1 Name (print, please) ID Production Management Fall 2007 Odette School of Business University of Windsor Midterm Exam 2 Solution Thursday, November 22, 5:0 6:50 pm Instructor: Mohammed Fazle Baki Aids Permitted: Calculator, straightedge, and a one-sided one-page note. Time available: 1 hour 20 minutes Instructions: This exam has 10 pages including this cover page and excluding a one-page table Please be sure to put your name and student ID number on each page. Show your work. Grading: Question Marks: 1 /10 2 /7 /8 4 /10 5 /10 6 /10 7 /10 Total: /65

2 Question 1: (10 points) Multiple Choice Questions 1.1 The costs of quality include which of the following? a. Appraisal costs b. Prevention costs c. Internal and external failure costs 1.2 (i) The objective of the Johnson s Rule for job sequencing is to minimize the length of time from the beginning of the first job until the finish of the last. (ii) Johnson s Rule is used only in production situations where we are dealing with one machine or one stage of production activity. 1. The Assignment Method is appropriate in solving scheduling problems that have which of the following characteristics? a. There are n things to be distributed to n destinations b. Each thing must be assigned to one and only one destination c. Only one criterion can be used 1.4 (i) One of the necessary inputs into the MRP system is Exception Reports. (ii) MRP is used in a variety of industries with a job-shop environment. 1.5 Which of the following statements hold true for Kanban Production Control Systems? a. The authority to produce or supply additional parts comes from upstream operations b. The cards or containers make up the Kanban Push System c. In a paperless control system, containers can be used instead of cards 2

3 1.6 (i) In a Two-Bin System for inventory you actually have to use four bins to make it work. (ii) IN a Two-Bin System for inventory items are used from one bin, and the second bin provides an amount large enough to ensure that the stock can be replenished. 1.7 (i) The Fixed-Order Quantity inventory model requires more time to maintain because every addition or withdrawal is logged. (ii) Safety stock is not necessary in any Fixed-Time Period model. 1.8 Which of the following assumptions are used in the Basic Fixed-Order Quantity inventory model? a. Lead time is averaged b. Ordering costs are variable c. Price per unit of product is constant d. None of the above 1.9 Holding Costs include which of the following? a. Breakage b. Order placing c. Typing up an order 1.10 The major functions of Shop-Floor Control are which of the following? a. Load labor into workstations b. Load machine hours into work stations c. Providing measurement of efficiency, utilization, and productivity of manpower and machines Question 2: (7 points) Jumbo s restaurant is trying to create a consecutive days off schedule that uses the fewest workers. Use the following information to create a consecutive days off schedule: Day M Tu W Th F S Su Requirements or Worker Worker Worker Worker Worker Worker Worker Worker

4 Days off: Worker 1: Thursday, Friday Worker 2: Monday, Tuesday Worker : Thursday, Friday Worker 4: Tuesday, Saturday or Worker 1: Thursday, Friday Worker 2: Monday, Tuesday Worker : Friday, Saturday Worker 4: Tuesday, Thursday Question : (8 points) Design specifications require that a key dimension on a product measure 120 ± 11 units. A process being considered for producing this product has a standard deviation of units. a. (4 points) Is the process capable? Justify your answer. C pk UTL X min σ X, LTL min, () () min σ [ 1. 22, 1. 22] > 1, process capable. b. (4 points) Suppose that the process average shifts to 125. Redo part a C pk UTL X min σ X, LTL min, () () min σ [ 0. 67, 1. 78] < 1, process not capable. Question 4: (10 points) Irwin sells a particular model of fan, with most of the sales being made in the summer months. Irwin makes a one-time purchase of the fans prior to each summer season at a cost of $40 each and sells each fan for $65. Any fans unsold at the end of summer season are marked down to $25 and sold in a special fall sale. a. (2 points) What is the marginal loss per unit? ML b. (2 points) What is the marginal profit per unit? MP c. (6 points) If the demand is uniformly distributed between 500 to 1700 units, find the optimal order quantity. ML 15 p ML + MP ( b a) ( ) 1250 Q b p. units Question 5: (10 points) The annual demand for a product is 26,000 units. The weekly demand is 500 units with a standard deviation of 50 units. The cost to place an order is $52, and the time from ordering to receipt is four weeks. The annual inventory carrying cost is $1.6 per unit. a. (4 points) Compute the optimal order quantity. Q 2 ( 26000)( 52) units 4

