Business Management System: Policies 00-BMS-002

Size: px
Start display at page:

Download "Business Management System: Policies 00-BMS-002"

Transcription

1 Business Management System: Policies 00-BMS-002

2 Preface This document defines the requirements that apply to the Business Management System (BMS) established at GM Nameplate (GMN). The BMS is comprised of the processes needed to support GMN s purpose and to achieve its strategic direction. The BMS is an integrated approach to managing the needs and requirements of our interested parties: customers, employees, shareholders and our local communities. The BMS integrates quality, environmental, and health and safety management systems requirements into BMS Processes by focusing on who we are, what we do and how we do it. This document is intended to be used by GM Nameplate, customers, auditors, and other interested parties who need to understand how GM Nameplate complies with customer, regulatory and international/standard management system requirements. Requirements for BMS Processes are defined as BMS Policies. Each BMS Policy identifies: The applicable BMS Process; Applicable management system standard sections and clauses; The activities needed to transform process inputs into process outputs; and The requirements that apply to each activity. Because the BMS is based upon the ISO9001 family of management standards and includes requirements for multiple management standards, requirements are identified where they deviate from the ISO9001 management standard. Requirements are differentiated from ISO9001 per the following formats: ISO9001 (standard font); AS9100 (italic font); ISO13485 (italic, bold font); ISO14001 (bold, green font); and ISO45001* (bold, orange font, *asterisk at the end). 00-BMS-002 Rev. 1 Page 2 of 38

3 Table of Contents BMS Processes PRODUCT RELATED PROCESSES Quoting Contract Review Advanced Product Quality Planning (APQP) Manufacturing Inspection and Packaging Product Audit and Ship Dispositioning Nonconforming Product SYSTEM RELATED PROCESSES Document Control Hiring Training Process Purchasing Receiving and Inspection Calibration Internal Audits Management Planning and Review BMS-002 Rev. 1 Page 3 of 38

4 BMS Processes 00-BMS-002 Rev. 1 Page 4 of 38

5 1.0 PRODUCT RELATED PROCESSES This section contains policies for the following: Product Planning Process Quoting Contract Review APQP Production Process Manufacturing Product Evaluation Process Inspection and Packaging Product Audit and Ship Dispositioning Nonconforming Product 00-BMS-002 Rev. 1 Page 5 of 38

6 1.1 Quoting Requirement applicable to this process include: ISO9001: , 8.2.1, 8.2.2; AS9100D 8.1, 8.2.1, 8.2.2; ISO13485: , 7.2.3; ISO14001: ; and ISO/DIS Activity 1 Determine customer requirements to ensure that: Product-related requirements are identified, which may include: o Part size, number and revision; o Tolerances; o Materials and material specifications; o Part configuration, including the ability to trace part components to requirements; o Key/critical characteristics; o Colors/Inks; o Font type and size; o ITAR classification; o EAR classification (ECCN); o Manufacturing process specifications; o Material compliance; o Certificate of Conformance; o Process capability; o First Article; o PPAP; o Documentation, including training or instruction needed to accompany the product to ensure effective use, application and/or incorporation to other parts or components; o Component specifications; o Post delivery requirements; o Features or characteristics critical to product safety and employee safety; and o Special requirements; System-related requirements are identified, which may include: o Quality, environmental and/or health system certifications; o Regulatory requirements; o On time delivery or specified lead times; o DFARs; o ITAR; and o Process capability. 00-BMS-002 Rev. 1 Page 6 of 38

7 1.1 Quoting (continued) Activity 2 Activity 3 Verify that GMN has the capability to meet requirements to ensure that: Customer requirements are addressed, which may include: o Part size; o Part tolerances and manufacturing tolerances; o Materials and material specifications; o Key/critical characteristics; o Colors/Inks; o Font type and size; o International Traffic Arms Regulations (ITAR) classification; o Export Arms Regulations (EAR) classification (e.g. Export Control Classification Number (ECCN)); o Manufacturing process specifications; o Material compliance; o Certificate of Conformance; o First Article requirements; o Production Part Approval Process (PPAP) requirements; o Part component specifications; o Post-delivery requirements; and o Customer order forecast. Create the manufacturing plan (a quote) to ensure that: The resources needed to manufacture, test, inspect and ship product to the customer are identified and documented; GMN s ability to meet the customer s requirements has been evaluated, including the ability to product, inspect, package, preserve and dispose of the product, and to maintain production capacity; Manufacturing processes are appropriate to the product, and include consideration of the effect of foreign object damage that could potentially result from the manufacturing processes; Monitoring, measurement, testing and inspection activities are appropriate to the product and the characteristics to be measured; Environmental hazards associated with specific products are identified; Safety hazards associated with specific products are identified;* The need for APQP is identified; Exceptions to customer requirements are documented; and Customer requirements unknown by GMN and deemed necessary and proper to supplying the product are documented; 00-BMS-002 Rev. 1 Page 7 of 38

8 1.1 Quoting (continued) Activity 4 Finalize the quote to ensure that: Product pricing, margins, commissions, and other cost factors have been reviewed and determined to be appropriate to the product; Product lead times, any exceptions to customer requirements, and unknown requirements are clearly and explicitly identified; Any other relevant information related to the product being provided by GMN to the customer is defined; and The finalized, formal quote is submitted to the customer. 00-BMS-002 Rev. 1 Page 8 of 38

9 1.2 Contract Review Requirement applicable to this process include: ISO9001: , 8.2 AS9100D 8.1, 8.2; 8.1.1; 8.1.2; ISO13485: ; 7.2, 7.5.1, 7.5.8, 7.5.9, 8.2.2, 8.2.3; ISO14001: ; and ISO/DIS Activity 1 Review purchase orders and customer communications to ensure that: Customer requirements are identified; Customer requirements differing from those previously communicated to GMN are identified; Customer requirements unknown to GMN at the time of quotation are resolved; The customer is not a Denied Person; The customer is a US Person where applicable; The product to be supplied by GMN to the customer will not be used for a prohibited end use; The need for APQP is verified; Customer complaints unrelated to products or contracts are documented, investigated, and the need for corrective action, and reporting to regulatory authorities is determined, including the issuance of advisory notices. Complaints not investigated are justified and documented; The need to complete customer surveys, supplier profiles, material compliance requests, return material authorizations, and supplier quality agreements is identified; The need to schedule, plan and facilitate customer visits, tours and audits is identified; and The need to obtain an export license is determined. 00-BMS-002 Rev. 1 Page 9 of 38

10 1.2 Contract Review (continued) Activity 2 Activity 3 Activity 4 Verify ability to meet customer requirements to ensure that: Customer requirements are evaluated based upon GMN capabilities; Customer requirements differing from those previously expressed are resolved, including requirements that cannot be met or only partially met; The effects of customer requirements that differ from those previously expressed is considered, and appropriate action is taken, including changes to the manufacturing plan; Applicable regulatory requirements are met; Processes are validated when product acceptance cannot be verified by subsequent monitoring and measurement; Manufacturing process controls are established to monitor and verify critical items and key characteristics; Product monitoring, measurement, testing, and inspection activities are documented and include the product characteristics to be verified, the product acceptance criteria, and the method for retaining evidence of verification; Risks identified during quotation are evaluated and managed; Methods to measure variable data are identified when variable data is used for process control and to determine product acceptance; Sampling plans are justified based upon recognized statistical principles and are appropriate to the product when plans are used for product acceptance; In process verification or inspection activities are identified, planned and sequenced when manufacturing processes prevent product verification or inspection at later stages of manufacture; Potential environmental hazards are identified; and Potential safety hazards are identified;* Assemble job ticket packages to ensure: All documented information required to manufacture, inspect, and ship product to the customer is contained or referenced. Commit to supply products to customers ensure that: The commitment to supply product is formally communicated only after customer requirements have been reviewed and GMN s ability to meet those requirements has been verified. 00-BMS-002 Rev. 1 Page 10 of 38

