1 Scott Avenue Bridge Rehabilitation Scott Avenue over Des Moines River
2 Previous UDR Meetings: - January 24, 2017: General overview of TIGER Grant Projects - May 16, 2017: Preliminary review of all 4 bridge projects (Scott Ave., SW 1 st., Court Ave., Locust St. General comments received from May 16 th UDR Board meeting: - In general, didn t like the sidewalk railing proposed (galvanized round tube w/ vertical spickets). New rail should be more rectilinear design. - Would like to consider the existing aluminum railing be re-used along the sidewalk. - Look at original photos of bridge to take design cues for new railing - Railing(s) and MidAm LED street lighting should be black in color. - Work with Parks to provide more defined bike lane on west side. Responses to comments received: - Replacement street lights will be black poles/fixtures (LED) provided by MidAmerican Electric. - Original railing on the bridge was an ornamental balustrade railing, which was removed in 1981 when the bridge was widened. Replacing with ornamental balustrade railing is not in original scope/budget with this rehabilitation. - The City is currently working on a Transportation Master Plan and Connect Downtown that will determine lane configuration and bike lanes. Project will respond to those efforts if they are in place prior to striping, otherwise existing configuration will be replaced. - For the railing, several options were looked at. See further discussion.
3 Existing concrete intermediate posts are to remain. Two Main Options with Sidewalk Railing Re-use existing aluminum railing Replace railing with new railing Additional consideration is a handrail needs to be installed on the bridge barrier rail to meet current standard height requirements.
4 Option 1 Re-use existing aluminum railing: --Not being recommended New aluminum handrail. ~$175,000 Re-use existing aluminum rail. ~$50,000 Challenges: - Sidewalk rail posts are cored/grouted into sidewalk which causes constructability issues: To perform sidewalk repairs and concrete overlay, rail posts will need to be cut off at the sidewalk elevation to avoid damage. To re-mount the existing railing, new aluminum base plates will need to be fabricated and welded to existing railing to be mounted to sidewalk surface. - Aluminum railing would contrast against new black LED light pole fixtures. - Higher costs, total estimated at $225, Aluminum is an expensive material and railing (including handrail) is more difficult and costly to repair. Advantages: - Keeps rectilinear design and preserves existing feel of the bridge. - Rail type would be same experience for anglers fishing off of bridge.
5 Option 2 Install new railing: - Engineering Dept. recommendation. Black tubular ornamental railing, pre-manufactured. ~$50,000 Black tubular ornamental railing, pre-manufactured. ~$75,000 Challenges: - Would be a different look than existing. - Possibly not as durable as aluminum, from a corrosion standpoint. Advantages: - Keeps rectilinear design. - Pre-manufactured rail is galvanized steel, and receives factory powder coating, generally with a 15 yr warranty. - Black color will match new black street LED light poles/fixtures. - Pre-manufactured rail could have 2 top rails, or just 1 top rail, to keep similar to existing geometry (more options). - Panel construction allows for easy replacement of panels, if damaged. - Costs are more favorable to other option, currently estimated at $125, No known problems with similar rails on other bridges (Fleur Dr., 6 th Avenue, Grand Walnut Cr).
6 Handrail members would be altered to square tube to blend better with sidewalk railing. Example photo: Location Fleur Drive, just south of Gray s Lake Rail system is available as a single top rail, or as double top rail as shown in the picture.
