Scott Avenue Bridge Rehabilitation Scott Avenue over Des Moines River

Size: px
Start display at page:

Download "Scott Avenue Bridge Rehabilitation Scott Avenue over Des Moines River"

Transcription

1 Scott Avenue Bridge Rehabilitation Scott Avenue over Des Moines River

2 Previous UDR Meetings: - January 24, 2017: General overview of TIGER Grant Projects - May 16, 2017: Preliminary review of all 4 bridge projects (Scott Ave., SW 1 st., Court Ave., Locust St. General comments received from May 16 th UDR Board meeting: - In general, didn t like the sidewalk railing proposed (galvanized round tube w/ vertical spickets). New rail should be more rectilinear design. - Would like to consider the existing aluminum railing be re-used along the sidewalk. - Look at original photos of bridge to take design cues for new railing - Railing(s) and MidAm LED street lighting should be black in color. - Work with Parks to provide more defined bike lane on west side. Responses to comments received: - Replacement street lights will be black poles/fixtures (LED) provided by MidAmerican Electric. - Original railing on the bridge was an ornamental balustrade railing, which was removed in 1981 when the bridge was widened. Replacing with ornamental balustrade railing is not in original scope/budget with this rehabilitation. - The City is currently working on a Transportation Master Plan and Connect Downtown that will determine lane configuration and bike lanes. Project will respond to those efforts if they are in place prior to striping, otherwise existing configuration will be replaced. - For the railing, several options were looked at. See further discussion.

3 Existing concrete intermediate posts are to remain. Two Main Options with Sidewalk Railing Re-use existing aluminum railing Replace railing with new railing Additional consideration is a handrail needs to be installed on the bridge barrier rail to meet current standard height requirements.

4 Option 1 Re-use existing aluminum railing: --Not being recommended New aluminum handrail. ~$175,000 Re-use existing aluminum rail. ~$50,000 Challenges: - Sidewalk rail posts are cored/grouted into sidewalk which causes constructability issues: To perform sidewalk repairs and concrete overlay, rail posts will need to be cut off at the sidewalk elevation to avoid damage. To re-mount the existing railing, new aluminum base plates will need to be fabricated and welded to existing railing to be mounted to sidewalk surface. - Aluminum railing would contrast against new black LED light pole fixtures. - Higher costs, total estimated at $225, Aluminum is an expensive material and railing (including handrail) is more difficult and costly to repair. Advantages: - Keeps rectilinear design and preserves existing feel of the bridge. - Rail type would be same experience for anglers fishing off of bridge.

5 Option 2 Install new railing: - Engineering Dept. recommendation. Black tubular ornamental railing, pre-manufactured. ~$50,000 Black tubular ornamental railing, pre-manufactured. ~$75,000 Challenges: - Would be a different look than existing. - Possibly not as durable as aluminum, from a corrosion standpoint. Advantages: - Keeps rectilinear design. - Pre-manufactured rail is galvanized steel, and receives factory powder coating, generally with a 15 yr warranty. - Black color will match new black street LED light poles/fixtures. - Pre-manufactured rail could have 2 top rails, or just 1 top rail, to keep similar to existing geometry (more options). - Panel construction allows for easy replacement of panels, if damaged. - Costs are more favorable to other option, currently estimated at $125, No known problems with similar rails on other bridges (Fleur Dr., 6 th Avenue, Grand Walnut Cr).

6 Handrail members would be altered to square tube to blend better with sidewalk railing. Example photo: Location Fleur Drive, just south of Gray s Lake Rail system is available as a single top rail, or as double top rail as shown in the picture.

