2 PROBLEM STATEMENT The US Department of Transportation has advised planning agencies across the country to begin considering how their local transportation systems will function in a connected vehicle environment. Connected vehicles will revolutionize the way we travel and will be a major, if not the major, contributor that drives the infrastructure, policy and practices of state agencies. The real time information provided by such systems will enable improved management of transportation systems through real-time information. The majority of these efforts to date have focused on improved operations. However, management of safety performance has FIGURE 1: V2V and V2I Connectivity largely been reactive by increasing responsiveness to incidents as opposed to focusing on crash prevention. This is largely due to the random nature of crashes, but also the limited development of safety models which typically examine static variables such as roadway geometry and ADT, and do not include temporal effects such as congestion or weather related variables. With the connected vehicle infrastructure, significantly more data on vehicle operations is available and there is the potential to explore these temporal effects on crash performance from data generated from vehicle to vehicle (V2V) and vehicle to infrastructure (V2I) in real time. This opens up an abundance of opportunities to identify high crash probability locations based on real time conditions. There is a need to develop a strategic framework that not only aims at identifying congestion and alleviating it but extend it to estimate the potential crash risk at network scale utilizing the extensive data available in a connected vehicle environment. While we are currently just stepping into the connected vehicle environment, we must take the initial steps to understand how this data may be used to enhance current understanding of congestion and safety performance. It is proposed that the active datasets from V2V and V2I can be integrated with a crash database and congestion-monitoring index using a composite index of the two. This will assist in identifying high-risk locations in a connected vehicle environment. RESEARCH OBJECTIVES The objective of this research is to leverage existing V2I datasets to link high resolution traffic performance and weather information data to safety performance data. This high resolution dataset can then be used to identify weather, geometric and operational conditions that may lead to increased crash experience. By identifying potential high crash conditions, future efforts can then identify alternative FIGURE 2 BLUETOAD devices deployed in Lexington, KY operational control strategies that may mitigate adverse conditions, or even send advisory information to drivers, provide alternative routing or call for alternative vehicle operating characteristics such as following distances, in a fully connected V2V University of Kentucky 1 Southeastern Transportation Center

3 environment. This project will assist in the development of understanding these relationships by leveraging high resolution operational condition data from a city-wide deployment of BlueToad devices in Lexington, KY (Figure 2), joined with individual crash records for the study period and hour by hour historical weather data from Automated Surface Observation System (ASOS) datasets. RESEARCH APPROACH TASKS Task 1: Research and Practice Review A comprehensive search for published and ongoing work related to vehicle to vehicle (V2V) and vehicle to infrastructure (V2I) on traffic management and safety analysis will be undertaken. This task will identify studies which focus on operational and weather related conditions that impact safety performance. This task will also identify strategies of V2V or V2I, such as variable speed limits, that may be used to identify and mitigate hazardous conditions. In the absence of V2I resources, this task will look at secondary resources such as traveler information systems practices that could be enhanced through transfer to V2I systems. In addition, this task will explore next generation V2I technology that could provide more information beyond the metrics provided by the Bluetooth data collection devices which would potentially identify next generation datasets. The Kentucky Transportation Center has a state-of-the-art transportation research library that maintains current information relating to all aspects of transportation. The library possesses copies of most general transportation journals and articles. The KTC library has access to national information services (TRIS, Transport, NTIS, Dialog, etc.) and the Center employs a full-time research librarian to assist with all literature search activities. These resources will help the team obtain the latest research information. Task 2: Data Collection Traffic Flow Data for Congestion Index V2V and V2I send and receive vehicle location information at a set period and frequency. An initial concept of V2I applications is the use of Bluetooth detection devices that gather individual vehicle characteristics along a corridor. The City of Lexington has deployed several corridors with Bluetooth devices that gather vehicle travel information such as speed and origin destination data throughout the city. These devices gather real-time vehicle information including location, speed and direction of vehicle and archive historical data in a database. Figure 3 shows an example of high resolution travel speed data obtained from this infrastructure. This data allows for monitoring of both recurring and non-recurring congestion in real-time for the roadway network on a link-by-link basis. Additional travel metrics can be derived from these datasets to develop congestion metrics. Historical data from these devices will be gathered for 1-year period (2015) for the Lexington network. Additional site visits will be made to the corridor to document the corridor infrastructure and roadway characteristics. While the V2I data does not provide accurate volume estimates as it only captures a sample of traveling vehicles, it can provide volume trends that can be joined with other permanent county stations within the network to estimate fluctuations in segment volumes. University of Kentucky 2 Southeastern Transportation Center

4 FIGURE 3 Sample Travel Metrics that can be derived from Bluetooth Data Crash and Incident Data for Safety Index Historical crash data will be procured from the Kentucky State Police crash database. These data will be plotted by GPS location and date stamped then matched to the road network which will link the crash data to the traffic characteristics and geometric data for the corridor. The crash data will also be disaggregated by time, type and severity on a link-by-link basis to match the travel speed and volume data obtained from the Bluetooth receiver data. The locational accuracy of the crash data is well understood in Kentucky s datasets and the project team has extensive experience working with the crash dataset. Care will be taken to ensure the crashes are properly linked to the correct corridors. Weather Data for Safety and Congestion Index Variability in weather conditions also impacts mobility and safety through visibility impairments, precipitation, high winds, and temperature extremes. Between 2002 and 2012, an average of 23% of all vehicle crashes was reported as weather-related. Additionally, weather impacts traffic operations and congestion which can also lead to increased crashes. Historical weather data including temperature, pressure, wind speed, wind direction and precipitation will be procured from the Automated Surface Observations System (ASOS). An example of this hourly dataset is shown in Figure 4. This data will be analyzed against the traffic flow distribution and crash frequency to be included in the development of the hazard index. University of Kentucky 3 Southeastern Transportation Center

