1 SABRe : Inspection Processes. Supplier Briefing Pack Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc. This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies.
2 Inspection Processes - List of Contents. 2 General Requirements. Visual Inspection. Dimensional Inspection. Non-destructive Testing. Issue and Control of Stamps. Operator Certification. Calibration Control and Measuring Equipment. Inspection Records.
3 Inspection Processes : General Requirements. 3 Inspection is the step within a business process at which a product is checked to confirm that it meets the specification or design intent. The inputs to the inspection process are a definition of the criteria to be inspected against (e.g. Detail Drawing / Repair Scheme / Technical Specification / Quality Acceptance Standard etc.), allied to a definition of the inspection technique(s) to be used. The type of inspection to be used is an input to the process - as an integral part of the overall inspection requirements. Acceptance criteria should also be specified, with the output being either acceptance or rejection of the specific operation and / or product(s) concerned. A systematic approach shall be employed to ensure inspection results are recorded against the product / feature being inspected ; this is particularly important when inspecting batches of product(s). The inspection location(s) shall be large enough to ensure batch integrity can be preserved and also be free of any potential contaminants (e.g. swarf, waste etc.) Environmental conditions shall be maintained to support accurate measurement, including temperature (where relevant), appropriate illumination to adequately highlight measurement equipment, together with those features being visually / dimensionally inspected or assessed.
4 Inspection Processes : Visual Inspection. 4 Following a production, processing, assembly or repair operation (as appropriate), visual inspection may be specified to detect changes in visual appearance in order to: Confirm such operations (e.g. surface coatings, assembly, testing etc.) have been completed satisfactorily - in accordance with specification requirements, are physically / operationally functional (where applicable) and free from damage. Detect that an operation has been completed unsatisfactorily (e.g. incorrect heat treatment, brazing, identity markings etc.). Confirm that product(s) are free from contamination by foreign bodies (e.g. swarf, blasting media, tooling etc.) and have similarly incurred no handling damage prior to customer despatch. Ensure that any special customer requirements detailed on the purchase order / technical specifications (e.g. identity markings, labelling, protection / packaging etc.) have been correctly incorporated - refer to SABRe Identity Markings & Serialisation and Protection, Packaging and Labelling Processes for additional detail. Depending on what is being inspected and the potential for any non-conformance that could be present, the supplier(s) technical authority (e.g. Engineering, Quality, Laboratory etc.) may specify additional Visual inspection controls to ensure that accurate discrimination between acceptable and unacceptable conditions can both be successfully and consistently achieved.
5 Inspection Processes : Visual Inspection (Contd.) 5 General Points: The capability to conduct inspection adequately should be subject to verification and periodically reassessed as an integral part of overall quality planning activities. Inspection personnel should have adequate background knowledge of the product or assembly and associated production processes ; this should also be subject to periodic re-assessment and / or implementation of additional training where necessary. Dependent upon the product configuration / application (e.g. colour coded electrical wiring / harness assemblies) - satisfactory colour perception / vision may also be a requirement (i.e. the inspector requires correct colour acuity and should be tested accordingly.). For additional detail governing aerospace applications, refer to RPS Visual Inspection.
6 Inspection Processes : Dimensional Inspection. 6 Dimensional Inspection shall take place at specified stages in the production / assembly or repair process to verify conformance to specified requirements : This shall be achieved by the use of measuring equipment that has a sufficient level of resolution for measuring the dimensional tolerance of the product feature being inspected - special to product equipment should be specified as / where necessary. Measurement devices and the inspection standard to be achieved should be subject to the same units of measurement (e.g. metric / imperial) to avoid the unnecessary application of conversion factors or calculations in the workplace environment. - which if incorrect, could adversely influence the acceptance / rejection criteria. All measuring equipment (inc. personal items) shall be in calibration when available for use, registered within the supplier(s) overall calibration system and controlled accordingly. In the event of damage being incurred during use (e.g. by dropping), previously designated in calibration equipment should be withdrawn from immediate use, subjected to re-calibration and reidentified accordingly within the supplier s gauge and measurement calibration system, prior to any further issue and / or usage. Every effort shall be made to reduce the total variation within the measurement process to a minimum. Where necessary, it is permissible to repeat a measurement several times, calculate an average value and use this average value to sentence the product.