7 Road View (looking Northeast) 49-0 roadway with one 8-0 sidewalk on bridge Painted for one lane (each direction) and parking on downstream side of bridge One bike lane across bridge Roadway striping can be adjusted if changes needed (Transportation Master Plan) Roadway lighting to be upgraded to LED lighting (black fixtures and poles)
City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River
5525 Merle Hay Road Suite 200 Johnston, IA 50131 Main 515.278.2913 + Fax 515.278.1846 H R G R E E N. C O M City of Des Moines Activity ID: 01-2015-008 Bridge Rehabilitation: Court Avenue over the Des Moines
More informationPIP STF05520 Details for Pipe Railing for Walking and Working Surfaces
TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationPIP STF05521 Details for Angle Railings for Walking and Working Surfaces
TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of
More informationUC Denver Guidelines and Design Standards SECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 - GENERAL A. This section provides general information standards. PART 2 - PRODUCTS A. Metal Studs- Structural: 1. 18 gauge and heavier units will fabricated
More informationSECTION DECORATIVE METAL RAILINGS
SECTION 05 73 00 DECORATIVE METAL RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Vertical Stainless Steel Cable Railing System. B. Horizontal Stainless Steel Cable Railing System. 1.2 RELATED SECTIONS
More informationAESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE
Over the Raritan River, New Jersey 29 AESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE After 62 years of service without a major reconstruction,
More informationTrex Commercial Products page Metal Railing
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post Rail (Glass). D. Tensiline Railings (Cable). E. Track Rail (Glass).
More informationSECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES Display hidden notes to specifier. (Don't know how? Click Here) A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post
More informationREHABILITATION PACKAGE 4-a
4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:
More informationAMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY
More informationSECTION ORNAMENTAL ALUMINUM RAILINGS PART 1 - GENERAL 1.01 SUMMARY
3-PART SPEC ORNAMENTAL ALUMINUM RAILINGS PART 1 - GENERAL 1.01 SUMMARY SECTION 05720 A. Section Includes: a. Solutions aluminum extruded shape top rail, square or round balustrade & rectangular bottom
More informationPassive Bollards Fixed and removable systems for simple, effective security
Passive Bollards Fixed and removable systems for simple, effective security Ross fixed and removable bollards are the ideal solution for perimeter protection of buildings, equipment and walkways. They
More informationCONCRETE STEPS, HANDRAILS, AND SAFETY RAIL
CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing
More informationCONCRETE STEPS, HANDRAILS, AND SAFETY RAIL
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES
More informationChapter 4 Bridge Program Drawings
Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles
More informationSECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES Display hidden notes to specifier. (Don't know how? Click Here) A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Invisirail
More informationINDUSTRIAL GUARDRAIL SYSTEMS
INDUSTRIAL GUARDRAIL SYSTEMS STRONGEST GUARDRAIL ON THE MARKET MANUFACTURED IN THE U.S.A. BEST PRICES MOST VARIETIES HEAVY DUTY ONE-LINE OR TWO-LINE Posts: 4 Sched 80 pipe Rail: 6 Sched 40 pipe Sleeved
More informationSCCRTC- MP San Lorenzo River Bridge Walkway Widening Feasibility Report
SCCRTC- MP 19.43 San Lorenzo River Bridge Walkway Widening Feasibility Report May 19, 2016 INTRODUCTION Jacobs Engineering Group was selected to provide a feasibility report for the Santa Cruz County Regional
More informationSECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION
SECTION 1101 SIGNALS AND APPURTENANCES PART 1 GENERAL 1.4 SUBMITTALS E. Submit warranty for all supplied material and workmanship for a period of two years from final acceptance. The warranty must state
More informationWELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017
WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry
More informationSPECRAIL. Aluminum Handrail and Accessibility Systems. The New Standard Of Quality. Featuring Styles AVON, BRIDGEPORT, BELLAIRE and CANTON INFILL
Aluminum Handrail and Accessibility Systems Featuring Styles AVON, BRIDGEPORT, BELLAIRE and CANTON INFILL STRONG/DURABLE DESIGN FLEXIBILITY MAINTENANCE FREE EASY INSTALLATION Welcome to America's trusted
More informationLAPEYRE STAIR PRODUCT LINE
LAPEYRE STAIR PRODUCT LINE Continuously Elevating Standards lapeyrestair.com Leave the stairs to the experts Lapeyre Stair provides a complete outsource solution for stairs with in-house resouces and over
More informationSTREET LIGHTING GENERAL INFORMATION
SECTION 1102 STREET LIGHTING GENERAL INFORMATION These specifications are for street lighting that is to be dedicated to the public and maintained by the City of Meridian. Such installations require a
More informationKeuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes.