11 1.3 Advanced Product Quality Planning (APQP) Requirements applicable to this process include: ISO9001: , 8.2 AS9100D 8.1, 8.2; 8.1.1; 8.1.2; ISO13485: ; 7.2, 7.5.1, 7.5.8, 7.5.9, 8.2.2, 8.2.3; ISO14001: ; and ISO/DIS Activity 1 Activity 2 Create project plan to ensure that: A cross functional team is identified from functions involved in the APQP process; Customer inputs are reviewed e.g. purchase order, design inputs, specifications; Customer requirements, including functional, performance, statutory, regulatory, delivery and post-delivery are identified; Potential environmental hazards are identified; Potential safety hazards are identified;* Manufacturing, testing and inspection data from previous or similar designs, product types, and manufacturing processes is considered as inputs to the planning process, where applicable; The need for process validation is identified; Potential consequences of obsolesce are considered e.g. materials, equipment, suppliers; Risks to the manufacture of products are identified and evaluated; and Conflicting customer requirements are identified. Develop quality plan, manufacturing plan and process controls to ensure that: The resources needed to plan, manufacture, inspect and ship product to the customer are identified and documented; GMN s ability to meet the customer s requirements has been evaluated and areas of uncertainty have been identified; Actions to manage risks to manufacture are identified, and assigned to the persons responsible for implementation, including inclusion to the manufacturing plan and the quality plan; Manufacturing processes are appropriate to the product; Testing and inspection activities are appropriate to the product and the characteristics to be measured; The elements of the quality plan are identified e.g. control plan, process flow chart, FMEA, PFMEA; and Tasks, responsibilities and completion dates for planning activities are identified. 00-BMS-002 Rev. 1 Page 11 of 38

12 1.3 Advanced Product Quality Planning (APQP) (continued) Activity 3 Activity 4 Activity 5 Activity 6 Create a validation protocol when required to ensure that: The validation objective is defined; The scope of the validation, including the manufacturing site, location of process and special conditions is defined; The process to be validated is defined, including the process steps; Reference documentation, including procedures, work instructions, and product or equipment specifications are identified; The validation procedure is defined, including the methods used to demonstrate that the process operates in a controlled state; The production, test, measurement and inspection equipment are identified; The data to be collected during the validation is defined; and The criteria used to evaluate whether the process can operate in a controlled state is defined. Conduct production run to ensure that: The manufacturing plan was followed and implemented effectively; The product conforms to requirements; The implementation of actions to manage risks is verified; and Product and process nonconformities are identified and corrective action is taken as necessary. Complete quality plan, manufacturing plan and process controls to ensure that: A production control plan is completed; All planning activities and actions defined within the project plan are completed; The quality plan is updated when changes to the plan are needed; and Customer approval of product and project documentation is obtained. Transfer product to production to ensure that: All necessary documentation is completed and available for production use. 00-BMS-002 Rev. 1 Page 12 of 38

13 1.4 Manufacturing Requirements applicable to this process include: ISO9001: ; 8.5; 8.7; AS9100D 8.1; 8.5; 8.7; ISO13485: , 7.5.1, 7.5.8, 7.5.9, , , 8.3.1, 8.3.2; 8.2.6; ISO14001: ; and ISO/DIS Activity 1 Activity 2 Review the job ticket package to ensure that: All previous workstations have been properly documented; Part number and revision on the drawing and the job ticket match; Sub-tickets correspond to the control ticket; Workstation instructions are identified and understood; Applicable work instructions are referenced and readily available for use; Tooling, fixtures, customer property or setup aids are identified; Monitoring and measurement activities, including any in-process tests, used to determine product acceptance are identified or referenced; Criteria for product acceptance is identified or referenced; and ITAR controlled technical data is identified. Setup workstations to ensure that: Setup materials and any nonconforming product remain identified and segregated from raw materials and conforming product; The workstation remains clean, organized and free of prohibited personal items; Tooling, fixtures, customer property, and setup aids are obtained from and returned to their designated storage locations; Actions are taken to eliminate or reduce environmental hazards; Actions are taken to eliminate or reduce safety hazards*; Product acceptance is verified by a supervising authority before processing the job; Changes to manufacturing processes are reviewed, evaluated and approved. Persons authorized to approve changes are identified; and Utilities, including air, water and electricity are monitored to the extent that their performance affects conformity to product requirements. 00-BMS-002 Rev. 1 Page 13 of 38

14 1.4 Manufacturing (continued) Activity 3 Activity 4 Process jobs to ensure that: Product characteristics are monitored and measured at frequencies appropriate to the product and process. When a sampling plan is used to determine measurement frequency, the sampling plan is justified based upon statistical principles and appropriate to the product characteristics being measured; Product is verified per established workmanship criteria and/or product specifications; Critical items, including key characteristics are monitored and controlled; Action is taken as applicable to prevent foreign object damage; In-process tests are performed as documented; Product is handled appropriately to preserve conformity and prevent damage and contamination, which may include: cleaning; special handling for sensitive products and hazardous materials; preservation instructions, including labelling; and shelf life control and stock rotation; Product is identified and segregated when determined to be nonconforming. Nonconforming product remains with the job unless it is transferred to a designated nonconforming product holding area; Action is taken to contain the effect of nonconformities on other products and processes; The extent and effect of the process nonconformities upon product is determined and appropriate actions are taken. Appropriate actions include containment, correction, and escalation; ITAR controlled technical data is secured and concealed from view when the job is not actively in process; Tooling, fixtures, customer property, and setup aids are returned to their designated storage locations after the job has been processed; and Suspect counterfeit materials are identified and segregated. Complete records to ensure that: Workstation sign-offs are properly documented, including the quantity of parts processed and their status e.g. conforming/nonconforming; Evidence of product acceptance, and the completion of manufacturing, testing, and inspection activities, is maintained; Customer property that has been lost, damaged or is otherwise unsuitable for use is reported to the customer and documented; and Product is identified and traceable when the product has not completed all required measurement and verification activities, yet is routed to workstations for subsequent processing. 00-BMS-002 Rev. 1 Page 14 of 38