7 Inspection Processes : Dimensional Inspection. 7 General Points : Unless prior / formal agreement has been received (refer to SABRe - Business Requirements) the use of Sampling Inspection techniques is not permitted on any product(s) destined for shipment to Rolls- Royce.This includes any product or operations which 1 st tier suppliers (I.e. those in receipt of Rolls- Royce purchase orders) may have sourced with relevant sub-tier suppliers. For outline details of Vision Standards, please refer to SABRe - Business Requirements. For additional detail of specific Rolls-Royce inspection requirements on FAIR s and Certified Release Inspector (CRI) Processes - please refer to the relevant SABRe topics and associated Supplier Briefing Packs. Should any doubt exist over inspection criteria on products scheduled for delivery to Rolls-Royce, please consult the relevant controlling technical authority (e.g. Quality, Laboratory etc.) from the Rolls- Royce Business Unit placing the purchase order(s) - prior to any final release / shipment of finished product(s).
8 Inspection Processes : Non-destructive Testing. 8 On Rolls-Royce ( make to print ) products, all NDT operations shall be undertaken in accordance with the governing engineering definition and / or technical (e.g. DGSPS, EDS, RRMP, RPS) specification(s) - as applicable. For additional detail on aerospace requirements - refer to RPS 906: Control of Nondestructive Testing. Where such work is being undertaken in house, 1 st tier suppliers shall hold the requisite / current Rolls-Royce approvals for both the process operations and operating / inspection personnel - as appropriate. Conversely, if such work is being out-sourced on aerospace applications, then the use of Rolls-Royce approved suppliers is mandatory (refer to SABRe - Supplier Approvals & Control of Sub-tier Suppliers for additional detail). Suppliers of design / make products which are manufactured and tested to their engineering definition and who may utilise their own approved supplier network shall be expected to operate in a comparable manner and be able to demonstrate equivalency of control / certification - as appropriate. Note : For additional detail on individual Non-destructive Testing (NDT) requirements, refer to the relevant Rolls-Royce process specifications (e.g. DGSPS, EDS, RRMP, RPS - as applicable) referenced by or within the controlling engineering definition. Should any doubt exist, consult the relevant controlling technical authority (e.g. Quality, Laboratory etc.) from the Rolls-Royce Business Unit placing the purchase order(s).
9 Inspection Processes : Issue and Control of Stamps. 9 The method used to record the outcome of all formal inspection activities and clear traceability regarding who has made the inspection decision must be consistent and not open to interpretation; for aerospace applications - a hand written signature alone does not satisfy this requirement. Whilst it is recognised that suppliers will control their own issuing system, the following points are mandatory for product(s) being shipped to Rolls-Royce: The supplier must ensure the stamp holder shall only be permitted to use the stamp within the agreed terms of authority and under no circumstances shall they exceed this authority, or permit the stamp to be used by any other person; the stamp holder being responsible for it s safe keeping and monitoring it s continued legibility at all times. The supplier s technical issuing authority shall be responsible for controlling the issue of unique stamps / codes for the area(s) involved within their company, thus avoiding any risk of duplication or misuse. The suppliers technical issuing authority shall also ensure stamp legibility checks are conducted on a regular (e.g. six monthly) basis - with any damaged or illegible stamps being immediately withdrawn from use, quarantined and destroyed / replaced / re-issued in a controlled (i.e. recorded) manner.
10 Inspection Processes : Operator Certification. 10 Suppliers implementing a system of Operator Certification shall ensure that: Nominated personnel are selected / trained in the operator certification process and also on inspection techniques (including equipment) relative to the particular process or operations in which they will be engaged and successfully assessed against set criteria prior to any approval being awarded. The scope of the operator certification activity shall be formally communicated to all personnel concerned and should clearly state the specific technical scope within which the operator(s) can inspect against and whether any restrictions (e.g. own work only ) shall apply. Operators should note - if something doesn t look or feel like the normal standard - then it may not be, so prior to releasing the product(s), check and see if something (e.g. the drawing / process) has changed, or is non-conformance present and if so - has it been properly documented and authorisation (e.g. via Concession / Waiver or Quality Plan etc.) received. Where utilised, operator certification details shall also feature as an integral element of the suppliers stamp issue process and be registered / controlled accordingly.