7 Road View (looking Northeast) 49-0 roadway with one 8-0 sidewalk on bridge Painted for one lane (each direction) and parking on downstream side of bridge One bike lane across bridge Roadway striping can be adjusted if changes needed (Transportation Master Plan) Roadway lighting to be upgraded to LED lighting (black fixtures and poles)

City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River

City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River 5525 Merle Hay Road Suite 200 Johnston, IA 50131 Main 515.278.2913 + Fax 515.278.1846 H R G R E E N. C O M City of Des Moines Activity ID: 01-2015-008 Bridge Rehabilitation: Court Avenue over the Des Moines

More information

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of

More information

UC Denver Guidelines and Design Standards SECTION STRUCTURAL METAL FRAMING

UC Denver Guidelines and Design Standards SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 - GENERAL A. This section provides general information standards. PART 2 - PRODUCTS A. Metal Studs- Structural: 1. 18 gauge and heavier units will fabricated

More information

SECTION DECORATIVE METAL RAILINGS

SECTION DECORATIVE METAL RAILINGS SECTION 05 73 00 DECORATIVE METAL RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Vertical Stainless Steel Cable Railing System. B. Horizontal Stainless Steel Cable Railing System. 1.2 RELATED SECTIONS

More information

AESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE

AESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE Over the Raritan River, New Jersey 29 AESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE After 62 years of service without a major reconstruction,

More information

Trex Commercial Products page Metal Railing

Trex Commercial Products page Metal Railing SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post Rail (Glass). D. Tensiline Railings (Cable). E. Track Rail (Glass).

More information

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES Display hidden notes to specifier. (Don't know how? Click Here) A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY

More information

SECTION ORNAMENTAL ALUMINUM RAILINGS PART 1 - GENERAL 1.01 SUMMARY

SECTION ORNAMENTAL ALUMINUM RAILINGS PART 1 - GENERAL 1.01 SUMMARY 3-PART SPEC ORNAMENTAL ALUMINUM RAILINGS PART 1 - GENERAL 1.01 SUMMARY SECTION 05720 A. Section Includes: a. Solutions aluminum extruded shape top rail, square or round balustrade & rectangular bottom

More information

Passive Bollards Fixed and removable systems for simple, effective security

Passive Bollards Fixed and removable systems for simple, effective security Passive Bollards Fixed and removable systems for simple, effective security Ross fixed and removable bollards are the ideal solution for perimeter protection of buildings, equipment and walkways. They

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES Display hidden notes to specifier. (Don't know how? Click Here) A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Invisirail

More information

INDUSTRIAL GUARDRAIL SYSTEMS

INDUSTRIAL GUARDRAIL SYSTEMS INDUSTRIAL GUARDRAIL SYSTEMS STRONGEST GUARDRAIL ON THE MARKET MANUFACTURED IN THE U.S.A. BEST PRICES MOST VARIETIES HEAVY DUTY ONE-LINE OR TWO-LINE Posts: 4 Sched 80 pipe Rail: 6 Sched 40 pipe Sleeved

More information

SCCRTC- MP San Lorenzo River Bridge Walkway Widening Feasibility Report

SCCRTC- MP San Lorenzo River Bridge Walkway Widening Feasibility Report SCCRTC- MP 19.43 San Lorenzo River Bridge Walkway Widening Feasibility Report May 19, 2016 INTRODUCTION Jacobs Engineering Group was selected to provide a feasibility report for the Santa Cruz County Regional

More information

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION SECTION 1101 SIGNALS AND APPURTENANCES PART 1 GENERAL 1.4 SUBMITTALS E. Submit warranty for all supplied material and workmanship for a period of two years from final acceptance. The warranty must state

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

SPECRAIL. Aluminum Handrail and Accessibility Systems. The New Standard Of Quality. Featuring Styles AVON, BRIDGEPORT, BELLAIRE and CANTON INFILL

SPECRAIL. Aluminum Handrail and Accessibility Systems. The New Standard Of Quality. Featuring Styles AVON, BRIDGEPORT, BELLAIRE and CANTON INFILL Aluminum Handrail and Accessibility Systems Featuring Styles AVON, BRIDGEPORT, BELLAIRE and CANTON INFILL STRONG/DURABLE DESIGN FLEXIBILITY MAINTENANCE FREE EASY INSTALLATION Welcome to America's trusted