15 1.5 Inspection and Packaging Business Management System: Policies Requirements applicable to this process include: ISO9001: ; 8.5; 8.7; AS9100D 8.1; 8.5; 8.7; ISO13485: , 7.5.1, 7.5.8, 7.5.9, , , 8.3.1, 8.3.2; 8.2.6; ISO14001: ; and ISO/DIS Activity 1 Activity 2 Activity 3 Perform First Article Inspection to ensure that: First Article Inspections are performed where required by contract, or determined as necessary to verify conformance to requirements; and Aerospace products are inspected per AS9102, First Article Inspection Requirements. Review job ticket packages to ensure that: All previous workstations have been properly documented; Supplies/overs allocated are identified; Part number and revision on the drawing and the job ticket match, including any supplies/overs allocated; Sub-tickets correspond to the control ticket; Workstation instructions are identified; Inspection criteria and acceptance/inspection level are identified; Applicable work instructions are readily available for use; Inspection and measuring devices, fixtures and aids, including customer property are identified; Part characteristics to be inspected and measured are identified; ITAR controlled technical data is identified; and Packaging and labelling requirements are identified. Setup workstations to ensure that: Inspection and measuring devices, fixtures and aids, including customer property are identified; The work environment is configured where applicable e.g. lighting, temperature; Suppliers/overs are obtained; Actions are taken to eliminate or reduce environmental hazards; and Actions are taken to eliminate or reduce safety hazards;* 00-BMS-002 Rev. 1 Page 15 of 38

16 1.5 Inspection and Packaging (continued) Activity 4 Activity 5 Inspect parts to ensure that: Inspect a sample part per the defined inspection criteria. Criteria includes, but is not limited to: o Dimensions; o Graphics and graphic locations; o Font, font size, and font location; o Color locations; o Size, shape and location of part features e.g. cutouts, round corners; Inspect each part per the specified inspection level against the defined criteria; Product is handled appropriately to preserve conformity and prevent damage and contamination, which may include: cleaning; special handling for sensitive products and hazardous materials; preservation instructions, including labelling; and shelf life control and stock rotation; Product is identified and segregated when determined to be nonconforming; Nonconforming product is transferred to a designated nonconforming product holding area or to Quality Assurance; Nonconforming product traceable to the supplies must be identified and segregated from nonconforming product traceable to the completed parts to preserve manufacturing lot integrity; ITAR controlled technical data is secured and concealed from view when the job is not actively in process; Inspection and measure devices, fixtures and aids, including customer property, are returned to their designated storage locations when no longer in use; and Suspect counterfeit materials are identified and segregated. Package conforming parts to ensure that Packaging methods and materials preserve product conformity, including preventing damage, contamination and deterioration; Special packaging requirements are defined when packaging methods alone are insufficient to preserve product conformity; and Label each package of parts. Labelling must contain the GM#, part number and part revision. 00-BMS-002 Rev. 1 Page 16 of 38

17 1.5 Inspection and Packaging (continued) Activity 6. Complete records to ensure that: Workstation sign-offs are properly documented, including the quantity of parts processed and their status e.g. conforming/nonconforming; Evidence of product acceptance, and the completion of manufacturing, testing, and inspection activities, is maintained; Customer property that has been lost, damaged or is otherwise unsuitable for use is reported to the customer and documented; Any inspection, nonconforming, and/or customer supplier forms are completed; The order status is determined as complete or within GMN s Terms and Conditions; and If the order quantity is short/incomplete or falls outside of GMN s Terms and Conditions, appropriate action is taken to determine if the job will be re-run for the balance of the order, and if the job will be shipped short/incomplete. 00-BMS-002 Rev. 1 Page 17 of 38

18 1.6 Product Audit and Ship Business Management System: Policies Requirements applicable to this process include: ISO9001: ; 8.5; 8.6, 8.7; AS9100D 8.1; 8.5; 8.6, 8.7; ISO13485: , 7.5.1, 7.5.8, 7.5.9, , , 8.3.1, 8.3.2; 8.2.6; ISO14001: ; and ISO/DIS Activity 1 Activity 2 Review job ticket packages to ensure that: All previous workstations have been properly documented; The quantity of conforming product is identified; Supplies/overs allocated are identified; Part number and revision on the drawing and the job ticket match, including any supplies/overs allocated and packaging labels; Sub-tickets correspond to the control ticket; Workstation instructions are identified; Inspection criteria and acceptance/inspection level are identified; Applicable work instructions are readily available for use; Documents required to accompany products are identified; Inspection and measuring devices, fixtures and aids, including customer property are identified; Part characteristics to be inspected and measured are identified; ITAR controlled technical data is identified; Packaging and labelling requirements are identified; and Documented customer approval is obtained when workstation 938 is omitted from the manufacturing plan, and includes the GM# and shipment releases to be omitted. Setup workstations to ensure that Inspection and measuring devices, fixtures and aids, including customer property are identified; The work environment is configured where applicable e.g. lighting, temperature; Actions are taken to eliminate or reduce environmental hazards; and Actions are taken to eliminate or reduce safety hazards;* 00-BMS-002 Rev. 1 Page 18 of 38

19 1.6 Product Audit and Ship (continued) Activity 3 Activity 4 Perform sample part inspection to ensure that: The product conforms to part and cosmetic specifications, as applicable: o Graphics position and layout; o Colors visual color check, count and location; o Windows, cutouts, bends, angles, shapes position and layout; o Studs and brackets presence and position; o Corners type, size, and location; o Liners and slits presence and position; o Adhesive review the line to verify the correct adhesive was used; o Masking; o Part dimensions if required, verify part dimensions are within the specified tolerance. Where applicable, ensure dimensions are inputted in NWA Statistical Software Database; o Part thickness for multilayer parts, identify each layer s thickness and add together those measurements to obtain the overall part thickness. o LEDs location, color, and alignment; o Connector presence and orientation; o Test labels any test labels affixed to parts are stamped or initialed; and o Part number marking if the part number is marked on the part, verify that the part number marked matches the drawing and ticket. If the part number marked on the part differs, review the drawing and job ticket to determine whether the different part number is valid. Perform sample audit to ensure that: The lot size equals the quantity of parts conforming parts; The sample is determined per C=0 Sampling Table, AQL 1.0. The acceptance number in all cases will be 0; The sample lot is inspected per applicable cosmetic and workmanship critera, which may include: o Alignment of components; o Burrs; o Rough or uneven edges; o Wrinkles and bubbles; and o Damage, dents, and nicks. The lot is rejected and returned to Inspection when a nonconformity is identified during the sample audit; ITAR controlled technical data is secured and concealed from view when the job is not actively in process; Inspection and measure devices, fixtures and aids, including customer property, are returned to their designated storage locations when no longer in use; Suspect counterfeit materials are identified and segregated; and Product is handled appropriately to preserve conformity and prevent damage and contamination, which may include: cleaning; special handling for sensitive products and hazardous materials; preservation instructions, including labelling; and shelf life control and stock rotation. 00-BMS-002 Rev. 1 Page 19 of 38

20 1.7 Product Audit and Ship (continued) Activity 5 Activity 6 Complete records to ensure that: Workstation sign-offs are properly documented, including the quantity of parts processed and their status e.g. conforming/nonconforming; Evidence of product acceptance, and the completion of manufacturing, testing, and inspection activities, is maintained; The quantity of product approved for release and shipment to the customer is documented; Customer property that has been lost, damaged or is otherwise unsuitable for use is reported to the customer and documented; Any inspection, nonconforming, and/or customer supplier forms are completed; and Documents required to accompany products are included with job ticket packages. Ship product to ensure that: All previous workstations have been properly documented; The quantity of product approved for shipment is identified; Part number and revision on the drawing and the job ticket match, including any supplies/overs allocated and packaging labels; Sub-tickets correspond to the control ticket; Workstation instructions are identified; Applicable work instructions are readily available for use; Documents required to accompany products are present; ITAR controlled technical data is secured and concealed from view when the job is not actively in process; Packaging requirements are identified; and Product is packaged in suitable containers that preserve conformity during shipment, including the prevention of damage, contamination and deterioration. 00-BMS-002 Rev. 1 Page 20 of 38