5 FIGURE 4: Sample weather variability by TOD (January 3, 2015) Task 3: Safety Performance Model Development This task will focus on developing a safety model based on the temporal conditions such as operational and weather data sources using the vehicular data from Bluetooth devices and other datasets including the weather and roadway inventory. The first step will be to analyze the variability within each dataset and represent all datasets in a common resolution such as 15-min interval by time of day (TOD) and day of week (DOW) for a year. The crash data will be disaggregated by crash type and severity for 15-min interval by TOD and DOW for the selected corridor. This data will be represented by link or segment of the roadway. The vehicular data from Bluetooth receivers (speed and direction) will be aggregated in 15-min bins by TOD and DOW. The weather data will also be aggregated in similar resolution and matched with other datasets. Once all datasets are assembled the next step will determine crash frequency (#crash/ link length) and crash rate (#crash/ length-vol). Travel metrics such as speed, Travel Time Index (TTI) and Congestion Index (CI) will also be estimated using the traffic flow data from the Bluetooth devices. The impact of weather conditions on crash rate and crash frequency will also be determined. Statistical analysis will be conducted to determine if links during congestion periods show higher crash rates or crash frequency. To combine the two indices into a composite index, a statistical model based on common Factor Analysis will be applied. This technique uses an estimate of common variance among the variables to generate the factor solution. This is achieved by grouping correlated indices to form a composite indicator that captures as much common information among sub-indicators as possible. This task will be extended to determine if there is any relationship between crash severity and congestion. The impact of different weather condition will be studied at varying congestion levels. These efforts will result in multiple numerical models quantifying the effect of varying congestion levels on safety. The outcome of this task will potentially be a composite indicator that will estimate the risk factor with congestion levels. Task 4: Testing and Evaluation This task will conduct a pilot test to validate the framework and the composite index developed in the previous task. For the development of the framework in the previous task, data from the year University of Kentucky 4 Southeastern Transportation Center

6 2015 was utilized. For testing and validating the framework, at least 6-months of data from 2016 will be utilized. Multiple corridors identified earlier in the study will be monitored and vehicular characteristics data will be collected for January to July of The developed models will be applied to these datasets and potential crash risks will be compared with actual crashes from the crash database. Statistical analysis will be conducted to quantify the relationship between the estimated crash risk and the observed crash data. In addition, cumulative residual plots (CURE Plots) will be used to test the reliability of the SPF development. Below is an example CURE plot including upper and lower confidence limits, indicating a reliable model between specific traffic volumes. FIGURE 5: Cumulative Residual Plots (CURE Plots) Task 5: Potential Applications This research will have several potential applications specifically in the field of ITS, traffic operations and safety. From an operations standpoint, this framework can assist in Active Traffic Management and Incident Management by highlighting the congestion prone areas. Within a connected vehicle environment, sites with Variable Speed Limits can find useful information to adjust speed limits based on the hazard index and increased probability of a crash. Agencies can develop Congestion Mitigation Strategies based on the network performance indication developed using this framework. This framework can highlight problem areas and safety measures can be proactively taken. Utilizing ITS infrastructure, this framework will provide the necessary information (such as warning and speed limit information) for V2I interaction. This task will identify and document potential applications and recommend implementation guidelines. Task 6: Results and Recommendations The outcome of this project will be a document that outlines the methodology to develop the framework to quantify the congestion index that translates into crash risk in a network. This is a crucial step for the safety initiative as we embark into the next generation of vehicle and infrastructure technology and begin to understanding how we may leverage information gained from this data rich environment. Agencies can utilize this framework to develop network wide risk assessment tool. Commercial equipment such as BlueToad can incorporate this to offer additional University of Kentucky 5 Southeastern Transportation Center

7 features to help state agencies monitor networks. This project will provide the tool required by agencies when the connected vehicles fully integrated into the roadway network. RESEARCH DURATION AND COST It is anticipated that this project will take 12 months to complete for a total budget of $100,000. The majority of the efforts involved in this effort will be data collection and numerical model development efforts which can be executed concurrently with other ongoing research projects currently underway at the Kentucky Transportation Center. A 50/50 match of the STC Grant is proposed. QUALIFICATION OF RESEARCH TEAM The Kentucky Transportation Center team members have extensive experience in operations and safety. Team members have not only worked with the datasets being utilized in the study but have also worked with the controlling agencies to refine and improve the datasets and technology deployments in questions. The Universities of Kentucky also offers well established civil engineering department that focus on transportation research from which to draw knowledgeable and interested graduate and undergraduate students. Dr. Adam Kirk, PE, PTOE, is a Principal Research Associate at the Kentucky Transportation Center at the University of Kentucky and will serve as the Principal Investigator for this research. Dr. Kirk leads the research team within the Center for Advanced Traffic Solutions Laboratory (CATSLab; catslab.ukytc.com), which focuses on advances within traffic signal systems and practices. In this role he has lead efforts within Lexington and Louisville Kentucky to implement and evaluate adaptive traffic control systems to ease high levels of congestion and associated safety problems. Dr. Kirk also has extensive safety experience, having utilized similar modeling efforts to develop surrogate safety performance measures for innovative intersection applications through his PhD research. Mr. Green has been working for the Kentucky Transportation Center since He is currently a research engineer in the Traffic Operations and Safety section. His focuses are in safety analysis and asset management. Mr. Green has conducted research in areas such as identification of high crash locations, secondary crashes, distracted driving, intersection crash rates, and pavement marking performance. Mr. Green has also been involved in the development and maintenance of several software packages used by the Kentucky Transportation Cabinet and other agencies. He has developed software for GPS-based data collection, asset management, crash analysis, mapping and database integration. Mr. Green is involved in a sign retro-reflectivity training course given to the transportation cabinet and local Kentucky governments. He is involved with Kentucky's traffic records improvement group known as KTRAC. He works closely with Kentucky's Highway Safety Improvement Program team in an effort to implement the Highway Safety Manual in Kentucky's safety prioritization. Dr. Agarwal has worked as a research engineer on various projects including Bluetooth device evaluations, intersection design, traffic modeling and safety implications. He has extensive experience in crash analysis, data modeling and statistical analyses. Dr. Agarwal has utilized Hardware-in-the-Loop system to conduct several studies including evaluation of adaptive traffic University of Kentucky 6 Southeastern Transportation Center