More information

LAPEYRE STAIR PRODUCT LINE

LAPEYRE STAIR PRODUCT LINE LAPEYRE STAIR PRODUCT LINE Continuously Elevating Standards lapeyrestair.com Leave the stairs to the experts Lapeyre Stair provides a complete outsource solution for stairs with in-house resouces and over

More information

STREET LIGHTING GENERAL INFORMATION

STREET LIGHTING GENERAL INFORMATION SECTION 1102 STREET LIGHTING GENERAL INFORMATION These specifications are for street lighting that is to be dedicated to the public and maintained by the City of Meridian. Such installations require a

More information

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes.

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes. SECTION 05 73 16 {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes. PART 1 GENERAL 1.1 SUMMARY A. Section includes cable railing system, with architectural metal

More information

SECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS

SECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS SECTION 05720 ARCHITECTURAL GLASS HANDRAIL AND RAILINGS PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and install [aluminum] railings and components. 1.02 REFERENCE A. American Architectural Manufacturers

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS

More information

Red Wing Bridge Alternates

Red Wing Bridge Alternates Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for

More information

Made in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes

Made in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes Submittal Sheet Materials: 1. 5 Schedule 40 Steel Pipe (1.90 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available. Powder Coat Our powder coat finish assures a high level

More information

DIVISION 2 - SITE WORK

DIVISION 2 - SITE WORK Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK Conditions of Use/ Responsibility of Data These guideline specifications are to be used by the A/E as a base document in the development

More information

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system. PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960

More information

Technical Seminar Mike O Connor

Technical Seminar Mike O Connor Technical Seminar Mike O Connor Columbus Marriot Northwest March 28, 2014 DOT 49 CFR 192.353 Meter Protection & Location Current Designs & Standards by Current Gas Provider Steel Bollards Bolt Down Bollards

More information

SECTION AWNINGS

SECTION AWNINGS SECTION 10 73 13 AWNINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Fixed metal awnings. 1.2 DEFINITIONS A. Awning: An architectural projection that provides weather protection,

More information

Made in U.S.A. Sunrise Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks:

Made in U.S.A. Sunrise Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: Submittal Sheet Materials: 1.5 Schedule 40 Steel Pipe (1.9 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available Powder Coat Our powder coat finish assures a high level

More information

SECTION CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

A. Atlantic Railing Series with Mushroom Top and Square Pickets

A. Atlantic Railing Series with Mushroom Top and Square Pickets 100 Series-A1-A10 PART 1 General 1.1 SECTION INCLUDES A. Atlantic Railing Series with Mushroom Top and Square Pickets 1.2 RELATED SECTIONS A. Section 05510-Metal Stairs: Metal Handrails other than those

More information

Tandem subtly articulates the entry to the building. We were very pleased with the result.

Tandem subtly articulates the entry to the building. We were very pleased with the result. Tandem subtly articulates the entry to the building. We were very pleased with the result. RACHEL PETRO RNL Lighting designer TANDEM National Renewable Energy Labs Golden, Colorado Architeture by RNL 24

More information

Engineering Surveys and Services Consulting Engineers, Scientists, and Land Surveyors Analytical and Materials Laboratories

Engineering Surveys and Services Consulting Engineers, Scientists, and Land Surveyors Analytical and Materials Laboratories Engineering Surveys and Services Consulting Engineers, Scientists, and Land Surveyors Analytical and Materials Laboratories 1113 Fay Street Columbia, Missouri 65201 Telephone 573-449-2646 Facsimile 573-499-1499

More information

ATI Evaluation Service A Division of Architectural Testing Certification Services

ATI Evaluation Service A Division of Architectural Testing Certification Services ATI Evaluation Service A Division of Architectural Testing Certification Services Subject to Renewal: 05/16/2016 Issued: 06/29/2015 Visit www.ati-es.com for current status Page 1 of 9 CPG Building Products