21 1.7 Dispositioning Nonconforming Product Requirements applicable to this process include: ISO9001: ; 10.2; AS9100D 8.7; 10.2; ISO13485: , 8.3.2; 8.5.2; ISO14001:2015 N/A; and ISO/DIS45001 N/A Business Management System: Policies Activity 1 Activity 2 Review nonconforming product to ensure that: The nonconformance is evaluated for validity; Any associated documentation (e.g. PO, RMA, internal form) reference the correct product and GM#, and indicate the product discrepancy or nonconformance (i.e. reason for rejection or return); The nonconformance is evaluated to determine if an external party may have contributed to the nonconformance, and as a result would need to be notified; The effect of the nonconformance on product already delivered, on product in process is determined; Nonconforming product remains segregated throughout review; and Suspect counterfeit materials are reviewed and verified by the applicable supplier. Determine the disposition to ensure that: Invalid nonconformances are returned to the customer or relevant function in the organization; Valid nonconformances remain identified and segregated from conforming product; Valid nonconformances are corrected where appropriate, or scrapped; Product conformance is verified when nonconforming product is corrected; Scrapped nonconforming product is identified until scrapped or destroyed; or conspicuously or permanently marketed until physically rendered unusable; ITAR controlled nonconforming product is conspicuously or permanently marked until physically destroyed; Approval of the organization responsible for product design is obtained when nonconforming product is dispositioned Used-As-Is or Repair; Customer approval is obtained when nonconforming product is dispositioned Used-As-Is or Repair, if the nonconformity results in a departure from contract requirements; Quality management approval, and customer approval when applicable, is obtained when accepting nonconforming product under concession. When accepting nonconforming product under concession, justification is provided and applicable regulatory requirements are met; The potential adverse effects of rework upon the product are considered; 00-BMS-002 Rev. 1 Page 21 of 38

22 1.7 Dispositioning Nonconforming Product (continued) Activity 3 Activity 4 Complete records to ensure that: A description of the nonconformance is maintained, which includes a summary of the evaluation and justification for the disposition; Actions taken as a result of the disposition are maintained, which include the results of rework and re-verification of product conformance; Reference to rework instructions and the results of re-verification of product conformance must be maintained; The persons responsible for reviewing and approving the disposition are identified; Nonconformities affected delivered products are reported to customers in a timely fashion; Suspect counterfeit material is reported to Purchasing; and Advisory notices are issued where applicable. Take corrective action to ensure that: The effect of nonconformities is contained and immediately corrected; Root causes of nonconformities are determined, including those related to human factors; The existence of similar nonconformities is considered; Action is taken to eliminate root causes and prevent recurrence; The effectiveness of corrective actions is verified; Actions are flowed down to external providers e.g. suppliers when it is determined that the supplier is responsible for the nonconformity; Actions are taken when timely and effective corrective actions are not achieved; and Actions are taken when nonconforming product is detected after delivery. 00-BMS-002 Rev. 1 Page 22 of 38

23 2.0 SYSTEM RELATED PROCESSES This section contains policies for the following: System Planning Process Management Planning (see Management Planning and Review) Resource Management Process Document Control Hiring Training Purchasing Receiving and Inspection Calibration System Evaluation Process Internal Audit Management Planning and Review 00-BMS-002 Rev. 1 Page 23 of 38

24 2.1 Document Control Requirements applicable to this process include: ISO9001: ; AS9100D 7.5; ISO13485: ; ISO14001: ; and ISO/DIS Activity 1 Activity 2 Activity 3 Activity 4 Evaluate new documents and document change requests to ensure that: Documents that need to be included in the BMS are identified; Changes to existing documents are clearly defined; and Documents are properly formatting, including document number and document revision. Add/Update documents to ensure that: Documents are added or uploaded in a timely manner; and Documents are added and updated appropriately based upon document type, organization hierarchy and document owner. Apply document controls to ensure that: Documents have the appropriate distribution, approval, release and access controls; Documents that are used to communicate information e.g. work instructions, specifications are electronically distributed as secured.pdfs; Documents that are used to record information e.g. forms are distributed in their native file format, and are access restricted when required by the document s owner e.g. fill in form fields only; Access to obsolete documents is restricted to Document Control or authorized persons; External documents are identified and distinguished from internal documents; and Obsolete documents are identified, archived and retained per record retention requirements. Review and approve documents to ensure that: The appropriate positions review and approve documents, including new document, document changes to existing documents, re-approval of existing documents and the obsolescence of documents; and The positions required to approve documents are identified by document type. 00-BMS-002 Rev. 1 Page 24 of 38

25 2.1 Document Control (continued) Activity 5 Activity 6 Release and distribute or withdrawal documents to ensure that: Documents are released after they have been approved by appropriate persons; Released documents, excluding documents that are intended to be written on e.g. forms, are physically identified as being Uncontrolled if Printed ; Access to documents is verified once released; Documents are available at relevant points of use; and A paper copies of documents are distributed only as needed, and are physically identified as Controlled. Add/update training requirements to ensure that: Training requirements are assigned to the appropriate job codes; Training requirements are revised following training content revisions; and Training requirements are communicated to the appropriate departments and personnel. 00-BMS-002 Rev. 1 Page 25 of 38

26 2.2 Hiring Requirement applicable to this process include: ISO9001: ; 7.2; AS9100D 7.1.2; 7.2; ISO13485: ; ISO14001: ; 7.2; and ISO/DIS ; 7.2. Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Activity 7 Request employees to ensure that: The Human Resources needed to implement and control BMS processes are identified, including appropriate skills, education and background requirements for job positions; Training requirements for job positions are identified; The required US personhood status is identified; A hiring timeline is established; and The creation of new job codes is identified. Review applicants to ensure that: The initial employee requisition is adequate to attract candidates meeting the job position requirements. Schedule interviews to ensure that: The hiring process is tracking to the hiring timeline. Review candidates post-interview to ensure that: Candidates are evaluated based upon the job position requirements and the results of candidate interviews; The need to revise the job position requirements, including adding additional job position requirements are is determined; and A suitable candidate is selected to receive an offer of employment. Offer employment to ensure that: N/A Screen employees pre-employment to ensure that: Candidates comply with substance use policies; and The required US personhood status is verified. On-board employees to ensure that: Appropriate employment paperwork is completed; and Employee receive GMN badges. 00-BMS-002 Rev. 1 Page 26 of 38