8 control deployments, development of a tool to evaluate pedestrian safety at intersections, feasibility of road diet conversion and studying the alternative signal system strategies for corridor preemption. Dr. Agarwal has also developed an online traffic technician training course that is utilized by the State of Kentucky. Dr. Agarwal has presented at national conferences including Transportation Research Board and has coauthored several transportation center reports and is the current secretary of the Signal Timing Manual Subcommittee of TRB. Full resumes for the project team are provided at the end of the proposal. STUDENT INVOLVEMENT Both undergraduate and graduate students from the University of Kentucky will be involved in the proposed project to provide them with increased learning opportunities and hands on experience. Erin Lammers, an undergraduate student in Civil Engineering will lead the development of the database having extensive experience in the USRAP program and operational evaluations of an ongoing evaluation of a Zipper Merge evaluation. Graham Winchester, will be a Master s student during the course of the project and will support manipulation and statistical analysis in the development of the safety models. He brings extensive experience in SPF model development having support efforts by KTC in calibrating HSM SPFs to Kentucky Data. Students are routinely involved in project meetings and discussions with the full project team to provide them with a global view of the project, as well as for the project team to gain innovative and new insight into the project approach. TECHNOLOGY TRANSFER The results of this research have the potential to be disseminated widely among the transportation community. This research will layout the methodology that may be used by other agencies to develop real time indices to monitor network operations and safety. It is anticipated that journal articles will be published based on the findings of this safety and operations research. Additionally, the results of the proposed study may also be presented at conference venues, like the Annual Transportation Research Board Meeting and be shared with state and local engineers during workshops accessible to transportation professionals. The results of this research will also be readily incorporated into the education and professional training courses regularly delivered by the researchers. Finally, the findings will also be available online at the Southeastern Transportation Center website and a special effort will be made to disseminate the results to federal and state agencies, policy makers as well as to relevant private sector. This research will be critical in establishing the way forward for agencies to manage transportation networks within the coming connected vehicle environment. University of Kentucky 7 Southeastern Transportation Center

9 STC Research Schedule/Timeline Task / Month Task 1: Research and Practice Review Deliverable: Literature Review Task 2. Data Collection Deliverable: Data Summary and Review Task 3: Safety Performance Model Deliverable: Model Documentation Task 4: Testing and Evaluation Task 5: Potential Applications Task 6: Results and Recommendations Deliverable: Final Report University of Kentucky 8 Southeastern Transportation Center

10 STC Research Project Description Project Title: Development of Safety Performance Indices in a Connected Vehicle Environment Principal Investigator: Adam Kirk University: University of Kentucky Telephone: Address: adam.kirk@uky.edu External Project Contact (if applicable): Address Street: City: State: Zip: Telephone: Address: Project Start Date: 06/01/2016 End Date: 05/30/2017 Other Milestones, Dates: Literature Review (August 31, 2016) Data Summary (September 30, 2016) Safety Model Documentation (February 28, 2017 Final Report (May 30, 2017) Project #: Project Objective: The objective of this research is to leverage existing V2I datasets to link high resolution traffic performance and weather information data to safety performance data. This high resolution dataset will then be used to develop crash performance models that account for temporal variations in weather, geometric and operational conditions. Project Abstract: This research will develop safety performance models based on temporal conditions such as congestion and weather from existing V2I datasets. Models will be developed from high resolution operational condition data from a city-wide deployment of BlueToad devices in Lexington, KY, joined with individual crash records for the study period and hour by hour historical weather data from Automated Surface Observation System (ASOS) datasets. These models can be used to identify alternative operational control strategies that may mitigate adverse conditions, or even send advisory information to drivers, provide alternative routing or call for alternative vehicle operating characteristics such as following distances, to fully manage transportation systems in a fully connected V2V/V2I environment. Task Description: Task 1: Research and Practice Review Task 2: Data Collection Task 3: Developing Framework for Integrating Indices Task 4: Testing and Evaluation Task 5: Potential Applications Task 6: Results and Recommendations Total Budget: $ 100,000 Student Involvement (Thesis, Assistantships, Paid Employment): This research will support 1 undergraduate and 1 graduate student in their current employment as research assistances at the Kentucky Transportation Center. In addition, the data and analysis of this project may be used in the Relationship to Other Projects: This project builds on the current efforts at KTC, developing Safety Performance Functions for Kentucky, and a SHRP2 project analyzing roadway segment speed data from Bluetooth and other second party data systems. Technology Transfer Activities: It is anticipated that the results of this research will be disseminated through existing publications of the STC, University o University of Tennessee, as well as submitted for inclusion in other application journals and presentations. Potential Benefits of Project: Benefits include improved management of transportation networks to increase efficiency and safety of travel. Additional insight into information available and applications of V2V and V2I infrastructure will also be provided. TRB Keywords: Connected Vehicles, Connected Infrastructure, Safety Performance Functions, Advanced Traffic Management Systems (ATMS),

11 PEER REVIEW FORM Peer Reviewer #1 Name: Organization/University Affiliation: Address: Phone #: Fax #: address: Please submit a brief overview of why this individual is qualified to review the material. Qualifications of reviewer: Peer Reviewer #2 Name: Organization/University Affiliation: Address: Phone #: Fax #: address: Please submit a brief overview of why this individual is qualified to review the material. Qualifications of reviewer: Peer Reviewer #3 Name: Organization/University Affiliation: Address: Phone #: Fax #: address: Please submit a brief overview of why this individual is qualified to review the material. Qualifications of reviewer: *Two peer reviewers will be selected for each final report. Other appropriate reviewers may be selected at the discretion of the STC.

12 Southeastern Transportation Center Proposed Budget O/E Grant Title: Development of Safety Performance Indices in a Connected Vehicle Environment University: Salaries: Other Direct Costs: University of Kentucky Federal Funds Matching Funds Faculty Administrative Staff Other Staff Graduate Student Salaries/Stipends Undergraduate Student Salaries/Stipends Total Salaries/Stipends Benefits (including student health insurance) 0 0 Total Salaries and Benefits Permanent Equipment Expendable Equipment and Supplies Computer Costs Non-salary Education Costs tuition/fees Other Costs: (specify) Printing / duplication Postal expense Communication Conference Registration / Fees Travel Computer Costs Other miscellaneous costs: Total Other Direct Costs Indirect Costs at 26% TOTAL COSTS 50,000 50,000

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four Scope of Services Traffic Signal Retiming Contract FM NO. 230017-8-32-01 Florida Department of Transportation District Four A-1 Contents 1. Background... 3 2. Summary of Services... 3 3. Consultant Requirements...