More information

540 20th Avenue, Lachine, Qc, H8S 3T1 T TF MEZZANINE

540 20th Avenue, Lachine, Qc, H8S 3T1 T TF MEZZANINE 540 20th Avenue, Lachine, Qc, H8S 3T1 T 514.634.7292 TF 800.361.2242 Info@federalsteel.ca www.federalsteel.ca MEZZANINE 03 What s your challenge? Table of Content 04 05 06 Design load Bracing Floor options

More information

Dyckman Avenue over Black River: A Movable Bridge Rehabilitation. South Haven, Michigan

Dyckman Avenue over Black River: A Movable Bridge Rehabilitation. South Haven, Michigan Dyckman Avenue over Black River: A Movable Bridge Rehabilitation South Haven, Michigan 1 Summary of Presentation Project Location History Condition Assessment Funding Design Construction Acknowledgements

More information

Baseline Document Change Announcement

Baseline Document Change Announcement BDC16D-01 Page 1 of 7 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANNOUNCEMENT: BDC16D-01 DATE: September

More information

Code Compliance Research Report CCRR-0238

Code Compliance Research Report CCRR-0238 Code Compliance Research Report CCRR-0238 Issue Date: 11-09-2016 Revision Date: 11-29-2018 Renewal Date: 11-09-2019 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC

More information

SPECIFICATIONS: Architectural Aluminum Railings

SPECIFICATIONS: Architectural Aluminum Railings PART ONE: GENERAL 1.1 SUMMARY SPECIFICATIONS: Architectural Aluminum Railings A. Work in this section includes custom and standard Interior and Exterior aluminum railings and guardrails. 1.2 PERFORMANCE

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

ATI Evaluation Service A Division of Architectural Testing Certification Services

ATI Evaluation Service A Division of Architectural Testing Certification Services ATI Evaluation Service A Division of Architectural Testing Certification Services PCA-125 Subject to Renewal: 05/16/2018 Issued: 05/24/2017 Visit www.ati-es.com for current status Page 1 of 9 CPG Building

More information

SECTION PERFORATED METAL. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION PERFORATED METAL. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 05735 PERFORATED METAL Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Architectural metal. B. Decorative metal. C. Perforated ceiling panels.

More information

PRODUCT INFORMATION Dero Rolling Racks

PRODUCT INFORMATION Dero Rolling Racks PRODUCT INFORMATION Dero Rolling Racks 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com R O L L I N G R A C K The graceful

More information

Aluminum Perforated Rolling Door

Aluminum Perforated Rolling Door Model ALUMA-VISION Perforated Curved or Flat Slats Rolling Service Door NOTE: For specifications, architects must choose from a variety of options. The standard choice will be shown first in plain text

More information

GENERAL FLOOR PLAN NOTES. REFER TO ADDITIONAL NOTES AND REQUIREMENTS ON ALL OTHER DOCUMENTS AND OTHER DISCIPLINES DOCUMENTS. A A.3 4' - 0" 5' - " B. ALL SITE INFO, FURNITURE, FIXTURES AND EQUIPMENT SHOWN

More information

Bermuda Bay Club Condominiums th Ave South St Petersburg, Florida 33711

Bermuda Bay Club Condominiums th Ave South St Petersburg, Florida 33711 Bermuda Bay Club Condominiums 4201 38 th Ave South St Petersburg, Florida 33711 Condition Survey Report of: Common Exterior Stairs and Railings Project Consultant: KWA Engineers, LLC Certificate of Authorization

More information

FRAMED GLASS BALUSTRADES

FRAMED GLASS BALUSTRADES CONTENTS 1. Product Introduction 2. General Notes 3. Connection Type 1 Timber Side Fix (Coach Screws) 4. Connection Type 2 Bolt Side-Fix 5. Connection Type 3 Timber Top-Fix 6. Connection Type 4 Timber