11 Inspection Processes - Calibration Control. 11 Whilst the following points are provided for guidance, it is recommended they are implemented as good practice in order to ensure a robust method of control and verification of measurement equipment: General Control and Verification of Measurement Equipment: A suppliers calibration system should be maintained in accordance with ISO as referenced within ISO 9001 and AS / EN 9100 (as guidance). It is recommended that Co-ordinate Measuring Machines (CMM s) are verified in accordance with ISO 10360, if an external company (i.e. Service Provider) is used to verify a suppliers CMM - this should be done in accordance with ISO Thermal and Environmental Control - Requirements for Measurement Rooms: Thermal control within manufacturing and measuring areas varies enormously and these effects must be taken into account when measuring components with tight tolerances. The larger the component the more significant is the effect; component design specifications and all measuring equipment assume measurements are carried out at the standard temperature of 20 degrees Centigrade, as detailed within Rolls-Royce Joint Engineering Specification (JES) 160.
12 Inspection Processes - Calibration Control (Contd.) 12 Standard Measurement Rooms This is the basic measurement room requirement for suppliers to Rolls-Royce. The Measurement Room can be located on the shop floor and normally there will be at least one Coordinate Measuring Machine (CMM) available for use. Components requiring measurement will need to soak / acclimatise to the ambient temperature before being measured.
13 Inspection Processes : Inspection Records. 13 General Requirements : Accurate records shall be maintained and retained to support the implementation and effective management of each stage of the overall manufacturing and / or inspection process - where appropriate. Record retention periods / storage and retrieval arrangements shall be in accordance with any regulatory or Rolls-Royce customer requirements applicable to documentation and data.. as referenced within SABRe - Control of Documents and Records. Records relating to the allocation of stamps, change in duties or status, shall be classified and retained as Category A records. Finally and please remember - blank sheets tell no tales - if a formal record is specified / required for specific operations (it is normally for a good and valid reason!) - so make sure it exists, or cause one to be created - prior to product release from your work station / company into Rolls-Royce.
SABRe Briefs & Guidance
SABRe Briefs & Guidance 2015 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationDocument 2007 Rev 0 December 2005 Page 1 of 8
Document 2007 Rev 0 December 2005 Page 1 of 8 1. Scope... 2 2. Definitions... 2 a. LabTest...2 b. Factory Location/ Manufacturer's Premises...2 c. Manufacturer...2 d. Subcontractor...2 e. f. Out-Worker...2
More informationTITLE: SQR-001 Supplier Quality Requirements
Page: Page 1 of 8 TITLE: SQR-001 Supplier Quality Requirements Page: Page 2 of 8 Contents REVISION HISTORY... 3 REFERENCED QUALITY DOCUMENTS... 3 DOCUMENT DETAILS... 3 1. PURPOSE OF DOCUMENT... 4 2. DOCUMENT
More informationSABRe Design & Development Process
SABRe Design & Development Process 2017 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose
More informationSupplier Quality Manual
Supplier Quality Manual Approvals: Quality Manager: Patrick Eckrich Date: 08/18/2017 Materials Manager: Dennis Okocha Date: 08/18/2017 Supplier Quality Manual Rev. _E_, Dated _August 18, 2017 Page 1 of
More informationAerospace MRO Supplier Quality Supplier Quality Assurance Requirements MRO1001. Rolls-Royce plc 2012 Page 1 of 7
Aerospace MRO Supplier Quality Supplier Quality Assurance Requirements MRO1001 Rolls-Royce plc 2012 Page 1 of 7 Table of contents 1 Purpose 2 2 SABRe Scope and Applicability 2 3 Definitions 2 4 Forms and
More informationGARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 2 Issue Date: 12/8/15 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0
More informationSABRe Design & Development Process
SABRe Design & Development Process 2016 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose
More informationProcurement Quality Assurance Requirements
1. REQUIREMENTS 1.1 Quality System This document provides the minimum Quality System Requirements to externally provided processes, products and services to Superior Thread Rolling (STR). Suppliers must
More informationDC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers
FACTORY INSPECTION PROCEDURES AND TESTS Requirements for Manufacturers Warszawa, February 1, 2012 CONTENTS Page No. FOREWORD 2 1 INTRODUCTION 2 2 DEFINITIONS 2 2.1 Factory Location/Manufacturer s Premises