More information

Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather

Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather Joshua Crain, Jim Peters, P.E., PTOE, and Carl S. Olson ABSTRACT The Highway 217 freeway in Portland, Oregon was the

More information

Urban Street Safety, Operation, and Reliability

Urban Street Safety, Operation, and Reliability Urban Street Safety, Operation, and Reliability March 2012 Overview Background Urban Street Operation Urban Street Safety Combined Operation and Safety Evaluation Reliability Evaluation 2 1 Background

More information

Smarter Work Zones Webinar Series

Smarter Work Zones Webinar Series Smarter Work Zones Webinar Series Webinar #12: Integrating Technology Applications Massachusetts DOT Todd Peterson and Neil Boudreau April 26, 2016 1:00-2:30pm EST Efficiency through technology and collaboration

More information

Special Events Planning

Special Events Planning Special Events Planning Prepared For: Prepared By: April 2010 Table of Contents 1.0 Overview... 1 2.0 Special Events Planning... 1 2.1 Impact of Planned Special Events... 1 2.2 Goals of Managing Travel

More information

Congestion Management Safety Plan Phase 4

Congestion Management Safety Plan Phase 4 AUGUST 2018 Congestion Management Safety Plan Phase 4 Executive Summary Report for MnDOT Metro District Prepared by: SRF Consulting Group, Inc. and Sambatek, Inc. BACKGROUND The Congestion Management Safety

More information

End of Queue Warning Systems. Systems Requirements

End of Queue Warning Systems. Systems Requirements End of Queue Warning Systems Systems Requirements December 2015, Revised 2/14/2018 Acknowledgements This document was prepared for Minnesota Department of Transportation s (MnDOT) Systems Engineering to

More information

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID 432430-1-32-13 TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES DISTRICT TWO November 27, 2017 Page 1 EXHIBIT A SCOPE

More information

Palm Beach County Fire Rescue

Palm Beach County Fire Rescue Featured Case Study: Palm Beach County Fire Rescue Emergency Vehicle Signal Priority System By: Harold Slater 522 Gillingham Sugar Land, Texas 77478 1.800.952.7285 www.trafficware.com About the Author

More information

City of Dubuque: Smart Traffic Routing with Efficient & Effective Traffic System (STREETS) Final Report version 1.1

City of Dubuque: Smart Traffic Routing with Efficient & Effective Traffic System (STREETS) Final Report version 1.1 City of Dubuque: Smart Traffic Routing with Efficient Final Report version 1.1 June 22, 2018 Submitted to: 17J18 0640 Prepared by Iteris, Inc. Iteris, Inc. i DOCUMENT VERSION CONTROL DOCUMENT NAME SUBMITTAL

More information

EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID:

EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID: EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID: 22089863202 EXHIBIT A SCOPE OF SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING I. GENERAL REQUIREMENTS...

More information

Terms of Reference for International Consultant

Terms of Reference for International Consultant Ref: BTN/IC/2015-01 Terms of Reference for International Consultant Intelligent Transport Systems (ITS) feasibility study and preparation of a comprehensive ITS Action Plan for Thimphu City I. BACKGROUND

More information

CSC for Modeling Support, FM A-1

CSC for Modeling Support, FM A-1 EXHIBIT A SCOPE OF SERVICES CONTINUING SERVICES CONTRACT FOR MODELING SUPPORT AND LIMITED ACCESS ANALYSIS Financial Project No. 243811-1-12-10 I. PURPOSE The purpose of this exhibit is to describe the

More information

Christy Wegener, Director of Planning and Operations

Christy Wegener, Director of Planning and Operations SUBJECT: FROM: Transit Signal Priority Upgrade Project Scope of Work for Design and Project Management Christy Wegener, Director of Planning and Operations DATE: October 2, 2017 Action Requested Authorize

More information

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process Proposed Comprehensive Update to the State of Rhode Island s Statewide Planning Program January 2018 Summary Outline of of Action Steps 1. Develop Objectives for Congestion Management What is the desired

More information

THE HIGHWAY SAFETY MANUAL

THE HIGHWAY SAFETY MANUAL THE HIGHWAY SAFETY MANUAL AASHTO Subcommittee on Design June 16, 2006 1 Overview of Presentation Purpose of the Highway Safety Manual Highway Safety Manual Contents Challenges Ahead 2 3 Is this road safe

More information

GIS USE IN PAVEMENT MARKING AND SIGN MANAGEMENT: AN INTEGRATED APPROACH

GIS USE IN PAVEMENT MARKING AND SIGN MANAGEMENT: AN INTEGRATED APPROACH GIS USE IN PAVEMENT MARKING AND SIGN MANAGEMENT: AN INTEGRATED APPROACH Omar Smadi 1, Zachary Hans 2, and Neal Hawkins 3 ABSTRACT Geographic information system (GIS) technology is a key component of all

More information

Intelligent Transportation Systems Study for the Edmonton and Calgary Ring Roads Terms of Reference

Intelligent Transportation Systems Study for the Edmonton and Calgary Ring Roads Terms of Reference Intelligent Transportation Systems Study for the Edmonton and Calgary Ring Roads Terms of Reference Highway Policy and Planning Branch 3 rd Floor, 4999-98 Avenue Edmonton, AB T6B 2X3 March 1, 2004 Background

More information

Peterborough County Road Safety Audit Guideline Pilot

Peterborough County Road Safety Audit Guideline Pilot Peterborough County Pilot Table of Contents 1.0 Purpose... 3 2.0 Road Safety Audit Objectives... 3 3.0 Legal Issues... 3 4.0 Road Safety Audit Procedures... 4 4.1 Project Selection Criteria... 5 4.2 Scope...