27 2.3 Training Process Requirement applicable to this process include: ISO9001: ; 7.1.6; 7.2; 7.3; AS9100D 7.1.2; 7.1.6; 7.2; 7.3; ISO13485: ; ISO14001: ; 7.2; 7.3; and ISO/DIS ; 7.2; 7.3 Activity 1 Activity 2 Activity 3 Employees participate in new employee orientation to ensure that: Employees are aware of the BMS Policy, BMS objectives, and how they contribute to the effectiveness of the BMS, compliance to regulatory requirements, product conformity, promoting a safe, healthy and ethical work environment, and reducing our environmental impact. Review training requirements to ensure that: The knowledge and information needed to adequately perform the duties assigned to job positions is identified; Documents relevant to job positions are identified and provided to employees, including relevant BMS documentation and any subsequent changes thereafter; and Competencies for job positions are determined and periodically reviewed. Train employees to ensure that: Training methods and actions are appropriate to the job position; Actions are taken as needed to obtain the necessary competency; Safety hazards associated with the job position, and actions to reduce the risks associated with the hazards, are identified and communicated to employees*; Environmental hazards associated with the job position, and actions to reduce the risks associated with the hazards, are identified and communicated to employees; FOD, export control and counterfeit materials aspects applicable to the job position are identified and communicated to employees; Training occurs within the required timeframe; and Employees are aware of their contribution to product quality and product safety, and the importance of integrity and ethical behavior. 00-BMS-002 Rev. 1 Page 27 of 38

28 2.3 Training (continued) Activity 4 Activity 5 Evaluate employee training to ensure that: The necessary competency for job positions has been demonstrated and observed; Additional actions are taken to obtain the necessary competency for a job position; and The need to extend training is identified and communicated before reaching the required timeframe for completion. Certify employees to ensure that: Evidence of obtaining the necessary competency is maintained. 00-BMS-002 Rev. 1 Page 28 of 38

29 2.4 Purchasing Requirement applicable to this process include: ISO9001: ; 8.5.2; AS9100D 8.4; 8.5.2; ISO13485: ; 7.5.9; ISO14001: ; and ISO/DIS Activity 1 Identify purchasing needs and requirements to ensure that: Resources needed for the BMS are determined and identified. Resources may include processes, products or material, services and equipment; Customer designated or approved resources are used when required by contract; Resources are analyzed based upon supply chain criticality, which may include consideration of whether a resource could be substituted or procured from an alternative source; is critical to GMN s processes or products supplied; is obtained through a distributor or broker, is highly susceptible to counterfeiting; Resources that present safety hazards are determined and identified;* Resources that present environmental hazards are determined and identified; Resources to be procured through distributors, brokers or customerdesignated suppliers are determined and identified; Resources, the procurement of which requires an executed supplier quality agreement, are determined and identified; Resources needed for ITAR controlled products are determined and identified; Resources responsible for supplying the final product to the customer on behalf of GMN are determined and identified; and Quality system requirements for resources are determined and identified. 00-BMS-002 Rev. 1 Page 29 of 38

30 2.4 Purchasing (continued) Activity 2 Activity 3 Identify, evaluate and select suppliers to ensure that: Suppliers are evaluated based upon their ability to meet external resource requirements. Evaluation criteria includes, but is not limited to the scope of approval; supplier type (e.g. OEM, distributor, broker, customer-designated); supplier performance (where known); whether the supplier maintains a documented quality management system; whether a supplier quality agreement is required; whether the resources to be supplied affect counterfeit risk; the supplier s ability to mitigate counterfeit risks identified by GMN; a supplier s DPL status and US person status, including DDTC registration; the adequacy and appropriateness of supplier controls in regards to the material or services to be provided; the supplier s ability to perform test or verification activities in behalf of GMN; Suppliers are selected and approved based upon the results of the supplier evaluation. Evidence of approval includes the persons who approved the supplier and any exceptions to the scope of approval; Suppliers are identified within the BMS. The identification includes a supplier s approval status, scope of approval, current performance to BMS supply chain criteria (e.g. on time delivery and product conformity,) and the scope of and requirements for delegations when verification activities are delegated, including monitoring of delegation activities; Suppliers are monitored at frequencies that detect potential performance issues, which could negatively affect suppliers ability to meet resource requirements. Monitoring of suppliers is based upon supplier on time deliver and product conformity. The results of monitoring are used to determine whether supplier re-evaluation is needed and/or changes in approval status and scope of approval; The results of re-evaluation may include a change in approval status or scope of approval, and corrective action; Documented information created by suppliers and/or maintained by suppliers is controlled; and The need for additional verification activities is considered based upon risks identified. Obtain quotations to ensure that: Suppliers have the ability to provide specified resources that meet BMS requirements for materials, components and services. 00-BMS-002 Rev. 1 Page 30 of 38

31 2.4 Purchasing (continued) Activity 4 Issue a purchase order to ensure that: Requirements specified for the product or service identified in the transaction are identified. Requirements include those related to the product, component and/or service to be supplied, or to the supplier s management system; Where applicable, requirements for products and services are identified, which may include product identification and any specifications necessary to differentiate one product from a similar product, including critical items or key characteristics; approval of changes related to design and development control; the approval of production methods, processes, equipment; product release activities, including the use of statistical techniques for product acceptance; test, inspection and verification activities; positive traceability and acquisition; the need to provide documented information as evidence of conformity e.g. test results, Certificates of Conformance or Analysis, test, inspection, verification or validation activities that GMN intends to perform at the supplier s premises; Where applicable, requirements for the supplier s management system are identified, which may include requirements applicable to the supplier s subtier suppliers; delegated verification and inspection activities; the use of designated suppliers; notification of the potential transfer of ITAR controlled technical data; the need to implement a quality management system; the need to maintain documented information, including disposition and retention specifications; rights of access to the supplier by GMN; competency or certification standards for employees performing work that affects product conformity; employee awareness of their contribution to product safety, the importance of ethical behavior, and their contribution to product or service conformity; notifying GMN of nonconforming processes, products or services and to obtain approval for disposition; notify GMN of changes to processes, products or services, including the place of manufacture and to obtain GMN s approval; notification of GMN by suppliers when product is changed, prior to implementing any changes that affect the ability of the product to meet purchasing requirements; Requirements are reviewed for adequacy by before being communicated to suppliers; and Resource specifications are defined, and identify any documentation needed to communicate the specifications e.g. drawing, blueprint, specification sheet; 00-BMS-002 Rev. 1 Page 31 of 38

32 2.5 Receiving and Inspection Business Management System: Policies Requirement applicable to this process include: ISO9001: , 8.5.2, 8.5.3, 8.5.4, 8.7; AS9100D 8.4.2, 8.5.2, 8.5.3, 8.5.4, 8.7; ISO13485: ; 7.5.9; ; ; 8.3 ISO14001: ; and ISO/DIS Activity 1 Activity 2 Receive and verify materials and components to ensure that: All identifying items listed on documentation received from suppliers e.g. part or product number, lot number, revision match or correspond to the identifying items listed on GMN created purchasing documentation, and job ticket packages where applicable; Product containers are reviewed for damage; Product, once verified and accepted, is positively identified to distinguish it from other product that has not been verified and accepted; and Customer property is identified. Store materials and components to ensure that: Product is identified. The identification includes the acceptance status; relevant information needed (1) to distinguish the product from similar products, (2) to enable First In, First Out inventory management practices, and (3) to enable product recall and containment; and product expiration information, where applicable; Product, regardless of where it is stored, is stored using methods that prevent product damage, deterioration, and contamination; Storage methods include requirements for preserving product sensitive to environmental conditions and subject to a defined expiration period; Storage methods also consider the prevention of safety incidents;* and Storage methods also consider the prevention of environmental hazards. 00-BMS-002 Rev. 1 Page 32 of 38