More informationD.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY
Page 1 of 8 D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY REF: DPE/Q.C.P.9 Dated: 19/10/2010 Approved By: P Knight Title: Quality Manager Signed: Page
More informationSABRe Design & Development Process
SABRe Design & Development Process 2017 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose
More informationPPAP. Supplier Submission Preparation Guide. Production Product Approval Process. Version 1.0 April 2015
PPAP Production Product Approval Process Version 1.0 April 2015 upplier ubmission Preparation Guide upplier ubmission Preparation Guide This document Provides guidance on the Production Product Approval
More informationQuality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)
Quality Code Quality Clause Title Q-001 Flow Down Requirements Q-002 Quality System Q-003 Discrepancies Q-004 FOD Foreign Object Debris/Damage Program Q-005 ESD Electrostatic Discharge Control Program
More informationANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION
PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:
More informationSupplier Quality Assurance Requirements
1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality
More informationPURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions)
PURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions) Requirements 1-12 and 18 are applicable to all Mission Aerospace, Inc. purchase orders issued. Requirements 13-17 are applicable when specifically
More informationSABRe : Supplier Problem Resolution Process. Supplier Briefing Pack. Problem Improvement Request (PIR) Rolls-Royce plc The information in this
SABRe : Supplier Problem Resolution Process.. Problem Improvement Request (PIR). 2007 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated
More informationProduct Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A
5/8/2012 Page No. 1 of 32 Date Description Of Change Signature Rev. Level 5/8/2012 New Document Jeremy Wilson Procedure pproval: Company Title: Date: Quality Manager 5/8/2012 5/8/2012 Page No. 2 of 32
More informationEP-QC Supplier s General Requirements. Revision AH
Supplier s General Requirements Revision AH NOTE: Unless identified as DCC CONTROLLED, a printed copy of this document is considered REFERENCE ONLY and may not be the current revision in effect. The current
More informationQUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig
QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Status: Latest Revision Date Revision Orig Abstract: This document describes the tailored quality management system for the build
More information<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By
Conforms to ISO 9001:2015 Revision history Revision Date Record of Changes Approved By 0.0 [Date of Issue] Initial Issue Control of hardcopy versions The digital version of this document is
More information1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert
1.0 Purpose This document defines PECO-Astronics (PECO) purchased material flow-down requirements. Additional specifications may also apply and will be documented on the purchase order; all requirements
More informationExternal Providers Quality Requirements.
External Providers Quality Requirements. 1. General Requirements. 1.1 Introduction. This document establishes the quality assurance requirements for external providers of process, product and service pursuant
More informationCMI Guidance Document
CMI Guidance Document for Product Quality Plan Requirements Reference CMI-GD-PQP This document has been produced by the Administration Department of CertMark International (CMI). For technical information
More informationPercival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)
TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationSUPPLIER QUALITY MANUAL
IMT-SQM 1 OF 6 Rev: 11/10/10-01 INTRODUCTION In today s lean, just-in-time manufacturing environment, product found to be nonconforming can cause serious manufacturing disruptions. In our continuing efforts
More informationAEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard
More informationL3SN-OP-W Rev A SUPPLIER FIRST ARTICLE INSPECTION (STANDARD REQUIREMENT)
WORK INSTRUCTION WORK INSTRUCTION/REV. NO. L3SN-OP-W2001-67 Rev A TITLE: SUPPLIER FIRST ARTICLE INSPECTION (STANDARD REQUIREMENT) 1.0 SCOPE This document defines the tasks associated with First Article
More informationSupplier Quality Requirements
Page 1 of 5 PURPOSE: To define the basic quality requirements for the suppliers of materials and/or services to SelectTech GeoSpatial (SGAMF). Unless otherwise stated on specific purchase orders, drawings,
More informationSupplier Quality Requirements SQR-1.0 Rev. 3
Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.