More information

Iowa Department of Transportation Intelligent Work Zone Deployments

Iowa Department of Transportation Intelligent Work Zone Deployments Iowa Department of Transportation Intelligent Work Zone Deployments SMARTER WORK ZONES TECHNOLOGY APPLICATIONS CASE STUDY The Every Day Counts Initiative (EDC-3) aims to accelerate the deployment of identified,

More information

Decision Support Systems for FDOT District 4 TSM&O

Decision Support Systems for FDOT District 4 TSM&O Decision Support Systems for FDOT District 4 TSM&O Melissa Ackert, P.E. District Transportation System Management & Operations Engineer FDOT District 4 Traffic Operations 1 Transportation Systems Management

More information

TASK 1 Interchange Justification for US 52 in Lawrence County, Ohio

TASK 1 Interchange Justification for US 52 in Lawrence County, Ohio REQUEST FOR PROPOSALS SPECIFICATIONS KYOVA Interstate Planning Commission Group 1: Lawrence County, Ohio US 52 Interchange Project PID: 104526 June 5, 2017 The KYOVA Interstate Planning Commission is seeking

More information

KENTUCKY TRANSPORTATION CENTER

KENTUCKY TRANSPORTATION CENTER Research Report KTC-10-16/FR181-10-1F KENTUCKY TRANSPORTATION CENTER KENNEDY INTERCHANGE CRASH STUDY OUR MISSION We provide services to the transportation community through research, technology transfer

More information

Connected and Automated Vehicles:

Connected and Automated Vehicles: Click to edit Master title style Connected and Automated Vehicles: Elements,» Fifth Applications level and Deployment Considerations Raj Ponnaluri, PhD, PE, PTOE, PMP Florida Department of Transportation

More information

ODOT Transportation Systems Management & Operations Plan

ODOT Transportation Systems Management & Operations Plan ODOT Plan Performance Measures Prepared for: Prepared by: May 2017 Updated December 2017 This page intentionally left blank Table of Contents List of Tables Introduction 1 ODOT s TSMO Performance Measures

More information

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement mctrans.ce.ufl.edu INSIDE THIS ISSUE McTrans Center University of Florida Civil & Coastal Engineering PO Box 116585 Gainesville, FL 32611-6585 Streets Heat Map Freeways Animation HSM Supplement Phone:

More information

4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot.

4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot. 4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot. 5.0 Basis of Payment. Payment for OPTIONAL TEMPORARY PAVEMENT MARKING as described

More information

Chapter 14 Work Program

Chapter 14 Work Program Chapter 14 Work Program The Metropolitan Council will carry out or participate in many studies and plans over the next three years. This is not an exhaustive list of all work to be completed by the Metropolitan

More information

TMC of the Future. Dr. Bob Edelstein, PE, PTOE Senior Vice President

TMC of the Future. Dr. Bob Edelstein, PE, PTOE Senior Vice President TMC of the Future Dr. Bob Edelstein, PE, PTOE Senior Vice President Overview Traffic Operations Centers Transportation Management Centers TMCs are transforming to be more proactive in addressing recurring

More information

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from

More information

This module discusses the types of available crash data and identifies their uses in highway safety in order to improve safety management and

This module discusses the types of available crash data and identifies their uses in highway safety in order to improve safety management and This module discusses the types of available crash data and identifies their uses in highway safety in order to improve safety management and decision making. It also provides an overview of data deficiencies

More information

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project NRITS & ITS AZ Annual Conference October 2018 Presented by: April Wire, P.E., PTOE ITS

More information

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627 DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# 433056-4-12-01 Ad # 19627 Qualification Requirements for Type of Work 99.0 I. Purpose II. Rail Services III. Administration

More information

Johnson City Regional ITS Architecture Update Kick-off Workshop. October 21, 2014

Johnson City Regional ITS Architecture Update Kick-off Workshop. October 21, 2014 Johnson City Regional ITS Architecture Update Kick-off Workshop October 21, 2014 Presentation Overview Overview of ITS ITS Architecture Development Process Existing Regional ITS Architecture Regional Boundaries

More information

Architecture Flow Descriptions

Architecture Flow Descriptions s Architecture Flow alert notification alert notification coordination alert status alerts and advisories archive requests archive status archived data product requests archived data products broadcast

More information

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual Andrew Ooms November 2012 Outline Safety Overview Current practices Safety Fundamentals Introduction the Highway

More information

Pre-Bidders' Web Conference for SHRP 2 Reliability Project RFPs L32-B and L32-C

Pre-Bidders' Web Conference for SHRP 2 Reliability Project RFPs L32-B and L32-C Pre-Bidders' Web Conference for SHRP 2 Reliability Project RFPs L32-B and L32-C Presenter: Gummada Murthy, Senior Program Officer, SHRP 2 Reliability Focus Area Transportation Research Board Outline 1.

More information

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018 REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018 1 REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN The Kentuckiana Regional Planning and Development Agency (KIPDA), the designated Metropolitan

More information

Midwest TSMO Peer Exchange. Milwaukee, Wisconsin: Sheraton Milwaukee Brookfield September th, 2016 KEY TAKEAWAYS

Midwest TSMO Peer Exchange. Milwaukee, Wisconsin: Sheraton Milwaukee Brookfield September th, 2016 KEY TAKEAWAYS KEY TAKEAWAYS State DOTs are no longer limited to traditional brick and mortar roles as they become increasingly responsible for enhancing mobility through operations and performance. State DOTs are trying

More information

Traffic Safety Measures Using Multiple Streams Real Time Data

Traffic Safety Measures Using Multiple Streams Real Time Data CAIT-UTC-055 Traffic Safety Measures Using Multiple Streams Real Time Data FINAL REPORT January 2017 Submitted by: Mohsen Jafari Professor of Industrial and Systems Engineering Center for Advanced Infrastructure

More information

Transportation Systems Management and Operations (TSM&O) The 2017 Traffic Operations Program Plan

Transportation Systems Management and Operations (TSM&O) The 2017 Traffic Operations Program Plan Transportation Systems Management and Operations (TSM&O) The 2017 Traffic Operations Program Plan Kevin Comstock TM2; July 27, 2017 What is TSM&O? The TDOT Traffic Operations Program Plan The Plan has