5 b. (6 points) Compute the reorder point necessary to provide a 97 percent service probability. R µ L + Z σ L µ L + Z σ units () ( ) L Question 6: (10 points) Charlie s Pizza orders all of its pepperoni, olives, anchovies, and mozzarella cheese to be shipped directly from Italy. An American distributor stops by every three weeks to take orders. Because the orders are shipped directly from Italy, they take one week to arrive. Charlie s Pizza uses an average of 150 pounds of pepperoni each week, with a standard deviation of 25 pounds. Charlie s prides itself on offering only the best-quality ingredients and a high level of service, so it wants to ensure a 99 percent probability of not stocking out on pepperoni. Assume that the sales representative just walked in the door and there are currently 200 pounds of pepperoni in the walk-in cooler. How many pounds of pepperoni must be ordered? ( T + L) + Z σ µ ( T + L) + Z σ T + 150( + 1) + 2. ( 25) M µ + L pounds Q M I T L pounds Question 7: (10 points) A single inventory item is ordered from an outside supplier. The anticipated demand for this item over the next 7 months is 14, 16, 15, 17, 11, 18, 9. Current inventory of this item is 2, and the ending inventory should be 4. Assume a holding cost of $2 per unit per month and a setup cost of $75. Assume a zero lead time. Determine the order policy for this item over the next 7 months. Use the least total cost heuristic. r , r So, r ( 12, 16, 15, 17, 1118,, 1). Months Q I1 I2 I I4 I5 I6 I7 Holding Order Difference cost cost stop stop a. (6 points) Use the table above to show your computation and summarize your order policy here: Month Order

6 b. (4 points) Use the table below to show the ending inventory that results from your order policy at the end of each of the 7 months: Month Gross Requirements Beginning Inventory Net Requirements Time-phased Net Requirements Planned order Release Planned Deliveries Ending Inventory

Production Management Fall 2006 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm

Production Management Fall 2006 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm Name (print, please) ID Production Management 73-604 Fall 2006 Odette School of Business University of Windsor Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm Instructor: Mohammed Fazle Baki

More information

Operations Management I Fall 2003 Odette School of Business University of Windsor. Midterm Exam II Solution Thursday, November 20 Education Gym

Operations Management I Fall 2003 Odette School of Business University of Windsor. Midterm Exam II Solution Thursday, November 20 Education Gym Last Name First Name ID Operations Management I 7-1 Fall 00 Odette School of usiness University of Windsor Midterm Exam II Solution Thursday, November 0 Education Gym Instructor: Mohammed Fazle aki Aids

More information

Operations Management I Fall 2004 Odette School of Business University of Windsor

Operations Management I Fall 2004 Odette School of Business University of Windsor Last Name First Name ID Operations Management I 73-331 Fall 2004 Odette School of Business University of Windsor Final Exam Wednesday, December 15, 12:00 noon 3:00 p.m. Ambassador Auditorium: Areas C,D,E,F,G

More information

Operations Management I Winter 2005 Odette School of Business University of Windsor

Operations Management I Winter 2005 Odette School of Business University of Windsor Last Name First Name ID Operations Management I 7-1 Winter 005 Odette School of Business University of Windsor Midterm Exam II Solution Thursday, March 1 Last Name A-L: Room OB B0 Last Name M-Z: Room ED

More information

Operations Management I Fall 2004 Odette School of Business University of Windsor

Operations Management I Fall 2004 Odette School of Business University of Windsor Last Name First Name ID Operations Management I 73-331 Fall 004 Odette School of Business University of Windsor Final Exam Solution Wednesday, December 15, 1:00 noon 3:00 p.m. Ambassador Auditorium: Areas

More information

ME 375K Production Engineering Management First Test, Spring 1998 Each problem is 20 points

ME 375K Production Engineering Management First Test, Spring 1998 Each problem is 20 points Name ME 375K Production Engineering Management First Test, Spring 1998 Each problem is 2 points 1. A raw material inventory holds an expensive product that costs $1 for each item. The annual demand for

More information

Operations Management I Winter 2002 Odette School of Business University of Windsor

Operations Management I Winter 2002 Odette School of Business University of Windsor Last Name First Name ID Operations Management I 7-1 Winter 00 Odette Scool of Business University of Windsor Midterm Exam II Solution Wednesday, Marc 7, 10:00 11:0 am Instructor: Moammed Fazle Baki Aids

More information

Mechanical Engineering 101

Mechanical Engineering 101 Mechanical Engineering 101 University of alifornia, Berkeley Lecture #17 1 Today s lecture apacity planning Kanban intro 2 MRP Last lecture: MRP scheduling Materials Requirements Planning: MRP This lecture:

More information

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. JIT --Intro 02/11/03 page 1 of 28

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. JIT --Intro 02/11/03 page 1 of 28 Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa JIT --Intro 02/11/03 page 1 of 28 Pull/Push Systems Pull system: System for moving work where a workstation pulls output