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

SECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS 3-Line Glass Rail Railing Spec

SECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS 3-Line Glass Rail Railing Spec SECTION 05720 ARCHITECTURAL GLASS HANDRAIL AND RAILINGS 3-Line Glass Rail Railing Spec PART 1 - GENERAL 1.01 WORK INCLUDED A. Furnish and install [aluminum] railings and components. 1.02 REFERENCE A. American

More information

SMALL CELL DESIGN GUIDELINES

SMALL CELL DESIGN GUIDELINES Section 1: Collocations on Existing Wireless Support Structures (Type I and II Requests) 1.1 Collocations Encouraged. The collocation of wireless facilities on existing support structures engineered to

More information

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY 08625-0600 BRIDGE RE-EVALUATION SURVEY REPORT STRUCTURE NO. 3XXX-XXX ROUTE I-287 SB OVER

More information

RESULT FOR PUBLIC BID RM INSTALLATION & REPAIR OF FENCING & RELATED ITEMS

RESULT FOR PUBLIC BID RM INSTALLATION & REPAIR OF FENCING & RELATED ITEMS RESULT FOR PUBLIC BID RM-110112 INSTALLATION & REPAIR FENCING & RELATED ITEMS ITEM QTY 1 250 LINEAR FENCE, CHAIN, LINK, COMPLETE, INSTALL, 4' HIGH ALUMINUM COATED PER $15.00 $3,750.00 2 250 LINEAR FENCE,

More information

SPECIFICATIONS. Section Ornamental Fences and Gates

SPECIFICATIONS. Section Ornamental Fences and Gates SPECIFICATIONS Section 02825 - Ornamental Fences and Gates Spec-Data Sheet 1. PRODUCT NAME Ultra Aluminum Industrial Picket Fence 2. MANUFACTURER Ultra Aluminum Mfg., Inc 2124 Grand Commerce Drive Howell,

More information

SECTION 2 DIVISION 05 METALS

SECTION 2 DIVISION 05 METALS SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:

More information

Dexco Structural I-Beam Coil Racks Highly accessible, form fitting storage solutions for large coils and spools

Dexco Structural I-Beam Coil Racks Highly accessible, form fitting storage solutions for large coils and spools Dexco Structural I-Beam Coil Racks Highly accessible, form fitting storage solutions for large coils and spools Safely storing and accessing metal coils can pose a real challenge. Ross engineers and manufactures

More information

Work Order Number *************************************************************************** SECTION C20 STAIRS 02/18

Work Order Number *************************************************************************** SECTION C20 STAIRS 02/18 NAVFAC PTS-C20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-C20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION C20 STAIRS 02/18 NOTE: This section

More information

MERRIMAC Homeowner s Association Architectural Control Committee Guidelines

MERRIMAC Homeowner s Association Architectural Control Committee Guidelines MERRIMAC Homeowner s Association Architectural Control Committee Guidelines The Merrimac Architectural Control Committee (the Committee) has been established pursuant to the Merrimac Declaration of Covenants,

More information

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 [ ].

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 [ ]. National Master Specification (NMS) Section 05 50 00 METAL FABRICATIONS Publisher: Spex.ca Page 1 Approved: 2010-06-30 Part 1 General 1.1 RELATED REQUIREMENTS.1 [ ]. 1.2 REFERENCES.1 CSA International.1

More information

Product Guide Specification

Product Guide Specification Digger Specialties, Inc. May 2012 PO Box 241 Bremen, Indiana 46506 Toll Free (800) 446-7659 Phone (574) 546-5999 Fax (574) 546-5099 Web Site www.diggerspecialties.com E-mail info@diggerspecialties.com

More information

Made in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1.