More informationQuality Guideline for Suppliers. 1. Purpose
Quality Guideline for Suppliers 1. Purpose The Quality Guideline (QGL) of Aumann Beelen GmbH forms an integral part of the purchase orders and is thus binding for all Suppliers, hereinafter referred to
More informationProprietary Document Disclosure Restricted To Employees and Authorized Holders
Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1
More informationQP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE
Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products
More informationSHELTON INDUSTRIAL PATTERN INC.
Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System
More informationQUALITY ASSURANCE REQUIREMENTS
SPACE AT MUCKLENEUK CAMPUS PRETORIA QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS, PRETORIA Page 1 1.1 QUALITY ASSURANCE REQUIREMENTS In undertaking the works (including all incidental services
More informationProcedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept
ALTA Quality Requirements for Suppliers 25 Sept 2017 1 2 3.2. Purchase order information a- When Alta customer is indicated on the purchase order or related engineering documents, customer quality requirements
More informationPurchase Order Quality Requirement Clauses
Purchase Order Quality Requirement Clauses Section I: Administrative. 1. Scope. This document lists the quality purchase requirements (QPRs) that JEM Engineering uses in business agreements such as purchase
More informationMaster Air Parts, Inc Skyway Drive, Suite 303 Santa Maria, CA (805) Phone (805) Fax
(Please type or print) Supplier: Address: City: State: Zip: Telephone: Fax: Email: Website: Brief list of Parts, material, or services to be provided to Master Air Parts, Inc. Are you an FAA Certified
More informationPURCHASING QUALITY NOTES
0001 Documented approval scopes issued by VerTechs Enterprises, Inc. Quality are adhered to at all times. When issued, the supplier shall maintain these documents for reference when servicing VerTechs
More informationPPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: March 19, 2014 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
More informationSABRe. FAQs Supplier Handbook. SABRe FAQs - Supplier Handbook. Last updated: 27 June 2013
SABRe SABRe FAQs - Supplier Handbook Last updated: FAQs Supplier Handbook 27 June 2013 Rolls-Royce plc 2013 Page 1 of 18 1. Purpose The purpose of the SABRe FAQs Supplier Handbook is to provide suppliers
More informationALTA Precision Inc. Quality Procedure
ALTA Precision Inc. Quality Procedure Procedure QAP 7.4.2 Issue 7 Date September 28, 2015 Page 1 of 5 ALTA Quality Requirements for Suppliers Prepared and issued by Marc Dumouchel Approved by Sonia Alonso
More informationPRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100
N&P PRECISION MACHINE INC Quality Commitment Quality Management System Manual AS9100 This printed copy is uncontrolled Page 1 of 44 Revision B N&P Precision Machine, Inc. Quality Management System Manual
More informationSUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality
SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: Gear Technology 10671 Civic Center Drive Rancho Cucamonga, CA 91730 GENERAL INFORMATION Attn: Manager of Quality
More informationSupplier Quality Manual
Supplier Quality Manual 1 1. Introduction Scope Purpose Application Implementation 2. Purchasing Expectations Terms and Conditions Engineering / Technical Support Customer Support Resources Pricing Consistent
More informationAEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,
More informationNMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual
NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..
More informationAS9100 PMA and 14 CFR 21 QUALITY HANDBOOK
AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK Origination Date: XXXX Document Identifier: Date: Document Status: Document Link: Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if
More informationISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK
ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Quality Policies Handbook Latest Revision Date Orig Abstract: This quality
More informationSupplier Quality Clauses
Page: 1 of 9 Supplier 425 Strempel St. Seguin, TX 78155 Page: 2 of 9 1.0 PURPOSE 1.1 The purpose of this this Quality Clause Document is to specify requirements by which Quality/Production activities shall
More informationQuality Management System
Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material
More informationQUALITY REQUIREMENTS FOR SUPPLIERS
NMB-Minebea UK Ltd Phone: +44 (0)1522 500 933 Doddington Road, Lincoln, Fax: +44 (0)1522 500 975 Lincolnshire LN6 3RA United Kingdom URL: http://www.minebea.co.jp QUALITY REQUIREMENTS FOR SUPPLIERS LNQA0500
More informationQUALITY REQUIREMENTS FOR SUPPLIERS
Quality Requirements for Suppliers to DSG Air. Applicability: DSG Air Edition/Issue: II/5 Sponsor: Chief Executive Review: >April 2015< Stakeholders: DSG Air Procurement and Compliance Managers DSG Configuration
More informationReplaces: Not applicable.