33 2.5 Receiving and Inspection (continued) Activity 3 Inspect materials and components to ensure that: Acceptance activities, including methods of inspection, testing, and verification of requirements, occur at frequencies appropriate to a supplier s performance history, product criticality, and counterfeit risk; High counterfeit risk materials and components are inspected to detect signs of counterfeit activities; Acceptance criteria, including critical or key characteristics are inspected; Sampling plans are based upon established statistical principles when used to verify resource conformance; Product, once verified and accepted, is positively identified to distinguish it from other product that has not been verified and accepted; Nonconforming product is identified, segregated and transferred to a designated holding area or to Quality Assurance for disposition; The product is identified and traceable when released for production use pending the completion of acceptance activities. The methods of identification unverified product to be recalled and contained, including product that has been incorporated or transformed into other products; Part number and revision on the drawing and the job ticket match; Workstation instructions are identified; Applicable work instructions are readily available for use; Inspection and measuring devices, fixtures and aids, including customer property are identified, obtained, and returned to are returned to their designated storage locations when no longer in use; ITAR controlled technical data is secured and concealed from view when the job is not actively in process; Workstation sign-offs are properly documented, including the quantity of parts processed and their status e.g. conforming/nonconforming; Evidence of product acceptance, and the completion of testing and inspection activities, is maintained; Customer property that has been lost, damaged or is otherwise unsuitable for use is reported to the customer and documented; Test data is evaluated when used to verify that product conforms to requirements, and validated when the product is a raw material and identified as a significant operational risk; Any inspection, nonconforming, and/or customer supplier forms are completed; Actions are taken to eliminate or reduce environmental hazards; and Actions are taken to eliminate or reduce safety hazards.* 00-BMS-002 Rev. 1 Page 33 of 38

34 2.6 Calibration Requirement applicable to this process include: ISO9001: ; 7.1.5; AS9100D 7.1.4; 7.1.5; ISO13485: ; ISO14001: ; and ISO/DIS Activity 1 Activity 2 Activity 3 Activity 4 Obtain IMTE and calibration standards to ensure that: Equipment and inspection stamps, including personally owned and customer supplied, needed to verify, validate or test for product or process conformity, and provide evidence of product acceptance, can be calibrated and traceable. Evaluate IMTE to ensure that: Equipment is suitable, based upon recommended usage, for the monitoring and measuring activities indicated or assigned; Equipment calibration requirements, including method, frequency, environmental conditions, calibration standard, and calibration instructions are identified; Equipment use requirements, including accuracy rations are identified; Equipment storage requirements, including methods to prevent damage and deterioration and to safeguard from adjustment are identified; and Software applications used in monitoring and measuring equipment are identified and validated. Add IMTE and calibration standards to register to ensure that: Equipment, including type, unique identification, calibration status and location of use are identified in the register; and Calibration frequency, method, and acceptance criteria are identified in the register. Calibrate IMTE and calibration standards to ensure that: IMTE calibration status is identifiable at the equipment s point of use; IMTE identification methods enable the equipment to be recalled for calibration; Calibration is carried out according to the equipment s environmental condition requirements; and Previous measuring results are reviewed for validity when IMTE is determined to be out of tolerance, damage or unfit for purpose. 00-BMS-002 Rev. 1 Page 34 of 38

Business Management System: Manual 00-BMS-001

Business Management System: Manual 00-BMS-001 Business Management System: Manual 00-BMS-001 Preface This manual defines the Business Management System (BMS) established by GM Nameplate. The BMS is comprised of the processes needed to support GM Nameplate

More information

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people. Title: AS9100D Quality Manual Revision Date.: 05/04/2018 Page 1 of 22 The Quality Policy of Monroe Engineering is defined in the following statement: Monroe Engineering is committed to customer satisfaction;

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

Medical QMS Quality Manual

Medical QMS Quality Manual SECTION 1: SIGNATURE PAGE Medical QMS Quality Manual APPROVALS: (Approvals are electronically recorded in the eqms.) CEO/President California Division: Bruce Cleckley President Washington Division: Brad

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company

More information

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard

More information

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0) TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...

More information

QUALITY POLICY MANUAL

QUALITY POLICY MANUAL C. L. HANN INDUSTRIES, INC. 1020 TIMOTHY DR. SAN JOSE CA 95133 QUALITY POLICY MANUAL Quality Policy Manual Rev. 1 8.18.97 MISSION STATEMENT C. L. Hann Industries, Inc. is designed to meet the precision

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

QUALITY MANUAL. Conforming To AS9100D and ISO9001:2015. QM-001 Page 0 of 36 Revision 24:

QUALITY MANUAL. Conforming To AS9100D and ISO9001:2015. QM-001 Page 0 of 36 Revision 24: QUALITY MANUAL Conforming To AS9100D and ISO9001:2015 QM-001 Page 0 of 36 Revision 24: 2018-03-09 Contents I. FOREWORD... 3 II. INTRODUCTION... 3 1 SCOPE... 4 1.1 SCOPE STATEMENT... 4 1.2 FACILITIES WITHIN

More information

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to: Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,

More information

Quality Systems Manual Rev. NC Issued July 9 / 2018

Quality Systems Manual Rev. NC Issued July 9 / 2018 NMT Specialized Machining Inc 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Quality Systems Manual Rev. NC Issued July 9 / 2018 Conforms to AS9100 Rev D and ISO 9001:2015 Table of Contents Introduction

More information

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100 N&P PRECISION MACHINE INC Quality Commitment Quality Management System Manual AS9100 This printed copy is uncontrolled Page 1 of 44 Revision B N&P Precision Machine, Inc. Quality Management System Manual

More information

Quality Management System Manual

Quality Management System Manual This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

SUPPLIER SURVEY FORM Instructions

SUPPLIER SURVEY FORM Instructions SUPPLIER SURVEY FORM Instructions 1. The following Supplier Survey was developed by Vishay Measurements Group, Inc. to assess and document the capability of its supplier base. 2. The Supplier Survey is

More information

Quality Flow-Down Requirements to Suppliers

Quality Flow-Down Requirements to Suppliers 1.0 Calibration System Seller s (herein referred to as Supplier) calibration system shall meet the requirements or standards of; ISO 9001, ISO 10012-1, or AS9100, and ANSI-Z540-1, or MIL-STD-45662. 2.0

More information

PRECISE INDUSTRIES INC. Quality Manual

PRECISE INDUSTRIES INC. Quality Manual PRECISE INDUSTRIES INC Revision N Issued July 5, 2017 Conforms to AS9100 Rev. D and ISO 9001:2015 Copyright Year2017 [PRECISE INDUSTRIES INC]; all rights reserved. This document may contain proprietary

More information

Reference Paragraphs. Appendix B AQS Auditor Handbook

Reference Paragraphs. Appendix B AQS Auditor Handbook Introduction Auditing is a basic tool to assess effective implementation of and conformity to Quality Management System (QMS) requirements. In addition to the determination of conformity, this handbook

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS TRANSLINE TECHNOLOGY, INC. (TTI) 1106 S Technology Circle Anaheim, CA 92805 Telephone: (714) 533-8300 FAX: (714) 533-8791 www.translinetech.com SQRs SUPPLIER QUALITY REQUIREMENTS Revision B 03/18 When

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

Quality Flow-Down Requirements to Suppliers

Quality Flow-Down Requirements to Suppliers 1.0 Calibration System: Seller s (herein referred to as Supplier) calibration system shall meet the requirements or standards of; ISO 9001, ISO 10012-1, or AS9100, and ANSI-Z540-1, or MIL-STD-45662. 2.0