Made in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1. Submittal Sheet Materials: 1.5 Schedule 40 Steel Pipe (1.9 OD) Finishes: Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sanded down 2. Washed

More information

2012 PAVEMENT CONDITIONS & SCENARIOS

2012 PAVEMENT CONDITIONS & SCENARIOS TRANSPORTATION ASSET MANAGEMENT 2012 PAVEMENT CONDITIONS & SCENARIOS The Village of Burton Village of Burton Transportation & Environmental Planning for the Counties of Cuyahoga, Geauga, Lake, Lorain,

More information

Durable, long-lasting fiberglass trash gates and enclosures are the superior choice for screening waste disposal and other unsightly areas.

Durable, long-lasting fiberglass trash gates and enclosures are the superior choice for screening waste disposal and other unsightly areas. Durable, long-lasting fiberglass trash gates and enclosures are the superior choice for screening waste disposal and other unsightly areas. Durable fiberglass gates can be used to screen waste disposal

More information

Modular Simplicity Dero

Modular Simplicity Dero B I K E H AV E N Modular Simplicity The Bike Haven bridges the gap between short and long term bike parking. The simple, modular canopy design makes it easy to create the bike shelter that fits your needs.

More information

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

MASTERSPEC - SHORT FORM. B. See Division 5 Section Metal Stairs for steel tube railings associated with metal stairs. SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated

More information

Code Compliance Research Report CCRR-0238

Code Compliance Research Report CCRR-0238 Code Compliance Research Report CCRR-0238 Issued: 11-09-2016 Renewal Due: 11-09-2018 Revised: 11-10-2017 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC 894 Prairie

More information

MATERIAL SPECIFICATION FOR STEEL POLES, BASE MOUNTED

MATERIAL SPECIFICATION FOR STEEL POLES, BASE MOUNTED ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 2423 APRIL 2017 MATERIAL SPECIFICATION FOR STEEL POLES, BASE MOUNTED TABLE OF CONTENTS 2423.01 SCOPE 2423.02 REFERENCES 2423.03 DEFINITIONS -

More information

Toll-Free

Toll-Free Primary applications for Ross HOP and OPD Series Security Doors and Frames include government, industrial, commercial and residential properties where protection of people and property is of utmost concern

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation District 6 400 E. William Street Delaware, Ohio 43015 (740) 833-8000 8000 John R. Kasich, Governor Jerry Wray, Director Jack R. Marchbanks, District Deputy Director August

More information

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014 Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size

More information

Dexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass

Dexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass Dexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass Dexco Cantilever Rack Systems offer the strength, durability and layout to store

More information

SECTION ORNAMENTAL ALUMINUM FENCING

SECTION ORNAMENTAL ALUMINUM FENCING SECTION 032300 ORNAMENTAL ALUMINUM FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

SECTION STRUCTURE MOUNT RAILING SYSTEM

SECTION STRUCTURE MOUNT RAILING SYSTEM SECTION 05520 STRUCTURE MOUNT RAILING SYSTEM Peak Fall Protection specializes in the design, engineering, fabrication, installation, and certification of fall protection safety systems. Our team of safety

More information

Faced with the prospect of

Faced with the prospect of RE-DECKING the M. Harvey Taylor Bridge Innovative Deck System Design Will Keep Traffic Flowing Roger B. Stanley, P.E., M.S.C.E. Fig. 1: Downstream elevation viewed looking eastward towards Harrisburg.

More information

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine

More information

RapiDeck TM Composite Equipment Platform

RapiDeck TM Composite Equipment Platform RapiDeck TM Composite Equipment Platform Installs in Hours Light Weight Low Installation Cost Highly Slip Resistant Corrosion Resistant Non-Conductive High Performance Composite Solutions RapiDeck TM -

More information

Beyond Elegance SERIES OF FINE VINYL & STEEL CARRIAGE DOORS

Beyond Elegance SERIES OF FINE VINYL & STEEL CARRIAGE DOORS Beyond Elegance D uet SERIES OF FINE VINYL & STEEL CARRIAGE DOORS DUET SERIES COLLECTIONS The Series brings together low maintenance materials, innovative construction techniques and fine detailing. Crafted