SECTION 05 73 16 {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes. PART 1 GENERAL 1.1 SUMMARY A. Section includes cable railing system, with architectural metal
More informationSECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS
SECTION 05720 ARCHITECTURAL GLASS HANDRAIL AND RAILINGS PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and install [aluminum] railings and components. 1.02 REFERENCE A. American Architectural Manufacturers
More informationRt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening
Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction
More informationSECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS
More informationRed Wing Bridge Alternates
Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for
More informationMade in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes
Submittal Sheet Materials: 1. 5 Schedule 40 Steel Pipe (1.90 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available. Powder Coat Our powder coat finish assures a high level
More informationDIVISION 2 - SITE WORK
Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK Conditions of Use/ Responsibility of Data These guideline specifications are to be used by the A/E as a base document in the development
More informationSECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.
PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960
More informationTechnical Seminar Mike O Connor
Technical Seminar Mike O Connor Columbus Marriot Northwest March 28, 2014 DOT 49 CFR 192.353 Meter Protection & Location Current Designs & Standards by Current Gas Provider Steel Bollards Bolt Down Bollards
More informationSECTION AWNINGS
SECTION 10 73 13 AWNINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Fixed metal awnings. 1.2 DEFINITIONS A. Awning: An architectural projection that provides weather protection,
More informationMade in U.S.A. Sunrise Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks:
Submittal Sheet Materials: 1.5 Schedule 40 Steel Pipe (1.9 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available Powder Coat Our powder coat finish assures a high level
More informationSECTION CHAIN LINK FENCES AND GATES
SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain
More informationRehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016
Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations
More informationA. Atlantic Railing Series with Mushroom Top and Square Pickets
100 Series-A1-A10 PART 1 General 1.1 SECTION INCLUDES A. Atlantic Railing Series with Mushroom Top and Square Pickets 1.2 RELATED SECTIONS A. Section 05510-Metal Stairs: Metal Handrails other than those
More informationTandem subtly articulates the entry to the building. We were very pleased with the result.
Tandem subtly articulates the entry to the building. We were very pleased with the result. RACHEL PETRO RNL Lighting designer TANDEM National Renewable Energy Labs Golden, Colorado Architeture by RNL 24
More informationEngineering Surveys and Services Consulting Engineers, Scientists, and Land Surveyors Analytical and Materials Laboratories
Engineering Surveys and Services Consulting Engineers, Scientists, and Land Surveyors Analytical and Materials Laboratories 1113 Fay Street Columbia, Missouri 65201 Telephone 573-449-2646 Facsimile 573-499-1499
More informationATI Evaluation Service A Division of Architectural Testing Certification Services
ATI Evaluation Service A Division of Architectural Testing Certification Services Subject to Renewal: 05/16/2016 Issued: 06/29/2015 Visit www.ati-es.com for current status Page 1 of 9 CPG Building Products
More information540 20th Avenue, Lachine, Qc, H8S 3T1 T TF MEZZANINE
540 20th Avenue, Lachine, Qc, H8S 3T1 T 514.634.7292 TF 800.361.2242 Info@federalsteel.ca www.federalsteel.ca MEZZANINE 03 What s your challenge? Table of Content 04 05 06 Design load Bracing Floor options
More informationDyckman Avenue over Black River: A Movable Bridge Rehabilitation. South Haven, Michigan
Dyckman Avenue over Black River: A Movable Bridge Rehabilitation South Haven, Michigan 1 Summary of Presentation Project Location History Condition Assessment Funding Design Construction Acknowledgements
More informationBaseline Document Change Announcement
BDC16D-01 Page 1 of 7 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANNOUNCEMENT: BDC16D-01 DATE: September
More informationCode Compliance Research Report CCRR-0238
Code Compliance Research Report CCRR-0238 Issue Date: 11-09-2016 Revision Date: 11-29-2018 Renewal Date: 11-09-2019 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC
More informationSPECIFICATIONS: Architectural Aluminum Railings
PART ONE: GENERAL 1.1 SUMMARY SPECIFICATIONS: Architectural Aluminum Railings A. Work in this section includes custom and standard Interior and Exterior aluminum railings and guardrails. 1.2 PERFORMANCE
More information2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN
2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016
More informationATI Evaluation Service A Division of Architectural Testing Certification Services
ATI Evaluation Service A Division of Architectural Testing Certification Services PCA-125 Subject to Renewal: 05/16/2018 Issued: 05/24/2017 Visit www.ati-es.com for current status Page 1 of 9 CPG Building
More informationSECTION PERFORATED METAL. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 05735 PERFORATED METAL Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Architectural metal. B. Decorative metal. C. Perforated ceiling panels.