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

PP Quality Assurance Procurement Clauses for Suppliers

PP Quality Assurance Procurement Clauses for Suppliers PP 360.3 Quality Assurance Procurement Clauses for Suppliers Version No: 7 Created By: Approved By: Erik Keim on 01/29/2019 at 10:44 PM Eric Deffarges on 02/05/2019 at 09:17 AM Valid From: 06/12/2017 Strictly

More information

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept ALTA Quality Requirements for Suppliers 25 Sept 2017 1 2 3.2. Purchase order information a- When Alta customer is indicated on the purchase order or related engineering documents, customer quality requirements

More information

Objective Evidence Record (OER)

Objective Evidence Record (OER) This material is derived from SAE AS9101D, which is copyrighted intellectual property of SAE international. SAE is not responsible for outcomes resulting from use of this material. APPENDIX A OBJECTIVE

More information

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No TITLE: EECTIVE DATE: 09/18/2014 External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No Yes PROPRIETARY DOCUMENT No TABLE O CONTENTS QUALITY POLICY

More information

Quality Procedure QP-843 Information for External Providers

Quality Procedure QP-843 Information for External Providers Page 1 of 12 Quality Procedure Approval On File John Morrissey, Management Representative On File John Morrissey, President PROPRIETARY RIGHTS Superior Jig, Inc. proprietary rights are retained for the

More information

Altech Machining, Inc. Terms and Conditions

Altech Machining, Inc. Terms and Conditions 11000 Woodside Avenue North Phone: (619) 448-3392 Santee, CA 92071 Fax: (619) 448-6854 info@altechmachining.net Altech Machining, Inc. Terms and Conditions The terms and conditions listed in this document

More information

PURCHASING QUALITY CLAUSES

PURCHASING QUALITY CLAUSES Page 1 of 5 These requirements apply to all suppliers A. Right of Entry Tri Models, Tri Model s customer and their customers or applicable regulatory agencies shall have right of access to all facilities,

More information

SUPPLIER QUALITY SYSTEM SURVEY

SUPPLIER QUALITY SYSTEM SURVEY SUPPLIER QUALITY SYSTEM SURVEY DATE (M/d/yy): 55 Dragon Court Woburn, MA 01801 Tel: (781) 933-7300 Fax: (781) 935-4529 GENERAL INFORMATION Supplier Name: Physical Address: City: State: Zip: Sr. Company

More information

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R. ISO 9001 The Standard Illustrations The International Standard for Quality Management Systems Year 2000 Edition Leland R. Beaumont ISO 9001, The Standard Illustrations Figures excerpted from ISO 9001,

More information

SUPPLIER QUALITY REQUIREMENTS

SUPPLIER QUALITY REQUIREMENTS SUPPLIER QUALITY REQUIREMENTS Revision B January 2017 This document establishes general and special product assurance requirements clauses for use on the Purchase Order and is part of the Terms and Conditions

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Page 2 Number of non-compliances:

More information

These requirements apply to all suppliers:

These requirements apply to all suppliers: Page 1 of 5 These requirements apply to all suppliers: A. Right of Entry Tri Models, Tri Model s customer and their customers or applicable regulatory agencies shall have right of access to all facilities,

More information

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers A. PURPOSE To define the Orbel quality assurance provisions for inventory materials received from strategic suppliers. This document is intended for use by Orbel strategic suppliers to aid in the quality

More information

Intro Corporation Purchase Order General Terms and Conditions

Intro Corporation Purchase Order General Terms and Conditions 1 General Quality Requirements Intro Corporation Purchase Order General Terms and Conditions 1.1 The Seller shall: a) Meet the requirements of the latest revision of the Supplier Quality Requirements (Including

More information

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner A. SCOPE This document contains requirements for conducting business with Tri Star Metals, LLC and its customers. It is applicable to suppliers that provide

More information

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

AERO GEAR, INC. SUPPLIER QUALITY MANUAL AERO GEAR, INC. SUPPLIER QUALITY MANUAL REVISION HISTORY REVISION EFFECTIVE DATE SUMMARY OF CHANGES A 30-JAN-1998 Original Issue B 17-OCT-2002 Added note re: subcontractors may not subcontract to another

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual 1 1. Introduction Scope Purpose Application Implementation 2. Purchasing Expectations Terms and Conditions Engineering / Technical Support Customer Support Resources Pricing Consistent

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Supplier Quality Requirements (Including Terms & Conditions)

Supplier Quality Requirements (Including Terms & Conditions) 1 General Quality Requirements 1.1 The Seller shall: a) Meet the requirements of the latest revision of the Supplier Quality Requirements (Including Terms & Conditions) and all applicable requirements

More information

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL AERO SUPPLY USA 21941 US HWY 19 NORTH Clearwater, FL. 33765 USA P.(727) 754-4915 F.(727) 754-4920 Website: www.aerosupplyusa.com Email: sales@aerosupplyusa.com QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

More information

Infinity Precision Inc. Quality Manual

Infinity Precision Inc. Quality Manual Infinity Precision Inc. Quality Manual Infinity Precision Inc. Quality Manual Revision 06 Page 1 of 29 TABLE OF CONTENTS INFINITY PRECISION INC. (IPI) COMPANY PROFILE... 4 1. SCOPE... 5 1.1 GENERAL...

More information

Trident Precision Manufacturing

Trident Precision Manufacturing Trident Precision Manufacturing QASQC Rev. A 6/7/06 Title: Supplier Quality Clauses Author: April V. Lusk Director of Quality General Suppliers are responsible for compliance to all stated Quality Clauses

More information

SUPPLIER QUALITY ASSESSMENT

SUPPLIER QUALITY ASSESSMENT Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

Supplier Quality Requirements

Supplier Quality Requirements Supplier Quality Requirements (Including Terms & Conditions) (FM QUAL 740TC REV. C 02/01/2018) 1. General Quality Requirements 1.1 The Seller Shall: a. Meet the requirements of the latest revision of the

More information

Supplier Quality Terms & Conditions

Supplier Quality Terms & Conditions Rev 01. February 20, 2018 Page 1 of 5 Supplier Quality Terms & Conditions Century Spring Corporation (CSC) maintains a quality management system that adheres to the requirements of ISO 9001:2015 and AS9100

More information

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6 TERMS & CONDITIONS Page 1 of 6 1.0 PURPOSE 1.1 Satellite Aerospace, Inc. Quality Requirements to Subtier Sources. 2.0 SCOPE 2.1 This document applies to all purchasing and sales personnel responsible for

More information

Revision Date Change Author Change Summary A 04/23/2015 S. Oluwole

Revision Date Change Author Change Summary A 04/23/2015 S. Oluwole Title: Supplier Quality Clauses Page: 1 of 11 Revision Date Change Author Change Summary A 04/23/2015 S. Oluwole In case of any conflict with this document and any other requirements, the order of precedence

More information

Supplier Quality Clauses

Supplier Quality Clauses Page: 1 of 9 Supplier 425 Strempel St. Seguin, TX 78155 Page: 2 of 9 1.0 PURPOSE 1.1 The purpose of this this Quality Clause Document is to specify requirements by which Quality/Production activities shall

More information

Quality Management System Manual

Quality Management System Manual SpecSys, Inc. recognizes its responsibility as a provider of quality products and services. To this end, SpecSys, Inc. has documented, implemented and maintains a System that complies with ISO 9001 2000.