More information

Examination. Telephone: Please make your calculations on Graph paper. Max points: 100

Examination. Telephone: Please make your calculations on Graph paper. Max points: 100 KPP227 TEN1 Production and Logistics Planning Examination Course: Production and Logistics Planning Date: 2014-01-14 Number of hours: 5 hours Group: Freestanding course Course code: KPP227 Examination

More information

MgtOp 340 Professor Munson Washington State University Sample Exam for Exam 2

MgtOp 340 Professor Munson Washington State University Sample Exam for Exam 2 MgtOp 340 Professor Munson Washington State University Sample Exam for Exam 2 Multiple Choice 1. Suppose that the annual EOQ cost (setup plus inventory holding) for a product stored in a warehouse is $10,000.

More information

Managerial Decision Modeling w/ Spreadsheets

Managerial Decision Modeling w/ Spreadsheets Managerial Decision Modeling w/ Spreadsheets, 3e (Balakrishnan/Render/Stair) Chapter 3 Linear Programming Modeling Applications with Computer Analyses in Excel 3.1 Chapter Questions 1) In a multi-period

More information

UNIVERSITY OF GUELPH Operations Management, FARE*3310 Winter 2013 Assignment 3

UNIVERSITY OF GUELPH Operations Management, FARE*3310 Winter 2013 Assignment 3 UNIVERSITY OF GUELPH Operations Management, FARE*3310 Winter 2013 Assignment 3 A N S W E R LAST NAME K E Y FIRST NAME F A R E 3 3 1 0 STUDENT ID NUMBER INSTRUCTIONS: 1. The due date for this assignment

More information

Pull Systems: Overview, Challenges and Success Factors

Pull Systems: Overview, Challenges and Success Factors Pull Systems: Overview, Challenges and Success Factors Mike Osterling 619-572-3632 mike@mosterling.com 1 Session Objectives Cover the most common types of pull systems See some examples of application

More information

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations JIT and Lean Operations Outline Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations Eliminate Waste Remove Variability Improve

More information

GROUP DUTY ROSTER WITH MULTIPLE SHIFTS IN A DAY

GROUP DUTY ROSTER WITH MULTIPLE SHIFTS IN A DAY 1 1 GROUP DUTY ROSTER WITH MULTIPLE SHIFTS IN A DAY SUGGESTIONS & SOLUTIONS FOR TCMS V2 2 Conditions that requiring this feature: 1. More than 1 working shift. 2. Each working shift is clearly defined.

More information

Chapter 11. In-Time and Lean Production

Chapter 11. In-Time and Lean Production Chapter 11 Just-In In-Time and Lean Production What is JIT? Producing only what is needed, when it is needed A philosophy An integrated management system JIT s mandate: Eliminate all waste Basic Elements

More information

Inventory Management. Copyright 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Independent demand items

Inventory Management. Copyright 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Independent demand items Chapter 12 Inventory Management McGraw-Hill/Irwin Copyright 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Inventory Inventory A stock or store of goods Independent demand items Items that

More information

JIT AND Lean Operations 14-1

JIT AND Lean Operations 14-1 Chapter 15 JIT AND Lean Operations 14-1 Product Structure Tree = Shop floor layouts A B(4) C(2) D(2) E(1) D(3) F(2) MRP vs. JIT 14-2 JIT/Lean Production Just-in-time: Repetitive production system in which

More information

Introduction. Introduction. Introduction LEARNING OBJECTIVES LEARNING OBJECTIVES

Introduction. Introduction. Introduction LEARNING OBJECTIVES LEARNING OBJECTIVES Valua%on and pricing (November 5, 2013) LEARNING OBJECTIVES Lecture 9 Control 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order quantity (EOQ) to determine how

More information

Flow and Pull Systems

Flow and Pull Systems Online Student Guide Flow and Pull Systems OpusWorks 2016, All Rights Reserved 1 Table of Contents LEARNING OBJECTIVES... 4 INTRODUCTION... 4 BENEFITS OF FLOW AND PULL... 5 CLEARING ROADBLOCKS... 5 APPROACH

More information

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004 JUST IN TIME Manuel Rincón, M.Sc. October 22nd, 2004 Lecture Outline 1. Just-in-Time Philosophy 2. Suppliers Goals of JIT Partnerships Concerns of Suppliers 3. JIT Layout Distance Reduction Increased Flexibility

More information

Manufacturing Resource Planning

Manufacturing Resource Planning Outline Manufacturing Resource Planning MRP The Strategic Importance of Short- Term Scheduling Scheduling Issues Forward and Backward Scheduling Scheduling Criteria Outline Continued Scheduling Process-Focused

