate Brochure UniSource Software Services UniSource Corporate Brochure 32 Lucas Lane, Bedfordview, Gauteng, South Africa, 2007 +27 (0)11 450 4595 sales@unisource.co.za Adding Value, Going Beyond The Product Our focus

More information

Net Requirements Plan. The logic of net requirements. MRP Planning Sheet. Gross Requirements Schedule

Net Requirements Plan. The logic of net requirements. MRP Planning Sheet. Gross Requirements Schedule Net Requirements Plan The logic of net requirements Gross Requirements Schedule MRP Planning Sheet Safety Stock BOMs, inventory records, purchase and production quantities may not be perfect Consideration

More information

Chapter 12. Enterprise Resource Planning

Chapter 12. Enterprise Resource Planning Chapter 12 Enterprise Resource Planning Enterprise Resource Planning (ERP) Organizes and manages a company s business processes by sharing information across functional areas Connects with supply-chain

More information

Seradex White Paper. ERP for Engineer to Order. A Discussion of High Performance Manufacturing Issues

Seradex White Paper. ERP for Engineer to Order. A Discussion of High Performance Manufacturing Issues Seradex White Paper A Discussion of High Performance Manufacturing Issues ERP for Engineer to Order Congratulations - you finally landed the big contract. But there's no time for a long celebration. You've

More information

Balaji Gaddam. Capable to Match (CTM) with SAP APO. Bonn Boston

Balaji Gaddam. Capable to Match (CTM) with SAP APO. Bonn Boston Balaji Gaddam Capable to Match (CTM) with SAP APO Bonn Boston Contents Acknowledgments... 11 1 Overview of SAP SCM... 13 1.1 SAP SCM Overview... 14 1.1.1 SAP Advanced Planner and Optimizer (SAP APO)...

More information

SME Conference: Computer Integrated Manufacturing. A Take Back Manufacturing to Toronto Imperative. May 24 th Presenter Chriss Poliquin

SME Conference: Computer Integrated Manufacturing. A Take Back Manufacturing to Toronto Imperative. May 24 th Presenter Chriss Poliquin SME Conference: Computer Integrated Manufacturing A Take Back Manufacturing to Toronto Imperative May 24 th 2012 Presenter Chriss Poliquin 1 Agenda I. Targeting your objectives and concerns II. What are

More information