More informationPRODUCT INFORMATION Dero Rolling Racks
PRODUCT INFORMATION Dero Rolling Racks 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com R O L L I N G R A C K The graceful
More informationAluminum Perforated Rolling Door
Model ALUMA-VISION Perforated Curved or Flat Slats Rolling Service Door NOTE: For specifications, architects must choose from a variety of options. The standard choice will be shown first in plain text
More informationGENERAL FLOOR PLAN NOTES. REFER TO ADDITIONAL NOTES AND REQUIREMENTS ON ALL OTHER DOCUMENTS AND OTHER DISCIPLINES DOCUMENTS. A A.3 4' - 0" 5' - " B. ALL SITE INFO, FURNITURE, FIXTURES AND EQUIPMENT SHOWN
More informationBermuda Bay Club Condominiums th Ave South St Petersburg, Florida 33711
Bermuda Bay Club Condominiums 4201 38 th Ave South St Petersburg, Florida 33711 Condition Survey Report of: Common Exterior Stairs and Railings Project Consultant: KWA Engineers, LLC Certificate of Authorization
More informationFRAMED GLASS BALUSTRADES
CONTENTS 1. Product Introduction 2. General Notes 3. Connection Type 1 Timber Side Fix (Coach Screws) 4. Connection Type 2 Bolt Side-Fix 5. Connection Type 3 Timber Top-Fix 6. Connection Type 4 Timber
More informationSECTION ALUMINUM HANDRAIL SYSTEMS
SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American
More informationPUBLIC INFORMATION MEETING June 24, 2015
Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase
More informationSECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS 3-Line Glass Rail Railing Spec
SECTION 05720 ARCHITECTURAL GLASS HANDRAIL AND RAILINGS 3-Line Glass Rail Railing Spec PART 1 - GENERAL 1.01 WORK INCLUDED A. Furnish and install [aluminum] railings and components. 1.02 REFERENCE A. American
More informationSMALL CELL DESIGN GUIDELINES
Section 1: Collocations on Existing Wireless Support Structures (Type I and II Requests) 1.1 Collocations Encouraged. The collocation of wireless facilities on existing support structures engineered to
More informationState of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY
State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY 08625-0600 BRIDGE RE-EVALUATION SURVEY REPORT STRUCTURE NO. 3XXX-XXX ROUTE I-287 SB OVER
More informationRESULT FOR PUBLIC BID RM INSTALLATION & REPAIR OF FENCING & RELATED ITEMS
RESULT FOR PUBLIC BID RM-110112 INSTALLATION & REPAIR FENCING & RELATED ITEMS ITEM QTY 1 250 LINEAR FENCE, CHAIN, LINK, COMPLETE, INSTALL, 4' HIGH ALUMINUM COATED PER $15.00 $3,750.00 2 250 LINEAR FENCE,
More informationSPECIFICATIONS. Section Ornamental Fences and Gates
SPECIFICATIONS Section 02825 - Ornamental Fences and Gates Spec-Data Sheet 1. PRODUCT NAME Ultra Aluminum Industrial Picket Fence 2. MANUFACTURER Ultra Aluminum Mfg., Inc 2124 Grand Commerce Drive Howell,
More informationSECTION 2 DIVISION 05 METALS
SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:
More informationDexco Structural I-Beam Coil Racks Highly accessible, form fitting storage solutions for large coils and spools
Dexco Structural I-Beam Coil Racks Highly accessible, form fitting storage solutions for large coils and spools Safely storing and accessing metal coils can pose a real challenge. Ross engineers and manufactures
More informationWork Order Number *************************************************************************** SECTION C20 STAIRS 02/18
NAVFAC PTS-C20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-C20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION C20 STAIRS 02/18 NOTE: This section
More informationMERRIMAC Homeowner s Association Architectural Control Committee Guidelines
MERRIMAC Homeowner s Association Architectural Control Committee Guidelines The Merrimac Architectural Control Committee (the Committee) has been established pursuant to the Merrimac Declaration of Covenants,
More informationNational Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 [ ].