More information

Mid-Term Examination. Suggested Solution to ECLT 5940 Supply Chain Management. Time: 7:00 9:45 PM

Mid-Term Examination. Suggested Solution to ECLT 5940 Supply Chain Management. Time: 7:00 9:45 PM Mid-Term Examination Suggested Solution to ECLT 5940 Supply Chain Management Time: 7:00 9:45 PM 1. This is an open-book/note examination. 2. One cannot lend books/notes to others. 3. There are totally

More information

Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2004

Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2004 Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2004 Follow the instructions for each of the two parts of this examination. This exam

More information

Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2003

Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2003 Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2003 Follow the instructions for each of the two parts of this examination. This exam

More information

Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2004

Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2004 Economics 1012A Introduction to Macroeconomics Spring 2004 Dr. R. E. Mueller First Midterm Examination February 13, 2004 Follow the instructions for each of the two parts of this examination. This exam

More information

How much money can you add to the bottom line with good inventory management?

How much money can you add to the bottom line with good inventory management? Inventory Management Key Concepts: Inventory are those stocks or items used to support production (raw materials and work-in-process items), supporting activities (maintenance, repair, and operating supplies),

More information

PROBLEMS. Quantity discounts Discounts or lower unit costs offered by the manufacturer when a customer purchases larger quantities of the product.

PROBLEMS. Quantity discounts Discounts or lower unit costs offered by the manufacturer when a customer purchases larger quantities of the product. GLOSSARY Economic order quantity (EOQ) The order quantity that minimizes the annual holding cost plus the annual ordering cost. Constant demand rate An assumption of many inventory models that states that

More information

Functional Area Systems Production / Operation Systems

Functional Area Systems Production / Operation Systems Functional Area Systems Production / Operation Systems Lecture Outline 5 Part 4 Instructor: Trevor Nadeau Examples: Functional Area Info Systems 2 Functional Area Information Systems 3 Computers in Manufacturing

More information

02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 4 ACS-1803 Introduction to Information Systems Examples:

More information

WHAT YOU NEED TO KNOW

WHAT YOU NEED TO KNOW Boss Revolution Bill Payment WHAT YOU NEED TO KNOW What is Bill Payment? Bill Payment service offers customers a convenient way to walk-in and pay their bills in cash at their local retailer. Users like

More information

Manufacturing Information Systems. deden08m.com 1

Manufacturing Information Systems. deden08m.com 1 Manufacturing Information Systems deden08m.com 1 Computers in the Physical System CAD (computer-aided design) Design database CAM (computer aided manufacturing) Robotics deden08m.com 2 Reorder Point (ROP)

More information

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01 Supply Chain Inventory Management Chapter 9 09-01 What is a Inventory Management? Inventory Management The planning and controlling of inventories in order to meet the competitive priorities of the organization.

More information

Yuji Yamamoto PPU411. Today s topic. What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system

Yuji Yamamoto PPU411. Today s topic. What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system Yuji Yamamoto PPU411 Today s topic What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system 1 Production planning and scheduling Demand Production planning 1,400pcs/m

More information

OUTSOURCED STORAGE AND FULFILLMENT FACILITY TO ENHANCE THE SERVICE CAPABILITIES OF SHOPPING MALL TENANTS

OUTSOURCED STORAGE AND FULFILLMENT FACILITY TO ENHANCE THE SERVICE CAPABILITIES OF SHOPPING MALL TENANTS OUTSOURCED STORAGE AND FULFILLMENT FACILITY TO ENHANCE THE SERVICE CAPABILITIES OF SHOPPING MALL TENANTS Zachary Montreuil University of North Carolina at Charlotte Mike Ogle, Ph.D. University of North

More information

For All Students Taking Consumer Math Summer Review Packet

For All Students Taking Consumer Math Summer Review Packet For All Students Taking Consumer Math Summer Review Packet Name Period Dear Student and Parent/Guardian, The math department at Central Dauphin School District wants you to be successful in Consumer Math.

More information

Functional Skills Maths Assessment. Level 1

Functional Skills Maths Assessment. Level 1 Functional Skills Maths Assessment Learner name Learner registration number Learner signature Centre Assessment date Level 1 NOCN USE ONLY Task Mark 1a 1b 1c 2a 2b 2c 3a 3b 3c 4a 4b Total Instructions

More information

Chapter 13. Lean and Sustainable Supply Chains

Chapter 13. Lean and Sustainable Supply Chains 1 Chapter 13 Lean and Sustainable Supply Chains 2 OBJECTIVES Lean Production Defined The Toyota Production System Lean Implementation Requirements Lean Services Lean Production 3 Lean Production can be