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan Chapter 10 Intelligent Transportation Systems Ohio Kentucky Indiana Regional Council of Governments 2030 Regional Transportation Plan Chapter 10 Intelligent Transportation Systems INTRODUCTION Intelligent

More information

Smarter Work Zones Paul Pisano FHWA Work Zone Management Team

Smarter Work Zones Paul Pisano FHWA Work Zone Management Team Smarter Work Zones Paul Pisano FHWA Work Zone Management Team National Rural ITS Conference Snowbird, UT August 2015 Efficiency through technology and collaboration Agenda Smarter Work Zones (SWZ) Overview

More information

Traffic/Mobility Analytics

Traffic/Mobility Analytics Daniel P. Farley Section Chief Traffic Operations Deployment and Maintenance dfarley@pa.gov 717-783-0333 How PennDOT is using large vehicle probe and crowd source information to begin to better plan, design,

More information

Request for Letters of Intent. Connected Traffic Control System (CTCS): Research Planning and Concept Development. October 18, 2017.

Request for Letters of Intent. Connected Traffic Control System (CTCS): Research Planning and Concept Development. October 18, 2017. Request for Letters of Intent Connected Traffic Control System (CTCS): Research Planning and Concept Development October 18, 2017 Issued by University of Virginia Center for Transportation Studies Charlottesville,

More information

SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE

SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE Quick Reference Guide Safety Assessments can save lives in New York State. They have been proven effective in practice, easy to

More information

Traffic Impact Study Requirements

Traffic Impact Study Requirements [TYPE THE COMPANY NAME] Traffic Impact Study Requirements County of San Mateo Department of Public Works Roadway Services 9/1/2013 I. Introduction The County of San Mateo (County), Department of Public

More information

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines Public Works Department Traffic Impact Analysis Guidelines Revised: August 2015 TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE... 3 EXEMPTIONS... 3 SCOPING... 4 METHODOLOGY... 5 STUDY AREA... 6 STUDY SCENARIOS...

More information

Chicago s Transportation Infrastructure: Integrating and Managing Transportation and Emergency Services

Chicago s Transportation Infrastructure: Integrating and Managing Transportation and Emergency Services Chicago s Transportation Infrastructure: Integrating and Managing Transportation and Emergency Services David Zavattero City of Chicago OEMC UIC IGERT Seminar May 21, 2009 /daz1d/present/uic-igert-data_may2009.ppt

More information

AASHTO Subcommittee on Traffic Engineering. June 19, John Conrad

AASHTO Subcommittee on Traffic Engineering. June 19, John Conrad AASHTO Subcommittee on Traffic Engineering June 19, 2012 John Conrad What is SHRP2? Save lives. Save money. Save time. $218 million, federally funded research program to address critical transportation

More information

Wisconsin Traffic Operations Performance Management System (TOPMS)-Phase 1. Advisory Group Meeting-November 10, 2014

Wisconsin Traffic Operations Performance Management System (TOPMS)-Phase 1. Advisory Group Meeting-November 10, 2014 Wisconsin Traffic Operations Performance Management System (TOPMS)-Phase 1 Advisory Group Meeting-November 10, 2014 Project Approach 3-Phase, 3-Year Project to Design and Build TOPMS Phase 1 Planning/Design,

More information

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1)

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1) EXHIBIT A SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1) TABLE OF CONTENTS OBJECTIVE... 1 SERVICES... 1 PROJECT MANAGEMENT... 1 SCHEDULE/STATUS REPORTS... 2 MEETINGS...

More information

How the NZ Transport Agency keeps you moving

How the NZ Transport Agency keeps you moving How the NZ Transport Agency keeps you moving How the NZ Transport Agency keeps you moving March 2011 NZ Transport Agency March 2011 ISBN 978-047837-1758 (print) ISBN 978-047837-1765 (online) Copyright:

More information

Connected vehicles and other advanced safety features can be effective in reducing, and maybe eliminating, these fatalities.

Connected vehicles and other advanced safety features can be effective in reducing, and maybe eliminating, these fatalities. 1 2 3 Michigan has made impressive strides over the past decade in reducing the number of traffic fatalities on our roads. However, over the past couple of years, the trend of sharp declines in fatalities

More information

Urban Traffic Data Integration: A Case Study for Edmonton

Urban Traffic Data Integration: A Case Study for Edmonton Urban Traffic Data Integration: A Case Study for Edmonton Presenter: Dr. Tony Qiu, University of Alberta Co-authors: Md Tazul, Gary Liu, Michael Ge, University of Alberta Dr. Stevanus A. Tjandra, City

More information

Connecticut Local Road Safety Plans TECH BRIEF

Connecticut Local Road Safety Plans TECH BRIEF Connecticut Local Road Safety Plans TECH BRIEF 2014-2 Of the 21,000 miles of roadway in Connecticut, 82% are maintained by local municipal agencies. In 2013, 50% of roadway departure injury crashes and

More information

Status of Highway Safety Manual Implementation. October 2015

Status of Highway Safety Manual Implementation. October 2015 Status of Highway Safety Manual Implementation October 2015 Agenda NCHRP Project 17-50 Overview Project Objective Panel members and support states Project Deliverables to Date Status of HSM Implementation

More information

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018 Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource

More information

Develop Guidelines for Access Management in Las Vegas

Develop Guidelines for Access Management in Las Vegas Develop Guidelines for Access Management in Las Vegas Project Team Dr. Mohamed Kaseko, PI Las Vegas, NV 89154-4015 702-895-1360 Dr. Hualiang Teng, Co-PI 702-895-4940 Dr. Zong Z. Tian, P.E., Co-PI Department

More information

MnDOT TSMO Implementation Planning TSMO Objective Profiles 8/15/18 DRAFT

MnDOT TSMO Implementation Planning TSMO Objective Profiles 8/15/18 DRAFT MnDOT TSMO Implementation Planning TSMO Objective Profiles 8/15/18 DRAFT The MnDOT TSMO Program Planning Support Project has developed an overall MnDOT TSMO Strategic Plan outlining key goals and identifying