Page 1/12 SCOPE - defines the quality requirements for purchasing materials, parts and services that may affect product quality of Airborne items. does not include requirements for design and development
More informationPurchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions
Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions Quality Requirements 1-9 are Mandatory on all Purchase Orders for products or services
More informationGENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS
GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:
More informationEP-QC Supplier s General Requirements. Revision AK
Supplier s General Requirements Revision AK NOTE: Unless identified as DCC CONTROLLED, a printed copy of this document is considered REFERENCE ONLY and may not be the current revision in effect. The current
More informationQUALITY REQUIREMENTS FOR SUPPLIERS
Rights of Intellectual Property This document is the property of ASE S.p.A and is delivered on the express condition that it is not to be disclosed, reproduced in whole or in part or used for manufacture
More informationSUPPLIER QUALITY ASSESSMENT
Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal
More informationQuality Systems Manual
Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management
More informationSupplier Quality Manual
Supplier Quality Manual Revision History Rev. Date Description of Change 1 9/23/16 New Release 2 6/7/17 Added to 9.2: Notify G&W immediately of any potential non-conforming product or any similar product
More informationSUPPLIER QUALITY REQUIREMENTS (SQR S)
SUPPLIER QUALITY REQUIREMENTS (SQR S) Q01 Q02 Q03 Q04 Q05 Q06 MANDATORY AMRO SOURCE INSPECTION When specified on individual Purchase Orders, AMRO Source Inspection shall be performed at supplier s facility
More informationSupplier Quality Manual
Supplier Quality Manual Revision History Rev. Date Description of Change 1 9/23/16 New Release 2 6/7/17 Added to 9.2: Notify G&W immediately of any potential non-conforming product or any similar product
More informationQUALITY POLICY MANUAL
C. L. HANN INDUSTRIES, INC. 1020 TIMOTHY DR. SAN JOSE CA 95133 QUALITY POLICY MANUAL Quality Policy Manual Rev. 1 8.18.97 MISSION STATEMENT C. L. Hann Industries, Inc. is designed to meet the precision
More informationQuality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA
7949 Silverton, Suite 924 San Diego, CA 92126 USA This document is approved for use Copy Holder Copy Holder: President Copy Number: 1 Scope: This Covers the activities and functions performed by operating
More informationSUPPLIER QUALITY PROGRAM Procurement Standard
SUPPLIER QUALITY PROGRAM Procurement Standard Revision: E Notice: This standard is subject to periodic review and may be revised at any time; users are cautioned to obtain the latest revision. 1.0 Purpose:
More informationQUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES
Your Company Name QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Policies and Procedures Latest Revision Date Abstract:
More informationSupplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing
Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company
More informationSupplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Bobby Gravison Quality Assurance Manager Accurus Tulsa Machining & Manufacturing 1 Record of Revisions Revision
More informationAS 9100 Rev C Quality Systems Manual AS-050C-QM
AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table
More informationSTANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS
1. GOVERNMENT/CUSTOMER SOURCE INSPECTION: a. Government/Customer inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government/Customer representative
More informationGKN Aerospace Advanced Composite Structure
1.0 PURPOSE To communicate GKN and/or customer specification requirements to the supplier based on all Group I and Group II purchase Orders. 2.0 SCOPE This procedure and the use of GKN Procurement Quality
More informationTo establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.