More information

PRODUCTION SCHEDULING PART-A

PRODUCTION SCHEDULING PART-A PRODUCTION SCHEDULING PART-A 1. List out any five priority sequencing rules. (Nov-2017) First come, first served (FCFS) Last come, first served (LCFS) Earliest due date (EDD) Shortest processing time (SPT)

More information

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time Chapter 17 Synchronizing and Balancing Processes 1 Goal Achieve uniform flow Level the master production schedule Production Time Avg. Reduce the size of batches produced for final assembly Production

More information

University of Puerto Rico Mayagüez Campus Industrial Engineering Department

University of Puerto Rico Mayagüez Campus Industrial Engineering Department University of Puerto Rico Mayagüez Campus Industrial Engineering Department Research Study Titled: Teaching Industrial Engineering to Generation Y Students through Computer Games National Science Foundation

More information

Chapter 1 Basic Microeconomic Principles

Chapter 1 Basic Microeconomic Principles Chapter 1 Basic Microeconomic Principles Prof. Jepsen ECO 610 Lecture 1 December 3, 2012 copyright John Wiley and Sons Outline Course outline Economics review (Chapter 1) Costs Demand Profit maximization

More information

SAP Supply Chain Management

SAP Supply Chain Management Estimated Students Paula Ibanez Kelvin Thompson IDM 3330 70 MANAGEMENT INFORMATION SYSTEMS SAP Supply Chain Management The Best Solution for Supply Chain Managers in the Manufacturing Field SAP Supply

More information

Sage 300 Direct Deposit. Getting Started Guide

Sage 300 Direct Deposit. Getting Started Guide Sage 300 Direct Deposit Getting Started Guide This is a publication of Sage Software, Inc. 2017 The Sage Group plc or its licensors. All rights reserved. Sage, Sage logos, and Sage product and service

More information

Preview from Notesale.co.uk Page 1 of 51. Inventory Policy Decisions

Preview from Notesale.co.uk Page 1 of 51. Inventory Policy Decisions Page 1 of 51 Inventory Policy Decisions Push Inventory Control Solution: We need to calculate total requirements for each warehouse. Total Requirements = Forecast + ( z x Forecast error ) where, z = number

More information

Inventory Control Models

Inventory Control Models Chapter 6 Inventory Control Models uantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna 2008 Prentice-Hall, Inc. Introduction Inventory is any stored resource used to satisfy

More information

Just-In-Time (JIT) Manufacturing. Overview

Just-In-Time (JIT) Manufacturing. Overview Just-In-Time (JIT) Manufacturing Overview The Just-in-Time (JIT) Manufacturing Philosophy Prerequisites for JIT Manufacturing Elements of JIT Manufacturing Benefits of JIT Manufacturing Success and JIT

More information

BSc (Hons) Business Information Systems. Examinations for / Semester 2

BSc (Hons) Business Information Systems. Examinations for / Semester 2 BSc (Hons) Business Information Systems Cohort: BIS/14B/FT Examinations for 2015-2016 / Semester 2 MODULE: QUANTITATIVE ANALYSIS FOR BUSINESS MODULE CODE: Duration: 3 Hours Instructions to Candidates:

More information

IT 470a Six Sigma Chapter X

IT 470a Six Sigma Chapter X Chapter X Lean Enterprise IT 470a Six Sigma Chapter X Definitions Raw Materials component items purchased and received from suppliers WIP work in process, items that are in production on the factory floor

More information

Answer Key Testname: M1 06

Answer Key Testname: M1 06 Testname: M1-06 1) B 2) D 3) A 4) B 5) C 6) C 7) B 8) A 9) D 10) B 11) A 12) D 13) B 14) A 15) B 16) B 17) B 18) D 19) A 20) B 21) B 22) D 23) B 24) B 25) A 26) With the pull method, customer demand (an

More information

Reorder Point Systems

Reorder Point Systems Reorder Point Systems EOQ with a reorder point The reorder point problem The service level method Fixed-order-interval model Reading: Page 563-573 Oct 23 ISMT162/Stuart Zhu 1 EOQ with a Reorder Point The

More information

Last Name First Name I.D. Number

Last Name First Name I.D. Number University of Alberta School of Business Department of Accounting, Operations and Information Systems Accounting 424 Sample Midterm II Exam Instructor: Stringer Last Name First Name I.D. Number INSTRUCTIONS

More information

GUIDE TO SETTING GOALS

GUIDE TO SETTING GOALS GUIDE TO SETTING GOALS What is a Goal? A goal is like a blueprint that orients us toward an outcome we desire. The formulation of goals is critical to successful lifestyle change. Are Some Goals Better