More information

TRACK RAIL. Base Shoe Railing System

TRACK RAIL. Base Shoe Railing System TRACK RAIL Base Shoe Railing System The Track Rail base shoe glass railing system is designed and constructed using laminated or fully tempered glass. Our glass railing system can be mounted as an independent

More information

ENGINEERING DEPARTMENT

ENGINEERING DEPARTMENT ENGINEERING DEPARTMENT Additional information about the Engineering Department may be obtained by calling Tim Bailey, P.E., Director of Engineering, at (919) 469-4030, through email at tim.bailey@townofcary.org

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

Safety Railing Solutions

Safety Railing Solutions providing safety solutions worldwide Safety Railing Solutions 2009 Solutions to your railing problems simple to design and specify unrivaled technical support world wide availability honoree CSI 05520

More information

Keep workers and products out of harms way. STRUCTURAL GUARDS

Keep workers and products out of harms way. STRUCTURAL GUARDS Keep workers and products out of harms way. STRUCTURAL GUARDS 2 Prevent costly accidents with Anderson s structural guards. Anywhere in your building that there is moving equipment, forklifts or people,

More information

Product Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS

Product Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS Product Guide Specification DIVISION 107300 SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS PART 1 - GENERAL [reference CSI 2004 MasterFormat Division 10 (Specialties Manufacturers) category 7300 (Protective

More information

TRANSPORT LINK CHAIN LINK CANTILEVER GATES

TRANSPORT LINK CHAIN LINK CANTILEVER GATES TRANSPORT II TRANSPORT ESTATE TRANSPORT IS ADAPTRACK CHAIN LINK CANTILEVER GATES 2"sq x.25" UPRIGHTS & DIAGONAL BRACES GATE TRACKS PRE-DRILLED FOR LEFT OR RIGHT OPENINGS ***GATE FABRIC MESH & BARBED WIRE

More information

NEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1

NEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1 MTA RR APPARATUS NEW ILLUMINATED LED SIGNAGE LIGHTWEIGHT REMOVABLE ALUMINUM PANEL FENCE 88 NORTH AVE CDR JOB NO. 60 NORTH AVE NORTH AVE CURRENT VIEW OF 88 NORTH AVENUE PROPOSED FACADE AT 88 NORTH AVENUE

More information

Model # 5803SM. 6/15/2018 Page 1 of 5

Model # 5803SM. 6/15/2018 Page 1 of 5 Model # 5803SM 6/15/2018 Page 1 of 5 6/15/2018 Page 2 of 5 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

CANYON RIDGE. collection PORTFOLIO LINE 5-LAYER CONSTRUCTION

CANYON RIDGE. collection PORTFOLIO LINE 5-LAYER CONSTRUCTION PORTFOLIO LINE CANYON RIDGE collection 5-LAYER CONSTRUCTION Design 36 shown in Walnut with Optional Olde Door Pull Handles, Mediterranean Strap Hinges and Fleur de Lis Step Plate. (Model CAN236PC) c l

More information

Fontanot: quality profile

Fontanot: quality profile For all technical info Fontanot: quality profile [ENVIROMENTALLY AWARE] MINIMUM IMPACT OF ITS MANUFACTURNIG ACTIVITY AND ENVIRONMENTALLY FRIENDLY [RESISTANT TO WEAR] INNOVATION AND MATERIAL RESEARCH FOR

More information

ATI Evaluation Service A Division of Architectural Testing Certification Services

ATI Evaluation Service A Division of Architectural Testing Certification Services ATI Evaluation Service A Division of Architectural Testing Certification Services PCA-125 Subject to Renewal: 02/21/2018 Issued: 02/28/2017 Visit www.ati-es.com for current status Page 1 of 7 Trex Company,

More information