1.0 PURPOSE To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 2.0 APPLICATION When (QAM) Appendix 8.4 is specified on the purchase order,
More informationUNCONTROLLED IF PRINTED 2 of 13
Forward Revision History NR-L Various Remove Revision with over one year of information M: 05-09-16 Revised pages 9 and 10 to change Form Name to Supplier Evaluation for Limited Scopes ; Revised page 11
More informationRevision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C
1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100
More informationBYRON PRODUCTS QUALITY TERMS AND CONDITIONS
001 CERTIFICATION OF COMPLIANCE: All parts/processes supplied by the supplier must be certified as to their compliance with all purchase order requirements. The certification must contain, as a minimum:
More informationPRINTED COPY IS NOT CONTROLLED
Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0
More informationPMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016
PMA Quality Assurance Manual Date Aviation Technical Services, Inc. 3121 109 th Street SW Everett, WA 98204 425-423-3371 2600 West Casino Road Everett, WA 98204 10315 Airport Road Everett, WA 98204 www.atsmro.com
More informationThis guide is applicable to River Protection Project - Waste Treatment Plant (RPP-WTP) project suppliers and is intended for supplier use only.
1.0 Objective 2.0 Scope Provide guidance to those suppliers preparing and submitting quality verification documents to Bechtel National Inc. (BNI), when required by a Bechtel National Inc. (BNI) Purchase
More informationISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual
ISO 9001:2008 and AS9100 Rev. C Supplier Quality Manual ffective Date: Section I Supplier (same as xternal Provider) xpectations 1.0 Introduction 2 of 7 This Supplier Quality Manual (SQM) has been created
More informationAUNA Supplier Quality Manual
1 AUNA Supplier Quality Manual Page 1 of 9 2 1. Section I - Supplier Expectations 1.0 Introduction: This Supplier Quality Manual (SQM) has been created to assist our suppliers in understanding the purchasing
More informationTHE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS
PROCUREMENT QUALITY ASSURANCE CLAUSES PAGE 1 OF 9 THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS A. Each certification document and report required shall be in the English language and identified
More informationQUALITY SYSTEM MANUAL
QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing
More informationSupplier Quality Requirements Master List
Master List 1. Certificate Of Conformance: Certificate of Conformance must accompany each shipment. This certificate must include part numbers, standard / specification, latest applicable revision level
More informationQuality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen Aunkirchen / Vilshofen
Page 1 of the Quality Assurance Agreement between MonLog GmbH and Suppliers Quality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen 4 94474 Aunkirchen / Vilshofen The following Quality
More informationISO 9001:2015. Quality Management System. Manual
ISO 9001:2015 Quality Management System Manual Introduction Company has made the Strategic Business Decision to develop and implement an effective Quality Management Systems (QMS) across all areas of the
More informationTÜV SÜD BABT Production Quality Certification Scheme
TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT
More informationSpecial Purchase Order Clauses
SC-1 Quality System: The Supplier shall have a quality management system that conforms to: a) SAE AS9100 Quality Management Systems Aerospace Requirements b) SAE AS9110 Quality Management Systems Aerospace
More informationPurchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015
Clause A - Quality System Requirements All references to the term Government in any of the documents referenced below shall be replaced with the term Curtiss-Wright and/or the Government. All references
More informationTrident Precision Manufacturing
Trident Precision Manufacturing QASQC Rev. A 6/7/06 Title: Supplier Quality Clauses Author: April V. Lusk Director of Quality General Suppliers are responsible for compliance to all stated Quality Clauses
More informationOsprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -
February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February
More informationRequirements for Suppliers
1.0 INTRODUCTION This document establishes requirements designed to ensure Park Engineering & Manufacturing Inc. (PEM) suppliers produce product that meets PEM s quality expectations and terms. Only suppliers
More informationVendor Qualification Survey
1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service
More informationTUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME
TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME Copyright TUV SUD BABT 2017 A Certification Body of: Page 1 of 33 Contents AMENDMENT RECORD 3 0. INTRODUCTION 3 1. PRE-CONDITIONS TO SUPPORT PRODUCTION
More informationSatellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6
TERMS & CONDITIONS Page 1 of 6 1.0 PURPOSE 1.1 Satellite Aerospace, Inc. Quality Requirements to Subtier Sources. 2.0 SCOPE 2.1 This document applies to all purchasing and sales personnel responsible for
More information