More information

Parts Manager - Reporting TRAINING WORKBOOK

Parts Manager - Reporting TRAINING WORKBOOK Parts Manager - Reporting TRAINING WORKBOOK Daily Reports... 2 Inventory Invoice Report... 2 Work Order Sales Margin Report... 3 Balancing the Daily Cash Till (Parts)... 4 Weekly Reports... 5 Inventory

More information

There are three options available for coping with variations in demand:

There are three options available for coping with variations in demand: Module 3E10 Operations management for Engineers - Crib 1 (a) Define the theoretical capacity of a manufacturing line. Explain why the actual capacity of a manufacturing line is often different from its

More information

Your Kick Off Guide Includes Steps to a Successful Kick Off Handouts Remember to have these materials ready at the kick off. Tools to Encourage

Your Kick Off Guide Includes Steps to a Successful Kick Off Handouts Remember to have these materials ready at the kick off. Tools to Encourage Your Kick Off Guide Includes Steps to a Successful Kick Off Handouts Remember to have these materials ready at the kick off. Tools to Encourage Participation Reminder Letters and Forms o Announcement Letter

More information

A comparison between Lean and Visibility approach in supply chain planning

A comparison between Lean and Visibility approach in supply chain planning A comparison between Lean and Visibility approach in supply chain planning Matteo Rossini, Alberto Portioli Staudacher Department of Management Engineering, Politecnico di Milano, Milano, Italy (matteo.rossini@polimi.it)

More information

INVENTORY MANAGEMENT

INVENTORY MANAGEMENT INVENTORY MANAGEMENT Professor Robert Saltzman Operations Analysis Inventory What is it? Idle goods, waiting to be used or sold Inventory can take many forms: Finished Goods: Food, clothes, cars, electronics,

More information

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION INTRODUCTION Have you implemented kanban yet? Have you been unable to roll it out or just abandoned it? Most companies who begin kanban implementation struggle to finish the job. In too many cases, the

More information

Chapter 17. Inventory Control

Chapter 17. Inventory Control 1 Chapter 17 Inventory Control 2 OBJECTIVES Inventory System Defined Inventory Costs Independent vs. Dependent Demand Single-Period Inventory Model Multi-Period Inventory Models: Basic Fixed-Order Quantity

More information

SELF ASSESSMENT PROBLEMS

SELF ASSESSMENT PROBLEMS CHAPTER2 MATERIALS COST SELF ASSESSMENT PROBLEMS LEVELS OF INVENTORY Q67: Two components, A and B are used as follows: Normal Usage 50 units per week each Minimum Usage 25 units per week each Maximum Usage

More information

ANYTIME 500 ENHANCED MRP

ANYTIME 500 ENHANCED MRP ANYTIME 500 ENHANCED MRP Improve material plans and purchasing with demand pegging, exception messages, approved vendors, new purchase order parameters. It can be difficult to see why MRP suggested order

More information

COMSATS Institute of Information Technology Abbottabad

COMSATS Institute of Information Technology Abbottabad COMSATS Institute of Information Technology Abbottabad Department of Management Sciences First Sessional: Spring 2018 Class: BBA 4 Date: 18-04-18 Subject: Cost Accounting Instructor: Zaheer A. Swati Total

More information

Short-Term. Scheduling

Short-Term. Scheduling Short-Term 15 Scheduling PowerPoint presentation to accompany Heizer, Render, Munson Operations Management, Twelfth Edition Principles of Operations Management, Tenth Edition PowerPoint slides by Jeff

More information

Yuji Yamamoto PPU411 VT 2017

Yuji Yamamoto PPU411 VT 2017 Yuji Yamamoto PPU411 VT 2017 1 Continuous review (Q) system A continuous review (Q) system, sometimes called a reorder point (ROP) system or fixed order-quantity system, tracks the remaining inventory

More information

Connecting S&OP to the Shop Floor: Here s How!

Connecting S&OP to the Shop Floor: Here s How! Connecting S&OP to the Shop Floor: Here s How! J. E. Boyer Company, Inc. John E. Boyer, President Copyright 2004 by J. E. Boyer Company, Inc. No portion of this article may be reproduced in whole or in

More information

Learning Objectives. Scheduling. Learning Objectives

Learning Objectives. Scheduling. Learning Objectives Scheduling 16 Learning Objectives Explain what scheduling involves and the importance of good scheduling. Discuss scheduling needs in high-volume and intermediate-volume systems. Discuss scheduling needs

More information

Table of Contents A. Organization Production MRP Controller Person Responsible for the Supply Area... 5 B. Master Data...