National Master Specification (NMS) Section 05 50 00 METAL FABRICATIONS Publisher: Spex.ca Page 1 Approved: 2010-06-30 Part 1 General 1.1 RELATED REQUIREMENTS.1 [ ]. 1.2 REFERENCES.1 CSA International.1
More informationProduct Guide Specification
Digger Specialties, Inc. May 2012 PO Box 241 Bremen, Indiana 46506 Toll Free (800) 446-7659 Phone (574) 546-5999 Fax (574) 546-5099 Web Site www.diggerspecialties.com E-mail info@diggerspecialties.com
More informationMade in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1.
Submittal Sheet Materials: 1.5 Schedule 40 Steel Pipe (1.9 OD) Finishes: Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sanded down 2. Washed
More information2012 PAVEMENT CONDITIONS & SCENARIOS
TRANSPORTATION ASSET MANAGEMENT 2012 PAVEMENT CONDITIONS & SCENARIOS The Village of Burton Village of Burton Transportation & Environmental Planning for the Counties of Cuyahoga, Geauga, Lake, Lorain,
More informationDurable, long-lasting fiberglass trash gates and enclosures are the superior choice for screening waste disposal and other unsightly areas.
Durable, long-lasting fiberglass trash gates and enclosures are the superior choice for screening waste disposal and other unsightly areas. Durable fiberglass gates can be used to screen waste disposal
More informationModular Simplicity Dero
B I K E H AV E N Modular Simplicity The Bike Haven bridges the gap between short and long term bike parking. The simple, modular canopy design makes it easy to create the bike shelter that fits your needs.
More informationMASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.
SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated
More informationCode Compliance Research Report CCRR-0238
Code Compliance Research Report CCRR-0238 Issued: 11-09-2016 Renewal Due: 11-09-2018 Revised: 11-10-2017 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC 894 Prairie
More informationMATERIAL SPECIFICATION FOR STEEL POLES, BASE MOUNTED
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 2423 APRIL 2017 MATERIAL SPECIFICATION FOR STEEL POLES, BASE MOUNTED TABLE OF CONTENTS 2423.01 SCOPE 2423.02 REFERENCES 2423.03 DEFINITIONS -
More informationToll-Free
Primary applications for Ross HOP and OPD Series Security Doors and Frames include government, industrial, commercial and residential properties where protection of people and property is of utmost concern
More informationOhio Department of Transportation
Ohio Department of Transportation District 6 400 E. William Street Delaware, Ohio 43015 (740) 833-8000 8000 John R. Kasich, Governor Jerry Wray, Director Jack R. Marchbanks, District Deputy Director August
More informationMondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014
Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size
More informationDexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass
Dexco Structural I-Beam Cantilever Racks Versatile, durable storage solutions for materials of considerable length and mass Dexco Cantilever Rack Systems offer the strength, durability and layout to store
More informationSECTION ORNAMENTAL ALUMINUM FENCING
SECTION 032300 ORNAMENTAL ALUMINUM FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationLesner Bridge Replacement
Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on
More informationSECTION STRUCTURE MOUNT RAILING SYSTEM
SECTION 05520 STRUCTURE MOUNT RAILING SYSTEM Peak Fall Protection specializes in the design, engineering, fabrication, installation, and certification of fall protection safety systems. Our team of safety
More informationFaced with the prospect of
RE-DECKING the M. Harvey Taylor Bridge Innovative Deck System Design Will Keep Traffic Flowing Roger B. Stanley, P.E., M.S.C.E. Fig. 1: Downstream elevation viewed looking eastward towards Harrisburg.
More informationSECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.
PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine
More informationRapiDeck TM Composite Equipment Platform
RapiDeck TM Composite Equipment Platform Installs in Hours Light Weight Low Installation Cost Highly Slip Resistant Corrosion Resistant Non-Conductive High Performance Composite Solutions RapiDeck TM -
More informationBeyond Elegance SERIES OF FINE VINYL & STEEL CARRIAGE DOORS
Beyond Elegance D uet SERIES OF FINE VINYL & STEEL CARRIAGE DOORS DUET SERIES COLLECTIONS The Series brings together low maintenance materials, innovative construction techniques and fine detailing. Crafted
More informationTRACK RAIL. Base Shoe Railing System
TRACK RAIL Base Shoe Railing System The Track Rail base shoe glass railing system is designed and constructed using laminated or fully tempered glass. Our glass railing system can be mounted as an independent
More informationENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT Additional information about the Engineering Department may be obtained by calling Tim Bailey, P.E., Director of Engineering, at (919) 469-4030, through email at tim.bailey@townofcary.org
More informationK. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.
DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:
More informationSafety Railing Solutions
providing safety solutions worldwide Safety Railing Solutions 2009 Solutions to your railing problems simple to design and specify unrivaled technical support world wide availability honoree CSI 05520
More informationKeep workers and products out of harms way. STRUCTURAL GUARDS
Keep workers and products out of harms way. STRUCTURAL GUARDS 2 Prevent costly accidents with Anderson s structural guards. Anywhere in your building that there is moving equipment, forklifts or people,
More informationProduct Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS
Product Guide Specification DIVISION 107300 SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS PART 1 - GENERAL [reference CSI 2004 MasterFormat Division 10 (Specialties Manufacturers) category 7300 (Protective
More informationTRANSPORT LINK CHAIN LINK CANTILEVER GATES
TRANSPORT II TRANSPORT ESTATE TRANSPORT IS ADAPTRACK CHAIN LINK CANTILEVER GATES 2"sq x.25" UPRIGHTS & DIAGONAL BRACES GATE TRACKS PRE-DRILLED FOR LEFT OR RIGHT OPENINGS ***GATE FABRIC MESH & BARBED WIRE
More informationNEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1
MTA RR APPARATUS NEW ILLUMINATED LED SIGNAGE LIGHTWEIGHT REMOVABLE ALUMINUM PANEL FENCE 88 NORTH AVE CDR JOB NO. 60 NORTH AVE NORTH AVE CURRENT VIEW OF 88 NORTH AVENUE PROPOSED FACADE AT 88 NORTH AVENUE
More informationModel # 5803SM. 6/15/2018 Page 1 of 5
Model # 5803SM 6/15/2018 Page 1 of 5 6/15/2018 Page 2 of 5 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationCANYON RIDGE. collection PORTFOLIO LINE 5-LAYER CONSTRUCTION
PORTFOLIO LINE CANYON RIDGE collection 5-LAYER CONSTRUCTION Design 36 shown in Walnut with Optional Olde Door Pull Handles, Mediterranean Strap Hinges and Fleur de Lis Step Plate. (Model CAN236PC) c l
More informationFontanot: quality profile
For all technical info Fontanot: quality profile [ENVIROMENTALLY AWARE] MINIMUM IMPACT OF ITS MANUFACTURNIG ACTIVITY AND ENVIRONMENTALLY FRIENDLY [RESISTANT TO WEAR] INNOVATION AND MATERIAL RESEARCH FOR
More informationATI Evaluation Service A Division of Architectural Testing Certification Services
ATI Evaluation Service A Division of Architectural Testing Certification Services PCA-125 Subject to Renewal: 02/21/2018 Issued: 02/28/2017 Visit www.ati-es.com for current status Page 1 of 7 Trex Company,
More information