More information

Development of a Decision Making Process for the HSM Implementation

Development of a Decision Making Process for the HSM Implementation 2015 UTC Conference of the Southeastern Region March 26-27, 2015 Development of a Decision Making Process for the HSM Implementation Priyanka Alluri, Ph.D., P.E. Assistant Professor Department of Civil

More information

NTC Program Progress Performance Report (PPPR) Information Form

NTC Program Progress Performance Report (PPPR) Information Form NTC Program Progress Performance Report (PPPR) Information Form For P.I. s Use On a semi-annual basis the NTC sponsored P.I. must report Program Progress Performance Report (PPPR) using the format specified

More information

Congestion Management Process 2013 Update

Congestion Management Process 2013 Update Congestion Management Process 2013 Update TRAVEL DEMAND MANAGEMENT AND TRANSPORTATION SYSTEM MANAGEMENT AND OPERATIONS STRATEGIES AND PROJECTS TDM and TSM&O Strategies Commuter Transportation Options Associated

More information

Request for Proposals Facilitating Utility Smart Energy Education (FUSED)

Request for Proposals Facilitating Utility Smart Energy Education (FUSED) Request for Proposals Facilitating Utility Smart Energy Education (FUSED) Specialized DER Professional Training for Utility Employees Technical point of contact: Business point of contact: Jenny Senff

More information

Origin-Destination Trips and Skims Matrices

Origin-Destination Trips and Skims Matrices Origin-Destination Trips and Skims Matrices presented by César A. Segovia, AICP Senior Transportation Planner AECOM September 17, 2015 Today s Webinar Content Matrix Estimation Data sources Florida Application

More information

Variable Speed Warnings on DMS

Variable Speed Warnings on DMS Variable Speed Warnings on DMS Evolving Tools for Better Safety and Service Jeanne Olubogun, P.E. District Traffic Engineer - St. Louis Region Jeanne.Olubogun@modot.mo.gov 314-275-1536 2014 Traffic and

More information

The sections below include examples of HSM implementation activities undertaken by various transportation agencies.

The sections below include examples of HSM implementation activities undertaken by various transportation agencies. NCHRP 17-50 TECHNICAL BRIEFINGS This series of technical briefings provide a reference for highway agencies that are interested in initiating the implementation of the American Association of State Highway

More information

Distracted Driving Detection System for Work Zones. Systems Requirements

Distracted Driving Detection System for Work Zones. Systems Requirements Distracted Driving Detection System for Work Zones Systems Requirements December 2015 Acknowledgements This document was prepared for the Minnesota Department of Transportation (MnDOT) Systems Engineering

More information

Regional Integrated Multi-Modal Information Sharing (RIMIS) System Project Concept of Operations Executive Summary

Regional Integrated Multi-Modal Information Sharing (RIMIS) System Project Concept of Operations Executive Summary Regional Integrated Multi-Modal Information Sharing (RIMIS) System Project Concept of Operations Executive Summary 190 North Independence Mall West Philadelphia, Pennsylvania EXECUTIVE SUMMARY Background

More information

Greater Yellowstone Rural ITS Priority Corridor Project. Task 5. ITS Vision Working Paper

Greater Yellowstone Rural ITS Priority Corridor Project. Task 5. ITS Vision Working Paper Greater Yellowstone Rural ITS Priority Corridor Project Task 5. ITS Vision Working Paper Prepared for the: Montana Department of Transportation and Federal Highway Administration, US Department of Transportation

More information

January 25, 2017 New Technology: The Future of Automated Vehicles and the Impacts on the Transportation Industry

January 25, 2017 New Technology: The Future of Automated Vehicles and the Impacts on the Transportation Industry January 25, 2017 New Technology: The Future of Automated Vehicles and the Connected and Automated Vehicles. No longer a question of if But rather of when Connected Vehicles Vehicle to Vehicle (V2V) Vehicle

More information

Predicting Travel Time Reliability: Methods and Implications for Practice

Predicting Travel Time Reliability: Methods and Implications for Practice Predicting Travel Time Reliability: Methods and Implications for Practice Today s Agenda SHRP 2 background (slides 2 6) L03 Overview (slides 7 19) Exploratory Analyses (slides 20 32) Before/After Studies

More information

Connected Corridors: I-210 Pilot Integrated Corridor Management System

Connected Corridors: I-210 Pilot Integrated Corridor Management System PARTNERS FOR ADVANCED TRANSPORTATION TECHNOLOGY INSTITUTE OF TRANSPORTATION STUDIES UNIVERSITY OF CALIFORNIA, BERKELEY Connected Corridors: I-210 Pilot Integrated Corridor Management System System Integration

More information

ITS Architecture Development

ITS Architecture Development Personal Information Access Transit Management Traffic Management Communications Fixed Point-to-Fixed Point Communica Vehicle Roadway ITS Architecture Development Systems Engineering For ITS Kickoff Workshop

More information

Agenda Item. Issue under Consideration: Contract #12-037, Technology Assessment Master Agreement

Agenda Item. Issue under Consideration: Contract #12-037, Technology Assessment Master Agreement Agenda Item Item: 6a Issue under Consideration: Contract #12-037, Technology Assessment Master Agreement Current Status: The County has an existing agreement with VC3, Incorporated to provide management

More information

REQUEST FOR PROPOSAL FOR. National Operations Center of Excellence (NOCoE) Managing Director

REQUEST FOR PROPOSAL FOR. National Operations Center of Excellence (NOCoE) Managing Director REQUEST FOR PROPOSAL FOR National Operations Center of Excellence (NOCoE) Managing Director From the American Association of State Highway and Transportation Officials January 22, 2016 A. INTRODUCTION

More information

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process:

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process: 01-08-19 Posting Date FRA-33-3.70 Smart Technology Connected Vehicle Roundabout Application Project PID No. 109356 City of Dublin Response Due Date: 01-24-19 Communications Restrictions Please note the

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

AASHTO s Highway Safety Manual and Performance Measures / Targets

AASHTO s Highway Safety Manual and Performance Measures / Targets AASHTO s Highway Safety Manual and Performance Measures / Targets Dr. Anthony Kane Director of Engineering and Technical Services Wednesday October 26, 2011 Bom dia damas e cavalheiros Talk Overview Highway