Table of Contents A. Organization Production MRP Controller Person Responsible for the Supply Area... 5 B. Master Data... Table of Contents A. Organization... 4 1. Production... 4 1.1. MRP Controller... 4 1.2. Person Responsible for the Supply Area... 5 B. Master Data... 5 1. Production... 6 1.1. Discrete Production... 6

More information

Department of Social Work - Field Program LEARNING AGREEMENT

Department of Social Work - Field Program LEARNING AGREEMENT Department of Social Work - Field Program LEARNING AGREEMENT PURPOSE The student Learning Agreement is a written agreement between the student and agency Field Instructor that outlines student goals and

More information

Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design

Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design Dr. Jitesh J. Thakkar Department of Industrial and Systems Engineering Indian Institute of Technology Kharagpur Instruction

More information

PRACTICE PROBLEM SET Topic 1: Basic Process Analysis

PRACTICE PROBLEM SET Topic 1: Basic Process Analysis The Wharton School Quarter II The University of Pennsylvania Fall 1999 PRACTICE PROBLEM SET Topic 1: Basic Process Analysis Problem 1: Consider the following three-step production process: Raw Material

More information

QUANTITATIVE METHODS AND OPERATIONS MANAGEMENT. Answer not more than four questions, two from Section A and two from Section B.

QUANTITATIVE METHODS AND OPERATIONS MANAGEMENT. Answer not more than four questions, two from Section A and two from Section B. MANAGEMENT STUDIES TRIPOS DIPLOMA IN MANAGEMENT STUDIES Tuesday 2 May 2000 1.30 to 4.30 Paper M2 QUANTITATIVE METHODS AND OPERATIONS MANAGEMENT Answer not more than four questions, two from Section A and

More information

Multiple Choice Identify the letter of the choice that best completes the statement or answers the question.

Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. Final day 2 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. What determines how a change in prices will affect total revenue for a company?

More information

Chapter 2 An Introduction to Cost Terms and Purposes

Chapter 2 An Introduction to Cost Terms and Purposes Chapter 2 An Introduction to Cost Terms and Purposes Copyright 2003 Pearson Education Canada Inc. Slide 2-15 Costs and Cost Objects Cost a resource sacrificed or foregone to achieve a specific objective

More information

Supply Chain Management. End-to-End Demand Planning

Supply Chain Management. End-to-End Demand Planning Supply Chain Management End-to-End Demand Planning Savage Arms Largest long gun manufacturer with centerfire operations in Westfield MA and rimfire in Lakefield Ontario. Importing shotguns from Turkey

More information

Cost Accounting. Multiple Choice Questions:

Cost Accounting. Multiple Choice Questions: Multiple Choice Questions: 1- The Value Chain a- Involves external companies as well as internal activities. b- Is the sequence of business functions in which customer usefulness is added to products or

More information

Just-in-Time System. Dr S G Deshmukh

Just-in-Time System. Dr S G Deshmukh Just-in-Time System Dr S G Deshmukh Difficulty in Production! Demand is uncertain and variable. Same equipment and people are used to make a variety of products. Switching products takes time.(imagaine

More information

Final Project: Patient Transporter Facility

Final Project: Patient Transporter Facility Final Project: Patient Transporter Facility ISE 453: Design of PLS Systems Fall 2018 Assigned: Tue, 20 Nov (Groups of 4) Due: 11p Sun, 9 Dec Background A patient transporter is designed to assist in the

More information

UPS Ground on Saturday

UPS Ground on Saturday UPS Ground on Saturday Consumers want choice, control and convenience Consumers expect quick delivery Long or unknown delivery times result in lost revenue E-commerce is a 24 x 7 operation 39% 31% 46%

More information

The Realities of Modern Manufacturing

The Realities of Modern Manufacturing Ch 1 Introduction Sections: 1. Production Systems 2. Automation in Production Systems 3. Manual Labor in Production Systems 4. Automation Principles and Strategies 5. Organization of the Book The Realities

More information

Test lasts for 120 minutes. You must stay for the entire 120 minute period.

Test lasts for 120 minutes. You must stay for the entire 120 minute period. ECO220 Mid-Term Test (June 29, 2005) Page 1 of 15 Last Name: First Name: Student ID #: INSTRUCTIONS: DO NOT OPEN THIS EAM UNTIL INSTRUCTED TO. Test lasts for 120 minutes. You must stay for the entire 120

More information

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems Outline Pull Manufacturing Why Pull Manufacturing? The Problem of Inventory Just In Time Kanban One Piece Flow Demand / Pull Standard Work & Takt Time Production Smoothing 1 2 Why Pull Manufacturing? Push

More information

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning TU-E2020 ADVANCED OPERATIONS MANAGEMENT Master Production Scheduling Material Requirements Planning Schedule for classes 26.10 Introduction to the Course / TS 27.10 Different models of Planning for Production