More information

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein. 1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification

More information

Quality Manual Revision: C Effective: 03/01/10

Quality Manual Revision: C Effective: 03/01/10 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers A. PURPOSE To define the Orbel quality assurance provisions for inventory materials received from strategic suppliers. This document is intended for use by Orbel strategic suppliers to aid in the quality

More information

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL DATE OF RELEASE: 02-Jun-2017 Page 1 of 9 TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL Change History: REV ECO ECO Completion/ Finished Date Summary of Change A01 S6-10550 29-JUL-15 Initial

More information

Procurement Quality Assurance Requirements

Procurement Quality Assurance Requirements 1. REQUIREMENTS 1.1 Quality System This document provides the minimum Quality System Requirements to externally provided processes, products and services to Superior Thread Rolling (STR). Suppliers must

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:

More information

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:

More information

CERTIFICATE OF REGISTRATION

CERTIFICATE OF REGISTRATION 03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.

More information

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,

More information

ISO 9001:2000 Revision G

ISO 9001:2000 Revision G ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational

More information

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products

More information

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS CONTROL OF NON-CONFORMING PRODUCTS (8.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

Supplier Quality Clauses

Supplier Quality Clauses Requirement Name Management System Design, Process, or Material Changes Submission of Nonconforming Material to POC Deviation / Waiver Resubmission of Material Notification of Previous Delivery of Defective

More information

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS ALLOY DIE CASTING 6550 Caballero Blvd Buena Park, CA Telephone: (714) 521-9800 FAX: (714) 521-5510 www.alloydie.com SQRs SUPPLIER QUALITY REQUIREMENTS Revision K 5/2018 When specified on an Alloy Die Casting

More information

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS ALLOY DIE CASTING 6550 Caballero Blvd Buena Park, CA Telephone: (714) 521-9800 FAX: (714) 521-5510 www.alloydie.com SQRs SUPPLIER QUALITY REQUIREMENTS Revision K 5/2018 When specified on an Alloy Die Casting

More information

Plan QAQ Supplier Quality Requirements (Rev 15)

Plan QAQ Supplier Quality Requirements (Rev 15) 1.0 Purpose To define Insitu s Supplier Quality Requirements for items procured from suppliers by Insitu for use in the manufacture and repair of products. 2.0 Scope This document applies to suppliers

More information

APPD DESCRIPTION OF CHANGE DATE. BY A NA 8/23/12 Updated to new format, re-sequenced clauses, added

APPD DESCRIPTION OF CHANGE DATE. BY A NA 8/23/12 Updated to new format, re-sequenced clauses, added REV DCO # REV APPD DESCRIPTION OF CHANGE DATE BY A NA 8/23/12 Updated to new format, re-sequenced clauses, added LK Clause Q25, Q26 & Q27 B NA 1/27/14 Revised Clause Q2 to add NADCAP; revised Clause Q24

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Purchasing PURPOSE SCOPE

Purchasing PURPOSE SCOPE Page #: 1 of 5 PURPOSE The purpose of the Purchase Order (PO) Terms and Conditions (T&Cs) are to communicate special terms per Training to the purchase of good and services to the supplier and business

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

Supplier Quality System Survey

Supplier Quality System Survey Supplier Division Address Date: Quality Contact: Reports to: Title: Title: Phone Fax e-mail Plant size (ft 2 ): Union: Contract expires: Total Employment: Direct Labor: Shifts: QA employees: This report

More information

Brumund Foundry Inc.

Brumund Foundry Inc. QUALITY ASSURANCE 1st TIER MANUAL Brumund Foundry Inc. 4400 West Carroll Ave. Chicago, IL 773-287-9250 PER ANSI/ASQC Q9002-1994 Page 1 of 7 THE PRESIDENT HAS DIRECTED THAT THE FOLLOWING POLICIES BE IMPLEMENTED

More information

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses Quality Requirements The following requirements apply at minimum, additional requirements may be incorporated with the company purchase order. Material and Hardware Providers - Q1, Q2, Q3, Q4, Q5, Q8,

More information

Helical Products Company

Helical Products Company Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc. ISO9001-2008 QUALITY MANUAL SCOPE HFI Fluid Power Products is a full line stocking distributor/manufacturer for both hydraulic and pneumatic

More information

JDI Quality Assurance Guideline

JDI Quality Assurance Guideline JDI Quality Assurance Guideline For Supplier, 2017 Japan Display Inc. 7/1/2017 - Table of Contents - 1. Introduction... - 7-1.1. Purpose of this Guideline...- 8-1.2. Structure of this Guideline...- 8-1.3.

More information

Rosen Aviation Supplier Quality Assurance Requirements

Rosen Aviation Supplier Quality Assurance Requirements 1. Purpose This document establishes the Quality Assurance Requirements for all Rosen Suppliers. This document is applicable to all Rosen Aviation Purchase Orders (POs). In addition to the requirements

More information

Quality Management System

Quality Management System Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material

More information

Supplier Quality Agreement

Supplier Quality Agreement Supplier Quality Agreement Clyde, OH Poplar Bluff, MO Brampton, Ontario Jeffersonville, IN Page 1 of 15 TABLE OF CONTENTS Table of Contents 1. Administrative Elements... 4 1.1. Scope... 4 1.2. Parties

More information

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 5

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 5 TERMS & CONDITIONS Page 1 of 5 1.0 PURPOSE 1.1 Quality Requirements to Subtier Sources. 2.0 SCOPE 2.1 This document applies to all purchasing and sales personnel responsible for the flow down of Quality

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

QUALITY MANUAL. Conforming To AS9120B and ISO9001:2015. QM-001 Page 0 of 32 Revision 22:

QUALITY MANUAL. Conforming To AS9120B and ISO9001:2015. QM-001 Page 0 of 32 Revision 22: QUALITY MANUAL Conforming To AS9120B and ISO9001:2015 QM-001 Page 0 of 32 Revision 22: 2017-08-29 Contents... 0 I. FOREWORD... 3 II. INTRODUCTION... 3 1 SCOPE... 3 1.1 SCOPE STATEMENT... 3 1.2 FACILITIES

More information

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

14620 Henry Road Houston, Texas PH: FX: WEB:  QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Supplier Quality Requirements (SQR)

Supplier Quality Requirements (SQR) Supplier Quality Requirements (SQR) General Warmelin Precision Products, LLC (WPP) may refuse to accept materials and services delivered under a Purchase Order (PO) if the Seller fails to comply with the

More information

Summary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000

Summary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000 This summary identifies the additional TL 9000 Release 4.0 requirements beyond those stated in ISO 9001:2000. See the TL 9000 R4.0 Handbook for the actual TL 9000 R4.0 requirements. ISO 9001:2000 section

More information

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II REV E Foreword This document defines the quality management system requirements to be applied in facilities registered to the aerospace standard AS9100. This

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

Supplier Quality Requirements

Supplier Quality Requirements 1 Surveillance and Auditing 1.1 The Supplier s Quality System is subject to initial and annual audits/surveys and acceptance by Texas Almet, its customers, and government regulatory agencies (e.g. The

More information