More information

TERRA Engineering creates a competitive traffic data mix with Miovision

TERRA Engineering creates a competitive traffic data mix with Miovision CASE STUDY Miovision Scout TERRA Engineering creates a competitive traffic data mix with Miovision Scenario As a leader with over 20 years experience, TERRA Engineering is focused on providing a full spectrum

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL RICK SCOTT GOVERNOR Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 MIKE DEW SECRETARY REQUEST FOR INFORMATION (RFI) from the Florida Department of Transportation INTRODUCTION

More information

This project will provide optimized traffic signal timings for the following signals listed below:

This project will provide optimized traffic signal timings for the following signals listed below: Project Scope This project will provide optimized traffic signal timings for the following signals listed below: Main Street Cross Street Maintaining Agency Main Street 1 Cross Street 1 ODOT DX Main Street

More information

Functional Requirements

Functional Requirements Missouri Department of Transportation Springfield Regional ITS Architecture Update Prepared for: Project ID: D8ITS-01 Missouri Department of Transportation Traffic Division MODOT DISTRICT 8 OFFICE M.O.

More information

Connected and Automated Vehicles and the Future of Transportation. Dean Gustafson, P.E., PTOE State Operations Engineer April 25, 2017

Connected and Automated Vehicles and the Future of Transportation. Dean Gustafson, P.E., PTOE State Operations Engineer April 25, 2017 Connected and Automated Vehicles and the Future of Transportation Dean Gustafson, P.E., PTOE State Operations Engineer April 25, 2017 Why Connect? What Benefits Can We Expect? National Timeline for Application

More information

Advancing Transportation Systems Management and Operations (TSMO) in Rural Areas

Advancing Transportation Systems Management and Operations (TSMO) in Rural Areas Advancing Transportation Systems Management and Operations (TSMO) in Rural Areas National Rural ITS Conference October 23, 2018 Joe Gregory FHWA Office of Operations SHRP2 Renewal Implementation February

More information

Recommended Roadway Plan Section 3 Existing Facilities & System Performance

Recommended Roadway Plan Section 3 Existing Facilities & System Performance Recommended Roadway Plan Section 3 Existing Facilities & System Performance RECOMMENDED ROADWAY PLAN SECTION 3 Existing Facilities and System Performance 3.1 Introduction An important prerequisite to transportation

More information

2015 ATSSA Traffic Expo Report

2015 ATSSA Traffic Expo Report 2015 ATSSA Traffic Expo Report February 8-10, 2015 Tampa, Florida By: Victor Lund, St. Louis County Traffic Engineer Submitted: February 11, 2015 Sunday, February 8, 2015 Power Talk Grassroots Advocacy:

More information

Traffic insights ATSPM Flashcards

Traffic insights ATSPM Flashcards Traffic insights ATSPM Flashcards Traffic Insights Optimize your traffic network. Measure the impact. Traffic Insights are a suite of signal performance analytics and tools that help improve traffic safety

More information

City of Fairfax, Virginia City Council Regular Meeting

City of Fairfax, Virginia City Council Regular Meeting City Council Regular Meeting Agenda Item # 7b City Council Meeting 5/10/2016 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable Mayor and Members of City Council Robert Sisson, City Manager Consideration

More information

EVALUATION OF VARIABLE SPEED LIMIT/VARIABLE ADVISORY SPEED SYSTEMS

EVALUATION OF VARIABLE SPEED LIMIT/VARIABLE ADVISORY SPEED SYSTEMS Research Project Proposal for EVALUATION OF VARIABLE SPEED LIMIT/VARIABLE ADVISORY SPEED SYSTEMS Submitted by Ahmed Al-Kaisy, PhD, PE Associate Professor Program Manager Safety and Operations Western Transportation

More information

Enhancing TSMO Capabilities and Resilience to Address Long-Term Weather and Climate Trends

Enhancing TSMO Capabilities and Resilience to Address Long-Term Weather and Climate Trends Enhancing TSMO Capabilities and Resilience to Address Long-Term Weather and Climate Trends Paul Pisano (FHWA) Doug Pape (Battelle) Hunter McCracken (Battelle) NOCoE Webinar June 7, 2018 1 Today s Presenters

More information

Towards Quantitative Safety Planning: Implementation of PLANSAFE

Towards Quantitative Safety Planning: Implementation of PLANSAFE Project No. NCHRP 08-36/ Task 97A Towards Quantitative Safety Planning: Implementation of PLANSAFE FINAL REPORT Prepared for NCHRP Transportation Research Board of the National Academies TRANSPORTATION

More information

ITSMD Annual Meeting & Baltimore Traffic Signal Forum November 6, 2014

ITSMD Annual Meeting & Baltimore Traffic Signal Forum November 6, 2014 ITSMD Annual Meeting & Baltimore Traffic Signal Forum November 6, 2014 Delaware Department of Transportation Transportation Management Program Update Gene S. Donaldson 1 PLAY ALONG! DOWNLOAD THE DELDOT

More information

Smarter Work Zones Webinar Series

Smarter Work Zones Webinar Series Smarter Work Zones Webinar Series Webinar #13: Implementing Work Zone ITS Applications Procurement Todd Peterson, Gerald (Jerry) Ullman, and Matthew Daeda May 11, 2016 1:00-2:30pm EDT Efficiency through

More information

Transportation Investment Corporation 2015/ /18 SERVICE PLAN

Transportation Investment Corporation 2015/ /18 SERVICE PLAN 2017/18 SERVICE PLAN For more information on Transportation Investment Corporation contact: Transportation Investment Corporation Corporate Head Office Suite 210 1500 Woolridge Street Coquitlam, British

More information

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the A Checklist for Law Enforcement Fire & Rescue EMS CRASH SITE Towing KYTC KVE Emergency Management Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the Kentucky

More information

Highway Safety Manual Implementation. Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation

Highway Safety Manual Implementation. Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation Highway Safety Manual Implementation Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation HSM Lead State Peer to Peer Workshop Highlights Illinois HSM Implementation HSM Lead

More information