More information

Cycle of costing accounting

Cycle of costing accounting Cycle of costing accounting IDENTIFY THE PRODUCT PRDUCT SPECIFICATION I DENTIFICATION Resources used in producing the product Cost valuation Materials cost s Labor cost s Over head cost s Costs classification

More information

Lecture 12. Introductory Production Control

Lecture 12. Introductory Production Control Lecture 12 Introductory Production Control 167 Where we ve come from: Models of Manufacturing Systems: Deterministic, Queuing, Simulation Key ideas: Some WIP useful for buffering stations, but More WIP

More information

The Future State Map. Future State. Map

The Future State Map. Future State. Map The Future State Map The Future State Map The purpose of value stream mapping is to highlight sources of waste and eliminate them by implementation of a future value stream that can become reality within

More information

ECON 1001 A. Come to the PASS workshop with your mock exam complete. During the workshop you can work with other students to review your work.

ECON 1001 A. Come to the PASS workshop with your mock exam complete. During the workshop you can work with other students to review your work. It is most beneficial to you to write this mock midterm UNDER EXAM CONDITIONS. This means: Complete the midterm in 1.5 hour(s). Work on your own. Keep your notes and textbook closed. Attempt every question.

More information

EXECUTIVE SUMMARY. Goals. Project Outline

EXECUTIVE SUMMARY. Goals. Project Outline ! 1 of 6! Welcome:Objective Welcome! You have been chosen as a member of the Organics Plus social media team! As a part of this team, you will learn how to use the following social media platforms to advertise

More information

LECTURE February Thursday, February 21, 13

LECTURE February Thursday, February 21, 13 LECTURE 10 21 February 2013 1 ANNOUNCEMENTS HW 4 due Friday at 11:45 PM Midterm 1 next Monday February 25th 7:30 PM - 8:30 PM in Anderson 270 (not this room) 2 old midterms are on Moodle; they are very

More information

Chapter 10: Financial Mathematics Percentages

Chapter 10: Financial Mathematics Percentages Chapter 10: Financial Mathematics 10.1 Percentages Bell Work Take your best guess at the percent for each statement. 1. % of Americans do not understand how compound interest works. (2008) 2. % of American

More information

Operations Management - 5 th Edition

Operations Management - 5 th Edition Chapter 15 Lean Production Operations Management - 5 th Edition Roberta Russell & Bernard W. Taylor, III Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lecture

More information

ISOM 1700 Critical Issues in Business Operations Winter 2018

ISOM 1700 Critical Issues in Business Operations Winter 2018 ISOM 1700 Critical Issues in Business Operations Winter 2018 Department of Information Systems, Business Statistics and Operations Management COURSE: ISOM1700 Critical Issues in Business Operations (3-0-0:3)

More information

Planning. Dr. Richard Jerz rjerz.com

Planning. Dr. Richard Jerz rjerz.com Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

OM (Fall 2016) Outline

OM (Fall 2016) Outline Lean Operations Outline Global Company Profile: Toyota Motor Corporation Lean Operations Lean and Just-in-Time Lean and the Toyota Production System Lean Organizations Lean in Services 2 Toyota Motor Corporation

More information

ACTIVITY 8: QUESTION. Identify some ways in which businesses can lose stock. ACTIVITY 8: ANSWER

ACTIVITY 8: QUESTION. Identify some ways in which businesses can lose stock. ACTIVITY 8: ANSWER The weekly schedule will be adjusted for stock in plant. There are various models for calculating the reorder quantity for stock which takes into account various practical issues. For example, a manufacturer

More information

The Simple Company (TSC) The TSC and TSC-MRP scenarios

The Simple Company (TSC) The TSC and TSC-MRP scenarios The Simple Company (TSC) The TSC and TSC-MRP scenarios This case study describes the story of the TSC, TSCMRP, TSCs and TSCMs scenarios. (For more details please go over the information available at the

More information

POSITION DESCRIPTION RECEPTIONIST / MEMBER SERVICES REPRESENTATIVE

POSITION DESCRIPTION RECEPTIONIST / MEMBER SERVICES REPRESENTATIVE POSITION DESCRIPTION JOB TITLE: DEPARTMENT: REPORTS TO: LEVEL/STATUS: SUPERVISES: RECEPTIONIST / MEMBER SERVICES REPRESENTATIVE Operations MSR Operations Manager 1 / Non-Exempt None PRIMARY PURPOSE Provides

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Visual Controls : Applying Visual Management to the Factory

Visual Controls : Applying Visual Management to the Factory Visual Controls : Applying Visual Management to the Factory Table Of Contents: Introduction xi Acknowledgments xix Chapter 1 Importance of the Visual Factory 1 (16) The Common Ground of Production 1 (6)

More information